HomeMy WebLinkAbout08. CIP No 19-04-Award Contract to Gentry Bros, Inc for Samoline Ave & Melva St Water System ImpsA FF TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCILCITY M Nio` FROM: OFFICE OF THE CITY MANAGER BY: DELFINO R. CONSUNJI, P.E., DIRECTOR OF PUBLIC WORKS/CITY ENGINEZ SUBJECT: AWARD CONSTRUCTION CONTRACT FOR SAMOLINE AVENUE AND MELVA STREET WATER SYSTEM IMPROVEMENTS, CAPITAL IMPROVEMENT PROJECT NO. 19-04 That the City Council: Award contract to Gentry Brothers, Inc. in the amount of $717,800 for the construction of Samoline Avenue and Melva Street Water System Improvements, Capital Improvement Project (CIP) 19-04; 2. Authorize transfer of $25,000 from CIP Water Fund Account No. 51-1-8674 to CIP Water Fund Account No. 51-1-8685 to cover the total project cost; and 3. Authorize Public Works Director to execute any change orders or additional scope of work for this project deemed necessary or desirable up to the approved project budget. •Ke -1 "s PI] Water system infrastructure along Samoline Avenue from Quill Drive to Melva Street and on Melva Street from Rives Avenue to Samoline Avenue are in need of improvements to ensure reliable water service for domestic and fire protection purposes (Attachment A). Said water improvements are proposed to be completed in advance of future street improvements in order to eliminate any impacts to new pavement in the future. FaIRPTI144 Mw V] Ills] (Z -Z t -_r_ I@ 21-1A kyf�' I IM -16 Wkyr� I (Q a I I[Z) (A VI (on I IQ Ion I I I I Cto ";Rykyrt I (A a I 11-1(A7 a tz-go! I I 11!�-J I I lei L:-] I Lei L'ZI;= CIP NO. 19-04 SAMOLINE AVENUE AND MELVA STREET WATER SYSTEM IMPROVEMENT PROJECT JANUARY 14, 2020 PAGE #2 The project was advertised in the Downey Patriot on December 12, 2019 and December 19, 2019 and published in various trade publications. On January 2, 2020, the City Clerk received and publicly opened four bids ranging from $717,800 to $1,135,610. The bid results were as follows: CONTRACTOR LOCATION BID AMOUNT Gentry Brothers, Inc. Irwindale $717,800 T.E. Roberts, Inc. Orange $806,205 All Cities Engineering, Inc. Jurupa Valley $814,065 Colich & Sons, L.P. Gardena $1,135,610 The lowest responsive and responsible bidder was Gentry Brothers, Inc. in the amount of $717,800 (Attachment C). Staff reviewed the bid proposal and references provided by Gentry Brothers, Inc. and found that Gentry Brothers, Inc. has satisfactorily completed projects in the Cities of Alhambra, Brea, Covina, Glendora, La Verne and Whittier. Gentry Brothers, Inc.'s state contractor's license is "current and active" they are registered with the California Department of Industrial Relations (DIR) for Labor Compliance. Staff recommends that the City Council award a contract to Gentry Brothers, Inc. for the construction of Samoline Avenue and Melva Street Water System Improvements, CIP 19-04. Construction is anticipated to begin in February 2020 and be completed by June 2020. This project is categorically exempt per Section 15302 Class 2(c) of the California Environmental Quality Act (CEQA) Guidelines. Efficiency & Adaptability Quality of Life, Infrastructure & Parks The total estimated cost of the project, including construction contract, contingencies, design, inspection, construction management, contract administration, and materials testing is $925,000 broken down as follows: Description Amount Design $49,000 Construction Contract $717,800 Contingencies (10%) $71,780 ..._-- Engineering, ----._ _._ _._-- Administration Inspection, Construction En ineerin ,and Contract Admi tion $86,420_ Total Estimated Project Cost: $925,000 E CIP NO. 19-04 SAMOLINE AVENUE AND MELVA STREET WATER SYSTEM IMPROVEMENT PROJECT JANUARY 14, 2020 PAGE #3 The project will be funded from the FY 2019-2020 Water Fund CIP as provided in the table below, including transfer of $25,000 from CIP Water Fund Account No. 51-1-8674 to CIP Water Fund Account No. 51-1-8685 through requested City Council action in order to keep all project funds in one account. ------- - ------ - ------- ---- Account No. Fundin Source Amount Samoline Ave. Water Improvements (Budgeted FY 51-1-8685 2019-20) $900,000 51-1-8685 tTransfer fo-r.-C-IP--Account No. 51-1-8674 $25,000 Total Project Fundir�g: $925,000 F-1 Vi 1-119.9 it -►I W, Attachment A - Project Location Map Attachment B - Plans Attachment C - Bid Summary 3 CIP NO. 19-04 SAMOLINE AVENUE AND MELVA STREET WATER SYSTEM IMPROVEMENT PROJECT JANUARY 14, 2020 PAGE #4 203mum�= N -7Z CITY OF DOWNEY DEPARTMENT OF PUBLIC WORKS UTILITIES DIVISION PROJECT LOCATION MAP PROJECT: SAMOLINE AVENUE AND MELVA STREET WATER SYSTEM IMPROVEMENT PROJECT I ITS: QUILL DRIVE TO MELVA STREET (and) RIVES AVENUE TO SAMOUNE AVENUE 0 I UNAUTHORIZED CHANGES & USES 'Y- -T —1 71 .LL 4a 14 rEIJ • MHUMUNT45. 15 IV laillyl NUT IN klm 0 0 Koji VON 0 gilma 101111 ml- - Nall §YMBOL/LEGEND END PROJECT,, BEGIN PROJECT VICINITY MAP NOT TO SCALE NOTETOC NTRACTOR y. CjY Or DOWNS/ TPLE SkEFTVlcpmiy MAP, mo umti in ui It h. ku La LW CD c umti in ui It h. ku r xv 91. MATCHLINE STA -50.00 SEE MEET 4 a q - - - - - - io 4Ikk P? o aAdm jaz of Fy Poo 1111 it rg ' MATCHLINE STA. 77+50.00 SEE MEET I Zl firs MMCMNESM 17+50 Mine W VMS.. Pro -�I` 3-111 tit 777-1 NAN k 'Z�7-771, r xv 91. MATCHLINE STA -50.00 SEE MEET 4 a q - - - - - - io 4Ikk P? o aAdm jaz of Fy Poo 1111 it rg ' MATCHLINE STA. 77+50.00 SEE MEET I 6, t t^• k -j L-'] Ll 0 11 its 1115 to in; q not to 1 q it TO TO jjj I A qi tit of A ON it to 11 a a is top off it, too Mti 11 -0 0 oil 1 Egg a 1 is it ryrm vo no -1 'no A-0 is CFD z z Zl firs MMCMNESM 17+50 6, t t^• k -j L-'] Ll 0 11 its 1115 to in; q not to 1 q it TO TO jjj I A qi tit of A ON it to 11 a a is top off it, too Mti 11 -0 0 oil 1 Egg a 1 is it ryrm vo no -1 'no A-0 is CFD z z .0a M'o 400 . - - wM 111". MATCHLINE STA 207-5000 aff SHE" a 14 1 'Az Mummy, f -d MATCHLINE STA. 17.50.00 TY E 1., 19 1 ° L- MATCHUNE STA 17-50 w Ix Lo Is 1 lilt 1 yD p gum Us 1— j oil AO pi lie 1" TY E 1., 19 1 ° L- MATCHUNE STA 17-50 w Ix Lo Is 1 lilt 1 j pi oil '00 jp; ps 11 to son NN All I too to 6u q its to 01 Y to Us A H A lot I AXA no Mon Us I it -4 I Q P 1 in19 of to! ply 1 1TJ M w 5 n q 1 05, all A 11 1 ;j "j q! lot it to of 16 - a TV a AT An A, 1 in P 5 tlR 1 to S' my oy, A A A j .0 -M U41M. —2, - - - WUM — f, t, MATCHLINESTA. 107-10.00 See AHOVE f , 'I A, I J, [ - - - - - - - - - - - - - - - - - iw A A 0 it I SEE BELOW En 5i, ry fi m —41 AM m it �.j MATCHLINE STA. 1440,00 SEE SHEET 4 f, t, �g 'I A, tl C) J, A A 0 it I SEE BELOW f, t, �g 'I A, A A it I SEE BELOW ry AM �.j J. 'I A, 01 MATCHLINE STA. 107+10.00 SEE BELOW A 01 MATCHLINE STA. 107+10.00 SEE BELOW tit a. MC i 1W WWI WMAM ,T a its AV gf My 1.5 US in loth i 1 �Ie , to tit a. MC i 1W WWI WMAM a its yr gf My 1.5 US in loth i 1 �Ie , to tit a. MC i 1W WWI WMAM a its yr gf My Its in tit a. MC i 1W WWI WMAM -7� is n -0 I I zc= 0 L '01 7 7 7v —nz -4 ."Tz Ytc, m -1 CITY OF DOWNEY DIP" 7,- P"Uuc d'l4t,, Mm.:il iT. -Tj s-NIVW PnZC WATER SYSTEM DETAILS V ----------- CITY OF DOWNEY DEP7. OF PU8UC WORKS UTILITIES DIVISION Tj -7- WATER SYSTEM DETAILS CAPITAL IMPROVEMENT PROJECT NO. 19-04 (Quill Drive to Melva Street and Rives Avenue to Sarrholine Avenue) BID SUMMARY January 2, 2020 Potable 10yalt, Win, fill q5' 4FA Asto'katpul Implunon.mom, 8 Furnish and install new 8 -inch MJ 1126- DIP bend and Lhaicalblack 2 9 Furnish and install new 8 -inch MJ 22 50 DIP bend and thrust block I Isolate, out and dowillour exicbrit 8 -inch main: remove existing valve, and install now 6 -inch W 0509 gate 10 Wm mO .1.'6Wd r"ot"; 2 Furnish and install now 0 -Inch x 8 -Inch FL Lee, (2) 8 -inch WxFL 0509 gate valves, 8 -inch MJxFL 11 adapters, and ans.rialr! polouitils 1 Isolate, out and devolter existing 8 -Inch main; remove oxisball too and valve, famish and install as. 8 -Inch -lid sleaves, ii -inch CIL 52 CML DIP with potable water ID top., and associated materials; end abandon 1 92 unplug remaining proton of existing 4 -inch main I Isolate, col, and dowelar existing 20 -inch main, remove existing tee and valve furnish and install now 20 - inch ealial sleeves, 20 -inch CIL 52 CML DIP with potable water ID tape, and associated materials, and 13 abandon I unplug remaining portion of ardisfing 12 -inch main I _L4_1 Rell:10 0,�Ilog md fic-111 vend -W — ant", 1`111 1 15 1 Remove existing valve box to abandon valve in place 4 EA S 500.T_j S 7. 00 $ 1.315.00 J $ 2,63000 $ 75000 $ 1.5WOO $ 600 $ 1.2000 EA S 500.00 $ WOO $ 1,01500 $ 1.015.00 $ 500.0 $ 500.00 $ 11.00100 $ 1.000.00 Gemr-Burithours, $ Roberts Incorporated 1 $ 15700 $2 08,810 00 ACE 299,250 00 Wish & S.ma L P Ipem Deard lien ON Unit j Unit Price $ 16'00 00 Amount Unit Prim I Amount Unit Prim Amount $ 10,050.00 Unit Prim $ 14,00000 Amount $ 4.000.00 92.730.00 Fire Hydrants 1 Abnndrrn and Reconnect [o }rlrUatg WYafra Main 6y Canhkrg;.uusg Per Items 4,2,3,4,9, and 6 Furnish and install no. James Jones 3700-R fire hydrant assembly(T.) 3 EA I $ 45,000.00 $ 10,00 00 — $ 3144000 9 8,00000 $ I Delpfi-Al'stApprex Station 50A3 9 LS $ 94.000.00 S 114,00040 $ 9,050.00 - 9,05000 0000 it 15,WO 00 15,OW.00 $ 12,00000 $ 12.000 00 2 D.Wl"ATiflAppre. Stefan 1OA0 I LS $ 6.000.00 1 S 16,000,00 $_I 112100 _111:125 _ (MD0$ _ L!2L __ 22 ow flo __ $ 16,000.00 30,000 96, .E 3 Detail "ATclApprox Station 92+66 1 LS $ 15,000Z $ 15,000.00 1,$ 14.270 00 14.270 00 $ 14,250 00 $ 14,250.00 1'$' 12,00000 $ 2,00000 4 Dal.iI"A4",flAppmx Sienna 15�92 1 LS $ 1 1,OD0.00 f $ 11000.011, $13,065.00 $ 13.06500 200000 $$ 58 $ 15,200.00 $ 12,00000 $ �2,OWOO 5 D.I.VAY at Affirprox Station 18.97 0 1 LS $ 13.10DO 00 $ 13, .00 $13.91500 $ J3.915.00 " OWO $ 18.00000 $ 12.000.00 $ 12.00000 6 NOTAIP-Ab" at Approx 6vanno 114+27 6 1 _8 $ 8.0w.00 $ 8,00000 $ 8,M00 8,02000 it 6 Z11500 $, 12,115,00 6 1200000 $ 920000 FoUblit War Not Top. Nfaabj 22 feet, furnish and install now James Jones 3775-R fire hydrant 1 J EA Hot lap existing 8 -inch main with 8 -inch x 8 -inch MJxFL lopping sleeve, 8 -Inch FL 0509 gale valve, 8-mch $ 11,000.00 $10,38500 1 $ 85WOO $ 8,50000 1 $ 6,70000 Remove existing fire hydrant riser from and including 90' elbow to fire hydrant head, plug remaining portion 7 MJxFL adapter, and all mosevilbal pralbuitt. 1 I EA $ 15, .00 $ 15,000.00 $ 9.79500 $ 9,7%00 $ 13,000 . DO $ 13,00000 $ 10.000.00 $ 10.000.00 Potable 10yalt, Win, fill q5' 4FA Asto'katpul Implunon.mom, 8 Furnish and install new 8 -inch MJ 1126- DIP bend and Lhaicalblack 2 9 Furnish and install new 8 -inch MJ 22 50 DIP bend and thrust block I Isolate, out and dowillour exicbrit 8 -inch main: remove existing valve, and install now 6 -inch W 0509 gate 10 Wm mO .1.'6Wd r"ot"; 2 Furnish and install now 0 -Inch x 8 -Inch FL Lee, (2) 8 -inch WxFL 0509 gate valves, 8 -inch MJxFL 11 adapters, and ans.rialr! polouitils 1 Isolate, out and devolter existing 8 -Inch main; remove oxisball too and valve, famish and install as. 8 -Inch -lid sleaves, ii -inch CIL 52 CML DIP with potable water ID top., and associated materials; end abandon 1 92 unplug remaining proton of existing 4 -inch main I Isolate, col, and dowelar existing 20 -inch main, remove existing tee and valve furnish and install now 20 - inch ealial sleeves, 20 -inch CIL 52 CML DIP with potable water ID tape, and associated materials, and 13 abandon I unplug remaining portion of ardisfing 12 -inch main I _L4_1 Rell:10 0,�Ilog md fic-111 vend -W — ant", 1`111 1 15 1 Remove existing valve box to abandon valve in place 4 EA S 500.T_j S 7. 00 $ 1.315.00 J $ 2,63000 $ 75000 $ 1.5WOO $ 600 $ 1.2000 EA S 500.00 $ WOO $ 1,01500 $ 1.015.00 $ 500.0 $ 500.00 $ 11.00100 $ 1.000.00 S 2 00.00 $ 26 %000 00 1 $ 15700 $2 08,810 00 $ 225 00 lt 299,250 00 D 521 00 EA $ M000.00 $ —LS$ _1241)(1.00 20,000.09 $ 2,79000 $ 5,58) 00 $ 8,00000 $ 16'00 00 $ 2,50000 $ 5,00000 Is 12 .00 $10,05000 $ 10,050.00 $ 14.00000 $ 14,00000 $ 4.00.00 $ 4.000.00 LS S 6, .00 S 6,0000 00 $ 7,750.00 $ 7.750.0 $ 10,00000 $ 10.00000 1 $ 1,8000 $ 9,800 LS S 16. All S 16. .00 $19,37000 S 19,37000 $ 22.5000 $ 22.5m.00 7.50000 $ 7,5000 EA $ 500.00 S 500100 _$ 37000 37000 $ 1.5m.00 $ 1, 5W 00 6W.0 600.00 —— r — $ EA 1 6 SW 00 S 7.0W 00 t $546000 $ imooll 00 70000 $ 2 800 00 ,Potable water Ductile Iran Pipe j I 16 Furnish and install now (Firch CIL 52 CML DIP with potable water ID tape 1330 LF S 2 00.00 $ 26 %000 00 1 $ 15700 $2 08,810 00 $ 225 00 lt 299,250 00 D 521 00 $ 692930 00 7 Furnish ardumall new 12 -inch CL 52 CML DIP with potable water 10 (ape 165 1 LF S 20100 11 S 33. .00 $ 52500 $ 86,625.00 $ 250.00 $ 41.25000 $ 562.00 $ 92.730.00 Fire Hydrants 1 Furnish and install no. James Jones 3700-R fire hydrant assembly(T.) 3 EA S 15,000 00 $ 45,000.00 $ 10,00 00 — $ 3144000 9 8,00000 $ 24,00000 —1 50,08 j $ 25,50000 Isolate, cut, and dowater existing 8 -inch main and remove existing fire hydrant assembly; Furnish and instal iiiiiillllll 19 new James Jones 3700-R No hydrant arecrably (Too) 2 FA It 16,000,00 _S 37,000.00 $ 14,GB5.00 $ 28,7700 $ 15,00000 $ 30,000 $ 9,50000 $ 19,00000 Remove existing fire hydrant riser from and including 90 -degree elbow to fire hydrant head, banish and 20 install now James Jonas 3700-R fire hydrant 3 EA $ I'L000,00 $ 33, .00 S 7.74000 $ 23,220.0 $ 8.00000 $ 24,000.00 $ 5,500.00 $ 16,500.00 Remove exisUng fire hydrant riser from and including 90 -degree elbow to lire hydrant head, hurrah and 21 install new James Jones 3700-R fire hydrant 2 EA S 11.000.00 It 22.00000 $ 9,15000 $ IR 300 00 $ 8.500.00 $ 1700000 S 6.40000 $ 12.80000 Remove existing fire hydrant riser from and including 90-degron, ofthow to lire hydrant head, extend lateral 3 22 feet, furnish and install now James Jones 3775-R fire hydrant 1 J EA $ 11,000,00 $ 11,000.00 $10,38500 $ 10,38500 $ 85WOO $ 8,50000 $ 6,70000 $ 6,70000 Remove existing fire hydrant riser from and including 90' elbow to fire hydrant head, plug remaining portion 23 of Fire hydrant lateral, and remove fire hydrant valve box 5 EA $ 500.00 $ 2,500,00 $ 2.950.00 $ 14.750.00 $ 550000 $ 27,50000 $ 1,20000 $ 6,00000 porobb, 'Not", WI -IM 1110 Strostp, 1 Remove existing, Iurmch and Install now 518 -inch fire service by-pass water motor and 520M MXtf and 1.$ 24 AMR mounting bracket on existing fire service backflow I EA S 1„ 00 S 1100.00 1 �840 00 $ 1_64_00 500.00 $ l' $ 1,50D 00 $ 750DO $ 75000 L� 25 Remove existing, furnish and install now 518 -Inch potable water molar and box 10 EA T'LOW00 S 10,00000 $ 1,10 Do $ 11,00000 $ gm Do $ 9,00000 it 70000 $ 7,00000 26 Remove/Abandon existing, furnish and install now 1 -Inch potable water service, 516 -inch motor, and box 22 EA S 2,000.00 $ 44J000.00 $ 4.82500 $ 106.150 00 $ 3.00.0 $ 66,00000 $ 3.3W.00 $ 72.600 00 27 R.mov.-Iiimalcin existing, furnish and install new I.Irch potable water service, 314 -inch motor, and box 7 EA S 2,100,00 $ 14,70000 $ 5,800 00 $ 40.6W.00 $ 3,20000 $ 22,400D) $ 3,40.00 $ 23.60,00 28 Remove station, furnish and install now 1 -Inch potable water molar and box 2 EA $ 1,301100 2,60) 00 $ 2,82500 $ 5,65000 $ 3,8W00 $ 7,60000 $ 900.00 $ 1,60000 29 Remove/Abandon existing, furnish and install now 1 -Inch potable water service, motor, and box 9 EA $ ?—NO 00 $ 16,000,00 $ 5,47000 $ 49,23000 $ 3.00000 $ 27.000 00 $ 2.800 $ 25,20000 Remove existing, furnish and install now 2 -inch potable wall angle motor stop on excling copper 30 C -W' ,J f1h qv`w, 910l"Ill I I S 3,5W.00 $ 3,50000 $ 3.07008 $ 3.07000 $ 3.50000 $ 3,500.00 $ 2.5W0 $ 2.5000 31 Remove l Abandon existing, furnish and install now 2 -inch potable water service, meter, and box 2 EA S 7.900.00 S 15,800.00 $ 8840.00 $ 17.600.00 $ 5,50000$ 11.000.00 $ 6.200.00 $ 12.400.00 downstream of now maker up to closet hose Bibb and and install building supply line downs 32 [:LFurnish ­mrm onmovo xhl+ �,r lm, 1,,,Wd om. lo on, roov­d 3 EA $ 4,500.00 00 $ 3,940 $ 11,82000 $ 5,00000 $ 15,00000 $ 2,W00 . it TW00 TIIAI BASE BID items 1 to 32 It 177,000,00 $ 806,205,00 S 814,065.00 $ 1,135,610.00 ALL BIDS RECEIVED: Engineer's Estimate 718,00000 CONTRACTOR TOTAL BASE BID Gentry Brothers $ 717,800.00 Roberts I ncorporated $ 806,20500 ACE $ 814,06500 C.Ilch & Sen., L P $ 1,135,610 00