TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL VED BY
FROM: OFFICE OF THE CITY MANAGER CITY ER
BY: DELFINO R. CONSUNJI, P.E., DIRECTOR OF PUBLIC WORKSICITY ENGI
DATE: JULY 28, 2020
SUBJECT: ACCEPT WORK FOR WOODRUFF AVENUE TRAFFIC SIGNAL FIBER-OPTIC
COMMUNICATION SYSTEM AND UPGRADES, CAPITAL IMPROVEMENT
PROJECT (CIP) NO. 17-06
That the City Council:
1) Accept work for Woodruff Avenue Traffic Signal Fiber -Optic Communication System and
Upgrades, CIP No. 17-06;
2) Approve final construction contract amount of $833,036.22; and
3) Authorize Public Works Director/City Engineer to file Notice of Completion with the Los
Angeles County Recorder's office.
lu$alem
On April 23, 2019, the City Council approved plans and specifications (Attachment A) for Woodruff
Avenue Traffic Signal Fiber -Optic Communication System and Upgrades and granted authority to
advertise for bids. On July 9, 2019, the City Council awarded a construction contract in the amount
of $787,277 to Select Electric, Inc. for this project. On September 5, 2019, work commenced and
was completed on June 24, 2020.
This project installed fiber-optic communications and traffic signal upgrades along the Woodruff
Avenue corridor between Firestone Boulevard and the South City Limit in order to facilitate traffic
signal operations and surveillance. This project also completed the following improvements:
• Construction of approximately 7,500 feet of fiber-optic communications conduit and cable and
associated field elements along Woodruff Avenue between Stewart & Gray Road and Foster
Road
• Upgrading the existing traffic signal at Stewart & Gray Road, including installation of video
detection cameras as well as reconstruction of all curb ramps and cross gutter on the west leg
of the intersection
• Installation of fiber-optic communication hubs at the Stewart & Gray Road and Imperial Highway
intersections
• Integration of fiber-optic communications and field elements with the Traffic Management
Center.
A total of three change orders were issued totaling $78,171.58, which included re-routing
communications conduit at the Imperial Highway and Washburn Road intersections around
unforeseen underground box culverts; removal of abandoned box culverts at the northwest and
CAPITAL IMPROVEMENT PROJECT NO. 17-06
ACCEPT WORK FOR WOODRUFF AVENUE TRAFFIC SIGNAL FIBER-OPTIC COMMUNICATION SYSTEM
AND UPGRADES
JULY 28, 2020
PAGE 2
northeast corners of the Stewart & Gray Road intersection; installation of a pedestrian push button
post at the southwest corner of said intersection, relocation of fiber-optic hub cabinet from Firestone
Boulevard to Stewart & Gray Road; installation of additional striping and pavement markings; and
additional compensation for installation of traffic signal pole at the northwest corner of the Stewart &
Gray Road intersection due to low overhead utility clearances and associated work. In addition,
there was a reduction in project cost totaling $32,412.46 due to reduction in constructed quantities
on several line items as well as a credit for allowing the contractor to remove portions of as opposed
to entire existing traffic signal pole foundations.
All improvements were completed in accordance with the approved plans and specifications. Staff is
recommending that the City Council accept the project as complete.
Quality of Life, Infrastructure and Parks
The final cost of the construction contract, including base contract amount, change orders and
overall reduction in quantities, is $833,036.22. The total final cost of the project is $1,170,199.50,
broken down as follows:
Item Amount
Base Construction Contract Amount $787,277.00
Change Orders $78,171.58
Reduction in Quantities ($32,412 36)
Final Construction Cost
$833,036.22
Design
$94,899.39
City -Furnished Materials
$91,400.00
Construction Inspection
$113,725.00
Construction Engineerina and Contract Administration
$37,138.85
Sufficient CIP funds are available to cover the total project cost as shown in the following table:
Account
No. ._
Funding Source
.- g _.....
Amount
__... _ .. y
26-17825
Metro Call for Projects grant (Expended in FY 2017-18 & 2018-19)
$69,390.00
26-17825
Metro Call for Projects grant (Appropriated in FY 2019-20)
$668,774.00
54-17825
Proposition C Local Return (Appropriated in FY 2019-20)
$481,974.00
56-17825
Measure R Local Return (Expended in FY 2017-18 & 2018719)
$17,375.00
56-17825
Measure Local Return (Appropriated in FY 2019-20) _
$391,609.00
.._..._.. _.._.._._......___
Total Project Funding:
$1,629,122.00
Savings in the amount of $458,922.54 will be available for reprograming.
ATTACHMENTS
Attachment A — Plans
K
111F 11111,- �llljq 1 0
19IIA �'� 1 llll•I ...... . ....... 111F=111
F-,
Av,,j 4 Z LIJ A
'poo,
VICINITY MAP
N
'Alp
gm-T49711-TTIMA
CAPITAL IMPROVEMENT PROJECT NO. 17-06
CITY OF DOWNEY
Ld w
9m
WOODRUFF AVENUE
L ---- az—
Ld
0
L,
CAPITAL IMPROVEMENT PROJECT NO. 17-06
CITY Oir DOWND
kr
ui Li w
c)
r
z e
WOODRUFF AVENUE nj '
GLEN ANDERSON FREEWAY (1-105)
A
V
UDTE MT S SHEET ONLY,
7
J=
GLEN ANDERSON FREEWAY (I- 1 05)
>
<
a,
WOODRUFF AVENUE
---7L — -- --------
`ECm- H A -A
F�7
CAPITAL IMPROVEMENT PROJECT NO. 17-06
C-, Y OF DOWN�Y--,'
25711=11-116Z.1t Inc.
WOODRUFF AVENUE
M
WOODRUFF AVENUE m
CAPITAL IMPROVEMENT PROJECT NO. 17-06
1111 IF 11111Y
H 4
WOODRUFF AVENUE w
u~i¢
e, r
i r S
n
ti
<t WOODRUFF AVENUE
r.
11
r
L N®l6B8REtlAA-n0N (SHEETS 2-5)
".
CAPITAL IMPROVEMENT PROJECT NO. 17-06
- Ctl Y Of d0"J'."NE'Y
imn..ra�ro+, &
� � fna 5adulFpms, tne. :'
MOO DETECTION ZONE DIMENSIONS
11 j
ID 0 L rE M p
Cl rY OF DOWNrY
&
-D FJA L
- - - - - - - - - - - - -
I'.*.
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - --- - - - - - - - - - - - - - -------- ----- ----
WOODRUFF AVENUE
MEDIAN ISLAND, RAMP, AND CROSS GUTTER (SOUTHWEST QUADRANT)
75
PAVEOUADJAGtNT TO C,&G
CONSTRUCTION NOTES
ITY OF DOWNEY
WOODRUFF AVE.
AL TRENCH DETAIL FOR CONDUIT
TYPICAL DETAIL CONDUIT CROSSING TYPIC
NTI 0 F, kFT-,
TYPICAL MINIMUM BENDING RADIUS
FOR MAINLINE COMMUNICATION CONDUIT
CONDUIT INSTALL4TION DETAILS
CAPITAL IMPROVEMENT PROJECT NO, 17-06
C"y
, OF )c,iv N,y
0�
TOR, VIEW
4m
TT -
VIDEO DETECTION CAMERA MOUNTING
DETAIL (ON SIGNAL MAST ARM)
jf7y OF DOWNEY
I F I sw
15-21
Df
Uj
(PARAMOUNT BOULEVARD)
(LAKEWOOD BOULEVARD)
E, I
Li
(BELLFLOWER BOULEVARD)
LIJ
7-
(WOODRUFF AVENUE)
OETZ;P.H�ff- & I
LEGENID
CAPITAL IMPROVEMENT PROJECT NO. 17-06
CITY OF DOWNEY
FOSTER ROAD/
WOODRUFF AVENUE
(SHEET 3
naeY
IMPERIAL HIGHWA(/
WOODRUFF AVENUE HUB 334
CABINET (SHEET 3)
24 '10C,
A, �br;OT
°:T
WASHBURN AWNUE/
WOODRUFF AVENUE
(SHEET 4)
STEWART AND GRAY
ROAD/WOODRUFF AVENUE
(SHEET 4)
FIRESTONE
GO, LEVARD/WDODRUFF
AVENUE (SHEET 5)
�, D-1
ll� 4
WOODRUFF AVENUE
40 SAN GABRIEL RIVER BRIDGE
TO FIRESTONE BOULEVARD/
STONEWOOD CENTER
FIRESTONE BOULEVARD/
WOODRUFF AVENUE HUB 334
CABINET (SHEET 5)
vt
TO FIRESTONE BOULEVARD/
STEWART & GRAY ROAD T.S
CO',,WUNICATION BLC,CK DIAGRAM
CAPITAL IMPROVEMENT PROJECT NO. 17-06
CITY OF LOONEY
71�
TABLE 7
I&S* RANDS rM M51FASUTION, .A GLE I EXg5T I No
TABLE 6
":0 SAMOUE CAM I EX [STI NGJ
TABLE 7
R4-S"ANrMMfO9A(,K$rXD CABL@ OOR MURE USO
Til�L
11A
TABLE 3
6S-'YrPAN0 SMFO WISTIRIbUrION CARE
M.ry "
FL
I
TABLE 8
24AI PAN 0 SMrO MC K9014 E CABLE
-4=,
TABLE 4
1 TRAND 1%11 -,Ill , 11 1AIIk %lN-,iNCj
77-
TABLE 9
24- STRAD 5 41s0 SAC KBONE CART iEXMCuNGI
&
TABLE 5
48 5 T RAN' 0 ShOO 0157N,RUT. 10h CA% f. I CK I
L I
TABLE 10
P4,SMNO VOPO RACE GONE CAM -FUTURE USE
of
FISER k5SIGNILIENITS.' Ty—R'I—Ec�
CAPITAL IMPROVEMENT PROJECT NO. 17-06,
c y "F
oc -
WOODRUFF AVENUE AND IMPERIAL HIGHWAY HUB
j:DU FDU
POWER DISTRIBUTION SURGE
ASSEMBLY DROTECTI*N
UNIT
LIGHT FAN
334 HUB CABINETS - C - HEMAT'ICS
(ME 'NEET 11 � MM-UlIA-1 El-
.1 Pt 11
WOODRUFF AVENUE AND FIRESTONE BOULEVARD HUB
FDU
46
4. 1 It
POWER DISTRIBUTION SURGE
ASSEMBLY
UNIT
EIGHT FAN
-i A\ r -FIC SIGN.VL C(_jr4Tr,0U_F.Fr CAt B.. [NE'r _DE.TPAL CT"rFIGP,,[._)
It 1, ItIL I I 1--i 111, Ititt-1,ti- I -
CAPITAL IMPROVEMENT PROJECT NO. 17-06
hTY OF DOWNEY
&
l Wz ml
=M 4-
r
- - - - - - - - - - - -
I, VC
-7 - - - - - - - -
WOODRUFF AVENUE
aWOODRUFF AVENUE
IMPERIAL HIGHWAYIWOODRUFF AVENUE VAULT AND HUB DETAIL
FIRESTONE BOULEVARD/WOODRUFF AVENUE VAULT AND HUB DETAIL
N, T
WOODRUFF AVENUE
-7-7 X7,
SPLICE DETAILS
CAPITAL IMPROVEMENT PROJECT NO. 17-06
CITY OF DOWNEY
'V
TYPICAL TRAFFIC SIGNAL SPLICE DETAIL