Loading...
HomeMy WebLinkAbout06. Misc Proj No. 344 - Award Contract to All Citites Engineering, Inc. - Patton Rd Water Main ImpAPite,Tn,,N,0,- D By TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNC91TY MA",,,',�`tGER FROM: OFFICE OF THE CITY MANAGER BY: DELFINO R. CONSUNJI, P.E., DIRECTOR OF PUBLIC WORKS/CITY EN ANUR DATE: FEBRUARY 11, 2020 SUBJECT: AWARD CONSTRUCTION CONTRACT FOR PATTON ROAD WATER MAIN IMPROVEMENTS, MISCELLANEOUS PROJECT NO. 344 ; eiln 0, 0 That the City Council: Award contract to All Cities Engineering, Inc. in the amount of $159,800 for the construction of Patton Road Water Main Improvements, Miscellaneous Project (MP) 344; 2. Authorize transfer of $210,000 from CIP Water Fund Account No. 51-1-8674 to CIP Water Fund Account No. 51-1-8690 to cover total project cost; and 3. Authorize Public Works Director/City Engineer to execute any change orders or additional scope of work deemed necessary or desirable up to the approved project budget. T-1191 62fel :tell 10, 1 The Public Works Department is responsible for the operations and maintenance of approximately 276 miles of water mains. As part of maintaining the water system, an existing water mainline on Patton Road at the intersection of Stewart and Gray Road is in need of repairs to ensure that the City is able to continue to provide reliable water service and fire protection (Attachment A). Due to the maintenance and repair nature of the water work, the project was informally bid January 16, 2020. On January 24, 2020, four bids were received ranging from $159 , 800 $313,500. The bid results were as follows: CONTRACTOR LOCATION BID AMOUNT All es Engineering, Inc. Jurupa Valley, CA $159,800.00 GRP Contractors, Inc. Buena Park, CA $168,774.95 Big Ben Engineering, Inc. Irvine, CA $238,375.00 lWiramontes Construction Company, Inc. Rialto, CA $313,500.00 MP NO. 344 PATTON ROAD WATER MAIN IMPROVEMENT PROJECT FEBRUARY 11, 2020 PAGE #2 The lowest responsive and responsible bidder was All Cities Engineering, Inc. in the amount of $159,800. All Cities Engineering, Inc. state contractor's license is "current and active" and they are registered with the California Department of Industrial Relations (DIR) for Labor Compliance. Staff recommends that the City Council award a contract to All Cities Engineering, Inc. for the construction of Patton Road Water Main Improvements, MP 344. The scope of water repairs include replacement of approximately 45 feet of water mains, associated fixings and connections on Patton Road from Fontana Street to just south of the intersection at Stewart and Gray Road. Construction is anticipated to be completed by the end of March 2020. This project is categorically exempt per Section 15302 Class 2 (c) of the California Environmental Quality Act (CEQA) Guidelines. Efficiency & Adaptability Quality of Life, Infrastructure & Parks The total estimated cost of the project, including construction contract, contingencies, inspection, materials testing, and contract administration is $208,976 broken down as follows: Description Amount �-Con-struction--Contract $159,800 Contingencies (12%) $19,176 Inspection, materials Testing, and Contract Administration $31,024 -F - Total Estimated Project Cost -$210,600 The project will be funded from the FY 2019-2020 Water Fund CIP as provided in the table below, including transfer of $210,000 from CIP Water Fund Account No. 51-1-8674 to CIP Water Fund Account No. 51-1-8690 through requested City Council action in order to keep all project funds in one account. Account No, Funding Source Amount 51-1-8690 Transfer from CIP Account No. 51-1-8674 $210,000 1111110% 1=1 10 ATTACHMENTS Attachment A — Project Location Map Attachment B — Bid Summary 4 • NO. 344 PATTON ROAD WATER MAIN IMPROVEMENT PROJECT TEBRU`' 2020 . ATTACHMENT A MISCELLANEOUS PROJECT No. 344 BID SUMMARY January 24, 2020 Mramontes, Construction Go., All Cities En�ineerinal, Inc. GRP on Inc, Big Ben, Inc Inc. Item Description Qty, Unit Unit Price Amount Unit Price Amount Amount Unit Price Amount Unit Price Amount I Install new 8-inch MJxFL C509 gate valve and 8-inch MJxFL adapter. I LS $ 2.500.00 S 2.500.00 $ 50000 $ 50000 $ 5,00000 $ 5,00000 $ 8,00000 $ 8,00000 2 Install new 8-inch MJ cap1plug with 2-inch temporary blow -off and thrust block 1 LS $ 600.00 $ 6W.00 $ 90000 $ 90000 $ 2,50000 $ 2,500.00 $ 3,00000 $ 3,00000 j Install now 8-inch CL52 CIVIL DIP with potable water ID tape 255 LF S 300.00 S 76,50,00 $ 30000 $ 76,50000 $ 525.00 $133,87500 $ 40000 $102,00000 4 Install now 6-Inch MJ 45-dogree DIP bond and thrust block 7 EA $ 6W.00 $ 4,200.00 $ 1.76785 $ 33,374.95 It 2,000.00 $ 14,000 00 $ 3,00000 $ 21,00000 5 Install new 8-Inch x 6-inch FL cross, (2) 6-inch MJxFL C509 gate valves, 8-inch MJxFL C509 I LS $ 7,00000 $ 7,00000 $12,50000 $ 12,500.00 $70,00000 $ 70,00000 cafe valve and 8-inch 10.1101 adapter $ 7,8W.00 S 7.1100.00 6 Install now 6-Inch CI-52 CIVIL DIP with potable water ID tape 45 I LF S 301 1 13.500.M $ 40000 $ 18,00000 $ 500.00 $ 22,50000 $ 50000 $ 22,50000 7 Install now 6-Inch MJ 45-degree DIP bend and thrust block. I t EA $ 6gi S 600.00 $ 2,000.00 $ 2,00000 $ 2,50000 $ 2,50000 $ 4,000.00 $ 4,000.00 6 Install new 6-inch MJ 90-degree DIP bend and thrust block. I 1A $ 6W.00 $ 6W.00 $ 2,50000 $ 2,500.00 $ 2,500.00 $ 2,50000 $ 4,000 00 It 4,00000 9 Install new 6-inch MJ DIP bend(s), connect now 6-Inch main to existing 6-inch main, and 2 LS $ 5,00000 $ 10,00000 $ 4,000.00 $ 8,000.00 $10,00000 $ 20,00000 abandonhPlug remaining portion or existing 6-inch main $12,500.00 $ 25,000.00 10 Remove existing and install now 1-inch potable water service, 518-inch meter, and box I EA 9 COMM S 4.000,00 $ 2,50000 I $ 2,500.00 $ 7,50000 $ 7,50000 $ 6,000.00 $ 6,000.00 11 Install new 8-inch MJ 45-degree DIP bend; connect new 8-inch main to existing 8-inch main; I I LS $ 3,00000 $ 3,000.00 $10,000.00 $ 10,00000 $25,00000 $ 25,00000 onJ &bwv1onvrIwq mmmnnq rxvtam of okiv,,c 8,inch rnmn S13,500.00 1 13.500.00 12 Remove existing valve box to abandon valve in place 4 EA $ 1.0DO.00 $ 4,000.00 $ 3,00000 $ 12,00000 $ 1,00000 $ 4,000.00 $ 2,000 O�O 0 0 8,0 0 0 13 Remove existing and install now 8-inch MJ C509 gate valve (at Cole Street). I EA $ 7,000.00-* $ 7,W0.00- -- 500 00 50000 $13,50000 $ 13,500.00 $'�00 $ 20,00000 _[$ TOTAL BASE BID - Items 1 to 13 $159,800.00 $168,774.95 $238,375.00 $313,500.00 ALL BIDS RECEIVED: ZMEMM= CONTRACTOR TOTAL BASE BID All Cities Engineering, Inc $ 159'800.00 GRP Contractors, Inc $ 168,774,95 Big Ben, Inc $ 238,37500 Miramontes Construction Go, Inc $ 313,50000