HomeMy WebLinkAbout04. CIP No. 15-21D - Award Const. Contract to NR Development Inc - Wilderness Park Pond Restoration ProjIMA02
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCILAPPROVED BY
CITY MANAGEn
FROM: OFFICE OF THE CITY MANAGER
BY: JOHN OSKOUI, ASSISTANT CITY MANAGER
DATE: MAY 12, 2020
SUBJECT: AWARD A CONSTRUCTION CONTRACT IN THE AMOUNT OF $1,425,500 TO NR
DEVELOPMENT,FOR THE WILDERNESS PARK POND RESTORATION
PROJECT (CIP NO. 15-21 D — PONDS AND ELECTRICAL IMPROVEMENTS)
ff X010 I ii�,, , f �@ Z
That the City Council'.
1. Reject the bid protest received on April 28, 2020, from Pacific Aquascape International,
Inc.
FE. Award a construction contract, in the amount of $1,425,500.00 to NR Development,
Inc. for the Wilderness Park Pond Restoration Project — Ponds and Electrical
Improvements, CIP No. 15-21D
3. Authorize the Assistant City Manager to execute any change orders or additional scopf.-
of work for this project deemed necessary or desirable up to 10% of the construction
contract amount.
I - Sol 0 1 0 0
101 &*ei I
On January 7, 2020, the City Clerk received and publicly opened three (3) bids for the
Wilderness Park Ponds Restoration and Electrical System Improvements — CIP No. 15-21D).
On January 7, 2020, the City received a bid protest from the representative of the second lowest
bidder, Pacific Aquascape International, Inc. On January 10, 2020, NR Development, the lowest
bidder provided a response to the bid protest.
ACTION REQUESTED FOR THE WILDERNESS PARK POND RESTORATION PROJECT (CIP NO. 15-
21 D — PONDS AND ELECTRICAL)
MAY 12, 2020
PAGE 2
At its meeting of January 28, 2019, the City Council rejected all bids received and authorized re -
solicitation of bids for CIP No. 15-21 D. On April 2, 2020, and April 9, 2020, the Notice Inviting
Bids for this project was published in the Downey Patriot.
Addendum No. 1 was issued on April 14, 2020, to include new guidelines for the mandatory
bid walk in response to COVID-19 required safety procedures, along with answers to pre -bid
requests for information. Addendum No. 2 was issued on April 15, 2020, to include State of
California's Contractor License requirements in response to a pre -bid request for information.
Addendum No. 3 was issued on April 20, 2020, to answer various pre -bid requests for
information.
On April 23, 2020, the City Clerk received and publicly opened five (5) bids which ranged from
$1,370,300 to $1,948,000, as shown on the attached bid summary (Attachment A). DD
Systems, Inc. dba Ace Construction & Design, Inc., the apparent lowest bidder was deemed
non -responsive as they did not include Addendum Nos. 1-3 in their submittal. The apparent
second lowest bidder is NR Development, Inc. of Downey, California with a bid in the amount of
$1,425,500. Staff has confirmed that NR Development, Inc. possesses the specified contractor
license and that the license is current and in good standing. Verbal qualification interviews with
randomly selected NR Development, Inc.'s references, as well as the listed subcontractors'
references, were completed and the responses were all satisfactory.
On April 28, 2020, the City received a bid protest letter from the apparent third lowest bidder,
Pacific Aquascape International, Inc., disputing the experience of the pond restoration
subcontractor, specifically as related to the ponds lining work. The ponds restoration
subcontractor for NR Development, Inc. is Hydrology Group, Inc. which has designated a third -
tier subcontractor, Conterra Inc. to perform the ponds lining portion of the project. The bid
submittal from NR Development included experience and references as specified in the bid
documents. Verbal qualification interviews with randomly selected references for the lake
restoration subcontractor, Hydrology Group, Inc. and the pond liner installer, Conterra, Inc.,
were completed and the responses were all satisfactory. Moreover, the bid protest by Pacific
Aquascape International, Inc. has been reviewed and analyzed by the City's outside legal
counsel with expertise in Public Contract Law and it has been determined that the bid protest is
without merit.
Below is a summary of the scope of work, implementation schedule and other relevant data:
WILDERNESS PARK POND RESTORATION — Ponds and Electrical System Improvement
• Restoring the wetlands habitat at two existing ponds at Wilderness park
• Replacing invasive plant species with native plants
• Installation of the 40 mi. pond liner
• Construction of naturalized hardened shoreline
• Installation of New aeration system to improve water quality
• Construction of new walking trail segments
• Installation of a new pedestrian bridge
• Construction of a new pond outlook area
• Construction of Dry creek beds
• Installation of educational wayfinding signage to facilitate wetlands and native habitat
'awareness
ACTION REQUESTED FOR THE WILDERNESS PARK POND RESTORATION PROJECT (CIP NO. 15-
21 D - PONDS AND ELECTRICAL)
MAY 12, 2020
PAGE 3
Reconstruct concrete walkways around the park's community building
Realign Electrical Vehicle Charging Station
Install new electrical enclosure
It is projected that construction would start on May 26, 2020, and be complete by the end of
October of 2020. The estimated project cost summary is attached to this report (Attachment C).
Quality of Life, Neighborhood & Infrastructure
The total estimated cost of the project, including construction costs (based on the construction
bid amount), contingencies, design, inspection, construction engineering and management
services, material testing, and City -procured electrical equipment; is $1,792,045.00. The City's
2019-20 Capital Improvement Program includes the Wilderness Park Pond Restoration Project.
This project is funded through the Measure S proceeds as well as grant funding from San
Gabriel and Lower Los Angeles Rivers and Mountains Conservancy and Habitat Conservation
Fund, as well as $200,000 in matching fund through General Fund (Account Nos. 26-1-7706
and 40-1-7706).
ATTACHMENTS
Attachment A: Bid Summary — Cl P 15-21 D — Ponds & Electrical System Improvements
Attachment B: Location Diagram
Attachment C: Project Cost Summary
ACTION REQUESTED FOR THE WILDERNESS PARK POND RESTORATION PROJECT (GIP NO. 15-
21 D — PONDS AND ELECTRICAL)
MAY 12, 2020
PAGE 4
CITY OF DOWNEY
Cl P NO. 15-21D
WILDERNESS PARK POND RESTORATION PROJECT - Ponds and Electrical
Bid Due Date: 4/23/19 @ 11:00 am
Company Name
NR Development, Inc
Pacific Aquascape
IVIIVIC, Inc.
Ca liba, Inc.
DD Systems, Inc. dba
Ace Construction & Design, Inc.*
* Non -responsive
Bid Amount
$1,425,500.00
$1,427,532.00
$1,554,511.00
9111 $1,948,000.00
ACTION REQUESTED FOR THE WILDERNESS PARK POND RESTORATION PROJECT (CIP NO. 15-
21 D - PONDS AND ELECTRICAL)
MAY 12, 2020
PAGE 5
1 k
s
ACTION REQUESTED FOR THE WILDERNESS PARK POND RESTORATION PROJECT (CIP NO. 15-
21 D — PONDS AND ELECTRICAL)
MAY 12, 2020
PAGE 6
Ems=
CIP No. 15-21 D —Ponds & Electric-""'
Bid Amount
Contingency
Design $110647.1
Inspection, construction engineering & contract administration (estimated) $96:111.
City purchased Electrical Equipment 17,237.
TOTAL ESTIMATED PROJECT COST: 1;