HomeMy WebLinkAbout09. Misc Proj No. 324 - Accept Work for Misc. Sewer Spot Repairs and Manhole Rehab - File Notice of Completionle-1011111110 L D BY CITY MANAGER TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: •, OF THE CITY MANAGER A BY: DELFINO R. CONSUNJI, P.E., DIRECTOR OF PUBLIC WORKS/CITY G1 Oil :8 V4 m F-XI 14 1 If -A I LelW-,l 0 That the City Council: 1. Accept work for Miscellaneous Sewer Spot Repairs and Manhole Rehabilitation, MP No. 324; C',. Authorize Director • Public • Engineer to file Notice • Completiou- Los Angeles County Recorder's office. 11&'14IT*K0U Due to the -• nature • the sewer •: the project was informally bid • May 18, 2020. On June 9, 2020, the City Council awarded a construction contract for this project to Miramontes Construction Company, Inc. in the amount of $82,700. Work commenced on June 15, 2020 and was completed on July 2, 2020. The sanitary sewer improvements included removing and replacing damaged sewer pipe • Bigby Street, Kingbee Street, Stamps Avenue, Suva Street, and Tweedy Lane and a manhole ring and cover at the intersection of Imperial Highway and Downey Avenue. During construction, additional work beyond the original scope of the project resulted in one contract change order totaling $9,695.42. The final construction contract amount was • The • order • included removal of interfering concrete encasement, installation of cement slurry, replacement of additional sewer main, and additional soil compaction and asphalt • All work plus change order were completed in accordance with the approved project plans and specifications. Staff is recommending that the City Council accept the project as complete and authorize the Director of Public Works/City Engineer to file the Notice of Completion with the Los Angeles County Recorder's Office. MP NO. 324 MISCELLANEOUS SEWER SPOT REPAIRS AND MANHOLE REHABILITATION JULY 14, 2020 PAGE#2 CITY COUNCIL PRIORITIES Quality of Life, Infrastructure & Parks FISCAL IMPACT The total project cost including construction, construction management, inspection, an,i materials testing was $107,785.42 broken down as follows: Item Construction Contract Chance Order Total Final Construction Cost Construction Management/inspection Materials Testin�____ Amount $82,700.00 $92,395.42 $10,721.00 $4,669.00 Total Final Project Cost: $ 1 07,785.42 The project was funded from Fiscal Year 2019-2020 Sewer Fund CIP Account No. 72-1-3999 as provided in the table below. Account No. Funding Source Amount 72-1-3999 Sewer Main Rehabilitation and Repair CIP Account $750,000 Total Project Funding: $750,000 1-11q.9 Ti, TA a &I Attachment A — Plans 0 0 DOWNEYSTORM WATER POLLUTION CONTROI REQUIREMENTS FOR r • f' _ CONSTRUCTION ACTIVITIES"MINI,MUM WATER QUALITY - _ N' J d �• • �- ;J• — 1 fJJ• 1 fJ PROTECTION REQUIREMENTS FOR ALL DEVELOPMENT J J J� CONST,,R,,,,UCTK}N PRCJECTS/CERTIFIGATIQN STATEMENT IF kk CONSTRUCTION PLANS FOR Tr i I r MISCELLANEOUS PROJECT NO. 324 " SEWER SPOT REPAIRS AND MANHOLE REHABILITATION -, LOCATION NO. 2 .,,:, x „,. TWEEDY LANE r ''„ _ tr O, 4 �+s - r., .., r S"'TAMPS AWNUE AN tYC SOUVAISTOREEpO`�,% a �r �```- i fYt INDEX TO PROJECT DRAWINGS r FL 7C, It- �°° `-N�x�..T ryE, C1E$CRF' „N 1 T GE H ET 1 „t - •-- B P BEET AND+T EF L&rdC DE ER:± 7 RFII I ,� ..,-, 'FP�L N nJEPat`arvNFuiR SiryEET xC,xER.p t n 1 v _TFMR, +TREFAIFlr` KIII,EE;TK ET FEVER IFIT NERn N` r ' �, a "-"�—_ r Idfi� ERihl HIC:hvtAx nPdCr r _ WNEI nUEPlUE Pd ,M t i E RE'- §RIEIT3TUTN r PEsr m,pg�" LOCATION NO.1 T BIGBY STREET kI E � LOCATION N0. 5 AYZ a �--� KINGBEE STREET y, -� _ - - LOCATION NO. 6_ F E E E D71c " it IPERIAL HIGHWAY _ J IllC E) T.,C Ur C §� EA C'IC (rR AND DOWNEY AVENUE ry d 1 44` tt,) .n �� .,,r, .rr„:h: T" `. .} ': r.r f,;.annn ^. r,ae 'q ,,w.. -r., r.ti• c VICINITY MAP UTILITY AND AGENCY INDEX s r,MI y .. .,, ,'. � .. ,. EI C A _§,.u, r •.. „ ,' n C;1, a x, � t i, ,.: ;: +„. u'F ... w.?. •„. +: +Yv1':'v ,.,. r;':. �,rr;, r„,tl "?r :�r'�r, -. i,',rr f•:F.., :r�', ,s , . , n n x•. ... ... r. ..., r, k r - � . , , e .. r ,.,-- — ai,�.. ,. ,,, ,.ry �F Ad n I CITY OF CiC)WM1i Y i IOTILITiES f< YI'_tON -' TMn mT !A SrrE CHARACTEFUS CS 101 STA ',PC LOCATION 1 - BIGBY STREET ALLENGROVE STREET LOCATION 2 - TWEEDY LANE CCWcTFNJCMGN NOTES: --T-, `­O`EL "- wl"1�171 I., PT -- CITY OF DOWN EY PEPT. OF PUBLIC WORKS UTILITIES DIVISION rv17 PiFAIR,'I I'M rt0.- C---AHII All"N F&"p ET DUE I A NO I 111FE F I-P. ME SF %Nl` P. I POT, REFL� I F�D D- fl,l� I ll-,- rlll�l DU SUVA STREET LOCATION 3 - STAMPS AVENUE k. tiA MANZANAR STREET LOCATION 4 - SUVA STREET CITY OF DOWNEY s,k—, E ff,i Ttlfliil ',TM,Wil, AiF11P IF i`ttl 11 1 ITF,F7F—, 'FIVFJn F,F Z" cl, LOCATION 5 - KINGBEE STREET CONSTRUCTION NOTES J mm CITY OF DOWNEYew DCtT, OF PUBLIC WORKS Y,, I [L LOCATION 6 - IMPERIAL HIGHWAY AND DOWNEY AVENUE CONSTRUCTION NOTES: CITY OF DOWNEY