That the City Council:
Award a contract to Miramontes Construction Company, Inc. in the amount of
$82,700 for Miscellaneous Sewer Spot Repairs and Manhole Rehabilitation,
Miscellaneous Project No. 324; and
2. Authorize Public Works Director/City Engineer to execute any change orders or
additional scope of work deemed necessary or desirable up to the approved project
••
As part of the City's annual sanitary sewer maintenance program, a number of the City's sewer
mains are assessed to identify areas in need of repairs to ensure continued efficiencies of the
sewer main system. Sewer mains on Bigby Street, Kingbee Street, Stamps Avenue, Suva
Street and Tweedy Lane along with a sewer manhole at the intersection of Imperial Highway
and Downey Avenue are in need of repairs and rehabilitation to ensure that the City is able to
continue to use this infrastructure to provide reliable sewer service to the community. Project
limits are shown on project location map (Attachment A).
The proposed sanitary sewer improvements include removing and replacing damaged sewer
pipe and a manhole ring and cover at spot locations on the above mentioned streets
(Attachment B).
Due to the repair nature of the sewer work, the project was informally bid on May 18, 2020. On
May 26, 2020, two bids were received ranging • $82,700 to $103,400. The bid results were
as follows:
CONTRACTOR LOCATION BID AMOUNT
Miramontes Construction Company, Inc. Rialto $82,700
Williams Pipeline Contractors, Inc. Somis $103,400
Gentry Brother, Inc. No Bid Received
Big Ben, Inc. No Bid Received
GRP Contractors No Bid Received
MP NO. 324 MISCELLANEOUS SEWER SPOT REPAIRS AND MANHOLE REHABILITATION
JUNE 9, 2020
PAGE #2
I All Cities Engineering, Inc -
The lowest responsive and responsible bidder was Miramontes Construction Company, Inc. in
the amount of $82,700 (Attachment C). Staff reviewed the bid proposal submitted by
Miramontes Construction Company, Inc. and found that Miramontes Construction Company,
Inc. has satisfactorily completed projects for the City of Downey in the past. Miramontes
Construction Company, Inc.'s state contractor's license is "current and active" and they are
registered with the California Department of Industrial Relations (DIR) for Labor Compliance.
Staff recommends that the City Council award a contract to Miramontes Construction Company,
Inc. for Miscellaneous Sewer Spot Repairs and Manhole Rehabilitation, Miscellaneous Project
No. 324.
Work is anticipated to begin in late June 2020 and be completed in early July 2020, weather
permitting.
This project is categorically exempt per Section 15302 Class 2(c) of the California
Environmental Quality Act (CEQA) Guidelines.
Quality of Life, Infrastructure & Parks
FISCAL IMPACT
The total estimated cost of the project, including design, repair and rehabilitation work,
contingencies, construction management, and contract administration is $122,000 broken down
as follows:
tion Amount
ri Descp
Rep , a , an , d rehabilitation , abilit , at . io n - work $82, 0 r Oi
Contingencies (15%) $12,3001
Inspection, Materials Test4,.and Contract Administration $27,0001
Total Estimated Project Cost: $122,0001
The project will be funded from the FY 2019-2020 Sewer Fund Capital Improvement Program
(CIP) as provided in the table below.
Account No. Funding Source Amount
72-1-3999 Sewer Main Rehabilitation and Repair CIP Account $750,000
Total Project Funding� $750,000
ATTACHMENTS
Attachment A — Project Location Map
Attachment B — Plans
Attachment C — Bid Summary
K
MP NO. 324 MISCELLANEOUS SEWER SPOT REPAIRS AND MANHOLE REHABILITATION
JUNE 9, 2020
PAGE
Project Location Map
Proiect Location
Project Location
P -oject Location
Project Location
Project Location
N TS
CITY OF DOWNEY
DERA"�FTMENT CJF F-1-OLIC 'v'K IF I e JTUTIES' N' ISION
PROJECT LOCATI-ON MAP
PROJECT. MISCELLANEOUS SEWER SPOT REPAIRS AND MANHOLE REHABILITATION
umrrs: VARIOUS LOCATIONS
ATTACHMENT A
3
GENERAL NOTES IM VN 0 tek T
F®rl
STORM L T 0, E WATER ROL UTION CON R L-R, QUIREMENTS FOR
CONSTRUCTION ACTIVITIES MINIMUM WATER OUALITY
1, 7 PUBBLIZO WORK8 DEPA RPROTECTION REQLIREMENTS FOR ALL DEVELOPMENT
-TrJDM- NTJ CONSTRUCTION PROJECTS/CERTIFICATION STATEMENT
CONSTRUCTION PLANS FOR
MISCELLANEOUS PROJECT O. 324
'0 - 4klk1, SEWER SPOT REPAIRS AND MANHOLE REHABILITATION
LOCATION NO. 2
TWEEDY LANE
LOCATION NO. 3 NO4
STAMPS AVENUE AND
SUVA STREET
I
INDEX TO PROJECT DRAWINGS
1- -IT
- .7REET AND-r- AtIF SFIFP fiP(7 REFrVFl,
SAP -PAIENUE STF-7 RUAiH5
1,-EE -EEl
'k,DEi�"IF"� TN!IERANHpLEREHANIMl�N
BIG BY STREET
el
VICINITY MAP
SITE CHARACTERISTICS
CQHSTFUGT*N(-j,TE,,
��-F 111TI K',
41
w
I
c
LOCATION 1 - BIGBY STREET
ALLENGROVE STREET
LOCATION 2 - TWEEDY LANE
CITY OF DOWNEY
T, C r T C, I M! R i if WOWw th 3If13.CK
°,D,F° -P, RUINS Nq-
d-
i
F
LOCATION 3 - STAMPS AVENUE
MANZANAR STREET
LOCATION 4 - SUVA STREET
P
CITY OF DOWNEY
—..DEFT OF PUBLIC WORKS UTILITIES 0111—
F T q F F, R pD P FT F,ii kkFni,T R F P
TA
AIL-m- l?". -
CONGTRU,-TION NOTES
—0 KD-ATF, FPCvr-, AMFC-,Lft', PMC,
—10,c u, c-, 1 - 11EFl 7—C7:T,l IJTN NF,�
[111•, Ic- 11E -D "'P`p cll,-L!'+,I
=7k,
Wl=
ullv��l X:1-1-llmlm
CITY OF bowNu
221 A
CONSTRUCTION NOTES:
DIX
LOCATION 6 - IMPERIAL HIGHWAY AND DOWNEY AVENUE
i.
CifY,
DE.- cr on's
MISGELLANEOSS PROJEGT r1o. 324
BID SUMMARY
May 26, 2020
Miramontes Construction
All Lilies Engineering,
coma V, Inc
Wiliarns Pipeline
Contractor Inc
Gonry Brother, Inc
Pin Bon, Inc
GRP Contractors
Inc
Item Description ON
Unit
Unit Face
Ancour,l
Unit Price
: Amount
Uni[Pri (Amount
Unilf'rice lAmount
Unill'tice lAmounl
Unit Price lAmount
1 Isolate, remove, and replace broken pipe win new 8' extra 6
EA
$ 6,5130.00
$39,000.00
$ 7,90000
$ 47,40000
strength VCR sewer main and repair couplings
Isolate, remove, and replace broken pipe with now 8' extra
2 strength VCR sewer main and remove and replace lateral 6
LS
$ 4,200.00
$25,200.00
S n,f,00 00
S 51,000 f�q
connection with now 13"4" extra strength VCP wya and repair
NO BID RECEIVED
NO BID RECEIVED
NO BID RECEIVED
NO BID RECEIVED
couplings
Remove existing, furnish and install now sewer manhole hams
3 and cover (Alhambra Foundry Model A-1 176 marked 'Sewer) and
1
EA
$18,600.00
$18,500.00
$ 5,000 00
$ 5,00000
top adjusting ring
TOTAL BASE BID — Items 1 - 3
$ 8Z700.00
$ 103,400.00
NO BID RECEIVED
I NO BID RECEIVED
NO BID RECEIVED
NO BID RECEIVED
Ati, HHD5RLCElVjj
Engineer's Estimate $104,00000
CONTRACTOR
LOALA&"Hl
Miramontas Construction Company, Inc
$ 82,70000
Williams Pipeline Contractor, Inc
$103,40000
Gentry Brothers, Inc
NO BID RECEIVED
Big Bon, Inc
NO BID RECEIVED
GRP Contractors
NO BID RECEIVED
All Cities Engineering, Inc
NO BID RECEIVED
M