Loading...
HomeMy WebLinkAbout05. CIP 19-37-01 & 19-37-03 - Accept Work for Fire Station 1 & 3 - File Notice of CompletionW A gill I m Lei 0 1 0 1*6111 WK6161 I fil Lei 14 SUBJECT: ACCEPTING COMPLETION OF FIRE STATION I AND FIRE STATION 3 MODERNIZATION AND EXPANSION PROJECT (CIP NO. 19-37-01 AND CIP NO. 19-37-03) AS COMPLETE AND AUTHORIZING THE ASSISTANT CITY MANAGER TO ISSUE AND FILE A NOTICE OF COMPLETION It is recommended that that the City Council: 1 . Accept the Fire Station 1 and Fire Station 3 Modernization and Expansion Project (CIP No. 19-37-01 and CIP No. 19-37-03) as complete. 2. Approve the final construction contract amount of $10,744,504.81 which includes the cost of all issued change orders to the original construction contract. 3. Authorize the Assistant City Manager to issue and file the project's Notice of Completior with the County of Los Angeles Recorder's Office. 4. Authorize increasing the previously approved budgets for Fire Station 1 and Fire Station3 Modernization and Expansion Projects. On January 22, 2019, the City Council approved the plans and specifications for the subject projects and granted authority to advertise for bids. On March 26, 2019, the City Council awarded a construction contract to PCN3, Inc. in the amount of $7,958,000.00 for completion of work per approved plans and specifications. PCN3, Inc. started the project at Fire Station 1 on June 3, 2019. Work included complete overhaul of a one story facility and transforming it to an expanded and fully modernized two story building. The old sleeping alcoves in a group dormitory configuration with one shared restroom , shower and locker room were replaced with thirteen (13) single occupancy dorm rooms sharing ACCEPTING COMPLETION OF FIRE STATION 1 AND FIRE STATION 3 MODERNIZATION AND EXPANSION PROJECT J U LY 14, 2020 PAGE 2 individual bathrooms at a typical ratio of 1 bathroom for every 2 dorm rooms, a new modernized raised floor Command and Data Center; new modernized program support facilities including an exercise room, dayroom, kitchen, and separate dining area; improvements to interior of the existing "Annex Building"; complete reconstruction of failed concrete pavement and other miscellaneous related work was completed on March 19, 2020. There were nineteen (19) change orders added to the original scope of this project which included construction schedule modifications, critical 9-1-1 infrastructure enhancements through adding a dry fire protection system in the server room and Dispatch Center, additional structural work, plumbing work, interior and exterior lighting improvements, replacement of the mechanical gates, additional improvements of the apparatus bay, complete reconstruction of on -site concrete paving, and parking lot ADA improvements. The total cost of construction for Fire Station 1 is $6,365,561.27. PCN3, Inc. started work at Fire Station 3 on June 3, 2019. Similar to Station 1, work at Station 3 work included complete overhaul of a one story facility and transforming it to an expanded and fully modernized two story building. Additionally, the apparatus bay was enlarged and improved. The existing and inadequate shared sleeping quarter and a single shared bathroom, shower area and locker room shared locker were replaced with seven (7) single occupancy dorm rooms sharing individual bathrooms at a typical ratio of 1 bathroom for every 2 dorm rooms. The new facility included modernized support spaces including exercise room, dayroom, kitchen, and separate dining area. The project was completed on March 26, 2020. There were thirteen (13) change orders added to the original scope of this project, including modifications to the project schedule, fencing improvements, building footing and framing modifications, complete reconstruction of damaged on -site concrete pavement, modifications to the apparatus bay, installation of additional data and electrical outlets, fire alarm interlock with HVAC units, installing additional exterior lights, and parking lot ADA improvements. The total cost of construction for Fire Station 3 is $4,378,943.54. Construction work including the original scope of work has been completed in a satisfactory manner. As such, it is recommended that the City Council accept the Fire Station 1 and Fire Station 3 Modernization and Expansion Project (CIP No. 19-37-01 and CIP No. 19-37-03) as complete, approve the final construction cost of $10,744,504.81, and authorize the Assistant City Manager to issue and file a Notice of Completion with the County of Los Angeles Recorder's Office. Reconstruction and modernization of Fire Stations 1 and 3 was an important undertaking which required careful planning and major logistical arrangements to accommodate continued operation of the City's public safety and emergency services while the existing facilities were under construction. As such, the entire operation was relocated to temporary facilities. Firefighters, fire engineers, captains, and ambulance operators where moved and housed in a temporary facility which was built from ground up. The Fire Department Dispatch Center personnel were relocated and accommodated in a re -purposed area located at the first floor of the City Hall. In order to support installation of new communication equipment, a temporary antenna as well as a new permanent one had to be installed at the temporary fire station and Station 1. The cost of temporary facilities and associated expenses is added to the cost of the construction contract for each station. The total cost for modernization and expansion of Station ACCEPTING COMPLETION OF FIRE STATION 1 AND FIRE STATION 3 MODERNIZATION AND EXPANSION PROJECT JULY 14, 2020 PAGE 3 1 is $8,602,287.11. The cost for Station 3 is $5,574,625.00. Expenditure details have been listed in Attachment A to this report. Therefore it is necessary to adjust the previously approved budgets of $7,300,000 and $5,000,000 for Stations 1 and 3 respectively, to $8,602,287 and $5,574,625. Within the context of the overall Measure S program cost, these increases have been offset by lower completion costs of other projects and cost allocations, therefore, the program cost remains the same. k 1H Efticiency & Adaptability Quality of Life, Neighborhood & Infrastructure FISCAL IMPACT The City's 2018-20 Capital Improvement Program includes the Fire Station 1 Modernization and Expansion Project and Fire Station 3 Modernization and Expansion Project utilizing Measure S Funds (Account Numbers 33-1-3301-0520 and 33-1-3313-0520). The total cost including planning, design, abatement of hazardous material, construction, inspection services, material testing, furniture and equipment, construction management and administration, construction engineering and supervision services, material testing, added scope of work, temporary facilities, data communication infrastructure and related costs is $14,176,912. Attachment A: Project Cost Summary ACCEPTING COMPLETION OF FIRE STATION 1 AND FIRE STATION 3 MODERNIZATION AND EXPANSION PROJECT JULY 14, 2020 PAGE 4 Fire Station 1 Base Contract Amount $4,619,000.00 Change Order No. 1 (4/24/19) $0.00 Change Order No. 2 (5/10/19) $64,875.00 Change Order No. 3 (5/29/19) $67,956.09 Change Order No. 4 (6/26/19) $73,594.78 Change Order No. 5 (8/5/19) $39,022.40 Change Order No. 6 (8/20/19) $31,274.29 Change Order No. 7 (10/l/19) $347,378.25 Change Order No. 8 (10/11/19) $20,465.76 Change Order No. 9 (10/16/19) $12,864.20 Change Order No. 10 (10/31/19) $0.00 Change Order No. 11 (10/31/19) $29,105.12 Change Order No. 12 (11/18/19) $32,344.29 Change Order No. 13 (12/2/19) $134,243.16 Change Order No. 14 (1/15/20) $404,000.00 Change Order No. 15 (1/16/20) $98,164.87 Change Order No. 16 (1/31/20) $184,940.10 Change Order No. 17 (2/14/20) $149,228.49 Change Order No. 18 (3/27/20) $19,104.47 Change Order No. 19 (4/23/20) $38,00U0 FIRE STATION 1 TOTAL $6,365,561.27 Fire Station 3 Base Contract Amount $3,339,000.00 Change Order No. 1 (4/24/19) $0.00 Change Order No. 2 (5/20/19) $27,722.00 Change Order No. 3 (6/26/19) $128,645.01 Change Order No. 4 (7/22/19) $40,710.39 Change Order No. 5 (9/12/19) $58,789.24 Change Order No. 6 (10/11/19) $14,390.95 Change Order No. 7 (10/24/19) $84,094.98 Change Order No. 8 (10/31/19) $0.00 Change Order No. 9 (11/5/19) $78,167.25 Change Order No. 10 (12/2/19) $28,194.21 Change Order No. 11 (1 /15/20) $146,000.00 Change Order No. 12 (3/2/20) $285,034.25 Change Order No. 13 (3/27/20) $148,195.26 DENNIS THE MENACE PARK TOTAL $4,378,943.54 FWANIVITOWN"IMIll ACCEPTING COMPLETION OF FIRE STATION 1 AND FIRE STATION 3 MODERNIZATION AND EXPANSION PROJECT JULY 14, 2020 PAGE 5 Total Construction Contract cost $10,744,504 Design $899,332 Construction Management $483,503 Inspection, construction supervision, contract administration, abatement $557,462 Temporary Facilities $514,365 Communication and Station Alert System $600,760 Furniture and Equipment $376,985 TOTAL-O• Account No. Fund Amount 33-1-3301 Measure S $8,602,287 33-1-3313 Measure S $5,574,625 TOTAL PROJECT FUNDING $14,176,912