Loading...
HomeMy WebLinkAbout4. PLN-20-00050 GP ConsistencySTAFF REPORT PLANNING DIVISION DATE: June 17, 2020 TO: PLANNING COMMISSION SUBMITTED BY: ALDO E. SCHINDLER, DIRECTOR OF COMMUNITY DEVELOPMENT REVIEWED BY: CRYSTAL LANDAVAZO, CITY PLANNER PREPARED BY: ALFONSO HERNANDEZ, SENIOR PLANNER SUBJECT: PLN-20-00050 (GENERAL PLAN CONSISTENCY) – A REQUEST TO FIND THAT THE CAPITAL IMPROVEMENT PROGRAM FOR THE 2020-21 FISCAL YEAR IS CONSISTENT WITH THE GENERAL PLAN. REPORT SUMMARY Pursuant to State Government Code 65401, the Planning Commission must find that the City’s Capital Improvement Program (CIP) is consistent with the City’s General Plan. Based on the analysis contained in this report, staff is recommending the Planning Commission adopt the following titled resolution: A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DOWNEY ADOPTING A FINDING THAT THE CAPITAL IMPROVEMENT PROGRAM FOR THE 2020-21 FISCAL YEAR IS CONSISTENT WITH THE GENERAL PLAN BACKGROUND The CIP identifies the proposed major projects and improvements that the City will undertake during the ensuing fiscal year. Included within the program are types of projects, costs, funding sources, and anticipated time frame. The types of projects include street improvements, property acquisitions, infrastructure improvements, consulting services, equipment, and building maintenance. Although the city may carry out multiple projects not identified in the CIP, the program only includes initiatives with costs exceeding $5,000.00. On an annual basis, the Planning Commission must review and find the program to be consistent with the City’s General Plan. Section 65401 of the State of California Government Code states that the CIP, “…shall be submitted to the county or city planning agency for review and report to said official agency as to conformity with the adopted general plan or part thereof.” The Planning Commission fulfills the role of the “planning agency” while the City Council fulfills the role of the “official agency”. The Planning Commission’s purpose in this process is to determine that the CIP is consistent with the goals, policies, and programs found within the City of Downey’s Vision 2025 General Plan. This action does not approve, fund, or authorize any individual or specific project. After action is taken on this item, the finding will then be forwarded to the City Council for their review and determination. CIP General Plan Consistency 2020-21 (PLN-20-00050) June 17, 2020 - Page 2 DISCUSSION The proposed 2020-21 CIP consists of 115 projects. The proposed improvements total approximately $92.72 million dollars, which are funded from a variety of federal, state, local, and grant funding sources. Within the program these projects are divided into six categories, which include Streets (intersection improvements, pavement rehabilitation, sidewalk repairs, landscaping, roadway widening, bridge replacement or rehabilitation, corridor beautification), Traffic Safety (traffic signal communication upgrades and expansion, traffic signal upgrades, street lighting upgrades new raised median island projects,), Public Facilities (park upgrades, facility maintenance, facility modernization/expansion), Water Utility (new water mains, service lines and infrastructure upgrades, new water wells, upgrade existing water wells, maintenance), Sewer Improvements (sanitary sewer system repair and rehabilitation), and Storm Water Improvements (storm drain repair, rehabilitation and maintenance, regulatory permit compliance,). A copy of the 2020-21 CIP is attached to this document. As previously noted, it is the Planning Commission’s responsibility is to determine if the CIP is consistent with the adopted General Plan. In reviewing the General Plan, staff found the proposed 2020-21 CIP to be consistent with the following policies: Streets Goal 2.1. Increase the capacity of the existing street system. Policy 2.1.1. Maintain a street system that provides safe and efficient movement of people and goods. Goal 8.3. Promote the enhancement of the streetscape. Policy 8.3.2. Promote city-initiated streetscape enhancement projects. Policy 8.3.3. Promote the installation of new trees. The proposed programs under the “Streets” projects include upgrading existing street intersections/roadways, street medians, and adding additional traffic lanes to streets, thereby increasing roadway capacity. The enhancements will allow the City to maintain a safe and efficient street system. Traffic Safety Goal 2.1. Increase the capacity of the existing street system. Policy 2.1.1. Maintain a street system that provides safe and efficient movement of people and goods. Goal 2.2. Promote the use of alternative modes of travel, other than single-occupant vehicles, to relieve traffic congestion. Policy 2.2.1. Promote walking as an attractive alternative to vehicular transportation. Policy 2.2.2. Promote bicycling as an attractive alternative to vehicular transportation. Goal 5.7. Reduce the likelihood of traffic accidents. Policy 5.7.1. Promote traffic safety along streets. Policy 5.7.2. Promote the installation of sidewalks and walkways to improve traffic safety. The proposed improvements under traffic safety include median improvements and traffic signal upgrades, and pedestrian safety improvements. These programs are consistent with the policies of the General Plan since they will assist in providing a safe and efficient street system and enhance the overall safety of traffic. Projects also include upgrades to sidewalks and bicycle related initiatives. CIP General Plan Consistency 2020-21 (PLN-20-00050) June 17, 2020 - Page 3 Public Facility Goal 1.1. Provide sufficient land areas for uses that serve the needs of residents, visitors, and businesses. Policy 1.1.5. Provide an appropriate amount of land area for recreation and entertainment. Goal 7.2. Optimize the use of established public parks to meet the needs of residents. Policy 7.2.2. Upgrade existing park facilities. Goal 7.3. Increase the amount of park acreage. Policy 7.3.1. Promote the expansion of the existing park system. Goal 8.2. Maintain and enhance the appearance of properties. Policy 8.2.2. Promote the upgrading of properties. Implementation of the projects listed in the CIP will be consistent with the policies mentioned above. The programs that are included in the CIP will upgrade existing parks and gyms, create a new sports complex, and modernize/expand existing fire stations. Water Utility, Stormwater Improvements, and Sewer Improvements Goal 4.1. Provide an adequate water supply for the needs of residents, workers, and visitors to the City. Policy 4.1.2. Maintain the water supply system to meet water demands. Goal 4.2. Prevent the contamination of groundwater. Policy 4.2.1. Monitor and improve groundwater quality. Goal 4.3. Reduce the contaminant level at beaches and oceans. Policy 4.2.1. Reduce the contaminant level of stormwater and urban runoff generated within Downey. Projects identified in the CIP consist of improvements to existing water wells and installation of new water wells, as well as maintenance of the infrastructure related to the City’s water supply. Initiatives also include remediation and clean up to prevent contamination of groundwater. Regarding urban runoff, the City will improve existing infrastructure and continue to comply with federal permits for water discharge. Lastly, sewer infrastructure will also receive continued maintenance and repair. As noted in the above analysis, the proposed 2020-21 Capital Improvement Program is consistent with the aforementioned General Plan goals and policies. For this reason, staff believes that the Planning Commission can find the CIP to be consistent with the General Plan. ENVIRONMENTAL ANALYSIS Staff has reviewed the General Plan Consistency for compliance with the California Environmental Quality Act (CEQA). Upon completion of this review staff has determined that CEQA is not applicable to this action, pursuant to CEQA Guideline Section No. 15061 (b)(3). A finding of consistency with the City’s General Plan does not approve, adopt, or fund any of the projects listed within the CIP. Impacts generated from a specific project will be analyzed through that respective approval. RESOLUTION NO. 20- A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DOWNEY ADOPTING A FINDING THAT THE CAPITAL IMPROVEMENT PROGRAM FOR THE 2020-21 FISCAL YEAR IS CONSISTENT WITH THE GENERAL PLAN THE PLANNING COMMISSION OF THE CITY OF DOWNEY DOES RESOLVE AS FOLLOWS: SECTION 1. The Planning Commission of the City of Downey does hereby find, determine and declare that: A. The City of Downey General Plan (Vision 2025) was adopted on January 25, 2005; and, B. The City of Downey has prepared a Capital Improvement Program for the 2020- 21 fiscal year; and, C. Pursuant to State of California Government Code Section 65401, the Planning Commission is required to review the Capital Improvement Program to determine that it is in conformance with the City’s General Plan; and, D. On June 17, 2020, the Planning Commission reviewed said request and considered all factors relating to the General Plan consistency of the Capital Improvement Program for the 2020-21 fiscal year. SECTION 2. The Planning Commission further finds, determines, and declares that the proposed project was reviewed for compliance with the California Environmental Quality Act (CEQA), and is exempt from CEQA, pursuant to Guideline Section 15061 (b)(3). SECTION 3. The Planning Commission does hereby find and determine that the Capital Improvement Program for the 2020-21 fiscal year is consistent with the City of Downey’s adopted General Plan because the projects contained therein are consistent with the following General Plan goals and policies: Goal 2.1. Increase the capacity of the existing street system. Policy 2.1.1. Maintain a street system that provides safe and efficient movement of people and goods. Goal 2.2. Promote the use of alternative modes of travel, other than single-occupant vehicles, to relieve traffic congestion. Policy 2.2.1. Promote walking as an attractive alternative to vehicular transportation. Policy 2.2.2. Promote bicycling as an attractive alternative to vehicular transportation. Goal 4.1. Provide an adequate water supply for the needs of residents, workers, and visitors to the City. Policy 4.1.2. Maintain the water supply system to meet water demands. Goal 4.2. Prevent the contamination of groundwater. Policy 4.2.1. Monitor and improve groundwater quality. Resolution No. 20- Downey Planning Commission CIP General Plan Consistency 2020-21 (PLN-20-00050) June 17, 2020 - Page 2 Goal 4.3. Reduce the contaminant level at beaches and oceans. Policy 4.3.1. Reduce the contaminant level of stormwater and urban runoff generated within Downey. Goal 5.7. Reduce the likelihood of traffic accidents. Policy 5.7.1. Promote traffic safety along streets. Policy 5.7.2. Promote the installation of sidewalks and walkways to improve traffic safety. Goal 7.2. Optimize the use of established public parks to meet the needs of residents. Policy 7.2.2. Upgrade existing park facilities. Goal 7.3. Increase the amount of park acreage. Policy 7.3.1. Promote the expansion of the existing park system. Goal 8.2. Maintain and enhance the appearance of properties. Policy 8.2.2. Promote the upgrading of properties. Goal 8.3. Promote the enhancement of the streetscape. Policy 8.3.2. Promote city-initiated streetscape enhancement projects. Policy 8.3.3. Promote the installation of new trees. SECTION 4. The Secretary shall certify the adoption of this Resolution. PASSED, APPROVED AND ADOPTED this 17th day of June 2020. Miguel Duarte, Chairman City Planning Commission I HEREBY CERTIFY that the foregoing is a true copy of a Resolution adopted by the Planning Commission of the City of Downey at a regular meeting thereof, held on the 17th day of June 2020, by the following vote, to wit: AYES: COMMISSIONERS: NOES: COMMISSIONERS: ABSENT: COMMISSIONERS: Mary Cavanagh, Secretary City Planning Commission City of Downey Capital Improvement Program FY 2020-21 H:\Pubworks\B-U-D-G-E-T\Budget 2020-21\CIP\FY 2020-21 CIP Listing-Approved Budget\FY 2020-21 CIP Listing - Final (05-14-2020).xlsx Page 1 of 4 Last Revised: 6/4/2020 9:41 PM CIP Number Number Account Requesting Department Type Project Title Project Location Activity C.O.New Total 22 AQMD Fund 23 L&L District Fund 25 TDA III Fund 26 Grant Fund 30 Gast Tax Fund 32 SB1 Local Return Fund 33 Measure S Bond Fund 35 Measure S Sales Tax Fund 38 Vehicle Imapct Fee Fund 40 Capital Project Fund 40 Art in Public Places Fund 40 Other Fund 50 Storm Water Fund 51 Water Fund 54 Prop "C" Local Return Fund 56 Measure R Local Return Fund 57 Measure M Local Return Fund 72 Sewer Fund Total Notes SS601B 1 16601 PW Street Improvements Paramount Boulevard at Firestone Boulevard Improvements Southwest Corner of Paramount Boulevard at Firestone Boulevard Const.83,556 0 83,556 0 0 0 83,556 0 0 0 0 0 0 0 0 0 0 0 0 0 0 83,556 n/a 2 16624 PW Street Improvements Annual Miscellaneous Bridge Repairs Citywide Const.198,000 2,000 200,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 200,000 0 200,000 CIP 16-20 3 16628 PW Street Improvements Old River School Road Pavement Rehabilitation Old River School Road (Imperial Highway to Arnett Street)Const.2,581,486 182,000 2,763,486 0 0 0 2,484,331 0 0 0 0 0 0 0 0 0 0 0 14,788 264,367 0 2,763,486 CIP 14-09 4 16692 PW Street Improvements Firestone Boulevard at Lakewood Boulevard Intersection Improvements Firestone Boulevard at Lakewood Boulevard Env., PS&E & Const. 1,229,765 1,359,100 2,588,865 0 0 0 2,588,865 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2,588,865 I-605 Corridor Congestion Hot Spots ($2.3 mil) Spring Hill Suites Developer Fee ($359,100) CIP 14-08 5 16693 PW Street Improvements Florence Avenue Bridge Rehabilitation at Rio Hondo River Florence Avenue at Rio Hondo River Env. + PS&E 211,197 1,635,149 1,846,346 0 0 0 1,789,189 0 0 0 0 0 0 0 0 0 0 0 0 57,157 0 1,846,346 Federal HBP grant CIP 14-07 6 16710 PW Street Improvements Florence Avenue Bridge Rehabilitation and Widening at San Gabriel River Florence Avenue at San Gabriel River Env + PS&E 836,152 112,000 948,152 0 0 0 912,000 17,132 0 0 0 0 0 0 0 0 0 0 19,020 0 0 948,152 Federal HBP grant CIP 15-13 7 17728 PW Street Improvements Safety Lighting Improvement Project Adjacent to the I-5 Freeway, Phase 2 Area currently occupied by Dollison Drive (vacated due to I-5 Fwy. expansion) between Fairford Avenue and Cecilia Street Const.60,000 0 60,000 0 60,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 60,000 Zone 1 L&L District Funding for Safety Lighting CIP 16-03 8 17804 PW Street Improvements I-5 Freeway at Florence Avenue Traffic Mitigation Improvements Florence Avenue (Studebaker Road to Orr & Day Road)Const.5,000 0 5,000 0 0 0 5,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5,000 Caltrans Grant for Traffic Mitigation & Inspection CIP 16-05 9 17806 PW Street Improvements Telegraph Road Traffic Throughput & Safety Enhancements, Phase 2 Telegraph Road (West City Limit to Lakewood Boulevard and Passons Boulevard to East City Limit) Const.6,699,540 2,800,460 9,500,000 0 0 0 5,828,739 0 1,000,000 0 0 0 0 0 0 0 0 1,220,801 0 1,450,460 0 9,500,000 Federal RSTP grant ($2.8 mil.= 28% of project cost) and Metro Measure M MSP grant ($350k). Includes reimbursement from Pico Rivera ($2.7 mil.). CIP 18-05 10 16721 PW Street Improvements Tweedy Lane Pavement Rehabilitation Tweedy Lane (Florence Avenue to Suva Street) Const.454,000 13,650 467,650 0 0 0 414,000 53,650 0 0 0 0 0 0 0 0 0 0 0 0 0 467,650 CIP 15-12 11 16712 PW Street Improvements Bellflower Boulevard Pavement Rehabilitation Bellflower Boulevard (Foster Road to Dalen Street) and (900 ft. N/O Imperial Highway to Stewart and Gray Road) Env + PS&E 15,000 10,000 25,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 25,000 0 0 0 25,000 CIP 14-14 12 16711 PW Street Improvements Woodruff Avenue Pavement Rehabilitation Woodruff Avenue (Foster Road to Stewart and Gray Road) Env + PS&E 15,000 10,000 25,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 25,000 0 0 25,000 CIP 19-05 13 16744 PW Street Improvements Suva Street at Rio Hondo River Bridge Repair Suva Street bridge at the Rio Hondo River Const.0 26,000 26,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 26,000 0 0 26,000 Los Angeles County Department of Public Works is the lead agency and the City's shared cost is $26,000. CIP 19-06 14 16745 PW Street Improvements Paramount Boulevard at Imperial Highway Intersection Improvements Paramount Boulevard at Imperial Highway R/W, PS&E & Const. 2,983,892 0 2,983,892 0 0 0 2,983,892 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2,983,892 CIP 19-07 15 16746 PW Street Improvements Lakewood Boulevard at Florence Avenue Intersection Improvements Lakewood Boulevard at Florence Avenue Env. R/W Acq. +PS&E 4,696,935 0 4,696,935 0 0 0 4,696,935 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4,696,935 CIP 19-08 16 16747 PW Street Improvements Lakewood Boulevard at Imperial Highway Intersection Improvements Lakewood Boulevard at Imperial Highway Env. R/W Acq. +PS&E 1,000,000 0 1,000,000 0 0 0 1,000,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,000,000 n/a 17 16762 PW Street Improvements Urban Forest Management Plan Citywide Const.251,100 0 251,100 0 0 0 251,100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 251,100 Cal-Fire grant CIP 20-01 18 16779 PW Street Improvements FY 19/20 Miscellaneous Concrete Repairs and ADA Improvements Council District 1 (miscellaneous concrete improvements) & Citywide (ADA improvements) Const.380,000 30,000 410,000 0 0 40,000 0 0 370,000 0 0 0 0 0 0 0 0 0 0 0 0 410,000 CIP 20-03 19 16781 PW Street Improvements FY 19/20 Residential Streets Pavement Rehabilitation Council Districts 3 & 4 Const.1,577,000 1,020,000 2,597,000 0 0 0 152,000 0 1,005,000 0 0 1,290,000 0 0 0 0 0 0 150,000 0 0 2,597,000 Includes $122k developer contribution (KB Homes) for Parrot Ave. N/O 5th St. and $30k (Aldi's) for Nash Ave. CIP 20-04 20 16782 PW Street Improvements Lakewood Boulevard Parkway Improvements Lakewood Boulevard (Imperial Highway and Bellflower Boulevard) PS&E + Const.5,000 95,000 100,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100,000 0 100,000 CIP 20-05 21 16783 PW Street Improvements Florence Avenue Pavement Rehabilitation Florence Avenue (Tweedy Lane to Brookshire Avenue) PS&E + Const.570,000 580,000 1,150,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,050,000 0 100,000 0 1,150,000 CIP 20-06 22 16784 PW Street Improvements 3rd Street Pavement Rehabilitation 3rd Street (Old River School Road to Rives Avenue) PS&E + Const.90,000 380,000 470,000 0 0 0 0 0 290,000 0 0 0 0 0 0 0 0 0 180,000 0 0 470,000 CIP 20-07 23 16785 PW Street Improvements Paramount Boulevard Median Landscape Improvements (Phase 1) Paramount Boulevard (Imperial Highway to Firestone Boulevard)Const.700,000 0 700,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 700,000 0 700,000 CIP 20-08 24 16786 PW Street Improvements Firestone Boulevard Median Landscape Improvements Firestone Boulevard (West City Limit to Old River School Road)Const.400,000 0 400,000 0 0 0 0 260,000 0 0 0 0 0 0 0 0 0 0 0 140,000 0 400,000 CIP 20-09 25 16787 PW Street Improvements Entry Monument Signs (Various Locations)Citywide PS&E + Const.60,000 0 60,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 60,000 0 0 60,000 CIP 20-24 26 16742 PW Street Improvements Paramount Boulevard Median Landscape Improvements (Phase 2) Paramount Boulevard (Firestone Boulevard to Florence Avenue)Const.295,000 220,000 515,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 515,000 0 0 515,000 CIP 20-36 27 16769 PW Street Improvements Lakewood Boulevard Street Improvements Lakewood Boulevard (Century Boulevard to Gardendale Street) PS&E + Const.737,500 0 737,500 0 0 0 0 0 0 0 0 0 0 0 737,500 0 0 0 0 0 0 737,500 Caltrans Relinquishment funds. CIP 20-37 28 17802 PW Street Improvements Lakewood Boulevard Street Improvements (Phase 3E) Lakewood Boulevard (Gallatin Road to Telegraph Road) PS&E + Const.489,206 0 489,206 0 0 0 489,206 0 0 0 0 0 0 0 0 0 0 0 0 0 0 489,206 CIP 21-01 29 16774 PW Street Improvements FY 20/21 Miscellaneous Concrete Repairs and ADA Improvements Council District 1 PS&E + Const.0 540,000 540,000 0 0 40,000 200,000 0 300,000 0 0 0 0 0 0 0 0 0 0 0 0 540,000 CIP 21-02 30 16775 PW Street Improvements FY 20/21 Annual Slurry Seal Project Council District 1 PS&E + Const.0 300,000 300,000 0 0 0 0 0 300,000 0 0 0 0 0 0 0 0 0 0 0 0 300,000 CIP 21-03 31 16776 PW Street Improvements FY 20/21 Annual Residential Streets Pavement Rehabilitation Council District 1 PS&E + Const.0 2,280,000 2,280,000 0 0 0 0 0 150,000 0 0 2,130,000 0 0 0 0 0 0 0 0 0 2,280,000 CIP 21-04 32 16777 PW Street Improvements Century Boulevard Pavement Rehabilitation Century Boulevard (Klondike Avenue to Downey Avenue and Downey Avenue to Elburg Street) PS&E + Const.0 200,000 200,000 0 0 0 0 0 0 0 0 200,000 0 0 0 0 0 0 0 0 0 200,000 City of Downey Capital Improvement Program FY 2020-21 H:\Pubworks\B-U-D-G-E-T\Budget 2020-21\CIP\FY 2020-21 CIP Listing-Approved Budget\FY 2020-21 CIP Listing - Final (05-14-2020).xlsx Page 2 of 4 Last Revised: 6/4/2020 9:41 PM CIP Number Number Account Requesting Department Type Project Title Project Location Activity C.O.New Total 22 AQMD Fund 23 L&L District Fund 25 TDA III Fund 26 Grant Fund 30 Gast Tax Fund 32 SB1 Local Return Fund 33 Measure S Bond Fund 35 Measure S Sales Tax Fund 38 Vehicle Imapct Fee Fund 40 Capital Project Fund 40 Art in Public Places Fund 40 Other Fund 50 Storm Water Fund 51 Water Fund 54 Prop "C" Local Return Fund 56 Measure R Local Return Fund 57 Measure M Local Return Fund 72 Sewer Fund Total Notes CIP 20-30 33 16778 PW Street Improvements Foster Bridge Boulevard, Rivergrove Drive and Glencliff Drive Pavement Rehabilitation Foster Bridge Boulevard (Bluff Road to Rivergrove Drive), Rivergrove Drive (Foster Bridge Boulevard to Glencliff Drive) and Glencliff Drive (Rivergrove Drive to Bluff Road) Design 0 60,000 60,000 0 0 0 0 0 0 0 0 60,000 0 0 0 0 0 0 0 0 0 60,000 CIP 21-05 34 16835 PW Street Improvements 3rd Street Pavement Rehabilitation 3rd Street (Rives Avenue to Paramount Boulevard)Design 0 50,000 50,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 50,000 0 50,000 CIP 21-06 35 16830 PW Street Improvements Fifth Street Pavement Rehabilitation Fifth Street (Brookshire Avenue to Lakewood Boulevard)Design 0 50,000 50,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 50,000 0 0 50,000 n/a 36 16454 PW Traffic Improvements Traffic Safety Improvement Program Various locations citywide Const.0 200,000 200,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 200,000 0 0 200,000 n/a 37 17808 PW Traffic Improvements Lakewood Boulevard/ Rosemead Boulevard Complete Streets Study Lakewood Boulevard (North City Limit to South City Limit)Study 64,807 193 65,000 0 0 0 0 0 65,000 0 0 0 0 0 0 0 0 0 0 0 0 65,000 City's share of grant received through Gateway Cities COG n/a 38 17829 PW Traffic Improvements Florence Avenue Regional Complete Streets Study Florence Avenue (West City Limit to East City Limit)Study 24,658 342 25,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 25,000 0 0 25,000 City's share of Metro grant procured by the Gateway Cities COG n/a 39 16005 PW Traffic Improvements I-5 Consortium Study 0 30,000 30,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 30,000 0 0 30,000 n/a 40 16484 PW Traffic Improvements I-710 Consortium Study 0 25,000 25,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 25,000 0 0 25,000 n/a 41 16572 PW Traffic Improvements 91/605 Major Corridor Study Study 0 20,000 20,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 20,000 0 0 20,000 n/a 42 16836 PW Traffic Improvements Systemic Safety Analysis Report Program Citywide Study 0 80,000 80,000 0 0 0 72,000 0 0 0 0 0 0 0 0 0 0 0 8,000 0 0 80,000 Full Caltrans grant amount = $72k; local match = $8k CIP 17-07 43 17826 PW Traffic Improvements Citywide Transit Priority System Downey LINK routes citywide Env + PS&E 170,700 1,216,300 1,387,000 0 0 0 1,292,000 0 0 0 0 0 0 0 0 0 0 0 95,000 0 0 1,387,000 Full grant amount = $1,292k; local match = $515k (20%) CIP 16-15 44 17827 PW Traffic Improvements Bike Share and Safety Education Program Citywide Const.43,900 100 44,000 0 0 0 20,000 0 0 0 0 0 0 0 0 0 0 0 24,000 0 0 44,000 Full grant amount = $180k; local match = $114k (39%) CIP 17-09 45 17830 PW Traffic Improvements Paramount Boulevard Signalization & Safety Enhancements Paramount Boulevard (Gardendale Street to Telegraph Road)Const.1,710,000 28,800 1,738,800 0 0 0 1,738,800 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,738,800 Federal HSIP Cycle 7 $187,500 grant and toll credits CIP 17-10 46 17831 PW Traffic Improvements Stewart & Gray Road Signalization & Safety Enhancements Stewart & Gray Road (Old River School Road and Firestone Boulevard) Const.2,146,112 5,888 2,152,000 0 0 0 1,981,880 0 0 0 0 0 0 0 0 0 0 0 170,120 0 0 2,152,000 Federal HSIP Cycle 7 grant and toll credits CIP 17-11 47 17832 PW Traffic Improvements South Downey Safe Routes to School Project South Part of the City PS&E + Const.415,250 180,000 595,250 0 0 184,500 210,750 0 200,000 0 0 0 0 0 0 0 0 0 0 0 0 595,250 Full grant amount = $238k; local match = $278k (54%) CIP 17-12 48 17833 PW Traffic Improvements Citywide Pedestrian Plan Citywide Study 80,000 0 80,000 0 0 0 80,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 80,000 Full grant amount = $300k; no local match CIP 17-14 49 17834 PW Traffic Improvements Traffic Management Center (TMC) Upgrades City Hall Const.273,000 0 273,000 0 0 0 218,400 54,600 0 0 0 0 0 0 0 0 0 0 0 0 0 273,000 LA County grant ($218k); local match $54k CIP 18-07 50 16722 PW Traffic Improvements Imperial Highway Signalization & Safety Enhancements Imperial Highway (Old River School Road to and Woodruff Avenue)Const.778,600 380,000 1,158,600 0 0 0 1,158,600 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,158,600 Federal HSIP Cycle 8 grant. CIP 19-14 51 16765 PW Traffic Improvements Downey Bike Master Plan Implementation Phase 1 Downtown/Transit Citywide PS&E + Const.1,103,156 1,609,260 2,712,416 0 0 0 2,164,933 0 0 0 0 0 0 0 0 0 0 0 0 547,483 0 2,712,416 Metro Call '15 grant (80%) + local match (20%). CIP 20-11 52 16789 PW Traffic Improvements Florence Avenue Traffic Signal Upgrades Florence Avenue at Downey Avenue and Florence Avenue at Brookshire Avenue Const.22,000 448,000 470,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 470,000 0 0 470,000 CIP 20-12 53 16790 PW Traffic Improvements Firestone Boulevard Traffic Signal Upgrades Firestone Boulevard at Rives Avenue and Firestone Boulevard at Downey Avenue Design 40,000 0 40,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 40,000 0 0 40,000 CIP 20-13 54 16791 PW Traffic Improvements Lakewood Boulevard Traffic Signal Upgrades Lakewood Boulevard at 5th Street- Cecilia Street and Lakewood Boulevard at Alameda Street Design 40,000 0 40,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 40,000 0 0 0 40,000 CIP 20-32 55 16772 PW Traffic Improvements Paramount Boulevard Traffic Signal Upgrades Paramount Boulevard at DePalma Street and Paramount Boulevard at Fire Station No. 1 Const.485,000 0 485,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 485,000 0 0 485,000 CIP 21-07 56 16831 PW Traffic Improvements Intersection Roundabouts Citywide PS&E + Const.0 450,000 450,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 450,000 0 0 450,000 CIP 21-08 57 16832 PW Traffic Improvements FY 20/21 Annual Citywide Traffic Striping of Major Roadways Citywide PS&E + Const.0 50,000 50,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 50,000 0 0 50,000 CIP 21-09 58 16833 PW Traffic Improvements Gallatin Road Street Lighting Upgrades South Side of Gallatin Road (400 feet west and east of Lakewood Boulevard) PS&E + Const.0 100,000 100,000 0 0 0 100,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100,000 Transfer from 26-17802 CIP 15-26 59 17665 PW Public Facilities Improvements Citywide Playground Structure Safety Repairs and Replacement Citywide Const.0 50,000 50,000 0 0 0 50,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 50,000 LA County Maintenance & Servicing Excess Funds Program CIP 15-21 60 17706 CM Public Facilities Improvements Wilderness Park Lake Improvement Project Wilderness Park Lakes Const.960,785 0 960,785 0 0 0 773,272 0 0 0 0 0 187,513 0 0 0 0 0 0 0 0 960,785 Prop 84 Habitat Conservation Grant/RMC Grant CIP 19-37-0 61 13312 CM Public Facilities Improvements Fire Station No. 2 Modernization and Expansion Project Fire Station No. 2 Const.3,533,036 0 3,533,036 0 0 0 0 0 0 3,533,036 0 0 0 0 0 0 0 0 0 0 0 3,533,036 CIP 19-37-0 62 13314 CM Public Facilities Improvements Fire Station No. 4 Modernization and Expansion Project Fire Station No. 4 Const.3,834,734 0 3,834,734 0 0 0 0 0 0 3,834,734 0 0 0 0 0 0 0 0 0 0 0 3,834,734 CIP 19-38 63 13302 CM Public Facilities Improvements Police Station Modernization Project Police Station Const.296,077 0 296,077 0 0 0 0 0 0 296,077 0 0 0 0 0 0 0 0 0 0 0 296,077 CIP 19-20 64 13303 CM Public Facilities Improvements Library Modernization Project Downey Library Const.3,317,494 0 3,317,494 0 0 0 0 0 0 3,317,494 0 0 0 0 0 0 0 0 0 0 0 3,317,494 CIP 19-21 65 13304 CM Public Facilities Improvements City Hall Improvement Project City Hall PS&E + Const.599,813 0 599,813 0 0 0 0 0 0 599,813 0 0 0 0 0 0 0 0 0 0 0 599,813 City of Downey Capital Improvement Program FY 2020-21 H:\Pubworks\B-U-D-G-E-T\Budget 2020-21\CIP\FY 2020-21 CIP Listing-Approved Budget\FY 2020-21 CIP Listing - Final (05-14-2020).xlsx Page 3 of 4 Last Revised: 6/4/2020 9:41 PM CIP Number Number Account Requesting Department Type Project Title Project Location Activity C.O.New Total 22 AQMD Fund 23 L&L District Fund 25 TDA III Fund 26 Grant Fund 30 Gast Tax Fund 32 SB1 Local Return Fund 33 Measure S Bond Fund 35 Measure S Sales Tax Fund 38 Vehicle Imapct Fee Fund 40 Capital Project Fund 40 Art in Public Places Fund 40 Other Fund 50 Storm Water Fund 51 Water Fund 54 Prop "C" Local Return Fund 56 Measure R Local Return Fund 57 Measure M Local Return Fund 72 Sewer Fund Total Notes CIP 19-22 66 13306 CM Public Facilities Improvements Civic Theatre Improvement Project Downey Civic Theatre Const.745,967 0 745,967 0 0 0 0 0 0 745,967 0 0 0 0 0 0 0 0 0 0 0 745,967 CIP 19-23 67 13307 CM Public Facilities Improvements Rio Hondo Event Center Improvements Rio Hondo Event Center Const.120,327 0 120,327 0 0 0 0 0 0 120,327 0 0 0 0 0 0 0 0 0 0 0 120,327 CIP 19-24 68 13308 CM Public Facilities Improvements Public Works & Utilities Yard Improvements Public Works & Utilities Yard PS&E + Const.83,951 0 83,951 0 0 0 0 0 0 83,951 0 0 0 0 0 0 0 0 0 0 0 83,951 CIP 19-25 69 13309 CM Public Facilities Improvements Downtown Parking Structure Improvements Downtown Parking Structure PS&E + Const.85,008 0 85,008 0 0 0 0 0 0 85,008 0 0 0 0 0 0 0 0 0 0 0 85,008 CIP 19-28 70 13320 CM Public Facilities Improvements Apollo Park Improvement Project Apollo Park Const.51,449 0 51,449 0 0 0 0 0 0 51,449 0 0 0 0 0 0 0 0 0 0 0 51,449 CIP 19-29 71 13330 CM Public Facilities Improvements Dennis the Menace Park Improvement Project Dennis the Menace Park Const.20,348 0 20,348 0 0 0 0 0 0 20,348 0 0 0 0 0 0 0 0 0 0 0 20,348 CIP 19-30 72 13340 CM Public Facilities Improvements Discovery Sports Complex Improvement Project Discovery Sports Complex Const.101,582 0 101,582 0 0 0 0 0 0 101,582 0 0 0 0 0 0 0 0 0 0 0 101,582 CIP 19-31 73 13350 CM Public Facilities Improvements Furman Park Improvement Project Furman Park Const.2,411,143 0 2,411,143 0 0 0 0 0 0 2,411,143 0 0 0 0 0 0 0 0 0 0 0 2,411,143 CIP 19-32 74 13360 CM Public Facilities Improvements Golden Park Improvement Project Golden Park Const.112,555 0 112,555 0 0 0 0 0 0 112,555 0 0 0 0 0 0 0 0 0 0 0 112,555 CIP 19-33 75 13370 CM Public Facilities Improvements Independence Park Improvement Project Independence Park Const.131,707 0 131,707 0 0 0 0 0 0 131,707 0 0 0 0 0 0 0 0 0 0 0 131,707 CIP 19-34 76 13380 CM Public Facilities Improvements Rio San Gabriel Park Improvement Project Rio San Gabriel Park PS&E + Const.90,946 0 90,946 0 0 0 0 0 0 90,946 0 0 0 0 0 0 0 0 0 0 0 90,946 CIP 19-35 77 13390 CM Public Facilities Improvements Wilderness Park Improvement Project Wilderness Park Const.5,564,091 0 5,564,091 0 0 0 0 0 0 5,564,091 0 0 0 0 0 0 0 0 0 0 0 5,564,091 CIP 19-36 78 13395 CM Public Facilities Improvements Treasure Island Park Improvement Project Treasure Island Park PS&E + Const.89,633 0 89,633 0 0 0 0 0 0 89,633 0 0 0 0 0 0 0 0 0 0 0 89,633 CIP 20-14 79 16792 CD Public Facilities Improvements Downey Avenue Art Intersections of Downey Avenue and 2nd Street, 3rd Street and 4th Street PS&E + Const.0 104,444 104,444 0 0 0 0 0 0 0 0 0 0 104,444 0 0 0 0 0 0 0 104,444 CIP 20-15 80 16793 CD Public Facilities Improvements Downey Civic Theatre Outdoor Plaza Art Sculpture Downey Civic Theatre PS&E + Const.0 100,000 100,000 0 0 0 0 0 0 0 0 0 0 100,000 0 0 0 0 0 0 0 100,000 CIP 20-17 81 16795 CD Public Facilities Improvements Downey Angels Walk Downtown Downey PS&E + Const.17,600 0 17,600 0 0 0 0 0 0 0 0 0 0 17,600 0 0 0 0 0 0 0 17,600 CIP 20-20 82 16798 PW Public Facilities Improvements Energy Efficiency Improvements at City Facilities Various City Facilities Citywide PS&E + Const.0 1,000,000 1,000,000 0 0 0 1,000,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,000,000 CIP 20-21 83 16739 PW Public Facilities Improvements Dais Upgrades in City Hall Council Chambers City Hall Council Chambers PS&E + Const.0 150,000 150,000 0 0 0 150,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 150,000 CIP 20-25 84 17885 CD Public Facilities Improvements Rancho South Campus Specific Plan Rancho Los Amigos South Campus Study 113,810 0 113,810 0 0 0 113,810 0 0 0 0 0 0 0 0 0 0 0 0 0 0 113,810 CIP 20-26 85 17886 CD Public Facilities Improvements Rancho Sports Complex Rancho Los Amigos South Campus PS&E + Const.3,000,000 0 3,000,000 0 0 0 3,000,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3,000,000 CIP 20-27 86 16770 CD Public Facilities Improvements Furman Park Rocket Furman Park Const.0 29,700 29,700 0 0 0 0 0 0 0 0 0 0 29,700 0 0 0 0 0 0 0 29,700 CIP 20-28 87 16771 FD Public Facilities Improvements Firefighter's Memorial Civic Center Const.0 45,000 45,000 0 0 0 0 0 0 0 0 0 0 45,000 0 0 0 0 0 0 0 45,000 CIP 21-10 88 16837 CD Public Facilities Improvements SW Corner Downey Avenue and 2nd Street Art Plaza Downey Avenue and 2nd Street PS&E + Const.0 242,160 242,160 0 0 0 0 0 0 0 0 0 0 242,160 0 0 0 0 0 0 0 242,160 CIP 21-11 89 16838 CD Public Facilities Improvements J. Del Toro Art Piece Downey Avenue and 2nd Street PS&E + Const.0 100,000 100,000 0 0 0 0 0 0 0 0 0 0 100,000 0 0 0 0 0 0 0 100,000 n/a 90 17887 CD Public Facilities Improvements SB-2 Planning Grant Study 310,000 0 310,000 0 0 0 310,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 310,000 CIP 21-17 91 16731 PW Public Facilities Improvements Paramount Boulevard at Firestone Boulevard Improvements Southwest Corner of Paramount Boulevard at Firestone Boulevard Const.9,575 0 9,575 0 0 0 3,500 0 0 0 0 0 0 6,075 0 0 0 0 0 0 0 9,575 n/a 92 18642 PW Water Improvements Water Well Refurbishment Program Well Sites (Citywide)Const.65,095 434,905 500,000 0 0 0 0 0 0 0 0 0 0 0 0 0 500,000 0 0 0 0 500,000 n/a 93 18647 PW Water Improvements Telemetry System Modifications Well Sites (Citywide) and Utilities Yard (9252 Stewart & Gray Rd)Const.500,000 0 500,000 0 0 0 0 0 0 0 0 0 0 0 0 0 500,000 0 0 0 0 500,000 n/a 94 18654 PW Water Improvements Water Distribution Main Replacement Program Citywide PS&E + Const.75,000 0 75,000 0 0 0 0 0 0 0 0 0 0 0 0 0 75,000 0 0 0 0 75,000 CC 686B 95 18665 PW Water Improvements New Water Wells No. 27 and No. 28 Well No. 27 - 7926 Springer Street; Well No. 28 - Utilities Yard 9252 Stewart & Gray Road Const.3,750,000 250,000 4,000,000 0 0 0 0 0 0 0 0 0 0 0 0 0 4,000,000 0 0 0 0 4,000,000 WRD Settlement n/a 96 18666 PW Water Improvements Well/Yard Site Security Well Sites (Citywide) and Utilities Yard (9252 Stewart & Gray Road)Const.45,291 4,709 50,000 0 0 0 0 0 0 0 0 0 0 0 0 0 50,000 0 0 0 0 50,000 n/a 97 18674 PW Water Improvements Water System Improvement Program Citywide Const.133,774 366,226 500,000 0 0 0 0 0 0 0 0 0 0 0 0 0 500,000 0 0 0 0 500,000 CIP 17-01 98 16583 PW Water Improvements Site Environmental Remediation/Groundwater Protection at 9255 Imperial Highway 9255 Imperial Highway Const.46,511 253,489 300,000 0 0 0 0 0 0 0 0 0 0 0 0 0 300,000 0 0 0 0 300,000 CIP 18-10 99 18680 PW Water Improvements Bellflower Boulevard Water System Improvements Bellflower Boulevard (Foster Road to Hall Road)Const.50,000 0 50,000 0 0 0 0 0 0 0 0 0 0 0 0 0 50,000 0 0 0 0 50,000 City of Downey Capital Improvement Program FY 2020-21 H:\Pubworks\B-U-D-G-E-T\Budget 2020-21\CIP\FY 2020-21 CIP Listing-Approved Budget\FY 2020-21 CIP Listing - Final (05-14-2020).xlsx Page 4 of 4 Last Revised: 6/4/2020 9:41 PM CIP Number Number Account Requesting Department Type Project Title Project Location Activity C.O.New Total 22 AQMD Fund 23 L&L District Fund 25 TDA III Fund 26 Grant Fund 30 Gast Tax Fund 32 SB1 Local Return Fund 33 Measure S Bond Fund 35 Measure S Sales Tax Fund 38 Vehicle Imapct Fee Fund 40 Capital Project Fund 40 Art in Public Places Fund 40 Other Fund 50 Storm Water Fund 51 Water Fund 54 Prop "C" Local Return Fund 56 Measure R Local Return Fund 57 Measure M Local Return Fund 72 Sewer Fund Total Notes CIP 19-03 100 18684 PW Water Improvements Pellet Street and Ryerson Avenue Water System Improvements Pellet Street (Ryerson Avenue to Old River School Road) and Ryerson Avenue (Dinwiddie Street to Rio Flora Const.25,000 900,000 925,000 0 0 0 0 0 0 0 0 0 0 0 0 0 925,000 0 0 0 0 925,000 CIP 20-23 101 18686 PW Water Improvements 3rd Street Water System Improvements 3rd Street (Old River School Road to Rives Avenue) PS&E + Const.50,000 1,350,000 1,400,000 0 0 0 0 0 0 0 0 0 0 0 0 0 1,400,000 0 0 0 0 1,400,000 CIP 20-31 102 18689 PW Water Improvements Destruction of Water Wells 1,3,20 and 27 Water Wells 1,3,20 and 27 PS&E + Const.0 50,000 50,000 0 0 0 0 0 0 0 0 0 0 0 0 0 50,000 0 0 0 0 50,000 CIP 21-12 103 18630 PW Water Improvements 3rd Street Water System Improvements 3rd Street (Rives Avenue to Paramount Boulevard) PS&E + Const.0 1,000,000 1,000,000 0 0 0 0 0 0 0 0 0 0 0 0 0 1,000,000 0 0 0 0 1,000,000 CIP 20-34 104 18631 PW Water Improvements Florence Avenue Water System Improvements Florence Avenue (Tweedy Lane to Brookshire Avenue) PS&E + Const.0 2,100,000 2,100,000 0 0 0 0 0 0 0 0 0 0 0 0 0 2,100,000 0 0 0 0 2,100,000 CIP 21-13 105 18632 PW Water Improvements Firestone Boulevard Pressure Valve Improvements Firestone Boulevard (West City Limits to East City Limits) PS&E + Const.0 500,000 500,000 0 0 0 0 0 0 0 0 0 0 0 0 0 500,000 0 0 0 0 500,000 CIP 21-14 106 18633 PW Water Improvements Cole Street Water System Improvements Cole Street (Brookshire Avenue to Patton Road)Design 0 75,000 75,000 0 0 0 0 0 0 0 0 0 0 0 0 0 75,000 0 0 0 0 75,000 CIP 21-15 107 18634 PW Water Improvements 5th Street Water System Improvements 5th Street (Downey Avenue to Lakewood Boulevard)Design 0 75,000 75,000 0 0 0 0 0 0 0 0 0 0 0 0 0 75,000 0 0 0 0 75,000 n/a 108 13999 PW Sewer Improvements Sewer Main Rehabilitation & Repair Program Citywide Const.550,000 200,000 750,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 750,000 750,000 n/a 109 14010 PW Sewer Improvements Sewer CCTV Inspection Program Citywide Const.127,046 147,954 275,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 275,000 275,000 CIP 21-16 110 14020 PW Sewer Improvements Wilderness Park Sewer Lift Station Citywide PS&E + Const.0 700,000 700,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 700,000 700,000 n/a 111 13944 PW Storm Water Improvements Storm Drain Repair Program Citywide Const.100,000 0 100,000 0 0 0 0 0 0 0 0 0 0 0 0 100,000 0 0 0 0 0 100,000 n/a 112 13983 PW Storm Water Improvements National Pollution Discharge Elimination System (NPDES) Permit Compliance Los Angeles River/Rio Hondo, San Gabriel River, Los Cerritos Channel Watersheds Const.100,000 0 100,000 0 0 0 0 0 0 0 0 0 0 0 0 100,000 0 0 0 0 0 100,000 n/a 113 14011 PW Storm Water Improvements Storm Drain Lift Station Refurbishment Program Imperial Highway (Old River School Road to Rives Avenue) and Paramount Boulevard at I-5 Freeway Const.25,000 0 25,000 0 0 0 0 0 0 0 0 0 0 0 0 25,000 0 0 0 0 0 25,000 CIP 20-33 114 14012 PW Storm Water Improvements Catch Basin Inserts Los Angeles River/Rio Hondo, San Gabriel River, Los Cerritos Channel Watersheds Const.21,000 129,000 150,000 0 0 0 0 0 0 0 0 0 0 0 0 150,000 0 0 0 0 0 150,000 CIP 20-35 115 14015 PW Storm Water Improvements Firestone Boulevard Dry Well Improvements Firestone Boulevard at West City Limits Const.0 300,000 300,000 0 0 0 0 0 0 0 0 0 0 0 0 300,000 0 0 0 0 0 300,000 Total 65,286,860 27,436,829 92,723,689 0 60,000 264,500 38,316,758 385,382 3,680,000 21,189,861 0 3,680,000 187,513 644,979 737,500 675,000 12,100,000 2,335,801 3,131,928 3,609,467 1,725,000 92,723,689