HomeMy WebLinkAbout09. CIP No. 20-02-Award Contract to Doug Martin Cont Co for FY 19-20 Slurry Seal Proj Dist 4Item No.
7� D BY
r -
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL CITY 10 AIGER
FROM: OFFICE OF THE CITY MANAGER
BY: DELFINO R. CONSUNJI, P.E., DIRECTOR OF PUBLIC WORKS/CITY EN I 4E
DATE: January 14, 2020
Ci . I
Z0141 *OKI 1] 6-19:4 LO dEJX!W:J I IF -J M h'i --• =h'J=110 I 11111=19111 *o1llllo[* I I
AN"IN411 go Is 011611 T 0
Mr- I oily] 0 11 1101OXTZ1111Z] 01 a idit•
-110 10 ' 0 0 0 r• 0 .
V4111 WrAw-1 mw&.-TZT.q E ifim R4 I
2. Approve the appropriation amount of $7,065 in Senate Bill 1 (SB1) funds in Accounl
No. 32-1-6780 to cover the estimated total project cost shortfall; and
3Authorize Public Works Director/City Engineer to execute any change orders or
additional scope of work for this project deemed necessary or desirable up to the
approved project budget.
On October 8, 2019, the City Council approved the plans and specifications (Attachment A) and
authorized staff to advertise for bids for the FY 2019/20 Slurry Seal Project (District 4). A total
of 35 street segments in Council District 4 covering a total of approximately six centerline miles
(31,901 linear feet) of roadway have been selected for this project. The streets and limits are
shown on the attached Project Street List (Attachment B) and Project Location Map (Attachment
C).
The project was advertised for bids in the Downey Patriot on October 31, 2019 and November
7, 2019, posted on Planet Bids on November 1, 2019, and published in various trade
publications. On November 21, 2019, the City Clerk received and publicly opened five bids
ranging from $260,967.65 to $337,031.09. The bid results were as follows:
L0191 k' 11 to] ;I
Roy Allan Slurry Seal, Inc.
Pavement Coatings Company
American Asphalt South, Inc.
All American Asphalt
LOCATION
BID AMOUNT
La Habra, CA
$260,'967.65
Santa Fe Springs, CA
$265,350.45
Jurupa Valley, CA
$292,569.00
Fontana, CA
$321,349.25
Corona, CA
$337,031.09
The lowest responsive and responsible bid in the amount of $260,967.65 was submitted by
Doug Martin Contracting Company, Inc. of La Habra, California (Attachment D). Doug Martin
Contracting Company, Inc. has satisfactorily completed similar projects for the Cities of
CAPITAL IMPROVEMENT PROJECT NO. 20-02
FY 2019/20 SLURRY SEAL PROJECT DISTRICT 4
JANUARY 14, 2020
PAGE #2
Bellflower, Downey, La Habra and Loma Linda. The company's references have been checked
and were satisfactory. In addition, Doug Martin Contracting Company, Inc.'s State of California
contractor's license is current and active. Finally, Doug Martin Contracting Company, Inc. and
its subcontractors are registered with the California Department of Industrial Relations under the
Public Works Contractor Registration Program for Labor Compliance. Staff recommends that
the City Council award a contract in the amount of $260,967.65 to Doug Martin Contracting
Company, Inc. for the FY 2019/20 Slurry Seal Project (District 4), Capital Improvement Project
No. 20-02.
Construction is anticipated to begin in February 2020 and be completed in April 2020.
CITY COUNCIL PRIORITIES
Quality of Life, Infrastructure & Parks
FISCAL IMPACT
The total estimated project cost, including construction contract, contingencies, design,
inspection, materials testing, construction management and contract administration is as
follows:
Item
Amount
Construction Contract
$260,96 -8 -
Contingencies (10%
Contingencies(10%)
$26,097
Subtotal Construction Cost
$287,065
Design
$4,000
Construction Inspection
$8,000
Construction Engineeri�_and Contract Administration_
Grand Total
_$8,000
$307,065
Staff recommends that the City Council appropriate an additional $7,065 in SB1 funds in
Account No. 32-1-6762 to cover the estimated total project cost shortfall.
With the approval of the additional appropriation in the amount of $7,065 funding in the amount
of $307,065 will be budgeted in the FY 2019/20 Capital Improvement Program broken down as
follows:
Account No. Funding Source
32-1-6762 SB1 funds
32-1-6762 SB1 funds Additional
Total Project Funding:
ATTACHMENTS
Attachment A — Plans
Attachment B — Slurry Seal Project District 4 Street List
Attachment C — Slurry Seal Project District 4 Location Map
Attachment D — Bid Summary
Amount
$300,000
$7,065
$307,065
0 1 r I q 11 - Y .7ii
TI
qI V
V, i;
i 7
Jl-
7- IF
-jj1P,
:I, ij.,
I)W
0 1 r I q 11 - Y .7ii
TI
qI V
V, i;
i 7
Jl-
7- IF
-jj1P,
im
a
LENGTH
WIDTH
AREA
NO.
STREETFROM
TO
(LF)
(LF)
I (SF)
1
BELLMANAV
_ FIFTH ST
CUL-DE-SAC NORTH
203
30
T 6,090
2
BIRCHDALEAV
TENTH ST/BAYSINGER AV
FLORENCE AV
469
36
16,884
3
BIRCHDALEAV
TENTH ST
SOUTH END
331
36
11,916
4
CASANESAV
GOTHAM
VIA AMORITA
935
36
33,660
I 5
CECILIA ST
STUDEBAKER RD
FAIRFORD AV
1,335
36
48,060
6
CECILIA ST
I FAIRFORD AV
ORR & DAY RD
1,174
36
42,264
7
CEDARTREE RD
SERAPIS AV
CHANEY AV
773
36
27,828
8
CLANCEYAV
GALLATIN RD
VISTA DEL RIO A
1,525
36
54,900
9
CORD AV
FOSTORIA ST
CECILIA ST
518
30
15,540
10
CORD AV
PELLET ST
CUL-DE-SAC NORTH
466
30
13,980
11
DACOSTA ST
BROOKSHIRE AV
CUL-DE-SAC WEST
344
32
11,008
12
DINSDALE ST
HALEDON AV
CUL-DE-SAC EAST
230
28
6,440
E�
I 13
DONEYAV
GALLATIN RD
VISTA DEL RIO AV
1,033
37.9
39,151
14
DONEY SANFORD BR RD
HASTY AV
GALLATIN RD/SID
1,399
36
50,364
15
FOSTORIA ST
WOODRUFF AV
CUL-DE-SAC EAST
574
30
17,220
16
GALLATIN RD
LAKEWOOD BL
LEMORAN AV
2,217
38
84,246
17
GOTHAM ST
WOODRUFF AV
PANGBORN AV
1,617
36
58,212
18
HASTYAV
GOTHAM ST
VIA AMORITA
930
30
27,900
19
LEFLOSSAV
CECILIA ST
NORTH END
472
36
16,992
20
LEXINGTON RD
DOWNEY AV
BROOKSHIRE AV
1,260
36
45,360
21
LINDSEYAV
BROOKPARK RD
CEDARTREE RD
695
36
25,020
22
MANZANARAV
GALLATIN RD
VISTA DEL RIO AV
1,203
36
43,308
23
MARBEL AV
FIFTH ST
CUL-DE-SAC NORTH
223
26
5,798
24
MULLER ST
CUL-DE-SAC WEST
TRISTAN DR
j 938
29.1
27,296
25
OTTO ST
CUL-DE-SAC WEST
BELLDER DR
518
30
15,540 I
26
PATTON RD
CLETA ST
FIRESTONE BL
1,,989
38
75,582
27
PELLET ST
CUL-DE-SAC WEST
PANGBORN AV
1,062
36
38,232
28
PICO VISTA RD
CUL-DE-SAC NORTH
395' SOUTHERLY
395
36
14,220
29
RAVILLER DR
BROOKSHIRE AV
BIRCHDALE AV
708
36
25,488
30
SERAPIS AV
S/0 CEDARTREE RD
TELEGRAPH RD
596
38
22,648
31
SEVENTH ST
DOWNEY AV
BROOKSHIRE AV
1,426
36
51,336
32
SHELLEYFIELD RD
CECILIA ST
GOTHAM ST
1,508
30
45,240
33
STOAKES AV
GALLATIN RD
VISTA DEL RIO AV
1,286
35.6
45,782
34
VISTA DEL RIO AV
DOWNEY AV
STOAKES AV
684
36
24,624
35
VISTA DEL RIO AV
STOAKES AV
BROOKSHIRE AV
865
28
24,220
TOTAL
31,901
1,112,348
CITY OF DOWNEY
DEPARTMENT OF i'ENGINEERING DIVISION
PROJECT:
RO CAPITAL IMPROVEMENT
. PROJECT
ATTACHMENT C
Item
20 Desenetion
-BASE BID ITEMS (ITEMS I THROUGH 7)
I Traffic Control. Public Convenience & Safety
2 Crack Seal Existing Asphat Pavement
3 Fumish EmUsilled Asphaft
Fumish Aggregate and Place Type 11 Slurry Seal on
4 City Streets
5 Remove Existing Pavement rkings & Striping
6 Install Painted Traffic Striping (2 Coats)
7 Install Thermoptasbc Pwemen( Wings
Total Base Bid -It em I to 7
ALL BIDS RECEIVED:
Doug Martin CoftacUng Company,
Inc. 1� I RayAll�aLn'Slurry
' Seal Inc Pavement Coatngs Co.
, I.I I.-....11-..... ""' oun
tUntAmoU it rice�T!!nUnit Price A
I ILS 1 $
19,500 LIF $
100 _ roN I $
975, 70N,j S
5,520 SIF 1 $
3.075 JILF7 6
3.460 ISF I S
CONTRACTOR
TOTAL BASE BID
Doug Martin Contracting Company, Inc
S 260,967.65
Ray Allan Slurry Seal Inc
S 265,350.45
Pavement Coatings Co.
$ 292,569.00
American Ashalt South, Inc.
S 321,349.25
American Ashatt
S 337,031.09
ATTACHMENT D
500.00
59,500.00
S
4,680.00
$ 4,60000
$
51.000,00
S 51,000.00
0.59
$ 11.505.00
$
0.90
$ 17,550.00
$
0.59
$ 11,505,00
875.62
1 S 140,099.20
S
60325
$ 109.320.00
$
650,00
$ 104.00.00
74.19
[S
S
107.22
S 104.53950
S
10000
S 97.500.00
1.36
7-7az.533525
$ 07.20
$ 7.5
$
1.60
$ 8,832.00
$
1.40
$ 7.72800
1.56
L! 4,797.00
S
077
3 2,367.75
$
1.60
3 4,920.00
4.
$ 15,224-00
$
5.22
S 18.061.20
$
4.60
S 15.916.00
�260,967�15_
_JS
265.350.45
I
$ 292513 00
ATTACHMENT D