HomeMy WebLinkAbout4. PLN-20-00050 GP ConsistencySTAFF REPORT
PLANNING DIVISION
DATE: June 17, 2020
TO: PLANNING COMMISSION
SUBMITTED BY: ALDO E. SCHINDLER, DIRECTOR OF COMMUNITY DEVELOPMENT
REVIEWED BY: CRYSTAL LANDAVAZO, CITY PLANNER
PREPARED BY: ALFONSO HERNANDEZ, SENIOR PLANNER
SUBJECT: PLN-20-00050 (GENERAL PLAN CONSISTENCY) – A REQUEST TO
FIND THAT THE CAPITAL IMPROVEMENT PROGRAM FOR THE
2020-21 FISCAL YEAR IS CONSISTENT WITH THE GENERAL PLAN.
REPORT SUMMARY
Pursuant to State Government Code 65401, the Planning Commission must find that the City’s
Capital Improvement Program (CIP) is consistent with the City’s General Plan. Based on the
analysis contained in this report, staff is recommending the Planning Commission adopt the
following titled resolution:
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
DOWNEY ADOPTING A FINDING THAT THE CAPITAL IMPROVEMENT
PROGRAM FOR THE 2020-21 FISCAL YEAR IS CONSISTENT WITH THE
GENERAL PLAN
BACKGROUND
The CIP identifies the proposed major projects and improvements that the City will undertake
during the ensuing fiscal year. Included within the program are types of projects, costs, funding
sources, and anticipated time frame. The types of projects include street improvements,
property acquisitions, infrastructure improvements, consulting services, equipment, and building
maintenance. Although the city may carry out multiple projects not identified in the CIP, the
program only includes initiatives with costs exceeding $5,000.00.
On an annual basis, the Planning Commission must review and find the program to be
consistent with the City’s General Plan. Section 65401 of the State of California
Government Code states that the CIP, “…shall be submitted to the county or city
planning agency for review and report to said official agency as to conformity with the
adopted general plan or part thereof.” The Planning Commission fulfills the role of the
“planning agency” while the City Council fulfills the role of the “official agency”. The
Planning Commission’s purpose in this process is to determine that the CIP is consistent
with the goals, policies, and programs found within the City of Downey’s Vision 2025
General Plan. This action does not approve, fund, or authorize any individual or specific
project. After action is taken on this item, the finding will then be forwarded to the City
Council for their review and determination.
CIP General Plan Consistency 2020-21 (PLN-20-00050)
June 17, 2020 - Page 2
DISCUSSION
The proposed 2020-21 CIP consists of 115 projects. The proposed improvements total
approximately $92.72 million dollars, which are funded from a variety of federal, state, local, and
grant funding sources. Within the program these projects are divided into six categories, which
include Streets (intersection improvements, pavement rehabilitation, sidewalk repairs,
landscaping, roadway widening, bridge replacement or rehabilitation, corridor beautification),
Traffic Safety (traffic signal communication upgrades and expansion, traffic signal upgrades,
street lighting upgrades new raised median island projects,), Public Facilities (park upgrades,
facility maintenance, facility modernization/expansion), Water Utility (new water mains, service
lines and infrastructure upgrades, new water wells, upgrade existing water wells, maintenance),
Sewer Improvements (sanitary sewer system repair and rehabilitation), and Storm Water
Improvements (storm drain repair, rehabilitation and maintenance, regulatory permit
compliance,). A copy of the 2020-21 CIP is attached to this document.
As previously noted, it is the Planning Commission’s responsibility is to determine if the CIP is
consistent with the adopted General Plan. In reviewing the General Plan, staff found the
proposed 2020-21 CIP to be consistent with the following policies:
Streets
Goal 2.1. Increase the capacity of the existing street system.
Policy 2.1.1. Maintain a street system that provides safe and efficient movement of
people and goods.
Goal 8.3. Promote the enhancement of the streetscape.
Policy 8.3.2. Promote city-initiated streetscape enhancement projects.
Policy 8.3.3. Promote the installation of new trees.
The proposed programs under the “Streets” projects include upgrading existing street
intersections/roadways, street medians, and adding additional traffic lanes to streets, thereby
increasing roadway capacity. The enhancements will allow the City to maintain a safe and
efficient street system.
Traffic Safety
Goal 2.1. Increase the capacity of the existing street system.
Policy 2.1.1. Maintain a street system that provides safe and efficient movement of
people and goods.
Goal 2.2. Promote the use of alternative modes of travel, other than single-occupant vehicles, to
relieve traffic congestion.
Policy 2.2.1. Promote walking as an attractive alternative to vehicular transportation.
Policy 2.2.2. Promote bicycling as an attractive alternative to vehicular transportation.
Goal 5.7. Reduce the likelihood of traffic accidents.
Policy 5.7.1. Promote traffic safety along streets.
Policy 5.7.2. Promote the installation of sidewalks and walkways to improve traffic
safety.
The proposed improvements under traffic safety include median improvements and traffic signal
upgrades, and pedestrian safety improvements. These programs are consistent with the
policies of the General Plan since they will assist in providing a safe and efficient street system
and enhance the overall safety of traffic. Projects also include upgrades to sidewalks and
bicycle related initiatives.
CIP General Plan Consistency 2020-21 (PLN-20-00050)
June 17, 2020 - Page 3
Public Facility
Goal 1.1. Provide sufficient land areas for uses that serve the needs of residents, visitors, and
businesses.
Policy 1.1.5. Provide an appropriate amount of land area for recreation and
entertainment.
Goal 7.2. Optimize the use of established public parks to meet the needs of residents.
Policy 7.2.2. Upgrade existing park facilities.
Goal 7.3. Increase the amount of park acreage.
Policy 7.3.1. Promote the expansion of the existing park system.
Goal 8.2. Maintain and enhance the appearance of properties.
Policy 8.2.2. Promote the upgrading of properties.
Implementation of the projects listed in the CIP will be consistent with the policies mentioned
above. The programs that are included in the CIP will upgrade existing parks and gyms, create
a new sports complex, and modernize/expand existing fire stations.
Water Utility, Stormwater Improvements, and Sewer Improvements
Goal 4.1. Provide an adequate water supply for the needs of residents, workers, and visitors to
the City.
Policy 4.1.2. Maintain the water supply system to meet water demands.
Goal 4.2. Prevent the contamination of groundwater.
Policy 4.2.1. Monitor and improve groundwater quality.
Goal 4.3. Reduce the contaminant level at beaches and oceans.
Policy 4.2.1. Reduce the contaminant level of stormwater and urban runoff generated
within Downey.
Projects identified in the CIP consist of improvements to existing water wells and installation of
new water wells, as well as maintenance of the infrastructure related to the City’s water supply.
Initiatives also include remediation and clean up to prevent contamination of groundwater.
Regarding urban runoff, the City will improve existing infrastructure and continue to comply with
federal permits for water discharge. Lastly, sewer infrastructure will also receive continued
maintenance and repair.
As noted in the above analysis, the proposed 2020-21 Capital Improvement Program is
consistent with the aforementioned General Plan goals and policies. For this reason, staff
believes that the Planning Commission can find the CIP to be consistent with the General Plan.
ENVIRONMENTAL ANALYSIS
Staff has reviewed the General Plan Consistency for compliance with the California
Environmental Quality Act (CEQA). Upon completion of this review staff has determined that
CEQA is not applicable to this action, pursuant to CEQA Guideline Section No. 15061 (b)(3). A
finding of consistency with the City’s General Plan does not approve, adopt, or fund any of the
projects listed within the CIP. Impacts generated from a specific project will be analyzed through
that respective approval.
RESOLUTION NO. 20-
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
DOWNEY ADOPTING A FINDING THAT THE CAPITAL IMPROVEMENT
PROGRAM FOR THE 2020-21 FISCAL YEAR IS CONSISTENT WITH THE
GENERAL PLAN
THE PLANNING COMMISSION OF THE CITY OF DOWNEY DOES RESOLVE AS FOLLOWS:
SECTION 1. The Planning Commission of the City of Downey does hereby find,
determine and declare that:
A. The City of Downey General Plan (Vision 2025) was adopted on January 25,
2005; and,
B. The City of Downey has prepared a Capital Improvement Program for the 2020-
21 fiscal year; and,
C. Pursuant to State of California Government Code Section 65401, the Planning
Commission is required to review the Capital Improvement Program to determine
that it is in conformance with the City’s General Plan; and,
D. On June 17, 2020, the Planning Commission reviewed said request and
considered all factors relating to the General Plan consistency of the Capital
Improvement Program for the 2020-21 fiscal year.
SECTION 2. The Planning Commission further finds, determines, and declares that the
proposed project was reviewed for compliance with the California Environmental Quality Act
(CEQA), and is exempt from CEQA, pursuant to Guideline Section 15061 (b)(3).
SECTION 3. The Planning Commission does hereby find and determine that the Capital
Improvement Program for the 2020-21 fiscal year is consistent with the City of Downey’s
adopted General Plan because the projects contained therein are consistent with the following
General Plan goals and policies:
Goal 2.1. Increase the capacity of the existing street system.
Policy 2.1.1. Maintain a street system that provides safe and efficient movement
of people and goods.
Goal 2.2. Promote the use of alternative modes of travel, other than single-occupant
vehicles, to relieve traffic congestion.
Policy 2.2.1. Promote walking as an attractive alternative to vehicular
transportation.
Policy 2.2.2. Promote bicycling as an attractive alternative to vehicular
transportation.
Goal 4.1. Provide an adequate water supply for the needs of residents, workers, and
visitors to the City.
Policy 4.1.2. Maintain the water supply system to meet water demands.
Goal 4.2. Prevent the contamination of groundwater.
Policy 4.2.1. Monitor and improve groundwater quality.
Resolution No. 20-
Downey Planning Commission
CIP General Plan Consistency 2020-21 (PLN-20-00050)
June 17, 2020 - Page 2
Goal 4.3. Reduce the contaminant level at beaches and oceans.
Policy 4.3.1. Reduce the contaminant level of stormwater and urban runoff
generated within Downey.
Goal 5.7. Reduce the likelihood of traffic accidents.
Policy 5.7.1. Promote traffic safety along streets.
Policy 5.7.2. Promote the installation of sidewalks and walkways to improve
traffic safety.
Goal 7.2. Optimize the use of established public parks to meet the needs of residents.
Policy 7.2.2. Upgrade existing park facilities.
Goal 7.3. Increase the amount of park acreage.
Policy 7.3.1. Promote the expansion of the existing park system.
Goal 8.2. Maintain and enhance the appearance of properties.
Policy 8.2.2. Promote the upgrading of properties.
Goal 8.3. Promote the enhancement of the streetscape.
Policy 8.3.2. Promote city-initiated streetscape enhancement projects.
Policy 8.3.3. Promote the installation of new trees.
SECTION 4. The Secretary shall certify the adoption of this Resolution.
PASSED, APPROVED AND ADOPTED this 17th day of June 2020.
Miguel Duarte, Chairman
City Planning Commission
I HEREBY CERTIFY that the foregoing is a true copy of a Resolution adopted by the
Planning Commission of the City of Downey at a regular meeting thereof, held on the 17th day of
June 2020, by the following vote, to wit:
AYES: COMMISSIONERS:
NOES: COMMISSIONERS:
ABSENT: COMMISSIONERS:
Mary Cavanagh, Secretary
City Planning Commission
City of Downey Capital Improvement Program FY 2020-21
H:\Pubworks\B-U-D-G-E-T\Budget 2020-21\CIP\FY 2020-21 CIP Listing-Approved Budget\FY 2020-21 CIP Listing - Final (05-14-2020).xlsx Page 1 of 4 Last Revised: 6/4/2020 9:41 PM
CIP
Number
Number Account Requesting
Department
Type Project Title Project Location Activity C.O.New Total
22
AQMD
Fund
23
L&L District
Fund
25
TDA III
Fund
26
Grant Fund
30
Gast Tax
Fund
32
SB1 Local
Return
Fund
33
Measure S
Bond Fund
35
Measure S
Sales Tax
Fund
38
Vehicle
Imapct Fee
Fund
40
Capital
Project
Fund
40
Art in
Public
Places
Fund
40
Other
Fund
50
Storm
Water
Fund
51
Water
Fund
54
Prop "C"
Local
Return
Fund
56
Measure R
Local Return
Fund
57
Measure M
Local Return
Fund
72
Sewer
Fund
Total Notes
SS601B 1 16601 PW Street
Improvements
Paramount Boulevard at Firestone
Boulevard Improvements
Southwest Corner of Paramount
Boulevard at Firestone Boulevard Const.83,556 0 83,556 0 0 0 83,556 0 0 0 0 0 0 0 0 0 0 0 0 0 0 83,556
n/a 2 16624 PW Street
Improvements Annual Miscellaneous Bridge Repairs Citywide Const.198,000 2,000 200,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 200,000 0 200,000
CIP 16-20 3 16628 PW Street
Improvements
Old River School Road Pavement
Rehabilitation
Old River School Road (Imperial
Highway to Arnett Street)Const.2,581,486 182,000 2,763,486 0 0 0 2,484,331 0 0 0 0 0 0 0 0 0 0 0 14,788 264,367 0 2,763,486
CIP 14-09 4 16692 PW Street
Improvements
Firestone Boulevard at Lakewood Boulevard
Intersection Improvements
Firestone Boulevard at Lakewood
Boulevard
Env.,
PS&E &
Const.
1,229,765 1,359,100 2,588,865 0 0 0 2,588,865 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2,588,865
I-605 Corridor Congestion Hot Spots ($2.3
mil) Spring Hill Suites Developer Fee
($359,100)
CIP 14-08 5 16693 PW Street
Improvements
Florence Avenue Bridge Rehabilitation at Rio
Hondo River Florence Avenue at Rio Hondo River Env. +
PS&E 211,197 1,635,149 1,846,346 0 0 0 1,789,189 0 0 0 0 0 0 0 0 0 0 0 0 57,157 0 1,846,346 Federal HBP grant
CIP 14-07 6 16710 PW Street
Improvements
Florence Avenue Bridge Rehabilitation and
Widening at San Gabriel River Florence Avenue at San Gabriel River Env +
PS&E 836,152 112,000 948,152 0 0 0 912,000 17,132 0 0 0 0 0 0 0 0 0 0 19,020 0 0 948,152 Federal HBP grant
CIP 15-13 7 17728 PW Street
Improvements
Safety Lighting Improvement Project
Adjacent to the I-5 Freeway, Phase 2
Area currently occupied by Dollison
Drive (vacated due to I-5 Fwy.
expansion) between Fairford Avenue
and Cecilia Street
Const.60,000 0 60,000 0 60,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 60,000 Zone 1 L&L District Funding for Safety
Lighting
CIP 16-03 8 17804 PW Street
Improvements
I-5 Freeway at Florence Avenue Traffic
Mitigation Improvements
Florence Avenue (Studebaker Road
to Orr & Day Road)Const.5,000 0 5,000 0 0 0 5,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5,000 Caltrans Grant for Traffic Mitigation &
Inspection
CIP 16-05 9 17806 PW Street
Improvements
Telegraph Road Traffic Throughput & Safety
Enhancements, Phase 2
Telegraph Road (West City Limit to
Lakewood Boulevard and Passons
Boulevard to East City Limit)
Const.6,699,540 2,800,460 9,500,000 0 0 0 5,828,739 0 1,000,000 0 0 0 0 0 0 0 0 1,220,801 0 1,450,460 0 9,500,000
Federal RSTP grant ($2.8 mil.= 28% of
project cost) and Metro Measure M MSP
grant ($350k). Includes reimbursement
from Pico Rivera ($2.7 mil.).
CIP 18-05 10 16721 PW Street
Improvements Tweedy Lane Pavement Rehabilitation Tweedy Lane (Florence Avenue to
Suva Street) Const.454,000 13,650 467,650 0 0 0 414,000 53,650 0 0 0 0 0 0 0 0 0 0 0 0 0 467,650
CIP 15-12 11 16712 PW Street
Improvements
Bellflower Boulevard Pavement
Rehabilitation
Bellflower Boulevard (Foster Road to
Dalen Street) and (900 ft. N/O
Imperial Highway to Stewart and
Gray Road)
Env +
PS&E 15,000 10,000 25,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 25,000 0 0 0 25,000
CIP 14-14 12 16711 PW Street
Improvements Woodruff Avenue Pavement Rehabilitation Woodruff Avenue (Foster Road to
Stewart and Gray Road)
Env +
PS&E 15,000 10,000 25,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 25,000 0 0 25,000
CIP 19-05 13 16744 PW Street
Improvements Suva Street at Rio Hondo River Bridge Repair Suva Street bridge at the Rio Hondo
River Const.0 26,000 26,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 26,000 0 0 26,000
Los Angeles County Department of Public
Works is the lead agency and the City's
shared cost is $26,000.
CIP 19-06 14 16745 PW Street
Improvements
Paramount Boulevard at Imperial Highway
Intersection Improvements
Paramount Boulevard at Imperial
Highway
R/W,
PS&E &
Const.
2,983,892 0 2,983,892 0 0 0 2,983,892 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2,983,892
CIP 19-07 15 16746 PW Street
Improvements
Lakewood Boulevard at Florence Avenue
Intersection Improvements
Lakewood Boulevard at Florence
Avenue
Env. R/W
Acq.
+PS&E
4,696,935 0 4,696,935 0 0 0 4,696,935 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4,696,935
CIP 19-08 16 16747 PW Street
Improvements
Lakewood Boulevard at Imperial Highway
Intersection Improvements
Lakewood Boulevard at Imperial
Highway
Env. R/W
Acq.
+PS&E
1,000,000 0 1,000,000 0 0 0 1,000,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,000,000
n/a 17 16762 PW Street
Improvements Urban Forest Management Plan Citywide Const.251,100 0 251,100 0 0 0 251,100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 251,100 Cal-Fire grant
CIP 20-01 18 16779 PW Street
Improvements
FY 19/20 Miscellaneous Concrete Repairs
and ADA Improvements
Council District 1 (miscellaneous
concrete improvements) & Citywide
(ADA improvements)
Const.380,000 30,000 410,000 0 0 40,000 0 0 370,000 0 0 0 0 0 0 0 0 0 0 0 0 410,000
CIP 20-03 19 16781 PW Street
Improvements
FY 19/20 Residential Streets Pavement
Rehabilitation Council Districts 3 & 4 Const.1,577,000 1,020,000 2,597,000 0 0 0 152,000 0 1,005,000 0 0 1,290,000 0 0 0 0 0 0 150,000 0 0 2,597,000
Includes $122k developer contribution (KB
Homes) for Parrot Ave. N/O 5th St. and
$30k (Aldi's) for Nash Ave.
CIP 20-04 20 16782 PW Street
Improvements
Lakewood Boulevard Parkway
Improvements
Lakewood Boulevard (Imperial
Highway and Bellflower Boulevard)
PS&E +
Const.5,000 95,000 100,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100,000 0 100,000
CIP 20-05 21 16783 PW Street
Improvements Florence Avenue Pavement Rehabilitation Florence Avenue (Tweedy Lane to
Brookshire Avenue)
PS&E +
Const.570,000 580,000 1,150,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,050,000 0 100,000 0 1,150,000
CIP 20-06 22 16784 PW Street
Improvements 3rd Street Pavement Rehabilitation 3rd Street (Old River School Road to
Rives Avenue)
PS&E +
Const.90,000 380,000 470,000 0 0 0 0 0 290,000 0 0 0 0 0 0 0 0 0 180,000 0 0 470,000
CIP 20-07 23 16785 PW Street
Improvements
Paramount Boulevard Median Landscape
Improvements (Phase 1)
Paramount Boulevard (Imperial
Highway to Firestone Boulevard)Const.700,000 0 700,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 700,000 0 700,000
CIP 20-08 24 16786 PW Street
Improvements
Firestone Boulevard Median Landscape
Improvements
Firestone Boulevard (West City Limit
to Old River School Road)Const.400,000 0 400,000 0 0 0 0 260,000 0 0 0 0 0 0 0 0 0 0 0 140,000 0 400,000
CIP 20-09 25 16787 PW Street
Improvements Entry Monument Signs (Various Locations)Citywide PS&E +
Const.60,000 0 60,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 60,000 0 0 60,000
CIP 20-24 26 16742 PW Street
Improvements
Paramount Boulevard Median Landscape
Improvements (Phase 2)
Paramount Boulevard (Firestone
Boulevard to Florence Avenue)Const.295,000 220,000 515,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 515,000 0 0 515,000
CIP 20-36 27 16769 PW Street
Improvements Lakewood Boulevard Street Improvements Lakewood Boulevard (Century
Boulevard to Gardendale Street)
PS&E +
Const.737,500 0 737,500 0 0 0 0 0 0 0 0 0 0 0 737,500 0 0 0 0 0 0 737,500 Caltrans Relinquishment funds.
CIP 20-37 28 17802 PW Street
Improvements
Lakewood Boulevard Street Improvements
(Phase 3E)
Lakewood Boulevard (Gallatin Road
to Telegraph Road)
PS&E +
Const.489,206 0 489,206 0 0 0 489,206 0 0 0 0 0 0 0 0 0 0 0 0 0 0 489,206
CIP 21-01 29 16774 PW Street
Improvements
FY 20/21 Miscellaneous Concrete Repairs
and ADA Improvements Council District 1 PS&E +
Const.0 540,000 540,000 0 0 40,000 200,000 0 300,000 0 0 0 0 0 0 0 0 0 0 0 0 540,000
CIP 21-02 30 16775 PW Street
Improvements FY 20/21 Annual Slurry Seal Project Council District 1 PS&E +
Const.0 300,000 300,000 0 0 0 0 0 300,000 0 0 0 0 0 0 0 0 0 0 0 0 300,000
CIP 21-03 31 16776 PW Street
Improvements
FY 20/21 Annual Residential Streets
Pavement Rehabilitation Council District 1 PS&E +
Const.0 2,280,000 2,280,000 0 0 0 0 0 150,000 0 0 2,130,000 0 0 0 0 0 0 0 0 0 2,280,000
CIP 21-04 32 16777 PW Street
Improvements Century Boulevard Pavement Rehabilitation
Century Boulevard (Klondike Avenue
to Downey Avenue and Downey
Avenue to Elburg Street)
PS&E +
Const.0 200,000 200,000 0 0 0 0 0 0 0 0 200,000 0 0 0 0 0 0 0 0 0 200,000
City of Downey Capital Improvement Program FY 2020-21
H:\Pubworks\B-U-D-G-E-T\Budget 2020-21\CIP\FY 2020-21 CIP Listing-Approved Budget\FY 2020-21 CIP Listing - Final (05-14-2020).xlsx Page 2 of 4 Last Revised: 6/4/2020 9:41 PM
CIP
Number
Number Account Requesting
Department
Type Project Title Project Location Activity C.O.New Total
22
AQMD
Fund
23
L&L District
Fund
25
TDA III
Fund
26
Grant Fund
30
Gast Tax
Fund
32
SB1 Local
Return
Fund
33
Measure S
Bond Fund
35
Measure S
Sales Tax
Fund
38
Vehicle
Imapct Fee
Fund
40
Capital
Project
Fund
40
Art in
Public
Places
Fund
40
Other
Fund
50
Storm
Water
Fund
51
Water
Fund
54
Prop "C"
Local
Return
Fund
56
Measure R
Local Return
Fund
57
Measure M
Local Return
Fund
72
Sewer
Fund
Total Notes
CIP 20-30 33 16778 PW Street
Improvements
Foster Bridge Boulevard, Rivergrove Drive
and Glencliff Drive Pavement Rehabilitation
Foster Bridge Boulevard (Bluff Road
to Rivergrove Drive), Rivergrove
Drive (Foster Bridge Boulevard to
Glencliff Drive) and Glencliff Drive
(Rivergrove Drive to Bluff Road)
Design 0 60,000 60,000 0 0 0 0 0 0 0 0 60,000 0 0 0 0 0 0 0 0 0 60,000
CIP 21-05 34 16835 PW Street
Improvements 3rd Street Pavement Rehabilitation 3rd Street (Rives Avenue to
Paramount Boulevard)Design 0 50,000 50,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 50,000 0 50,000
CIP 21-06 35 16830 PW Street
Improvements Fifth Street Pavement Rehabilitation Fifth Street (Brookshire Avenue to
Lakewood Boulevard)Design 0 50,000 50,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 50,000 0 0 50,000
n/a 36 16454 PW Traffic
Improvements Traffic Safety Improvement Program Various locations citywide Const.0 200,000 200,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 200,000 0 0 200,000
n/a 37 17808 PW Traffic
Improvements
Lakewood Boulevard/ Rosemead Boulevard
Complete Streets Study
Lakewood Boulevard (North City
Limit to South City Limit)Study 64,807 193 65,000 0 0 0 0 0 65,000 0 0 0 0 0 0 0 0 0 0 0 0 65,000 City's share of grant received through
Gateway Cities COG
n/a 38 17829 PW Traffic
Improvements
Florence Avenue Regional Complete Streets
Study
Florence Avenue (West City Limit to
East City Limit)Study 24,658 342 25,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 25,000 0 0 25,000 City's share of Metro grant procured by the
Gateway Cities COG
n/a 39 16005 PW Traffic
Improvements I-5 Consortium Study 0 30,000 30,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 30,000 0 0 30,000
n/a 40 16484 PW Traffic
Improvements I-710 Consortium Study 0 25,000 25,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 25,000 0 0 25,000
n/a 41 16572 PW Traffic
Improvements 91/605 Major Corridor Study Study 0 20,000 20,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 20,000 0 0 20,000
n/a 42 16836 PW Traffic
Improvements Systemic Safety Analysis Report Program Citywide Study 0 80,000 80,000 0 0 0 72,000 0 0 0 0 0 0 0 0 0 0 0 8,000 0 0 80,000 Full Caltrans grant amount = $72k; local
match = $8k
CIP 17-07 43 17826 PW Traffic
Improvements Citywide Transit Priority System Downey LINK routes citywide Env +
PS&E 170,700 1,216,300 1,387,000 0 0 0 1,292,000 0 0 0 0 0 0 0 0 0 0 0 95,000 0 0 1,387,000 Full grant amount = $1,292k; local match =
$515k (20%)
CIP 16-15 44 17827 PW Traffic
Improvements Bike Share and Safety Education Program Citywide Const.43,900 100 44,000 0 0 0 20,000 0 0 0 0 0 0 0 0 0 0 0 24,000 0 0 44,000 Full grant amount = $180k; local match =
$114k (39%)
CIP 17-09 45 17830 PW Traffic
Improvements
Paramount Boulevard Signalization & Safety
Enhancements
Paramount Boulevard (Gardendale
Street to Telegraph Road)Const.1,710,000 28,800 1,738,800 0 0 0 1,738,800 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,738,800 Federal HSIP Cycle 7 $187,500 grant and
toll credits
CIP 17-10 46 17831 PW Traffic
Improvements
Stewart & Gray Road Signalization & Safety
Enhancements
Stewart & Gray Road (Old River
School Road and Firestone
Boulevard)
Const.2,146,112 5,888 2,152,000 0 0 0 1,981,880 0 0 0 0 0 0 0 0 0 0 0 170,120 0 0 2,152,000 Federal HSIP Cycle 7 grant and toll credits
CIP 17-11 47 17832 PW Traffic
Improvements South Downey Safe Routes to School Project South Part of the City PS&E +
Const.415,250 180,000 595,250 0 0 184,500 210,750 0 200,000 0 0 0 0 0 0 0 0 0 0 0 0 595,250 Full grant amount = $238k; local match =
$278k (54%)
CIP 17-12 48 17833 PW Traffic
Improvements Citywide Pedestrian Plan Citywide Study 80,000 0 80,000 0 0 0 80,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 80,000 Full grant amount = $300k; no local match
CIP 17-14 49 17834 PW Traffic
Improvements
Traffic Management Center (TMC)
Upgrades City Hall Const.273,000 0 273,000 0 0 0 218,400 54,600 0 0 0 0 0 0 0 0 0 0 0 0 0 273,000 LA County grant ($218k); local match $54k
CIP 18-07 50 16722 PW Traffic
Improvements
Imperial Highway Signalization & Safety
Enhancements
Imperial Highway (Old River School
Road to and Woodruff Avenue)Const.778,600 380,000 1,158,600 0 0 0 1,158,600 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,158,600 Federal HSIP Cycle 8 grant.
CIP 19-14 51 16765 PW Traffic
Improvements
Downey Bike Master Plan Implementation
Phase 1 Downtown/Transit Citywide PS&E +
Const.1,103,156 1,609,260 2,712,416 0 0 0 2,164,933 0 0 0 0 0 0 0 0 0 0 0 0 547,483 0 2,712,416 Metro Call '15 grant (80%) + local match
(20%).
CIP 20-11 52 16789 PW Traffic
Improvements Florence Avenue Traffic Signal Upgrades
Florence Avenue at Downey Avenue
and Florence Avenue at Brookshire
Avenue
Const.22,000 448,000 470,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 470,000 0 0 470,000
CIP 20-12 53 16790 PW Traffic
Improvements Firestone Boulevard Traffic Signal Upgrades
Firestone Boulevard at Rives Avenue
and Firestone Boulevard at Downey
Avenue
Design 40,000 0 40,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 40,000 0 0 40,000
CIP 20-13 54 16791 PW Traffic
Improvements Lakewood Boulevard Traffic Signal Upgrades
Lakewood Boulevard at 5th Street-
Cecilia Street and Lakewood
Boulevard at Alameda Street
Design 40,000 0 40,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 40,000 0 0 0 40,000
CIP 20-32 55 16772 PW Traffic
Improvements
Paramount Boulevard Traffic Signal
Upgrades
Paramount Boulevard at DePalma
Street and Paramount Boulevard at
Fire Station No. 1
Const.485,000 0 485,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 485,000 0 0 485,000
CIP 21-07 56 16831 PW Traffic
Improvements Intersection Roundabouts Citywide PS&E +
Const.0 450,000 450,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 450,000 0 0 450,000
CIP 21-08 57 16832 PW Traffic
Improvements
FY 20/21 Annual Citywide Traffic Striping of
Major Roadways Citywide PS&E +
Const.0 50,000 50,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 50,000 0 0 50,000
CIP 21-09 58 16833 PW Traffic
Improvements Gallatin Road Street Lighting Upgrades
South Side of Gallatin Road (400 feet
west and east of Lakewood
Boulevard)
PS&E +
Const.0 100,000 100,000 0 0 0 100,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100,000 Transfer from 26-17802
CIP 15-26 59 17665 PW
Public
Facilities
Improvements
Citywide Playground Structure Safety
Repairs and Replacement Citywide Const.0 50,000 50,000 0 0 0 50,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 50,000 LA County Maintenance & Servicing Excess
Funds Program
CIP 15-21 60 17706 CM
Public
Facilities
Improvements
Wilderness Park Lake Improvement Project Wilderness Park Lakes Const.960,785 0 960,785 0 0 0 773,272 0 0 0 0 0 187,513 0 0 0 0 0 0 0 0 960,785 Prop 84 Habitat Conservation Grant/RMC
Grant
CIP 19-37-0 61 13312 CM
Public
Facilities
Improvements
Fire Station No. 2 Modernization and
Expansion Project Fire Station No. 2 Const.3,533,036 0 3,533,036 0 0 0 0 0 0 3,533,036 0 0 0 0 0 0 0 0 0 0 0 3,533,036
CIP 19-37-0 62 13314 CM
Public
Facilities
Improvements
Fire Station No. 4 Modernization and
Expansion Project Fire Station No. 4 Const.3,834,734 0 3,834,734 0 0 0 0 0 0 3,834,734 0 0 0 0 0 0 0 0 0 0 0 3,834,734
CIP 19-38 63 13302 CM
Public
Facilities
Improvements
Police Station Modernization Project Police Station Const.296,077 0 296,077 0 0 0 0 0 0 296,077 0 0 0 0 0 0 0 0 0 0 0 296,077
CIP 19-20 64 13303 CM
Public
Facilities
Improvements
Library Modernization Project Downey Library Const.3,317,494 0 3,317,494 0 0 0 0 0 0 3,317,494 0 0 0 0 0 0 0 0 0 0 0 3,317,494
CIP 19-21 65 13304 CM
Public
Facilities
Improvements
City Hall Improvement Project City Hall PS&E +
Const.599,813 0 599,813 0 0 0 0 0 0 599,813 0 0 0 0 0 0 0 0 0 0 0 599,813
City of Downey Capital Improvement Program FY 2020-21
H:\Pubworks\B-U-D-G-E-T\Budget 2020-21\CIP\FY 2020-21 CIP Listing-Approved Budget\FY 2020-21 CIP Listing - Final (05-14-2020).xlsx Page 3 of 4 Last Revised: 6/4/2020 9:41 PM
CIP
Number
Number Account Requesting
Department
Type Project Title Project Location Activity C.O.New Total
22
AQMD
Fund
23
L&L District
Fund
25
TDA III
Fund
26
Grant Fund
30
Gast Tax
Fund
32
SB1 Local
Return
Fund
33
Measure S
Bond Fund
35
Measure S
Sales Tax
Fund
38
Vehicle
Imapct Fee
Fund
40
Capital
Project
Fund
40
Art in
Public
Places
Fund
40
Other
Fund
50
Storm
Water
Fund
51
Water
Fund
54
Prop "C"
Local
Return
Fund
56
Measure R
Local Return
Fund
57
Measure M
Local Return
Fund
72
Sewer
Fund
Total Notes
CIP 19-22 66 13306 CM
Public
Facilities
Improvements
Civic Theatre Improvement Project Downey Civic Theatre Const.745,967 0 745,967 0 0 0 0 0 0 745,967 0 0 0 0 0 0 0 0 0 0 0 745,967
CIP 19-23 67 13307 CM
Public
Facilities
Improvements
Rio Hondo Event Center Improvements Rio Hondo Event Center Const.120,327 0 120,327 0 0 0 0 0 0 120,327 0 0 0 0 0 0 0 0 0 0 0 120,327
CIP 19-24 68 13308 CM
Public
Facilities
Improvements
Public Works & Utilities Yard Improvements Public Works & Utilities Yard PS&E +
Const.83,951 0 83,951 0 0 0 0 0 0 83,951 0 0 0 0 0 0 0 0 0 0 0 83,951
CIP 19-25 69 13309 CM
Public
Facilities
Improvements
Downtown Parking Structure Improvements Downtown Parking Structure PS&E +
Const.85,008 0 85,008 0 0 0 0 0 0 85,008 0 0 0 0 0 0 0 0 0 0 0 85,008
CIP 19-28 70 13320 CM
Public
Facilities
Improvements
Apollo Park Improvement Project Apollo Park Const.51,449 0 51,449 0 0 0 0 0 0 51,449 0 0 0 0 0 0 0 0 0 0 0 51,449
CIP 19-29 71 13330 CM
Public
Facilities
Improvements
Dennis the Menace Park Improvement
Project Dennis the Menace Park Const.20,348 0 20,348 0 0 0 0 0 0 20,348 0 0 0 0 0 0 0 0 0 0 0 20,348
CIP 19-30 72 13340 CM
Public
Facilities
Improvements
Discovery Sports Complex Improvement
Project Discovery Sports Complex Const.101,582 0 101,582 0 0 0 0 0 0 101,582 0 0 0 0 0 0 0 0 0 0 0 101,582
CIP 19-31 73 13350 CM
Public
Facilities
Improvements
Furman Park Improvement Project Furman Park Const.2,411,143 0 2,411,143 0 0 0 0 0 0 2,411,143 0 0 0 0 0 0 0 0 0 0 0 2,411,143
CIP 19-32 74 13360 CM
Public
Facilities
Improvements
Golden Park Improvement Project Golden Park Const.112,555 0 112,555 0 0 0 0 0 0 112,555 0 0 0 0 0 0 0 0 0 0 0 112,555
CIP 19-33 75 13370 CM
Public
Facilities
Improvements
Independence Park Improvement Project Independence Park Const.131,707 0 131,707 0 0 0 0 0 0 131,707 0 0 0 0 0 0 0 0 0 0 0 131,707
CIP 19-34 76 13380 CM
Public
Facilities
Improvements
Rio San Gabriel Park Improvement Project Rio San Gabriel Park PS&E +
Const.90,946 0 90,946 0 0 0 0 0 0 90,946 0 0 0 0 0 0 0 0 0 0 0 90,946
CIP 19-35 77 13390 CM
Public
Facilities
Improvements
Wilderness Park Improvement Project Wilderness Park Const.5,564,091 0 5,564,091 0 0 0 0 0 0 5,564,091 0 0 0 0 0 0 0 0 0 0 0 5,564,091
CIP 19-36 78 13395 CM
Public
Facilities
Improvements
Treasure Island Park Improvement Project Treasure Island Park PS&E +
Const.89,633 0 89,633 0 0 0 0 0 0 89,633 0 0 0 0 0 0 0 0 0 0 0 89,633
CIP 20-14 79 16792 CD
Public
Facilities
Improvements
Downey Avenue Art Intersections of Downey Avenue and
2nd Street, 3rd Street and 4th Street
PS&E +
Const.0 104,444 104,444 0 0 0 0 0 0 0 0 0 0 104,444 0 0 0 0 0 0 0 104,444
CIP 20-15 80 16793 CD
Public
Facilities
Improvements
Downey Civic Theatre Outdoor Plaza Art
Sculpture Downey Civic Theatre PS&E +
Const.0 100,000 100,000 0 0 0 0 0 0 0 0 0 0 100,000 0 0 0 0 0 0 0 100,000
CIP 20-17 81 16795 CD
Public
Facilities
Improvements
Downey Angels Walk Downtown Downey PS&E +
Const.17,600 0 17,600 0 0 0 0 0 0 0 0 0 0 17,600 0 0 0 0 0 0 0 17,600
CIP 20-20 82 16798 PW
Public
Facilities
Improvements
Energy Efficiency Improvements at City
Facilities Various City Facilities Citywide PS&E +
Const.0 1,000,000 1,000,000 0 0 0 1,000,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,000,000
CIP 20-21 83 16739 PW
Public
Facilities
Improvements
Dais Upgrades in City Hall Council Chambers City Hall Council Chambers PS&E +
Const.0 150,000 150,000 0 0 0 150,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 150,000
CIP 20-25 84 17885 CD
Public
Facilities
Improvements
Rancho South Campus Specific Plan Rancho Los Amigos South Campus Study 113,810 0 113,810 0 0 0 113,810 0 0 0 0 0 0 0 0 0 0 0 0 0 0 113,810
CIP 20-26 85 17886 CD
Public
Facilities
Improvements
Rancho Sports Complex Rancho Los Amigos South Campus PS&E +
Const.3,000,000 0 3,000,000 0 0 0 3,000,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3,000,000
CIP 20-27 86 16770 CD
Public
Facilities
Improvements
Furman Park Rocket Furman Park Const.0 29,700 29,700 0 0 0 0 0 0 0 0 0 0 29,700 0 0 0 0 0 0 0 29,700
CIP 20-28 87 16771 FD
Public
Facilities
Improvements
Firefighter's Memorial Civic Center Const.0 45,000 45,000 0 0 0 0 0 0 0 0 0 0 45,000 0 0 0 0 0 0 0 45,000
CIP 21-10 88 16837 CD
Public
Facilities
Improvements
SW Corner Downey Avenue and 2nd Street
Art Plaza Downey Avenue and 2nd Street PS&E +
Const.0 242,160 242,160 0 0 0 0 0 0 0 0 0 0 242,160 0 0 0 0 0 0 0 242,160
CIP 21-11 89 16838 CD
Public
Facilities
Improvements
J. Del Toro Art Piece Downey Avenue and 2nd Street PS&E +
Const.0 100,000 100,000 0 0 0 0 0 0 0 0 0 0 100,000 0 0 0 0 0 0 0 100,000
n/a 90 17887 CD
Public
Facilities
Improvements
SB-2 Planning Grant Study 310,000 0 310,000 0 0 0 310,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 310,000
CIP 21-17 91 16731 PW
Public
Facilities
Improvements
Paramount Boulevard at Firestone
Boulevard Improvements
Southwest Corner of Paramount
Boulevard at Firestone Boulevard Const.9,575 0 9,575 0 0 0 3,500 0 0 0 0 0 0 6,075 0 0 0 0 0 0 0 9,575
n/a 92 18642 PW Water
Improvements Water Well Refurbishment Program Well Sites (Citywide)Const.65,095 434,905 500,000 0 0 0 0 0 0 0 0 0 0 0 0 0 500,000 0 0 0 0 500,000
n/a 93 18647 PW Water
Improvements Telemetry System Modifications Well Sites (Citywide) and Utilities
Yard (9252 Stewart & Gray Rd)Const.500,000 0 500,000 0 0 0 0 0 0 0 0 0 0 0 0 0 500,000 0 0 0 0 500,000
n/a 94 18654 PW Water
Improvements
Water Distribution Main Replacement
Program Citywide PS&E +
Const.75,000 0 75,000 0 0 0 0 0 0 0 0 0 0 0 0 0 75,000 0 0 0 0 75,000
CC 686B 95 18665 PW Water
Improvements New Water Wells No. 27 and No. 28
Well No. 27 - 7926 Springer Street;
Well No. 28 - Utilities Yard 9252
Stewart & Gray Road
Const.3,750,000 250,000 4,000,000 0 0 0 0 0 0 0 0 0 0 0 0 0 4,000,000 0 0 0 0 4,000,000 WRD Settlement
n/a 96 18666 PW Water
Improvements Well/Yard Site Security Well Sites (Citywide) and Utilities
Yard (9252 Stewart & Gray Road)Const.45,291 4,709 50,000 0 0 0 0 0 0 0 0 0 0 0 0 0 50,000 0 0 0 0 50,000
n/a 97 18674 PW Water
Improvements Water System Improvement Program Citywide Const.133,774 366,226 500,000 0 0 0 0 0 0 0 0 0 0 0 0 0 500,000 0 0 0 0 500,000
CIP 17-01 98 16583 PW Water
Improvements
Site Environmental
Remediation/Groundwater Protection at
9255 Imperial Highway
9255 Imperial Highway Const.46,511 253,489 300,000 0 0 0 0 0 0 0 0 0 0 0 0 0 300,000 0 0 0 0 300,000
CIP 18-10 99 18680 PW Water
Improvements
Bellflower Boulevard Water System
Improvements
Bellflower Boulevard (Foster Road to
Hall Road)Const.50,000 0 50,000 0 0 0 0 0 0 0 0 0 0 0 0 0 50,000 0 0 0 0 50,000
City of Downey Capital Improvement Program FY 2020-21
H:\Pubworks\B-U-D-G-E-T\Budget 2020-21\CIP\FY 2020-21 CIP Listing-Approved Budget\FY 2020-21 CIP Listing - Final (05-14-2020).xlsx Page 4 of 4 Last Revised: 6/4/2020 9:41 PM
CIP
Number
Number Account Requesting
Department
Type Project Title Project Location Activity C.O.New Total
22
AQMD
Fund
23
L&L District
Fund
25
TDA III
Fund
26
Grant Fund
30
Gast Tax
Fund
32
SB1 Local
Return
Fund
33
Measure S
Bond Fund
35
Measure S
Sales Tax
Fund
38
Vehicle
Imapct Fee
Fund
40
Capital
Project
Fund
40
Art in
Public
Places
Fund
40
Other
Fund
50
Storm
Water
Fund
51
Water
Fund
54
Prop "C"
Local
Return
Fund
56
Measure R
Local Return
Fund
57
Measure M
Local Return
Fund
72
Sewer
Fund
Total Notes
CIP 19-03 100 18684 PW Water
Improvements
Pellet Street and Ryerson Avenue Water
System Improvements
Pellet Street (Ryerson Avenue to Old
River School Road) and Ryerson
Avenue (Dinwiddie Street to Rio Flora
Const.25,000 900,000 925,000 0 0 0 0 0 0 0 0 0 0 0 0 0 925,000 0 0 0 0 925,000
CIP 20-23 101 18686 PW Water
Improvements 3rd Street Water System Improvements 3rd Street (Old River School Road to
Rives Avenue)
PS&E +
Const.50,000 1,350,000 1,400,000 0 0 0 0 0 0 0 0 0 0 0 0 0 1,400,000 0 0 0 0 1,400,000
CIP 20-31 102 18689 PW Water
Improvements Destruction of Water Wells 1,3,20 and 27 Water Wells 1,3,20 and 27 PS&E +
Const.0 50,000 50,000 0 0 0 0 0 0 0 0 0 0 0 0 0 50,000 0 0 0 0 50,000
CIP 21-12 103 18630 PW Water
Improvements 3rd Street Water System Improvements 3rd Street (Rives Avenue to
Paramount Boulevard)
PS&E +
Const.0 1,000,000 1,000,000 0 0 0 0 0 0 0 0 0 0 0 0 0 1,000,000 0 0 0 0 1,000,000
CIP 20-34 104 18631 PW Water
Improvements
Florence Avenue Water System
Improvements
Florence Avenue (Tweedy Lane to
Brookshire Avenue)
PS&E +
Const.0 2,100,000 2,100,000 0 0 0 0 0 0 0 0 0 0 0 0 0 2,100,000 0 0 0 0 2,100,000
CIP 21-13 105 18632 PW Water
Improvements
Firestone Boulevard Pressure Valve
Improvements
Firestone Boulevard (West City Limits
to East City Limits)
PS&E +
Const.0 500,000 500,000 0 0 0 0 0 0 0 0 0 0 0 0 0 500,000 0 0 0 0 500,000
CIP 21-14 106 18633 PW Water
Improvements Cole Street Water System Improvements Cole Street (Brookshire Avenue to
Patton Road)Design 0 75,000 75,000 0 0 0 0 0 0 0 0 0 0 0 0 0 75,000 0 0 0 0 75,000
CIP 21-15 107 18634 PW Water
Improvements 5th Street Water System Improvements 5th Street (Downey Avenue to
Lakewood Boulevard)Design 0 75,000 75,000 0 0 0 0 0 0 0 0 0 0 0 0 0 75,000 0 0 0 0 75,000
n/a 108 13999 PW Sewer
Improvements Sewer Main Rehabilitation & Repair Program Citywide Const.550,000 200,000 750,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 750,000 750,000
n/a 109 14010 PW Sewer
Improvements Sewer CCTV Inspection Program Citywide Const.127,046 147,954 275,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 275,000 275,000
CIP 21-16 110 14020 PW Sewer
Improvements Wilderness Park Sewer Lift Station Citywide PS&E +
Const.0 700,000 700,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 700,000 700,000
n/a 111 13944 PW Storm Water
Improvements Storm Drain Repair Program Citywide Const.100,000 0 100,000 0 0 0 0 0 0 0 0 0 0 0 0 100,000 0 0 0 0 0 100,000
n/a 112 13983 PW Storm Water
Improvements
National Pollution Discharge Elimination
System (NPDES) Permit Compliance
Los Angeles River/Rio Hondo, San
Gabriel River, Los Cerritos Channel
Watersheds
Const.100,000 0 100,000 0 0 0 0 0 0 0 0 0 0 0 0 100,000 0 0 0 0 0 100,000
n/a 113 14011 PW Storm Water
Improvements
Storm Drain Lift Station Refurbishment
Program
Imperial Highway (Old River School
Road to Rives Avenue) and
Paramount Boulevard at I-5 Freeway
Const.25,000 0 25,000 0 0 0 0 0 0 0 0 0 0 0 0 25,000 0 0 0 0 0 25,000
CIP 20-33 114 14012 PW Storm Water
Improvements Catch Basin Inserts
Los Angeles River/Rio Hondo, San
Gabriel River, Los Cerritos Channel
Watersheds
Const.21,000 129,000 150,000 0 0 0 0 0 0 0 0 0 0 0 0 150,000 0 0 0 0 0 150,000
CIP 20-35 115 14015 PW Storm Water
Improvements Firestone Boulevard Dry Well Improvements Firestone Boulevard at West City
Limits Const.0 300,000 300,000 0 0 0 0 0 0 0 0 0 0 0 0 300,000 0 0 0 0 0 300,000
Total 65,286,860 27,436,829 92,723,689 0 60,000 264,500 38,316,758 385,382 3,680,000 21,189,861 0 3,680,000 187,513 644,979 737,500 675,000 12,100,000 2,335,801 3,131,928 3,609,467 1,725,000 92,723,689