Loading...
HomeMy WebLinkAbout10. Misc Proj No. 324 - Awrd Contract to Miramontes Const for Misc Sewer Spot Repairs and Manhole Rehabnem ,• APPROVED BY TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIt ITY AGEA FROM: • OF THE CITY MANAGER BY: • R. CONSUNJI,DIRECTOR OF PUBLIC WORKSICITY MENIN FR I Z • 1 • j That the City Council: Award a contract to Miramontes Construction Company, Inc. in the amount of $82,700 for Miscellaneous Sewer Spot Repairs and Manhole Rehabilitation, Miscellaneous Project No. 324; and 2. Authorize Public Works Director/City Engineer to execute any change orders or additional scope of work deemed necessary or desirable up to the approved project •• As part of the City's annual sanitary sewer maintenance program, a number of the City's sewer mains are assessed to identify areas in need of repairs to ensure continued efficiencies of the sewer main system. Sewer mains on Bigby Street, Kingbee Street, Stamps Avenue, Suva Street and Tweedy Lane along with a sewer manhole at the intersection of Imperial Highway and Downey Avenue are in need of repairs and rehabilitation to ensure that the City is able to continue to use this infrastructure to provide reliable sewer service to the community. Project limits are shown on project location map (Attachment A). The proposed sanitary sewer improvements include removing and replacing damaged sewer pipe and a manhole ring and cover at spot locations on the above mentioned streets (Attachment B). Due to the repair nature of the sewer work, the project was informally bid on May 18, 2020. On May 26, 2020, two bids were received ranging • $82,700 to $103,400. The bid results were as follows: CONTRACTOR LOCATION BID AMOUNT Miramontes Construction Company, Inc. Rialto $82,700 Williams Pipeline Contractors, Inc. Somis $103,400 Gentry Brother, Inc. No Bid Received Big Ben, Inc. No Bid Received GRP Contractors No Bid Received MP NO. 324 MISCELLANEOUS SEWER SPOT REPAIRS AND MANHOLE REHABILITATION JUNE 9, 2020 PAGE #2 I All Cities Engineering, Inc - The lowest responsive and responsible bidder was Miramontes Construction Company, Inc. in the amount of $82,700 (Attachment C). Staff reviewed the bid proposal submitted by Miramontes Construction Company, Inc. and found that Miramontes Construction Company, Inc. has satisfactorily completed projects for the City of Downey in the past. Miramontes Construction Company, Inc.'s state contractor's license is "current and active" and they are registered with the California Department of Industrial Relations (DIR) for Labor Compliance. Staff recommends that the City Council award a contract to Miramontes Construction Company, Inc. for Miscellaneous Sewer Spot Repairs and Manhole Rehabilitation, Miscellaneous Project No. 324. Work is anticipated to begin in late June 2020 and be completed in early July 2020, weather permitting. This project is categorically exempt per Section 15302 Class 2(c) of the California Environmental Quality Act (CEQA) Guidelines. Quality of Life, Infrastructure & Parks FISCAL IMPACT The total estimated cost of the project, including design, repair and rehabilitation work, contingencies, construction management, and contract administration is $122,000 broken down as follows: tion Amount ri Descp Rep , a , an , d rehabilitation , abilit , at . io n - work $82, 0 r Oi Contingencies (15%) $12,3001 Inspection, Materials Test4,.and Contract Administration $27,0001 Total Estimated Project Cost: $122,0001 The project will be funded from the FY 2019-2020 Sewer Fund Capital Improvement Program (CIP) as provided in the table below. Account No. Funding Source Amount 72-1-3999 Sewer Main Rehabilitation and Repair CIP Account $750,000 Total Project Funding� $750,000 ATTACHMENTS Attachment A — Project Location Map Attachment B — Plans Attachment C — Bid Summary K MP NO. 324 MISCELLANEOUS SEWER SPOT REPAIRS AND MANHOLE REHABILITATION JUNE 9, 2020 PAGE Project Location Map Proiect Location Project Location P -oject Location Project Location Project Location N TS CITY OF DOWNEY DERA"�FTMENT CJF F-1-OLIC 'v'K IF I e JTUTIES' N' ISION PROJECT LOCATI-ON MAP PROJECT. MISCELLANEOUS SEWER SPOT REPAIRS AND MANHOLE REHABILITATION umrrs: VARIOUS LOCATIONS ATTACHMENT A 3 GENERAL NOTES IM VN 0 tek T F®rl STORM L T 0, E WATER ROL UTION CON R L-R, QUIREMENTS FOR CONSTRUCTION ACTIVITIES MINIMUM WATER OUALITY 1, 7 PUBBLIZO WORK8 DEPA RPROTECTION REQLIREMENTS FOR ALL DEVELOPMENT -TrJDM- NTJ CONSTRUCTION PROJECTS/CERTIFICATION STATEMENT CONSTRUCTION PLANS FOR MISCELLANEOUS PROJECT O. 324 '0 - 4klk1, SEWER SPOT REPAIRS AND MANHOLE REHABILITATION LOCATION NO. 2 TWEEDY LANE LOCATION NO. 3 NO4 STAMPS AVENUE AND SUVA STREET I INDEX TO PROJECT DRAWINGS 1- -IT - .7REET AND-r- AtIF SFIFP fiP(7 REFrVFl, SAP -PAIENUE STF-7 RUAiH5 1,-EE -EEl 'k,DEi�"IF"� TN!IERANHpLEREHANIMl�N BIG BY STREET el VICINITY MAP SITE CHARACTERISTICS CQHSTFUGT*N(-j,TE,, ��-F 111TI K', 41 w I c LOCATION 1 - BIGBY STREET ALLENGROVE STREET LOCATION 2 - TWEEDY LANE CITY OF DOWNEY T, C r T C, I M! R i if WOWw th 3If13.CK °,D,F° -P, RUINS Nq- d- i F LOCATION 3 - STAMPS AVENUE MANZANAR STREET LOCATION 4 - SUVA STREET P­ CITY OF DOWNEY —..DEFT OF PUBLIC WORKS UTILITIES 0111— F T q F F, R pD P FT F,ii kkFni,T R F P TA AIL-m- l?". - CONGTRU,-TION NOTES —0 KD-ATF, FPCvr-, AMFC-,Lft', PMC, —10,c u, c-, 1 - 11EFl 7—C7:T,l IJTN NF,� [111•, Ic- 11E -D "'P`p cll,-L!'+,I =7k, Wl= ullv��l X:1-1-llmlm CITY OF bowNu 221 A CONSTRUCTION NOTES: DIX LOCATION 6 - IMPERIAL HIGHWAY AND DOWNEY AVENUE i. CifY, DE.- cr on's MISGELLANEOSS PROJEGT r1o. 324 BID SUMMARY May 26, 2020 Miramontes Construction All Lilies Engineering, coma V, Inc Wiliarns Pipeline Contractor Inc Gonry Brother, Inc Pin Bon, Inc GRP Contractors Inc Item Description ON Unit Unit Face Ancour,l Unit Price : Amount Uni[Pri (Amount Unilf'rice lAmount Unill'tice lAmounl Unit Price lAmount 1 Isolate, remove, and replace broken pipe win new 8' extra 6 EA $ 6,5130.00 $39,000.00 $ 7,90000 $ 47,40000 strength VCR sewer main and repair couplings Isolate, remove, and replace broken pipe with now 8' extra 2 strength VCR sewer main and remove and replace lateral 6 LS $ 4,200.00 $25,200.00 S n,f,00 00 S 51,000 f�q connection with now 13"4" extra strength VCP wya and repair NO BID RECEIVED NO BID RECEIVED NO BID RECEIVED NO BID RECEIVED couplings Remove existing, furnish and install now sewer manhole hams 3 and cover (Alhambra Foundry Model A-1 176 marked 'Sewer) and 1 EA $18,600.00 $18,500.00 $ 5,000 00 $ 5,00000 top adjusting ring TOTAL BASE BID — Items 1 - 3 $ 8Z700.00 $ 103,400.00 NO BID RECEIVED I NO BID RECEIVED NO BID RECEIVED NO BID RECEIVED Ati, HHD5RLCElVjj Engineer's Estimate $104,00000 CONTRACTOR LOALA&"Hl Miramontas Construction Company, Inc $ 82,70000 Williams Pipeline Contractor, Inc $103,40000 Gentry Brothers, Inc NO BID RECEIVED Big Bon, Inc NO BID RECEIVED GRP Contractors NO BID RECEIVED All Cities Engineering, Inc NO BID RECEIVED M