HomeMy WebLinkAbout04. CIP 17-06 Accept Work for Woodruff Ave Traffic Signal Fiber-Optic Comm System & Upgrades Projkp�'M 110. TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL VED BY FROM: OFFICE OF THE CITY MANAGER CITY ER BY: DELFINO R. CONSUNJI, P.E., DIRECTOR OF PUBLIC WORKSICITY ENGI DATE: JULY 28, 2020 SUBJECT: ACCEPT WORK FOR WOODRUFF AVENUE TRAFFIC SIGNAL FIBER-OPTIC COMMUNICATION SYSTEM AND UPGRADES, CAPITAL IMPROVEMENT PROJECT (CIP) NO. 17-06 That the City Council: 1) Accept work for Woodruff Avenue Traffic Signal Fiber -Optic Communication System and Upgrades, CIP No. 17-06; 2) Approve final construction contract amount of $833,036.22; and 3) Authorize Public Works Director/City Engineer to file Notice of Completion with the Los Angeles County Recorder's office. lu$alem On April 23, 2019, the City Council approved plans and specifications (Attachment A) for Woodruff Avenue Traffic Signal Fiber -Optic Communication System and Upgrades and granted authority to advertise for bids. On July 9, 2019, the City Council awarded a construction contract in the amount of $787,277 to Select Electric, Inc. for this project. On September 5, 2019, work commenced and was completed on June 24, 2020. This project installed fiber-optic communications and traffic signal upgrades along the Woodruff Avenue corridor between Firestone Boulevard and the South City Limit in order to facilitate traffic signal operations and surveillance. This project also completed the following improvements: • Construction of approximately 7,500 feet of fiber-optic communications conduit and cable and associated field elements along Woodruff Avenue between Stewart & Gray Road and Foster Road • Upgrading the existing traffic signal at Stewart & Gray Road, including installation of video detection cameras as well as reconstruction of all curb ramps and cross gutter on the west leg of the intersection • Installation of fiber-optic communication hubs at the Stewart & Gray Road and Imperial Highway intersections • Integration of fiber-optic communications and field elements with the Traffic Management Center. A total of three change orders were issued totaling $78,171.58, which included re-routing communications conduit at the Imperial Highway and Washburn Road intersections around unforeseen underground box culverts; removal of abandoned box culverts at the northwest and CAPITAL IMPROVEMENT PROJECT NO. 17-06 ACCEPT WORK FOR WOODRUFF AVENUE TRAFFIC SIGNAL FIBER-OPTIC COMMUNICATION SYSTEM AND UPGRADES JULY 28, 2020 PAGE 2 northeast corners of the Stewart & Gray Road intersection; installation of a pedestrian push button post at the southwest corner of said intersection, relocation of fiber-optic hub cabinet from Firestone Boulevard to Stewart & Gray Road; installation of additional striping and pavement markings; and additional compensation for installation of traffic signal pole at the northwest corner of the Stewart & Gray Road intersection due to low overhead utility clearances and associated work. In addition, there was a reduction in project cost totaling $32,412.46 due to reduction in constructed quantities on several line items as well as a credit for allowing the contractor to remove portions of as opposed to entire existing traffic signal pole foundations. All improvements were completed in accordance with the approved plans and specifications. Staff is recommending that the City Council accept the project as complete. Quality of Life, Infrastructure and Parks The final cost of the construction contract, including base contract amount, change orders and overall reduction in quantities, is $833,036.22. The total final cost of the project is $1,170,199.50, broken down as follows: Item Amount Base Construction Contract Amount $787,277.00 Change Orders $78,171.58 Reduction in Quantities ($32,412 36) Final Construction Cost $833,036.22 Design $94,899.39 City -Furnished Materials $91,400.00 Construction Inspection $113,725.00 Construction Engineerina and Contract Administration $37,138.85 Sufficient CIP funds are available to cover the total project cost as shown in the following table: Account No. ._ Funding Source .- g _..... Amount __... _ .. y 26-17825 Metro Call for Projects grant (Expended in FY 2017-18 & 2018-19) $69,390.00 26-17825 Metro Call for Projects grant (Appropriated in FY 2019-20) $668,774.00 54-17825 Proposition C Local Return (Appropriated in FY 2019-20) $481,974.00 56-17825 Measure R Local Return (Expended in FY 2017-18 & 2018719) $17,375.00 56-17825 Measure Local Return (Appropriated in FY 2019-20) _ $391,609.00 .._..._.. _.._.._._......___ Total Project Funding: $1,629,122.00 Savings in the amount of $458,922.54 will be available for reprograming. ATTACHMENTS Attachment A — Plans K 111F 11111,- �llljq 1 0 19IIA �'� 1 llll•I ...... . ....... 111F=111 F-, Av,,j 4 Z LIJ A 'poo, VICINITY MAP N 'Alp gm-T49711-TTIMA CAPITAL IMPROVEMENT PROJECT NO. 17-06 CITY OF DOWNEY Ld w 9m WOODRUFF AVENUE L ---- az— Ld 0 L, CAPITAL IMPROVEMENT PROJECT NO. 17-06 CITY Oir DOWND kr ui Li w c) r z e WOODRUFF AVENUE nj ' GLEN ANDERSON FREEWAY (1-105) A V UDTE MT S SHEET ONLY, 7 J= GLEN ANDERSON FREEWAY (I- 1 05) > < a, WOODRUFF AVENUE ---7L — -- -------- `ECm- H A -A F�7 CAPITAL IMPROVEMENT PROJECT NO. 17-06 C-, Y OF DOWN�Y--,' 25711=11-116Z.1t Inc. WOODRUFF AVENUE M WOODRUFF AVENUE m CAPITAL IMPROVEMENT PROJECT NO. 17-06 1111 IF 11111Y H 4 WOODRUFF AVENUE w u~i¢ e, r i r S n ti <t WOODRUFF AVENUE r. 11 r L N®l6B8REtlAA-n0N (SHEETS 2-5) ". CAPITAL IMPROVEMENT PROJECT NO. 17-06 - Ctl Y Of d0"J'."NE'Y imn..ra�ro+, & � � fna 5adulFpms, tne. :' MOO DETECTION ZONE DIMENSIONS 11 j ID 0 L rE M p Cl rY OF DOWNrY & -D FJA L - - - - - - - - - - - - - I'.*. - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - --- - - - - - - - - - - - - - -------- ----- ---- WOODRUFF AVENUE MEDIAN ISLAND, RAMP, AND CROSS GUTTER (SOUTHWEST QUADRANT) 75 PAVEOUADJAGtNT TO C,&G CONSTRUCTION NOTES ITY OF DOWNEY WOODRUFF AVE. AL TRENCH DETAIL FOR CONDUIT TYPICAL DETAIL CONDUIT CROSSING TYPIC NTI 0 F, kFT-, TYPICAL MINIMUM BENDING RADIUS FOR MAINLINE COMMUNICATION CONDUIT CONDUIT INSTALL4TION DETAILS CAPITAL IMPROVEMENT PROJECT NO, 17-06 C"y , OF )c,iv N,y 0� TOR, VIEW 4m TT - VIDEO DETECTION CAMERA MOUNTING DETAIL (ON SIGNAL MAST ARM) jf7y OF DOWNEY I F I sw 15-21 Df Uj (PARAMOUNT BOULEVARD) (LAKEWOOD BOULEVARD) E, I Li (BELLFLOWER BOULEVARD) LIJ 7- (WOODRUFF AVENUE) OETZ;P.H�ff- & I LEGENID CAPITAL IMPROVEMENT PROJECT NO. 17-06 CITY OF DOWNEY FOSTER ROAD/ WOODRUFF AVENUE (SHEET 3 naeY IMPERIAL HIGHWA(/ WOODRUFF AVENUE HUB 334 CABINET (SHEET 3) 24 '10C, A, �br;OT °:T WASHBURN AWNUE/ WOODRUFF AVENUE (SHEET 4) STEWART AND GRAY ROAD/WOODRUFF AVENUE (SHEET 4) FIRESTONE GO, LEVARD/WDODRUFF AVENUE (SHEET 5) �, D-1 ll� 4 WOODRUFF AVENUE 40 SAN GABRIEL RIVER BRIDGE TO FIRESTONE BOULEVARD/ STONEWOOD CENTER FIRESTONE BOULEVARD/ WOODRUFF AVENUE HUB 334 CABINET (SHEET 5) vt TO FIRESTONE BOULEVARD/ STEWART & GRAY ROAD T.S CO',,WUNICATION BLC,CK DIAGRAM CAPITAL IMPROVEMENT PROJECT NO. 17-06 CITY OF LOONEY 71� TABLE 7 I&S* RANDS rM M51FASUTION, .A GLE I EXg5T I No TABLE 6 ":0 SAMOUE CAM I EX [STI NGJ TABLE 7 R4-S"ANrMMfO9A(,K$rXD CABL@ OOR MURE USO Til�L 11A TABLE 3 6S-'YrPAN0 SMFO WISTIRIbUrION CARE M.ry " FL I TABLE 8 24AI PAN 0 SMrO MC K9014 E CABLE -4=, TABLE 4 1 TRAND 1%11 -,Ill , 11 1AIIk %lN-,iNCj 77- TABLE 9 24- STRAD 5 41s0 SAC KBONE CART iEXMCuNGI & TABLE 5 48 5 T RAN' 0 ShOO 0157N,RUT. 10h CA% f. I CK I L I TABLE 10 P4,SMNO VOPO RACE GONE CAM -FUTURE USE of FISER k5SIGNILIENITS.' Ty—R'I—Ec� CAPITAL IMPROVEMENT PROJECT NO. 17-06, c y "F oc - WOODRUFF AVENUE AND IMPERIAL HIGHWAY HUB j:DU FDU POWER DISTRIBUTION SURGE ASSEMBLY DROTECTI*N UNIT LIGHT FAN 334 HUB CABINETS - C - HEMAT'ICS (ME 'NEET 11 � MM-UlIA-1 El- .1 Pt 1­1 WOODRUFF AVENUE AND FIRESTONE BOULEVARD HUB FDU 46 4. 1 It POWER DISTRIBUTION SURGE ASSEMBLY UNIT EIGHT FAN -i A\ r -FIC SIGN.VL C(_jr4Tr,0U_F.Fr CAt B.. [NE'r _DE.TPAL CT"rFIGP,,[._) It 1, ItIL I I 1--i 111, Ititt-1,ti- I - CAPITAL IMPROVEMENT PROJECT NO. 17-06 hTY OF DOWNEY & l Wz ml ­=M 4- r - - - - - - - - - - - - I, VC -7 - - - - - - - - WOODRUFF AVENUE aWOODRUFF AVENUE IMPERIAL HIGHWAYIWOODRUFF AVENUE VAULT AND HUB DETAIL FIRESTONE BOULEVARD/WOODRUFF AVENUE VAULT AND HUB DETAIL N, T WOODRUFF AVENUE -7-7 X7, SPLICE DETAILS CAPITAL IMPROVEMENT PROJECT NO. 17-06 CITY OF DOWNEY 'V TYPICAL TRAFFIC SIGNAL SPLICE DETAIL