HomeMy WebLinkAboutPC Reso 10-2677RESOLUTION NO. 10-2677
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DOWNEY
APPROVING PLN -10-08051 (CONDITIONAL USE PERMIT), A REQUEST BY
CLEARWIRE COMMUNICATIONS TO INSTALL SIX (6) WIRELESS ANTENNAS AND
SIX (6) DISH ANTENNAS ON THE ROOF -TOP OF THE EXISTING COMMERCIAL
BUILDING AT 8630 FLORENCE AVE, ZONED C -P (PROFESSIONAL OFFICE)
THE PLANNING COMMISSION OF THE CITY OF DOWNEY DOES RESOLVE AS FOLLOWS:
SECTION 1. The Planning Commission of the City of Downey does hereby find,
determine and declare that:
A. An application was filed by Roger Spencer (hereinafter "applicant") requesting
approval of a PLN -10-08051 (Conditional Use Permit), to install six (6) wireless
antennas and six (6) dish antennas on the roof of the existing building at 8630
Florence Ave, zoned C -P (Professional Office) (hereinafter "subject property")
(Assessor Identification No. 6252-001-022 & 024);
B. On October 7, 2010, notice of the pending public hearing was sent to all property
owners within 500' of the subject site and the notice was published in the Downey
Patriot; and
C. The Planning Commission held a duly noticed public hearing on October 20,
2010 and, after fully considering all oral and written testimony and facts and
opinions offered at the aforesaid public hearing, adopted Resolution No. 10-2677,
approving PLN -10-08051 (Conditional Use Permit).
SECTION 2. The Planning Commission further finds, determines and declares the
environmental impact of the proposed development has been reviewed and has been found to
be in compliance with the California Environmental Quality Act (CEQA) and is categorically
exempt from CEQA, pursuant to Guideline Section No. 15301 (Class 1, Existing Facilities).
SECTION 3. Having considered all of the oral and written evidence presented to it at
said public hearings, the Planning Commission further finds, determines and declares that:
A. The requested conditional use permit will not adversely affect the purpose and
intent of this chapter or the City's General Plan or the public convenience or
general welfare of persons residing or working in the neighborhood thereof.
General Plan Policy No. 2.7.1 states that the City should "Provide adequate utility
and communications infrastructure." Approving this project will help achieve this
policy by increasing the capacity of the existing communications network.
B. The requested use will not adversely affect the adjoining land uses and the
growth and development of the area in which it is proposed to be located. The
subject site is in a fully developed area of the City, with no vacant properties in
the adjacent area. Installation of the antenna panels will not prevent surrounding
properties from further being developed. Moreover, in order to mitigate aesthetic
impacts on surrounding properties, the proposal has been designed to hide the
antennas and its equipment cabinet behind the existing screened enclosures.
Resolution No. 10-2677
Downey Planning Commission
C. The size and shape of the subject property proposed for the use is adequate to
allow the full development of the proposed use in a manner not detrimental to the
particular area. The subject site is a rectangular shaped lot that is improved with
a two (2) story medical office building and an off-street parking lot. The proposed
project will be located within the new screen boxes on the roof of the building.
The location of the antennas, and all related equipment, will not interfere with the
use of the building or reduce the amount of available parking. Thus, the site has
sufficient shape and size to accommodate the proposed project.
D. The traffic generated by the proposed use will not impose an undue burden upon
the streets and highways in the area. The proposed project is an unmanned
wireless communications facility, which typically only requires a single site visit
once a month for maintenance. The adjoining streets (Bellman and Florence
Avenue) have sufficient capacity to absorb any additional traffic the requested
use may create.
SECTION 4. Based upon the findings set forth in Sections 1 through 3 of this
Resolution, the Planning Commission of the City of Downey hereby approves PLN -10-08051
(Conditional Use Permit), subject to conditions of approval attached hereto as Exhibit A, which
are necessary to preserve the health, safety and general welfare of the community and enable
the Planning Commission to make the findings set forth in the previous sections. The conditions
are fair and reasonable for the accomplishment of these purposes.
SECTION 5. This Conditional Use Permit shall become null and void unless use has
commenced within one year of this approval and pursued diligently to completion or a one-year
extension of time granted by the Downey Planning Commission, pursuant to Section 9824 of the
Downey Municipal Code.
SECTION 6. The Secretary shall certify the adoption of this Resolution.
PASSED, APPROVED AND ADOPTED this 20th day of October, 2010.
Louis Morales, Chairman
City Planning Commission
I HEREBY CERTIFY that the foregoing is a true copy of a Resolution adopted by the
Planning Commission of the City of Downey at a regular meeting thereof, held on the 20th day of
October, 2010, by the following vote, to wit:
AYES:
COMMISSIONERS:
Kiefer, Vasquez, Lambros, Morales
NOES:
COMMISSIONERS:
None
ABSTAINS
COMMISSIONER:
Murray
r] `via
Theresa Donahue, Secretary
City Planning Commission
PLN -10-08051 (CUP) — 8630 Florence Ave
October 20, 2010 - Page 2
Resolution No. 10-2677
Downey Planning Commission
PLN -10-08051 (CONDITIONAL USE PERMIT)
EXHIBIT A - CONDITIONS
PLANNING
1) The approval of PLN -10-08051 (Conditional Use Permit), for Clearwire Communications
to install six (6) antennas and six (6) dish antennas on the roof of the existing building
and to install an equipment cabinet on the ground at 8630 Florence Avenue, as shown
on the approved site plan and elevations. Any deviations or exceptions from said site
plan, other than those authorized by this Resolution or those that do not impact other
conditions, shall not be permitted without the approval of the Downey Planning
Commission.
2) The new equipment enclosure and screen boxes shall be painted and constructed of
materials that match the existing buildings.
3) The Planning Commission's approval of PLN -10-08051 (Conditional Use Permit) shall
not be construed to mean any waiver of applicable and appropriate zoning regulations, or
any Federal, State, County, and City laws and regulations. Unless otherwise expressly
specified, all other requirements of the City of Downey Municipal Code shall apply.
4) The City Planner is authorized to make minor modifications to the approved preliminary
plans or any of the conditions, if such modifications shall achieve substantially the same
results as would strict compliance with said plans and conditions.
5) All conditions for Design Review Board Case Nos. 98-84 and 04-78 shall remain valid
and in force.
6) The applicant shall comply with all conditions of approval of PLN -10-08051 before this
conditional use permit becomes valid.
7) The owner/applicant shall incorporate a copy of this Resolution No. 10-2677 (including
Exhibit A — Conditions), into the approved set of building plans.
PUBLIC WORKS/ENGINEERING
8) If applicable, the owner/applicant shall obtain all necessary plan approvals and permits
and shall be in conformance with the Standard Plans and Specification for Public Works
Construction and as modified by the City of Downey's Standard Plans and Specifications.
9) If applicable, the owner/applicant shall be required to complete a construction &
demolition (C&D) waste management plan per Article V, Chapter 8 of the Downey
Municipal Code.
10) The owner/applicant shall provide that all construction graffiti created as part of this
project in the public right of way to be removed.
FIRE
11) The applicant/owner shall install a Knox@ Rapid Entry System for the project. (END)
H:\PLANNING\RESOS\PC\2010\10-2677.doc
PLN -10-08051 (CUP) — 8630 Florence Ave
October 20, 2010 - Page 3