Loading...
HomeMy WebLinkAboutFull Agenda 3-1-23PLANNING COMMISSION AGENDA MARCH 1, 2023 REGULAR MEETING – 6:30 PM COUNCIL CHAMBERS 11111 BROOKSHIRE AVE., DOWNEY, CA I. CALL TO ORDER: A REGULAR PLANNING COMMISSION MEETING - 6:30 P.M. II. FLAG SALUTE III. ROLL CALL: Chair Ortiz, Vice Chair Uva, Duarte, and Guerra IV. PLANNING COMMISSIONER ANNOUNCEMENTS; REQUEST FOR FUTURE AGENDA ITEMS; AND CONFERENCE/MEETING REPORTS: V. PRESENTATIONS: VI. REPORT ON CITY COUNCIL ACTIONS: VII. PUBLIC HEARINGS: RECOMMENDED ACTION 1. PLN-22-00102 (Site Plan Review) Approve Location: 10538 La Reina Avenue Request: A request to construct a 4-unit multi-family development. CEQA: Categorical Exemption – Section 15303 (Class 3, New Construction or Conversion of Small Structures) Staff: Assistant Planner Abraham Luna Contact: aluna@downeyca.org 2. PLN-22-00052 (Site Plan Review and Conditional Use Permit) Approve Location: 9180 & 9148 Telegraph Road Request: A request to construct a new 4,777 square foot drive-thru restaurant (chick-fil-a). CEQA: Categorical Exemption – Section 15303 (Class 3, New Construction or Conversion of Small Structures) Staff: Senior Planner Gerardo Marquez Contact: gmarquez@downeyca.org 3. PLN-21-00147 (Site Plan Review and Conditional Use Permit) & PLN-22-00098 (Tentative Tract Map) Approve Location: 12428 Benedict Avenue Request: A request to construct to construct a 5,044 square foot addition to an existing mosque, and consolidate two adjacent parcels. CEQA: Categorical Exemption – Section 15301 (Class 1, Existing Facilities) & Section 15315 (Class 15, Minor Land Subdivisions) Staff: Assistant Planner Abraham Luna Contact: aluna@downeyca.org PLANNING COMMISSION AGENDA MARCH 1, 2023 VIII. NON-AGENDA/CONSENT CALENDAR/OTHER BUSINESS PUBLIC COMMENTS: This portion of the agenda provides an opportunity for the public to address the Planning Commission on non- agenda, consent and other business items within the jurisdiction of the Planning Commission and not listed on the agenda. It is requested, but not required, that you state your name, address and subject matter upon which you wish to speak. Please limit your comments for non-agenda items to no more than four (4) minutes. Pursuant to the Brown Act, no discussion or action, other than a brief response, referral to the City Planning staff or schedule for a subsequent agenda, shall be taken by the Planning Commission on any issue brought forth under this section. IX. CONSENT CALENDAR ITEMS: Items in this section will be voted on in one motion unless a Commissioner requests separate actions. Further, any Consent Calendar items removed from the agenda will be considered by the Commission following the public hearing items. X. OTHER BUSINESS: XI. STAFF MEMBER COMMENTS: XII. ADJOURNMENT: To Wednesday, March 1, 2023 at 6:30 pm, at Downey City Hall, 11111 Brookshire Avenue, Downey, CA. 90241. Supporting documents are available at: www.downeyca.org; City Hall-City Clerk’s Department, 11111 Brookshire Avenue, Monday – Friday, 7:30 a.m. – 5:30 p.m. Video streaming of the meeting is available on the City’s website. In compliance with the Americans with Disabilities Act (ADA), if special assistance is needed to participate in this meeting, complete the City’s Title II ADA Reasonable Accommodation Form located on the City’s website and at City Hall - City Clerk’s Department, 11111 Brookshire Avenue, Monday – Friday, 7:30 a.m. – 5:30 p.m., and submit to the City Clerk’s Department or contact (562) 904-7280 or TTY 7-1-1, 48 business hours prior to the Planning Commission meeting. The City of Downey prohibits discrimination on the basis of disability in any of its program and services. For questions, concerns, complaints, or for additional information regarding the ADA, contact the City’s ADA/Section 504 Coordinator at ADACoordinator@downeyca.org; Phone: (562) 299-6619; or TTY at 7-1-1. In compliance with Title VI of the Civil Rights Act, the City of Downey prohibits discrimination of any person in any of its program and services. If written language translation of City agendas or minutes, or for oral language interpretation at a City meeting is needed, contact (562) 299-6619, 48 business hours prior to the meeting. NOTICE: SECTION 9806 – APPEALS Any person aggrieved or affected by any final determinations of the Commission concerning an application for action of an administrative nature, including a variance or a permit, or any condition or requirement thereon, or upon the failure of the Commission to make its findings and determinations within thirty (30) days after the closure of the hearing thereon, no later than fifteen (15) calendar days, (Exception: subdivisions. no later than ten (10) calendar days) after the date of the decision or of the Commission’s failure to make a determination, may file with the City Planner a written notice of appeal there from to the Council. Such appeal s hall set forth specifically wherein it is claimed the Commission’s findings were in error, and wherein the decision of the Commission is not supported by the evidence in the matter, and wherein the public necessity, convenience, and welfare require the Commission’s decision to be reversed or modified PLANNING COMMISSION AGENDA MARCH 1, 2023 En cumplimiento con el Título VI de la Ley de Derechos Civiles, la Ciudad de Downey prohíbe la discriminación de cualquier persona en todos sus programas y servicios. En caso de necesitar una traducción escrita de los órdenes del día o las actas de las reuniones de la ciudad, o para solicitar un intérprete oral para una reunion de la ciudad, comuníquese con el (562) 299-6619 en el horario de atención comercial, 48 horas antes de la reunión. I Art Bashmakian, Interim City Planner, City of Downey, do hereby certify, under penalty of perjury under the laws of the State of California that the foregoing notice was posted pursuant to Government Code Section 54950 Et. Seq. and City of Downey Ordinance at the following locations: Downey City Hall, Downey City Library, and Barbara J. Riley Senior Center. Dated this 23rd day of February, 2023 Art Bashmakian Art Bashmakian Interim City Planner 10538 La Reina Avenue – PLN-22-00102 March 1, 2023 – 2 On August 2, 2022, the applicant filed a request for a Site Plan Review. Subsequently, the applicant was issued an incomplete letter on August 29, 2022 and November 28, 2022. Upon resubmittal on December 5th, 2022 staff reviewed all documents and issued a letter deeming the application complete for filing on January 17, 2023. On February 02, 2023, notice of the pending public hearing, scheduled for February 15, 2023, was mailed to all property owners within 500 feet of the subject property. Due to a technical error, the public hearing was not published in the Downey Patriot and the item could not be considered and was rescheduled for the March 1, 2023 meeting date. The notice of the pending public hearing was published in the Downey Patriot on February 16, 2023. Existing Front Elevation from La Reina Avenue DISCUSSION The Site Plan Review process requires evaluations to the proposed site changes, landscaping, architecture, and compliance with the Downey Municipal Code. The proposed development includes demolition of the existing single-family dwelling and its detached 2-car garage and the construction of two buildings each consisting of two units and 2-car attached garages. Each unit will have private open space area of at least 200 square feet. The proposed development will reflect a Craftsman Style Architecture. Two guest parking spaces are shown on the project plans as required per the Downey Municipal Code. The existing driveway will be utilized and improved with pavers throughout the site to break-up the monotony of the concrete. The proposed four-unit development will comply with all applicable development standards. As a point of reference, some major development standards for this project are as follows: PC AGENDA PAGE 2 10538 La Reina Avenue – PLN-22-00102 March 1, 2023 – 3 Standard Zoning Code Standards Proposed Lot Coverage 50% 49.57% Building Height 35 ft. / 3 stories 34’-9” / 3 stories Setbacks: Front Rear (3 story building abutting a pubic alley) Side 15 ft. Min. 26 ft. Min. 5 ft. Min. 15 ft. 33’-10”. 5 ft. Parking 10 Spaces (8 covered, 2 guest parking) 10 spaces (8 covered, 2 guest parking) All elements of the proposed Site Plan Review are in compliance with the Downey Municipal Code. Architecture All buildings will utilize a uniform color and materials and incorporate elements of the Craftsman Style architecture. Its development will bring a unique architectural character to the neighborhood. The massing of the buildings will be minimized by the use of various materials and colors with façade breaks between each building story. The two front units will have street facing entries and a prominent porch enhancing the neighborhood appeal. The front of the building will have exposed wood beams, tapered columns, and a column base made of masonry to encapsulate both front entrances. The primary wall façade finish will be “gray cloth” stucco, “infinite deep-sea” wood siding, exposed wood details stained “redwood natural tone”, and Coronado stone wrapping the front façade. The colors and materials used for this project are commonly found throughout Craftsman style architecture. The buildings will incorporate other details such as wooden shutters, roof brackets, wooden garage doors, and header details around windows and doors to further enhance the Craftsman style architecture on the building. Landscape The project will include 1,731 square feet of landscape area consisting mostly of drought tolerant landscape. The proposed landscaping will provide a colorful landscape edge oriented towards the front and enhance the overall site. Landscaping will incorporate a tiered system consisting of grass, shrubs, and trees. The landscaping will include (2) two pacific madrone trees, Bermuda grass, dwarf bottle brush, dwarf kangaroo paw, and hummingbird sage. PC AGENDA PAGE 3 10538 La Reina Avenue – PLN-22-00102 March 1, 2023 – 4 Proposed Elevation from La Reina Avenue DEVELOPMENT REVIEW COMMITTEE On August 18, 2022, the Development Review Committee (DRC) evaluated the project as it pertains to Planning, Police, Fire, Public Works, and Building and Safety matters and provided staff with comments and conditions. The Fire Department requires that the site install a fire hydrant with approved water supply capable of supplying the required fire flow for fire protection. No additional departments expressed concerns or opposition over the project, and issued standard conditions. Recommended conditions of approval have been included in the attached Resolution to address potential impacts. ENVIRONMENTAL ANALYSIS Staff has reviewed the proposed Site Plan Review for compliance with the California Environmental Quality Act (CEQA). Upon completion of this review, staff has determined that this request is categorically exempt from CEQA, pursuant to Guideline Section No. 15303 (Class 3 – New Construction or Conversion of Small Structures). Class 3 exemptions consist of Multi-family residential structures of not more than 6 units in urbanized areas. FINDINGS Pursuant to Municipal Code Section 9820.08, there are seven (7) findings that must be adopted prior to approving a Site Plan Review. The findings are as follows: A.The site plan is consistent with the goals and polices embodied in the General Plan and other applicable plans and policies adopted by the Council; The project’s objective to revitalize the site helps achieve various long-term goals. Specifically, the following policies are promoted by the Site Plan Review: PC AGENDA PAGE 4 10538 La Reina Avenue – PLN-22-00102 March 1, 2023 – 5 Policy 2.2. – Encourage infill development and recycling of land to provide adequate residential sites. Policy 8.1.1 – Promote architectural design of the highest quality. Policy 8.2.2 – Promote the upgrading of properties. The proposed architecture uses quality materials that provide different elements to achieve Craftsman style architecture. The site is compatible in that the surrounding properties consist of a variety of architectural styles; however, this development will be replacing an outdated craftsman style home with a newer multi-family development that will bring a significant upgrade to the immediate area. In efforts to maintain a neighborhood feel, the front unit is developed facing La Reina Avenue to conserve the neighborhood impression of that street. The site is also compatible with the zoning designation and the General Plan Land Use designation which both encourage multi- family residential. Additionally, the majority of the surrounding properties are also multi- family residential. This development will achieve a long-term goal of recycling land to providing more housing units as this development consists of three additional units than what currently exists on the site. B. The proposed development is in accordance with the purposes and objectives of this article and the zone in which the site is located; The purpose of the R-3 (Multiple-Family Residential) zone, as stated in the Downey Municipal Code, “is intended to provide for the development of multiple-family residential living areas compatible with the neighborhood environment and outdoor recreation potential of the community. Such areas are envisioned as being located and designed to be complementary to adjacent uses and at the same time provide suitable space for multiple-family living quarters.” The proposed development is in full conformance with the objectives stated above and the properties to the south, east, and west of the subject site are also developed as multiple-family residential. C. The proposed development’s site plan and its design features, including architecture and landscaping, will integrate harmoniously and enhance the character and design of the site, the immediate neighborhood, and the surrounding areas of the City; The proposed design of the project will integrate harmoniously with this area by providing aesthetically pleasing architecture and landscaping. The proposed development will enhance the neighborhood with its high-quality Craftsman Style Architecture. The proposed Craftsman architectural style is compatible and integrated to the style of landscaping and the overall site. In addition, the streetscape will be enhanced as well as the transition from the street onto the site through the proposed landscaping, pedestrian access, and upgraded driveway and driveway approach. D. The site plan and location of the buildings, parking areas, signs, landscaping, luminaries, and other site features indicate that proper consideration has been given to both the functional aspects of the site development, such as automobile and pedestrian circulation, and the visual effects of the development from the view of the public streets; The project has considered all functional aspects of the site and will be well integrated into the neighborhood. The landscaping around the front building façades creates a nice transitional buffer between the residences, the public right of way, and La Reina Avenue. PC AGENDA PAGE 5 10538 La Reina Avenue – PLN-22-00102 March 1, 2023 – 6 The added walkway and sidewalk to the street frontage will maintain an inviting appearance to the site and enhance the residential character along that street. Exterior light lamps are carefully placed near the front porch entrances to ensure both vehicles and pedestrians are able to move around the site in a safe manner. The front prominent porch brings an inviting attraction to the neighborhood that provides curb appeal and functions as a practical social space for its tenants. This project also incorporates a decorative paved driveway entrance to the subject site, thus preventing a long barren driveway with no visual appeal. E. The proposed development will improve the community appearance by preventing extremes of dissimilarity or monotony in new construction or in alterations of facilities; The proposed project reflects Craftsman style architecture, and reflects a high quality of architectural design. In staff’s opinion, the development is neither dissimilar nor monotonous from other properties in the area and this project will improve the overall appearance of the neighborhood. Other developments along La Reina Avenue consist of a variety of architectural styles from California ranch, craftsman, Dutch colonial and mid- century modern. Lastly, this proposed development will be keeping with the quality of design, but will not mimic other properties. F. The site plan and design considerations shall tend to upgrade property in the immediate neighborhood and surrounding areas with an accompanying betterment of conditions affecting the public health, safety, comfort, and welfare; The proposed architecture is a significant upgrade to the immediate neighborhood and surrounding areas, in terms of use and density. In addition, the redevelopment of this site has the potential of serving as an example for higher quality architecture for future developments within the City of Downey. The project complies with all zoning codes and will comply with all building and safety, and engineering codes to ensure a safe and sound structure for its occupants and its surrounding neighbors. Lastly, the project was designed to ensure that any potential effects will not negatively harm or impact the surrounding sites and accompany the public health, safety, comfort and general welfare as much as possible. G. The proposed development’s site plan and its design features will include graffiti- resistant features and materials in accordance with the requirements of Section 4960 of Chapter 10 of Article IV of this Code; The project has been conditioned to meet the requirements specified in Section 4960 of the Downey Municipal Code. Section 4960 discusses the installation of anti-graffiti materials and the appropriate allotted time limit for the removal of graffiti. CORRESPONDENCE As of the date that this report was printed, staff has not received any correspondence regarding this application. CONCLUSION Based on the analysis contained within this report, staff is concluding that all findings required for approval can be made in a positive manner. As such, staff is recommending that the PC AGENDA PAGE 6 10538 La Reina Avenue – PLN-22-00102 March 1, 2023 – 7 Planning Commission approve the application (PLN-22-00102), thereby approving a four-unit multifamily development. EXHIBITS A. Maps B. Draft Resolution C. Project Plans PC AGENDA PAGE 7 10538 La Reina Avenue – PLN-22-00102 March 1, 2023 – 8 Exhibit ‘A’ – Maps AERIAL PHOTOGRAPH Subject Site PC AGENDA PAGE 8 10538 La Reina Avenue – PLN-22-00102 March 1, 2023 – 9 LOCATION MAP ZONING MAP Subject Site PC AGENDA PAGE 9 Resolution No. 23- Downey Planning Commission 10538 La Reina Ave – PLN-22-00102 March 1, 2023 – Page 1 RESOLUTION NO. 23- A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DOWNEY APPROVING A SITE PLAN REVIEW (PLN-22-00102), THEREBY ALLOWING THE CONSTRUCTION OF FOUR MULTI-FAMILY RE SIDENTIAL UNITS LOCATED AT 10538 LA REINA AVENUE THE PLANNING COMMISSION OF THE CITY OF DOWNEY DOES RESOLVE AS FOLLOWS: SECTION 1. The Planning Commission of the City of Downey does hereby find, determine and declare that: A.On August 2, 2022, the application was filed by Willy Barrios (hereinafter referred to as the “applicant”) a request for Site Plan Review (PLN-22-00102) to construct four new dwelling units; and, B.The application was deemed incomplete due to missing information on August 29, 2022 and November 28, 2022. The applicant resubmitted additional information and the application was deemed complete for further processing on January 17 2023; and C.On February 02, 2023, a notice of the public hearing was sent to all property owners within 500’ of the subject site and the notice was published in Downey Patriot; and, D.On February 15, 2023, at the Planning Commission hearing the item was continued to a date certain due to a published error in the Downey Patriot; and, E.On February 16, 2023, a notice of the public hearing was published in the Downey Patriot; and, A.The Planning Commission held a duly noticed public hearing on March 1, 2023 and after fully considering all oral and written testimony, facts, and opinions offered at the aforesaid public hearing adopted this resolution. SECTION 2. The Planning Commission further finds, determines and declares that the proposed project was reviewed for compliance with the California Environmental Quality Act (CEQA), and is categorially exempt from CEQA, pursuant to Guideline Section 15303 (Class 3, New Construction or Conversion of small structures). Class 3 exemptions consist of Multi-family residential structures of not more than 6 units in urbanized areas. SECTION 3. Having considered all of the oral and written evidence presented to it at said public hearings regarding the Site Plan Review, the Planning Commission further finds, determines and declares that: A.The site plan is consistent with the goals and polices embodied in the General Plan and other applicable plans and policies adopted by the Council. The project’s objective to revitalize the site helps achieve various long-term goals. Specifically, the following policies are promoted by the Site Plan Review. Policy 2.2. – Encourage infill development and recycling of land to provide adequate residential sites. Policy 8.1.1 – Promote architectural design of the highest quality. Policy 8.2.2 – Promote PC AGENDA PAGE 10 Resolution No. 23- Downey Planning Commission 10538 La Reina Ave – PLN-22-00102 March 1, 2023 – Page 2 the upgrading of properties. The proposed architecture uses quality materials that provide different elements to achieve Craftsman style architecture. The site is compatible in that the surrounding properties consist of a variety of architectural styles; however, this development will be replacing an outdated craftsman style home with a newer multi-family development that will bring a significant upgrade to the immediate area. In efforts to maintain a neighborhood feel, the front unit is developed facing La Reina Avenue to conserve the neighborhood impression of that street. The site is also compatible with the zoning designation and the General Plan Land Use designation which both encourage multi-family residential. Additionally, the majority of the surrounding properties are also multi-family residential. This development will achieve a long-term goal of recycling land to providing more housing units as this development consists of three additional units than what currently exists on the site. B. The proposed development is in accordance with the purposes and objectives of this article and the zone in which the site is located. The purpose of the R-3 (Multiple- Family Residential) zone, as stated in the Downey Municipal Code, “is intended to provide for the development of multiple-family residential living areas compatible with the neighborhood environment and outdoor recreation potential of the community. Such areas are envisioned as being located and designed to be complementary to adjacent uses and at the same time provide suitable space for multiple-family living quarters.” The proposed application is in full conformance with the objectives stated above and the properties to the south, east, and west of the subject site are also developed as multiple-family residential. C. The proposed development’s site plan and its design features, including architecture and landscaping, will integrate harmoniously and enhance the character and design of the site, the immediate neighborhood, and the surrounding areas of the City. The proposed design of the project will integrate harmoniously with this area by providing aesthetically pleasing architecture and landscaping. The proposed development will bring a unique character neighborhood. The proposed Craftsman architectural style is compatible and integrated to the style of landscaping and the overall site. In addition, the streetscape will be enhanced as well as the transition from the street onto the site through the proposed landscaping, pedestrian access, and upgraded driveway and driveway approach. D. The site plan and location of the buildings, parking areas, signs, landscaping, luminaries, and other site features indicate that proper consideration has been given to both the functional aspects of the site development, such as automobile and pedestrian circulation, and the visual effects of the development from the view of the public streets. The project has considered all functional aspects of the site and will be well integrated into the neighborhood. The landscaping around the front building façades creates a nice transitional buffer between the residences, the public right of way, and La Reina Avenue. The added walkway and sidewalk to the street frontage will maintain an inviting appearance to the site and enhance the residential character along that street. Exterior light lamps are carefully placed near the front porch entrances to ensure both vehicles and pedestrians are able to move around the site in a safe manner. The front prominent porch brings an inviting attraction to the neighborhood that provides curb appeal and functions as a practical social space for its tenants. This project also incorporates a decorative paved driveway entrance to the subject site, thus preventing a long barren driveway with no visual appeal. PC AGENDA PAGE 11 Resolution No. 23- Downey Planning Commission 10538 La Reina Ave – PLN-22-00102 March 1, 2023 – Page 3 E. The proposed development will improve the community appearance by preventing extremes of dissimilarity or monotony in new construction or in alterations of facilities. The proposed project reflects Craftsman style architecture, and reflects a high quality of architectural design. In staff’s opinion, the development is neither dissimilar nor monotonous from other properties in the area and this project will improve the overall appearance of the neighborhood. Other developments along La Reina Avenue consist of a variety of architectural styles from California ranch, craftsman, Dutch colonial and mid-century modern. Lastly, this proposed development will be keeping with the quality of design, but will not mimic other properties. F. The site plan and design considerations shall tend to upgrade property in the immediate neighborhood and surrounding areas with an accompanying betterment of conditions affecting the public health, safety, comfort, and welfare. The proposed architecture is a significant upgrade to the immediate neighborhood and surrounding areas, in terms of use and density. In addition, the redevelopment of this site has the potential of serving as an example for higher quality architecture for future developments within the City of Downey. The project complies with all zoning codes and will comply with all building and safety, and engineering codes to ensure a safe and sound structure for its occupants and its surrounding neighbors. Lastly, the project was designed to ensure that any potential effects will not negatively harm or impact the surrounding sites and accompany the public health, safety, comfort and general welfare as much as possible. G. The proposed development’s site plan and its design features will include graffiti- resistant features and materials in accordance with the requirements of Section 4960 of Chapter 10 of Article IV of this Code. The project has been conditioned to meet the requirements specified in Section 4960 of the Downey Municipal Code. Section 4960 discusses the installation of anti-graffiti materials and the appropriate allotted time limit for the removal of graffiti. SECTION 4. Based upon the findings set forth in Sections 1 through 3 of this Resolution, the Planning Commission of the City of Downey hereby approves a Site Plan Review (PLN-22-00102), subject to conditions of approval attached hereto as Exhibit ‘A’, which are necessary to preserve the health, safety and general welfare of the community and enable the Planning Commission to make the findings set forth in the previous sections. The conditions are fair and reasonable for the accomplishment of these purposes. SECTION 5. The Secretary shall certify the adoption of this Resolution. PASSED, APPROVED AND ADOPTED this 1st day of March 2023. Horacio Ortiz, Chairman City Planning Commission PC AGENDA PAGE 12 Resolution No. 23- Downey Planning Commission 10538 La Reina Ave – PLN-22-00102 March 1, 2023 – Page 4 I HEREBY CERTIFY that the foregoing is a true copy of a Resolution adopted by the Planning Commission of the City of Downey at a regular meeting thereof held on the 1st day of March 2023, by the following vote, to wit: AYES: COMMISSIONERS: NOES: COMMISSIONERS: ABSENT: COMMISSIONERS: ABSTAIN: COMMISSIONERS: Linda Thai, Deputy City Clerk PC AGENDA PAGE 13 Resolution No. 23- Downey Planning Commission 10538 La Reina Ave – PLN-22-00102 March 1, 2023 – Page 5 PLN-22-00102 (SITE PLAN REVIEW) EXHIBIT A - CONDITIONS PLANNING 1. The approval of this Site Plan Review (PLN-22-00102) allows for the construction of four three-story residential dwelling units, each designed with an attached 2-car garage located at 10538 La Reina Avenue. 2. No later than March 22, 2023, the applicant and the property owner shall sign and return an affidavit of Acceptance of Conditions, as provided by the City of Downey. 3. The site shall remain in substantial conformance with this request and the approved set of plans. 4. Approval of the Site Plan Review (PLN-22-00102) shall not be construed to mean any waiver of applicable and appropriate zoning regulations, or any Federal, State, County, and City laws and regulations. Unless otherwise expressly specified, all other requirements of the City of Downey Municipal Code shall apply. 5. The Owner/Applicant agrees, as a condition of approval of this resolution, to indemnify, defend and hold harmless, at Applicant's expense, City and City's agents, officers and employees from and against any claim, action or proceeding commenced within the time period provided in Government Code Section 66499.37 to attack, review, set aside, void or annul the approval of this resolution, to challenge the determination made by City under the California Environmental Quality Act or to challenge the reasonableness, legality or validity of any condition attached hereto. City shall promptly notify Applicant of any such claim, action or proceeding to which City receives notice, and City will cooperate fully with Applicant in the defense thereof. Applicant shall reimburse the City for any court costs and attorney's fees that the City may be required to pay as a result of any such claim, action or proceeding. City may, in its sole discretion, participate in the defense of any such claim, action or proceeding, but such participation shall not relieve Applicant of the obligations of this condition. 6. The City Planner is authorized to make minor modifications to the approved preliminary plans or any of the conditions if such modifications shall achieve substantially the same results as would strict compliance with said plans and conditions. 7. All buildings and walls must be finished with graffiti resistant materials pursuant to Downey Municipal Code Section 4960. 8. Any graffiti applied to the site shall be removed within 48 hours. 9. The approved Craftsman architectural style, finish material, and colors shall remain in strict conformance with the approved elevations and materials board reflecting stucco, wood siding, stone veneer, and exposed wood trim. Changes to the facades and/or colors shall be subject to the review and approval of the City Planner. At his/her discretion, the City Planner may refer changes to the facades and/or colors to the Planning Commission for consideration. PC AGENDA PAGE 14 Resolution No. 23- Downey Planning Commission 10538 La Reina Ave – PLN-22-00102 March 1, 2023 – Page 6 10. The applicant shall comply with the art in public places requirements set forth in Downey Municipal Code 8950 et seq. This shall include payment of all required fees prior to the issuance of building permits. Should the applicant exercise their right to install public art on site, the public art application (including payment of all deposits) shall be submitted prior to the issuance of building permits. 11. The Applicant shall incorporate a copy of this Exhibit A - Conditions of Approval, into the approved set of building plans. 12. Driveways and driveway approaches shall be improved with concrete and pavers throughout, as approved on the project plans. Any changes or modification to the approved driveway must be approved by the City Planner. 13. All landscaping must remain in compliance with the Downey Municipal Code, be composed of drought tolerant plants, and strictly conform to the approved set of plans. Any revisions to the proposed landscape plans will first require approval from the City Planner. 14. Open space requirements must comply with the provisions set forth in section 9312.08(b)(10)(iv) of the Downey Municipal Code. The private open space patio areas for each unit shall have no dimension less than eight (8) feet with a minimum area of two hundred (200) square feet. 15. Prior to the final of building permits, all landscaping and irrigation shall be installed. The type, size and number of landscaping shall be as noted on the final approved landscape plan. All landscape shall be installed and permanently maintained. 16. Prior to the final of building permits, all installed landscaping shall be certified by a licensed Landscape Architect. The licensed Landscape Architect shall be on-site during the delivery of all trees to certify that all trees and plants are the right species and size. 17. All exterior lights on the property shall be LED and shall be directed, positioned, and/or shielded such that they do not illuminate surrounding properties and the public right-of- way. 18. All above grade back-flow preventers, check valves, shall be screened from view from the public right-of-way by a decorative metal-cut-out screen subject to approval of the City Planner. 19. All exterior mechanical and utility equipment shall be designed and located five feet from property line so as to not transmit noise or vibration to abutting properties. All utility equipment shall be located along the sides and/or rear of the buildings and shall be screened from public view through the use of landscape screens, walls, or other devices architecturally compatible with the buildings. Electrical panels and/or transformers are expressly prohibited from being located between the buildings and the public street. BUILDING 20. All construction shall comply with the most recent adopted City and State building codes: a) 2022 California Building Code PC AGENDA PAGE 15 Resolution No. 23- Downey Planning Commission 10538 La Reina Ave – PLN-22-00102 March 1, 2023 – Page 7 b) 2022 California Residential Code c)2022 California Electrical Code d) 2022 California Mechanical Code e) 2022 California Plumbing Code f)2022 California Fire Code g)2022 California Green Code 21.Special Inspections – As indicated by California Building Code Section 1704, the owner shall employ one or more special inspectors who shall provide special inspections when required by CBC section 1704. Please contact the Building Division at time of plan submittal to obtain application for special inspections. 22.The Title Sheet of the plans shall include: a)Occupancy Group b)Occupant Load c)Description of use d)Type of Construction e)Height of Building f)Floor area of building(s) and/or occupancy group(s) 23.School impact fees shall be paid prior to permit issuance. 24.Dimensioned building setbacks and property lines, street centerlines and between buildings or other structures shall be designed on plot plan. 25.All property lines and easements must be shown on plot plan. A statement that such lines and easements are shown is required. 26.The project design will conform with energy conservation measures articulated in Title 24 of the California Code of Regulations and address measures to reduce energy consumption such as flow restrictors for toilets, low consumptions light fixtures, and insulation and shall use to the extent feasible draught landscaping. 27.A design professional will be required at time of construction drawings, to prepare plans for proposed improvements per the Business and Professions’ Code. 28.Public and private site improvements shall be designed in accordance with the Americans with Disabilities Act and Chapter 11 of the California Building Code. Site plan shall include a site accessibility plan identifying exterior routes of travel and detailing running slope, cross slope, width, pedestrian ramp, curb ramps, handrails, signage and truncated domes. Path of travel shall be provided from the public right of way and accessible parking to building. The design professional shall ensure that the site accessibility plan is compliance with the latest Federal and State regulations. FIRE The following comments pertain to a limited fire review of a design review plan submittal. The comments contained herein shall not be construed as complete or encompassing all fire-life safety code requirements set forth in local, State, and/or National local codes. PC AGENDA PAGE 16 Resolution No. 23- Downey Planning Commission 10538 La Reina Ave – PLN-22-00102 March 1, 2023 – Page 8 29. Deferred automatic fire sprinkler plan submittal required for new Residential Group R occupancy. Automatic fire sprinkler system design, installation, and testing shall be per NFPA 13D or 13R based on the building construction type, height, fire separation, etc. [CFC § 903.2.8; DMC 3318] 30. Fire sprinklers shall be required in proposed Accessory Dwelling Units. 31. Premises shall be appropriately addressed. An approved address identification shall be provided that is legible and placed in a position that is visible from the street/road. Sizing shall be approved and at a minimum meet requirement of CA Fire Code [CA Fire Code §505.1] 32. Smoke alarms shall be installed in Residential Group R occupancies on the ceiling or wall or each separate sleeping areas, rooms used for sleeping, in each story within the dwelling [CA Fire Code §907.2.11.2] 33. Carbon monoxide detection shall be installed in R-occupancies dwelling units in the following locations: (1) Outside each separate sleeping area in the immediate vicinity of bedroom, (2) On every occupiable level of the dwelling unit, (3) where fuel-burning equipment is located [915.2.1] 34. Project construction shall comply with requirements set forth in the CA Building and Residential Codes for egress, construction type and height, etc. 35. Additional fire hydrant(s) shall be required such that the hydrant spacing on La Reina Ave. is in compliance with Article III, Chapter 6, Section 3610 of the Downey Municipal Code (…”One hundred fifty feet (150’) is the maximum distance from any point on street or frontage to a hydrant.”). PUBLIC WORKS Streets 36. All public utilities shall be installed underground. 37. Proposed public improvements shall comply with the latest edition of Standard Plans and Specifications for Public Works Construction, City of Downey standards and the Americans with Disabilities Act (ADA). 38. Obtain permits from the Public Works Department for all improvements within the public right of way at least two weeks prior to commencing work. Contact Brian Aleman, Assistant Civil Engineer I, at (562) 904-7110 for information. 39. Remove and replace damaged, uneven or sub-standard curb, gutter, sidewalk, driveway, disabled ramps, and pavement to the satisfaction of the Public Works Department. Contact the Public Works Inspector at (562) 904-7110 to identify the limits of the areas to be removed and replaced at least 48 hours prior to commencing work. 40. Submit public improvement plan(s) for review and approval by Public Works Department. PC AGENDA PAGE 17 Resolution No. 23- Downey Planning Commission 10538 La Reina Ave – PLN-22-00102 March 1, 2023 – Page 9 41. Construct (1) parkway tree. 24-inch box street trees at the parkway on La Reina Avenue frontage. The species of any new street trees to be planted shall be in accordance with the City’s Tree Master Plan (contact City arborist for tree species.) 42. Remove all Underground Service Alert (USA) temporary pavement markings immediately following the completion of the work / Final permit inspection. 43. Paint property address numbers (4” height) on the curb face in front of the proposed development to the City’s satisfaction. 44. Driveway approaches shall match driveway width as specified in City Standard Drawing No. 19. Water & Sewer 45. The owner/applicant shall furnish and install separate water service lines, meters, and boxes for each tenant space. Connect new separate water service lines to existing 6- inch main located on La Reina Avenue. 46. The owner/applicant shall provide a fire sprinkler system(s) in accordance with Fire Department and Building and Safety standards. Should such fire sprinkler system(s) require the installation of dedicated fire service lateral(s), such lateral(s) shall be constructed in accordance with the latest Department of Public Works and Fire Department standards including backflow devices, fire department connections and other appurtenances as required. New fire service lateral(s) shall be connected to existing 6-inch main located on La Reina Avenue and shall be dedicated for fire service only. 47. If required, the owner/applicant shall furnish and install irrigation, domestic, and fire water backflow devices in accordance with City of Downey standards and as required by State and LA County Department of Public Health. Backflow devices shall be located on private property, readily accessible for emergency and inspection purposes, and screened from view by providing sufficient landscaping. 48. Backflow devices shall be certified in the field by a licensed LA County Department of Public Health certified tester prior to placing into service and such certification provided to City. 49. Owner or tenant must establish accounts with the City Cashier prior to the City activating and the tenant using any fire and potable water service and meter. 50. The owner/applicant shall provide separate off-site water improvement plan sets for review and approval from Public Works. The plan shall consist of the following: a. Potable Water Improvement Plans (all City-owned potable water and fire service lateral improvements). Improvement plans for potable water main improvements shall be plan and profile. Final City approved potable water main improvement plans shall be submitted on mylars and shall be signed and stamped by a State of California licensed Civil Engineer. PC AGENDA PAGE 18 Resolution No. 23- Downey Planning Commission 10538 La Reina Ave – PLN-22-00102 March 1, 2023 – Page 10 51.The owner/applicant shall provide and record utility easement(s) for access to, and inspection and maintenance of, public water lines, meters, and appurtenances. 52.The owner/applicant shall furnish and install a new _6_ - inch sewer lateral(s) (from the 8” sewer main on La Reina Avenue to the front property line) for each house in the lot. New sewer laterals shall be constructed with Vitrified Clay Pipe (VCP). The existing sewer lateral can be used for one of the house. The design and improvements of sewers shall be in accordance with the latest standards of the Department of Public Works. Septic systems shall not be allowed. 53.Utility plans for proposed new sewer lateral(s) shall be submitted to and approved by the Department of Public Works prior to the issuance of the grading plan permit. 54.Submit a copy of the sewer plans to the City and to the Sanitation Districts of Los Angeles County for review and approval. Approval must be assured prior to the start of construction. Contact Los Angeles County Sanitation District for their requirement. 55.The lot shall be served by adequately sized water supply facilities, which shall include fire hydrants of the size, type and location approved by the Fire Chief. 56.The owner/applicant shall retrofit any existing fire hydrant(s) within the property frontage in accordance to latest Fire Department and Department of Public Works standards including but not limited to furnishing and installation of a new riser, fire hydrant head, and associated fittings. 57.Any deviation from the city standards in constructing the water and sewer lines shall be approved by the Los Angeles County Health Department. Grading 58.Submit an engineered grading plan and/or hydraulic calculations and site drainage plan for the site (prepared and sealed by a registered civil engineer in the State of California) accompanied by a soil and geology report for approval by the Engineering Division and Building and Safety Division. Lot(s) shall not have less than one (1%) percent gradient on any asphalt or non-paved surface, or less than one quarter (1/4%) percent gradient on any concrete surface. Provide the following information on plans: topographic site information, including all building pad and other elevations, dimensions/location of existing/proposed public improvements adjacent to project (i.e. street, sidewalk, parkway and driveway widths, catch basins, pedestrian ramps); the width and location of all existing and proposed easements, the dimensions and location of proposed dedications; (for alley dedications, show elevations of the four corners of the dedication and centerline of alley, existing and proposed underground utility connections); the location, depth and dimensions of potable water, reclaimed water and sanitary sewer lines; chemical and hazardous material storage, if any, including containment provisions; and the type of existing use, including the gross square footage of the building and its disposition; construction details of drainage devices and details of Low Impact Development (LID) plan. 59.Include any other applicable site-specific conditions. PC AGENDA PAGE 19 Resolution No. 23- Downey Planning Commission 10538 La Reina Ave – PLN-22-00102 March 1, 2023 – Page 11 60. The drainage plan must provide for each lot having an independent drainage system to the public street, to a public drainage facility, or by means of an approved drainage easement. NPDES 61. The owner/applicant shall comply with the National Pollutant Discharge Elimination System (NPDES); Ordinance 1142 of the Downey Municipal Code (DMC); and the Low Impact Development (LID) Plan. Furthermore, the applicant shall be required to Certify and append Public Works standard “Attachment A” to all construction and grading plans as required by the LACoDPW Stormwater Quality Management Plan (SQMP). 62. If any hazardous material is encountered on the site that has the potential to reach the ground water supply, the owner/applicant shall secure a permit for the State Regional Water Quality Control Board. 63. If any hazardous material is encountered on the site, the owner/applicant shall secure an ID number from the EPA. 64. The owner/applicant shall deploy Best Management Practices during and after construction. 65. Owner/applicant shall comply with the Low Impact Development requirements for small scale Residential LID Category. The owner/applicant shall incorporate one of the two options (Vegetated Bio swale or Cultec System) in the site plan with detail. a) Include the following statement into your plan: “As the designer/architect of the project, I have designed the LID System in accordance with the design criteria of the City of Downey’s LID Technical Guidance Manual for Small Site Developments.” Assessment District 66. The owner/applicant hereby consents to the annexation of the property into the Downey City Lighting Maintenance District in accordance with Division 15 of the Streets and Highways Code, and to incorporation or annexation into a new or existing Benefit Assessment or Municipal Improvement District in accordance with Division 10 and Division 12 of the Streets and Highways Code and/or Division 2 of the Government Code of the State of California. Recycling 67. Complete a construction & demolition (C&D) waste management plan per Article V, Chapter 8 of the Downey Municipal Code. General 68. Remove all construction-related Underground Service Alert (USA) temporary pavement markings created as part of this project within the public-right-of-way in a timely manner. PC AGENDA PAGE 20 Resolution No. 23- Downey Planning Commission 10538 La Reina Ave – PLN-22-00102 March 1, 2023 – Page 12 69.The owner/applicant must comply with all applicable Federal, State and local rules and regulations, American Disabilities Act (ADA), including compliance with South Coast Air Quality Management District (SCAQMD) regulations. [End of Conditions] PC AGENDA PAGE 21 GUESTPARKING10538 LA REINA AVE.ALLEYSCALE 1/8"=1'-0"PLOT PLANEXISTG.CONC. APRONEXISTG. PARKWAYEXISTG. SIDEWALKNORTH477.00 S.F.1,733.00 S.F.150.00'PROPERTY LINE150.00'PROPERTY LINE60.00'PROPERTY LINE60.00'PROPERTY LINE15'-0"38'-1"25'-0"17'-0"5'-0"12'-0"11'-0"24'-0"NEW 4" THICKCONC. DRIVEWAYSECOND FLOOR LINESECOND FLOOR LINE REAR YARDFRONT YARDSIDE YARDSIDE YARDLANDSCAPELANDSCAPEGUESTPARKING23'-10"42'-1"17'-0"42'-1"15'-0"LANDSCAPE446.00 S.F.38'-1"10'-0"19'-10"446.00 S.F.10'-0"10'-0"11'-6"22'-0"22'-0"4'-6"4'-0"1,733.00 S.F.1,733.00 S.F.1,733.00 S.F.477.00 S.F.477.00 S.F.477.00 S.F.SECOND FLOOR LINESECOND FLOOR LINE13'-0"12'-0"14'-2"14'-8"14'-2"5'-0"NEW 4" THICKCONC. DRIVEWAYNEW 4" THICKCONC. DRIVEWAYNEW 4" THICKCONC. DRIVEWAY13'-4"PORCH4'-8"10'-0"LAUNDRYSLD. DOOR(E) WINDOW(E) WINDOW(E) WINDOW(E) WINDOW(E) WINDOW (E) WINDOW (E) WINDOW (E) WINDOW(E) WINDOW(E) WINDOW(E) WINDOWNEW WINDOWNEW WINDOWNEW WINDOWNEW WINDOWNEW WINDOWNEW WINDOWNEW WINDOWNEW WINDOW20'-0"20'-0"6" CURB6" CURB(N) WATER METER(N) WATER METER(E) WATER METER(N) WATER METER(N) WATER METER(N) WATER METER(N) A/C COMPRESSORON CONCRETE PAD(N) A/C COMPRESSORON CONCRETE PAD(N) A/C COMPRESSORON CONCRETE PAD(N) A/C COMPRESSORON CONCRETE PAD(N) A/C COMPRESSORON CONCRETE PAD(N) ELECTRICAL METER(N) ELECTRICAL METERRECESSED INTO WALL(N) ELECTRICAL METERRECESSED INTO WALL(N) ELECTRICAL METER(N) ELECTRICAL METER(N) ELECTRICAL METER(N) GAS METERUTILITY EQUIPMENT SCREEN2'-0" X 3'-0" WOOD10'-0"10'-0"NEW 4" THICKCONC. DRIVEWAY(N) PAVERS(N) PAVERS(N) PAVERSCONCRETE TRIMA-1SITE PLAN, GENERALELEVATIONSISSUES AND REVISIONSComputer FileProject NameDescriptionProject NumberSHEET:ScaleNO.1.DATE2.3. CHECKBYCONSULTANTCONTACT:PROPOSED 3-STORY4-UNITSAPARTMENTS AND2-ADUSEAL: VERIFY MEASUREMENTS WITH CORRESPONDINGCOSTRUCTED OR EXISTING CONDITIONS PRIOR TOPROCEEDING WITH THE WORK, AND NOTIFY THEARCHITECT IMMEDIATELY OF SIGNIFICANTDISCREPANCIES.FINISH ELEVATIONS REFERENCED ON ARCHITECTURALDRAWINGS ARE DATUM ELEVATIONS ABOVE THE FINISHFLOOR ELEVATION. THE CONTRACTOR MUSTCOORDINATE DATUM-BASED ARCHITECTURALELEVATIONS SHOWN WITH SITE-SPECIFIC ELEVATIONSSHOWN ON CIVIL DRAWINGS.WALL DIMENSIONS SHOWN ARE TO FACE OF WALLFINISH UNLESS SPECIFICALLY NOTED OTHERWISE.10538 LA REINA AVE.DOWNEY, CA. 90241C&CDrafting DesignEdgar Cortes& CommercialResidentialDesign1100 Orangethorpe Ave.Ca. 92801# 200w, Anaheim(562) 916 7505 (714) 813 6555e_mail: ccdraftingdesign@yahoo.comOWNER:Mr. WILLIE BARRIOSMobile: (323) 495 7208Mr. WILLIEMobile: (323) 495 720810224 LA REINA AVE.DOWNEY, CA. 90241PROJECT INFORMATION9,000.00 SQ.FT.LOT AREAZONE R-3 MULTIPLE FAMILY RESIDENCE 35'-0"3- STORYROOFING:BUILDING SIZEBUILDING HEIGHTEXTERIOR FINISH:CONSTRUCTION TYPE:FRAME:TYPE VB-SPRINKLERED (NFPA 13R)WOOD SIDING AND STUCCOSHINGLES ROOFING SEE PLANWOOD FRAMER3ZONINGR3OCCUPANCY GROUPCODESTHIS PROJECT SHALL COMPLY WITH TITLE 24 AND 2019CALIFORNIA BUILDING CODE (CBC), CALIFORNIAMECHANICAL CODE (CMC), CALIFORNIA PLUMBINGCODE (CPC), CALIFORNIA ELECTRICAL CODE (CEC), ANDCALIFORNIA ENERGY CODE, C.R.C. AND C.G.C., TYPE OFFIRE SPRINKLER INSTALLED (NFPA 13R) AS AMENDEDBY CHAPTER 35PARKING SPACES: 10 PARKINGTOTAL COVER AREA=4,462.00 / 9,000.00 X 100 = 49.57 % < 50%LEGAL DESCRIPTIONAPN. 6252-025-017DOWNEY HOME TRACT LOT 16 BLK 6A-1SHEET INDEXPLOT PLANAn approved fire sprinkler system shall be installed.Fire Department.Plans must be submitted separately to the DowneyDEFERRED SUBMITTAL : Fire SprinklersFIRE DEPARTMENT NOTESSCOPE OF WORKDEMO OF (E) SFD AND (E) 2-CAR GARAGE.PROP0SED (4) 3-STORY APARTMENT UNITSWITH (4) 2-CAR GARAGES. AND (2) 1-STORYADUBUILDING SHALL HAVE ADDRESS NUMBERS PLACED IN A POSITIONTHAT IS PLAINLY LEGIBLE AND VISIBLE FROM THE STREET OR ROADFRONTING THE PROPERTY. NUMBERS SHALL CONTRAST WITHBACKGROUND, BE ARABIC OR ALPHABETICAL LETTERS AND BE AMINIMUM OF 4" HIGH WITH A MINIMUM STROKE OF 1/2". (R319.1 CRC)PROPOSED FOUR (4) 3-STORY UNITS AND 2 ADU PROPOSED AREA UNIT 1 FIRST FLOOR =320.00 SQ.FT.SECOND FLOOR =661.00 SQ.FT.TOTAL LIVING AREA UNIT 1 =1,734.00 SQ.FT.PROPOSED GARAGE AREA UNIT 1 =477.00 SQ.FT.A-2FIRST FLOOR PLANS (BUILDINGS 1 AND 2)A-3SECOND FLOOR PLANS (BUILDINGS 1 AND 2)A-4TOTAL LANDSCAPE: 2,424.00 SQ FTLOT COVERAGE:THIRD FLOOR =753.00 SQ.FT.PROPOSED AREA UNIT 2 FIRST FLOOR =SECOND FLOOR =TOTAL LIVING AREA UNIT 2 =PROPOSED GARAGE AREA UNIT 2 =477.00 SQ.FT.THIRD FLOOR =PROPOSED AREA UNIT 3 FIRST FLOOR =SECOND FLOOR =TOTAL LIVING AREA UNIT 3 =PROPOSED GARAGE AREA UNIT 3 =477.00 SQ.FT.THIRD FLOOR =PROPOSED AREA UNIT 4 FIRST FLOOR =SECOND FLOOR =TOTAL LIVING AREA UNIT 4 =PROPOSED GARAGE AREA UNIT 4 =477.00 SQ.FT.THIRD FLOOR =PROPOSED AREA ADU 1 FIRST FLOOR =465.00 SQ.FT.THIRD FLOOR PLANS (BUILDINGS 1 AND 2)A-5FLOOR PLAN (BUILDING 3), ELEVATIONS (BUILDING 3)A-6BUILDING 1 ELEVATIONS, A-7BUILDING 2 ELEVATIONSPROPOSED AREA ADU 2 FIRST FLOOR =465.00 SQ.FT.OPEN SPACE=200.00 SQ.FT.OPEN SPACE=200.00 SQ.FT.OPEN SPACE=200.00 SQ.FT.OPEN SPACE=200.00 SQ.FT.320.00 SQ.FT.661.00 SQ.FT.1,734.00 SQ.FT.753.00 SQ.FT.320.00 SQ.FT.661.00 SQ.FT.1,734.00 SQ.FT.753.00 SQ.FT.320.00 SQ.FT.661.00 SQ.FT.1,734.00 SQ.FT.753.00 SQ.FT.A-8LANDSCAPE PLAN, CONCEPTUAL LID PLANA-9DEMO PLANSP1PHOTOMETRIC PLAN 1P2PHOTOMETRIC PLAN 2P3PHOTOMETRIC PLAN 3A-10RENDERINGSPC AGENDA PAGE 22PC AGENDA PAGE 22 BEDROOMBEDROOMBATHBATH2-CAR GARAGE2-CAR GARAGESCALE 1/4"=1'-0"FIRST FLOOR PLAN (BUILDING 1)UNIT 1 & 211'-5"13'-4"20'-0"20'-8"TTTT20'-0"20'-8"11'-5"13'-4"4'-0"SECOND FLOOR LINE38'-1"43'-0"14'-2"7'-4"7'-4"14'-2"13'-0"4'-5"20'-8"38'-1"3'-6"5'-0"7'-11"11'-5"3'-6"10'-10"5'-0"7'-11"LANDING320.00 SQ.FT.BEDROOMBEDROOMBATHBATH2-CAR GARAGE2-CAR GARAGESCALE 1/4"=1'-0"FIRST FLOOR PLAN (BUILDING 2)UNIT 3 & 411'-5"13'-4"20'-0"20'-8"TTTT20'-0"20'-8"11'-5"13'-4"4'-0"SECOND FLOOR LINE38'-1"43'-0"14'-2"7'-4"7'-4"14'-2"13'-0"4'-5"20'-8"38'-1"3'-6"5'-0"7'-11"11'-5"3'-6"10'-10"5'-0"7'-11"LANDING320.00 SQ.FT.UNIT 1UNIT 2UNIT 3UNIT 4UPUPUPUPA-2FIRST FLOOR PLAN(BUILDINGS 1 AND 2)ISSUES AND REVISIONSComputer FileProject NameDescriptionProject NumberSHEET:ScaleNO.1.DATE2.3. CHECKBYCONSULTANTCONTACT:PROPOSED 3-STORY4-UNITSAPARTMENTS AND2-ADUSEAL: VERIFY MEASUREMENTS WITH CORRESPONDINGCOSTRUCTED OR EXISTING CONDITIONS PRIOR TOPROCEEDING WITH THE WORK, AND NOTIFY THEARCHITECT IMMEDIATELY OF SIGNIFICANTDISCREPANCIES.FINISH ELEVATIONS REFERENCED ON ARCHITECTURALDRAWINGS ARE DATUM ELEVATIONS ABOVE THE FINISHFLOOR ELEVATION. THE CONTRACTOR MUSTCOORDINATE DATUM-BASED ARCHITECTURALELEVATIONS SHOWN WITH SITE-SPECIFIC ELEVATIONSSHOWN ON CIVIL DRAWINGS.WALL DIMENSIONS SHOWN ARE TO FACE OF WALLFINISH UNLESS SPECIFICALLY NOTED OTHERWISE.10538 LA REINA AVE.DOWNEY, CA. 90241C&CDrafting DesignEdgar Cortes& CommercialResidentialDesign1100 Orangethorpe Ave.Ca. 92801# 200w, Anaheim(562) 916 7505 (714) 813 6555e_mail: ccdraftingdesign@yahoo.comOWNER:Mr. WILLIE BARRIOSMobile: (323) 495 7208Mr. WILLIEMobile: (323) 495 720810224 LA REINA AVE.DOWNEY, CA. 90241PC AGENDA PAGE 23PC AGENDA PAGE 23 ISLEDINING ROOMLIVING ROOMBALCONYKITCHENBATHISLEDINING ROOMLIVING ROOMBALCONYKITCHENBATHLAUNDRYSCALE 1/4"=1'-0"SECOND FLOOR PLAN (BUILDING 1)UNIT 1 & 2OPEN SPACE200.00 SQ.FT.OPEN SPACE200.00 SQ.FT.10'-0"32'-1"21'-6"21'-6"UPUP21'-6"21'-6"10'-0"32'-1"43'-0"13'-10"20'-8"31'-3"3'-0"4'-0"6'-5"2'-0"5'-0"6'-5"3'-0"4'-7"4'-7"3'-0"13'-10"20'-8"31'-3"3'-0"4'-0"6'-5"3'-0"5'-0"6'-5"3'-0"4'-7"4'-7"3'-0"11'-5"11'-5"21'-3"13'-10"13'-10"3'-6"661.00 SQ.FT.ISLEDINING ROOMLIVING ROOMBALCONYKITCHENBATHISLEDINING ROOMLIVING ROOMBALCONYKITCHENBATHLAUNDRYSCALE 1/4"=1'-0"SECOND FLOOR PLAN (BUILDING 2)UNIT 3 & 4OPEN SPACE200.00 SQ.FT.OPEN SPACE200.00 SQ.FT.10'-0"32'-1"21'-6"21'-6"UP21'-6"21'-6"10'-0"32'-1"43'-0"13'-10"20'-8"31'-3"3'-0"4'-0"6'-5"2'-0"5'-0"6'-5"3'-0"4'-7"4'-7"3'-0"13'-10"20'-8"31'-3"3'-0"4'-0"6'-5"3'-0"5'-0"6'-5"3'-0"4'-7"4'-7"3'-0"11'-5"11'-5"21'-3"13'-10"13'-10"3'-6"UNIT 1UNIT 2UNIT 3UNIT 4LAUNDRYUPDWDWDWDW661.00 SQ.FT.A-3SECOND FLOOR PLANS(BUILDING 1 AND 2)ISSUES AND REVISIONSComputer FileProject NameDescriptionProject NumberSHEET:ScaleNO.1.DATE2.3. CHECKBYCONSULTANTCONTACT:PROPOSED 3-STORY4-UNITSAPARTMENTS AND2-ADUSEAL: VERIFY MEASUREMENTS WITH CORRESPONDINGCOSTRUCTED OR EXISTING CONDITIONS PRIOR TOPROCEEDING WITH THE WORK, AND NOTIFY THEARCHITECT IMMEDIATELY OF SIGNIFICANTDISCREPANCIES.FINISH ELEVATIONS REFERENCED ON ARCHITECTURALDRAWINGS ARE DATUM ELEVATIONS ABOVE THE FINISHFLOOR ELEVATION. THE CONTRACTOR MUSTCOORDINATE DATUM-BASED ARCHITECTURALELEVATIONS SHOWN WITH SITE-SPECIFIC ELEVATIONSSHOWN ON CIVIL DRAWINGS.WALL DIMENSIONS SHOWN ARE TO FACE OF WALLFINISH UNLESS SPECIFICALLY NOTED OTHERWISE.10538 LA REINA AVE.DOWNEY, CA. 90241C&CDrafting DesignEdgar Cortes& CommercialResidentialDesign1100 Orangethorpe Ave.Ca. 92801# 200w, Anaheim(562) 916 7505 (714) 813 6555e_mail: ccdraftingdesign@yahoo.comOWNER:Mr. WILLIE BARRIOSMobile: (323) 495 7208Mr. WILLIEMobile: (323) 495 720810224 LA REINA AVE.DOWNEY, CA. 90241PC AGENDA PAGE 24PC AGENDA PAGE 24 BEDROOMBEDROOMM. BEDROOMW.I.C.M. BATHBEDROOMBEDROOMM. BEDROOMW.I.C.M. BATHSCALE 1/4"=1'-0"THIRD FLOOR PLAN (BUIILDING 1)UNIT 1 & 210'-2"10'-0"10'-2"10'-7"3'-0"6'-9"6'-0"6'-9"8'-0"5'-0"12'-1"13'-10"3'-0"3'-0"6'-5"7'-11"10'-2"10'-0"10'-2"10'-7"3'-0"6'-9"6'-0"6'-9"8'-0"5'-0"12'-1"13'-10"3'-0"3'-0"6'-5"7'-11"43'-0"37'-7"10'-8"2'-5"6'-5"5'-5"12'-8"37'-7"10'-8"2'-5"6'-5"5'-5"12'-8"43'-0"14'-3"14'-6"14'-3"10'-9"10'-9"10'-9"10'-9"DW6'-5"3'-0"3'-6"753.00 SQ.FT.BEDROOMBEDROOMM. BEDROOMW.I.C.M. BATHBEDROOMBEDROOMM. BEDROOMW.I.C.M. BATHSCALE 1/4"=1'-0"THIRD FLOOR PLAN (BUILDING 2)UNIT 3 & 410'-2"10'-0"10'-2"10'-7"3'-0"6'-9"6'-0"6'-9"8'-0"5'-0"12'-1"13'-10"3'-0"3'-0"6'-5"6'-5"7'-11"10'-2"10'-0"10'-2"10'-7"6'-9"6'-0"6'-9"8'-0"5'-0"12'-1"13'-10"3'-0"3'-0"6'-5"6'-5"7'-11"43'-0"37'-7"10'-8"2'-5"6'-5"5'-5"12'-8"37'-7"10'-8"2'-5"6'-5"5'-5"12'-8"43'-0"14'-3"14'-6"14'-3"10'-9"10'-9"10'-9"10'-9"753.00 SQ.FT.UNIT 2UNIT 1UNIT 3UNIT 43'-0"3'-0"3'-0"3'-0"DWDW6'-5"3'-0"3'-6"DWA-4THIRD FLOOR PLANS(BUILDINGS 1 AND 2)ISSUES AND REVISIONSComputer FileProject NameDescriptionProject NumberSHEET:ScaleNO.1.DATE2.3. CHECKBYCONSULTANTCONTACT:PROPOSED 3-STORY4-UNITSAPARTMENTS AND2-ADUSEAL: VERIFY MEASUREMENTS WITH CORRESPONDINGCOSTRUCTED OR EXISTING CONDITIONS PRIOR TOPROCEEDING WITH THE WORK, AND NOTIFY THEARCHITECT IMMEDIATELY OF SIGNIFICANTDISCREPANCIES.FINISH ELEVATIONS REFERENCED ON ARCHITECTURALDRAWINGS ARE DATUM ELEVATIONS ABOVE THE FINISHFLOOR ELEVATION. THE CONTRACTOR MUSTCOORDINATE DATUM-BASED ARCHITECTURALELEVATIONS SHOWN WITH SITE-SPECIFIC ELEVATIONSSHOWN ON CIVIL DRAWINGS.WALL DIMENSIONS SHOWN ARE TO FACE OF WALLFINISH UNLESS SPECIFICALLY NOTED OTHERWISE.10538 LA REINA AVE.DOWNEY, CA. 90241C&CDrafting DesignEdgar Cortes& CommercialResidentialDesign1100 Orangethorpe Ave.Ca. 92801# 200w, Anaheim (562) 916 7505 (714) 813 6555e_mail: ccdraftingdesign@yahoo.comOWNER:Mr. WILLIE BARRIOSMobile: (323) 495 7208Mr. WILLIEMobile: (323) 495 720810224 LA REINA AVE.DOWNEY, CA. 90241PC AGENDA PAGE 25PC AGENDA PAGE 25 6'-0"10'-6"10'-2"19'-0"10'-3"6'-0"10'-6"10'-2"19'-0"10'-3"BEDROOMLIVING/DINING ROOMKITCHENBATHBEDROOMBATHLIVING/DINING ROOMKITCHENSCALE 1/4"=1'-0"FIRST FLOOR PLAN (BUILDING 3)465.00 SQ.FT.19'-10"22'-0"22'-0"19'-10"44'-0"22'-0"22'-0"6'-0"ADU 1ADU 2SCALE 1/4"=1'-0"EAST ELEVATION (BUILDING 3) ADU 1 & 2VERTICAL SIDINGWOOD TRIMS15'-10"9'-0"1" STUCCO TYP.1" STUCCO TYP.SCALE 1/4"=1'-0"WEST ELEVATION (BUILDING 3) ADU 1 & 2SCALE 1/4"=1'-0"NORTH ELEVATION (BUILDING 3) ADU 1 & 2WOOD TRIMS15'-10"9'-0"1" STUCCO TYP.SCALE 1/4"=1'-0"SOUTH ELEVATION (BUILDING 3) ADU 1 & 2WOOD TRIMS15'-10"9'-0"1" STUCCO TYP.12222333SHINGLE SHAKE ROOF HDZ SHINGLESCOLOR: CHARCOALGAF TIMBERLINE4SHINGLE SHAKE ROOF HDZ SHINGLESCOLOR: CHARCOALGAF TIMBERLINE4SHINGLE SHAKE ROOF HDZ SHINGLESCOLOR: CHARCOALGAF TIMBERLINE4CLASS "A" MIN.CLASS "A" MIN.CLASS "A" MIN.FASCIA5FASCIA5FASCIA5FASCIA5WINDOWS7WINDOWS7WINDOWS712"X30" G.S.12"X30" G.S.915'-10"15'-10"VERTICAL SIDING9'-0"9'-0"WOOD TRIMS1" STUCCO TYP.1113SHINGLE SHAKE ROOF HDZ SHINGLESCOLOR: CHARCOALGAF TIMBERLINE4CLASS "A" MIN.FASCIA5WINDOWS712"X30" G.S.12"X30" G.S.988A-5ADU (BUILDING 3) FLOORPLAN, ELEVATIONSISSUES AND REVISIONSComputer FileProject NameDescriptionProject NumberSHEET:ScaleNO.1.DATE2.3. CHECKBYCONSULTANTCONTACT:PROPOSED 3-STORY4-UNITSAPARTMENTS AND2-ADUSEAL: VERIFY MEASUREMENTS WITH CORRESPONDINGCOSTRUCTED OR EXISTING CONDITIONS PRIOR TOPROCEEDING WITH THE WORK, AND NOTIFY THEARCHITECT IMMEDIATELY OF SIGNIFICANTDISCREPANCIES.FINISH ELEVATIONS REFERENCED ON ARCHITECTURALDRAWINGS ARE DATUM ELEVATIONS ABOVE THE FINISHFLOOR ELEVATION. THE CONTRACTOR MUSTCOORDINATE DATUM-BASED ARCHITECTURALELEVATIONS SHOWN WITH SITE-SPECIFIC ELEVATIONSSHOWN ON CIVIL DRAWINGS.WALL DIMENSIONS SHOWN ARE TO FACE OF WALLFINISH UNLESS SPECIFICALLY NOTED OTHERWISE.10538 LA REINA AVE.DOWNEY, CA. 90241C&CDrafting DesignEdgar Cortes& CommercialResidentialDesign1100 Orangethorpe Ave.Ca. 92801# 200w, Anaheim(562) 916 7505 (714) 813 6555e_mail: ccdraftingdesign@yahoo.comOWNER:Mr. WILLIE BARRIOSMobile: (323) 495 7208Mr. WILLIEMobile: (323) 495 720810224 LA REINA AVE.DOWNEY, CA. 90241PC AGENDA PAGE 26PC AGENDA PAGE 26 SCALE 1/4"=1'-0"WEST ELEVATION (BUILDING 1) UNIT 1 & 234'-9"0'-8"9'-0"9'-0"1'-0"8'-0"WOOD TRIMS26 GA GALV. STL. WEEP SCREED TYP.HORIZONTAL SIDINGLOUVER VENT12"X30" G.S.HORIZONTAL SIDINGSTUCCOVERTICAL SIDINGblanco smooth FASCIASTONE VENEERESR-2598COUNTRY CASTLE- MADISONCOUNTY BY CORONADO STONE9'-0"8'-0"8'-0"34'-9"3'-0"SCALE 1/4"=1'-0"SOUTH ELEVATION (BUILDING 1) UNIT 1 & 28'-0"1'-0"9'-0"1'-0"8'-0"0'-8"HORIZONTAL SIDINGWOOD TRIMSSTONE VENEEROWNER, TYP.TO BE SELECTED BYHORIZONTAL SIDINGVERTICAL SIDINGSTONE VENEERESR-2598COUNTRY CASTLE- MADISONCOUNTY BY CORONADO STONE1" STUCCO TYP.1" STUCCO TYP.1" STUCCO TYP.1" STUCCO TYP.1" STUCCO TYP.1" STUCCO TYP.11111122122223WOOD TRIMSWOOD TRIMS33SHINGLE SHAKE ROOF HDZ SHINGLESCOLOR: CHARCOALGAF TIMBERLINE4SHINGLE SHAKE ROOF HDZ SHINGLESCOLOR: CHARCOALGAF TIMBERLINE4CLASS "A" MIN.CLASS "A" MIN.1115SHUTTERSWINDOWS679FASCIA5FASCIA5WINDOWS7FASCIA51010889'-0"8'-0"8'-0"34'-9"3'-0"SCALE 1/4"=1'-0"NORTH ELEVATION (BUILDING 1) UNIT 1 & 20'-8"8'-0"1'-0"9'-0"1'-0"8'-0"STONE VENEEROWNER, TYP.TO BE SELECTED BYWOOD TRIMSSTUCCOHORIZONTAL SIDINGHORIZONTAL SIDING1" STUCCO TYP.1" STUCCO TYP.1" STUCCO TYP.1" STUCCO TYP.1" STUCCO TYP.1" STUCCO TYP.SCALE 1/4"=1'-0"EAST ELEVATION (BUILDING 1) UNIT 1 & 234'-9"0'-8"8'-0"1'-0"9'-0"1'-0"8'-0"SHINGLE SHAKE ROOF HDZ SHINGLESCOLOR: CHARCOALGAF TIMBERLINEVERTICAL SIDINGWOOD TRIMS1" STUCCO TYP.1" STUCCO TYP.1" STUCCO TYP.1" STUCCO TYP.111222222WOOD TRIMSWOOD TRIMSWOOD TRIMSWOOD TRIMS33334SHINGLE SHAKE ROOF HDZ SHINGLESCOLOR: CHARCOALGAF TIMBERLINE4CLASS "A" MIN.CLASS "A" MIN.118FASCIA5FASCIA5WINDOWS7WINDOWS789'-0"A-6ELEVATIONS (BUILDING 1)UNITS 1 AND 2ISSUES AND REVISIONSComputer FileProject NameDescriptionProject NumberSHEET:ScaleNO.1.DATE2.3. CHECKBYCONSULTANTCONTACT:PROPOSED 3-STORY4-UNITSAPARTMENTS AND2-ADUSEAL: VERIFY MEASUREMENTS WITH CORRESPONDINGCOSTRUCTED OR EXISTING CONDITIONS PRIOR TOPROCEEDING WITH THE WORK, AND NOTIFY THEARCHITECT IMMEDIATELY OF SIGNIFICANTDISCREPANCIES.FINISH ELEVATIONS REFERENCED ON ARCHITECTURALDRAWINGS ARE DATUM ELEVATIONS ABOVE THE FINISHFLOOR ELEVATION. THE CONTRACTOR MUSTCOORDINATE DATUM-BASED ARCHITECTURALELEVATIONS SHOWN WITH SITE-SPECIFIC ELEVATIONSSHOWN ON CIVIL DRAWINGS.WALL DIMENSIONS SHOWN ARE TO FACE OF WALLFINISH UNLESS SPECIFICALLY NOTED OTHERWISE.10538 LA REINA AVE.DOWNEY, CA. 90241C&CDrafting DesignEdgar Cortes& CommercialResidentialDesign1100 Orangethorpe Ave.Ca. 92801# 200w, Anaheim(562) 916 7505 (714) 813 6555e_mail: ccdraftingdesign@yahoo.comOWNER:Mr. WILLIE BARRIOSMobile: (323) 495 7208Mr. WILLIEMobile: (323) 495 720810224 LA REINA AVE.DOWNEY, CA. 90241PC AGENDA PAGE 27PC AGENDA PAGE 27 SCALE 1/4"=1'-0"NORTH ELEVATION (BUILDING 2) UNIT 3 & 4SCALE 1/4"=1'-0"EAST ELEVATION (BUILDING 2) UNIT 3 & 434'-9"0'-8"9'-0"9'-0"1'-0"8'-0"HORIZONTAL SIDINGVERTICAL SIDINGSTUCCOWOOD TRIMS12"X30" G.S.9'-0"8'-0"8'-0"34'-9"3'-0"8'-0"1'-0"9'-0"1'-0"8'-0"0'-8"HORIZONTAL SIDINGWOOD TRIMSSTONE VENEEROWNER, TYP.TO BE SELECTED BYHORIZONTAL SIDINGVERTICAL SIDING1" STUCCO TYP.1" STUCCO TYP.1" STUCCO TYP.1" STUCCO TYP.1" STUCCO TYP.1" STUCCO TYP.111111222222233SHINGLE SHAKE ROOF HDZ SHINGLESCOLOR: CHARCOALGAF TIMBERLINE4SHINGLE SHAKE ROOF HDZ SHINGLESCOLOR: CHARCOALGAF TIMBERLINE4111FASCIA5FASCIA5SHUTTERS6WINDOWS7WINDOWS712"X30" G.S.91010889'-0"SCALE 1/4"=1'-0"WEST ELEVATION (BUILDING 2) UNIT 3 & 4SCALE 1/4"=1'-0"SOUTH ELEVATION (BUILDING 2) UNIT 3 & 4HORIZONTAL SIDINGVERTICAL SIDINGSTUCCOWOOD TRIMS9'-0"8'-0"8'-0"34'-9"3'-0"0'-8"8'-0"1'-0"9'-0"1'-0"8'-0"STONE VENEEROWNER, TYP.TO BE SELECTED BYWOOD TRIMSSTUCCOHORIZONTAL SIDINGHORIZONTAL SIDING1" STUCCO TYP.1" STUCCO TYP.1" STUCCO TYP.1" STUCCO TYP.1" STUCCO TYP.1" STUCCO TYP.112222222233SHINGLE SHAKE ROOF HDZ SHINGLESCOLOR: CHARCOALGAF TIMBERLINE4SHINGLE SHAKE ROOF HDZ SHINGLESCOLOR: CHARCOALGAF TIMBERLINE4CLASS "A" MIN.CLASS "A" MIN.1FASCIA5FASCIA5WINDOWS7WINDOWS7889'-0"9'-0"1A-7ELEVATIONS (BUILDING 2)UNIT 3 & UNIT 4ISSUES AND REVISIONSComputer FileProject NameDescriptionProject NumberSHEET:ScaleNO.1.DATE2.3. CHECKBYCONSULTANTCONTACT:PROPOSED 3-STORY4-UNITSAPARTMENTS AND2-ADUSEAL: VERIFY MEASUREMENTS WITH CORRESPONDINGCOSTRUCTED OR EXISTING CONDITIONS PRIOR TOPROCEEDING WITH THE WORK, AND NOTIFY THEARCHITECT IMMEDIATELY OF SIGNIFICANTDISCREPANCIES.FINISH ELEVATIONS REFERENCED ON ARCHITECTURALDRAWINGS ARE DATUM ELEVATIONS ABOVE THE FINISHFLOOR ELEVATION. THE CONTRACTOR MUSTCOORDINATE DATUM-BASED ARCHITECTURALELEVATIONS SHOWN WITH SITE-SPECIFIC ELEVATIONSSHOWN ON CIVIL DRAWINGS.WALL DIMENSIONS SHOWN ARE TO FACE OF WALLFINISH UNLESS SPECIFICALLY NOTED OTHERWISE.10538 LA REINA AVE.DOWNEY, CA. 90241C&CDrafting DesignEdgar Cortes& CommercialResidentialDesign1100 Orangethorpe Ave.Ca. 92801# 200w, Anaheim(562) 916 7505 (714) 813 6555e_mail: ccdraftingdesign@yahoo.comOWNER:Mr. WILLIE BARRIOSMobile: (323) 495 7208Mr. WILLIEMobile: (323) 495 720810224 LA REINA AVE.DOWNEY, CA. 90241PC AGENDA PAGE 28PC AGENDA PAGE 28 1,731.00 SQ FTCOOL SEASON GRASSBERMUDA GRASSCYNODON DACTYLON(DROUGHT TOLERANT )PACIFIC MADRONEArbutus Menziesii 215 GAL.(Drought Tolerant)(Drought Tolerant)NOTE: NO EXISTING TREES CURRENTLY ON THE PROPERTY. ALL NEW TREES.HUMMINGBIRDSALVIA SPATHACEA95 GAL.SAGE(DROUGHT TOLERANT )DWARF KANGAROOANIGOZANTHOS372 GAL.PAW(DROUGHT TOLERANT )DWARFCALLISTEMON332 GAL.BOTTLEBRUSH(DROUGHT TOLERANT )AREA 1LANDSCAPE AREA265.00AREA 21,205.00AREA 3146.00AREA 473.00AREA 519.00S.F.S.F.S.F.S.F.S.F.TOTAL1,731.00S.F.AREA 623.00S.F.Arbutus Menziesii(Drought Tolerant)CYNODON DACTYLON(DROUGHT TOLERANT )SALVIA SPATHACEA(DROUGHT TOLERANT )ANIGOZANTHOS(DROUGHT TOLERANT )CALLISTEMON(DROUGHT TOLERANT )Landscaping Plan. A landscaping plan showing the location of all turf, plant materials, and irrigation systems shall be required for all uses that include landscapingprojects. Landscaping plans for projects within the R-1, R-2, and R-3 Zones shall be reviewed by the City Planner. In lieu of City inspections, the installer shall sign aself-certification certificate. Landscaping projects for all other zones shall be approved by the Planning Commission during Site Plan Review. Plans submitted for theissuance of a building permit or a site plan may be used in lieu of a landscaping plan provided that compliance with all of the requirements of a landscaping plan isachieved to the satisfaction of the Commission during Site Plan Review. The Commission may reject such plans if they determine that they are not consistent with thepurpose of this chapter. Landscaping plans shall demonstrate a recognizable pattern or theme for the overall development through conformance with the following:LANDSCAPE NOTE:GUESTPARKING10538 LA REINA AVE.ALLEYSCALE 1/8"=1'-0"LANDSCAPE PLANEXISTG.CONC. APRONEXISTG. PARKWAYEXISTG. SIDEWALKNORT H477.00 S.F.1,733.00 S.F.150.00'PROPERTY LINE150.00'PROPERTY LINE60.00'PROPERTY LINE60.00'PROPERTY LINE15'-0"38'-1"25'-0"17'-0"5'-0"12'-0"11'-0"24'-0"NEW 4" THICKCONC. DRIVEWAYNEW 4" THICKCONC. DRIVEWAYSECOND FLOOR LINESECOND FLOOR LINE REAR YARDFRONT YARDSIDE YARDSIDE YARDLANDSCAPELANDSCAPEGUESTPARKING23'-10"42'-1"17'-0"42'-1"15'-0"LANDSCAPE446.00 S.F.38'-1"10'-0"19'-10"446.00 S.F.10'-0"10'-0"11'-6"22'-0"22'-0"4'-6"4'-0"1,733.00 S.F.1,733.00 S.F.1,733.00 S.F.477.00 S.F.477.00 S.F.477.00 S.F.SECOND FLOOR LINESECOND FLOOR LINE13'-0"12'-0"14'-2"14'-8"14'-2"5'-0"NEW 4" THICKCONC. DRIVEWAYNEW 4" THICKCONC. DRIVEWAYNEW 4" THICKCONC. DRIVEWAYNEW STAMPEDCONCRETENEW STAMPEDCONCRETE13'-4"PORCH4'-8"10'-0"LAUNDRYSLD. DOOR(E) WINDOW(E) WINDOW(E) WINDOW(E) WINDOW(E) WINDOW (E) WINDOW (E) WINDOW (E) WINDOW(E) WINDOW(E) WINDOW(E) WINDOWNEW WINDOWNEW WINDOWNEW WINDOWNEW WINDOWNEW WINDOWNEW WINDOWNEW WINDOWNEW WINDOW10'-0"20'-0"10'-0"20'-0"6" CURB6" CURBAREA 21,205.00 SQ.FT.AREA 3146.00 SQ.FT.AREA 4LANDSCAPE AREA73.00 SQ.FT.AREA 519 SQ FTAREA 1LANDSCAPE AREA265.00 SQ.FT.AREA 623 SQ FTMETAL SCREENGINGER DOVE GRAY -DETAIL A-FOR EQUIPMENT WITHIN STREET VISIBILITYNEW 4" THICKCONC. DRIVEWAYSECOND FLOOR LINESECOND FLOOR LINESECOND FLOOR LINESECOND FLOOR LINENEW 4" THICKCONC. DRIVEWAYNEW 4" THICKCONC. DRIVEWAYNEW 4" THICKCONC. DRIVEWAY(N) A/C COMPRESSORON CONCRETE PAD(N) ELECTRICAL METER(N) ELECTRICAL METERNEW 4" THICKCONC. DRIVEWAY(N) PAVERS(N) PAVERSGUESTPARKINGALLEYEXISTG. PARKWAYEXISTG. SIDEWALKRTH477.00 S.F.1,733.00 S.F.150.00'PROPERTY LINE150.00'PROPERTY LINE60.00'PROPERTY LINE60.00'PROPERTY LINE15'-0"38'-1"25'-0"17'-0"5'-0"12'-0"11'-0"24'-0"NEW 4" THICKCONC. DRIVEWAYNEW 4" THICKCONC. DRIVEWAYSECOND FLOOR LINESECOND FLOOR LINE REAR YARDFRONT YARDSIDE YARDSIDE YARDLANDSCAPEGUESTPARKING23'-10"42'-1"17'-0"42'-1"15'-0"LANDSCAPE446.00 S.F.38'-1"10'-0"19'-10"446.00 S.F.10'-0"10'-0"11'-6"22'-0"22'-0"4'-6"4'-0"1,733.00 S.F.1,733.00 S.F.1,733.00 S.F.477.00 S.F.477.00 S.F.477.00 S.F.SECOND FLOOR LINESECOND FLOOR LINE13'-0"12'-0"14'-2"14'-8"14'-2"5'-0"NEW 4" THICKCONC. DRIVEWAYNEW 4" THICKCONC. DRIVEWAYNEW 4" THICKCONC. DRIVEWAYNEW STAMPEDCONCRETENEW STAMPEDCONCRETE13'-4"PORCH4'-8"10'-0" LAUNDRYSLD. DOOR(E) WINDOW(E) WINDOW(E) WINDOW(E) WINDOW(E) WINDOW (E) WINDOW (E) WINDOW (E) WINDOW(E) WINDOWNEW WINDOWNEW WINDOWNEW WINDOWNEW WINDOWNEW WINDOWNEW WINDOWNEW WINDOWNEW WINDOW10'-0"20'-0"10'-0"20'-0"6" CURB6" CURBERERERERERER(N) A/C COMPRESSORON CONCRETE PAD8'-0"8'-0"LID VEGETATEDSWALE1----1%1% SLOPE1% SLOPE1% SLOPE5%5%5%5%1%1%1%1%1%1%1%1%1%1%5%5%5%5%5%5%5%5%5%5%1%1%5%5%5%5%5%5%5%5%5%5%5%5%5%5%5%5%1%1%5%5%5%5%5%5%5%5%5%5%1%1%DETAIL-1LID INFORMATION AND DETAILDETAIL 1A-8LANDSCAPE PLANISSUES AND REVISIONSComputer FileProject NameDescriptionProject NumberSHEET:ScaleNO.1.DATE2.3. CHECKBYCONSULTANTCONTACT:PROPOSED 3-STORY4-UNITSAPARTMENTS AND2-ADUSEAL: VERIFY MEASUREMENTS WITH CORRESPONDINGCOSTRUCTED OR EXISTING CONDITIONS PRIOR TOPROCEEDING WITH THE WORK, AND NOTIFY THEARCHITECT IMMEDIATELY OF SIGNIFICANTDISCREPANCIES.FINISH ELEVATIONS REFERENCED ON ARCHITECTURALDRAWINGS ARE DATUM ELEVATIONS ABOVE THE FINISHFLOOR ELEVATION. THE CONTRACTOR MUSTCOORDINATE DATUM-BASED ARCHITECTURALELEVATIONS SHOWN WITH SITE-SPECIFIC ELEVATIONSSHOWN ON CIVIL DRAWINGS.WALL DIMENSIONS SHOWN ARE TO FACE OF WALLFINISH UNLESS SPECIFICALLY NOTED OTHERWISE.10538 LA REINA AVE.DOWNEY, CA. 90241C&CDrafting DesignEdgar Cortes& CommercialResidentialDesign1100 Orangethorpe Ave.Ca. 92801# 200w, Anaheim(562) 916 7505 (714) 813 6555e_mail: ccdraftingdesign@yahoo.comOWNER:Mr. WILLIE BARRIOSMobile: (323) 495 7208Mr. WILLIEMobile: (323) 495 720810224 LA REINA AVE.DOWNEY, CA. 90241CONCEPTUAL LID PLANPC AGENDA PAGE 29PC AGENDA PAGE 29 10538 LA REINA AVE.ALLEYEXISTG.CONC. APRONEXISTG. PARKWAYEXISTG. SIDEWALKNORTH150.00'PROPERTY LINE150.00'PROPERTY LINE60.00'PROPERTY LINE60.00'PROPERTY LINESCALE 1/8"=1'-0"DEMO PLAN1,734.00 S.F.862.00 S.F.270.00 S.F.810.00 S.F.BEHR #S500-7INFINITE DEEP SEASIDINGWINDOW TRIMMATERIAL SAMPLE BOARDFASCIAHDZ SHINGLESBY: GAF TIMBERLINECOLOR: CHARACOALROOF SHINGLES3451WINDOW SHUTTERS6WINDOWALUMINUM SLIDINGWINDOW BY ANDERSONCOLOR: BLACK78DOOR/GARAGE DOORSTUCCO2BEHR #N520-7CARBON SATIN9VENTBEHR ULTRA PUREWHITEBEHR #N520-7CARBON SATINBEHR #S500-7INFINITE DEEP SEABEHR #N520-7CARBON SATINBEHR #PPU26-09GRAYCLOTHEXPOSED WOOD10BEHR #SC-122REDWOOD NATURALTONE STAINED WOODFINISHA-9DEMO PLANISSUES AND REVISIONSComputer FileProject NameDescriptionProject NumberSHEET:ScaleNO.1.DATE2.3. CHECKBYCONSULTANTCONTACT:PROPOSED 3-STORY4-UNITSAPARTMENTS AND2-ADUSEAL: VERIFY MEASUREMENTS WITH CORRESPONDINGCOSTRUCTED OR EXISTING CONDITIONS PRIOR TOPROCEEDING WITH THE WORK, AND NOTIFY THEARCHITECT IMMEDIATELY OF SIGNIFICANTDISCREPANCIES.FINISH ELEVATIONS REFERENCED ON ARCHITECTURALDRAWINGS ARE DATUM ELEVATIONS ABOVE THE FINISHFLOOR ELEVATION. THE CONTRACTOR MUSTCOORDINATE DATUM-BASED ARCHITECTURALELEVATIONS SHOWN WITH SITE-SPECIFIC ELEVATIONSSHOWN ON CIVIL DRAWINGS.WALL DIMENSIONS SHOWN ARE TO FACE OF WALLFINISH UNLESS SPECIFICALLY NOTED OTHERWISE.10538 LA REINA AVE.DOWNEY, CA. 90241C&CDrafting DesignEdgar Cortes& CommercialResidentialDesign1100 Orangethorpe Ave.Ca. 92801# 200w, Anaheim (562) 916 7505 (714) 813 6555e_mail: ccdraftingdesign@yahoo.comOWNER:Mr. WILLIE BARRIOSMobile: (323) 495 7208Mr. WILLIEMobile: (323) 495 720810224 LA REINA AVE.DOWNEY, CA. 90241PC AGENDA PAGE 30PC AGENDA PAGE 30 A-10RENDERINGSISSUES AND REVISIONSComputer FileProject NameDescriptionProject NumberSHEET:ScaleNO.1.DATE2.3. CHECKBYCONSULTANTCONTACT:PROPOSED 3-STORY4-UNITSAPARTMENTS AND2-ADUSEAL: VERIFY MEASUREMENTS WITH CORRESPONDINGCOSTRUCTED OR EXISTING CONDITIONS PRIOR TOPROCEEDING WITH THE WORK, AND NOTIFY THEARCHITECT IMMEDIATELY OF SIGNIFICANTDISCREPANCIES.FINISH ELEVATIONS REFERENCED ON ARCHITECTURALDRAWINGS ARE DATUM ELEVATIONS ABOVE THE FINISHFLOOR ELEVATION. THE CONTRACTOR MUSTCOORDINATE DATUM-BASED ARCHITECTURALELEVATIONS SHOWN WITH SITE-SPECIFIC ELEVATIONSSHOWN ON CIVIL DRAWINGS.WALL DIMENSIONS SHOWN ARE TO FACE OF WALLFINISH UNLESS SPECIFICALLY NOTED OTHERWISE.10538 LA REINA AVE.DOWNEY, CA. 90241C&CDrafting DesignEdgar Cortes& CommercialResidentialDesign1100 Orangethorpe Ave.Ca. 92801# 200w, Anaheim (562) 916 7505 (714) 813 6555e_mail: ccdraftingdesign@yahoo.comOWNER:Mr. WILLIE BARRIOSMobile: (323) 495 7208Mr. WILLIEMobile: (323) 495 720810224 LA REINA AVE.DOWNEY, CA. 90241PC AGENDA PAGE 31PC AGENDA PAGE 31 PC AGENDA PAGE 1 Site Plan Review and Conditional Use Permit - PLN-22-00052 March 1, 2023 - Page 2 small tenant commercial uses while across the street to the north is the City of Pico Rivera and there is a commercial office building. On May 09, 2022 the applicant filed a request for a SPR, and CUP. Subsequently, the applicant was issued an incomplete letter on June 27, 2022. After submitting all required documents, on January 17, 2023, the application was deemed complete. On February 16, 2023, notice of the pending public hearing was published in the Downey Patriot and mailed to all property owners within 500 feet of the subject property. Existing Elevation along Telegraph Road DISCUSSION The project consists of demolishing two existing free-standing restaurants and replacing them with a 4,777 square foot fast food restaurant with outdoor seating, a drive-through operation, 63 parking spaces and accessory landscaping. Additionally, significant landscaping improvements is proposed to be provided along the perimeter of the entire site. Per Downey Municipal Code (DMC), the development of a new commercial building requires review and approval of a Site Plan Review application to ensure that the proposed development meets the DMC development, design and use standards. Additionally, all drive through establishments within the C-2 General Commercial Zone require approval of a conditional use permit to ensure that the operation does not have an adverse impact on the area which they are located in or any future uses on the site. The subject site is located on an active thoroughfare within the City which required significant analysis of the various components related to traffic impacts of the proposal. A traffic impact analysis (TIA) was conducted to assess circulation on the subject site and potential impacts to the surrounding area. The components that were analyzed in the traffic study included analysis of the existing traffic conditions, project trip generation, parking, and projected queuing based on other like-in-kind establishments within the region. Additionally, a high level of consideration was placed on the architecture of the proposed development to ensure it would further the City’s goal to continuously enhance design throughout the City. Site Plan Review The Site Plan Review (SPR) includes an evaluation of the proposed site changes, landscaping, and compliance with the Downey Municipal Code. The proposed development will include two driveway entrances, one accessed from Telegraph Road and one accessed from Serapis Avenue. Parking is proposed along the northern portion of the site and the drive-through aisles PC AGENDA PAGE 2 Site Plan Review and Conditional Use Permit - PLN-22-00052 March 1, 2023 - Page 3 along the entirety of the southern perimeter of the site as well as portions of the rear eastern and western perimeter. The drive-through window is located along the south façade (facing rear of property). Additionally, the outdoor covered seating area is proposed adjacent to the primary building facing telegraph. The site will include a 384 square foot trash enclosure adjacent to the entrance of the drive-through lane. Pedestrian entrance to the building is located along the north elevation. Major development standards for this project are as follows: Standard Minimum/ Maximums Proposed Lot Coverage 50% 6.5% Building Height 45 ft. or 3 story max. 1 story (23 ft. to top of roof mounted screen wall) Minimum Required Landscaping 7,387 sq. ft. (10% of site) 15,185 sq. ft. (20.6% of site) Setbacks: Telegraph Road (Front) Serapis Ave. (Side Street) Rear Side (Interior) 15 ft. min. 5 ft. 46 ft. N/A 145 ft. 5 ft. 46 ft. 0 ft. Parking (1/100 sq. ft.) 54 Stalls 61 Stalls (including 3 accessible space) Architecture The proposed design for the new restaurant is most closely associated with contemporary style architecture. The restaurant building materials include a combination of stucco and wood siding along the west, east and north elevations. A mix of smooth stucco (Color: “Milk Glass”) and sand textured stucco (Color: “Pigeon Gray”) finishes will make up the remaining portions of the façade on all elevations, and the elevation parallel to Telegraph Road will also have four separate translucent frosted laminate glass windows. The building will also incorporate large recessed windows and multiple points of wall depth. Metal canopies on all windows, black metal storefront framing, landscaping, and light fixtures are used to further accent the building. All signage will require submittal to the City Planner for review and approval prior to the issuance of building permits. PC AGENDA PAGE 3 Site Plan Review and Conditional Use Permit - PLN-22-00052 March 1, 2023 - Page 4 Birdseye (View from Telegraph/Serapis intersection) Landscaping The street frontages will provide landscape planters along Telegraph Road and Serapis Avenue. The planters throughout the site will include a combination of trees, shrubs, vines and groundcover. The planters along the thoroughfares will consist of a combination of white crape myrtles, chinese elm, brisbane box and african sumac trees. The norththwest planter and the planter along the drive-through aisle will include a variety of native shrubs and groundcover such as deer grass fountain grass and other drought tolerant species. Conditional Use Permit A Conditional Use Permit is required for the operation of a drive-through in conjunction with a restaurant. Drive-through The proposal incorporates three (3) drive through lanes to accommodate for anticipated high volume of customers. The entrance to the proposed drive-through lanes will be on the west side of the parking lot, which can be accessed by both Telegraph Road and Serapis Avenue. They will continue along the western side of the building, wrap around the south of the building where the order boards are located and finally wrap around the western side of the building leading to the pick-up window/food delivery area. The drive through will exit back into the parking lot. Vehicles can either head northbound towards Telegraph Road, or eastbound on to Serapis Avenue to exit the subject site (Attachment D). The proposed drive-thru, utilizes three lanes, which can accommodate forty-four (44) 9’ x 20’ cars at one time. The City’s queuing standard for drive-through restaurants is eight vehicles, four before the menu board, and four after the menu board to the pickup window. A single proposed drive-through lane will include stacking for fourteen (14) vehicles, six before the menu board, and eight after the menu board to the pickup window. A single drive-through lane includes six more spaces than required by the DMC. As mentioned above in aggregate, the three drive through lanes shall hold a total of 44 vehicles at one time. Although the project exceeds the minimum queuing standard, it’s known that some businesses require more queuing than what the Code requires. For this reason, PC AGENDA PAGE 4 Site Plan Review and Conditional Use Permit - PLN-22-00052 March 1, 2023 - Page 5 a Traffic Impact Analysis (TIA) was prepared by Linscott Law & Greenspan, Engineers, which analyzed the following: • Drive-Through Queueing • Project Trip Generation • Vehicle Mile Traveled (VMT ) Assessment Due to the known activity of Chick-Fil-A establishments and the activity at this intersection, a queueing analysis was required to determine the appropriate queuing length for this development. The drive-through queueing analysis was conducted in December 2021 and analyzed Chick-Fil- A’s with drive-through lanes in Irvine, San Juan Capistrano, and Yucaipa. The consultant observed operations at these locations during the assessment period and utilized this data to identify average need and peak demand for drive-through operations. It should be noted that Los Angeles County Public Health Orders regarding Covid-19, had been lifted at the time of surveys. Based on the aggregate observations, an average of 11 vehicles in the drive-through service window queue can be expected, with an 85th percentile queue of 18 vehicles and a 95th percentile queue of 22 vehicles. The 85th percentile queue represents the maximum vehicle queue with approximately 85 percent probability of the time the queue is expected to be 18 vehicles or less, and 15 percent of the time the queue may be 19 vehicles or more. The 95th percentile queue represents the maximum vehicle queue with 95 percent probability; 95 percent of the time the queue is expected to be 22 vehicles or less, and five (5) percent of the time the queue may be 23 vehicles or more. The maximum observed queue totaled 31 vehicles. It is noted that while the 85th percentile queue is the design standard typically used in the traffic engineering profession the 95th percentile queue has been used in order to provide a conservative assessment, especially since the drive-through service window queue at the project site has the potential to back onto a major roadway (Telegraph Road). The proposed project is planned to accommodate up to 44 vehicles in queue. Therefore, the proposed drive-through service lanes are expected to adequately accommodate the 95th percentile queue of 22 vehicles without encroaching into the on-site drive-aisles or the adjacent public right-of-way. The proposed drive-through service lanes would also adequately accommodate the maximum observed queue of 31 vehicles. It is noted that the typical queue throughout the rest of the day is expected to be less than the vehicle queue during the morning, mid-day, and evening peak service times. Operation The proposed hours of operation for the restaurant and drive-through are Monday through Saturday, 6:00 a.m. to 11:30 p.m. The restaurant is closed on Sundays. Noise associated with the operation of the restaurant, including the drive-through speaker is not expected to negatively impact the surrounding uses. Much of the noise associated with the drive-through speaker, which is located approximately 185-feet south of Telegraph Road and 145-feet from Serapis Avenue, will be drowned out by the ambient traffic noise. In addition, the nearest residentially developed properties are located approximately 46-feet south of the proposed commercial structure and the nearest speaker is approximately 31-feet from the nearest bordering residential property line. However, as with all businesses, a condition of approval has been added that requires the project must comply with the City’s noise ordinance. Parking and Circulation The proposed development will exceed the minimum requirement of parking stalls by providing 61 parking spaces. Pursuant to the Downey Municipal Code (DMC) drive-through restaurants PC AGENDA PAGE 5 Site Plan Review and Conditional Use Permit - PLN-22-00052 March 1, 2023 - Page 6 require one parking space for every 100 square feet of gross floor area. The parking requirement for a proposed 4,777 square foot restaurant and 574 square feet of outdoor seating area (5,351 gross floor area) is 54 parking spaces. Additionally, the proposed parking design for the site complies with the established standards within the DMC. DEVELOPMENT REVIEW COMMITTEE The Development Review Committee (DRC) discussed and evaluated the project as it pertains to Planning, Police, Fire, Public Works, and Building and Safety matters. The Public Works Department provided standard conditions and requested the execution of a traffic impact analysis as well as conditions pertaining to the consolidation of the two parcels. Additionally, the Downey Fire Department also provided standard conditions pertaining to safety and standard fire code regulations. No other departments expressed major concerns or opposition over the project, and issued standard conditions. Recommended conditions of approval have been included in the attached Resolution to address potential impacts. ENVIRONMENTAL ANALYSIS Staff has reviewed the proposed Site Plan Review for compliance with the California Environmental Quality Act (CEQA). Upon completion of this review, staff has determined that this request is categorically exempt from CEQA, pursuant to Guideline Section No. 15303 (Class 3 – New Construction or Conversion of small structures). Class 3 exemptions consist of commercial projects in urban areas that do not exceed 10,000 square feet in floor area, with no value as a habitat for threatened species, in which an approval would not result in any significant impacts and the site can be adequately served by all required utilities. FINDINGS Pursuant to Municipal Code Section 9820.08, there are seven (7) findings that must be adopted prior to approving the Site Plan Review. The findings are as follows: A. That the site plan is consistent with the goals and polices embodied in the General Plan and other applicable plans and policies adopted by the Council; The project is consistent with all applicable goals and policies specified in the City’s General Plan and policies adopted by the City Council. In addition, the project’s objective to revitalize the site helps achieve various long-term goals. Specifically, the following policies are promoted by the Site Plan Review, and Conditional Use Permit: Policy 8.1.1 – Promote architectural design of the highest quality. Policy 8.2.2 – Promote the upgrading of properties. The proposed architecture is a significant upgrade to the existing facilities on site, and is compatible with surrounding properties although it will be newer than most developments within its proximity. The redevelopment of this site has the potential of serving as an example of higher quality architecture for future developments within the city. B. That the proposed development is in accordance with the purposes and objectives of this article and the zone in which the site is located; PC AGENDA PAGE 6 Site Plan Review and Conditional Use Permit - PLN-22-00052 March 1, 2023 - Page 7 The purpose of the C-2 (General Commercial) zone, as stated in the Downey Municipal Code, “is intended to provide for and encourage the orderly development of general commercial uses, with a wide variety of goods and services, for the residents of the entire City, with provisions designed to ensure that such commerce will be efficient, functionally related, and compatible with adjacent noncommercial development.” The proposed application is in full conformance with the objectives stated above. Furthermore, a restaurant and drive-thru use are commonly found in the General Commercial zone and are consistent with other uses found along Imperial Highway. C. That the proposed development’s site plan and its design features, including architecture and landscaping, will integrate harmoniously and enhance the character and design of the site, the immediate neighborhood, and the surrounding areas of the City; The proposed design of the project will integrate harmoniously with this area by providing aesthetically pleasing architecture and landscaping. The new 4,777 square foot restaurant building, and ancillary outdoor seating will serve as a significant upgrade from the existing facilities on the site. The proposed development will provide substantial landscaping throughout the site which will exceed the minimum development standards within the Downey Municipal Code. In addition, the streetscape will be enhanced as well as the transition from the street onto the site through the proposed landscaping and upgraded infrastructure. D. That the site plan and location of the buildings, parking areas, signs, landscaping, luminaries, and other site features indicate that proper consideration has been given to both the functional aspects of the site development, such as automobile and pedestrian circulation, and the visual effects of the development from the view of the public streets; The site layout has two entries, one from Telegraph Road and the other from Serapis Avenue. Parking is concentrated along the northern portion of the property, while the drive-thru aisle abuts the east and south property lines. There is pedestrian access onto the site via a walkway along both Telegraph Road and Serapis Avenue. A queuing study was completed and determined a queue of eleven (11) vehicles is required; the proposed drive-thru, through multiple lanes, holds forty-five (44) 9’ x 20’ cars at one time. Although it is not anticipated, a condition has been included to require the queue be contained on-site. The proposed landscaping surrounding the property is intended to heavily compliment the aesthetics of the site. E. That the proposed development will improve the community appearance by preventing extremes of dissimilarity or monotony in new construction or in alterations of facilities; The proposed project reflects true contemporary style architecture and keeps with the low scale of residential developments to the south of this site. that the proposed architectural style is neither dissimilar nor monotonous from other buildings in the area and this project will upgrade the overall appearance of the site and, in turn, improve the community appearance. This proposed development will be keeping with the quality of design of other similar type of uses and existing operators within the city. F. That the site plan and design considerations shall tend to upgrade property in the immediate neighborhood and surrounding areas with an accompanying betterment of conditions affecting the public health, safety, comfort, and welfare; PC AGENDA PAGE 7 Site Plan Review and Conditional Use Permit - PLN-22-00052 March 1, 2023 - Page 8 The proposed architecture is a significant upgrade to the existing facilities on site, and is compatible with surrounding properties although it will be newer than most developments within its proximity. In addition, the redevelopment of this site has the potential of serving as an example for higher quality architecture for future developments within the City of Downey. Lastly, the operational procedures of the proposed development are also conditioned in an effort to ensure that any potential effects in public health, safety, comfort and general welfare are mitigated as much as possible. G. That the proposed development’s site plan and its design features will include graffiti-resistant features and materials in accordance with the requirements of Section 4960 of Chapter 10 of Article IV of this Code; The project has been conditioned to meet the requirements specified in Section 4960 of the Downey Municipal Code. Section 4960 discusses the installation of anti-graffiti materials and the appropriate allotted time limit for the removal of graffiti. Pursuant to Municipal Code Section 9824.06, there are four (4) findings that must be adopted prior to approving the Conditional Use Permit. The findings are as follows: A. That the requested Conditional Use Permit will not adversely affect the intent and purpose of this article or the City’s General Plan or the public convenience or general welfare of persons residing or working in the neighborhood thereof; The project is consistent with all applicable goals and policies specified in the City’s General Plan and policies adopted by the City Council. In addition, the project’s objective to revitalize the site helps achieve various long-term goals. Specifically, the following policies are promoted by the Site Plan Review, and Conditional Use Permit: Policy 8.1.1 – Promote architectural design of the highest quality. Policy 8.2.2 – Promote the upgrading of properties. The proposed architecture is a significant upgrade to the existing facilities on site, and is compatible with surrounding properties although it will be newer than most developments within its proximity. The redevelopment of this site has the potential of serving as an example of higher quality architecture for future developments within the city. B. That the requested use will not adversely affect the adjoining land uses and the growth and development of the area in which it is proposed to be located; The proposed use (drive-thru and outdoor dining) is intended to complement the proposed fast-food restaurant. The use is also common within commercial areas and occasionally found in close proximity to residential areas. Staff views the use as a common practice among fast-food chains and typically found within major commercial corridors. Adverse impacts are not anticipated as a result of approval specifically because the amount of building square footage, number of uses, and close proximity to neighboring properties is reduced with the new proposed development. The project meets and exceeds the minimum development standards in the Downey Municipal Code to ensure that setbacks, landscaping, parking and parking design standards complement existing surrounding properties and protect adjoining land uses. In addition, the proposed conditions of approval are intended to mitigate any potential impacts. PC AGENDA PAGE 8 Site Plan Review and Conditional Use Permit - PLN-22-00052 March 1, 2023 - Page 9 C. That the size and shape of the site proposed for the use is adequate to allow the full development of the proposed use in a manner not detrimental to the particular area; The site is approximately 1.7 acres, and the proposed buildings will occupy a total of 4,777 square feet and ancillary outdoor dining, resulting in a floor-area ratio of .06. The drive-thru exceeds the required development standards for drive-thru businesses (per D.M.C. Section 9406) and is found to be satisfactory per the analysis contained in the queuing study for this application. In addition, the proposed improvement does not create alterations that would restrict future permitted uses from occupying the site or an existing use located within the nearby area from altering their operations. Therefore, the size and shape of the site proposed for the use not only meets but also exceeds the minimum required development standards to allow the full development of the proposed use in a manner not detrimental to the particular area. D. That the traffic generated by the proposed use will not impose an undue burden upon the streets and highways in the area; Vehicular access to the project site is planned to be accommodated by two project driveways including one driveway located on Telegraph Road and one driveway located on Serapis Avenue. Due to the existing raised concrete median along Telegraph Road, the Telegraph Road project driveway will be limited to right-turn inbound and outbound turning movements only. The Serapis Avenue project driveway will accommodate right- turning and left-turning inbound and outbound movements. Development of the proposed project would not conflict with the existing pedestrian system or the existing/proposed bicycle system. Additionally, the proposed project is expected to generate a net increase of 46 vehicle trips (24 net new inbound trips and 22 net new outbound trips) during the weekday mid-day peak hour. During the weekday PM peak hour, the proposed project is expected to generate a net increase of 41 vehicle trips (18 net new inbound trips and 23 net new outbound trips). Over a 24-hour period, the proposed project is forecast to generate a net increase of 629 vehicle trips (approximately 315 net new inbound trips and 315 net new outbound trips) during a typical weekday. Therefore, traffic generated by the proposed use will not impose an undue burden upon the streets and highways in the area because although volume to capacity ratios along Serapis Avenue will see an increase of .021 and .019 along Telegraph Road, individually they will maintain their existing Level of Service (LOS) grades. Serapis Avenue will maintain its LOS grade of A and Telegraph Road will maintain its LOS grade of B. CORRESPONDENCE As of the date that this report was printed, staff has not received any correspondence regarding this application. CONCLUSION Based on the analysis contained within this report, staff is concluding that all findings required for approval can be made in a positive manner. As such, staff is recommending that the Planning Commission approve the application (PLN-22-00052), thereby approving the construction of a 4,777 square foot fast food restaurant with outdoor seating and drive-through PC AGENDA PAGE 9 Site Plan Review and Conditional Use Permit - PLN-22-00052 March 1, 2023 - Page 10 EXHIBITS A. Maps B. Draft Resolution – CUP and SPR C. Traffic Impact Analysis D. Project Plans Location PC AGENDA PAGE 10 Site Plan Review and Conditional Use Permit - PLN-22-00052 March 1, 2023 - Page 11 Aerial Photograph Zoning Subject Sites PC AGENDA PAGE 11 RESOLUTION NO. 23- A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DOWNEY APPROVING A SITE PLAN REVIEW AND CONDITIONAL USE PERMIT, THEREBY ALLOWING THE CONSTRUCTION OF A 4,777 SQUARE FOOT FAST FOOD RESTAURANT WITH OUTDOOR SEATING AND DRIVE-THROUGH FACILITIES ON PROPERTY LOCATED AT 9180 & 9148 TELEGRAPH ROAD IN THE GENERAL COMMERCIAL (C-2) AND PARKING BUFFER (PB) ZONE. THE PLANNING COMMISSION OF THE CITY OF DOWNEY DOES RESOLVE AS FOLLOWS: SECTION 1. The Planning Commission of the City of Downey does hereby find, determine and declare that: A. On May 9, 2022, Andrew Hunt with 4G Development (hereinafter “applicant”), submitted a request for a Site Plan Review, and Conditional Use Permit to construct a new 4,777 square foot restaurant, with outdoor seating and drive- through facilities; and, B. On June 27, 2022, the applicants were issued a letter deeming the application incomplete. C. On January 17, 2023, the application was deemed complete after all required documents were submitted and reviewed. D. On February 16, 2023, a notice of the public hearing was sent to all property owners within 500’ of the subject site and the notice was published in Downey Patriot; and, G. The Planning Commission held a duly noticed public hearing on March 1, 2023, and after fully considering all oral and written testimony, facts, and opinions offered at the aforesaid public hearing adopted this resolution. SECTION 2. The Planning Commission further finds, determines and declares that the proposed project was reviewed for compliance with the California Environmental Quality Act (CEQA), and is categorically exempt from CEQA, pursuant to Guideline Section No. 15303 (Class 3 – New Construction or Conversion of small structures). Class 3 exemptions consist of commercial projects in urban areas that do not exceed 10,000 square feet in floor area, with no value as a habitat for threatened species, in which an approval would not result in any significant impacts and the site can be adequately served by all required utilities. SECTION 3. Having considered all of the oral and written evidence presented to it at said public hearings regarding the Site Plan Review, the Planning Commission further finds, determines and declares that: A. That the site plan is consistent with the goals and polices embodied in the General Plan and other applicable plans and policies adopted by the Council. The project is consistent with all applicable goals and policies specified in the City’s General Plan and policies adopted by the City Council. In addition, the project’s objective to revitalize the site helps achieve various long-term goals. Specifically, the following policies are promoted by the Site Plan Review, and Conditional Use Permit: PC AGENDA PAGE 12 Policy 8.1.1 – Promote architectural design of the highest quality. Policy 8.2.2 – Promote the upgrading of properties. The proposed architecture is a significant upgrade to the existing facilities on site, and is compatible with surrounding properties although it will be newer than most developments within its proximity. The redevelopment of this site has the potential of serving as an example of higher quality architecture for future developments within the city. B. That the proposed development is in accordance with the purposes and objectives of this article and the zone in which the site is located. The purpose of the C-2 (General Commercial) zone, as stated in the Downey Municipal Code, “is intended to provide for and encourage the orderly development of general commercial uses, with a wide variety of goods and services, for the residents of the entire City, with provisions designed to ensure that such commerce will be efficient, functionally related, and compatible with adjacent noncommercial development.” The proposed application is in full conformance with the objectives stated above. Furthermore, a restaurant and drive-thru use are commonly found in the General Commercial zone and are consistent with other uses found along Imperial Highway. C. That the proposed development’s site plan and its design features, including architecture and landscaping, will integrate harmoniously and enhance the character and design of the site, the immediate neighborhood, and the surrounding areas of the City. The proposed design of the project will integrate harmoniously with this area by providing aesthetically pleasing architecture and landscaping. The new 4,777 square foot restaurant building, and ancillary outdoor seating will serve as a significant upgrade from the existing facilities on the site. The proposed development will provide substantial landscaping throughout the site which will exceed the minimum development standards within the Downey Municipal Code. In addition, the streetscape will be enhanced as well as the transition from the street onto the site through the proposed landscaping and upgraded infrastructure. D. That the site plan and location of the buildings, parking areas, signs, landscaping, luminaries, and other site features indicate that proper consideration has been given to both the functional aspects of the site development, such as automobile and pedestrian circulation, and the visual effects of the development from the view of the public streets. The site layout has two entries, one from Telegraph Road and the other from Serapis Avenue. Parking is concentrated along the northern portion of the property, while the drive-thru aisle abuts the east and south property lines. There is pedestrian access onto the site via a walkway along both Telegraph Road and Serapis Avenue. A queuing study was completed and determined a queue of eleven (11) vehicles is required; the proposed drive-thru, through multiple lanes, holds forty-five (44) 9’ x 20’ cars at one time. Although it is not anticipated, a condition has been included to require the queue be contained on-site. The proposed landscaping surrounding the property is intended to heavily compliment the aesthetics of the site. E. That the proposed development will improve the community appearance by preventing extremes of dissimilarity or monotony in new construction or in alterations of facilities. The proposed project reflects true contemporary style architecture and keeps with the low scale of residential developments to the south of this site. that the proposed architectural style is neither dissimilar nor monotonous from other buildings in the area PC AGENDA PAGE 13 and this project will upgrade the overall appearance of the site and, in turn, improve the community appearance. This proposed development will be keeping with the quality of design of other similar type of uses and existing operators within the city. F. That the site plan and design considerations shall tend to upgrade property in the immediate neighborhood and surrounding areas with an accompanying betterment of conditions affecting the public health, safety, comfort, and welfare. The proposed architecture is a significant upgrade to the existing facilities on site, and is compatible with surrounding properties although it will be newer than most developments within its proximity. In addition, the redevelopment of this site has the potential of serving as an example for higher quality architecture for future developments within the City of Downey. Lastly, the operational procedures of the proposed development are also conditioned in an effort to ensure that any potential effects in public health, safety, comfort and general welfare are mitigated as much as possible. G. That the proposed development’s site plan and its design features will include graffiti- resistant features and materials in accordance with the requirements of Section 4960 of Chapter 10 of Article IV of this Code. The project has been conditioned to meet the requirements specified in Section 4960 of the Downey Municipal Code. Section 4960 discusses the installation of anti-graffiti materials and the appropriate allotted time limit for the removal of graffiti. SECTION 4. Having considered all of the oral and written evidence presented to it at said public hearings regarding the Conditional Use Permit, the Planning Commission further finds, determines and declares that: A. That the requested Conditional Use Permit will not adversely affect the intent and purpose of this article or the City’s General Plan or the public convenience or general welfare of persons residing or working in the neighborhood thereof. The project is consistent with all applicable goals and policies specified in the City’s General Plan and policies adopted by the City Council. In addition, the project’s objective to revitalize the site helps achieve various long-term goals. Specifically, the following policies are promoted by the Site Plan Review, and Conditional Use Permit: Policy 8.1.1 – Promote architectural design of the highest quality. Policy 8.2.2 – Promote the upgrading of properties. The proposed architecture is a significant upgrade to the existing facilities on site, and is compatible with surrounding properties although it will be newer than most developments within its proximity. The redevelopment of this site has the potential of serving as an example of higher quality architecture for future developments within the city. B. That the requested use will not adversely affect the adjoining land uses and the growth and development of the area in which it is proposed to be located. The proposed use (drive-thru and outdoor dining) is intended to complement the proposed fast-food restaurant. The use is also common within commercial areas and occasionally found in close proximity to residential areas. Staff views the use as a common practice among fast-food chains and typically found within major commercial corridors. Adverse impacts are not anticipated as a result of approval specifically because the amount of building PC AGENDA PAGE 14 square footage, number of uses, and close proximity to neighboring properties is reduced with the new proposed development. The project meets and exceeds the minimum development standards in the Downey Municipal Code to ensure that setbacks, landscaping, parking and parking design standards complement existing surrounding properties and protect adjoining land uses. In addition, the proposed conditions of approval are intended to mitigate any potential impacts. C. That the size and shape of the site proposed for the use is adequate to allow the full development of the proposed use in a manner not detrimental to the particular area. The site is approximately 1.7 acres, and the proposed buildings will occupy a total of 4,777 square feet and ancillary outdoor dining, resulting in a floor-area ratio of .06. The drive- thru exceeds the required development standards for drive-thru businesses (per D.M.C. Section 9406) and is found to be satisfactory per the analysis contained in the queuing study for this application. In addition, the proposed improvement does not create alterations that would restrict future permitted uses from occupying the site or an existing use located within the nearby area from altering their operations. Therefore, the size and shape of the site proposed for the use not only meets but also exceeds the minimum required development standards to allow the full development of the proposed use in a manner not detrimental to the particular area. D. That the traffic generated by the proposed use will not impose an undue burden upon the streets and highways in the area. Vehicular access to the project site is planned to be accommodated by two project driveways including one driveway located on Telegraph Road and one driveway located on Serapis Avenue. Due to the existing raised concrete median along Telegraph Road, the Telegraph Road project driveway will be limited to right-turn inbound and outbound turning movements only. The Serapis Avenue project driveway will accommodate right-turning and left-turning inbound and outbound movements. Development of the proposed project would not conflict with the existing pedestrian system or the existing/proposed bicycle system. Additionally, the proposed project is expected to generate a net increase of 46 vehicle trips (24 net new inbound trips and 22 net new outbound trips) during the weekday mid-day peak hour. During the weekday PM peak hour, the proposed project is expected to generate a net increase of 41 vehicle trips (18 net new inbound trips and 23 net new outbound trips). Over a 24-hour period, the proposed project is forecast to generate a net increase of 629 vehicle trips (approximately 315 net new inbound trips and 315 net new outbound trips) during a typical weekday. Therefore, traffic generated by the proposed use will not impose an undue burden upon the streets and highways in the area because although volume to capacity ratios along Serapis Avenue will see an increase of .021 and .019 along Telegraph Road, individually they will maintain their existing Level of Service (LOS) grades. Serapis Avenue will maintain its LOS grade of A and Telegraph Road will maintain its LOS grade of B. SECTION 5. Based upon the findings set forth in Sections 1 through 4 of this Resolution, the Planning Commission of the City of Downey hereby approves the Site Plan Review, and Conditional Use Permit (PLN-22-00052), subject to conditions of approval attached hereto as Exhibit ‘A’, which are necessary to preserve the health, safety and general welfare of the community and enable the Planning Commission to make the findings set forth in the previous sections. The conditions are fair and reasonable for the accomplishment of these purposes. PC AGENDA PAGE 15 SECTION 6. The Secretary shall certify the adoption of this Resolution. PASSED, APPROVED AND ADOPTED this 1st day of March 2023. Horacio Ortiz, Chairman, City Planning Commission I HEREBY CERTIFY that the foregoing is a true copy of a Resolution adopted by the Planning Commission of the City of Downey at a regular meeting thereof, held on the 1st day of March 2023, by the following vote, to wit: AYES: COMMISSIONERS: NOES: COMMISSIONERS: ABSENT: COMMISSIONERS: ABSTAIN: COMMISSIONERS: Linda Thai Deputy City Clerk PC AGENDA PAGE 16 PLN-22-00052 (SITE PLAN REVIEW, & CONDITIONAL USE PERMIT) EXHIBIT A – CONDITIONS PLANNING 1) The approval of this Site Plan Review, and Conditional Use Permit (PLN-22-00052) allows for the construction of a one-story 4,777 square-foot restaurant with outdoor seating, and drive-through for property located at 9180 & 9148 Telegraph Road. 2) This approval shall not be construed to mean any waiver of applicable and appropriate zoning regulations, or any Federal, State, County, and City laws and regulations. Unless otherwise expressly specified, all other requirements of the City of Downey Municipal Code shall apply. 3) The site shall remain in substantial conformance with this request and the approved set of plans date stamped January 17, 2023. 4) The Owner/Applicant agrees, as a condition of approval of this resolution, to indemnify, defend and hold harmless, at Applicant's expense, City and City's agents, officers and employees from and against any claim, action or proceeding commenced within the time period provided in Government Code Section 66499.37 to attack, review, set aside, void or annul the approval of this resolution, to challenge the determination made by City under the California Environmental Quality Act or to challenge the reasonableness, legality or validity of any condition attached hereto. City shall promptly notify Applicant of any such claim, action or proceeding to which City receives notice, and City will cooperate fully with Applicant in the defense thereof. Applicant shall reimburse the City for any court costs and attorney's fees that the City may be required to pay as a result of any such claim, action or proceeding. City may, in its sole discretion, participate in the defense of any such claim, action or proceeding, but such participation shall not relieve Applicant of the obligations of this condition. 5) The administrative Lot Line Adjustment process shall be completed prior to issuance of building permits. The Lot Line Adjustment shall comply with the applicable conditions set forth in this resolution by Public Works. 6) The City Planner is authorized to make minor modifications to the approved preliminary plans or any of the conditions if such modifications shall achieve substantially the same results as would strict compliance with said plans and conditions. 7) Prior to the submittal of plans into Building and Safety Plan Check or commencement of business, whichever occurs first, the applicant and the property owner shall sign an affidavit of Acceptance of Conditions, as provided by the City of Downey. 8) The applicant must comply with the art in public places requirements set forth in Downey Municipal Code 8950 et seq. This shall include payment of all required fees prior to the issuance of building permits. Should the applicant exercise their right to install public art on site, the public art application (including payment of all deposits) shall be submitted prior to the issuance of building permits. 9) The use approved herein must be executed within one year of approval or shall be PC AGENDA PAGE 17 subject to revocation where this approval will be deemed null and void. 10) The business owner shall consent to and provide access to all areas of the subject premises without charge during normal business hours to any City Official for purposes of verifying compliance with any of the Conditions of Approval of this application. 11) The approved architectural style shall be Contemporary, as noted in the approved plans. Changes to the facades and/or colors shall be subject to the review and approval of the City Planner. 12) All finished materials must be to the satisfaction of the City Planner. Final approval of all building materials (including but not limited to glass type, wall texture, metal canopies, wood panels) must be granted by the City Planner prior to the issuance of Building Permits. This application does not grant final approval of the selected materials; final materials will be evaluated and reviewed through the Building Permit process. 13) All landscaping must comply with the Downey Municipal Code, be composed of drought tolerant plants, and requires final approval from the City Planner prior to the issuance of Building Permits. This application does not grant final approval of the landscape design. Final approvals will be granted through the Building Permit process. 14) The permitted hours of operation of the restaurant and drive-through are Monday – Saturday 6:00 a.m. to 11:30 p.m. All deliveries made to the business shall be between 7:00 a.m. and 9:00 p.m. 15) All exterior lights on the property must be LED and must be directed, positioned, and/or shielded such that they do not illuminate surrounding properties and the public right-of- way. 16) For security purposes, lighting must be placed in such a way as to illuminate the area surrounding the trash enclosure. This lighting shall be un-switched and photo-sensor controlled. 17) All interior and exterior mechanical, plumbing, and unfinished electrical equipment and materials (including but not limited to wiring and pipes) must be screened from the public’s view. All screening materials must be approved by the City Planner. 18) Any bollards on the site must be decorative in nature and shall be approved by the City Planner. 19) Queueing associated with the drive-through facilities shall be contained on-site and also allow for appropriate ingress/egress onto the site. 20) All buildings and walls must be finished with graffiti resistant materials. Prior to the issuance of building permits, the applicant shall demonstrate to the satisfaction of the City Planner, that the finished materials will comply with this requirement. 21) Any graffiti applied to the site shall be removed within 48 hours. 22) The applicant must provide decorative pavers across the driveways. The decorative pavers shall be as approved by the City Planner prior to the issuance of building permits. PC AGENDA PAGE 18 23) Roof-mounted equipment shall be screened at all times by a material to be approved by the City Planner. 24) A stop sign must be installed at the end of the drive-through lane. 25) All above grade back-flow preventers, and check valves shall be and screened from view from the public right-of -way with decorative metal cut-out panels, as approved by the City Planner. 26) Noise generated from the site, including the drive-through speaker shall comply with Municipal Code Section 4600 et. seq. In any case, noise shall not exceed 65 dBA, as measured at the property line. Volume on speaker to be lowered between the hours of 6:00 a.m. to 8:00 a.m. and 9:00 p.m. to 11:30 p.m. 27) Prior to the installation of any signs, the property owner must obtain approval of a Sign permit. 28) The applicant must place delineating marks throughout the site and at both driveways to distinguish ingress and egress onto the site. 29) The applicant must incorporate a copy of this Exhibit A, Conditions of Approval, into the approved set of building plans. BUILDING 30) All construction shall comply with the most recent adopted City and State building codes: • 2022 California Building Code • 2022 California Electrical Code • 2022 California Mechanical Code • 2022 California Plumbing Code • 2022 California Fire Code • 2022 California Green Code 31) Special Inspections – As indicated by California Building Code Section 1704, the owner shall employ one or more special inspectors who shall provide special inspections when required by CBC section 1704. Please contact the Building Division at time of plan submittal to obtain application for special inspections. 32) The Title Sheet of the plans shall include: • Occupancy Group • Occupant Load • Description of use • Type of Construction • Height of Building • Floor area of building(s) and/or occupancy group(s) 33) School impact fees shall be paid prior to permit issuance. PC AGENDA PAGE 19 34) Dimensioned building setbacks and property lines, street centerlines and between buildings or other structures shall be designed on plot plan. 35) All property lines and easements must be shown on plot plan. A statement that such lines and easements are shown is required. 36) The project design will conform with energy conservation measures articulated in Title 24 of the California Code of Regulations and address measures to reduce energy consumption such as flow restrictors for toilets, low consumptions light fixtures, and insulation and shall use to the extent feasible draught landscaping. 37) A design professional will be required at time of construction drawings, to prepare plans for proposed improvements per the Business and Professions’ Code. 38) Public and private site improvements shall be designed in accordance with the Americans with Disabilities Act and Chapter 11 of the California Building Code. Site plan shall include a site accessibility plan identifying exterior routes of travel and detailing running slope, cross slope, width, pedestrian ramp, curb ramps, handrails, signage and truncated domes. Path of travel shall be provided from the public right of way and accessible parking to building. The design professional shall ensure that the site accessibility plan is compliance with the latest Federal and State regulations. 39) All projects including food service or Public pools and/or spas shall be checked and approved by the County Health Department as part of the building department plan review process. 40) Construction hours shall be limited to 7:00 a.m. to 7:00 p.m., Monday through Friday and 8:00 a.m. to 5:00 p.m., Saturdays. There shall be no construction on the site outside of these hours. FIRE 1. Design and construction to meet all conditions for Assembly Group occupancy as it relates to the occupant load, exiting, exit sizing, exit illumination, emergency lighting, etc. 2. An occupancy load sign shall be posted and be clearly visible [CA Fire Code §1004] 3. Establishment shall be equipped with an automatic sprinkler system. A deferred automatic fire sprinkler plan shall be submitted for Assembly Group A-2 occupancy. Automatic fire sprinkler system design, installation, and testing shall be per NFPA 13 [CFC § 903.2.1.2 #3; DMC 3318] 4. Establishment shall be equipped with a fire alarm and detection system. A deferred fire alarm and detection system plan submittal required for Assembly Group A-2 occupancy. Automatic fire alarm and detection system design, installation, and testing shall be per NFPA 72 [CFC § 907; DMC 3318] PC AGENDA PAGE 20 5. Install approved key boxes (e.g. Knox Boxes) to occupancy [CA Fire Code §506.1]. 6. Commercial cooking equipment that produce grease laden vapors shall be protected with a Type I Hood in accordance with CA Mechanical Code, and an automatic fire extinguishing system that is listed and labeled for its intended use [CA Fire Code § 904.12] 7. If wet chemical extinguisher system is used to protect commercial cooking equipment and hood, the automatic fire extinguishing system shall be UL 300 complainant and have the required semi-annual inspection and testing [CA Fire Code § 904.2.2; §904.5; §904.12; §609] 8. Premises shall be appropriately addressed. An approved address identification shall be provided that is legible and placed in a position that is visible from the street/road. Sizing shall be approved and at a minimum meet requirement of CA Fire Code [CA Fire Code §505.1] 9. If applicable, establishment of hazardous materials business plan (HMBP) for handling of compressed and/or refrigerated beverage system gases (e.g. Carbon dioxide, Nitrogen) exceeding 1000 cubic feet at STP (standard temperature pressure) [HSC 25507(5)(C)] 10. Exit signs shall be properly illuminated and readily visible from any direction of egress travel [CA Fire Code §1013.1; 1013.31030.2; 1030.3] 11. If an insulated liquid carbon dioxide system is used for the beverage system, it shall adhere to requirements set forth in CA Fire Code Section 5307 for ventilation, gas detection, etc. 12. If storage of commercial kitchen cooking oil shall occur, it shall adhere to requirements of CA Fire Code Section 608. 13. Egress shall be designed to meet requirements of CA Building Code and Chapter 10 of the CA Fire Code for occupant load, number of egresses, egress sizing, door swing direction, etc. PUBLIC WORKS 1. All public utilities shall be installed underground. 2. Proposed public improvements shall comply with the latest edition of Standard Plans and Specifications for Public Works Construction, City of Downey standards and the Americans with Disabilities Act (ADA). PC AGENDA PAGE 21 3. Obtain permits from the Public Works Department for all improvements within the public right of way at least two weeks prior to commencing work. Contact Brian Aleman, Assistant Civil Engineer, at (562) 904-7110 for information. 4. Remove and replace damaged, uneven or sub-standard curb, gutter, sidewalk, driveway, disabled ramps, and pavement to the satisfaction of the Public Works Department. Contact the Public Works Inspector at (562) 904-7110 to identify the limits of the areas to be removed and replaced at least 48 hours prior to commencing work. 5. Owner/applicant must submit public improvement plan(s) for review and approval by Public Works Department prior to obtaining an encroachment permit. 6. All unused driveways shall be removed and constructed with full-height curb gutter, and sidewalk to match existing improvements. 7. The owner /applicant shall reconstruct all driveway approaches per Standard Plans of Public Works Construction (SPPWC) No. 110-2 Type C. Driveway width bottom of X to bottom of X shall be as wide as the driveway or parking aisle they serve. The new widen driveways shall be at least five (5) feet away from any above-ground obstructions (including storm drains) in the public right-of-way to the top of the driveway “X.” Otherwise, the obstruction shall be relocated at the applicant’s expense. Ensure that each driveway provides proper pedestrian access across, in compliance with ADA standards. The final layout and site driveway approach design shall be subject to the review and approval by the Public Works Department. 8. Remove all Underground Service Alert (USA) temporary pavement markings immediately following the completion of the work / Final permit inspection. USA markings shall be installed using chalk-based paint only. 9. Applicant shall coordinate with the Metropolitan Transportation Authority (METRO) regarding the relocation of transit bus stop(s) if deemed absolutely necessary upon city approval in advance and subject to the approval of the Director of Public Works. 10. Applicant shall coordinate with Downey Link Transportation regarding the relocation of the transit bus stop if deem absolutely necessary upon city approval in advance and subject to approval of the Director of Public Works. 11. Paint property address numbers (4” height) on the curb face in front of the proposed development to the City’s satisfaction. 12. Drive approaches shall match driveway width as specified per Standard Plan of Public Works Construction No. 110-2 Type C. 13. Any utilities that are in conflict with the development shall be relocated at the PC AGENDA PAGE 22 owner/applicant's expense. 14. Any acquired property in the form of easement, fee simple or irrevocable offer shall be in form acceptable by the city engineer and the city attorney prior to its recordation. 15. Since Telegraph Road is on pavement moratorium until 2025, owner/applicant shall remove and replace the asphalt street pavement to the centerline with (or other specified limits) from the edge of the gutter (gutter lip) along Telegraph Road if any utility cuts are required in order to service the proposed development. Restore pavement markings as needed. Owner/applicant shall contact the Public Works department at 562-904-7110 to go over asphalt design mix and restoration limits Traffic 1. The owner / applicant shall prepare and submit a traffic impact analysis study to the satisfaction of the City Traffic Engineer, who shall define the specific requirements of the Study. The owner / applicant shall be responsible for any improvements required to mitigate traffic impacts created by the project as identified by the study and / or financially contribute a fair share toward the cost of constructing capital improvement(s), not considered part of the frontage of the project site, necessary to offset all or a portion of the project traffic impacts. Submit a traffic impact study for the city engineer’s review and approval. Said study shall include the following unless otherwise specified a. Trip generation b. Queuing analysis for drive-through and site driveways. c. Conclusions and findings shall be summarized in the final report along with recommendations if it is determined that the vehicle queue will spill over onto Telegraph Road and/or Serapis Avenue. d. The traffic study shall be stamped and signed by a registered Traffic Engineer of Civil Engineer in the state of California. Water & Sewer 1. The owner/applicant shall furnish and install separate water service lines, meters, and boxes for each tenant space. Connect new separate water service line to existing 8-inch main located on Telegraph Road or 10” main located on Serapis Avenue. PC AGENDA PAGE 23 2. The owner/applicant shall provide a fire sprinkler system(s) in accordance with Fire Department and Building and Safety standards. Should such fire sprinkler system(s) require the installation of dedicated fire service lateral(s), such lateral(s) shall be constructed in accordance with the latest Department of Public Works and Fire Department standards including backflow devices, fire department connections and other appurtenances as required. New fire service lateral(s) shall be connected to existing 8-inch main located on Telegraph Road or 10” main located on Serapis Avenue and shall be dedicated for fire service only. 3. The owner/applicant shall furnish and install domestic and fire water backflow devices in accordance with City of Downey standards and as required by State and LA County Department of Public Health. Backflow devices shall be located on private property, readily accessible for emergency and inspection purposes, and screened from view by providing sufficient landscaping. 4. Backflow devices shall be certified in the field by a licensed LA County Department of Public Health certified tester prior to placing into service and such certification provided to City. 5. Existing potable and fire water service lines and associated appurtenances must be removed and abandoned from existing water main. 6. Owner or tenant must establish accounts with the City Cashier prior to the City activating and the tenant using any fire, potable, or recycled water service and meter. 7. The owner/applicant shall provide separate water improvement plan sets for review and approval consisting of the following: a. Potable Water Improvement Plans (all City-owned potable water and fire service lateral improvements) Final City approved potable water improvement plans shall be submitted on mylars and shall be signed and stamped by a State of California licensed civil engineer. In addition to review and approval by City. Improvement plans for potable water main improvements shall be both plan and profile. 8. Upon completion of water improvements, owner/applicant shall submit red-lined construction plans to City noting all changes to the plan and profile of all water improvements installed. Such changes shall be incorporated into a final record drawing mylar which shall be signed and stamped by the original engineer and/or architect of record and submitted to the City along with digital files (AutoCAD – latest edition). 9. The owner/applicant shall furnish and install a sewer lateral (to the front property line) and abandon any existing unused/damaged sewer laterals. The design and PC AGENDA PAGE 24 improvements of sewers shall be in accordance with the latest standards of the Department of Public Works. Septic systems shall not be allowed. 10. Utility plans shall be submitted to and approved by the Department of Public Works prior to the issuance of the grading plan permit. 11. The owner/applicant shall consult the Department of Public Works to determine the sewer location and design requirements. 12. The owner/applicant shall conduct a sewer capacity study. Grading 1. Submit an engineered grading plan and/or hydraulic calculations and site drainage plan for the site (prepared and sealed by a registered civil engineer in the State of California) accompanied by a soil and geology report for approval by the Engineering Division and Building and Safety Division. Lot(s) shall not have less than one (1%) percent gradient on any asphalt or non-paved surface, or less than one quarter (1/4%) percent gradient on any concrete surface. Provide the following information on plans: topographic site information, including all building pad and other elevations, dimensions/location of existing/proposed public improvements adjacent to project (i.e. street, sidewalk, parkway and driveway widths, catch basins, pedestrian ramps); the width and location of all existing and proposed easements, the dimensions and location of proposed dedications; (for alley dedications, show elevations of the four corners of the dedication and centerline of alley, existing and proposed underground utility connections); the location, depth and dimensions of potable water, reclaimed water and sanitary sewer lines; chemical and hazardous material storage, if any, including containment provisions; and the type of existing use, including the gross square footage of the building and its disposition; construction details of drainage devices and details of Low Impact Development (LID) plan. 2. Include any other applicable site-specific conditions. NPDES 1. The owner/applicant shall comply with the National Pollutant Discharge Elimination System (NPDES); Ordinance 1142 of the Downey Municipal Code (DMC); and the Low Impact Development (LID) Plan. Furthermore, the applicant shall be required to Certify and append Public Works standard “Attachment A” to all construction and grading plans as required by the LACoDPW Stormwater Quality Management Plan (SQMP). 2. The owner/applicant shall secure a WDID number along with his SWPPP. 3. If any hazardous material is encountered on the site that has the potential to reach the PC AGENDA PAGE 25 ground water supply, the owner/applicant shall secure a permit for the State Regional Water Quality Control Board. 4. If any hazardous material is encountered on the site, the owner/applicant shall secure an ID number from the U.S. Environmental Protection Agency (EPA). 5. The owner/applicant shall deploy Best Management Practices during and after construction. Subdivision 1. The filed map shall comply with the latest edition of the state subdivision Map Act, the City of Downey Municipal Code and all the applicable state and local laws. Prior to recordation, the Applicant shall: a. Prepare map under the direction of a Registered Civil Engineer authorized to practice land surveying, or a Licensed Land Surveyor. The map must be processed through the Dept. of Public Works prior to being filed with the County Recorder. b. A preliminary Title Report (or a chain of title) prepared by the title company for the subdivision is required showing all fee interest holders and encumbrances. An updated title report shall be provided (not older than 90 days) before the final tract/parcel map is released for filing with the County Recorder. c. Monumentation of the tract/parcel map boundaries, street centerline and lot boundaries are required for a map based on a record of survey. In the absence of such record, a licensed land surveyor shall set up all the missing monumentation. d. Any required property in the form of easement, fee simple or irrevocable offer and any right of way vacation in form accepted by the city engineer shall be shown on the map. Recycling 1. The facility must provide for recycling facilities, i.e., storage and handling areas for recycling facilities. Trash enclosure shall include roof cover, floor drain connection to grease interceptor and water hose bib connection for maintenance. 2. Complete a construction & demolition (C&D) waste management plan per Article V, Chapter 8 of the Downey Municipal Code. PC AGENDA PAGE 26 General 1. Construct onsite pavement, consisting of a minimum section of 4” thick aggregate base, and a minimum 2-1/2” thick asphalt concrete pavement. Construct Pavement on-site parking and circulation areas as required by a pavement engineering or geotechnical report prepared by a Registered Civil Engineer, subject to the review and approval of the Public Works and Community Development Departments. 2. The owner/applicant must comply with all applicable Federal, State and local rules and regulations, American Disabilities Act (ADA), including compliance with South Coast Air Quality Management District (SCAQMD) regulations. 3. The owner/applicant shall submit a recorded mylar copy of the final map, a digital AutoCAD format file (AutoCAD 2012 or later) and scanned, uncompressed TIFF images of final map on a portable media for city’s GIS system data updates and maintenance. 4. The owner/applicant shall submit a mylar copy of the final as-built public improvement plan(s), a digital AutoCAD format file (AutoCAD 2012 or later) and scanned, uncompressed TIFF images of final map on a portable media for city’s GIS system data updates and maintenance. Additional comments: PC AGENDA PAGE 27 Attachment A Storm Water Pollution Control Requirements for Construction Activities Minimum Water Quality Protection Requirements for All Development Construction Projects/Certification Statement The following is intended as an attachment for construction and grading plans and represent the minimum standards of good housekeeping which must be implemented on all construction sites regardless of size. ☐ Eroded sediments and other pollutants must be retained on site and may not be transported from the site via sheetflow, swales, area drains, natural drainage courses or wind. ☐ Stockpiles of earth and other construction related materials must be protected from being transported from the site by the forces of wind or water. ☐ Fuels, oils, solvents and other toxic materials must be stored in accordance with their listing and are not to contaminate the soil and surface waters. All approved storage containers are to be protected from the weather. Spills must be cleaned up immediately and disposed of in a proper manner. Spills may not be washed into the drainage system. ☐ Non-storm water runoff from equipment and vehicle washing and any other activity shall be contained at the project site. ☐ Excess or waste concrete may not be washed into the public way or any other drainage system. Provisions shall be made to retain concrete wastes on site until they can be disposed of as solid waste. ☐ Trash and construction related solid wastes must be deposited into a covered receptacle to prevent contamination of rainwater and dispersal by wind. ☐ Sediments and other materials may not be tracked from the site by vehicle traffic. The construction entrance roadways must be stabilized so as to inhibit sediments from being deposited into the public way. Accidental depositions must be swept up immediately and may not be washed down by rain or other means. ☐ Any slopes with disturbed soils or denuded of vegetation must be stabilized so as to inhibit erosion by wind and water. ☐ Other _____________________________________________________________ _____________________________________________________________ As the project owner or authorized agent of the owner, I have read and understand the requirements listed above, necessary to control storm water pollution from sediments, erosion, and construction materials, and I certify that I will comply with these requirements. Project Name: _________________________________________________________ Project Address: _______________________________________________________ Print Name ______________________________________ (Owner or authorized agent of the owner) Signature _____________________________________ Date __________________ (Owner or authorized agent of the owner) PC AGENDA PAGE 28 TRANSPORTATION IMPACT ANALYSIS SERAPIS AVENUE/TELEGRAPH ROAD CHICK-FIL-A PROJECT City of Downey, California January 16, 2023 Prepared for: Chick-fil-A Inc. 15635 Alton Parkway, Suite 350 Irvine, California 92618 LLG Ref. 1-22-4499-1 Prepared by: Under the Supervision of: Grace Turney, P.E. David S. Shender, P.E. Transportation Engineer III Principal PC AGENDA PAGE 29 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 1-22-4499-1 Serapis Avenue/Telegraph Road Chick-fil-A Project O:\JOB_FILE\4499\Report\4499-Rpt2.doc i TABLE OF CONTENTS SECTION PAGE 1.0 Introduction ................................................................................................................................ 1 1.1 Transportation Study Overview ........................................................................................ 1 1.2 Study Methodology ............................................................................................................ 1 1.3 Los Angeles County Congestion Management Program Status ...................................... 3 2.0 Project Description .................................................................................................................... 5 2.1 Existing Project Site ........................................................................................................... 5 2.2 Proposed Project Description ............................................................................................ 5 2.3 Project Site Access ............................................................................................................. 5 2.3.1 Vehicular Site Access ............................................................................................ 5 2.3.2 Non-Vehicular Site Access ................................................................................... 8 2.4 Project Parking ................................................................................................................... 8 2.5 Project Trip Generation and Distribution .......................................................................... 9 2.5.1 Project Trip Generation ......................................................................................... 9 2.5.2 Project Trip Distribution and Assignment ............................................................ 10 2.6 Drive-Through Service Window Vehicle Queuing .......................................................... 14 3.0 Project Site Context ................................................................................................................... 17 3.1 Non-Vehicle Network ........................................................................................................ 17 3.1.1 Pedestrian System .................................................................................................. 17 3.1.2 Bicycle System ...................................................................................................... 17 3.2 Transit Network .................................................................................................................. 19 3.3 Vehicle Network ................................................................................................................ 19 3.3.1 Roadway Classifications ....................................................................................... 19 3.3.2 Regional Highway System .................................................................................... 22 3.3.3 Roadway Descriptions .......................................................................................... 22 3.4 Traffic Count Data ............................................................................................................. 22 3.5 Future Cumulative Traffic Volumes ................................................................................. 22 3.5.1 Related Projects ..................................................................................................... 27 3.5.2 Ambient Traffic Growth Factor ............................................................................ 27 4.0 CEQA Transportation Assessment ......................................................................................... 32 4.1 Vehicle Miles Traveled (VMT) Project Screening ........................................................... 32 4.1.1 Non-Retail Project Trip Generation Screening Criteria ...................................... 32 4.1.2 Retail Project Screening Criteria .......................................................................... 33 4.1.3 Proximity to Transit Screening Criteria ............................................................... 33 4.1.4 Residential Project Screening Criteria .................................................................. 34 4.1.5 Summary of Screening Conclusions .................................................................... 34 4.2 Impact Conclusions ............................................................................................................ 35 4.3 Cumulative Impact Analysis.............................................................................................. 35 PC AGENDA PAGE 30 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 1-22-4499-1 Serapis Avenue/Telegraph Road Chick-fil-A Project O:\JOB_FILE\4499\Report\4499-Rpt2.doc ii TABLE OF CONTENTS (continued) SECTION PAGE 5.0 Non-CEQA Analysis .................................................................................................................. 36 5.1 Analysis Methodology ....................................................................................................... 36 5.2 Criteria for Non-CEQA Analysis ...................................................................................... 36 5.3 Analysis Scenarios ............................................................................................................. 37 5.4 Existing Conditions ............................................................................................................ 38 5.4.1 Existing Conditions ............................................................................................... 38 5.4.2 Existing With Project Conditions ......................................................................... 38 5.5 Future Year 2024 Cumulative Conditions ........................................................................ 38 5.5.1 Future Year 2024 Cumulative Without Project Conditions ................................ 38 5.5.2 Future Year 2024 Cumulative With Project Conditions ..................................... 42 6.0 Summary and Conclusions ....................................................................................................... 44 APPENDICES APPENDIX A. Chick-fil-A Queuing Observation Data B. Vehicular, Pedestrian, and Bicycle Count Data C. ICU and Levels of Service Explanation ICU Data Worksheets – Weekday Mid-day and PM Peak Hours PC AGENDA PAGE 31 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 1-22-4499-1 Serapis Avenue/Telegraph Road Chick-fil-A Project O:\JOB_FILE\4499\Report\4499-Rpt2.doc iii TABLE OF CONTENTS (continued) LIST OF FIGURES SECTION—FIGURE # PAGE 1–1 Vicinity Map ............................................................................................................................. 2 2–1 Aerial Photograph of Existing Project Site ............................................................................. 6 2–2 Site Plan .................................................................................................................................... 7 2–3 Project Trip Distribution .......................................................................................................... 12 2–4 Project Traffic Volumes ........................................................................................................... 13 3–1 Existing and Proposed Bikeway .............................................................................................. 18 3–2 Existing Transit Routes ............................................................................................................ 21 3–3 Existing Lane Configurations .................................................................................................. 23 3–4 Existing Traffic Volumes ......................................................................................................... 26 3–5 Location of Related Projects .................................................................................................... 29 3–6 Related Projects Traffic Volumes ............................................................................................ 30 5–1 Existing With Project Traffic Volumes ................................................................................... 40 5–2 Future Cumulative Without Project Traffic Volumes ............................................................ 41 5–3 Future Cumulative With Project Traffic .................................................................................. 43 LIST OF TABLES SECTION—TABLE # PAGE 2–1 Project Trip Generation Forecast ............................................................................................. 11 2–2 Summary of Chick-fil-A Drive-Through Service Lane Queueing Observations .................. 15 3–1 Existing Transit Routes ............................................................................................................ 20 3–2 Existing Roadway Descriptions ............................................................................................... 24 3–3 Existing Traffic Volumes ......................................................................................................... 25 3–4 Related Projects List and Trip Generation .............................................................................. 28 5–1 Summary of Volume to Capacity Ratios, Delays and Levels of Service .............................. 39 PC AGENDA PAGE 32 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 1-22-4499-1 Serapis Avenue/Telegraph Road Chick-fil-A Project O:\JOB_FILE\4499\Report\4499-Rpt2.doc TRANSPORTATION IMPACT ANALYSIS City of Downey, California January 16, 2023 1.0 INTRODUCTION 1.1 Transportation Study Overview This transportation impact study has been conducted to identify and evaluate the potential transportation impacts of the proposed Serapis Avenue/Telegraph Avenue Chick-fil-A project (“proposed project”). The project site is located at 9148 Telegraph Road in the City of Downey. The proposed project site is generally bounded by Telegraph Road to the north, Serapis Avenue to the east, existing residential development to the south, and existing commercial and residential development to the west. The project site and general vicinity are shown in Figure 1-1. The transportation assessment follows the requirements set forth by the City of Downey. It is noted that the City of Downey has not yet adopted revised transportation assessment guidelines, however, a vehicle miles traveled (VMT) assessment has been prepared in compliance with Senate Bill (SB) 743. In addition, the City maintains vehicle Level of Service (LOS) standards for local transportation infrastructure. Therefore, the City has identified both CEQA based analysis requirements and non- CEQA based analysis requirements for analyzing the potential transportation impacts of proposed development projects. This study evaluates potential project-related VMT impacts pursuant to the screening criteria and analysis tools approved for use by the City of Downey. The study also evaluates potential project- related effects on LOS at two (2) study intersections in the vicinity of the project site. The study intersections were determined in consultation with City of Downey staff. The Intersection Capacity Utilization (ICU) method was used to determine LOS for the City of Downey study intersections. This report (i) presents the proposed project’s existing transportation network context, (ii) presents existing traffic volumes, (iii) forecasts cumulative baseline conditions, (iv) forecasts project- generated traffic, (v) assesses the potential for project-related transportation impacts consistent with the CEQA compliant and non-CEQA compliant metrics set forth by the City of Downey, and (vi) recommends transportation mitigation and/or improvement measures, where necessary. 1.2 Study Methodology The CEQA and non-CEQA analysis criteria for this transportation assessment were identified in consultation with City of Downey staff. The analysis criteria were determined based on the City’s -1-PC AGENDA PAGE 33 -2-PC AGENDA PAGE 34 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 1-22-4499-1 Serapis Avenue/Telegraph Road Chick-fil-A Project O:\JOB_FILE\4499\Report\4499-Rpt2.doc Guidelines, the proposed project description and location, and the characteristics of the surrounding transportation system. On September 27, 2013, Governor Brown signed Senate Bill (SB) 743 (Steinberg, 2013). Among other things, SB 743 initiated a change in the methodology to analyze transportation impacts under CEQA (Public Resources Code Section [PRC] 21000 and following). Through PRC Section 21099, which states in part that “automobile delay, as described solely by level of service or similar measures of vehicular capacity or traffic congestion shall not be considered a significant impact on the environment,” SB 743 directed the Governor’s Office of Planning and Research (OPR) to identify a new metric for evaluating transportation impacts. OPR identified vehicle miles traveled (VMT) as the most appropriate metric, and developed the Technical Advisory on Evaluating Transportation Impacts in CEQA 1 (“Technical Advisory”), which provides non-binding recommendations on the implementation of VMT analysis methodology and which has significantly informed the way VMT analyses are conducted in the State. State-wide implementation of the new metric was required by July 1, 2020. Pursuant to current statutes, the County of Los Angeles has adopted VMT as the metric for determining environmental impacts in compliance with SB 743. On July 23, 2020, the County of Los Angeles Department of Public Works (LACPW) Traffic Safety & Mobility Division released its VMT-focused transportation analysis methodology and guidelines, Transportation Impact Analysis Guidelines 2. Although the City of Downey has not yet adopted revised transportation impact assessment guidelines, a VMT assessment has been prepared to comply with this State legislation. In general, the City of Downey may elect to utilize LACPW’s current Transportation Impact Analysis Guidelines as a benchmark for the TIA requirements, with variations as outlined in the City’s future guidelines. While the City may formally adopt VMT methodology for environmental impact analysis, it should be noted that the City has retained a requirement for local intersection operational analyses. Therefore, this study also assumes preparation of intersection LOS analysis. Specifically, the Intersection Capacity Utilization (ICU) methodology is utilized to evaluate LOS at the City of Downey signalized study intersections. 1.3 Los Angeles County Congestion Management Program Status The Los Angeles County Congestion Management Program (CMP) was previously a state-mandated program that was enacted by the California State Legislature with the passage of Proposition 111 in 1990 that primarily utilized a level of service (LOS) performance metric. Pursuant to California Government Code §65088.3, local jurisdictions may opt out of the CMP requirement without penalty if a majority of the local jurisdictions representing a majority of the County’s population formally adopt resolutions requesting to opt out of the program. As of November 2019, the majority 1 Technical Advisory on Evaluating Transportation Impacts in CEQA, Governor’s Office of Planning and Research, December 2018. 2 Los Angeles County Department of Public Works (LACPW) Transportation Impact Analysis Guidelines, July 23, 2020. -3-PC AGENDA PAGE 35 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 1-22-4499-1 Serapis Avenue/Telegraph Road Chick-fil-A Project O:\JOB_FILE\4499\Report\4499-Rpt2.doc of local agencies representing the majority of the County’s population have adopted resolutions to opt out of the program. Therefore, the CMP is no longer applicable in Los Angeles County. -4-PC AGENDA PAGE 36 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 1-22-4499-1 Serapis Avenue/Telegraph Road Chick-fil-A Project O:\JOB_FILE\4499\Report\4499-Rpt2.doc 2.0 PROJECT DESCRIPTION 2.1 Existing Project Site The project site is located at 9148 Telegraph Road in the City of Downey, California. The proposed project site consists of two parcels (APN’s: 6388-004-019 and 6388-004-017) and is generally bounded by Telegraph Road to the north, Serapis Avenue to the east, existing residential development to the south, and existing commercial and residential development to the west. The proposed project site and general vicinity are shown in Figure 1-1. The project site is currently occupied by two existing restaurants: the 7,491 square-foot Frantone’s Pizza & Spaghetti Villa on the west side of the project site; and the 2,565 square-foot Chris Burgers located in the northeast corner of the project site. Vehicular access to the project site is currently provided via two driveways along Telegraph Road and four driveways along Serapis Avenue. The existing restaurants will be demolished in order to accommodate the proposed project. An aerial photograph of the existing project site is presented in Figure 2-1. 2.2 Proposed Project Description The proposed project consists of the development of a 4,777 square-foot Chick-fil-A restaurant at the project site. The restaurant will accommodate both indoor and outdoor dining via 90 interior seats and 32 outdoor seats in a 574 square-foot patio area located west of the proposed building. The restaurant is also planned to provide two (2) drive-through service lanes, which will accommodate up to 44 vehicles in queue. Construction and occupancy of the proposed project is anticipated to be completed by the year 2024. The site plan for the proposed project is illustrated in Figure 2-2. 2.3 Project Site Access 2.3.1 Vehicular Site Access Vehicular access to the project site will be accommodated by two (2) project driveways, including one driveway located on Telegraph Road and one driveway located on Serapis Avenue. A description of each proposed project site access point is provided in further detail below: • Telegraph Road Driveway The Telegraph Road project driveway will be located along the northerly property frontage near the northwest corner of the project site. Two (2) inbound lanes and one (1) outbound lane will be provided at the Telegraph Road driveway, which will provide access to the surface parking spaces and internal drive aisles. Due to the existing raised concrete median along Telegraph Road, this driveway will be limited to right-turn inbound and outbound turning movements only. • Serapis Avenue Driveway The Serapis Avenue project driveway will be located along the easterly property frontage. One (1) inbound lane and one (1) outbound lane will be provided at the Serapis Avenue driveway, which will provide access to the surface parking spaces and internal drive aisles. -5-PC AGENDA PAGE 37 -6-PC AGENDA PAGE 38 -7-PC AGENDA PAGE 39 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 1-22-4499-1 Serapis Avenue/Telegraph Road Chick-fil-A Project O:\JOB_FILE\4499\Report\4499-Rpt2.doc The Serapis Avenue driveway will accommodate full access (i.e., right-turning and left- turning inbound and outbound movements). The proposed project will result in the closure of four existing driveways (i.e., one driveway on Telegraph Road and three driveways on Serapis Avenue). The driveways will be closed and reconstructed with sidewalk, curb, and gutter to the City of Downey’s current design standards. It is noted that the existing site currently has a total of four (4) driveways along Serapis Avenue. The proposed project would result in the consolidation of these existing driveways into one (1) driveway, which is expected to result in a reduced potential for conflicts between vehicles entering and exiting the project site and pedestrians and other vehicles traveling along Serapis Avenue. Within the project site, vehicle circulation will be accommodated by drive aisles which provide access to the surface parking spaces and the drive-through service lanes. The drive-through service lanes will be accessible from the westerly drive aisle and will wrap counter-clockwise around the proposed restaurant building adjacent to the southerly property line, and will exit adjacent to the Serapis Avenue project driveway. It is further understood that should the project driveway along Serapis Avenue become blocked for any reason in a way that may affect on-site drive-through operations, Chick-fil-A staff will be present to direct vehicles to exit the site via the project driveway on Telegraph Road. 2.3.2 Non-Vehicular Site Access In addition to vehicular site access, the project site is planned to accommodate non-vehicular access to the proposed restaurant. Pedestrian access within the project site will be accommodated by an Americans with Disabilities Act (ADA) compliant walkway that will connect to the restaurant building and patio dining area from Serapis Avenue, as shown in Figure 2-2. The walkway will provide exclusive pedestrian and bicycle access from the public sidewalks to the proposed restaurant building. The walkways thus minimize the extent of pedestrian and bicycle interaction with vehicles at the site and provide a comfortable, convenient, and safe environment for pedestrians and bicyclists accessing the proposed restaurant from outside the project site. 2.4 Project Parking The proposed project is planned to provide a total of 61 parking spaces, including three (3) handicap accessible spaces and four (4) spaces reserved for clean air, vanpool, or electric vehicles. In addition, the project site will provide six (6) public short-term bicycle parking spaces and four (4) secure long- term bicycle parking spaces west of the outdoor dining area. A calculation of the Code parking requirement was prepared in accordance with the City of Downey Municipal Code nonresidential parking requirements (Section 9712, Nonresidential Parking Requirements). According to the Municipal Code, the required parking ratio for a drive-through eating and drinking establishment is one (1) space for every 100 square feet of gross floor area. The proposed project will provide 4,777 square feet of floor area as well as 574 square feet of outdoor patio area, or a total of 5,351 square feet. Therefore, application of the Municipal Code parking -8-PC AGENDA PAGE 40 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 1-22-4499-1 Serapis Avenue/Telegraph Road Chick-fil-A Project O:\JOB_FILE\4499\Report\4499-Rpt2.doc regulations results in an on-site parking requirement of 54 spaces (i.e., 5,351 SF * 1 space/100 SF = 54 spaces). The proposed project’s planned on-site parking supply of 61 spaces therefore exceeds the Municipal Code parking requirement of 54 spaces, resulting in a surplus of seven (7) spaces. 2.5 Project Trip Generation and Distribution 2.5.1 Project Trip Generation Forecast Traffic generation is expressed in vehicle trip ends, defined as one-way vehicular movements, either entering or exiting the generating land use. The traffic volumes anticipated to be generated by the proposed project were forecast for the typical weekday mid-day and PM peak hours as well as over a 24-hour period (i.e., daily). Trip generation rate information provided in the Institute of Transportation Engineers’ (ITE) Trip Generation Manual, 11th Edition 3 and Trip Generation Handbook, 3rd Edition4 was utilized to prepare the trip generation forecast. Specifically, trip generation average rates per 1,000 square feet of gross floor area for Fast-Food Restaurant with Drive-Through Window (ITE Land Use Code 934) were used to forecast the trips generated by the proposed Chick-fil-A restaurant. Based on information provided in the Trip Generation Manual appendices regarding the hourly distribution of entering and exiting vehicle trips, the peak trip generation on a typical weekday occurs between 12:00 and 1:00 PM for the proposed land use. Therefore, trip generation average rates associated with the PM Peak Hour of Generator were used in order to forecast the weekday mid-day peak hour trip generation. In recognition of the generally higher level of activity at Chick-fil-A restaurants in the region compared to typical fast-food developments, the trip generation average rates applied to the proposed Chick- fil-A project have been adjusted upward by one standard deviation. A forecast was also made of likely pass-by trips that could be anticipated at the site for the proposed project. Pass-by trips are intermediate stops made on the way from an origin to a primary trip destination without a route diversion. Pass-by trips are attracted from traffic passing the site on an adjacent street or roadway that offers direct access to the site. The Trip Generation Handbook presents the national database of pass-by trip rates for 25 land uses, including Fast-Food Restaurant with Drive-Through Window (ITE Land Use 934). Pursuant to the data presented in the Handbook, a 50% pass-by adjustment has been applied to the vehicle trip generation forecast for the proposed Chick-fil-A restaurant. Trip generation forecasts were also prepared for the two existing restaurants which currently occupy the project site. Trip generation average rates for High-Turnover (Sit-Down) Restaurant (ITE Land Use Code 932) and Fast-Food Restaurant with Drive-Through Window (ITE Land Use Code 934) were used to forecast the expected traffic generation for the existing Frantone’s Pizza and Spaghetti Villa and Chris Burgers, respectively. Based on information provided in the Trip Generation Manual appendices regarding the hourly distribution of entering and exiting vehicle trips, the peak trip 3 Institute of Transportation Engineers Trip Generation Manual, 11th Edition, Washington D.C., 2021. 4 Institute of Transportation Engineers Trip Generation Handbook, 3rd Edition, Washington, D.C., revised 2017. -9-PC AGENDA PAGE 41 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 1-22-4499-1 Serapis Avenue/Telegraph Road Chick-fil-A Project O:\JOB_FILE\4499\Report\4499-Rpt2.doc generation on a typical weekday occurs between 12:00 and 1:00 PM for both existing land uses; therefore, trip generation average rates associated with the PM Peak Hour of Generator were used in order to forecast the weekday mid-day peak hour trip generation. Consistent with the trip generation forecast prepared for the proposed project, a pass-by adjustment was applied to the existing restaurants’ vehicle trip generation forecasts. Pursuant to the data presented in the Trip Generation Handbook for High-Turnover (Sit-Down) Restaurant (ITE Land Use Code 932), a 43% pass-by adjustment has been applied to the vehicle trip generation forecast for Frantone’s Pizza and Spaghetti Villa. A 50% pass-by adjustment has been applied to the vehicle trip generation forecast for Chris Burgers, consistent with the data presented for Fast-Food Restaurant with Drive-Through Window land uses. The trip generation rates and forecast of the vehicular trips anticipated to be generated by the proposed project are presented in Table 2-1. As summarized in Table 2-1, the proposed project is expected to generate a net increase of 46 vehicle trips (24 net new inbound trips and 22 net new outbound trips) during the weekday mid-day peak hour. During the weekday PM peak hour, the proposed project is expected to generate a net increase of 41 vehicle trips (18 net new inbound trips and 23 net new outbound trips). Over a 24-hour period, the proposed project is forecast to generate a net increase of 629 vehicle trips (approximately 315 net new inbound trips and 315 net new outbound trips) during a typical weekday. 2.5.2 Project Trip Distribution and Assignment Project traffic volumes both entering and exiting the site have been distributed and assigned to the adjacent street system based on the following considerations: • The site's proximity to major traffic corridors (i.e., Telegraph Road, Rosemead Boulevard, Lakewood Boulevard, Passons Boulevard, etc.); • Expected localized traffic flow patterns based on adjacent roadway channelization and presence of traffic signals; • Existing intersection traffic volumes; • Ingress/egress scheme planned for the proposed project; and • Nearby population and employment centers. The general, directional traffic distribution patterns for the proposed project are presented in Figure 2-3. The forecast net new weekday mid-day and PM peak hour project traffic volumes at the study intersections associated with the proposed project are presented in Figure 2-4. The traffic volume assignments presented in Figure 2-4 reflects the traffic distribution characteristics shown in Figure 2-3 and the project trip generation forecasts presented in Table 2-1. -10-PC AGENDA PAGE 42 Table 2-1 PROJECT TRIP GENERATION FORECAST TRIP GENERATION RATES [1] ITE WEEKDAY WEEKDAY LAND USE WEEKDAY MID-DAY PEAK HOUR PM PEAK HOUR ITE LAND USE CATEGORY CODE VARIABLE IN (%)OUT (%)TOTAL IN (%)OUT (%)TOTAL High-Turnover (Sit-Down) Restaurant [2]932 Per 1,000 SF 107.20 51%49%16.35 61%39%9.05 Fast-Food Restaurant with Drive- Through Window [2]934 Per 1,000 SF 467.48 51%49%50.94 52%48%33.03 Chick-fil-A Restaurant [3]Per 1,000 SF 706.10 51%49%75.85 52%48%50.62 PROJECT TRIP GENERATION FORECAST ITE DAILY MID-DAY PEAK HOUR PM PEAK HOUR LAND USE TRIP ENDS [4]VOLUMES [4]VOLUMES [4] LAND USE CODE SIZE VOLUMES IN OUT TOTAL IN OUT TOTAL Proposed Project Chick-fil-A [3]4,777 GSF 3,373 185 177 362 126 116 242 - Less Pass-by (50%) [5](1,687)(93)(89)(182)(63)(58)(121) Subtotal Proposed Project 1,686 92 88 180 63 58 121 Existing Uses to be Removed Frantone's Pizza & Spaghetti Villa 932 (7,491)GSF (803)(62)(60)(122)(41)(27)(68) - Less Pass-by (43%) [5]345 27 26 53 18 12 30 Chris Burgers 934 (2,565)GSF (1,199)(67)(64)(131)(44)(41)(85) - Less Pass-by (50%) [5]600 34 32 66 22 21 43 Subtotal Existing Uses to be Removed (1,057)(68)(66)(134)(45)(35)(80) NET NEW PROJECT TRIPS 629 24 22 46 18 23 41 [1]Source: ITE "Trip Generation Manual", 11th Edition, 2021. [2] [3] - Daily Trip Rate: (467.48 + 238.62) = 706.10 trips per 1,000 SF of floor area; - Mid-Day Peak Hour Trip Rate: (50.94 + 24.91) = 75.85 trips per 1,000 SF of floor area; - PM Peak Hour Trip Rate: (33.03 + 17.59) = 50.62 trips per 1,000 SF of floor area. [4]Trips are one-way traffic movements, entering or leaving. [5]Sources: ITE "Trip Generation Manual", 11th Edition, 2021 and ITE "Trip Generation Handbook", 3rd Edition, revised 2017. Pass-by trips are made as intermediate stops on the way from an origin to a primary destination without a route diversion. Pass-by trips are attracted from traffic passing the site on an adjacent street or roadway that offers direct access to the site. In recognition of the higher level of activity at Chick-fil-A restaurants in the region compared to typical fast-food development, the trip generation rates applied to the proposed project represents the average trip generation rates for Land Use 934 which have been adjusted upward by one standard deviation, as shown below: Based on Vehicle Time of Day Distributions provided in the Trip Generation Manual Appendices, the peak hour of trip generation for this land use occurs from 12:00-1:00 PM. Therefore, the trip rates associated with the Weekday PM Peak Hour of Generator were used to forecast weekday mid-day peak hour trips. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 1-22-4499-1 Serapis Avenue/Telegraph Road Chick-fil-A Project -11-PC AGENDA PAGE 43 -12-PC AGENDA PAGE 44 -13-PC AGENDA PAGE 45 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 1-22-4499-1 Serapis Avenue/Telegraph Road Chick-fil-A Project O:\JOB_FILE\4499\Report\4499-Rpt2.doc 2.6 Drive-Through Service Window Vehicle Queuing A review of the expected maximum drive-through service-window vehicle queue lengths was conducted to determine the adequacy of the proposed service-lane queue storage areas. In recognition of the unique vehicle queuing characteristics of Chick-fil-A restaurants, vehicle queuing at three (3) other existing Chick-fil-A restaurant locations in the Southern California region was reviewed in order to more appropriately forecast the expected vehicle queue at the proposed project. The following three (3) locations were observed in order to document the queuing at existing Chick- fil-A drive-through operations: • 4127 Campus Drive, Irvine, California • 31872 Del Obispo Street, San Juan Capistrano, California • 31479 Avenue E, Yucaipa, California Queuing observations at these existing locations were conducted in December 2021 (i.e., after the Los Angeles County Health Department Safer at Home orders due to COVID-19 had been lifted and local schools were in regular in-person session). The queue observations were collected by the independent traffic data subconsultant Transportation Studies Inc. (TSI) on three consecutive days (i.e., Thursday, Friday, and Saturday) during the morning (7:00-9:00 AM), mid-day (11:00 AM-2:00 PM), and evening (4:00-7:00 PM) peak service periods. The vehicular queues at each site were recorded at 5-minute intervals during these observation periods. The queuing observation data worksheets are provided in Appendix A. The queue length frequency at each observation site, as well as the aggregate queue length frequency for all three sites is presented in Table 2-2. Based on the aggregate observations, an average of 11 vehicles in the drive-through service window queue can be expected, with an 85th percentile queue of 18 vehicles and a 95th percentile queue of 22 vehicles. The 85th percentile queue represents the maximum vehicle queue with approximately 85 percent probability; 85 percent of the time the queue is expected to be 18 vehicles or less, and 15 percent of the time the queue may be 19 vehicles or more. The 95th percentile queue represents the maximum vehicle queue with 95 percent probability; 95 percent of the time the queue is expected to be 22 vehicles or less, and five (5) percent of the time the queue may be 23 vehicles or more. The maximum observed queue totaled 31 vehicles. It is noted that while the 85th percentile queue is the design standard typically used in the traffic engineering profession the 95th percentile queue has been used in order to provide a conservative assessment, especially since the drive-through service window queue at the project site has the potential to back onto a major roadway (Telegraph Road). As shown in Figure 2-2, the proposed project is planned to accommodate up to 44 vehicles in queue. Therefore, the proposed drive-through service lanes are expected to adequately accommodate the 95th percentile queue of 22 vehicles without encroaching into the on-site drive-aisles or the adjacent public right-of-way. The proposed drive-through service lanes would also adequately accommodate the maximum observed queue of 31 vehicles. It is noted that the typical queue throughout the rest of the day is expected to be less than the vehicle queue during the morning, mid-day, and evening peak service times. -14-PC AGENDA PAGE 46 Table 2-2 Summary of Chick-fil-A Drive-Through Service Lane Queuing Observations OBSERVED FREQUENCY OF QUEUE LENGTH TOTAL CUMULATIVE QUEUE QUEUE QUEUE LENGTH LENGTH LENGTH PERCENT (VEHICLES) [1]FREQUENCY FREQUENCY PROBABILITY 0 5 12 0 17 17 1.7% 1 8 4 3 15 32 3.3% 2 2 19 3 24 56 5.8% 3 11 13 9 33 89 9.2% 4 9 14 17 40 129 13.3% 5 7 9 15 31 160 16.5% 6 11 15 23 49 209 21.5% 7 9 20 31 60 269 27.7% 8 18 28 15 61 330 34.0% 9 4 23 23 50 380 39.1% 10 14 27 22 63 443 45.6% 11 12 29 26 67 510 52.5% 12 21 20 18 59 569 58.5% 13 22 23 24 69 638 65.6% 14 18 15 19 52 690 71.0% 15 19 13 10 42 732 75.3% 16 13 14 22 49 781 80.3% 17 25 8 8 41 822 84.6% 18 26 5 6 37 859 88.4% 19 17 2 8 27 886 91.2% 20 8 2 4 14 900 92.6% 21 15 3 2 20 920 94.7% 22 8 2 5 15 935 96.2% 23 7 3 4 14 949 97.6% 24 7 0 3 10 959 98.7% 25 2 0 0 2 961 98.9% 26 1 1 1 3 964 99.2% 27 5 0 1 6 970 99.8% 28 0 0 1 1 971 99.9% 29 0 0 0 0 971 99.9% 30 0 0 0 0 971 99.9% 31 0 0 1 1 972 100.0% Total Observations 324 324 324 972 ---- Average 14 10 11 11 ---- 85th Percentile 20 15 16 18 ---- 95th Percentile 23 18 21 22 ---- Maximum 27 26 31 31 ---- [1]Queue length represents the maximum vehicle queue observed every five (5) minutes during the observation period. [2] [3] 4127 Campus Drive, Irvine [2] 31872 Del Obispo St., San Juan Cap. [2] 31479 Avenue E, Yucaipa [3] Observations were conducted on December 9 through 11, 2021, for the hours of 7:00-9:00 AM, 11:00 AM-2:00 PM, and 4:00-8:00 PM. Observations were conducted on December 16 through 18, 2021, for the hours of 7:00-9:00 AM, 11:00 AM-2:00 PM, and 4:00-8:00 PM. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 1-22-4499-1 Serapis Avenue/Telegraph Road Chick-fil-A Project -15-PC AGENDA PAGE 47 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 1-22-4499-1 Serapis Avenue/Telegraph Road Chick-fil-A Project O:\JOB_FILE\4499\Report\4499-Rpt2.doc Even though it is anticipated that the proposed drive-through service lanes will accommodate all potential queues at the project site, Chick-fil-A staff will implement the following program on an as- needed basis during peak operating times in order to ensure that the queue will not extend into the public right-of-way. The program consists of the following as provided by Chick-fil-A management staff:  “Our restaurants are staffed so that if the drive-thru queuing begins stacking onto the street, team members go out and assist with ordering via Chick-fil-A’s iPad ordering system. Our operators use the iPad ordering during our peak hours of 11:30 am to 1:30 pm and any additional time when needed. The iPad ordering system allows team members to take orders, receive payment, and assist with traffic movement within the parking lot. Based on data from our other comparable stores, the iPad ordering system increases the Chick-fil-A drive thru speed of service by 30% than the typical speaker box. Putting people forward in the drive-through is one of our biggest competitive advantages in the market because it personally connects our team members with our valued guest. We innovations that increase capacity and put our people forward to care for our guest in every interaction. Our customers enjoy the face to face ordering over the standard drive thru experience.” Along with face-to-face ordering, Chick-fil-A has implemented a dual drive-through concept from the entrance of the drive-through to the pick-up window. The outer drive-through lane can be used for full order take and meal delivery, mobile pick up lane, or for a pickup point for smaller orders. The Operator has the flexibility to use the second lane as they see fit (during peak demand). Chick- fil-A team members will take orders and deliver orders in both lanes. Appropriate safety signage and protocols are placed throughout the drive-through. It should be noted that Chick-fil-A team members will control the drive-through area after the pick- up window, ensuring that only one vehicle will depart at a time after they receive their order, in order to minimize potential vehicle turning-movement conflicts. -16-PC AGENDA PAGE 48 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 1-22-4499-1 Serapis Avenue/Telegraph Road Chick-fil-A Project O:\JOB_FILE\4499\Report\4499-Rpt2.doc 3.0 PROJECT SITE CONTEXT The project site is located within a well-established multi-modal transportation network maintained by the City of Downey. The following sections provide an overview of the transportation infrastructure in the vicinity of the proposed project, including infrastructure which supports both motorized and non-motorized transportation modes. 3.1 Non-Vehicle Network Non-vehicular transportation generally encompasses walking, biking, and other active transportation modes. Distinct facilities are often provided for these non-vehicular modes. Most prominently, paved sidewalks are typically provided to facilitate pedestrian travel outside of the roadway. In some cases, bicycle facilities such as painted bike lanes or separated bike paths are provided within the roadway in order to separate bike traffic from vehicular traffic. Roadways which are designed to prioritize non-vehicular transportation modes utilize complimentary non-vehicular infrastructure in order to promote comfortable, safe travel for both pedestrians and bicyclists. A review of the pedestrian and bicycle infrastructure provided in the vicinity of the project site is provided below. 3.1.1 Pedestrian System Pedestrian infrastructure consists of facilities such as sidewalks, crosswalks, pedestrian signals, curb access ramps, Americans with Disabilities Act (ADA) compliant tactile warning pads, and curb extensions, among other things. These facilities are widely provided within the study area. Public sidewalks are provided along the major corridors in the City, including Telegraph Road, Serapis Avenue, and Passons Boulevard. Marked crosswalks, pedestrian signals, and curb ramps and tractile warning pads (i.e., truncated dome pads) are also provided at the study intersections. Development of the proposed project would not conflict with the existing pedestrian system. 3.1.2 Bicycle System Bicycle infrastructure consists of both facilities within the roadway as well as public bicycle parking spaces. The Federal and State transportation systems recognize three primary bikeway facilities: Bicycle Paths (Class I), Bicycle Lanes (Class II), and Bicycle Routes (Class III). Bicycle Paths (Class I) are exclusive car free facilities that are typically not located within a roadway area. Bicycle Lanes (Class II) are part of the street design that is dedicated only for bicycles and identified by a striped lane separating vehicle lanes from bicycle lanes. Bicycle Routes (Class III) are preferably located on collector and lower volume arterial streets. The existing and proposed bicycle infrastructure in the City of Downey is illustrated in Figure 3-1. As shown in Figure 3-1, there are currently no designated bicycle facilities within the City of Downey, aside from the San Gabriel River Trail which is located approximately one (1) mile east of the project site in the adjacent City of Santa Fe Springs. The Southern California Association of Government’s (SCAG) Regional Bikeway Shapefile (RBS) identifies potential bicycle routes within the City based on information provided by the Los Angeles County Transportation Commission and the City of Downey. As shown in Figure 3-1, potential bicycle facilities in closest proximity to the -17-PC AGENDA PAGE 49 -18-PC AGENDA PAGE 50 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 1-22-4499-1 Serapis Avenue/Telegraph Road Chick-fil-A Project O:\JOB_FILE\4499\Report\4499-Rpt2.doc proposed project site include Telegraph Road and Passons Boulevard. Additionally, the Downey Bike Master Plan Implementation Phase 1 Downtown/Transit project under Capital Improvement Program (CIP) 19-14 would include installation of Class II bicycle facilities on nine roadway segments, bicycle parking facilities, and way-finding signs. Development of the proposed project would not conflict with the existing or proposed bicycle system. 3.2 Transit Network Public bus transit service is provided within the project study area. Public bus transit service is currently provided by the City of Downey (DowneyLink), City of Montebello (Montebello Bus Line) and the Los Angeles County Metropolitan Transportation Authority (Metro). A summary of the existing transit service in the vicinity of the project site is presented in Table 3-1. The existing public transit routes in the vicinity of the project site are illustrated in Figure 3-2. As summarized in Table 3-1, a total of four (4) public transit routes provide service within the project study area. The nearest transit stops are provided at the Serapis Avenue/Telegraph Road intersection adjacent to the project site. Transit service at these stops is provided approximately every 30 minutes or more during the weekday morning and afternoon peak hours. 3.3 Vehicle Network 3.3.1 Roadway Classifications The City of Downey utilizes the roadway categories recognized by regional, state and federal transportation agencies. There are four categories in the roadway hierarchy, ranging from freeways with the highest capacity to two-lane undivided roadways with the lowest capacity. The roadway categories are summarized as follows: • Freeways are limited-access and high speed travel ways included in the state and federal highway systems. Their purpose is to carry regional through-traffic. Access is provided by interchanges with typical spacing of one mile or greater. No local access is provided to adjacent land uses. • Arterial roadways are major streets that primarily serve through-traffic and provide access to abutting properties as a secondary function. Arterials are generally designed with two to six travel lanes and their major intersections are signalized. This roadway type is divided into two categories: principal and minor arterials. Principal arterials are typically four-or-more lane roadways and serve both local and regional through-traffic. Minor arterials are typically two-to-four lane streets that service local and commuter traffic. • Collector roadways are streets that provide access and traffic circulation within residential and non-residential (e.g., commercial and industrial) areas. Collector roadways connect local streets to arterials and are typically designed with two through travel lanes (i.e., one through travel lane in each direction) that may accommodate on-street parking. They may also provide access to abutting properties. -19-PC AGENDA PAGE 51 Table 3-1 EXISTING TRANSIT ROUTES [1] NO. OF BUSES TRANSIT CORRIDOR(S)TRANSIT STOP DURING PEAK HOUR ROUTE DESTINATIONS IN VICINITY OF SITE NEAREST TO SITE DIR AM PM DowneyLink -Telegraph Road Serapis Avenue/C/Clockwise 1 0 North Telegraph Road DowneyLink -Telegraph Road Serapis Avenue/C/Clockwise 0 2 Northeast Telegraph Road Metro 62 Telegraph Road Serapis Avenue/EB 2 2 Telegraph Road WB 2 3 Montebello Bus Line - 60 Passons Boulevard Serapis Avenue/NB 1 0 Telegraph Road SB 1 1 TOTAL 7 8 [1] North Route Circular Mid-Day Only Sources: City of Downey (DowneyLink), City of Montebellow (Montebello Bus Line), Los Angeles County Metropolitan Transportation Authority (Metro) websites, 2022. Northeast Route Circular AM/PM Peak Hours Hawaiian Gardens to Downtown Los Angeles via Cerritos, Norwalk, Pico Rivera, Commerce, Boyle Heights San Gabriel River Parkway to Pico Rivera LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 1-22-4499-1 Serapis Avenue/Telegraph Road Chick-fil-A Project-20-PC AGENDA PAGE 52 -21-PC AGENDA PAGE 53 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 1-22-4499-1 Serapis Avenue/Telegraph Road Chick-fil-A Project O:\JOB_FILE\4499\Report\4499-Rpt2.doc • Local roadways distribute traffic within a neighborhood, or similar adjacent neighborhoods, and are not intended for use as a through-street or a link between higher capacity facilities such as collector or arterial roadways. Local streets are fronted by residential uses and do not typically serve commercial uses. Generally, travel lanes are not striped, and parking may be accommodated on one or both sides of the roadway. 3.3.2 Regional Highway System Primary regional access is provided by the I-5 (Golden State) Freeway as shown in Figure 1-1. The I-5 Freeway is a major north-south freeway connecting Southern California with Central and Northern California. In the project vicinity, four mixed-flow mainline freeway lanes are provided in each direction on the I-5 Freeway. Northbound and southbound on/off ramps are provided to and from the I-5 Freeway at Lakewood Boulevard in the project area. 3.3.3 Roadway Descriptions The current lane configurations and traffic control measures at each study intersection is presented in Figure 3-3. Descriptions of the roadways which comprise the study area are provided in Table 3-2, including the roadway classification, number of lanes, median types, and speed limits designated by the City of Downey. 3.4 Traffic Count Data Manual counts of vehicular, pedestrian, and bicycle volumes were conducted at each of the two (2) study intersections during the weekday mid-day and afternoon (PM) peak periods to determine the peak hour traffic volumes. The manual counts were conducted in October 2022 by an independent traffic count subconsultant (City Traffic Counters) at the study intersections on a typical weekday from 11:30 AM to 1:30 PM and from 4:00 PM to 6:00 PM to determine the mid-day and PM peak commute hours, respectively. It is noted that all traffic counts were conducted when local schools were in regular, in-person session. The existing weekday mid-day and PM peak hour intersection traffic volumes by approach are summarized in Table 3-3. The existing traffic volumes at the study intersections during the weekday mid-day and PM peak hours are shown in Figure 3-4. Summary data worksheets of the manual traffic counts of the study intersections are contained in Appendix B. 3.5 Future Cumulative Traffic Volumes The forecast of future pre-project conditions was prepared in accordance to procedures outlined in Section 15130 of the CEQA Guidelines. Specifically, the CEQA Guidelines provide two options for developing the future traffic volume forecast: “(A) A list of past, present, and probable future projects producing related or cumulative impacts, including, if necessary, those projects outside the control of the [lead] agency, or -22-PC AGENDA PAGE 54 -23-PC AGENDA PAGE 55 Table 3-2 EXISTING ROADWAY DESCRIPTIONS TRAVEL LANES MEDIAN SPEED ROADWAY CLASSIFICATION [1]DIRECTION [2]NO. LANES [3]TYPES [4]LIMIT Telegraph Road Major Arterial EB-WB 6 to 5 [5]RMI/2WLT 40 Serapis Avenue Local Street NB-SB 2 [5], [6]N/A 25 Passons Boulevard Local Street NB-SB [5], [6]N/A 25 Notes: [1]Roadway classifications obtained from the City of Downey General Plan Vision 2025, Circulation Plan , adopted January 25, 2005, and City of Norwalk General Plan Circulation Element , adopted Febuary 29, 1996. [2]Direction of roadways in the project area: NB-SB = northbound and southbound; and EB-WB = eastbound and westbound. [3]Number of lanes in both directions on the roadway. [4]Median type of the road: RMI = Raised Median Island; 2WLT = 2-Way Left-Turn Lane; and N/A = Not Applicable. [5]City of Downey [6]City of Pico Rivera LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 1-22-4499-1 Serapis Avenue/Telegraph Road Chick-fil-A Project -24-PC AGENDA PAGE 56 Table 3-3 EXISTING TRAFFIC VOLUMES [1] WEEKDAY MID-DAY AND PM PEAK HOURS MID-DAY PEAK HOUR PM PEAK HOUR NO.INTERSECTION DATE DIR BEGAN VOLUME BEGAN VOLUME 1 Serapis Avenue/10/19/2022 NB 12:15 PM 103 5:00 PM 116 Telegraph Road SB 130 214 EB 828 1,389 WB 828 1,069 2 Passons Boulevard/10/19/2022 NB 12:30 PM 67 5:00 PM 81 Telegraph Road SB 155 219 EB 741 1,264 WB 682 932 [1]Counts conducted by City Traffic Counters. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 1-22-4499-1 Serapis Avenue/Telegraph Road Chick-fil-A Project -25-PC AGENDA PAGE 57 -26-PC AGENDA PAGE 58 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 1-22-4499-1 Serapis Avenue/Telegraph Road Chick-fil-A Project O:\JOB_FILE\4499\Report\4499-Rpt2.doc (B) A summary of projections contained in an adopted local, regional or statewide plan, or related planning document, that describes or evaluates conditions contributing to the cumulative effect. Such plans may include: a general plan, regional transportation plan, or plans for the reduction of greenhouse gas emissions. A summary of projections may also be contained in an adopted or certified prior environmental document for such a plan. Such projections may be supplemented with additional information such as a regional modeling program. Any such document shall be referenced and made available to the public at a location specified by the lead agency.” Although the CEQA Guidelines do not strictly apply to the local transportation assessment required by the City of Downey, this traffic analysis provides a highly conservative estimate of future pre- project traffic volumes as it incorporates both the “A” and “B” options for purposes of developing the forecast. 3.5.1 Related Projects A forecast of on-street traffic conditions prior to occupancy of the proposed project was prepared by incorporating the potential trips associated with other known development projects (related projects) in the area (i.e., within an approximate one-mile radius from the project site). With this information, the potential impact of the proposed project can be evaluated within the context of the cumulative impacts of all ongoing development. The related projects research was based on information on file with the City of Downey and the City of Pico Rivera. The list of related projects in the project site area is presented in Table 3-4. The location of the related projects is shown in Figure 3-5. Traffic volumes expected to be generated by the related projects were calculated using rates provided in the Institute of Transportation Engineers’ (ITE) Trip Generation Manual. The related projects’ respective traffic generation for the weekday mid-day and PM peak hours, as well as on a daily basis for a typical weekday, is summarized in Table 3-4. The related projects traffic volumes were distributed and assigned to the street system based on the projects’ locations in relation to the study intersections, their proximity to major traffic corridors, proposed land uses, nearby population and employment centers, etc. The anticipated distribution of the related projects traffic volumes to the study intersections during the weekday mid-day and PM peak hours are displayed in Figure 3-6. 3.5.2 Ambient Traffic Growth Factor Horizon year background traffic growth estimates have been calculated using an ambient traffic growth factor. The ambient traffic growth factor is intended to include unknown related projects in the study area as well as account for typical growth in traffic volumes due to the development of projects outside the study area. An annual growth rate of one percent (1.0%) per year was selected for this analysis. Therefore, application of this one percent (1.0%) annual ambient growth factor in addition to the forecast traffic generated by the related projects allows for a very conservative forecast of future traffic volumes in the project study area as incorporation of both (i.e., an ambient traffic growth rate -27-PC AGENDA PAGE 59 Table 3-4 RELATED PROJECTS LIST AND TRIP GENERATION [1] PROJECT MID-DAY PEAK HOUR PM PEAK HOUR MAP PROJECT PROJECT NAME/NUMBER LAND USE DATA DATA TRIP ENDS [2]VOLUMES [2], [3]VOLUMES [2] NO.STATUS ADDRESS/LOCATION LAND-USE SIZE SOURCE VOLUMES IN OUT TOTAL IN OUT TOTAL City of Downey D1 Proposed Telegraph Medical Plaza Medical Office 7,800 GSF [4]281 15 22 37 9 22 31 9432 Telegraph Road D2 Proposed Telegraph Townhomes Townhomes 39 DU [5]263 14 8 22 13 7 20 7940 Telegraph Road City of Pico Rivera P1 Proposed SoCalGas Office Building Office 259 Employees [6]1,146 22 126 148 22 126 148 8101 Rosemead Boulevard P2 Approved Starbucks Coffee Shop 2 Lanes [7]358 17 17 34 15 15 30 9257 Slauson Ave TOTAL 2,048 68 173 241 59 170 229 [1] [2]Trips are one-way traffic movements, entering or leaving. [3] [4]ITE Land Use Code 720 (Medical-Dental Office Building - Stand-Alone) trip generation average rates. [5]ITE Land Use Code 220 (Multifamily Housing (Low-Rise) Not Close to Rail Transit) trip generation average rates. [6]Source: "SoCalGas Office Building Project" Initial Study/Mitigated Negative Declaration, prepared by Michael Baker International, August 2022. [7] The trip rates associated with the Weekday PM Peak Hour of Generator were used to forecast weekday mid-day peak hour trips. ITE Land Use Code 938 (Coffee/Donut Shop with Drive-Through Window and No Indoor Seating) trip generation average rates. The drive-through lane and walk-up window are assumed to represent (2) service lanes. Sources: City of Downey Community Development, Planning and the City of Pico Rivera, except as noted below. Traffic volumes were obtained by applying trip rates as provided in the ITE "Trip Generation Manual", 11th Edition, 2021, except where noted below. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 1-22-4499-1 Serapis Avenue/Telegraph Road Chick-fil-A Project-28-PC AGENDA PAGE 60 -29-PC AGENDA PAGE 61 -30-PC AGENDA PAGE 62 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 1-22-4499-1 Serapis Avenue/Telegraph Road Chick-fil-A Project O:\JOB_FILE\4499\Report\4499-Rpt2.doc and a detailed list of cumulative development projects) is expected to overstate potential future traffic volumes. -31-PC AGENDA PAGE 63 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 1-22-4499-1 Serapis Avenue/Telegraph Road Chick-fil-A Project O:\JOB_FILE\4499\Report\4499-Rpt2.doc 4.0 CEQA TRANSPORTATION ASSESSMENT The State of California Governor’s Office of Planning and Research (OPR) issued proposed updates to the CEQA guidelines in November 2017 that amends the Appendix G question for transportation impacts to delete reference to vehicle delay and level of service and instead refer to Section 15064.3, subdivision (b)(1) of the CEQA Guidelines asking if the project will result in a substantial increase in vehicle miles traveled (VMT). The California Natural Resources Agency certified and adopted the revisions to the CEQA Guidelines in December of 2018, and as of July 1, 2020 the provisions of the new section are in effect statewide. Concurrently, OPR developed the Technical Advisory on Evaluating Transportation Impacts in CEQA (December 2018), which provides non-binding recommendations on the implementation of VMT methodology which has significantly informed the way VMT analyses are conducted in the State. The City of Downey has not formally adopted VMT methodology, screening criteria, or thresholds for VMT analysis of land use development projects within its jurisdiction. Instead, the City follows the methodology set forth in the Los Angeles County Public Works Transportation Impact Analysis Guidelines 5 (“County Guidelines”). Traditionally, public agencies have set certain thresholds to determine whether a project requires detailed transportation analysis or if it could be assumed to have less than significant environmental impacts without additional study. Consistent with the recommendations provided by OPR in the Technical Advisory, the County Guidelines recognize four screening criteria which may be applied to screen proposed projects out of detailed VMT analysis. Proposed projects are not required to satisfy all of the screening criteria in order to screen out of further VMT analysis; satisfaction of one criterion is sufficient for screening purposes. The following sections provide a detailed explanation of each screening criteria as it relates to the proposed project. 4.1.1 Non-Retail Project Trip Generation Screening Criteria Section 3.1.2.1 of the County Guidelines states that: “If the answer is no to the question below, further analysis is not required, and a less than significant determination can be made. • Does the development project generate a net increase of 110 or more daily vehicle trips?” The County Guidelines further indicate that a proposed project’s daily vehicle trip generation should be estimated using the most recent edition of the Institute of Transportation Engineers’ (ITE) Trip Generation Manual, or through use of empirical trip generation data if the project’s land use is not listed in the Manual. As presented in Table 2-1, the proposed project is forecast to generate a net increase of 629 vehicle trips. The answer to the screening question is “Yes”; therefore, the non-retail project trip generation screening criterion is not satisfied. 5 Los Angeles County Public Works, “Transportation Impact Analysis Guidelines”, July 23, 2020. -32-PC AGENDA PAGE 64 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 1-22-4499-1 Serapis Avenue/Telegraph Road Chick-fil-A Project O:\JOB_FILE\4499\Report\4499-Rpt2.doc 4.1.2 Retail Project Screening Criteria New local serving retail development typically redistributes shopping trips rather than creating new ones. By adding retail opportunities into the urban fabric and improving retail destination proximity, local serving retail developments tend to shorten trips and reduce VMT, and may be presumed to cause less than significant impacts. Consistent with OPR’s guidance, the County assumes that retail projects of any type which are less than 50,000 square feet may be considered local serving retail. Therefore, Section 3.1.2.2 of the County Guidelines states: “A project that contains a local serving retail use is assumed to have less than significant VMT impacts for the retail portion of the project. If the answer to the following question is no, a less than significant determination can be made for the portion of the project that contains retail uses. • Does the project contain retail uses that exceed 50,000 square feet of gross floor area?” The proposed project consists of the development of a total of 4,777 square-foot restaurant. The proposed land use type is identified by County Guidelines as a retail land use, and the size of the project is well below 50,000 square feet. Therefore, the answer to the screening question is “No.” The proposed project satisfies the criteria to be considered a local serving use and is screened out of further VMT analysis as it is presumed to cause less than significant transportation impacts. 4.1.3 Proximity to Transit Screening Criteria CEQA Guidelines Section 15064.3(b)(1) states in part: “Generally, projects within one-half mile of either an existing major transit stop or a stop along an existing high-quality transit corridor should be presumed to cause a less than significant transportation impact.” In keeping with the statutory presumption of less than significant impacts due to nearby high-quality transit, the County Guidelines include a screening criterion based on proximity to transit. Consistent with the recommendations provided by OPR, the County also notes certain project-specific or location- specific information which might indicate that the presumption is not appropriate. Thus, Section 3.1.2.3 of the County Guidelines states that: “If the project is located near a major transit stop or high-quality transit corridor, the following question should be considered: • Is the project located within a one-half mile radius of a major transit stop 6 or an existing stop along a high-quality transit corridor 7? If the answer to the above question is yes, then the following subsequent questions should be considered: 6 Public Resources Code Section 21064.3: ““Major transit stop” means a site containing any of the following: (a) An existing rail or bus rapid transit station. (b) A ferry terminal served by either a bus or rail transit service. (c) The intersection of two or more major bus routes with a frequency of service interval of 15 minutes or less during the morning and afternoon peak commute periods. 7 Public Resources Code Section 21155(b): “For purposes of this section, a high-quality transit corridor means a corridor with fixed route bus service with service intervals no longer than 15 minutes during peak commute hours.” -33-PC AGENDA PAGE 65 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 1-22-4499-1 Serapis Avenue/Telegraph Road Chick-fil-A Project O:\JOB_FILE\4499\Report\4499-Rpt2.doc • Does the project have a Floor Area Ratio (FAR) less than 0.75? • Does the project provide more parking than required by the County Code? • Is the project inconsistent with the SCAG RTP/SCS? • Does the project replace residential units set aside for lower income households with a smaller number of market-rate residential units? If the answer to all four subsequent questions is no, further analysis is not required, and a less than significant determination can be made.” As described in Section 3.2, public transit service is provided in the vicinity of the proposed project site. The public bus transit service is provided by Metro Line 62 along Telegraph Road approximately every 30 minutes during peak periods, which does not meet the criteria for a high- quality transit corridor. Similarly, based on a review of the “High Quality Transit Areas (HQTA) 2016 – SCAG Region” map produced by the Southern California Association of Governments (SCAG), the project site is not situated within 0.5-miles of a high-quality transit area. The answer to the screening question is “No”; therefore, the proximity to transit screening criterion is not satisfied. 4.1.4 Residential Project Screening Criteria In the Technical Advisory, OPR refers to research indicating that low-income housing in infill locations generally improves the jobs-housing match, shortening commutes and reducing VMT. OPR asserts that evidence supports presuming less than significant transportation impacts for 100% affordable residential developments, and that a project consisting of a high percentage of affordable housing may be a basis for a lead agency to find a less than significant impact on VMT, thereby screening out of detailed VMT analysis. Consistent with the recommendations provided by OPR, Section 3.1.2.4 of the County Guidelines indicate that certain projects which further the State’s affordable housing goals are presumed to have less than significant impacts on VMT. The Guidelines state: “If the project requires discretionary action and the answer is yes to the question below, further analysis is not required, and a less than significant determination can be made. • Are 100% of the units, excluding manager’s units, set aside for lower income households?” The proposed project does not include any residential or low-income housing components; therefore, this screening criterion does not apply. 4.1.5 Summary of Screening Conclusions The County Guidelines recognize four screening criteria which may be applied to screen proposed projects out of detailed VMT analysis. Proposed projects are not required to satisfy all of the screening criteria in order to screen out of further VMT analysis; satisfaction of one criterion is sufficient for screening purposes. The proposed project satisfies the Retail Project screening criterion and is screened out of further VMT analysis. -34-PC AGENDA PAGE 66 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 1-22-4499-1 Serapis Avenue/Telegraph Road Chick-fil-A Project O:\JOB_FILE\4499\Report\4499-Rpt2.doc 4.2 Impact Conclusions As described in Section 4.1.5, the proposed project satisfies the Retail Project screening criterion and is screened out of further VMT analysis. The screening criterion is based on the presumption that local serving retail land uses will cause less than significant impacts. Therefore, through satisfaction of the screening criterion, the proposed project is determined to have less than significant transportation impacts. 4.3 Cumulative Impact Analysis The County’s Guidelines state that short-term effects are evaluated in the detailed project-level VMT analysis, while long-term or cumulative effects are determined through consistency with SCAG’s current RTP/SCS, which is called Connect SoCal. Connect SoCal is the regional plan that demonstrates compliance with air quality conformity requirements and greenhouse gas (GHG) reduction targets. As such, projects that are consistent with this plan in terms of development location, density, and intensity are part of the regional solution for meeting air pollution and GHG goals. Projects that are deemed to be consistent would have a less than significant cumulative impact on VMT. Developments in a location where the RTP/SCS does not specify any development may indicate a significant impact on transportation. However, if a project does not demonstrate a significant impact in the project impact analysis, a less than significant impact in the cumulative impact analysis can also be determined. Projects that fall under an efficiency-based impact threshold (e.g., residential VMT per capita, employment VMT per employee, or total VMT per service population) are already shown to align with the long-term VMT and GHG reduction goals. Land use projects that demonstrate a project-level impact and which are not found to be consistent with the SCAG RTP/SCS could have a significant transportation impact. The Technical Advisory provides the following additional discussion of cumulative impacts: “[M]etrics such as VMT per capita or VMT per employee, i.e., metrics framed in terms of efficiency (as recommended below for use on residential and office projects), cannot be summed because they employ a denominator. A project that falls below an efficiency-based threshold that is aligned with long-term goals and relevant plans has no cumulative impact distinct from the project impact. Accordingly, a finding of a less-than-significant project impact would imply a less than significant cumulative impact, and vice-versa.” The proposed project has been determined to have a less than significant project-level impact through satisfaction of the Retail Project screening criterion. Therefore, it is concluded that the proposed project will not result in a significant cumulative impact. -35-PC AGENDA PAGE 67 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 1-22-4499-1 Serapis Avenue/Telegraph Road Chick-fil-A Project O:\JOB_FILE\4499\Report\4499-Rpt2.doc 5.0 NON-CEQA ANALYSIS Based on coordination with City of Downey staff, the following two (2) study intersections were identified for operational evaluation of the proposed project and other cumulative developments in the study area: 1. Serapis Avenue/Telegraph Road (Signalized) 2. Passons Boulevard/Telegraph Road (Signalized) It is noted that the nearby Edith Unsworth Elementary School which is located at 9001 Lindsey Avenue typically has student dismissal times of 2:35 PM (for TK through 3rd grades) and 3:00 PM (for 4th and 5th grades). These dismissal times correspond to a period of relatively reduced activity at Chick-fil-A restaurants. Therefore, it is assumed that the proposed project’s peak lunch and dinner time periods will not overlap with the school’s dismissal period. 5.1 Analysis Methodology In order to estimate the proposed project’s effect on intersection operations, a multi-step process has been utilized. The first step is trip generation, which estimates the total arriving and departing traffic volumes on a peak hour and daily basis. The second step of the forecasting process is trip distribution, which identifies the origins and destinations of inbound and outbound project traffic volumes. These origins and destinations are typically based on demographics and existing/anticipated travel patterns in the study area. The third step is traffic assignment, which involves the allocation of project traffic to study area streets and intersections. Traffic distribution patterns are indicated by general percentage orientation, while traffic assignment allocates specific volume forecasts to individual roadway links and intersection turning movements throughout the study area. The proposed project’s forecast trip generation, distribution, and assignment is presented in Section 2.5 herein. With the forecasting process complete and project traffic assignments developed, the effect of the proposed project is isolated by comparing operational conditions at the selected study intersections using existing and expected future traffic volumes without and with forecast project traffic. The City of Downey signalized study intersections were evaluated using the Intersection Capacity Utilization (ICU) method of analysis which determines Volume-to-Capacity (v/c) ratios on a critical lane basis. The overall intersection v/c ratio is subsequently assigned a Level of Service (LOS) value to describe intersection operations. Level of Service varies from LOS A (free flow condition) to LOS F (jammed condition). A description of the ICU method and corresponding Levels of Service is provided in Appendix C. 5.2 Criteria for Non-CEQA Analysis The relative effect of the added project traffic volumes to be generated by the proposed project during the weekday mid-day and PM peak hours was evaluated based on analysis of existing and future operating conditions at the study intersections, without and with the proposed project. The -36-PC AGENDA PAGE 68 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 1-22-4499-1 Serapis Avenue/Telegraph Road Chick-fil-A Project O:\JOB_FILE\4499\Report\4499-Rpt2.doc previously discussed capacity analysis procedures were utilized to evaluate the future v/c or delay relationships and service level characteristics at each study intersection. The effect of project-generated traffic at each City of Downey study intersection was compared to the City of Downey’s intersection LOS standards as presented below. The Downey Vision 2025 Circulation Element of the General Plan has established vehicle Level of Service (LOS) standards which local infrastructure will strive to maintain. The Circulation Element defines acceptable level of service as LOS D or better, along with the following applicable policy and program:  Policy 2.1.1. Maintain a street system that provides safe and efficient movement of people and goods. • Program 2.1.1.1. Maintain intersections and street segments at acceptable service levels and not worsen those intersections and street segments currently operating at unacceptable levels. For purposes of this analysis, an intersection would be found inconsistent with the City’s Circulation Element if project traffic causes the intersection to degrade from an acceptable LOS to an unacceptable LOS (i.e., LOS E or LOS F). For an intersection already operating at unacceptable LOS, any increase in the intersection’s Volume-to-Capacity ratio would be found inconsistent with the City’s Circulation Element. The following section presents the operational (i.e., Level of Service) analysis prepared for the proposed project pursuant to this requirement. The operational analysis was prepared utilizing the following data previously presented herein: • Project Peak Hour Traffic Generation: Refer to Section 2.5.1 herein for the project traffic generation forecasts. • Project Trip Distribution and Assignment: Refer to Section 2.5.2 herein. • Existing Roadway Network: Refer to Section 3.3 herein. • Existing Weekday Mid-day and PM Peak Hour Traffic Count Data: Refer to Section 3.4 herein. • Related Projects: Refer to Section 3.5.1 herein. 5.3 Analysis Scenarios Level of Service calculations have been prepared for the following scenarios for the study intersections: 1. Existing conditions. 2. Existing with project conditions. -37-PC AGENDA PAGE 69 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 1-22-4499-1 Serapis Avenue/Telegraph Road Chick-fil-A Project O:\JOB_FILE\4499\Report\4499-Rpt2.doc 3. Condition 1 plus one percent (1.0%) per year annual ambient traffic growth through year 2024 and with completion and occupancy of the cumulative projects (i.e., future cumulative without project conditions). 4. Condition 3 with completion and occupancy of the proposed project (i.e., future cumulative with project conditions). 5. Condition 4 with implementation of intersection improvement measures, if necessary. The weekday Mid-day and PM peak hour LOS analysis prepared for the study intersections using the ICU methodology is summarized in Table 5-1. The ICU data worksheets for the analyzed intersections are provided in Appendix C. 5.4 Existing Conditions 5.4.1 Existing Conditions As indicated in column [a] of Table 5-1, both of the study intersections are presently operating at LOS D or better during the mid-day and PM peak hours under existing conditions. The existing traffic volumes at the study intersections during the weekday mid-day and PM peak hours are displayed in Figure 3-4. 5.4.2 Existing With Project Conditions As shown in column [b] of Table 5-1, both of the study intersections are expected to continue operating at LOS D or better during the mid-day and PM peak hours under the existing with project conditions. The v/c ratios at the study intersections incrementally increase with the addition of project-generated traffic. The incremental increases in v/c ratios at the study intersections do not exceed the City’s LOS standards, therefore no project-specific intersection improvements or project- specific transportation demand management measures are proposed or required. The existing with project traffic volumes at the study intersections during the weekday mid-day and PM peak hours are displayed in Figure 5-1. 5.5 Future Year 2024 Cumulative Conditions 5.5.1 Future Year 2024 Cumulative Without Project Conditions The future year 2024 cumulative baseline conditions were forecast based on the addition of traffic generated by the completion and occupancy of the related projects, as well as the growth in traffic due to the combined effects of continuing development, intensification of existing developments and other factors (i.e., ambient growth). The v/c ratios at the study intersections are incrementally increased with the addition of ambient traffic and traffic generated by the related projects listed in Table 3–4. As presented in column [c] of Table 5-1, both of the study intersections are expected to continue to operate at LOS D or better during the mid-day and PM peak hours under the future year 2024 cumulative without project conditions. The future year 2024 cumulative without project traffic volumes at the study intersections during the weekday mid-day and PM peak hours are displayed in Figure 5-2. -38-PC AGENDA PAGE 70 Table 5-1 SUMMARY OF VOLUME TO CAPACITY RATIOS AND LEVELS OF SERVICE WEEKDAY MID-DAY AND PM PEAK HOURS [a][b][c][d] YEAR 2022 YEAR 2024 YEAR 2024 YEAR 2022 EXISTING W/CHANGE FUTURE FUTURE W/ PEAK EXISTING PROJECT IN V/C PRE-PROJECT PROJECT IN V/C NO.INTERSECTION HOUR V/C LOS [1]V/C LOS [1][(b)-(a)]V/C LOS [1]V/C LOS [1][(d)-(c)] 1 Serapis Avenue/MID-DAY 0.513 A 0.534 A 0.021 0.525 A 0.547 A 0.022 Telegraph Road PM 0.658 B 0.677 B 0.019 0.674 B 0.693 B 0.019 2 Passons Boulevard/MID-DAY 0.453 A 0.456 A 0.003 0.473 A 0.476 A 0.003 Telegraph Road PM 0.546 A 0.550 A 0.004 0.561 A 0.565 A 0.004 [1]Level of Service (LOS) is based on the reported ICU value for City of Downey signalized intersections. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 1-22-4499-1 Serapis Avenue/Telegraph Road Chick-fil-A Project -39-PC AGENDA PAGE 71 -40-PC AGENDA PAGE 72 -41-PC AGENDA PAGE 73 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 1-22-4499-1 Serapis Avenue/Telegraph Road Chick-fil-A Project O:\JOB_FILE\4499\Report\4499-Rpt2.doc 5.5.2 Future Year 2024 Cumulative With Project Conditions As shown in column [d] of Table 5-1, both of the study intersections are expected to continue to operate at LOS D or better during the mid-day and PM conditions. The v/c ratios at the study intersections incrementally increase with the addition of project-generated traffic. The incremental increases in v/c ratios at the study intersections do not exceed the City’s LOS standards, therefore no project-specific intersection improvements or project-specific transportation demand management measures are proposed or required. The future year 2024 cumulative with project traffic volumes at the study intersections during the weekday mid-day and PM peak hours are displayed in Figure 5-3. -42-PC AGENDA PAGE 74 -43-PC AGENDA PAGE 75 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 1-22-4499-1 Serapis Avenue/Telegraph Road Chick-fil-A Project O:\JOB_FILE\4499\Report\4499-Rpt2.doc 6.0 SUMMARY AND CONCLUSIONS • Project Description – The proposed project site is located at 9148 Telegraph Road in the City of Downey, California. The proposed project consists of the development of a 4,777 square-foot Chick-fil-A restaurant at the project site. The restaurant will accommodate both indoor and outdoor dining via 90 interior seats and 32 outdoor seats in a 574 square-foot patio area located west of the proposed building. The restaurant is also planned to provide two (2) drive-through service lanes, which will accommodate up to 44 vehicles in queue. Construction and occupancy of the proposed project is anticipated to be completed by the year 2024. • Project Site Access – Vehicular access to the project site is planned to be accommodated by two project driveways including one driveway located on Telegraph Road and one driveway located on Serapis Avenue. Due to the existing raised concrete median along Telegraph Road, the Telegraph Road project driveway will be limited to right-turn inbound and outbound turning movements only. The Serapis Avenue project driveway will accommodate right-turning and left- turning inbound and outbound movements. Development of the proposed project would not conflict with the existing pedestrian system or the existing/proposed bicycle system. • Project Parking – The proposed project is planned to provide a total of 61 vehicular parking spaces and 10 bicycle parking spaces. Application of the parking ratios provided in the City of Downey Municipal Code Section 9712 to the proposed project results in a parking requirement of 54 vehicular parking spaces. Thus, the proposed project parking supply would exceed the minimum Code parking requirement. • Project Trip Generation – The proposed project is expected to generate a net increase of 46 vehicle trips (24 net new inbound trips and 22 net new outbound trips) during the weekday mid- day peak hour. During the weekday PM peak hour, the proposed project is expected to generate a net increase of 41 vehicle trips (18 net new inbound trips and 23 net new outbound trips). Over a 24-hour period, the proposed project is forecast to generate a net increase of 629 vehicle trips (approximately 315 net new inbound trips and 315 net new outbound trips) during a typical weekday. • Drive-Through Service Window Queuing – The proposed project is planned to provide two (2) drive-through service lanes which will accommodate up to 44 vehicles in queue. Based on empirical observations at existing Chick-fil-A restaurant locations in the Cities of Irvine, San Juan Capistrano, and Yucaipa, a maximum 95th percentile queue of 22 vehicles is expected for the proposed project. Therefore, the planned service-lane queue storage area is expected to adequately accommodate the forecast maximum vehicle queue. Although the proposed drive- through services lanes are expected to accommodate the potential queues at the project site, Chick-fil-A staff will implement a queue management program on an as needed basis during their peak operating times in order to ensure that the queue will not extend into the public right- of-way. -44-PC AGENDA PAGE 76 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 1-22-4499-1 Serapis Avenue/Telegraph Road Chick-fil-A Project O:\JOB_FILE\4499\Report\4499-Rpt2.doc • CEQA Vehicle Miles Traveled Analysis – The proposed project satisfies the Retail Project screening criterion and is screened out of further VMT analysis. The screening criterion is based on the presumption that local serving retail land uses will cause less than significant impacts. Therefore, through satisfaction of the screening criterion, the proposed project is determined to have less than significant transportation impacts. • Non-CEQA Analysis – In consultation with the City of Downey, two (2) study intersections were selected for operational evaluation of the proposed project and other cumulative developments in the study area. Based on application of the City of Downey’s intersection LOS standards, it was determined that the incremental increases in v/c ratios at the study intersections due to the addition of project-generated traffic do not exceed the City’s LOS standards. Therefore, no project-specific intersection improvements or project-specific transportation demand management measures are proposed or required. • Interaction with Nearby School-Generated Traffic – It is noted that the nearby Edith Unsworth Elementary School which is located at 9001 Lindsey Avenue typically has student dismissal times of 2:35 PM (for TK through 3rd grades) and 3:00 PM (for 4th and 5th grades). These dismissal times correspond to a period of relatively reduced activity at Chick-fil-A restaurants. Therefore, it is assumed that the proposed project’s peak lunch and dinner time periods will not overlap the school’s dismissal period. It is further understood that should the project driveway along Serapis Avenue become blocked for any reason in a way that may affect on-site drive- through operations, Chick-fil-A staff will be present to direct vehicles to exit the site via the project driveway on Telegraph Road. -45-PC AGENDA PAGE 77 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 1-22-4499-1 Serapis Avenue/Telegraph Road Chick-fil-A Project APPENDIX A CHICK-FIL-A QUEUING OBSERVATION DATA PC AGENDA PAGE 78 Location Irvine Chick‐Fil‐A DATE 12/9/2021 Queue Pick‐Up to  Order Board Total Line Queue  Order Board Back Total Queue 7:00 AM 0 1 1 7:05 AM 1 0 1 7:10 AM 0 0 0 7:15 AM 1 0 1 7:20 AM 0 0 0 7:25 AM 0 1 1 7:30 AM 0 0 0 7:35 AM 1 2 3 7:40 AM 2 1 3 7:45 AM 3 3 6 7:50 AM 3 2 5 7:55 AM 3 2 5 8:00 AM 2 2 4 8:05 AM 3 0 3 8:10 AM 2 2 4 8:15 AM 2 2 4 8:20 AM 3 1 4 8:25 AM 0 1 1 8:30 AM 1 2 3 8:35 AM 2 2 4 8:40 AM 2 3 5 8:45 AM 2 4 6 8:50 AM 3 1 4 8:55 AM 1 2 3 11:00 AM 0 0 0 11:05 AM 0 0 0 11:10 AM 7 1 8 11:15 AM 5 3 8 11:20 AM 5 4 9 11:25 AM 3 0 3 11:30 AM 5 4 9 11:35 AM 6 0 6 11:40 AM 5 2 7 11:45 AM 6 5 11 11:50 AM 7 7 14 11:55 AM 7 9 16 12:00 PM 6 11 17 12:05 PM 7 10 17 12:10 PM 7 10 17 12:15 PM 7 6 13 12:20 PM 7 12 19 12:25 PM 7 12 19 12:30 PM 7 12 19 12:35 PM 7 14 21 12:40 PM 7 6 13 12:45 PM 7 9 16 12:50 PM 7 10 17 12:55 PM 7 16 23 1:00 PM 7 16 23 1:05 PM 7 16 23 1:10 PM 7 16 23 1:15 PM 7 6 13 1:20 PM 7 7 14 1:25 PM 7 6 13 1:30 PM 7 11 18 1:35 PM 7 12 19 1:40 PM 7 14 21 1:45 PM 7 10 17 1:50 PM 7 16 23 1:55 PM 7 15 22 4:00 PM 6 11 17 4:05 PM 5 14 19 4:10 PM 7 15 22 4:15 PM 5 7 12 4:20 PM 7 8 15 4:25 PM 5 7 12 4:30 PM 4 14 18 4:35 PM 4 9 13 4:40 PM 8 11 19 4:45 PM 7 11 18 4:50 PM 7 10 17 4:55 PM 7 15 22 5:00 PM 8 13 21 5:05 PM 4 6 10 5:10 PM 6 12 18 5:15 PM 5 9 14 5:20 PM 7 11 18 5:25 PM 3 7 10 5:30 PM 6 14 20 5:35 PM 7 14 21 5:40 PM 4 15 19 5:45 PM 5 8 13 5:50 PM 8 16 24 5:55 PM 6 12 18 6:00 PM 5 11 16 6:05 PM 4 11 15 6:10 PM 10 14 24 6:15 PM 2 6 8 6:20 PM 10 14 24 6:25 PM 5 10 15 6:30 PM 9 18 27 6:35 PM 4 13 17 6:40 PM 8 11 19 6:45 PM 10 17 27 6:50 PM 6 11 17 6:55 PM 10 15 25 7:00 PM 9 11 20 7:05 PM 7 17 24 7:10 PM 8 16 24 7:15 PM 6 14 20 7:20 PM 9 15 24 7:25 PM 7 11 18 7:30 PM 9 11 20 7:35 PM 5 10 15 7:40 PM 6 10 16 7:45 PM 5 9 14 7:50 PM 4 8 12 7:55 PM 4 8 12 G-6 PC AGENDA PAGE 79 Location Irvine Chick‐Fil‐A DATE 12/10/2021 Queue Pick‐Up to  Order Board Total Line Queue  Order Board Back Total Queue 7:00 AM 2 5 7 7:05 AM 3 3 6 7:10 AM 3 8 11 7:15 AM 3 4 7 7:20 AM 2 6 8 7:25 AM 4 8 12 7:30 AM 3 3 6 7:35 AM 4 8 12 7:40 AM 3 4 7 7:45 AM 1 3 4 7:50 AM 1 2 3 7:55 AM 5 8 13 8:00 AM 3 7 10 8:05 AM 3 5 8 8:10 AM 4 8 12 8:15 AM 3 8 11 8:20 AM 5 8 13 8:25 AM 4 8 12 8:30 AM 5 7 12 8:35 AM 7 14 21 8:40 AM 0 3 3 8:45 AM 3 5 8 8:50 AM 5 9 14 8:55 AM 5 8 13 11:00 AM 4 8 12 11:05 AM 3 8 11 11:10 AM 4 8 12 11:15 AM 6 12 18 11:20 AM 4 6 10 11:25 AM 6 13 19 11:30 AM 5 13 18 11:35 AM 7 11 18 11:40 AM 6 15 21 11:45 AM 7 14 21 11:50 AM 5 16 21 11:55 AM 4 11 15 12:00 PM 4 10 14 12:05 PM 3 7 10 12:10 PM 5 5 10 12:15 PM 4 10 14 12:20 PM 7 10 17 12:25 PM 5 13 18 12:30 PM 7 10 17 12:35 PM 5 13 18 12:40 PM 3 14 17 12:45 PM 7 11 18 12:50 PM 9 12 21 12:55 PM 5 10 15 1:00 PM 7 9 16 1:05 PM 4 8 12 1:10 PM 8 11 19 1:15 PM 6 12 18 1:20 PM 10 17 27 1:25 PM 7 9 16 1:30 PM 7 15 22 1:35 PM 6 14 20 1:40 PM 10 16 26 1:45 PM 6 12 18 1:50 PM 6 12 18 1:55 PM 2 6 8 4:00 PM 4 10 14 4:05 PM 3 5 8 4:10 PM 3 4 7 4:15 PM 5 8 13 4:20 PM 3 9 12 4:25 PM 4 6 10 4:30 PM 4 9 13 4:35 PM 5 12 17 4:40 PM 6 8 14 4:45 PM 6 11 17 4:50 PM 4 8 12 4:55 PM 4 9 13 5:00 PM 7 8 15 5:05 PM 2 8 10 5:10 PM 4 12 16 5:15 PM 10 15 25 5:20 PM 8 14 22 5:25 PM 4 15 19 5:30 PM 8 9 17 5:35 PM 8 13 21 5:40 PM 6 13 19 5:45 PM 5 13 18 5:50 PM 6 15 21 5:55 PM 8 15 23 6:00 PM 6 13 19 6:05 PM 7 10 17 6:10 PM 7 11 18 6:15 PM 5 6 11 6:20 PM 4 11 15 6:25 PM 4 14 18 6:30 PM 8 9 17 6:35 PM 8 13 21 6:40 PM 6 13 19 6:45 PM 5 9 14 6:50 PM 7 9 16 6:55 PM 5 13 18 7:00 PM 6 9 15 7:05 PM 5 12 17 7:10 PM 5 13 18 7:15 PM 7 10 17 7:20 PM 7 16 23 7:25 PM 9 13 22 7:30 PM 5 10 15 7:35 PM 5 11 16 7:40 PM 5 13 18 7:45 PM 4 11 15 7:50 PM 11 16 27 7:55 PM 5 10 15 G-7 PC AGENDA PAGE 80 Location Irvine Chick‐Fil‐A DATE 12/11/2021 Queue Pick‐Up to  Order Board Total Line Queue  Order Board Back Total Queue 7:00 AM 0 1 1 7:05 AM 1 1 2 7:10 AM 1 2 3 7:15 AM 1 1 2 7:20 AM 3 5 8 7:25 AM 2 1 3 7:30 AM 0 1 1 7:35 AM 2 4 6 7:40 AM 2 4 6 7:45 AM 3 4 7 7:50 AM 0 1 1 7:55 AM 2 3 5 8:00 AM 1 3 4 8:05 AM 1 2 3 8:10 AM 4 6 10 8:15 AM 4 8 12 8:20 AM 3 5 8 8:25 AM 1 4 5 8:30 AM 4 10 14 8:35 AM 2 4 6 8:40 AM 2 3 5 8:45 AM 4 9 13 8:50 AM 2 2 4 8:55 AM 4 5 9 11:00 AM 3 3 6 11:05 AM 3 3 6 11:10 AM 3 10 13 11:15 AM 4 7 11 11:20 AM 4 6 10 11:25 AM 3 11 14 11:30 AM 5 17 22 11:35 AM 4 10 14 11:40 AM 2 9 11 11:45 AM 2 4 6 11:50 AM 9 11 20 11:55 AM 7 14 21 12:00 PM 4 7 11 12:05 PM 8 16 24 12:10 PM 4 13 17 12:15 PM 3 9 12 12:20 PM 8 10 18 12:25 PM 4 14 18 12:30 PM 2 6 8 12:35 PM 6 11 17 12:40 PM 5 8 13 12:45 PM 5 12 17 12:50 PM 5 14 19 12:55 PM 5 8 13 1:00 PM 3 13 16 1:05 PM 5 13 18 1:10 PM 8 9 17 1:15 PM 4 9 13 1:20 PM 7 12 19 1:25 PM 4 10 14 1:30 PM 6 14 20 1:35 PM 6 13 19 1:40 PM 5 10 15 1:45 PM 8 13 21 1:50 PM 11 16 27 1:55 PM 7 15 22 4:00 PM 4 10 14 4:05 PM 6 9 15 4:10 PM 6 10 16 4:15 PM 8 12 20 4:20 PM 3 5 8 4:25 PM 4 4 8 4:30 PM 4 6 10 4:35 PM 4 6 10 4:40 PM 3 8 11 4:45 PM 4 13 17 4:50 PM 2 9 11 4:55 PM 4 8 12 5:00 PM 1 4 5 5:05 PM 5 9 14 5:10 PM 4 5 9 5:15 PM 3 12 15 5:20 PM 5 9 14 5:25 PM 4 11 15 5:30 PM 3 4 7 5:35 PM 5 7 12 5:40 PM 5 8 13 5:45 PM 2 6 8 5:50 PM 5 7 12 5:55 PM 6 7 13 6:00 PM 4 3 7 6:05 PM 4 7 11 6:10 PM 4 3 7 6:15 PM 4 10 14 6:20 PM 4 11 15 6:25 PM 3 5 8 6:30 PM 2 6 8 6:35 PM 4 13 17 6:40 PM 4 7 11 6:45 PM 4 11 15 6:50 PM 4 9 13 6:55 PM 6 7 13 7:00 PM 4 4 8 7:05 PM 5 5 10 7:10 PM 4 9 13 7:15 PM 3 5 8 7:20 PM 5 10 15 7:25 PM 5 7 12 7:30 PM 5 11 16 7:35 PM 5 7 12 7:40 PM 3 7 10 7:45 PM 7 9 16 7:50 PM 6 12 18 7:55 PM 6 15 21 G-8 PC AGENDA PAGE 81 Location SJC Chick‐Fil‐A DATE 12/9/2021 Queue Pick‐Up to  Order Board Total Line Queue  Order Board Back Total Queue 7:00 AM 0 0 0 7:05 AM 1 1 2 7:10 AM 5 4 9 7:15 AM 3 4 7 7:20 AM 1 1 2 7:25 AM 2 2 4 7:30 AM 1 0 1 7:35 AM 2 2 4 7:40 AM 1 2 3 7:45 AM 3 4 7 7:50 AM 2 1 3 7:55 AM 0 0 0 8:00 AM 2 1 3 8:05 AM 4 6 10 8:10 AM 1 0 1 8:15 AM 1 1 2 8:20 AM 2 2 4 8:25 AM 4 4 8 8:30 AM 4 3 7 8:35 AM 1 2 3 8:40 AM 0 0 0 8:45 AM 4 4 8 8:50 AM 1 1 2 8:55 AM 1 1 2 11:00 AM 3 6 9 11:05 AM 5 2 7 11:10 AM 5 4 9 11:15 AM 5 5 10 11:20 AM 2 2 4 11:25 AM 5 8 13 11:30 AM 7 7 14 11:35 AM 7 9 16 11:40 AM 7 7 14 11:45 AM 3 4 7 11:50 AM 8 8 16 11:55 AM 7 7 14 12:00 PM 7 7 14 12:05 PM 5 12 17 12:10 PM 5 6 11 12:15 PM 12 6 18 12:20 PM 8 9 17 12:25 PM 13 8 21 12:30 PM 9 8 17 12:35 PM 6 7 13 12:40 PM 9 13 22 12:45 PM 5 12 17 12:50 PM 5 6 11 12:55 PM 13 5 18 1:00 PM 8 5 13 1:05 PM 7 8 15 1:10 PM 5 9 14 1:15 PM 8 11 19 1:20 PM 6 10 16 1:25 PM 10 5 15 1:30 PM 8 5 13 1:35 PM 7 9 16 1:40 PM 6 6 12 1:45 PM 6 7 13 1:50 PM 2 4 6 1:55 PM 8 1 9 4:00 PM 7 10 17 4:05 PM 3 0 3 4:10 PM 5 6 11 4:15 PM 5 6 11 4:20 PM 3 3 6 4:25 PM 7 5 12 4:30 PM 4 4 8 4:35 PM 3 4 7 4:40 PM 4 3 7 4:45 PM 5 5 10 4:50 PM 3 10 13 4:55 PM 5 5 10 5:00 PM 6 7 13 5:05 PM 5 6 11 5:10 PM 7 6 13 5:15 PM 8 5 13 5:20 PM 8 7 15 5:25 PM 4 7 11 5:30 PM 6 3 9 5:35 PM 5 5 10 5:40 PM 6 5 11 5:45 PM 4 3 7 5:50 PM 4 5 9 5:55 PM 5 3 8 6:00 PM 4 7 11 6:05 PM 5 4 9 6:10 PM 6 15 21 6:15 PM 7 5 12 6:20 PM 5 5 10 6:25 PM 6 4 10 6:30 PM 4 4 8 6:35 PM 5 5 10 6:40 PM 6 9 15 6:45 PM 4 5 9 6:50 PM 6 4 10 6:55 PM 4 5 9 7:00 PM 6 4 10 7:05 PM 6 4 10 7:10 PM 6 7 13 7:15 PM 6 5 11 7:20 PM 5 7 12 7:25 PM 5 6 11 7:30 PM 4 5 9 7:35 PM 4 2 6 7:40 PM 7 3 10 7:45 PM 5 9 14 7:50 PM 5 1 6 7:55 PM 1 3 4 G-9 PC AGENDA PAGE 82 Location SJC Chick‐Fil‐A DATE 12/10/2021 Queue Pick‐Up to  Order Board Total Line Queue  Order Board Back Total Queue 7:00 AM 0 0 0 7:05 AM 0 0 0 7:10 AM 1 1 2 7:15 AM 1 1 2 7:20 AM 0 0 0 7:25 AM 2 1 3 7:30 AM 0 1 1 7:35 AM 3 3 6 7:40 AM 4 4 8 7:45 AM 1 1 2 7:50 AM 1 1 2 7:55 AM 3 2 5 8:00 AM 3 5 8 8:05 AM 2 1 3 8:10 AM 3 3 6 8:15 AM 1 1 2 8:20 AM 2 2 4 8:25 AM 3 3 6 8:30 AM 2 1 3 8:35 AM 4 5 9 8:40 AM 3 4 7 8:45 AM 2 1 3 8:50 AM 3 3 6 8:55 AM 2 2 4 11:00 AM 3 4 7 11:05 AM 5 4 9 11:10 AM 4 4 8 11:15 AM 8 8 16 11:20 AM 5 6 11 11:25 AM 4 8 12 11:30 AM 8 7 15 11:35 AM 3 8 11 11:40 AM 10 6 16 11:45 AM 7 2 9 11:50 AM 6 8 14 11:55 AM 6 4 10 12:00 PM 6 6 12 12:05 PM 6 14 20 12:10 PM 8 8 16 12:15 PM 7 8 15 12:20 PM 11 12 23 12:25 PM 12 7 19 12:30 PM 11 15 26 12:35 PM 13 9 22 12:40 PM 11 12 23 12:45 PM 8 6 14 12:50 PM 10 6 16 12:55 PM 12 9 21 1:00 PM 9 11 20 1:05 PM 9 8 17 1:10 PM 9 14 23 1:15 PM 8 8 16 1:20 PM 10 8 18 1:25 PM 7 8 15 1:30 PM 7 6 13 1:35 PM 9 7 16 1:40 PM 5 4 9 1:45 PM 4 6 10 1:50 PM 6 4 10 1:55 PM 5 4 9 4:00 PM 7 7 14 4:05 PM 2 7 9 4:10 PM 6 2 8 4:15 PM 6 6 12 4:20 PM 6 4 10 4:25 PM 5 8 13 4:30 PM 6 5 11 4:35 PM 5 9 14 4:40 PM 8 2 10 4:45 PM 4 8 12 4:50 PM 5 7 12 4:55 PM 8 3 11 5:00 PM 3 2 5 5:05 PM 3 4 7 5:10 PM 4 3 7 5:15 PM 5 6 11 5:20 PM 5 4 9 5:25 PM 4 4 8 5:30 PM 4 5 9 5:35 PM 6 5 11 5:40 PM 4 6 10 5:45 PM 4 4 8 5:50 PM 5 6 11 5:55 PM 5 6 11 6:00 PM 4 6 10 6:05 PM 4 8 12 6:10 PM 5 3 8 6:15 PM 8 7 15 6:20 PM 7 9 16 6:25 PM 7 8 15 6:30 PM 4 5 9 6:35 PM 7 1 8 6:40 PM 5 6 11 6:45 PM 10 6 16 6:50 PM 7 8 15 6:55 PM 6 7 13 7:00 PM 8 10 18 7:05 PM 4 6 10 7:10 PM 4 5 9 7:15 PM 6 1 7 7:20 PM 5 1 6 7:25 PM 3 5 8 7:30 PM 5 7 12 7:35 PM 5 8 13 7:40 PM 6 2 8 7:45 PM 6 8 14 7:50 PM 8 7 15 7:55 PM 4 6 10 G-10 PC AGENDA PAGE 83 Location SJC Chick‐Fil‐A DATE 12/11/2021 Queue Pick‐Up to  Order Board Total Line Queue  Order Board Back Total Queue 7:00 AM 0 0 0 7:05 AM 1 1 2 7:10 AM 3 3 6 7:15 AM 1 1 2 7:20 AM 0 0 0 7:25 AM 2 2 4 7:30 AM 2 2 4 7:35 AM 4 4 8 7:40 AM 1 1 2 7:45 AM 0 0 0 7:50 AM 2 2 4 7:55 AM 1 1 2 8:00 AM 2 4 6 8:05 AM 3 1 4 8:10 AM 2 2 4 8:15 AM 1 1 2 8:20 AM 2 2 4 8:25 AM 1 1 2 8:30 AM 1 0 1 8:35 AM 3 4 7 8:40 AM 0 0 0 8:45 AM 0 0 0 8:50 AM 1 1 2 8:55 AM 2 3 5 11:00 AM 5 3 8 11:05 AM 6 6 12 11:10 AM 2 4 6 11:15 AM 7 7 14 11:20 AM 7 6 13 11:25 AM 3 3 6 11:30 AM 5 5 10 11:35 AM 6 6 12 11:40 AM 6 6 12 11:45 AM 6 7 13 11:50 AM 6 3 9 11:55 AM 5 6 11 12:00 PM 4 5 9 12:05 PM 4 10 14 12:10 PM 9 8 17 12:15 PM 9 7 16 12:20 PM 8 3 11 12:25 PM 5 13 18 12:30 PM 7 5 12 12:35 PM 7 8 15 12:40 PM 6 5 11 12:45 PM 5 8 13 12:50 PM 7 5 12 12:55 PM 9 2 11 1:00 PM 4 4 8 1:05 PM 4 6 10 1:10 PM 7 6 13 1:15 PM 5 8 13 1:20 PM 4 8 12 1:25 PM 5 6 11 1:30 PM 7 5 12 1:35 PM 8 6 14 1:40 PM 10 7 17 1:45 PM 3 7 10 1:50 PM 7 9 16 1:55 PM 2 5 7 4:00 PM 6 5 11 4:05 PM 3 2 5 4:10 PM 3 5 8 4:15 PM 3 2 5 4:20 PM 0 0 0 4:25 PM 3 4 7 4:30 PM 3 2 5 4:35 PM 0 2 2 4:40 PM 3 3 6 4:45 PM 1 2 3 4:50 PM 4 8 12 4:55 PM 1 2 3 5:00 PM 3 5 8 5:05 PM 3 5 8 5:10 PM 2 5 7 5:15 PM 4 3 7 5:20 PM 4 4 8 5:25 PM 5 9 14 5:30 PM 3 3 6 5:35 PM 5 6 11 5:40 PM 4 0 4 5:45 PM 3 2 5 5:50 PM 4 4 8 5:55 PM 5 8 13 6:00 PM 3 4 7 6:05 PM 5 7 12 6:10 PM 5 6 11 6:15 PM 6 4 10 6:20 PM 5 5 10 6:25 PM 4 1 5 6:30 PM 6 5 11 6:35 PM 4 6 10 6:40 PM 6 7 13 6:45 PM 7 6 13 6:50 PM 8 3 11 6:55 PM 1 2 3 7:00 PM 3 5 8 7:05 PM 2 3 5 7:10 PM 1 1 2 7:15 PM 4 4 8 7:20 PM 2 6 8 7:25 PM 6 2 8 7:30 PM 2 1 3 7:35 PM 6 7 13 7:40 PM 4 4 8 7:45 PM 7 8 15 7:50 PM 6 3 9 7:55 PM 4 3 7 G-11 PC AGENDA PAGE 84 File Q2112021 DATE 12/16/2021 Location Chic‐fil‐A‐Yucaipa Queue Pick‐Up to  Order Board Total Line Queue  Order Board Back Total Queue 7:00 AM 6 2 8 7:05 AM 1 2 3 7:10 AM 3 1 4 7:15 AM 1 3 4 7:20 AM 2 1 3 7:25 AM 2 2 4 7:30 AM 2 5 7 7:35 AM 4 2 6 7:40 AM 2 7 9 7:45 AM 4 2 6 7:50 AM 1 3 4 7:55 AM 0 5 5 8:00 AM 4 7 11 8:05 AM 6 0 6 8:10 AM 5 0 5 8:15 AM 6 5 11 8:20 AM 4 3 7 8:25 AM 2 4 6 8:30 AM 4 0 4 8:35 AM 2 6 8 8:40 AM 4 2 6 8:45 AM 3 3 6 8:50 AM 2 4 6 8:55 AM 4 3 7 11:00 AM 6 10 16 11:05 AM 8 5 13 11:10 AM 7 4 11 11:15 AM 3 11 14 11:20 AM 5 5 10 11:25 AM 5 4 9 11:30 AM 11 11 22 11:35 AM 9 10 19 11:40 AM 0 4 4 11:45 AM 6 7 13 11:50 AM 5 5 10 11:55 AM 5 5 10 12:00 PM 11 8 19 12:05 PM 10 13 23 12:10 PM 7 6 13 12:15 PM 6 6 12 12:20 PM 8 8 16 12:25 PM 8 8 16 12:30 PM 13 10 23 12:35 PM 8 9 17 12:40 PM 12 14 26 12:45 PM 11 9 20 12:50 PM 8 8 16 12:55 PM 5 6 11 1:00 PM 5 6 11 1:05 PM 7 5 12 1:10 PM 8 8 16 1:15 PM 7 7 14 1:20 PM 4 6 10 1:25 PM 11 11 22 1:30 PM 8 6 14 1:35 PM 8 9 17 1:40 PM 8 9 17 1:45 PM 13 7 20 1:50 PM 6 8 14 1:55 PM 7 7 14 4:00 PM 8 3 11 4:05 PM 8 2 10 4:10 PM 2 6 8 4:15 PM 5 6 11 4:20 PM 4 8 12 4:25 PM 5 3 8 4:30 PM 6 2 8 4:35 PM 5 9 14 4:40 PM 4 4 8 4:45 PM 6 6 12 4:50 PM 4 5 9 4:55 PM 5 6 11 5:00 PM 6 10 16 5:05 PM 5 8 13 5:10 PM 0 4 4 5:15 PM 9 6 15 5:20 PM 5 4 9 5:25 PM 7 7 14 5:30 PM 4 5 9 5:35 PM 6 5 11 5:40 PM 9 9 18 5:45 PM 7 7 14 5:50 PM 5 6 11 5:55 PM 7 8 15 6:00 PM 6 4 10 6:05 PM 5 4 9 6:10 PM 7 9 16 6:15 PM 9 10 19 6:20 PM 4 5 9 6:25 PM 8 8 16 6:30 PM 3 1 4 6:35 PM 9 11 20 6:40 PM 5 6 11 6:45 PM 8 7 15 6:50 PM 5 7 12 6:55 PM 15 12 27 7:00 PM 8 7 15 7:05 PM 6 7 13 7:10 PM 3 3 6 7:15 PM 5 6 11 7:20 PM 12 12 24 7:25 PM 7 5 12 7:30 PM 8 11 19 7:35 PM 10 6 16 7:40 PM 12 11 23 7:45 PM 7 5 12 7:50 PM 11 7 18 7:55 PM 5 5 10 G-12 PC AGENDA PAGE 85 File Q2112021 DATE 12/17/2021 Location Chic‐fil‐A‐Yucaipa Queue Pick‐Up to  Order Board Total Line Queue  Order Board Back Total Queue 7:00 AM 4 3 7 7:05 AM 4 0 4 7:10 AM 2 6 8 7:15 AM 5 3 8 7:20 AM 3 4 7 7:25 AM 1 3 4 7:30 AM 1 1 2 7:35 AM 5 2 7 7:40 AM 3 2 5 7:45 AM 2 3 5 7:50 AM 2 1 3 7:55 AM 1 4 5 8:00 AM 3 3 6 8:05 AM 2 3 5 8:10 AM 3 4 7 8:15 AM 4 6 10 8:20 AM 3 6 9 8:25 AM 5 4 9 8:30 AM 3 4 7 8:35 AM 2 3 5 8:40 AM 5 4 9 8:45 AM 6 3 9 8:50 AM 5 3 8 8:55 AM 3 2 5 11:00 AM 11 6 17 11:05 AM 11 11 22 11:10 AM 6 6 12 11:15 AM 5 6 11 11:20 AM 5 8 13 11:25 AM 5 11 16 11:30 AM 9 7 16 11:35 AM 3 7 10 11:40 AM 8 7 15 11:45 AM 13 11 24 11:50 AM 10 9 19 11:55 AM 8 10 18 12:00 PM 5 4 9 12:05 PM 4 9 13 12:10 PM 11 8 19 12:15 PM 9 7 16 12:20 PM 8 9 17 12:25 PM 8 8 16 12:30 PM 6 7 13 12:35 PM 6 4 10 12:40 PM 13 15 28 12:45 PM 5 6 11 12:50 PM 10 6 16 12:55 PM 8 10 18 1:00 PM 9 12 21 1:05 PM 6 6 12 1:10 PM 7 6 13 1:15 PM 11 10 21 1:20 PM 9 10 19 1:25 PM 7 6 13 1:30 PM 15 16 31 1:35 PM 6 5 11 1:40 PM 12 11 23 1:45 PM 7 7 14 1:50 PM 8 9 17 1:55 PM 8 7 15 4:00 PM 8 3 11 4:05 PM 2 4 6 4:10 PM 4 3 7 4:15 PM 9 5 14 4:20 PM 3 0 3 4:25 PM 5 9 14 4:30 PM 3 4 7 4:35 PM 5 7 12 4:40 PM 4 8 12 4:45 PM 5 3 8 4:50 PM 7 2 9 4:55 PM 6 4 10 5:00 PM 7 5 12 5:05 PM 6 7 13 5:10 PM 3 8 11 5:15 PM 4 9 13 5:20 PM 6 7 13 5:25 PM 4 6 10 5:30 PM 3 3 6 5:35 PM 8 6 14 5:40 PM 8 9 17 5:45 PM 9 9 18 5:50 PM 10 8 18 5:55 PM 8 8 16 6:00 PM 0 2 2 6:05 PM 4 4 8 6:10 PM 6 7 13 6:15 PM 8 7 15 6:20 PM 15 9 24 6:25 PM 4 7 11 6:30 PM 7 7 14 6:35 PM 6 7 13 6:40 PM 7 9 16 6:45 PM 7 6 13 6:50 PM 6 7 13 6:55 PM 11 11 22 7:00 PM 6 5 11 7:05 PM 9 5 14 7:10 PM 6 7 13 7:15 PM 8 7 15 7:20 PM 8 4 12 7:25 PM 7 9 16 7:30 PM 5 5 10 7:35 PM 6 4 10 7:40 PM 9 2 11 7:45 PM 6 4 10 7:50 PM 3 4 7 7:55 PM 3 8 11 G-13 PC AGENDA PAGE 86 File Q2112021 DATE 12/18/2021 Location Chic‐fil‐A‐Yucaipa Queue Pick‐Up to  Order Board Total Line Queue  Order Board Back Total Queue 7:00 AM 1 0 1 7:05 AM 1 2 3 7:10 AM 2 2 4 7:15 AM 2 2 4 7:20 AM 1 0 1 7:25 AM 0 2 2 7:30 AM 2 1 3 7:35 AM 1 0 1 7:40 AM 2 5 7 7:45 AM 1 2 3 7:50 AM 4 4 8 7:55 AM 4 3 7 8:00 AM 1 3 4 8:05 AM 4 2 6 8:10 AM 3 2 5 8:15 AM 3 3 6 8:20 AM 2 5 7 8:25 AM 2 1 3 8:30 AM 5 4 9 8:35 AM 2 3 5 8:40 AM 2 5 7 8:45 AM 3 3 6 8:50 AM 4 3 7 8:55 AM 3 4 7 11:00 AM 3 3 11:05 AM 4 4 11:10 AM 7 7 11:15 AM 10 10 11:20 AM 6 6 11:25 AM 4 4 11:30 AM 7 7 11:35 AM 7 7 11:40 AM 7 7 11:45 AM 6 6 11:50 AM 6 6 11:55 AM 6 6 12:00 PM 4 4 12:05 PM 6 6 12:10 PM 5 5 12:15 PM 10 10 12:20 PM 7 7 12:25 PM 7 7 12:30 PM 7 7 12:35 PM 5 5 12:40 PM 5 5 12:45 PM 9 9 12:50 PM 11 11 12:55 PM 6 6 1:00 PM 7 7 1:05 PM 10 10 1:10 PM 11 11 1:15 PM 7 7 1:20 PM 9 9 1:25 PM 9 9 1:30 PM 4 4 1:35 PM 8 8 1:40 PM 7 7 1:45 PM 6 6 1:50 PM 6 6 1:55 PM 5 5 4:00 PM 5 7 12 4:05 PM 7 7 14 4:10 PM 9 7 16 4:15 PM 8 6 14 4:20 PM 10 3 13 4:25 PM 1 6 7 4:30 PM 9 5 14 4:35 PM 9 8 17 4:40 PM 8 4 12 4:45 PM 6 1 7 4:50 PM 2 8 10 4:55 PM 5 8 13 5:00 PM 2 6 8 5:05 PM 6 7 13 5:10 PM 1 4 5 5:15 PM 11 11 22 5:20 PM 7 6 13 5:25 PM 7 6 13 5:30 PM 10 10 20 5:35 PM 5 2 7 5:40 PM 5 4 9 5:45 PM 3 8 11 5:50 PM 8 6 14 5:55 PM 3 7 10 6:00 PM 9 7 16 6:05 PM 6 5 11 6:10 PM 3 5 8 6:15 PM 6 7 13 6:20 PM 3 3 6 6:25 PM 7 9 16 6:30 PM 5 4 9 6:35 PM 7 8 15 6:40 PM 4 5 9 6:45 PM 6 6 12 6:50 PM 9 5 14 6:55 PM 7 9 16 7:00 PM 8 8 16 7:05 PM 5 4 9 7:10 PM 6 6 12 7:15 PM 4 7 11 7:20 PM 5 5 10 7:25 PM 6 3 9 7:30 PM 9 10 19 7:35 PM 8 4 12 7:40 PM 8 7 15 7:45 PM 4 3 7 7:50 PM 5 5 10 7:55 PM 7 2 9 G-14 PC AGENDA PAGE 87 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 1-22-4499-1 Serapis Avenue/Telegraph Road Chick-fil-A Project APPENDIX B VEHICLE, PEDESTRIAN, AND BICYCLE COUNT DATA PC AGENDA PAGE 88 File Name : SerapisAve_TelegraphRd Site Code : 00000000 Start Date : 10/19/2022 Page No : 1 Groups Printed- Vehicles Serapis Avenue Southbound Telegraph Road Westbound Serapis Avenue Northbound Telegraph Road Eastbound Start Time Left Thru Right Left Thru Right U-Turns Left Thru Right Left Thru Right U-Turns Int. Total 11:30 AM 15 0 12 2 149 2 0 17 1 4 8 144 8 5 367 11:45 AM 9 6 10 4 184 5 1 9 1 4 12 157 15 12 429 Total 24 6 22 6 333 7 1 26 2 8 20 301 23 17 796 12:00 PM 12 1 11 2 169 8 4 6 1 6 8 156 11 5 400 12:15 PM 15 2 18 1 192 9 5 13 1 6 13 165 15 12 467 12:30 PM 11 3 17 8 189 8 2 21 1 10 8 168 12 7 465 12:45 PM 14 0 21 3 211 7 3 18 0 5 10 187 16 6 501 Total 52 6 67 14 761 32 14 58 3 27 39 676 54 30 1833 01:00 PM 16 3 10 5 176 6 3 22 3 3 9 169 24 7 456 01:15 PM 14 6 18 4 175 4 1 16 0 7 3 177 21 12 458 Total 30 9 28 9 351 10 4 38 3 10 12 346 45 19 914 04:00 PM 16 2 18 0 218 10 3 19 0 0 4 272 23 10 595 04:15 PM 15 2 26 1 225 10 3 23 1 8 9 293 16 0 632 04:30 PM 20 7 22 4 240 6 1 19 0 4 16 307 27 5 678 04:45 PM 16 2 17 5 248 5 1 19 2 4 11 265 28 5 628 Total 67 13 83 10 931 31 8 80 3 16 40 1137 94 20 2533 05:00 PM 29 3 20 2 251 6 4 13 3 4 15 287 22 7 666 05:15 PM 19 4 29 4 284 4 1 23 1 5 8 313 18 3 716 05:30 PM 26 7 17 3 221 3 2 16 2 5 9 294 21 13 639 05:45 PM 25 7 28 5 263 10 6 37 2 5 17 330 23 9 767 Total 99 21 94 14 1019 23 13 89 8 19 49 1224 84 32 2788 Grand Total 272 55 294 53 3395 103 40 291 19 80 160 3684 300 118 8864 Apprch %43.8 8.9 47.3 1.5 94.5 2.9 1.1 74.6 4.9 20.5 3.8 86.4 7 2.8 Total %3.1 0.6 3.3 0.6 38.3 1.2 0.5 3.3 0.2 0.9 1.8 41.6 3.4 1.3 CITY TRAFFIC COUNTERS WWW.CTCOUNTERS.COM PC AGENDA PAGE 89 File Name : SerapisAve_TelegraphRd Site Code : 00000000 Start Date : 10/19/2022 Page No : 2 Serapis Avenue Southbound Telegraph Road Westbound Serapis Avenue Northbound Telegraph Road Eastbound Start Time Left Thru Right App. Total Left Thru Right U-Turns App. Total Left Thru Right App. Total Left Thru Right U-Turns App. Total Int. Total Peak Hour Analysis From 11:30 AM to 01:15 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 12:15 PM 12:15 PM 15 2 18 35 1 192 9 5 207 13 1 6 20 13 165 15 12 205 467 12:30 PM 11 3 17 31 8 189 8 2 207 21 1 10 32 8 168 12 7 195 465 12:45 PM 14 0 21 35 3 211 7 3 224 18 0 5 23 10 187 16 6 219 501 01:00 PM 16 3 10 29 5 176 6 3 190 22 3 3 28 9 169 24 7 209 456 Total Volume 56 8 66 130 17 768 30 13 828 74 5 24 103 40 689 67 32 828 1889 % App. Total 43.1 6.2 50.8 2.1 92.8 3.6 1.6 71.8 4.9 23.3 4.8 83.2 8.1 3.9 PHF .875 .667 .786 .929 .531 .910 .833 .650 .924 .841 .417 .600 .805 .769 .921 .698 .667 .945 .943 Serapis Avenue Telegraph Road Telegraph Road Serapis Avenue Right 66 Thru 8 Left 56 InOut Total 75 130 205 Right30 Thru768 Left17 U-Turns13 OutTotalIn769 828 1597 Left 74 Thru 5 Right 24 Out TotalIn 92 103 195 Left40 Thru689 Right67 U-Turns32 TotalOutIn908 828 1736 Peak Hour Begins at 12:15 PM Vehicles Peak Hour Data North CITY TRAFFIC COUNTERS WWW.CTCOUNTERS.COM PC AGENDA PAGE 90 File Name : SerapisAve_TelegraphRd Site Code : 00000000 Start Date : 10/19/2022 Page No : 3 Serapis Avenue Southbound Telegraph Road Westbound Serapis Avenue Northbound Telegraph Road Eastbound Start Time Left Thru Right App. Total Left Thru Right U-Turns App. Total Left Thru Right App. Total Left Thru Right U-Turns App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 05:00 PM 05:00 PM 29 3 20 52 2 251 6 4 263 13 3 4 20 15 287 22 7 331 666 05:15 PM 19 4 29 52 4 284 4 1 293 23 1 5 29 8 313 18 3 342 716 05:30 PM 26 7 17 50 3 221 3 2 229 16 2 5 23 9 294 21 13 337 639 05:45 PM 25 7 28 60 5 263 10 6 284 37 2 5 44 17 330 23 9 379 767 Total Volume 99 21 94 214 14 1019 23 13 1069 89 8 19 116 49 1224 84 32 1389 2788 % App. Total 46.3 9.8 43.9 1.3 95.3 2.2 1.2 76.7 6.9 16.4 3.5 88.1 6 2.3 PHF .853 .750 .810 .892 .700 .897 .575 .542 .912 .601 .667 .950 .659 .721 .927 .913 .615 .916 .909 Serapis Avenue Telegraph Road Telegraph Road Serapis Avenue Right 94 Thru 21 Left 99 InOut Total 80 214 294 Right23 Thru1019 Left14 U-Turns13 OutTotalIn1342 1069 2411 Left 89 Thru 8 Right 19 Out TotalIn 119 116 235 Left49 Thru1224 Right84 U-Turns32 TotalOutIn1202 1389 2591 Peak Hour Begins at 05:00 PM Vehicles Peak Hour Data North CITY TRAFFIC COUNTERS WWW.CTCOUNTERS.COM PC AGENDA PAGE 91 File Name : SerapisAve_TelegraphRd_BP Site Code : 00000000 Start Date : 10/19/2022 Page No : 1 Groups Printed- Pedestrians and Bikes Serapis Avenue South Leg Telegraph Road West Leg Serapis Avenue North Leg Telegraph Road East Leg Start Time Bikes Peds Bikes Peds Bikes Peds Bikes Peds Int. Total 11:30 AM 1 0 0 0 0 0 0 0 1 11:45 AM 0 0 0 3 0 0 0 0 3 Total 1 0 0 3 0 0 0 0 4 12:15 PM 0 0 0 0 0 1 0 0 1 12:30 PM 0 0 0 3 0 2 0 0 5 12:45 PM 1 0 0 0 0 1 0 0 2 Total 1 0 0 3 0 4 0 0 8 01:00 PM 0 2 0 0 0 0 0 1 3 01:15 PM 2 0 0 1 0 0 0 0 3 Total 2 2 0 1 0 0 0 1 6 04:00 PM 0 0 0 0 1 0 1 0 2 04:15 PM 0 0 1 0 0 0 0 1 2 04:30 PM 1 0 0 1 0 0 0 1 3 04:45 PM 1 0 0 1 2 0 0 0 4 Total 2 0 1 2 3 0 1 2 11 05:00 PM 0 0 0 1 2 2 1 1 7 05:15 PM 0 1 0 1 0 0 0 0 2 05:30 PM 0 1 0 1 1 2 0 0 5 Total 0 2 0 3 3 4 1 1 14 Grand Total 6 4 1 12 6 8 2 4 43 Apprch %60 40 7.7 92.3 42.9 57.1 33.3 66.7 Total %14 9.3 2.3 27.9 14 18.6 4.7 9.3 CITY TRAFFIC COUNTERS WWW.CTCOUNTERS.COM PC AGENDA PAGE 92 File Name : SerapisAve_TelegraphRd_BP Site Code : 00000000 Start Date : 10/19/2022 Page No : 2 Serapis Avenue South Leg Telegraph Road West Leg Serapis Avenue North Leg Telegraph Road East Leg Start Time Bikes Peds App. Total Bikes Peds App. Total Bikes Peds App. Total Bikes Peds App. Total Int. Total Peak Hour Analysis From 11:30 AM to 01:15 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 12:30 PM 12:30 PM 0 0 0 0 3 3 0 2 2 0 0 0 5 12:45 PM 1 0 1 0 0 0 0 1 1 0 0 0 2 01:00 PM 0 2 2 0 0 0 0 0 0 0 1 1 3 01:15 PM 2 0 2 0 1 1 0 0 0 0 0 0 3 Total Volume 3 2 5 0 4 4 0 3 3 0 1 1 13 % App. Total 60 40 0 100 0 100 0 100 PHF .375 .250 .625 .000 .333 .333 .000 .375 .375 .000 .250 .250 .650 Serapis Avenue Telegraph Road Telegraph Road Serapis Avenue Thru 3 Peds 2 InOut Total 0 5 5 Thru0 U-Turns4 OutTotalIn0 4 4 Thru 0 Peds 3 Out TotalIn 3 3 6 Thru0 U-Turns1 TotalOutIn0 1 1 Peak Hour Begins at 12:30 PM Pedestrians and Bikes Peak Hour Data North CITY TRAFFIC COUNTERS WWW.CTCOUNTERS.COM PC AGENDA PAGE 93 File Name : SerapisAve_TelegraphRd_BP Site Code : 00000000 Start Date : 10/19/2022 Page No : 3 Serapis Avenue South Leg Telegraph Road West Leg Serapis Avenue North Leg Telegraph Road East Leg Start Time Bikes Peds App. Total Bikes Peds App. Total Bikes Peds App. Total Bikes Peds App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:45 PM 04:45 PM 1 0 1 0 1 1 2 0 2 0 0 0 4 05:00 PM 0 0 0 0 1 1 2 2 4 1 1 2 7 05:15 PM 0 1 1 0 1 1 0 0 0 0 0 0 2 05:30 PM 0 1 1 0 1 1 1 2 3 0 0 0 5 Total Volume 1 2 3 0 4 4 5 4 9 1 1 2 18 % App. Total 33.3 66.7 0 100 55.6 44.4 50 50 PHF .250 .500 .750 .000 1.00 1.00 .625 .500 .563 .250 .250 .250 .643 Serapis Avenue Telegraph Road Telegraph Road Serapis Avenue Thru 1 Peds 2 InOut Total 5 3 8 Thru0 U-Turns4 OutTotalIn1 4 5 Thru 5 Peds 4 Out TotalIn 1 9 10 Thru1 U-Turns1 TotalOutIn0 2 2 Peak Hour Begins at 04:45 PM Pedestrians and Bikes Peak Hour Data North CITY TRAFFIC COUNTERS WWW.CTCOUNTERS.COM PC AGENDA PAGE 94 File Name : PassonsBlvd_TelegraphRd Site Code : 00000000 Start Date : 10/19/2022 Page No : 1 Groups Printed- Vehicles Passons Boulevard Southbound Telegraph Road Westbound Passons Boulevard Northbound Telegraph Road Eastbound Start Time Left Thru Right Left Thru Right U-Turns Left Thru Right Left Thru Right U-Turns Int. Total 11:30 AM 16 1 12 3 141 14 4 8 3 2 12 149 8 2 375 11:45 AM 18 3 10 2 154 12 7 5 3 8 10 132 10 0 374 Total 34 4 22 5 295 26 11 13 6 10 22 281 18 2 749 12:00 PM 23 2 13 3 158 19 3 7 3 5 9 150 9 1 405 12:15 PM 15 3 12 4 150 14 2 5 0 3 9 164 7 2 390 12:30 PM 22 5 19 5 149 15 6 10 3 6 11 165 5 0 421 12:45 PM 12 2 14 6 158 12 2 9 4 5 9 176 11 0 420 Total 72 12 58 18 615 60 13 31 10 19 38 655 32 3 1636 01:00 PM 20 4 19 2 142 9 3 11 3 4 11 159 10 1 398 01:15 PM 24 2 12 5 136 22 10 7 1 4 4 167 11 1 406 Total 44 6 31 7 278 31 13 18 4 8 15 326 21 2 804 04:00 PM 36 4 22 7 169 23 5 13 2 12 20 240 15 2 570 04:15 PM 19 4 10 6 188 24 4 2 8 11 6 281 18 2 583 04:30 PM 40 3 15 4 194 16 7 5 3 6 7 278 8 1 587 04:45 PM 28 2 10 4 204 27 5 9 3 4 11 245 13 0 565 Total 123 13 57 21 755 90 21 29 16 33 44 1044 54 5 2305 05:00 PM 33 0 15 2 198 23 4 12 3 4 13 274 11 2 594 05:15 PM 40 4 20 1 206 32 5 9 2 9 14 298 6 3 649 05:30 PM 28 7 15 9 193 26 4 8 5 9 13 269 12 0 598 05:45 PM 35 3 19 7 189 25 8 8 3 9 17 323 6 3 655 Total 136 14 69 19 786 106 21 37 13 31 57 1164 35 8 2496 Grand Total 409 49 237 70 2729 313 79 128 49 101 176 3470 160 20 7990 Apprch %58.8 7.1 34.1 2.2 85.5 9.8 2.5 46 17.6 36.3 4.6 90.7 4.2 0.5 Total %5.1 0.6 3 0.9 34.2 3.9 1 1.6 0.6 1.3 2.2 43.4 2 0.3 CITY TRAFFIC COUNTERS WWW.CTCOUNTERS.COM PC AGENDA PAGE 95 File Name : PassonsBlvd_TelegraphRd Site Code : 00000000 Start Date : 10/19/2022 Page No : 2 Passons Boulevard Southbound Telegraph Road Westbound Passons Boulevard Northbound Telegraph Road Eastbound Start Time Left Thru Right App. Total Left Thru Right U-Turns App. Total Left Thru Right App. Total Left Thru Right U-Turns App. Total Int. Total Peak Hour Analysis From 11:30 AM to 01:15 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 12:30 PM 12:30 PM 22 5 19 46 5 149 15 6 175 10 3 6 19 11 165 5 0 181 421 12:45 PM 12 2 14 28 6 158 12 2 178 9 4 5 18 9 176 11 0 196 420 01:00 PM 20 4 19 43 2 142 9 3 156 11 3 4 18 11 159 10 1 181 398 01:15 PM 24 2 12 38 5 136 22 10 173 7 1 4 12 4 167 11 1 183 406 Total Volume 78 13 64 155 18 585 58 21 682 37 11 19 67 35 667 37 2 741 1645 % App. Total 50.3 8.4 41.3 2.6 85.8 8.5 3.1 55.2 16.4 28.4 4.7 90 5 0.3 PHF .813 .650 .842 .842 .750 .926 .659 .525 .958 .841 .688 .792 .882 .795 .947 .841 .500 .945 .977 Passons Boulevard Telegraph Road Telegraph Road Passons Boulevard Right 64 Thru 13 Left 78 InOut Total 104 155 259 Right58 Thru585 Left18 U-Turns21 OutTotalIn764 682 1446 Left 37 Thru 11 Right 19 Out TotalIn 68 67 135 Left35 Thru667 Right37 U-Turns2 TotalOutIn686 741 1427 Peak Hour Begins at 12:30 PM Vehicles Peak Hour Data North CITY TRAFFIC COUNTERS WWW.CTCOUNTERS.COM PC AGENDA PAGE 96 File Name : PassonsBlvd_TelegraphRd Site Code : 00000000 Start Date : 10/19/2022 Page No : 3 Passons Boulevard Southbound Telegraph Road Westbound Passons Boulevard Northbound Telegraph Road Eastbound Start Time Left Thru Right App. Total Left Thru Right U-Turns App. Total Left Thru Right App. Total Left Thru Right U-Turns App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 05:00 PM 05:00 PM 33 0 15 48 2 198 23 4 227 12 3 4 19 13 274 11 2 300 594 05:15 PM 40 4 20 64 1 206 32 5 244 9 2 9 20 14 298 6 3 321 649 05:30 PM 28 7 15 50 9 193 26 4 232 8 5 9 22 13 269 12 0 294 598 05:45 PM 35 3 19 57 7 189 25 8 229 8 3 9 20 17 323 6 3 349 655 Total Volume 136 14 69 219 19 786 106 21 932 37 13 31 81 57 1164 35 8 1264 2496 % App. Total 62.1 6.4 31.5 2 84.3 11.4 2.3 45.7 16 38.3 4.5 92.1 2.8 0.6 PHF .850 .500 .863 .855 .528 .954 .828 .656 .955 .771 .650 .861 .920 .838 .901 .729 .667 .905 .953 Passons Boulevard Telegraph Road Telegraph Road Passons Boulevard Right 69 Thru 14 Left 136 InOut Total 176 219 395 Right106 Thru786 Left19 U-Turns21 OutTotalIn1331 932 2263 Left 37 Thru 13 Right 31 Out TotalIn 68 81 149 Left57 Thru1164 Right35 U-Turns8 TotalOutIn892 1264 2156 Peak Hour Begins at 05:00 PM Vehicles Peak Hour Data North CITY TRAFFIC COUNTERS WWW.CTCOUNTERS.COM PC AGENDA PAGE 97 File Name : PassonsBlvd_TelegraphRd_BP Site Code : 00000000 Start Date : 10/19/2022 Page No : 1 Groups Printed- Pedestrians and Bikes Passons Boulevard South Leg Telegraph Road West Leg Passons Boulevard North Leg Telegraph Road East Leg Start Time Bikes Peds Bikes Peds Bikes Peds Bikes Peds Int. Total 11:30 AM 0 0 1 1 1 2 0 1 6 11:45 AM 0 3 0 3 0 1 0 0 7 Total 0 3 1 4 1 3 0 1 13 12:00 PM 0 0 0 1 0 0 0 0 1 12:15 PM 0 2 0 0 0 3 0 0 5 12:30 PM 0 1 0 0 0 0 0 0 1 12:45 PM 1 2 0 2 1 1 0 0 7 Total 1 5 0 3 1 4 0 0 14 01:00 PM 0 6 1 1 0 1 0 0 9 01:15 PM 2 2 0 1 0 2 0 0 7 Total 2 8 1 2 0 3 0 0 16 04:00 PM 0 9 0 10 1 9 0 0 29 04:15 PM 0 1 0 2 0 2 0 0 5 04:30 PM 0 2 0 1 2 1 0 0 6 04:45 PM 2 3 0 3 1 5 0 0 14 Total 2 15 0 16 4 17 0 0 54 05:00 PM 1 1 0 5 2 0 0 0 9 05:15 PM 1 3 0 2 1 3 0 0 10 05:30 PM 1 3 1 3 0 2 0 0 10 05:45 PM 0 2 0 1 2 0 0 0 5 Total 3 9 1 11 5 5 0 0 34 Grand Total 8 40 3 36 11 32 0 1 131 Apprch %16.7 83.3 7.7 92.3 25.6 74.4 0 100 Total %6.1 30.5 2.3 27.5 8.4 24.4 0 0.8 CITY TRAFFIC COUNTERS WWW.CTCOUNTERS.COM PC AGENDA PAGE 98 File Name : PassonsBlvd_TelegraphRd_BP Site Code : 00000000 Start Date : 10/19/2022 Page No : 2 Passons Boulevard South Leg Telegraph Road West Leg Passons Boulevard North Leg Telegraph Road East Leg Start Time Bikes Peds App. Total Bikes Peds App. Total Bikes Peds App. Total Bikes Peds App. Total Int. Total Peak Hour Analysis From 11:30 AM to 01:15 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 12:30 PM 12:30 PM 0 1 1 0 0 0 0 0 0 0 0 0 1 12:45 PM 1 2 3 0 2 2 1 1 2 0 0 0 7 01:00 PM 0 6 6 1 1 2 0 1 1 0 0 0 9 01:15 PM 2 2 4 0 1 1 0 2 2 0 0 0 7 Total Volume 3 11 14 1 4 5 1 4 5 0 0 0 24 % App. Total 21.4 78.6 20 80 20 80 0 0 PHF .375 .458 .583 .250 .500 .625 .250 .500 .625 .000 .000 .000 .667 Passons Boulevard Telegraph Road Telegraph Road Passons Boulevard Thru 3 Peds 11 InOut Total 1 14 15 Thru1 U-Turns4 OutTotalIn0 5 5 Thru 1 Peds 4 Out TotalIn 3 5 8 Thru0 U-Turns0 TotalOutIn1 0 1 Peak Hour Begins at 12:30 PM Pedestrians and Bikes Peak Hour Data North CITY TRAFFIC COUNTERS WWW.CTCOUNTERS.COM PC AGENDA PAGE 99 File Name : PassonsBlvd_TelegraphRd_BP Site Code : 00000000 Start Date : 10/19/2022 Page No : 3 Passons Boulevard South Leg Telegraph Road West Leg Passons Boulevard North Leg Telegraph Road East Leg Start Time Bikes Peds App. Total Bikes Peds App. Total Bikes Peds App. Total Bikes Peds App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:00 PM 04:00 PM 0 9 9 0 10 10 1 9 10 0 0 0 29 04:15 PM 0 1 1 0 2 2 0 2 2 0 0 0 5 04:30 PM 0 2 2 0 1 1 2 1 3 0 0 0 6 04:45 PM 2 3 5 0 3 3 1 5 6 0 0 0 14 Total Volume 2 15 17 0 16 16 4 17 21 0 0 0 54 % App. Total 11.8 88.2 0 100 19 81 0 0 PHF .250 .417 .472 .000 .400 .400 .500 .472 .525 .000 .000 .000 .466 Passons Boulevard Telegraph Road Telegraph Road Passons Boulevard Thru 2 Peds 15 InOut Total 4 17 21 Thru0 U-Turns16 OutTotalIn0 16 16 Thru 4 Peds 17 Out TotalIn 2 21 23 Thru0 U-Turns0 TotalOutIn0 0 0 Peak Hour Begins at 04:00 PM Pedestrians and Bikes Peak Hour Data North CITY TRAFFIC COUNTERS WWW.CTCOUNTERS.COM PC AGENDA PAGE 100 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 1-22-4499-1 Serapis Avenue/Telegraph Road Chick-fil-A Project APPENDIX C ICU AND LEVELS OF SERVICE EXPLANATION ICU DATA WORKSHEETS – WEEKDAY MID-DAY AND PM PEAK HOURS PC AGENDA PAGE 101 INTERSECTION CAPACITY UTILIZATION (ICU) DESCRIPTION Level of Service is a term used to describe prevailing conditions and their effect on traffic. Broadly interpreted, the Levels of Service concept denotes any one of a number of differing combinations of operating conditions which may occur as a roadway is accommodating various traffic volumes. Level of Service is a qualitative measure of the effect of such factors as travel speed, travel time, traffic interruptions, freedom to maneuver, safety, driving comfort and convenience. Six Levels of Service, A through F, have been defined in the 1965 Highway Capacity Manual, published by the Transportation Research Board. Level of Service A describes a condition of free flow, with low traffic volumes and relatively high speeds, while Level of Service F describes forced traffic flow at low speeds with jammed conditions and queues which cannot clear during the green phases. The Intersection Capacity Utilization (ICU) method of intersection capacity analysis has been used in our studies. It directly relates traffic demand and available capacity for key intersection movements, regardless of present signal timing, The capacity per hour of green time for each approach is calculated based on the methods of the Highway Capacity Manual. The proportion of total signal time needed by each key movement is determined and compared to the total time available (100 percent of the hour). The result of summing the requirements of the conflicting key movements plus an allowance for clearance times is expressed as a decimal fraction. Conflicting key traffic movements are those opposing movements whose combined green time requirements are greatest. The resulting ICU represents the proportion of the total hour required to accommodate intersection demand volumes if the key conflicting traffic movements are operating at capacity. Other movements may be operating near capacity, or may be operating at significantly better levels. The ICU may be translated to a Level of Service as tabulated below. The Levels of Service (abbreviated from the Highway Capacity Manual) are listed here with their corresponding ICU and Load Factor equivalents. Load Factor is that proportion of the signal cycles during the peak hour which are fully loaded; i.e. when all of the vehicles waiting at the beginning of green are not able to clear on that green phase. Intersection Capacity Utilization Characteristics Level of Service Load Factor Equivalent ICU A 0.0 0.00 - 0.60 B 0.0 - 0.1 0.61 - 0.70 C 0.1 - 0.3 0.71 - 0.80 D 0.3 - 0.7 0.81 - 0.90 E 0.7 - 1.0 0.91 - 1.00 F Not Applicable Not Applicable SERVICE LEVEL A There are no loaded cycles and few are even close to loaded at this service level. No approach phase is fully utilized by traffic and no vehicle waits longer than one red indication. SERVICE LEVEL B This level represents stable operation where an occasional approach phase is fully utilized and a substantial number are approaching full use. Many drivers begin to feel restricted within platoons of vehicles. SERVICE LEVEL C At this level stable operation continues. Loading is still intermittent but more frequent than at Level B. Occasionally drivers may have to wait through more than one red signal indication and backups may develop behind turning vehicles. Most drivers feel somewhat restricted, but not objectionably so. SERVICE LEVEL D This level encompasses a zone of increasing restriction approaching instability at the intersection. Delays to approaching vehicles may be substantial during short peaks within the peak hour, but enough cycles with lower demand occur to permit periodic clearance of queues, thus preventing excessive backups. Drivers frequently have to wait through more than one red signal. This level is the lower limit of acceptable operation to most drivers. SERVICE LEVEL E This represents near capacity and capacity operation. At capacity (ICU = 1.0) it represents the most vehicles that the particular intersection can accommodate. However, full utilization of every signal cycle is seldom attained no matter how great the demand. At this level all drivers wait through more than one red signal, and frequently through several. SERVICE LEVEL F Jammed conditions. Traffic backed up from a downstream location on one of the street restricts or prevents movement of traffic through the intersection under consideration. PC AGENDA PAGE 102 LINSCOTT, LAW & GREENSPAN, ENGINEERS 600 S. Lake Avenue, Ste 500, Pasadena 91106 (626) 796.2322 Fax (626) 792.0941 INTERSECTION CAPACITY UTILIZATION Serapis Avenue @ Telegraph Road N-S St:Serapis Avenue Peak hr:MID-DAY Date:11/21/2022 E-W St:Telegraph Road Annual Growth:1.00%Existing Year:2022 Project:Serapis Avenue/Telegraph Road Chick-fil-A Project/1-22-4499-1 Projection Year:2024 File:ICU1 2022 EXISTING TRAFFIC 2022 EXISTING WITH PROJECT 2024 FUTURE PRE-PROJECT 2024 FUTURE WITH PROJECT 2024 FUTURE W/ PROJECT + MITIGATION Added Added 1 2 V/C Added Total 2 V/C Amb. Grow.Rel. Proj.Total 2 V/C Added Total 2 V/C Movement Volume Capacity Ratio Volume Volume Capacity Ratio Volume Volume Volume Capacity Ratio Volume Volume Capacity Ratio NB Left 74 0 0.046 *29 103 0 0.064 *1 0 75 0 0.047 *29 104 0 0.065 * NB Thru 5 1600 0.064 0 5 1600 0.089 0 0 5 1600 0.065 0 5 1600 0.090 NB Right 24 0 0.000 11 35 0 0.000 0 0 24 0 0.000 11 35 0 0.000 SB Left 56 0 0.035 0 56 0 0.035 1 1 58 0 0.036 0 58 0 0.036 SB Thru 8 1600 0.081 *3 11 1600 0.083 *0 0 8 1600 0.083 *3 11 1600 0.085 * SB Right 66 0 0.000 0 66 0 0.000 1 0 67 0 0.000 0 67 0 0.000 EB Left 72 1600 0.045 *3 75 1600 0.047 *1 0 73 1600 0.046 *3 76 1600 0.048 * EB Thru [3]689 3200 0.215 8 697 3200 0.218 14 21 724 3200 0.226 8 732 3200 0.229 EB Right [3]67 1600 0.042 0 67 1600 0.042 1 0 68 1600 0.043 0 68 1600 0.043 WB Left 30 1600 0.019 20 50 1600 0.031 1 0 31 1600 0.019 20 51 1600 0.032 WB Thru [4]768 3200 0.240 *0 768 3200 0.240 *15 14 797 3200 0.249 *0 797 3200 0.249 * WB Right [4]30 1600 0.019 0 30 1600 0.019 1 1 32 1600 0.020 0 32 1600 0.020 Yellow Allowance 0.100 *0.100 *0.100 *0.100 * ICU 0.513 0.534 0.525 0.547 LOS A A A A *Key conflicting movement as a part of ICU 1 Counts conducted by: City Traffic Counters 2 Capacity expressed in veh/hour of green 3 Eastbound parking restrictions (TANS 4-6P) 4 Westbound parking restrictions (1HR Pkg 9A-10P)PC AGENDA PAGE 103 LINSCOTT, LAW & GREENSPAN, ENGINEERS 600 S. Lake Avenue, Ste 500, Pasadena 91106 (626) 796.2322 Fax (626) 792.0941 INTERSECTION CAPACITY UTILIZATION Serapis Avenue @ Telegraph Road N-S St:Serapis Avenue Peak hr:PM Date:11/21/2022 E-W St:Telegraph Road Annual Growth:1.00%Existing Year:2022 Project:Serapis Avenue/Telegraph Road Chick-fil-A Project/1-22-4499-1 Projection Year:2024 File:ICU1 2022 EXISTING TRAFFIC 2022 EXISTING WITH PROJECT 2024 FUTURE PRE-PROJECT 2024 FUTURE WITH PROJECT 2024 FUTURE W/ PROJECT + MITIGATION Added Added 1 2 V/C Added Total 2 V/C Amb. Grow.Rel. Proj.Total 2 V/C Added Total 2 V/C Movement Volume Capacity Ratio Volume Volume Capacity Ratio Volume Volume Volume Capacity Ratio Volume Volume Capacity Ratio NB Left 89 0 0.056 *26 115 0 0.072 *2 0 91 0 0.057 *26 117 0 0.073 * NB Thru 8 1600 0.073 0 8 1600 0.095 0 0 8 1600 0.074 0 8 1600 0.096 NB Right 19 0 0.000 10 29 0 0.000 0 0 19 0 0.000 10 29 0 0.000 SB Left 99 0 0.062 0 99 0 0.062 2 0 101 0 0.063 0 101 0 0.063 SB Thru 21 1600 0.134 *2 23 1600 0.135 *0 0 21 1600 0.136 *2 23 1600 0.138 * SB Right 94 0 0.000 0 94 0 0.000 2 0 96 0 0.000 0 96 0 0.000 EB Left 81 1600 0.051 *2 83 1600 0.052 *2 0 83 1600 0.052 *2 85 1600 0.053 * EB Thru [3]1224 4800 0.273 7 1231 4800 0.274 25 18 1267 4800 0.282 7 1274 4800 0.283 EB Right [3]84 0 0.000 0 84 0 0.000 2 0 86 0 0.000 0 86 0 0.000 WB Left 27 1600 0.017 14 41 1600 0.026 1 0 28 1600 0.018 14 42 1600 0.026 WB Thru [4]1019 3200 0.318 *0 1019 3200 0.318 *20 14 1053 3200 0.329 *0 1053 3200 0.329 * WB Right [4]23 1600 0.014 0 23 1600 0.014 0 1 24 1600 0.015 0 24 1600 0.015 Yellow Allowance 0.100 *0.100 *0.100 *0.100 * ICU 0.658 0.677 0.674 0.693 LOS B B B B *Key conflicting movement as a part of ICU 1 Counts conducted by: City Traffic Counters 2 Capacity expressed in veh/hour of green 3 Eastbound parking restrictions (TANS 4-6P) 4 Westbound parking restrictions (1HR Pkg 9A-10P)PC AGENDA PAGE 104 LINSCOTT, LAW & GREENSPAN, ENGINEERS 600 S. Lake Avenue, Ste 500, Pasadena 91106 (626) 796.2322 Fax (626) 792.0941 INTERSECTION CAPACITY UTILIZATION Passons Boulevard @ Telegraph Road N-S St:Passons Boulevard Peak hr:MID-DAY Date:11/21/2022 E-W St:Telegraph Road Annual Growth:1.00%Existing Year:2022 Project:Serapis Avenue/Telegraph Road Chick-fil-A Project/1-22-4499-1 Projection Year:2024 File:ICU2 2022 EXISTING TRAFFIC 2022 EXISTING WITH PROJECT 2024 FUTURE PRE-PROJECT 2024 FUTURE WITH PROJECT 2024 FUTURE W/ PROJECT + MITIGATION Added Added 1 2 V/C Added Total 2 V/C Amb. Grow.Rel. Proj.Total 2 V/C Added Total 2 V/C Movement Volume Capacity Ratio Volume Volume Capacity Ratio Volume Volume Volume Capacity Ratio Volume Volume Capacity Ratio NB Left 37 0 0.023 *0 37 0 0.023 *1 0 38 0 0.024 *0 38 0 0.024 * NB Thru 11 1600 0.042 0 11 1600 0.042 0 0 11 1600 0.043 0 11 1600 0.043 NB Right 19 0 0.000 0 19 0 0.000 0 0 19 0 0.000 0 19 0 0.000 SB Left 78 0 0.049 0 78 0 0.049 2 3 83 0 0.052 0 83 0 0.052 SB Thru 13 1600 0.097 *0 13 1600 0.098 *0 0 13 1600 0.101 *0 13 1600 0.102 * SB Right 64 0 0.000 2 66 0 0.000 1 0 65 0 0.000 2 67 0 0.000 EB Left 37 1600 0.023 2 39 1600 0.024 1 0 38 1600 0.024 2 40 1600 0.025 EB Thru [3]667 3200 0.208 *6 673 3200 0.210 *13 22 702 3200 0.219 *6 708 3200 0.221 * EB Right [3]37 1600 0.023 0 37 1600 0.023 1 0 38 1600 0.024 0 38 1600 0.024 WB Left 39 1600 0.024 *0 39 1600 0.024 *1 6 46 1600 0.029 *0 46 1600 0.029 * WB Thru [4]585 3200 0.183 6 591 3200 0.185 12 15 612 3200 0.191 6 618 3200 0.193 WB Right [4]58 1600 0.036 0 58 1600 0.036 1 3 62 1600 0.039 0 62 1600 0.039 Yellow Allowance 0.100 *0.100 *0.100 *0.100 * ICU 0.453 0.456 0.473 0.476 LOS A A A A *Key conflicting movement as a part of ICU 1 Counts conducted by: City Traffic Counters 2 Capacity expressed in veh/hour of green 3 Eastbound parking restrictions (TANS 4-6P) 4 Westbound parking restrictions (1HR Pkg 9A-10P)PC AGENDA PAGE 105 LINSCOTT, LAW & GREENSPAN, ENGINEERS 600 S. Lake Avenue, Ste 500, Pasadena 91106 (626) 796.2322 Fax (626) 792.0941 INTERSECTION CAPACITY UTILIZATION Passons Boulevard @ Telegraph Road N-S St:Passons Boulevard Peak hr:PM Date:11/21/2022 E-W St:Telegraph Road Annual Growth:1.00%Existing Year:2022 Project:Serapis Avenue/Telegraph Road Chick-fil-A Project/1-22-4499-1 Projection Year:2024 File:ICU2 2022 EXISTING TRAFFIC 2022 EXISTING WITH PROJECT 2024 FUTURE PRE-PROJECT 2024 FUTURE WITH PROJECT 2024 FUTURE W/ PROJECT + MITIGATION Added Added 1 2 V/C Added Total 2 V/C Amb. Grow.Rel. Proj.Total 2 V/C Added Total 2 V/C Movement Volume Capacity Ratio Volume Volume Capacity Ratio Volume Volume Volume Capacity Ratio Volume Volume Capacity Ratio NB Left 37 0 0.023 *0 37 0 0.023 *1 0 38 0 0.024 *0 38 0 0.024 * NB Thru 13 1600 0.051 0 13 1600 0.051 0 0 13 1600 0.052 0 13 1600 0.052 NB Right 31 0 0.000 0 31 0 0.000 1 0 32 0 0.000 0 32 0 0.000 SB Left 136 0 0.085 0 136 0 0.085 3 2 141 0 0.088 0 141 0 0.088 SB Thru 14 1600 0.137 *0 14 1600 0.138 *0 0 14 1600 0.141 *0 14 1600 0.142 * SB Right 69 0 0.000 2 71 0 0.000 1 0 70 0 0.000 2 72 0 0.000 EB Left 65 1600 0.041 *2 67 1600 0.042 *1 0 66 1600 0.041 *2 68 1600 0.043 * EB Thru [3]1164 4800 0.250 6 1170 4800 0.251 23 19 1206 4800 0.259 6 1212 4800 0.260 EB Right [3]35 0 0.000 0 35 0 0.000 1 0 36 0 0.000 0 36 0 0.000 WB Left 40 1600 0.025 0 40 1600 0.025 1 4 45 1600 0.028 0 45 1600 0.028 WB Thru [4]786 3200 0.246 *5 791 3200 0.247 *16 15 817 3200 0.255 *5 822 3200 0.257 * WB Right [4]106 1600 0.066 0 106 1600 0.066 2 3 111 1600 0.069 0 111 1600 0.069 Yellow Allowance 0.100 *0.100 *0.100 *0.100 * ICU 0.546 0.550 0.561 0.565 LOS A A A A *Key conflicting movement as a part of ICU 1 Counts conducted by: City Traffic Counters 2 Capacity expressed in veh/hour of green 3 Eastbound parking restrictions (TANS 4-6P) 4 Westbound parking restrictions (1HR Pkg 9A-10P)PC AGENDA PAGE 106 CODE INFORMATION DRAWING INDEX 5200 Buffington Road Atlanta, Georgia 30349-2998 Phone: (404) 765-8000 Fax: (404) 684-8550 9148 TELEGRAPH ROAD DOWNEY, CA 90240 VICINITY MAP NOT TO SCALE1 BUILDING CODE:2019 CALIFORNIA BUILDING CODE PLUMBING CODE:2019 CALIFORNIA PLUMBING CODE MECHANICAL CODE:2019 CALIFORNIA MECHANICAL CODE ELECTRICAL CODE:2019 CALIFORNIA ELECTRICAL CODE ACCESSIBILITY CODE:2019 CALIFORNIA BUILDING CODE ENERGY CODE:2019 CALIFORNIA ENERGY CODE FIRE CODE:2019 CALIFORNIA FIRE CODE GAS CODE:2019 CALIFORNIA PLUMBING CODE -TITLE PAGE -SITE PLAN -FLOOR PLAN -B&W ELEVATIONS -LANDSCAPE PLANS -QUEUEING/VEHICLE STACKING PLAN -RENDERING PACKAGE BUILDING DATA Architect: C.R.H.O. 1833 17TH STREET; SUITE 301 SANTA ANA, CA. 92705 PHONE: (714) 832-1834 FAX: (714) 832-1910 CONTACT: russell hatfield E-MAIL: russell@CRHO.COM Landscape Architect: JOHN HOURIAN & ASSOC. 107 AVENIDA MIRAMAR, SUITE "D" SAN CLEMENTE, CA 92672 PHONE: (949) 489-5623 FAX: (949) 489-5632 CONTACT: JOHN HOURIAN E-MAIL: team@hourianassociates.com OCCUPANCY:A2 (RESTAURANT) CONSTRUCTION TYPE:V-B SITE AREA:73,870 s.f. FIRE SPRINKLERED:YES BUILDING AREA:4,777 s.f. FAR:.064 ZONING:C-2 COMMERCIAL Civil Engineer: TRUXAW AND ASSOCIATES 1915 W. ORANGEWOOD AVE. SUITE 101 ORANGE, CA 92868 PHONE: (714) 935-0265 CONTACT: RANDY DECKER E-MAIL: randydecker@truxaw.com APN:6388-004-019 & 6388-004-017 PARKING PARKING SPACES REQUIRED:53 BASIS : 1 SPACE/ 100 S.F. BUILDING AREA + PATIO AREA (4,777 + 574) / 100 = 53 PARKING SPACES PROVIDED: STANDARD SPACES:54 ACCESSIBLE SPACES: 3 EV SPACES: 4 TOTAL PARKING SPACED PROVIDED:61 SHORT-TERM BICYCLE SPACE REQUIRED: BASIS: 5% TOTAL PARKING SPACE (MINIMUM 2)61 X 5% = 4 LONG-TERM BICYCLE SPACE REQUIRED: BASIS: 5% TOTAL PARKING SPACE (MINIMUM 2)61 X 5% = 4 TOTAL BICYCLE SPACES PROVIDED:6 SHORT-TERM + 4 LONG-TERM) CAR STACK SPACES PROVIDED :44 Information contained on this drawing and in all digital files produced for above named project may not be reproduced in any manner without express written or verbal consent from authorized project representatives. Chick-fil-A 5200 Buffington Road Atlanta, Georgia 30349-2998 NO.DATE DESCRIPTIONTELEGRAPH & SERAPIS FSU REVISION SCHEDULE CUP SUBMITTAL9148 TELEGRAPH RD.DOWNEY, CA A 05164FSR#CHICK-FIL-A1 B C D E A B C D E 234 1234 PC AGENDA PAGE 107 NOPARKINGPARKINGNOCLEANAIR/VANPOOL/EVCLEANAIR/VANPOOL/EVCLEANAIR/VANPOOL/EVCLEANAIR/VANPOOL/EVCLEANAIR/VANPOOL/EVCLEANAIR/VANPOOL/EVCLEANAIR/VANPOOL/EVCLEANAIR/VANPOOL/EVCLEANAIR/VANPOOL/EVCLEANAIR/VANPOOL/EVEVCHARGINGONLYEVCHARGINGONLYEVCHARGINGONLYTELEGRAPH ROAD(P U B LIC S T R E E T )SERAPISAVENUE(PUBLICSTREET)P/L P/L P/L P/L P/L P/L P/L T WMFDCPBPB P B WMGM DS WVLC LC LCLC1 2 2 2 2 2 222 2 2 3 4 6 58 7 7 9 10 10 12 13 11 12 14 15 15 15 17 1819 20 16 16 19 2020 20 20 20 21 22 21 23 25 30 23 23 24 24 26 27 28 29 31 32 31 32 33 2715'-0"BLDG.SETBACK5'-0" BLDG. SETBACK 46'-0"BLDG. SETBACK5'-5"10'-6"3'-0"10'-6"2'-0"14'-7"43'-2 1/2"9'-11"20'-0"25'-0"20'-0"20'-0"25'-0"10'-0"TYP.9'-0"36'-0"18'-0"TYP.9'-0"6'-0"7'-0"6'-0"39'-6"18'-0" 37'-6" TYP. 9'-0"9'-0"5'-0"9'-0"8'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"12'-0"5'-0"9'-0" 20'-0"26'-6"25'-0"25'-0" TYP. 9'-0" TYP. 9'-0" 23'-4"10'-0" 3'-0" 10'-0" 2'-0" 8 7/8"124'-9" 2'-0" 10'-6" 3'-0" 10'-6" 3'-0" 10'-6"14'-0"13'-6"12'-0"SITE PLAN LEGEND PROPERTY LINE BUILDING LINE 6" CURB & GUTTER SIDEWALK ACCESSIBLE PATH OF TRAVEL 4" WIDE DIAGONAL STRIPPING EASEMENT LINE CHICK FIL A'S LIMIT OF WORK 1 TRASH ENCLOSURE WITH STORAGE AREA. RE: A-103 4 EXISTING POLE SIGN TO REMAIN TO BE REFACED 3 SHORT TERM BIKE PARKING, 4 BIKE RACKS (8 SPACES). RE: 1E/A-100 PEDESTRIAN SIGN BY ONWER, UNDER SEPARATE PERMIT. RE: CIVIL PLANS5 TRANSFORMER PAD. RE: CIVIL & ELECTRICAL PLANS6 7 ACCESSIBLE SPACES, STRIPING, SIGNAGE AND RAMPS. RE: CIVIL PLANS8 9 CONCRETE SIDEWALK. RE: CIVIL PLANS10 HEIGHT CLEARANCE ARM BY OWNER, UNDER SEPARATE PERMIT. RE: CIVIL PLANS11 DIRECTIONAL SIGN BY OWNER, UNDER SEPARATE PERMIT. RE: CIVIL PLANS12 GAS METER. RE: CIVIL PLANS13 GREASE INTERCEPTOR. RE: PLUMBING AND CIVIL PLANS14 SITE PLAN KEYNOTES 15 FUTURE EV CHARGER. RE: ELECTRICAL PLANS16 OUTSIDE MEAL DELIVERY CANOPY BY OWNER, UNDER SEPARATE PERMIT. RE: CIVIL PLANS17 VAN ACCESSIBLE EVCS SPACE18 STANDARD ACCESSIBLE EVCS SPACE19 DRIVE-THRU MENU BOARDS BY OWNER, UNDER SEPARATE PERMIT. RE: CIVIL PLANS DESIGNAGED PARKING FOR CLEAN AIR VEHICLES20 21 22 NEW RETAINING WALL. RE: CIVIL PLANS 23 FLAG POLE BY OWNER, UNDER SEPARATE PERMIT. RE: CIVIL PLANS 24 2'-0" STRIPED WALKWAY FOR TEAM MEMBER. RE: CIVIL PLANS 25 UNDERGROUND INFILTRATION BMP. RE: CIVIL PLANS 27 28 26 RECONSTRUCT NEIGHBOR'S TRASH ENCLOSURE. RE: CIVIL PLANS 3'-0" STRIPED WALKWAY FOR TEAM MEMBER. RE: CIVIL PLANS 2 LOT LIGHT. RE: ELECTRICAL EXISTING RETAINING WALL TO REMAIN. RE: CIVIL PLANS 6'-0" W. STRIPED CROSSWALK. RE: CIVIL PLANS 3'-0" W. STRIPED CROSSWALK. RE: CIVIL PLANS 29 OUTDOOR DINING AREA WITH OPEN TRELLIS ABOVE. RE:30 SAFETY POST AND MOUNT WITH MAGNETIC DELINEATOR BASE.31 TEAM MEMBER CROSSING FLEX SIGN 32 MOVEABLE DELINEATOR WITH RUBBER BASE MAX. 15'-0" O.C. 33 34 MDP CABINET. RE: ELECTRICAL PLANS EV CHARGER. RE: ELECTRICAL PLANS PARKING 1.PARKING REQUIRED:53 SPACES BASIS: 1 SPACE PER 100 SF OF GFA (4,777 S.F. + 574 S.F.) /100 BUILDING AREA:4,777 S.F. OUTDOOR SEATING AREA:574 S.F. ACC. SPACES REQUIRED:3 SPACES EV CAPABLE SPACES REQUIRED:13 SPACES (INCLUDING 3 EVCS -1 VAN ACC. EVCS & 2 STANDARD EVCS) 2.PARKING PROVIDED:61 SPACES STANDARD SPACES:45 SPACES ACC. SPACES:3 SPACES DESIGNATED PARKING FOR CLEAN AIR VEHICLES:13 SPACES (INCLUDING 3 EVCS -1 VAN ACC EVCS & 2 STANDARD EVCS) 4.SHORT TERM & LONG TERM BICYCLES PARKING (5% OF REQUIRED AUTOMOBILE PARKING) SHORT TERM BICYCLE SPACES REQUIRED:4 SPACES SHORT TERM BICYCLE SPACES PROVIDED:3 BIKE RACKS (6 SPACES) 5.LONG TERM BICYCLE SPACES REQUIRED:4 SPACES LONG TERM BICYCLE SPACES PROVIDED:4 SPACES (INSIDE REFUSE ENCLOSURE STORAGE, SEE A-103) Chick-fil-A 5200 Buffington Road Atlanta, Georgia 30349-2998 Information contained on this drawing and in all digital files produced for above named project may not be reproduced in any manner without express written or verbal consent from authorized project representatives. CONSULTANT PROJECT # PRINTED FOR DATE SHEET SHEET NUMBER DRAWN BY REVISION SCHEDULE A 1234 B C D E A B C D E 1234 CHICK-FIL-ABUILDING TYPE / SIZE: RELEASE: #1/30/2023 3:47:33 PMAutodesk Docs://CA_05164_Telegraph & Serapis FSU_2023.1_FSR/05164_Telegraph & Serapis FSU_ARC.rvt A-100 SITE PLAN DESIGN DEVELOPMENT 01/20/23 AuthorTELEGRAPH & SERAPIS 051649148 TELEGRAPH ROADDOWNEY, CA 9024010-LE-05164-A-100-SITE PLAN 21-172 22.05 P13 LE LRG FSR NO.DATE DESCRIPTION 1" = 20'-0" SITE PLAN1A NORTHPC AGENDA PAGE 108 PC AGENDA PAGE 109 PC AGENDA PAGE 110 TELEGRAPH RD.SERAPIS AVEPEDESTRIANSIGNOUTSIDE MEALDELIVERY(OMD) CANOPYTRASH ENCLOSUREW/ STORAGE ROOM &LONG TERM BIKERACKS (TYP. 4)HEIGHT CLEARANCEBAROUTDOOR DININGAREA W/ OPENTRELLIS ABOVELOT LIGHTS, TYP.GREASEINTERCEPTORBIKE RACKSFLAG POLEEXISTING POLESIGN TO REMAINAND TO BEREFACEDTRANSFORMERT10-04-22Information contained on this drawing and in alldigital files produced for above named projectmay not be reproduced in any manner withoutexpress written or verbal consent fromauthorized project representatives.ARCHITECT'S PROJECT #PRINTED FORDATESHEETSHEET NUMBERDRAWN BYChick-fil-A5200 Buffington RoadAtlanta, Georgia30349-2998NO.DATEDESCRIPTIONTELEGRAPH & SERAPIS FSUREVISION SCHEDULECUP SUBMITTAL 9148 TELEGRAPH RD. DOWNEY, CAA05164FSR#CHICK-FIL-A 21-1721BCDEABCDE2341234CUP Submittal-- 04/18/22 CUP SubmittalDateRenewal DateSignature12889-30-2310-04-22hourianassociates,landscape architecture + design san clemente | santa barbara, californiainc. o: 949.489.5623 f: 858.810.0335RA/JGHL1.0PRELIMINARYLANDSCAPE PLANPC AGENDA PAGE 111 NOPARKINGPARKINGNOCLEANAIR/VANPOOL/EVCLEANAIR/VANPOOL/EVCLEANAIR/VANPOOL/EVCLEANAIR/VANPOOL/EVCLEANAIR/VANPOOL/EVCLEANAIR/VANPOOL/EVCLEANAIR/VANPOOL/EVCLEANAIR/VANPOOL/EVCLEANAIR/VANPOOL/EVCLEANAIR/VANPOOL/EVEVCHARGINGONLYEVCHARGINGONLYEVCHARGINGONLYTELEGRAPH ROAD(P U B LIC S T R E E T )SERAPISAVENUE(PUBLICSTREET)P/L P/L P/L P/L P/L P/L P/L TWMFDCPBPB P B WMGM DS WVLC LC LCLC1 2 2 2 2 2 222 2 2 3 4 6 58 7 7 9 10 10 12 13 11 12 14 15 15 15 17 1819 20 16 16 19 2020 20 20 20 21 22 21 23 25 30 23 23 24 24 26 27 28 29 31 32 31 32 33 2715'-0"BLDG.SETBACK5'-0" BLDG. SETBACK 46'-0"BLDG. SETBACK5'-5"10'-6"3'-0"10'-6"2'-0"14'-7"43'-2"9'-11 1/2"20'-0"25'-0"20'-0"20'-0"25'-0"10'-0"TYP.9'-0"36'-0"18'-0"TYP.9'-0"6'-0"7'-0"6'-0"39'-6"18'-0" 37'-6" TYP. 9'-0"9'-0"5'-0"9'-0"8'-0"9'-0"9'-0"9'-0"9'-0"9'-0"9'-0"12'-0"5'-0"9'-0" 20'-0"26'-6"25'-0"25'-0" TYP. 9'-0" TYP. 9'-0" 23'-4"10'-0" 3'-0" 10'-0" 2'-0" 9"124'-9" 2'-0" 10'-6" 3'-0" 10'-6" 3'-0" 10'-6"14'-0"13'-6"12'-0"SITE PLAN LEGEND PROPERTY LINE BUILDING LINE 6" CURB & GUTTER SIDEWALK ACCESSIBLE PATH OF TRAVEL 4" WIDE DIAGONAL STRIPPING EASEMENT LINE CHICK FIL A'S LIMIT OF WORK 1 TRASH ENCLOSURE WITH STORAGE AREA. RE: A-102 4 EXISTING POLE SIGN TO REMAIN TO BE REFACED 3 SHORT TERM BIKE PARKING, 4 BIKE RACKS (8 SPACES). RE: 1D/A-100 PEDESTRIAN SIGN BY ONWER, UNDER SEPARATE PERMIT. RE: CIVIL PLANS5 TRANSFORMER PAD. RE: CIVIL & ELECTRICAL PLANS6 7 ACCESSIBLE SPACES, STRIPING, SIGNAGE AND RAMPS. RE: CIVIL PLANS8 9 CONCRETE SIDEWALK. RE: CIVIL PLANS10 HEIGHT CLEARANCE ARM BY OWNER, UNDER SEPARATE PERMIT. RE: CIVIL PLANS11 DIRECTIONAL SIGN BY OWNER, UNDER SEPARATE PERMIT. RE: CIVIL PLANS12 GAS METER. RE: CIVIL PLANS13 GREASE INTERCEPTOR. RE: PLUMBING AND CIVIL PLANS14 SITE PLAN KEYNOTES 15 FUTURE EV CHARGER. RE: ELECTRICAL PLANS16 OUTSIDE MEAL DELIVERY CANOPY BY OWNER, UNDER SEPARATE PERMIT. RE: A-10317 VAN ACCESSIBLE EVCS SPACE18 STANDARD ACCESSIBLE EVCS SPACE19 DRIVE-THRU MENU BOARDS BY OWNER, UNDER SEPARATE PERMIT. RE: CIVIL PLANS DESIGNAGED PARKING FOR CLEAN AIR VEHICLES20 21 22 NEW RETAINING WALL. RE: CIVIL PLANS 23 FLAG POLE BY OWNER, UNDER SEPARATE PERMIT. RE: CIVIL PLANS 24 2'-0" STRIPED WALKWAY FOR TEAM MEMBER. RE: CIVIL PLANS 25 UNDERGROUND INFILTRATION BMP. RE: CIVIL PLANS 27 28 26 RECONSTRUCT NEIGHBOR'S TRASH ENCLOSURE. RE: CIVIL PLANS 3'-0" STRIPED WALKWAY FOR TEAM MEMBER. RE: CIVIL PLANS 2 LOT LIGHT. RE: ELECTRICAL EXISTING RETAINING WALL TO REMAIN. RE: CIVIL PLANS 6'-0" W. STRIPED CROSSWALK. RE: CIVIL PLANS 3'-0" W. STRIPED CROSSWALK. RE: CIVIL PLANS 29 OUTDOOR DINING AREA WITH OPEN TRELLIS ABOVE. RE:30 SAFETY POST AND MOUNT WITH MAGNETIC DELINEATOR BASE.31 TEAM MEMBER CROSSING FLEX SIGN 32 MOVEABLE DELINEATOR WITH RUBBER BASE MAX. 15'-0" O.C. 33 34 MDP CABINET. RE: ELECTRICAL PLANS EV CHARGER. RE: ELECTRICAL PLANS PARKING 1.PARKING REQUIRED:54 SPACES BASIS: 1 SPACE PER 100 SF OF GFA (4,794 S.F. + 574 S.F.) /100 BUILDING AREA:4,794 S.F. OUTDOOR SEATING AREA:574 S.F. ACC. SPACES REQUIRED:3 SPACES EV CAPABLE SPACES REQUIRED:13 SPACES (INCLUDING 3 EVCS -1 VAN ACC. EVCS & 2 STANDARD EVCS) 2.PARKING PROVIDED:61 SPACES STANDARD SPACES:45 SPACES ACC. SPACES:3 SPACES DESIGNATED PARKING FOR CLEAN AIR VEHICLES:13 SPACES (INCLUDING 3 EVCS -1 VAN ACC EVCS & 2 STANDARD EVCS) 4.SHORT TERM & LONG TERM BICYCLES PARKING (5% OF REQUIRED AUTOMOBILE PARKING) SHORT TERM BICYCLE SPACES REQUIRED:4 SPACES SHORT TERM BICYCLE SPACES PROVIDED:3 BIKE RACKS (6 SPACES) 5.LONG TERM BICYCLE SPACES REQUIRED:4 SPACES LONG TERM BICYCLE SPACES PROVIDED:4 SPACES (INSIDE REFUSE ENCLOSURE STORAGE, SEE A-103) OLYMPIA BIKE RACK MODEL: SKOLY, POWDER -COATED COLOR : DARK BRONZE TOP VIEW SIDE VIEW 3"3'-0" TYPICAL 3"7"7"35.6".Chick-fil-A 5200 Buffington Road Atlanta, Georgia 30349-2998 Information contained on this drawing and in all digital files produced for above named project may not be reproduced in any manner without express written or verbal consent from authorized project representatives. CONSULTANT PROJECT # PRINTED FOR DATE SHEET SHEET NUMBER DRAWN BY REVISION SCHEDULE A 1234 B C D E A B C D E 1234 CHICK-FIL-ABUILDING TYPE / SIZE: RELEASE: #2/16/2023 8:07:34 AMAutodesk Docs://CA_05164_Telegraph & Serapis FSU_2023.1_FSR/05164_Telegraph & Serapis FSU_ARC.rvt A-100 SITE PLAN DESIGN DEVELOPMENT 01/20/23 AuthorTELEGRAPH & SERAPIS 051649148 TELEGRAPH ROADDOWNEY, CA 9024010-LE-05164-A-100-SITE PLAN 21-172 22.05 P13 LE LRG FSR NO.DATE DESCRIPTION 1" = 20'-0" SITE PLAN1A NORTH3/4" = 1'-0" BIKE RACK DETAIL1D PC AGENDA PAGE 112 0 10 20 30EAST ELEVATION NORTH ELEVATION COLOR AND MATERIAL LEGENDWD-1STC-3Note:All roof top mechanical equipment shall be located inequipment well and screened from view by parapet walls.File Name: 21-172 Telegraph & Serapis- Color Elevations 04/04/2208/29/22 Resysta, Color: Siam (FVG C-14)Stucco - Color to Match : Dunn Edwards, DE6214 "Pigeon Gray" STC-1 Stucco - Color to Match: Dunn Edwards, DE6370 "Charcoal Smudge"AL-1 Aluminum Awning - Color: Dark BronzeSTC-2 Stucco - Color to Match: Dunn Edwards, DE358 "Milk Glass"G41 Translucent White Laminate Glass. MFR: BENDHEIM, MODEL: CRHO-1325ST-1 YKK Storefront System - Color: Dark Bronze23'-0"PRELIMINARY ELEVATIONSTelegraph & Serapis- Downey, CAWEST ELEVATION SOUTH ELEVATIONStucco STC-2Wood Siding WD-1Canopy - AL-1Stucco STC-1Canopy - AL-1Stucco STC-2Stucco STC-3Translucent Laminate White Glass G41 Stucco STC-3Wood Siding WD-1Stucco STC-2Wood Siding WD-1Stucco STC-2 Translucent Laminate White Glass G41Stucco STC-1Wooding Siding WD-1Stucco STC-3PRELIMINARY ELEVATIONSTelegraph & Serapis- Downey, CA PC AGENDA PAGE 113 SOUTHEAST VIEW04/04/2208/29/22File Name: 21-172 Telegraph & Serapis- Color ElevationsPRELIMINARY ELEVATIONSTelegraph & Serapis- Downey, CAPRELIMINARY ELEVATIONSTelegraph & Serapis- Downey, CA PC AGENDA PAGE 114 SOUTHWEST VIEW04/04/2208/29/22File Name: 21-172 Telegraph & Serapis- Color ElevationsPRELIMINARY ELEVATIONSTelegraph & Serapis- Downey, CAPRELIMINARY ELEVATIONSTelegraph & Serapis- Downey, CA PC AGENDA PAGE 115 NORTHEAST VIEW04/04/2208/29/22File Name: 21-172 Telegraph & Serapis- Color ElevationsPRELIMINARY ELEVATIONSTelegraph & Serapis- Downey, CAPRELIMINARY ELEVATIONSTelegraph & Serapis- Downey, CA PC AGENDA PAGE 116 NORTHWEST VIEW04/04/2208/29/22File Name: 21-172 Telegraph & Serapis- Color ElevationsPRELIMINARY ELEVATIONSTelegraph & Serapis- Downey, CAPRELIMINARY ELEVATIONSTelegraph & Serapis- Downey, CA PC AGENDA PAGE 117 BIRD'S EYE VIEW 1File Name: 21-172 Telegraph & Serapis- Color Elevations 04/04/2208/29/22PRELIMINARY ELEVATIONSTelegraph & Serapis- Downey, CAPRELIMINARY ELEVATIONSTelegraph & Serapis- Downey, CA PC AGENDA PAGE 118 BIRD'S EYE VIEW 204/04/2208/29/22File Name: 21-172 Telegraph & Serapis- Color ElevationsPRELIMINARY ELEVATIONSTelegraph & Serapis- Downey, CAPRELIMINARY ELEVATIONSTelegraph & Serapis- Downey, CAPRELIMINARY ELEVATIONSTelegraph & Serapis- Downey, CA PC AGENDA PAGE 119 BIRD'S EYE VIEW 3File Name: 21-172 Telegraph & Serapis- Color Elevations 04/04/2208/29/22PRELIMINARY ELEVATIONSTelegraph & Serapis- Downey, CAPRELIMINARY ELEVATIONSTelegraph & Serapis- Downey, CA PC AGENDA PAGE 120 BIRD'S EYE VIEW 4File Name: 21-172 Telegraph & Serapis- Color Elevations 04/04/2208/29/22PRELIMINARY ELEVATIONSTelegraph & Serapis- Downey, CA PC AGENDA PAGE 121 PC AGENDA PAGE 1 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DOWNEY APPROVING A SITE PLAN REVIEW, CONDITIONAL USE PERMIT, (PLN-22-00098) AND TENTIVE PARCEL MAP (PLN-21-00147), ALLOWING THE EXPANSION OF AN EXISTING RELIGIOUS FACILITY WITH SITE IMPROVEMENTS AND THE CONSOLIDATION OF TWO ADJACENT PROPERTIES AT THE ADDRESS OF 12428 BENEDICT AVENUE BACKGROUND The current religious facility was granted a CUP (CUP No. 05-65) by the Planning Commission in June 15, 2005. This approval allowed an existing 1,300 square foot house to be demolished to facilitate the construction of the current 1,600 square foot Mosque along with new parking layout for the facility. The approval was based on a schedule of activities consisting of daily prayer services (see Attachment D). The schedule anticipated number of people who would attend the daily services with Fridays being the busiest day. Along with CUP No. 05-65, Design Review application (DR. 05-87) was also issued in 2005 for the façade design to the 1,600 square foot Mosque structure that stands today. Since then, no changes have been made to the site. The subject site after the lot merger is 19,559 square feet with one street frontage east of Benedict Avenue and north of Imperial Highway. The surrounding areas are variously zoned which are summarized in the table below: Land use Zone GP North Light Manufacturing business Light Manufacturing (M-1) Manufacturing (M) South Single-Family Residences General Commercial (C-2) Neighborhood Commercial (NC) East Multi-Unit Residential General Commercial (C-2) Neighborhood Commercial (NC) West Multi-Unit Residential Multiple-Family Residential (R-3) Medium Density Residential (MDR) PC AGENDA PAGE 2 On October 22nd, 2021 the applicant filed a request for a tentative parcel map to consolidate the two adjacent properties with the current parcel. On July 27th, 2022 the applicant filed a request for a Site Plan Review and Conditional Use Permit. On November 22nd, 2021 and August 25th, 2022, the application was deemed incomplete. On January 20th, 2023 the application was deemed complete and was publicly noticed in the Downey Patriot on February 16th, 2023 and mailed to all property owners within 500 feet of the subject property. Subject Site after Merger Individual Parcels before Merger PC AGENDA PAGE 3 Existing Front Elevation from Benedict Avenue DISCUSSION Site Plan Review The SPR evaluates the proposed changes to the building’s exterior and circulation on site and any additions of floor area greater than ten (10) percent. The applicant wishes to expand this single-story use of a Religious Facility with a 1st floor addition of 1,864 square feet, a 2nd floor addition of 3,052 square feet and a machine room located on the roof top disguised as decorative architectural feature. The exterior improvements to this building will consist of a smooth white stucco finish with a domical mosque architecture and a minaret, which is a slender tower feature which is purely ornamental to the building. There will be two half dome structures located on the roof at the front and rear of the building which will serve as vaulted ceilings viewed from the interior and a small enclosed architectural feature towards the rear of the roof which houses the mechanical equipment for the elevator. The floor area addition will include office spaces on the 1st and 2nd floors, an increase in square footage to the prayer hall on the 1st floor that has vaulted ceilings to the roof, and an elevator shaft towards the rear. The 2nd floor will cantilever over towards the parking lot with multiple façade breaks. In addition to façade improvements, the existing covered trash enclosure will be relocated to the south east corner of the property. The site circulation will be altered due to the consolidation of two adjacent properties. It is important to note the homes are located in a commercial zone therefore making those residential homes non-conforming uses. This consolidation will replace them with conforming commercial uses as the properties are recycled and will provide sufficient area for additional required parking and landscape areas. There will be a total of two entrances off of Benedict Avenue, both with two-way driving isles located to the south of the building. The proposed landscape plan follows the cities three-tiered system consisting of ground cover, shrubs, and trees which will dramatically improve the aesthetics of the parking lot and improve public view of the site and improve the aesthetics of the entire project site. The landscape will provide a colorful contrast to the proposed white stucco of the building. PC AGENDA PAGE 4 Proposed Front Isometric View from Benedict Avenue Conditional Use Permit The existing building has a CUP approval from 2005 (CUP No. 05-65) and was issued in approval for a Religious Public Use. This new conditional use permit will supersede and replace the previous approval for the continuation of use and based on the new square footages per the provided specific design plans. The new building of 5,044 square feet will be the new total, however the prayer sessions and children’s study sessions will be held in specific areas of the building seven days a week at alternating times of the day. The children attending these study sessions range in age from 6 to 14 years of age and will be “reciting and discussion of the Koran and other holy books” as provided by the applicant, during each session. The schedule provided for both services matches the previously approved schedule from 2005 and will not overlap in times schedules. PROPOSED SCHEDULE OF ACTIVITES – PRAYER SERVICE/CHILDREN’S STUDY SESSIONS TABL E A - November through March Activity Days Time Prayer Service Sunday – Saturday 5 am – 6 am Prayer Service Sunday – Thursday 1 pm – 1:30 pm Prayer Service Saturday – Sunday 3 pm – 3:30 pm Prayer Service Sunday – Saturday 5:15 pm – 5:45 pm Prayer Service Sunday – Saturday 7:30 pm – 9:30 pm Prayer Service Friday Only 1 pm – 2 pm Children’ Studies Monday – Thursday 8 am – 12 pm Children’ Studies Monday – Friday 3:45 pm – 5:00 pm Children’ Studies Monday – Friday 6:pm – 7:15 pm Children’ Studies Saturday – Sunday 10 am – 12 pm PC AGENDA PAGE 5 TABLE B – April through October (Daylight Saving Time) Activity Days Time Prayer Service Monday – Saturday 5 am – 6 am Prayer Service Saturday – Thursday 1 pm – 1:30 pm Prayer Service Friday Only 1 pm – 2 pm Prayer Service Sunday – Saturday 6:30 pm – 7:30 pm Prayer Service Sunday – Saturday 8 pm – 8:45 pm Prayer Service Sunday – Saturday 9:15 pm – 10:30 pm Children’ Studies Monday – Thursday 8 am – 12 pm Children’ Studies Saturday – Sunday 10 am – 12 pm Children’ Studies Monday – Friday 3:30 pm – 4:45 pm Children’ Studies Monday – Friday 5 pm – 6:15 pm It should be noted that the 15-minute time gap between activities only occurs in a few instances; the time intervals separating activities for the rest of the day range from 30 minutes to two hours. Furthering establishing a sufficient time gap between the different activities is knowing that pray service worshipers usually only spend up to 10 minutes at each session even though the Assembly Rooms are available for an hour. As shown on the attached plans, there are two areas that will be used for prayer services on the 1st floor which are referenced on the plans as ‘prayer hall’ and ‘atrium’, both totaling an assembly area of 1,702 square feet requiring a total of 23 parking spaces (one space for every five persons based on maximum occupancy load factor of 15). In addition to the ‘prayer hall’ and ‘atrium’, these areas will also be used as classrooms for children’s study sessions along with a ‘meeting room’ located on the 2nd floor. Classroom used for children’s studies require 1.5 parking spaces per classroom requiring an additional 4 parking spaces. Lastly, the addition to the building will include offices for members of the church which make up 843 square feet, requiring a total of 3 parking spaces. The remaining square footage of the building is dedicated to corridors and restrooms. The applicant meets the required number of 31 parking spaces and has a surplus of 1 parking stall. Tentative Parcel Map As part of this project, Tentative Parcel Map No. 83742 will consolidate the neighboring two adjacent properties (APN: 6283-016-062 & 6283-016-061) to the south along Benedict Avenue with the existing lot. The current facility occupies an 8,997 square foot parcel. With the consolidation of the two additional parcels, the facility will occupy a lot area of 19,599 square feet. The two adjacent parcels are also zoned C-2. The existing residences on the two parcels will be demolished to facilitate the additional parking spaces and trash enclosure for the expanded Religious Facility. The minimum lot size for C-2 is 10,000 square feet and minimum lot width and lot depth is 100’ x 100’. The newly merged parcel will have a width of 188’, depth of102.24. DEVELOPMENT REVIEW COMMITTEE The project was reviewed by the Development Review Committee (DRC) on November 3rd, 2021 for the Tentative Parcel Map & August 18th, 2022 for Site Plan Review and Conditional Use Permit applications. The project was discussed and evaluated as it pertains to Planning, Police, Fire, Public Works, and Building and Safety matters. No departments expressed concerns or opposition over the project, and issued standard conditions. PC AGENDA PAGE 6 Recommended conditions of approval have been included in the attached Resolution to address potential impacts. ENVIRONMENTAL ANALYSIS Staff has reviewed the proposed Site Plan Review, Conditional Use Permit, and Tentative Parcel Map, for compliance with the California Environmental Quality Act (CEQA). Upon completion of this review, staff has determined that this request has been found to be Categorically Exempt from CEQA, pursuant to Guideline Section No. 15301 (Class 1 – Existing Facilities) and No. 15315 (Class 15 – Minor Land Subdivisions). Class 1 exemptions consist of additions to existing structures provided that the addition will not result to an increase of more than 10,000 square feet and if the project is in an area where all public services and facilities are available to allow for maximum development permissible in the General Plan and the area in which the project is located is not environmentally sensitive. Class 15 exemptions consist of the division of property in urbanized areas zoned commercial into four or fewer parcels when the division is in conformance with the General Plan and zoning. FINDINGS Pursuant to Municipal Code Section 9820.08, there are seven findings that must be adopted prior to approving a Site Plan Review application. The findings are as follows: A.The site plan is consistent with the goals and polices embodied in the General Plan and other applicable plans and policies adopted by the Council; The project’s objective to revitalize the site helps achieve various long-term goals. Specifically, the following policies are promoted by the Site Plan Review: Policy 8.1.1 – Promote architectural design of the highest quality. Policy 8.2.2 – Promote the upgrading of properties. The proposed architecture uses quality materials that provide different elements to achieve a domical style architecture for the mosque. This is a significant upgrade to the existing religious facility that has remained the same since 2005. The redevelopment of this site has the potential of serving as an example for higher quality of architecture for future developments within the city. The quality of design, site layout, and landscaping not only upgrades the subject property, but the surrounding areas as well. B.The proposed development is in accordance with the purposes and objectives of this article and the zone in which the site is located; The purpose of the C-2 (General Commercial) zone, as stated in the Downey Municipal Code,” is intended to provide for and encourage the orderly development of general commercial uses, with a wide variety of goods and services, for the residents of the entire city, with provisions designed to ensure that such commerce will be efficient, function related, and compatible with adjacent noncommercial development.” It is staff’s opinion that the proposed application is in full conformance with the objectives stated above. This is achieved because religious facilities are commonly found in commercial corridors and residential areas and is compatible with other commercial uses. In addition, the proposed project continues to provide residents with a variety and services. C.The proposed development’s site plan and its design features, including PC AGENDA PAGE 7 architecture and landscaping, will integrate harmoniously and enhance the character and design of the site, the immediate neighborhood, and the surrounding areas of the City; The proposed design of the project will integrate harmoniously with this area by providing aesthetically pleasing architecture and landscaping. The renovations serve as a significant upgrade from the existing facility on site. In addition, the street scape is enhanced and the transition from the street onto the site is improved by the proposed landscaping. D.The site plan and location of the buildings, parking areas, signs, landscaping, luminaries, and other site features indicate that proper consideration has been given to both the functional aspects of the site development, such as automobile and pedestrian circulation, and the visual effects of the development from the view of the public streets; The site plan along with the site features including landscaping and parking have considered all functional aspects of the site and will be well integrated into the neighborhood. The project is expanded off the general location of the existing building footprint and all new additions comply with the development standards for the zone. The added driveway entrance for the expanded parking lot provides a more efficient ingress and egress for vehicular traffic. In addition, the landscaping around the front building façade and within the new parking area creates a nice transitional buffer between the religious facility, the public right of way, and Benedict Avenue. E.The proposed development will improve the community appearance by preventing extremes of dissimilarity or monotony in new construction or in alterations of facilities; The overall design objective is to compliment the use it serves. The proposed redevelopment reflects a high quality of architectural design. The development is unique in its architecture and provides an example of quality architecture for future developments within the City of Downey. F.The site plan and design considerations shall tend to upgrade property in the immediate neighborhood and surrounding areas with an accompanying betterment of conditions affecting the public health, safety, comfort, and welfare; The proposed architecture is a significant upgrade to the immediate neighborhood and surrounding areas. In addition, the redevelopment of this site has the potential of serving as an example for higher quality architecture for future developments within the City of Downey. The project complies with all zoning codes and will comply with all building and safety, and engineering codes to ensure a safe and sound structure for its occupants and its surrounding neighbors. Lastly, the project was designed to ensure that any potential effects will not negatively harm or impact the surrounding sites and the public health, safety, comfort and general welfare. G.The proposed development’s site plan and its design features will include graffiti- resistant features and materials in accordance with the requirements of Section 4960 of Chapter 10 of Article IV of this Code; The project has been conditioned to meet the requirements specified in Section 4960 of PC AGENDA PAGE 8 the Downey Municipal Code. Section 4960 discusses the installation of anti-graffiti materials and the appropriate allotted time limit for the removal of graffiti. Pursuant to Municipal Code Section 9824.06, there are four findings that must be adopted prior to approving the Conditional Use Permit. The findings are as follows: A. The requested Conditional Use Permit will not adversely affect the intent and purpose of this article or the City’s General Plan or the public convenience or general welfare of persons residing or working in the neighborhood thereof; The project will not adversely affect the intent and purpose of the Downey Municipal Code or the City’s General Plan. The subject site is located within an active commercial corridor that contains complimentary uses, therefore the project should not cause a nuisance related to public convenience or general welfare to any nearby persons residing or working in the area. Policy 1.1.4 – Provide an appropriate amount of land area for people to acquire goods and services. Program 9.1.1.5 – Continue the revitalization of commercial and industrial corridors. The proposed use will provide services for the public benefit and support goals and policies in the General Plan under Neighborhood Commercial uses. The mosque in itself and its expansion will serve the surrounding area by providing religious facilities to the Muslim Community. Its expansion will further support to diversify the amount of goods and services available to patrons of the City. As part of its expansion, it will consolidate the two adjacent properties which are developed with the non-conforming use of residential homes and will be replaced with the conforming use of a religious facility, strengthening the commercial corridor off of Imperial Highway. B. The requested use will not adversely affect the adjoining land uses and the growth and development of the area in which it is proposed to be located; A religious facility use is common and appropriate within commercial areas and in urbanized areas and occasionally found within proximity to residential zones. In addition, the use is existing and currently functions appropriately on the subject site. The expansion of the facility will not adversely affect adjoining land uses as the project will comply with all development standards including parking standards and landscaping. Conditions of approval ensure the project will not result in negative impacts. C. The size and shape of the site proposed for the use is adequate to allow the full development of the proposed use in a manner not detrimental to the particular area; The proposed addition is combined with the expansion of the site to approximately 19,599. The larger parcel adequately accommodates the expansion of the building along with the additional parking stalls, drive aisles, trash enclosure and driveway. The parking lot will accommodate the required number of parking spaces ensuring that parking demand does not significantly spill onto adjacent neighborhoods. Therefore, the size and shape of the site will not be detrimental to the particular area. D. The traffic generated by the proposed use will not impose an undue burden upon the streets and highways in the area; PC AGENDA PAGE 9 The added square footage to this existing building will potentially increase the usage and increase vehicle trips to the site. However, the connecting street of Imperial Highway is a major arterial with three (3) travel lanes in each direction and has sufficient excess capacity to accommodate project generated traffic. In addition, project generated traffic is not expected to spill over into the street parking since the parking meets the required number of 31 parking spaces. In addition, prayer service and children’s study sessions will be at staggered times; Therefore, traffic generated by the proposed use will not impose an undue burden upon the streets and highways in the area. Pursuant to the requirements of Subdivision Map Act Article 1 Section 66474, staff recommends that the Planning Commission make the following findings to recommend the overall request: A.The proposed map is consistent with the General and Specific Plans. Policy 8.2.2 – Promote the upgrading of properties The proposed TPM is consistent with the City’s General Plan. The map most closely helps promote Policy 8.2.2 relating to the improvement of existing properties. Although the City’s General Plan does not address subdivisions directly, subdivisions proposed for commercial properties are rarely processed without an improved benefit to the site and streetscape. The project includes redevelopment of a site along with the consolidation of the adjacent lots that has not experienced significant upgrades since 1948. These upgrades include, but are not limited to, site layout, landscaping, circulation, parking, and façade improvements. B.The design or improvement of the proposed subdivision is consistent with applicable general and specific plans. The project is consistent with all applicable goals and policies specified in the City’s General plan and policies adopted by the City Council. The project main objective is to redevelop the site and achieve long-term goals. Policy 8.1.1 – Promote architectural design of the highest quality. Policy 8.2.2 – Promote the upgrading of properties. The exterior changes to the façade along with the additions are a significant upgrade to the existing facility on-site and will be newer than most developments within is proximity. The redevelopment of the site has the potential of serving as an example of higher quality architecture for future developments within the city. Program 9.1.1.5 – Continue the revitalization of commercial and industrial corridors. The site was developed with a mosque use in 2005 and the two adjacent properties have not seen any improvements since 1948. This redevelopment would remove all non- conforming uses on the sites and revitalize the commercial use it is zoned for and supported under the General Plan. C.The site is physically suitable for the type of development. The subject site is physically suitable for the type of development. The site holds infrastructure, utilities, and vehicular and pedestrian access. It is also well under the PC AGENDA PAGE 10 maximum building development. In addition, the project is found to be in compliance with all development standards and will comply with Conditions of approval for this application. These standards include, but are not limited to, setbacks, height, and landscaping. These characteristics will remain unchanged from the approvals related to the layout of the site. D.The site is physically suitable for the proposed density of development. The square footage after the subdivision will be 19,599 and is allowed a maximum lot coverage of 50 percent and is currently at the lot coverage of 33 percent. The improvements to the existing building have a maximum height of 45 feet or three stories; the proposed height is 45 feet which is due to the minaret tower feature which is only decorative. Furthermore, existing roadways and infrastructure adequately serve the lot. E.The design of the subdivision or type of improvements is not likely to cause serious public health problems. The design of the project has been carefully laid out to avoid conditions that could result in series public health problems. Pedestrian circulation on the site is separated from vehicle traffic as walkways are directly connected to all entrances to the public right-of- way. It is staff’s opinion that this site layout works best to facilitate vehicle movement without jeopardizing pedestrian safety. Staff believes that the functional aspects of the site development from the view of the public street have been properly considered in the request. F.The design of the subdivision or type of improvements will not conflict with easements, acquired by the public at large, for access through or use of property within the proposed subdivision. During the review of the preliminary title report for the subject site, no such easements were found within the subject property. Overhead utility lines are present along the rear property line, but will not be modified or altered as a result of this application. G.The design of the subdivision of the proposed improvements is not likely to cause substantial environmental damage or substantially and avoidably injure wildlife or their habitat. The project site is in an urban setting and is already serving the community as an existing use as a religious facility. The proposed map and development will not cause or contribute to impacts not already existing on the site or in the general area. In addition, environmental impacts related to noise, traffic, light, and aesthetic have been identified as negligible and compliance with categorical exemptions from the California Environmental Quality Act. CORRESPONDENCE As of the date that this report was printed, staff has not received any correspondence regarding this application. CONCLUSION PC AGENDA PAGE 11 Based on the analysis contained within this report, staff is concluding that all findings required for Site Plan Review, Conditional Use Permit and Tentative Parcel Map No. 83742 can be made in a positive manner. As such, staff is recommending that the Planning Commission approve the application (PLN-21-00147 & PLN-22-00098), thereby approving the 5,044 addition, façade remodel, and the site improvements such as parking layout and landscaping. EXHIBITS A.Maps B.Draft Resolution C.Project Plans D.Tentative Parcel Map No. 83742 PC AGENDA PAGE 12 Exhibit ‘A’ – Maps AERIAL PHOTOGRAPH Subject Site IMPERIAL HWY BENEDICT AVE PC AGENDA PAGE 13 LOCATION MAP ZONING MAP Subject Site PC AGENDA PAGE 14 RESOLUTION NO. 23- A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DOWNEY APPROVING A SITE PLAN REVIEW, CONDITIONAL USE PERMIT, (PLN-22-00098) AND TENTIVE PARCEL MAP (PLN-21-00147), ALLOWING THE EXPANSION OF AN EXISTING RELIGIOUS FACILITY WITH SITE IMPROVEMENTS AND THE CONSOLIDATION OF TWO ADJACENT PROPERTIES AT THE ADDRESS OF 12428 BENEDICT AVENUE THE PLANNING COMMISSION OF THE CITY OF DOWNEY DOES RESOLVE AS FOLLOWS: SECTION 1. The Planning Commission of the City of Downey does hereby find, determine and declare that: A.On October 22, 2021, the application was filed by Mohammad A. Ansari, (hereinafter referred to as the “applicant”) for a request for Tentative Parcel Map (PLN-21-00147) to consolidate the two adjacent properties; and, B.On July 27, 2022, the application was filed by the applicant, for a request for a Site Plan Review and a Conditional Use Permit (PLN-22-00098) for the expansion of an existing Mosque, façade and site improvements; and, C.The application was deemed incomplete due to missing information on November 22, 2021 and August 25, 2022. The applicant resubmitted additional information and the application was deemed complete for further processing on January 11 2023; and D.On February 16, 2023, a notice of the public hearing was sent to all property owners within 500’ of the subject site and the notice was published in Downey Patriot; and, E.The Planning Commission held a duly noticed public hearing on March 1, 2023 and after fully considering all oral and written testimony, facts, and opinions offered at the aforesaid public hearing adopted this resolution. SECTION 2. The Planning Commission further finds, determines and declares that the proposed project was reviewed for compliance with the California Environmental Quality Act (CEQA), and is categorially exempt from CEQA, pursuant to Guideline Section No. 15301 (Class 1 – Existing Facilities) and No. 15315 (Class 15 – Minor Land Subdivisions). Class 1 exemptions consist of additions to existing structures provided that the addition will not result to an increase of more than 10,000 square feet and if the project is in an area where all public services and facilities are available to allow for maximum development permissible in the General Plan and the area in which the project is located is not environmentally sensitive. Class 15 exemptions consist of the division of property in urbanized areas zoned commercial into four or fewer parcels when the division is in conformance with the General Plan and zoning. SECTION 3. Having considered all of the oral and written evidence presented to it at said public hearings regarding the Site Plan Review, the Planning Commission further finds, determines and declares that: PC AGENDA PAGE 15 A. The site plan is consistent with the goals and polices embodied in the General Plan and other applicable plans and policies adopted by the Council. The project’s objective to revitalize the site helps achieve various long-term goals. Specifically, the following policies are promoted by the Site Plan Review: Policy 8.1.1 – Promote architectural design of the highest quality. Policy 8.2.2 – Promote the upgrading of properties. The proposed architecture uses quality materials that provide different elements to achieve a domical style architecture for the mosque. This is a significant upgrade to the existing religious facility that has remained the same since 2005. The redevelopment of this site has the potential of serving as an example for higher quality of architecture for future developments within the city. The quality of design, site layout, and landscaping not only upgrades the subject property, but the surrounding areas as well. B. The proposed development is in accordance with the purposes and objectives of this article and the zone in which the site is located. The purpose of the C-2 (General Commercial) zone, as stated in the Downey Municipal Code,” is intended to provide for and encourage the orderly development of general commercial uses, with a wide variety of goods and services, for the residents of the entire city, with provisions designed to ensure that such commerce will be efficient, function related, and compatible with adjacent noncommercial development.” It is staff’s opinion that the proposed application is in full conformance with the objectives stated above. This is achieved because religious facilities are commonly found in commercial corridors and residential areas and is compatible with other commercial uses. In addition, the proposed project continues to provide residents with a variety and services. C. The proposed development’s site plan and its design features, including architecture and landscaping, will integrate harmoniously and enhance the character and design of the site, the immediate neighborhood, and the surrounding areas of the City. The proposed design of the project will integrate harmoniously with this area by providing aesthetically pleasing architecture and landscaping. The renovations serve as a significant upgrade from the existing facility on site. In addition, the street scape is enhanced and the transition from the street onto the site is improved by the proposed landscaping. D. The site plan and location of the buildings, parking areas, signs, landscaping, luminaries, and other site features indicate that proper consideration has been given to both the functional aspects of the site development, such as automobile and pedestrian circulation, and the visual effects of the development from the view of the public streets. The site plan along with the site features including landscaping and parking have considered all functional aspects of the site and will be well integrated into the neighborhood. The project is expanded off the general location of the existing building footprint and all new additions comply with the development standards for the zone. The added driveway entrance for the expanded parking lot provides a more efficient ingress and egress for vehicular traffic. In addition, the landscaping around the front building façade and within the new parking area creates a nice transitional buffer between the religious facility, the public right of way, and Benedict Avenue. E. The proposed development will improve the community appearance by preventing extremes of dissimilarity or monotony in new construction or in alterations of facilities. The overall design objective is to compliment the use it serves. The PC AGENDA PAGE 16 proposed redevelopment reflects a high quality of architectural design. The development is unique in its architecture and provides an example of quality architecture for future developments within the City of Downey. F.The site plan and design considerations shall tend to upgrade property in the immediate neighborhood and surrounding areas with an accompanying betterment of conditions affecting the public health, safety, comfort, and welfare. The proposed architecture is a significant upgrade to the immediate neighborhood and surrounding areas. In addition, the redevelopment of this site has the potential of serving as an example for higher quality architecture for future developments within the City of Downey. The project complies with all zoning codes and will comply with all building and safety, and engineering codes to ensure a safe and sound structure for its occupants and its surrounding neighbors. Lastly, the project was designed to ensure that any potential effects will not negatively harm or impact the surrounding sites and the public health, safety, comfort and general welfare. G.The proposed development’s site plan and its design features will include graffiti- resistant features and materials in accordance with the requirements of Section 4960 of Chapter 10 of Article IV of this Code. The project has been conditioned to meet the requirements specified in Section 4960 of the Downey Municipal Code. Section 4960 discusses the installation of anti-graffiti materials and the appropriate allotted time limit for the removal of graffiti. SECTION 4. Having considered all of the oral and written evidence presented to it at said public hearings regarding the Conditional Use Permit, the Planning Commission further finds, determines and declares that: A.The requested Conditional Use Permit will not adversely affect the intent and purpose of this article or the City’s General Plan or the public convenience or general welfare of persons residing or working in the neighborhood thereof; The project will not adversely affect the intent and purpose of the Downey Municipal Code or the City’s General Plan. The subject site is located within an active commercial corridor that contains complimentary uses, therefore the project should not cause a nuisance related to public convenience or general welfare to any nearby persons residing or working in the area. Policy 1.1.4 – Provide an appropriate amount of land area for people to acquire goods and services. Program 9.1.1.5 – Continue the revitalization of commercial and industrial corridors. The proposed use will provide services for the public benefit and support goals and policies in the General Plan under Neighborhood Commercial uses. The mosque in itself and its expansion will serve the surrounding area by providing religious facilities to the Muslim Community. Its expansion will further support to diversify the amount of goods and services available to patrons of the City. As part of its expansion, it will consolidate the two adjacent properties which are developed with the non-conforming use of residential homes and will be replaced with the conforming use of a religious facility, strengthening the commercial corridor off of Imperial Highway. B.The requested use will not adversely affect the adjoining land uses and the growth and development of the area in which it is proposed to be located. A religious facility use is common and appropriate within commercial areas and in urbanized areas and occasionally found within proximity to residential zones. In addition, the use is existing and currently functions appropriately on the subject site. The expansion of the facility will not adversely affect adjoining land uses as the project will comply with all development PC AGENDA PAGE 17 standards including parking standards and landscaping. Conditions of approval ensure the project will not result in negative impacts. C.The size and shape of the site proposed for the use is adequate to allow the full development of the proposed use in a manner not detrimental to the particular area. The proposed addition is combined with the expansion of the site to approximately 19,599. The larger parcel adequately accommodates the expansion of the building along with the additional parking stalls, drive aisles, trash enclosure and driveway. The parking lot will accommodate the required number of parking spaces ensuring that parking demand does not significantly spill onto adjacent neighborhoods. Therefore, the size and shape of the site will not be detrimental to the particular area. D.The traffic generated by the proposed use will not impose an undue burden upon the streets and highways in the area. The added square footage to this existing building will potentially increase the usage and increase vehicle trips to the site. However, the connecting street of Imperial Highway is a major arterial with three (3) travel lanes in each direction and has sufficient excess capacity to accommodate project generated traffic. In addition, project generated traffic is not expected to spill over into the street parking since the parking meets the required number of 31 parking spaces. In addition, prayer service and children’s study sessions will be at staggered times; Therefore, traffic generated by the proposed use will not impose an undue burden upon the streets and highways in the area. SECTION 5. Having considered all of the oral and written evidence presented to it at said public hearings regarding the Tentative Parcel Map, the Planning Commission further finds, determines and declares that: A.The proposed map is consistent with the General and Specific Plans. Policy 8.2.2 – Promote the upgrading of properties. The proposed TPM is consistent with the City’s General Plan. The map most closely helps promote Policy 8.2.2 relating to the improvement of existing properties. Although the City’s General Plan does not address subdivisions directly, subdivisions proposed for commercial properties are rarely processed without an improved benefit to the site and streetscape. The project includes redevelopment of a site along with the consolidation of the adjacent lots that has not experienced significant upgrades since 1948. These upgrades include, but are not limited to, site layout, landscaping, circulation, parking, and façade improvements. B.The design or improvement of the proposed subdivision is consistent with applicable general and specific plans. The project is consistent with all applicable goals and policies specified in the City’s General plan and policies adopted by the City Council. The project main objective is to redevelop the site and achieve long-term goals. Policy 8.1.1 – Promote architectural design of the highest quality. Policy 8.2.2 – Promote the upgrading of properties. The exterior changes to the façade along with the additions are a significant upgrade to the existing facility on-site and will be newer than most developments within is proximity. The redevelopment of the site has the potential of serving as an example of higher quality architecture for future developments within the city. Program 9.1.1.5 – Continue the revitalization of commercial and industrial corridors. The site was developed with a mosque use in 2005 and the two adjacent properties have not seen any improvements since 1948. This redevelopment would remove all non- PC AGENDA PAGE 18 conforming uses on the sites and revitalize the commercial use it is zoned for and supported under the General Plan. C. The site is physically suitable for the type of development. The subject site is physically suitable for the type of development. The site holds infrastructure, utilities, and vehicular and pedestrian access. It is also well under the maximum building development. In addition, the project is found to be in compliance with all development standards and will comply with Conditions of approval for this application. These standards include, but are not limited to, setbacks, height, and landscaping. These characteristics will remain unchanged from the approvals related to the layout of the site. D. The site is physically suitable for the proposed density of development. The square footage after the subdivision will be 19,599 and is allowed a maximum lot coverage of 50 percent and is currently at the lot coverage of 33 percent. The improvements to the existing building have a maximum height of 45 feet or three stories; the proposed height is 45 feet which is due to the minaret tower feature which is only decorative. Furthermore, existing roadways and infrastructure adequately serve the lot. E. The design of the subdivision or type of improvements is not likely to cause serious public health problems. The design of the project has been carefully laid out to avoid conditions that could result in series public health problems. Pedestrian circulation on the site is separated from vehicle traffic as walkways are directly connected to all entrances to the public right-of-way. It is staff’s opinion that this site layout works best to facilitate vehicle movement without jeopardizing pedestrian safety. Staff believes that the functional aspects of the site development from the view of the public street have been properly considered in the request. F. The design of the subdivision or type of improvements will not conflict with easements, acquired by the public at large, for access through or use of property within the proposed subdivision. During the review of the preliminary title report for the subject site, no such easements were found within the subject property. Overhead utility lines are present along the rear property line, but will not be modified or altered as a result of this application. G. The design of the subdivision of the proposed improvements is not likely to cause substantial environmental damage or substantially and avoidably injure wildlife or their habitat. The project site is in an urban setting and is already serving the community as an existing use as a religious facility. The proposed map and development will not cause or contribute to impacts not already existing on the site or in the general area. In addition, environmental impacts related to noise, traffic, light, and aesthetic have been identified as negligible and compliance with categorical exemptions from the California Environmental Quality Act. SECTION 6. Based upon the findings set forth in Sections 1 through 6 of this Resolution, the Planning Commission of the City of Downey hereby approves a Site Plan Review, Conditional Use Permit, and Tentative Parcel Map No. 83742 (PLN-21-00147 & PLN- 22-00098), subject to conditions of approval attached hereto as Exhibit ‘A’, which are necessary to preserve the health, safety and general welfare of the community and enable the Planning Commission to make the findings set forth in the previous sections. The conditions are fair and reasonable for the accomplishment of these purposes. PC AGENDA PAGE 19 SECTION 7. The Secretary shall certify the adoption of this Resolution. PASSED, APPROVED AND ADOPTED this 1st day of March 2023. Horacio Ortiz, Chairman City Planning Commission I HEREBY CERTIFY that the foregoing is a true copy of a Resolution adopted by the Planning Commission of the City of Downey at a regular meeting thereof held on the 1st day of March 2023, by the following vote, to wit: AYES: COMMISSIONERS: NOES: COMMISSIONERS: ABSENT: COMMISSIONERS: ABSTAIN: COMMISSIONERS: Linda Thai, Deputy City Clerk PC AGENDA PAGE 20 PLN-21-00147 & PLN-22-00098 (TENATIVE PARCEL MAP & SITE PLAN REVIEW, CONDITIONAL USE PERMIT) EXHIBIT A - CONDITIONS PLANNING 1. The approval of this Tentative Parcel Map No. (PLN-21-00147), Site Plan Review, and Conditional Use Permit (PLN-22-00098) allows for the addition of 5,044 square feet to an existing mosque with site improvements, including a façade improvement and a parcel map to consolidate the two adjacent properties at the addresses of 12436 & 12440 Benedict Avenue. 2. Conditional Use Permit PLN-22-00098 shall supersede and replace Conditional Use Permit No. 05-65. 3. The following table shall permit the days and times for prayer service and children’s study sessions. SCHEDULE OF ACTIVITES – PRAYER SERVICE/CHILDREN’S STUDY SESSIONS TABLE A - November through March Activity Days Time Prayer Service Sunday – Saturday 5 am – 6 am Prayer Service Sunday – Thursday 1 pm – 1:30 pm Prayer Service Saturday – Sunday 3 pm – 3:30 pm Prayer Service Sunday – Saturday 5:15 pm – 5:45 pm Prayer Service Sunday – Saturday 7:30 pm – 9:30 pm Prayer Service Friday Only 1 pm – 2 pm Children’ Studies Monday – Thursday 8 am – 12 pm Children’ Studies Monday – Friday 3:45 pm – 5:00 pm Children’ Studies Monday – Friday 6:pm – 7:15 pm Children’ Studies Saturday – Sunday 10 am – 12 pm TABLE B – April through October (Daylight Saving Time) Activity Days Time Prayer Service Monday – Saturday 5 am – 6 am Prayer Service Saturday – Thursday 1 pm – 1:30 pm Prayer Service Friday Only 1 pm – 2 pm Prayer Service Sunday – Saturday 6:30 pm – 7:30 pm Prayer Service Sunday – Saturday 8 pm – 8:45 pm Prayer Service Sunday – Saturday 9:15 pm – 10:30 pm Children’ Studies Monday – Thursday 8 am – 12 pm Children’ Studies Saturday – Sunday 10 am – 12 pm Children’ Studies Monday – Friday 3:30 pm – 4:45 pm Children’ Studies Monday – Friday 5 pm – 6:15 pm 4. No later than March 16, 2023, the applicant and the property owner shall sign and return an affidavit of Acceptance of Conditions, as provided by the City of Downey. 5. All activities at the Muslim church facility shall be conducted entirely within the proposed 5,044 square foot building. PC AGENDA PAGE 21 6.Prayer services shall not include musical instruments or a loud speaker announcing service to the neighborhood. 7.The Owner/Applicant agrees, as a condition of approval of this resolution, to indemnify, defend and hold harmless, at Applicant's expense, City and City's agents, officers and employees from and against any claim, action or proceeding commenced within the time period provided in Government Code Section 66499.37 to attack, review, set aside, void or annul the approval of this resolution, to challenge the determination made by City under the California Environmental Quality Act or to challenge the reasonableness, legality or validity of any condition attached hereto. City shall promptly notify Applicant of any such claim, action or proceeding to which City receives notice, and City will cooperate fully with Applicant in the defense thereof. Applicant shall reimburse the City for any court costs and attorney's fees that the City may be required to pay as a result of any such claim, action or proceeding. City may, in its sole discretion, participate in the defense of any such claim, action or proceeding, but such participation shall not relieve Applicant of the obligations of this condition. 8.The City Planner is authorized to make minor modifications to the approved preliminary plans or any of the conditions if such modifications shall achieve substantially the same results as would strict compliance with said plans and conditions. 9.The approved architectural style, finished material, and colors shall ne as approved by the Planning Commission. Changes to the facades and/or colors shall be subject to the review and approval of the City Planner. At his/her discretion, the City Planner may refer changes to the facades and/or colors to the Planning Commission for consideration. 10.All buildings and walls must be finished with graffiti resistant materials pursuant to Downey Municipal Code Section 4960. 11.Any graffiti applied to the site shall be removed within 48 hours. 12.The Applicant shall incorporate a copy of this Exhibit A - Conditions of Approval, into the approved set of building plans. 13.All landscaping must remain in compliance with the Downey Municipal Code, be composed of drought tolerant plants, and strictly conform to the approved set of plans. Any revisions to the proposed landscape plans will first require approval from the City Planner. 14.Parents whose child/children attend the study sessions shall park their motor vehicles in the onsite parking area and escort the child/children from the vehicle into the classroom; parents shall also escort the child from the classroom to their motor vehicle. 15.Prior to the final of building permits, all landscaping and irrigation shall be installed. The type, size and number of landscaping shall be as noted on the final approved landscape plan. All landscape shall be installed and permanently maintained. 16.Prior to the final of building permits, all installed landscaping shall be certified by a licensed Landscape Architect. The licensed Landscape Architect shall be on-site during the delivery of all trees to certify that all trees and plants are the right species and size. PC AGENDA PAGE 22 17. All planting beds and landscaped areas shall be provided with a permanent watering system consisting of an appropriate number of bubblers or sprinklers capable of supplying adequate water to all plant materials. Bubblers or sprinklers use to satisfy the requirements of this provision shall be spaced to assure complete coverage of the plant material. 18. All exterior lights on the property shall be LED and shall be directed, positioned, and/or shielded such that they do not illuminate surrounding properties and the public right-of- way. 19. All exterior mechanical and utility equipment shall be designed and located five feet from property line so as to not transmit noise or vibration to abutting properties. All utility equipment shall be located along the sides and/or rear of the buildings and shall be screened from public view through the use of landscape screens, walls, or other devices architecturally compatible with the buildings. Electrical panels and/or transformers are expressly prohibited from being located between the buildings and the public street. 20. All parking stalls shall be designed to avert the use to wheel stops by providing an overhang of 30 inches into a curbed landscape area. BUILDING 21. All construction shall comply with the most recent adopted City and State building codes: a) 2022 California Building Code b) 2022 California Residential Code c) 2022 California Electrical Code d) 2022 California Mechanical Code e) 2022 California Plumbing Code f) 2022 California Fire Code g) 2022 California Green Code 22. Special Inspections – As indicated by California Building Code Section 1704, the owner shall employ one or more special inspectors who shall provide special inspections when required by CBC section 1704. Please contact the Building Division at time of plan submittal to obtain application for special inspections. 23. The Title Sheet of the plans shall include: a) Occupancy Group b) Occupant Load c) Description of use d) Type of Construction e) Height of Building f) Floor area of building(s) and/or occupancy group(s) 24. School impact fees shall be paid prior to permit issuance. 25. Dimensioned building setbacks and property lines, street centerlines and between buildings or other structures shall be designed on plot plan. PC AGENDA PAGE 23 26.All property lines and easements must be shown on plot plan. A statement that such lines and easements are shown is required. 27.The project design will conform with energy conservation measures articulated in Title 24 of the California Code of Regulations and address measures to reduce energy consumption such as flow restrictors for toilets, low consumptions light fixtures, and insulation and shall use to the extent feasible draught landscaping. 28.A design professional will be required at time of construction drawings, to prepare plans for proposed improvements per the Business and Professions’ Code. 29.Public and private site improvements shall be designed in accordance with the Americans with Disabilities Act and Chapter 11 of the California Building Code. Site plan shall include a site accessibility plan identifying exterior routes of travel and detailing running slope, cross slope, width, pedestrian ramp, curb ramps, handrails, signage and truncated domes. Path of travel shall be provided from the public right of way and accessible parking to building. The design professional shall ensure that the site accessibility plan is compliance with the latest Federal and State regulations. FIRE The following comments pertain to a limited fire review of a design review plan submittal. The comments contained herein shall not be construed as complete or encompassing all fire-life safety code requirements set forth in local, State, and/or National local codes. 30.Deferred automatic fire sprinkler plan submittal required for new Residential Group R occupancy. Automatic fire sprinkler system design, installation, and testing shall be per NFPA 13D or 13R based on the building construction type, height, fire separation, etc. [CFC § 903.2.8; DMC 3318] 31. Fire Project construction shall comply with requirements set forth in the CA Building Code for egress calculation, exit pathways, and discharge. PUBLIC WORKS CONDITIONS 32.All public utilities shall be installed underground. 33.Proposed public improvements shall comply with the latest edition of Standard Plans and Specifications for Public Works Construction, City of Downey standards and the Americans with Disabilities Act (ADA). 34.Obtain permits from the Public Works Department for all improvements within the public right of way at least two weeks prior to commencing work. Contact Brian Aleman, Assistant Civil Engineer, at (562) 904-7110 for information. 35.Remove and replace damaged, uneven or sub-standard curb, gutter, sidewalk, driveway, disabled ramps, and pavement to the satisfaction of the Public Works Department. Contact the Public Works Inspector at (562) 904-7110 to identify the limits of the areas to be removed and replaced at least 48 hours prior to commencing work. PC AGENDA PAGE 24 36. Owner/applicant must submit public improvement plan(s) for review and approval by Public Works Department prior to obtaining an encroachment permit. 37. All unused driveways shall be removed and constructed with full-height curb gutter, and sidewalk to match existing improvements. 38. The owner /applicant shall reconstruct all driveway approaches per Standard Plans of Public Works Construction (SPPWC) No. 110-2 Type C. Driveway width bottom of X to bottom of X shall be as wide as the driveway or parking aisle they serve. The new widen driveways shall be at least five (5) feet away from any above-ground obstructions (including storm drains) in the public right-of-way to the top of the driveway “X.” Otherwise, the obstruction shall be relocated at the applicant’s expense. Ensure that each driveway provides proper pedestrian access across, in compliance with ADA standards. The final layout and site driveway approach design shall be subject to the review and approval by the Public Works Department. 39. Remove all Underground Service Alert (USA) temporary pavement markings immediately following the completion of the work / Final permit inspection. USA markings shall be installed using chalk-based paint only. 40. Paint property address numbers (4” height) on the curb face in front of the proposed development to the City’s satisfaction. 41. Drive approaches shall match driveway width as specified per Standard Plan of Public Works Construction No. 110-2 Type C. 42. Any utilities that are in conflict with the development shall be relocated at the owner/applicant's expense. 43. Any acquired property in the form of easement, fee simple or irrevocable offer shall be in form acceptable by the city engineer and the city attorney prior to its recordation. Water & Sewer 44. The owner/applicant shall provide a fire sprinkler system(s) in accordance with Fire Department and Building and Safety standards. Should such fire sprinkler system(s) require the installation of dedicated fire service lateral(s), such lateral(s) shall be constructed in accordance with the latest Department of Public Works and Fire Department standards including backflow devices, fire department connections and other appurtenances as required. New fire service lateral(s) shall be connected to existing 8-inch main located on Benedict Avenue and shall be dedicated for fire service only. 45. The owner/applicant shall furnish and install domestic and fire water backflow devices in accordance with City of Downey standards and as required by State and LA County Department of Public Health. Backflow devices shall be located on private property, readily accessible for emergency and inspection purposes, and screened from view by providing sufficient landscaping. 46. Backflow devices shall be certified in the field by a licensed LA County Department of Public Health certified tester prior to placing into service and such certification provided PC AGENDA PAGE 25 to City. 47. If existing water utilities are being upgraded, existing potable and fire water service lines and associated appurtenances must be removed and abandoned from existing water main. 48. Any unused existing potable water services line and associated appurtenance must be removed and abandon from existing water main off of Benedict Avenue. 49. Owner or tenant must establish accounts with the City Cashier prior to the City activating and the tenant using any fire, potable, or recycled water service and meter. 50. For any water service upgrades, the owner/applicant shall provide separate water improvement plan sets for review and approval consisting of the following: a. Potable Water Improvement Plans (all City-owned potable water and fire service lateral improvements. 51. Final City approved potable water improvement plans shall be submitted on mylars and shall be signed and stamped by a State of California licensed civil engineer. In addition to review and approval by City. Improvement plans for potable water main improvements shall be both plan and profile. 52. Upon completion of water improvements, owner/applicant shall submit red-lined construction plans to City noting all changes to the plan and profile of all water improvements installed. Such changes shall be incorporated into a final record drawing mylar which shall be signed and stamped by the original engineer and/or architect of record and submitted to the City along with digital files (AutoCAD – latest edition). 53. If applicable, the owner/applicant shall furnish and install a sewer lateral (to the front property line) and abandon any existing unused/damaged sewer laterals. The design and improvements of sewers shall be in accordance with the latest standards of the Department of Public Works. Septic systems shall not be allowed. 54. Utility plans shall be submitted to and approved by the Department of Public Works prior to the issuance of the grading plan permit. 55. The owner/applicant shall consult the Department of Public Works to determine the sewer location and design requirements. Grading 56. Submit an engineered grading plan and/or hydraulic calculations and site drainage plan for the site (prepared and sealed by a registered civil engineer in the State of California) accompanied by a soil and geology report for approval by the Engineering Division and Building and Safety Division. Lot(s) shall not have less than one (1%) percent gradient on any asphalt or non-paved surface, or less than one quarter (1/4%) percent gradient on any concrete surface. Provide the following information on plans: topographic site information, including all building pad and other elevations, dimensions/location of existing/proposed public improvements adjacent to project (i.e. street, sidewalk, parkway and driveway widths, catch basins, pedestrian ramps); the width and location of all PC AGENDA PAGE 26 existing and proposed easements, the dimensions and location of proposed dedications; (for alley dedications, show elevations of the four corners of the dedication and centerline of alley, existing and proposed underground utility connections); the location, depth and dimensions of potable water, reclaimed water and sanitary sewer lines; chemical and hazardous material storage, if any, including containment provisions; and the type of existing use, including the gross square footage of the building and its disposition; construction details of drainage devices and details of Low Impact Development (LID) plan. 57.Include any other applicable site-specific conditions. NPDES 58.The owner/applicant shall comply with the National Pollutant Discharge Elimination System (NPDES); Ordinance 1142 of the Downey Municipal Code (DMC); and the Low Impact Development (LID) Plan. Furthermore, the applicant shall be required to Certify and append Public Works standard “Attachment A” to all construction and grading plans as required by the LACoDPW Stormwater Quality Management Plan (SQMP). 59.Owner/applicant shall comply with the Low Impact Development requirements. The owner/applicant shall provide separate Low Impact Development plan and report for review and approval from the City of Downey Engineering Division. Low Impact Development design shall comply with Attachment H of the City of Downey’s MS4 Permit per the design criteria set by the County Regional Board. 60.The owner/applicant shall secure a WDID number along with his SWPPP. 61.If any hazardous material is encountered on the site that has the potential to reach the ground water supply, the owner/applicant shall secure a permit for the State Regional Water Quality Control Board. 62.If any hazardous material is encountered on the site, the owner/applicant shall secure an ID number from the U.S. Environmental Protection Agency (EPA). 63.The owner/applicant shall deploy Best Management Practices during and after construction. Subdivision 64.The filed map shall comply with the latest edition of the state subdivision Map Act, the City of Downey Municipal Code and all the applicable state and local laws. Prior to recordation, the Applicant shall: a)Prepare map under the direction of a Registered Civil Engineer authorized to practice land surveying, or a Licensed Land Surveyor. The map must be processed through the Dept. of Public Works prior to being filed with the County Recorder. b)A preliminary Title Report (or a chain of title) prepared by the title company for the subdivision is required showing all fee interest holders and encumbrances. PC AGENDA PAGE 27 An updated title report shall be provided (not older than 90 days) before the final tract/parcel map is released for filing with the County Recorder. c) Monumentation of the tract/parcel map boundaries, street centerline and lot boundaries are required for a map based on a record of survey. In the absence of such record, a licensed land surveyor shall set up all the missing monumentation. d) Any required property in the form of easement, fee simple or irrevocable offer and any right of way vacation in form accepted by the city engineer shall be shown on the map. Recycling 65. The facility must provide for recycling facilities, i.e., storage and handling areas for recycling facilities. Trash enclosure shall include roof cover, floor drain connection to grease interceptor and water hose bib connection for maintenance. 66. Complete a construction & demolition (C&D) waste management plan per Article V, Chapter 8 of the Downey Municipal Code. General 67. Construct onsite pavement, consisting of a minimum section of 4” thick aggregate base, and a minimum 2-1/2” thick asphalt concrete pavement. Construct Pavement on-site parking and circulation areas as required by a pavement engineering or geotechnical report prepared by a Registered Civil Engineer, subject to the review and approval of the Public Works and Community Development Departments. 68. The owner/applicant must comply with all applicable Federal, State and local rules and regulations, American Disabilities Act (ADA), including compliance with South Coast Air Quality Management District (SCAQMD) regulations. 69. The owner/applicant shall submit a recorded mylar copy of the final map, a digital AutoCAD format file (AutoCAD 2012 or later) and scanned, uncompressed TIFF images of final map on a portable media for city’s GIS system data updates and maintenance. 70. The owner/applicant shall submit a mylar copy of the final as-built public improvement plan(s), a digital AutoCAD format file (AutoCAD 2012 or later) and scanned, uncompressed TIFF images of final map on a portable media for city’s GIS system data updates and maintenance. [End of Conditions] PC AGENDA PAGE 28 A-1DRAWING NO.CLIENTDRAWING NO.PROJECT NO.SCALETITLEPERMIT SEALPROPOSED ADDIT+ ALTERATION TOISLAMIC CENTER OMID-CITIES12428 BENEDICT ADOWNEY, CA 90241012020ISLAMIC CENTER OFMID-CITIES12428 BENEDICT AVE.DOWNEY, CA 90242Email:pcmaxpclab@yahoo.cPh: 1-562-450-6660SITE PLANF.A.R.:6,644 SF / 19,599.00 SFMAX. ALLOWABLE F.A.R.: 1:4LOT SIZE:EXISTING LOT AREA: 88'-0" X 104'-3" = 9,174.00 SFNEW LOT AREA: 188'-0" X 104'-3" = 19,599.00 SFLOT COVERAGE:EXISTING LOT COVERAGE: 1,600.00 SFTOTAL LOT COVERAGE: 3,464.00 SFBUILDING CALCULATIONS:EXISTING BUILDING AREA (1 LEVEL): 1,600.00 SFSTNEW ADDITION - BUILDING AREA (1 LEVEL): 1,864.00 SFSTNEW ADDITION - BUILDING AREA (2 LEVEL): 3,052.00 SFNDNEW ADDITION - BUILDING AREA MACHINE ROOM: 128.00 SFTOTAL BUILDING AREA: 6,644.00 SFLANDSCAPE AREA: +/- 3,700.00OCCUPANCY: B, A31 LEVEL:STPRAYER HALL: 975.00 SFOFFICE -1: 165.00 SFATRIUM: +/- 727.00 SF2 LEVEL:NDOFFICE 2: 236.00 SFOFFICE 3: 221.00 SFOFFICE 4: 221.00 SFMEETING ROOM: 280.00 SFPANTRY / COPIER: 261.00 SFOCCUPANT LOAD:PRAYER HALL: 975.00 SF @ 7.00 = 140OFFICE -1: 165.00 SF @ 150.00 = 1FIRST LEVEL TOTAL OL: 141OFFICE 2: 236.00 SF @ 150.00 = 2OFFICE 3: 221.00 SF @ 150.00 = 2OFFICE 4: 221.00 SF @ 150.00 = 2MEETING ROOM: 280.00 SF @ 15.00 = 19PANTRY / COPIER: 261.00 SF @ 15.00 = 18SECOND LEVEL TOTAL OL: 43SCOPE OF WORK:ADDITION OF 5,044.00 SF ON FIRST& SECOND FLOORS. ALONG WITH NEWPARKING LOT, LANDSCAPING,FACADE REMODEL, FINISHES, ETC.REMODELING OF (E) BUILDING: 1,600.00 SFZONING: COMMERCIAL C-2DESCRIPTION OF USE:EXISTING: RELIGIOUS CENTERWITH NEW ADDITION: RELIGIOUS CENTERSPRINKLERS: YESTYPE OF CONSTRUCTION: V-BSTORIES: 02BUILDING HEIGHT: 45'-0"PROPERTY ADDRESS:12428 BENEDICT AVE., DOWNEY, CA 91242PARCEL#1: 6283-016-011PARCEL#2: 6283-016-061PARCEL#3: 6283-016-062CODE COMPLIANCE:THE PROJECT SHALL COMPLY WITH CODES,ORDINANCES OR LAWS HAVINGJURISDICTION ON THE PROJECT, WHICHINCLUDES BUT ARE NOT LIMITED TO:2019 CALIFORNIA BUILDING CODE2019 CALIFORNIA ELECTRICAL CODE2019 CALIFORNIA MECHANICAL CODE2019 CALIFORNIA BUILDING PLUMBING CODE2019 CALIFORNIA FIRE CODE2019 CALIFORNIA BUILDING STANDARD CODEAMERICAN WITH DISABILITIES ACT (ADA)NSCALE: 1" = 10'-0"SITE PLAN 104.25'104.25'188'188'50'-0" EXISTING BUILDING32'-0" EXISTING BUILDING2'-0"DEDICATION(E) 5'-0"(N) 15'-3"(N) 46'-6"(N) 135'-0" AT FIRST FLOOR(N) 128'-6" AT SECOND FLOOR25' APPROACH25' APPROACHCITY PARKWAYCITY SIDEWALKCITY PARKWAYCITY SIDEWALKCITY PARKWAYCITY SIDEWALKLINE OF 2' DEDICATIONLINE OF 2' DEDICATIONPLANTERUP1:12RAMPDNCLBENEDICT AVE.6'-6"20'-0"25'-0"25'-0"40'-0"25'-0"90'-0"25'-0"15'-0"63'-0"21'-3"5'-0"DRIVE AISLEDRIVE AISLEDRIVE AISLE14'-6"17'-5"TRASHENCLOSURE29'-0"8'-0"7'-0"5'-0"9'-0"20'-0" (TYP)(TYP)9'-0"20'-0" (TYP)(TYP)9'-0"20'-0" (TYP)(TYP)9'-0"20'-0" (TYP)(TYP)9'-0"20'-0" (TYP)(TYP)PATIO WITH SOFTLANDSCAPE:PLANTER300 S.F.PLANTER300 S.F.PLANTER600 S.F.325 S.F.+/-590 S.F.PLANTER550 S.F.PLANTERPLANTERPLANTER520 S.F.PROPOSEDADDITIONEXISTINGBUILDINGDOUBLE HEIGHT ATRIUM WITH SKYLIGHT AT ROOF LEVELNO1:12RAMPDN4'-0"4'-0"NOPARKINGPARKING17'-7"4'-6"380 S.F.,&21$7(/,(5,1&&23<5,*+75(6(59(''(6,*1(5*5($7%(1''5,9(',$021'%$5&$7(/  LFRQSDN#\DKRRFRPOWNERSHIP. COPYRIGHTS AND USE OFDRAWINGS. DOCUMENTS, SPECIFICATIONS ANDCOPIES THEREOF FURNISHED BY ICON ATELIERINC ARE AND SHALL REMAIN ITS' PROPERTY.THEY ARE TO BE USED ONLY WITH RESPECT TOTHIS PROJECT. FEDERAL LAW PROHIBITS THEREPRODUCTION, DISPLAY, SALE OR OTHERDISPOSITION OF THIS DOCUMENT WITHOUT THEEXPRESS WRITTEN CONSENT OF ICON ATELIERINC. ALL RIGHTS RESERVED.PC AGENDA PAGE 29 A-2DRAWING NO.CLIENTDRAWING NO.PROJECT NO.SCALETITLEPROJECTPERMIT SEALPROPOSED ADDIT+ ALTERATION TOISLAMIC CENTER OMID-CITIES12428 BENEDICT ADOWNEY, CA 90241012020ISLAMIC CENTER OFMID-CITIES12428 BENEDICT AVE.DOWNEY, CA 90242Email:pcmaxpclab@yahoo.cPh: 1-562-450-6660FIRST LEVEL PLANNFIRST FLOOR PLANSCALE: 1/4" = 1'-0"EXISTING BUILDING7'-6"3'-0"11'-0"21'-5"2'-6"5'-0"3'-0"3'-0"3'-0"15'-0"8'-0"74'-0"5'-0"5'-6"11'-0"12'-6"9'-6"5'-0"4'-0"4'-6"4'-6"5'-7"5'-0"5'-0"4'-6"9'-10"11'-0"3'-0"32'-0"11'-6"4'-6"2'-0"2'-6"31'-6"26'-6"27'-0"5'-0"5'-6"6'-6"4'-6"2'-0"5'-0"5'-0"7'-0"5'-0"15'-0"10'-0"24'-0"6'-6"6'-6"7'-8"19'-0"4'-0"6'-6"8'-0"13'-8"1'-8"6'-0"4'-0"21'-5"2'-4"12'-0"2'-4"12'-1"2'-4"12'-0"2'-4"12'-0"2'-4"12'-0"2'-4"1'-0"5'-6"6'-6"2'-6"3'-0"2'-0"53'-0"82'-0"8'-0"15'-0"21'-11"36'-4"31'-6"27'-6"5'-6"7'-6"ABCDE2534614'-0"82'-0"8'-0"74'-0"7'-0"SHOE AREASHOE RACKMEN'S RESTROOM OFFICE 1PRAYER HALLJANITOR'SROOMHALLHALLELEVATORDRINKINGFOUNTAINAV ROOMELECTRICALROOMUPLANDING4'-7"DOUBLE HEIGHT EXTENT36'-1"SEAT2'-0"6"1'-0"STORAGEDOUBLE HEIGHT ATRIUMWITH SKYLIGHT AT ROOF LEVELAA-6AA-6BA-6BA-6NO1:12RAMPNOPARKINGPARKING,&21$7(/,(5,1&&23<5,*+75(6(59(''(6,*1(5*5($7%(1''5,9(',$021'%$5&$7(/  LFRQSDN#\DKRRFRPOWNERSHIP. COPYRIGHTS AND USE OFDRAWINGS. DOCUMENTS, SPECIFICATIONS ANDCOPIES THEREOF FURNISHED BY ICON ATELIERINC ARE AND SHALL REMAIN ITS' PROPERTY.THEY ARE TO BE USED ONLY WITH RESPECT TOTHIS PROJECT. FEDERAL LAW PROHIBITS THEREPRODUCTION, DISPLAY, SALE OR OTHERDISPOSITION OF THIS DOCUMENT WITHOUT THEEXPRESS WRITTEN CONSENT OF ICON ATELIERINC. ALL RIGHTS RESERVED.PC AGENDA PAGE 30 OWNERSHIP. COPYRIGHTS AND USE OFDRAWINGS. DOCUMENTS, SPECIFICATIONS ANDCOPIES THEREOF FURNISHED BY ICON ATELIERINC ARE AND SHALL REMAIN ITS' PROPERTY.THEY ARE TO BE USED ONLY WITH RESPECT TOTHIS PROJECT. FEDERAL LAW PROHIBITS THEREPRODUCTION, DISPLAY, SALE OR OTHERDISPOSITION OF THIS DOCUMENT WITHOUT THEEXPRESS WRITTEN CONSENT OF ICON ATELIERINC. ALL RIGHTS RESERVED.PC AGENDA PAGE 31 17+,5')/2253/$16&$/(  12'-0"12'-0"13'-2"82'-0"59'-6"2'-4"2'-4"2'-4"2'-4"2'-4"2'-4"1'-6"8'-0"15'-6"6'-6"7'-0"30'-0"32'-0"3'-0"8'-0"15'-0"31'-6"27'-6"5'-6"7'-6"ABCE25346112'-0"12'-0"MACHINE ROOMFIRST FLOORROOF VAULTED ROOFMINARET$'5$:,1*12,&21$7(/,(5,1&&23<5,*+75(6(59('&/,(17'5$:,1*12352-(&7126&$/(7,7/(352-(&73(50,76($/'(6,*1(5*5($7%(1''5,9(',$021'%$5&$7(/  LFRQSDN#\DKRRFRP352326('$'',7,21$/7(5$7,2172,6/$0,&&(17(52)0,'&,7,(6%(1(',&7$9('2:1(<&$,6/$0,&&(17(52)0,'&,7,(6%(1(',&7$9('2:1(<&$(PDLOSFPD[SFODE#\DKRRFRP3KVAULTED ROOFD74'-0"ROOF+/-16'-0"ROOF PLAN SKYLIGHTSOVER DOUBLEHEIGHT ATRIUM+/-7'-6"36'-7"21'-11"ROOF SKYLIGHTSOVER PLANTEROWNERSHIP. COPYRIGHTS AND USE OFDRAWINGS. DOCUMENTS, SPECIFICATIONS ANDCOPIES THEREOF FURNISHED BY ICON ATELIERINC ARE AND SHALL REMAIN ITS' PROPERTY.THEY ARE TO BE USED ONLY WITH RESPECT TOTHIS PROJECT. FEDERAL LAW PROHIBITS THEREPRODUCTION, DISPLAY, SALE OR OTHERDISPOSITION OF THIS DOCUMENT WITHOUT THEEXPRESS WRITTEN CONSENT OF ICON ATELIERINC. ALL RIGHTS RESERVED.PC AGENDA PAGE 32 45'-0"14'-0"11'-0"14'-0"11'-0"9'-0"14'-0"11'-0"9'-0"9'-0"7'-0"SET-BACKPLPLPLPL($67(/(9$7,216&$/(  1257+(/(9$7,216&$/(  :(67(/(9$7,216&$/(  45'-0"14'-0"11'-0"9'-0"PLPL7'-0"SET-BACK6287+(/(9$7,216&$/(  $'5$:,1*12,&21$7(/,(5,1&&23<5,*+75(6(59('&/,(17'5$:,1*12352-(&7126&$/(7,7/(352-(&73(50,76($/'(6,*1(5*5($7%(1''5,9(',$021'%$5&$7(/  LFRQSDN#\DKRRFRP352326('$'',7,21$/7(5$7,2172,6/$0,&&(17(52)0,'&,7,(6%(1(',&7$9('2:1(<&$,6/$0,&&(17(52)0,'&,7,(6%(1(',&7$9('2:1(<&$(PDLOSFPD[SFODE#\DKRRFRP3KWHITE STUCCOFINISHWHITE STUCCOFINISHWHITE STUCCOFINISHWHITE STUCCOFINISHFINIELEVATIONSOWNERSHIP. COPYRIGHTS AND USE OFDRAWINGS. DOCUMENTS, SPECIFICATIONS ANDCOPIES THEREOF FURNISHED BY ICON ATELIERINC ARE AND SHALL REMAIN ITS' PROPERTY.THEY ARE TO BE USED ONLY WITH RESPECT TOTHIS PROJECT. FEDERAL LAW PROHIBITS THEREPRODUCTION, DISPLAY, SALE OR OTHERDISPOSITION OF THIS DOCUMENT WITHOUT THEEXPRESS WRITTEN CONSENT OF ICON ATELIERINC. ALL RIGHTS RESERVED.PC AGENDA PAGE 33 SECTION "A" SCALE: 1/4" = 1'-0"SECTION "B" SCALE: 1/4" = 1'-0"10'-0"13'-0"30'-10"16'-10"13'-0"10'-0"24'-0"4'-0"24'-0"13'-0"10'-0"A-6DRAWING NO.ICON ATELIER, INC.COPYRIGHT RESERVEDCLIENTDRAWING NO.PROJECT NO.SCALETITLEPROJECTPERMIT SEALDESIGNER863 GREAT BEND DRIVEDIAMOND BAR, CA. 91765TEL. (714) 681-0823iconpak@yahoo.comPROPOSED ADDITION+ ALTERATION TOISLAMIC CENTER OFMID-CITIES12428 BENEDICT AVE.DOWNEY, CA 902421012020ISLAMIC CENTER OFMID-CITIES12428 BENEDICT AVE.DOWNEY, CA 90242Email:pcmaxpclab@yahoo.comPh: 1-562-450-6660SECTIONSOWNERSHIP. COPYRIGHTS AND USE OFDRAWINGS. DOCUMENTS, SPECIFICATIONS ANDCOPIES THEREOF FURNISHED BY ICON ATELIERINC ARE AND SHALL REMAIN ITS' PROPERTY.THEY ARE TO BE USED ONLY WITH RESPECT TOTHIS PROJECT. FEDERAL LAW PROHIBITS THEREPRODUCTION, DISPLAY, SALE OR OTHERDISPOSITION OF THIS DOCUMENT WITHOUT THEEXPRESS WRITTEN CONSENT OF ICON ATELIERINC. ALL RIGHTS RESERVED.PC AGENDA PAGE 34 A-DRAWING NO.ICON ATELIER, INC.COPYRIGHT RESERVEDCLIENTDRAWING NO.PROJECT NO.SCALETITLEPROJECTPERMIT SEALDESIGNER863 GREAT BEND DRIVEDIAMOND BAR, CA. 91765TEL. (714) 681-0823iconpak@yahoo.comPROPOSED ADDITION+ ALTERATION TOISLAMIC CENTER OFMID-CITIES12428 BENEDICT AVE.DOWNEY, CA 902421012020ISLAMIC CENTER OFMID-CITIES12428 BENEDICT AVE.DOWNEY, CA 90242Email:pcmaxpclab@yahoo.comPh: 1-562-450-6660PROPOSED SITE PLANNORTBENEDICT AVENUESOUTH-WEST VIEWWEST SIDE FACADESOUTH-EAST VIEWSOUTH SIDE FACADENORTH-WEST VIEWNORTH-EAST VIEWEAST SIDE FACADERENDERINGS OFPROPOSED PROJECT7OWNERSHIP. COPYRIGHTS AND USE OFDRAWINGS. DOCUMENTS, SPECIFICATIONS ANDCOPIES THEREOF FURNISHED BY ICON ATELIERINC ARE AND SHALL REMAIN ITS' PROPERTY.THEY ARE TO BE USED ONLY WITH RESPECT TOTHIS PROJECT. FEDERAL LAW PROHIBITS THEREPRODUCTION, DISPLAY, SALE OR OTHERDISPOSITION OF THIS DOCUMENT WITHOUT THEEXPRESS WRITTEN CONSENT OF ICON ATELIERINC. ALL RIGHTS RESERVED.PRPRPRPRPRPRPRPRPRPRPRPRPRPRPRPRPRPRPRPPPRPPRPRPRPRPRPRPRPRPPRPPRPRPPRPPRPRPRPRPRPRPRPRPPPPRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRROPOPOPOPOPOPOOOOOOPOPOOOPOOPOOPOPOPOPOPOPOPOOOPOPOOPOOOPOOOOPOOOOOOOPOOOOOPOPOOPOOOOOPOPOOPOOOOOPOOOPOOOOOPOPOOOPOOPPPPPPPPPPPPPPPPPPPOSOSOSOSOSOSOSOSOSOSOOSOSOSOSOSOSOOSOSOOSOSOSOSOSOOSOOSOSOSOSOSOOOSOSOOOSOSOOSOOSOSOSOSOSOSOOSOOOSOOOSOOOOOOSOOSSSSSSSSSSSSSSSSSSSSSSSSSSSSEDEDEEDEDEDEDEDEDEDEDEDEDEDEEEEDEDEDEDEEEDEEDEDEEDEEEEEDEEDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSITIIIIIITITITITITIIIITTTTTTTTTTTE EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEPLPLPPPPPPLPLPLPLPLPLPPLPLPLPLPLPLPLPLPPLPLPPPLPLPLPPLPPPPPPLPLPPPPPPLLLLLLLLLLLLLLLLLLLLLLLLLLLLLANANANANANANANANANANANAAANANANAANAAAAANAANANANANAAANANANANAAANANAAANAAAANANAAAANANAAAAAANAAAAAAAAANAANANAAAAANANANAANANANANAANAAAANAANANANANANANANANAAAANAAAANAAANANAANANANAAAANANANANAAANANANAAAAANAAANANAAAAAANANANANAAANAANAAAAAANAAANANAANAAAAAANAAAAAAAANAAAAAAAAAAANAAAAANAAAANAAANAAAAANAANNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNONNORNNONORNORNORNORNNNNNNNNNNNORNORNORNORNORNNNNNNNNNONORNORNORNORNORNONNNNNONORNORNORNONNNNNNONORNORNORNONONNNNNONONORNONONORNNORNORNORNORNNNNNNORNORNORNORNORNORNORNNNNNNNONORNORNONONNNNNNNNORNNNORNONONONNNNNORNNNONNNONONNNNNNNNNNNNONORNNONNNNNNNORNNNNNONORNORNNORNORNORNNNNNNNORNORNNNNNNNORNONOOOROOOROOOROOOOOOROROOOOOOOOOOOOOOOOROOOOOOOOROOOOOOOOOOOOOOROOROOROOROOROOOROOOOROOOOOROOOROOOORORORRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRTTTTTTTTBENBENBENBEBEBENBENBENBENBEBEBENBENBBENBENBEBENBENBENBEBENBENBENBEBEBENBENBBBBEBBENBEBENBBENBENBENBENBBENBEBENBENENENEEEEENEEENENENEEEEENNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNEEEDEEDEDEDEDIEEDEEDIEDEEEEEEEDEDEDEDEEDEDIEDEEEEEEEDEEDEDEDEDIEEDEDEDEEEEEEDEDIEDEDEDEDEEDIEEDEDEEEEDEDIEEEEDEDIEEEEEEEDEDEDEDIEEDIEEEEEDEDEDIEDIEDEDEDIEDEEDIEDIEEDEDIEDIEEDEEDIEDIEDIEEDIEDEEDEDIEDIEDIEDIEDIEDIEDEDIEDIEEDIEEDIEEDIEDIEDIEEDIEDIEEDEDIEDEDEDIEDEDEEEDEDIEDIEDIEDEDIEDDIDDDDDDDDIDDDDDDDDDDDDDIDDDDDDIDDDDDDDDDDDDDDDIDIDIDDIDDDIDDDDDDIDDDIDIDIDDDDDIIIIIIIIIICTCTCT CTCTCT CTCTCTCCTCTCTCTCTCCTCCTCCCTCTCTCTCTCCT CTCT CTCTCCCCTCCCTCCT CTCTCTCTCCTCTCCCTCTCTCCTCTCTCCTCCCTCT CCTCTCTCTCTCTCCTCCTCTCTCT CCTCTCTCTCCTCTCTCTCCCCCCCTCTCCT CCCTCCCCTCCTCTTTTTTTTTTTTTTTTTTTTTTAVEAVEAVEAVEAVEAVEAVEAVEAVEAVAVEAVEAVEAVEAVEAVAVEAVEAVEAVEAVAVEAVEAVEAVEAVAVEAVEAVAVEAAVEAAVEAVEAVEAVEAVAVEAVAVEAVAVEAVEAVEAVEAVEAVAAVEAVEAAVAVEAAVEAAVAVAVAVAAAVEAVEAAVEAVAAVEAVEAVAVEAAVAAVEAVEAVEAAAVAAVAVEAAAAVEAVAAVAAAVAVAVEAVAVEAVEAVAVEAVEAAVAVEAVEAAVEAVEAAVEAVEAAVAAAVEAAAVEAVEAAVAVEAVEAVEAVEAVEAAAVAAAVAVEAVEAVAAAVAAVEAVAVAVEVEVVVVVEVEVVVVVVVVVVVVVEVVVVVVVVVVVVVVVVVVVEVVVVVVEVVVVVEVVVVEVVVVVVVVVEVVVVEVVVVEVVVVVEVEVVEEEEEEEEEEEEEEEEENUENUNUENUNUENUENUENUNUNUENUNNUNUENUNUNUNUNUNUENUNUENUENUNUENUENUNUNUENUNNUNUNUNUENUENUNUNUENUENUENUENUNUNUNUNUENUNUNUNUNUNUNUNUENUNUNUNNNUNUNUNNUNUNUNUENNUNUNUNNUENNUNUENNUNUNUENNUNNUNUENNUENUENUNUENUNNNUENUENUENNNUNUNUENUENUNUNNNUENUEUUUUUUUUEUUUUUEUUUEUUEUEUEUEUEUUUEUEUEUEUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUUEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEENORTHBENEDICT AVENUEPC AGENDA PAGE 35 SALVIA LEUCANTHAMEXICAN BUSH SAGELOMANDRA 'BREEZE'DWARF MAT RUSHACACIA BAILEYANAFERNLEAF ACACIAFICUS CARICAEDIBLE FIGOLEA EURPOPAEA ' SWAN HILL'SWAN HILL FRUITLESS OLIVEPHOENIX DACTYLIFERADATE PALMLEPTOSPERMUM SCOPARIUM 'APPLE BLOSSOM'NEW ZEALAND TEA TREE APPLE BLOSSOMJASMINUM POLYANTHUMPINK JASMINELANTANA MONTEVIDENSISPURPLE TRAILING LANTANAOSCULARIA DELTOIDESPINK ICEPLANTROSMARINUS OFFICINALIS 'GOLDERN RAIN'GOLDEN RAIN ROSEMARYRIBES SPECIOSUMFUCHSIAFLOWER GOOSEBERRYCHITALPA TASHKENTENSIS 'MORNING CLOUD' MORNING CLOUD CHITALPAPC AGENDA PAGE 36 SCALE:AS SHOWNDESIGNED BY:FMNO. DATE REVISIONBYDATE:NOV 2021SHEET NUMBERPROPOSED PHOTOMETRIC PLANGENERAL NOTE1. PHOTOMETRIC DESIGN AND LAYOUT PERFORMED BY DIALUX LIGHTING APPLICATION SOFTWARE; DATED 11/28/2021.1. Utilization Profile - LIGHTING FOR COMMON APPLICATIONSSPECIAL NOTE2. Application - Building Entries/Outdoor; Site Gated Entries, Manned,Vehicles, Cars and light trucks, General Area, LZ3PROPOSED BLDG12428 BENEDICT AVEDOWNEY, CAPC AGENDA PAGE 37 PC AGENDA PAGE 38