TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: •, OF THE CITY MANAGER A
BY: DELFINO R. CONSUNJI, P.E., DIRECTOR OF PUBLIC WORKS/CITY G1
Oil
:8 V4 m F-XI 14 1 If -A I LelW-,l 0
That the City Council:
1. Accept work for Miscellaneous Sewer Spot Repairs and Manhole Rehabilitation, MP
No. 324;
C',. Authorize Director • Public • Engineer to file Notice • Completiou-
Los Angeles County Recorder's office.
11&'14IT*K0U
Due to the -• nature • the sewer •: the project was informally bid • May 18, 2020. On
June 9, 2020, the City Council awarded a construction contract for this project to Miramontes
Construction Company, Inc. in the amount of $82,700. Work commenced on June 15, 2020 and
was completed on July 2, 2020.
The sanitary sewer improvements included removing and replacing damaged sewer pipe •
Bigby Street, Kingbee Street, Stamps Avenue, Suva Street, and Tweedy Lane and a manhole
ring and cover at the intersection of Imperial Highway and Downey Avenue.
During construction, additional work beyond the original scope of the project resulted in one
contract change order totaling $9,695.42. The final construction contract amount was
• The • order • included removal of interfering concrete encasement,
installation of cement slurry, replacement of additional sewer main, and additional soil
compaction and asphalt •
All work plus change order were completed in accordance with the approved project plans and
specifications. Staff is recommending that the City Council accept the project as complete and
authorize the Director of Public Works/City Engineer to file the Notice of Completion with the
Los Angeles County Recorder's Office.
MP NO. 324 MISCELLANEOUS SEWER SPOT REPAIRS AND MANHOLE REHABILITATION
JULY 14, 2020
PAGE#2
CITY COUNCIL PRIORITIES
Quality of Life, Infrastructure & Parks
FISCAL IMPACT
The total project cost including construction, construction management, inspection, an,i
materials testing was $107,785.42 broken down as follows:
Item
Construction Contract
Chance Order Total
Final Construction Cost
Construction Management/inspection
Materials Testin�____
Amount
$82,700.00
$92,395.42
$10,721.00
$4,669.00
Total Final Project Cost: $ 1 07,785.42
The project was funded from Fiscal Year 2019-2020 Sewer Fund CIP Account No. 72-1-3999 as
provided in the table below.
Account
No. Funding Source Amount
72-1-3999 Sewer Main Rehabilitation and Repair CIP Account $750,000
Total Project Funding: $750,000
1-11q.9 Ti, TA a &I
Attachment A — Plans
0
0 DOWNEYSTORM
WATER POLLUTION CONTROI REQUIREMENTS FOR
r • f' _
CONSTRUCTION ACTIVITIES"MINI,MUM WATER QUALITY
- _ N' J d �• • �- ;J• — 1 fJJ• 1 fJ
PROTECTION REQUIREMENTS FOR ALL DEVELOPMENT
J J J�
CONST,,R,,,,UCTK}N PRCJECTS/CERTIFIGATIQN STATEMENT
IF kk
CONSTRUCTION PLANS FOR
Tr
i I r
MISCELLANEOUS PROJECT NO. 324
"
SEWER SPOT REPAIRS AND MANHOLE REHABILITATION
-,
LOCATION NO. 2
.,,:, x „,.
TWEEDY LANE
r ''„ _
tr
O, 4
�+s -
r., ..,
r
S"'TAMPS AWNUE AN tYC
SOUVAISTOREEpO`�,% a �r
�```-
i fYt INDEX TO PROJECT DRAWINGS
r
FL
7C, It-
�°°
`-N�x�..T ryE, C1E$CRF' „N
1
T GE H ET
1 „t
- •-- B P BEET AND+T EF L&rdC DE ER:± 7 RFII I ,�
..,-, 'FP�L N
nJEPat`arvNFuiR SiryEET xC,xER.p
t n 1 v
_TFMR, +TREFAIFlr`
KIII,EE;TK ET FEVER IFIT NERn N`
r
'
�, a "-"�—_ r Idfi� ERihl HIC:hvtAx nPdCr r _ WNEI nUEPlUE Pd ,M t i E RE'- §RIEIT3TUTN
r PEsr m,pg�" LOCATION NO.1
T BIGBY STREET
kI
E
�
LOCATION N0. 5
AYZ
a
�--�
KINGBEE STREET
y,
-�
_
- -
LOCATION NO. 6_
F E E E D71c "
it
IPERIAL HIGHWAY _ J
IllC E) T.,C Ur C §� EA C'IC (rR
AND DOWNEY AVENUE ry
d 1
44`
tt,)
.n �� .,,r, .rr„:h: T" `. .} ': r.r f,;.annn ^. r,ae 'q ,,w.. -r., r.ti•
c
VICINITY MAP
UTILITY AND AGENCY INDEX
s
r,MI y ..
.,, ,'. � .. ,.
EI C A _§,.u, r
•.. „ ,' n C;1, a x, � t i, ,.: ;: +„. u'F
... w.?. •„. +: +Yv1':'v ,.,. r;':. �,rr;, r„,tl "?r :�r'�r, -. i,',rr f•:F.., :r�',
,s , . , n n x•. ... ... r. ..., r, k r - � . ,
,
e
.. r ,.,--
— ai,�.. ,.
,,,
,.ry �F Ad
n I
CITY OF CiC)WM1i Y i
IOTILITiES f< YI'_tON -' TMn
mT
!A
SrrE CHARACTEFUS CS
101
STA ',PC
LOCATION 1 - BIGBY STREET
ALLENGROVE STREET
LOCATION 2 - TWEEDY LANE
CCWcTFNJCMGN NOTES:
--T-, `O`EL "-
wl"1�171 I.,
PT --
CITY OF DOWN
EY
PEPT. OF PUBLIC WORKS UTILITIES DIVISION rv17
PiFAIR,'I I'M rt0.- C---AHII All"N
F&"p
ET DUE I A NO I 111FE F I-P. ME SF %Nl` P. I POT, REFL� I F�D
D- fl,l� I ll-,- rlll�l DU
SUVA STREET
LOCATION 3 - STAMPS AVENUE
k.
tiA
MANZANAR STREET
LOCATION 4 - SUVA STREET
CITY OF DOWNEY
s,k—, E ff,i Ttlfliil
',TM,Wil, AiF11P IF i`ttl 11 1 ITF,F7F—, 'FIVFJn F,F
Z"
cl,
LOCATION 5 - KINGBEE STREET
CONSTRUCTION NOTES
J
mm
CITY OF DOWNEYew
DCtT, OF PUBLIC WORKS
Y,,
I
[L
LOCATION 6 - IMPERIAL HIGHWAY AND DOWNEY AVENUE
CONSTRUCTION NOTES:
CITY OF DOWNEY