HomeMy WebLinkAbout03. CIP 19-32, 19-33 & 19-35-Accpt Work for Golden, Independence & Wilderness Parks Imprvs-File NOCFROM: OFFICE OF THE CITY MANAGER
BY: JOHN OSKOUI, P.E., ASSISTANT CITY MANAGER
I IL111 I Rlef,3 fifliffifigol
:J ZtelVA:4 :J ;top
It is recommended that that the City Council:
Accept the Golden Park, Independence Park and Wilderness Park Improvement
Project (CIP No. 19-32, CIP No. 19-33 and CIP No. 19-35) as complete.
2. Approve the final construction contract amount of $6,521,818.93 which includes the
cost of all issued change orders to the original construction contract.
3. Authorize Notice of Completion to be filed with the County of Los Angeles Recorder's
Office.
On April 9, 2019, the City Council approved the plans and specifications for the subject project
and granted authority to advertise for bids. On May 28, 2019, the City Council awarded a
construction contract to NR Development, Inc. in the amount of $6,159,330.00 for completion of
work per approved plans and specifications.
UPPIMS
NR Development, Inc. started the project at Golden Park on August 12, 2019. Work included
improvements to the existing community building construction of accessible path of travel to
new amenities; installation of six (6) new picnic shelters; installation of rubberized surfacing at
play area; construction of a storage shed and refuse containers enclosure; reconstruction of
the parking lot; basketball court improvements; baseball field improvements; construction of
walking/jogging trail with pedestrian light fixtures; and installation of site furnishings including
picnic tables, BBQs, benches, trash receptacles, and drinking fountains. There were five (5)
change orders added to the scope of this project, including schedule adjustments, additional
concrete removal, changes to the refuse containers enclosure and water closet, main water
valve replacement, enhancement of electrical supply, restoration of handball court, gas pipe
relocation, drinking fountain enhancements and temporary fence rental.
ACCEPTING COMPLETION OF GOLDEN PARK, INDEPENDENCE PARK AND WILDERNESS PARK
IMPROVEMENTS PROJECT
AUGUST 11, 2020
PAGE 2
The total cost of construction for Golden Park is $2,576,602.54. The project's total cost
including design, construction management, inspection services, testing, contract administration
and other related costs is $3,008,789.65 (Attachment A).
NR Development, Inc. started the project at Independence Park on July 15, 2019. Work
included construction of a new community restroom building; installation of playground
rubberized surfacing, eight (8) tennis courts; irrigation system adjustments; improvements of the
parking lot; and installation of site furnishings including benches and drinking fountains. There
were four (4) change orders added to the scope of this project, including installation of
additional site furnishings, lighting fixtures , drinking fountain and bottle filler units , credit for
revised water and sewer connections, construction of additional concrete walkway at the
playground, additional parking lot pavement.
The total cost of construction for Independence Park is $1,319,687.69. The project's total cost
including design, construction management, inspection services, testing, contract administration
and other related costs is $1,593,043.64 (Attachment A).
NR Development, Inc. started the project at Wilderness Park on August 12, 2019. Work
included improvements to the existing community and restroom building; construction of a new
public restroom building; construction of accessible path of travel to new amenities; installation
of three (3) new picnic shelters; installation of rubberized surfacing at play area; irrigation
system adjustments; construction of refuse containers enclosure; parking lot improvements; and
installation of site furnishings including benches and drinking fountains. There were eight (8)
change orders added to the scope of this project, including schedule adjustments, temporary
fence, community building enhancements, installation of a precast concrete pad per Southern
California Edison's request, installation of additional drinking fountain and bottle filler units, main
water valve replacement, additional enhancements to the new restroom building, and credits for
the sewer connection.
The total cost of construction for Wilderness Park is $2,625,528.70. The project's total cost
including design, construction management, inspection services, testing, contract administration
and other related costs is $3,071,336.99 (Attachment A).
Construction work including the original scope of work has been completed in a satisfactory
manner. As such, it is recommended that the City Council accept the Golden Park,
Independence Park, and Wilderness Park Improvements Project, CIP Nos. 19-32, 19-33, and
19-35, as complete, approve the final construction cost of $6,521,818.93, and authorize the
Notice of Completion to be filed with the County of Los Angeles Recorder's Office.
Efficiency & Adaptability
Quality of Life, Neighborhood & Infrastructure
ACCEPTING COMPLETION DFGOLDEN PARK, INDEPENDENCE PARK AND WILDERNESS PARK
IMPROVEMENTS PROJECT
AUGUST 11.282D
PAGE
FISCAL IMPACT
The City's Capital Improvement Program includes the Golden Park, Independence Park, and
Wilderness Park Improvements Project utilizing Measure S Funds (Account Numbers 33-1-
3360-0520, 33-1-3370-0520, and 33-1-3390-0520). The total budget for the improvements
project was $7,850,000. The total cost for the project, including construction, design, inspection,
construction engineering and management services, and material testing is $7,673,170.28,
leaving a balance of $176,829.72 which will be reallocated to the Measure S Capital
Improvement Program funds.
ATTACHMENTS
ACCEPTING COMPLETION OFGOLDEN PARK, INDEPENDENCE PARK AND WILDERNESS PARK
IMPROVEMENTS PROJECT
AUGUST 11.2Q2O
PAGE
PROJECT COST SUMMARY
CONSTRUCTION CONTRACT COST SUMMARY
_ _
Deschotiow
Golden Park Base Contract Amount
$2.489.493.00
Change Order No. 1 (O805/1A)—Schedule adjustment
$0.00
Change Order No. 2(1D04/10—Additional concrete removal, trash
enn|unum block chonge, water closet configuration, existing
innu|odun, beam size ohange, shade structure uoom|inau
$22.791.74
Change Order No. 3 (1021/1A)—Main water valve rep|eoement,
electrical and power requirements, partition track removal,
existing handball court neotoration, relocation of gas pipe
$29.740.01
Change Order No. 4 (01/2020 —Sohedu|o extension (weather delay)
$0.00
Change Order No. 5(03/302O)—Drinking fountain ADArequirements,
8^wa|| extension, shade structure clock timer, Community Building
mnistamand axterior|iqhta, iumoonarvheooe nenUy|u
$34.577.70
GOLDEN PARK TOTAL
$2.570.802.54
Independence Park Base Contract Amount $1.205.587.00
Change Order No. 1 (08/30UQ)—Furnishings and lighting, drinking
fountain and bottle filler, credit for bollards and baohOow
dexiue/endoaupn.additional concrete adplayground $30.624.09
Change Order No. 2(OS05/18)—Parking lot pavement section $72.873.00
Change Order No. 3(1O/O3/10)—Dog waste station $4.804.60
Change Order No. 4(120QK1D)—Concrete walkway extension north
ofCourt #3 $6.000.00
INDEPENDENCE PARK TOTAL $1.319.687.60
Wilderness Park Base Contract Amount
$2.484.250.00
Change Order No. 1 (0805/19)—Schedule adjustment
$0.00
Change Order No. 2(10O3/18)—Temporary alley fence, Community
Building changes, block change, surface mounted LED ak
Community Building, shade structure scoeHnen
$123.279.96
Change Order No. 3(1021/10—Edison precast pad, outside
mechanical unit, drinking fountain and bottle filler, main
water valve replacement
$27.864.28
Change Order No. 4(O1/2020—Schedule extension (weather delay)
$0.00
Change Order No. 5 (O403/28)—Schedule extension (Bid Delay for 15'21D)
$0.00
Change Order No. 8(O505/2O)—Schedule extension (COV|D'18)
80.00
Change Order No. 705/1Q/20—Shade structure clock timer, building
clarifications, Community Building sensors, credit for sewer
connection
$12.134A0
Change Order Nm 8(O7/29/2O)—Credit for Hvdno-send
-$2.000�00
WILDERNESS PARK TOTAL
$2.825.528.70
TOTAL CONSTRUCTION CONTRACT COST
$8.521.810.93
TOTAL PROJECT COST SUMMARY
Total Construction Contract cost
$6.521.818.93
ConouKankQemiceo—Denign
$681.102.00
Construction En i hngomdComtracyAdmm,stratiun
$480�189,35
TOTAL PROJECT COST
$7.673.170.38
ATTACHMENT
ACCEPTING COMPLETION OF GOLDEN PARK, INDEPENDENCE PARK AND WILDERNESS PARK
IMPROVEMENTS PROJECT
AUGUST 11, 2020
PAGE 5
Projec
Accou
Golden.1
Independence
c
•'
• i
PROJECT FUNDING
Fund Sudetd
Cost
Variance
Amount
Measure S $ 3,050,000
$ 3,008,790
$ 41,210
Measure S $ 1,700,000
$ 1,593,044
$ 106,956
Measure S $ 3,100,000
$ 3,071,337
$ 28,663
TOTAL PROJECT r .;