HomeMy WebLinkAbout08. CIP No 19-04-Award Contract to Gentry Bros, Inc for Samoline Ave & Melva St Water System ImpsA FF
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCILCITY M Nio`
FROM: OFFICE OF THE CITY MANAGER
BY: DELFINO R. CONSUNJI, P.E., DIRECTOR OF PUBLIC WORKS/CITY ENGINEZ
SUBJECT: AWARD CONSTRUCTION CONTRACT FOR SAMOLINE AVENUE AND MELVA
STREET WATER SYSTEM IMPROVEMENTS, CAPITAL IMPROVEMENT
PROJECT NO. 19-04
That the City Council:
Award contract to Gentry Brothers, Inc. in the amount of $717,800 for the
construction of Samoline Avenue and Melva Street Water System Improvements,
Capital Improvement Project (CIP) 19-04;
2. Authorize transfer of $25,000 from CIP Water Fund Account No. 51-1-8674 to CIP
Water Fund Account No. 51-1-8685 to cover the total project cost; and
3. Authorize Public Works Director to execute any change orders or additional scope of
work for this project deemed necessary or desirable up to the approved project
budget.
•Ke -1 "s PI]
Water system infrastructure along Samoline Avenue from Quill Drive to Melva Street and on
Melva Street from Rives Avenue to Samoline Avenue are in need of improvements to ensure
reliable water service for domestic and fire protection purposes (Attachment A). Said water
improvements are proposed to be completed in advance of future street improvements in order
to eliminate any impacts to new pavement in the future.
FaIRPTI144 Mw
V] Ills] (Z -Z t -_r_ I@ 21-1A kyf�' I IM -16 Wkyr� I (Q a I I[Z) (A VI (on I IQ Ion I I I I Cto ";Rykyrt I (A a I 11-1(A7 a tz-go! I I 11!�-J I I lei L:-] I Lei L'ZI;=
CIP NO. 19-04 SAMOLINE AVENUE AND MELVA STREET WATER SYSTEM IMPROVEMENT
PROJECT
JANUARY 14, 2020
PAGE #2
The project was advertised in the Downey Patriot on December 12, 2019 and December 19,
2019 and published in various trade publications. On January 2, 2020, the City Clerk received
and publicly opened four bids ranging from $717,800 to $1,135,610.
The bid results were as
follows:
CONTRACTOR LOCATION
BID AMOUNT
Gentry Brothers, Inc. Irwindale
$717,800
T.E. Roberts, Inc.
Orange
$806,205
All Cities Engineering, Inc.
Jurupa Valley
$814,065
Colich & Sons, L.P.
Gardena
$1,135,610
The lowest responsive and responsible bidder was Gentry Brothers, Inc. in the amount of
$717,800 (Attachment C). Staff reviewed the bid proposal and references provided by Gentry
Brothers, Inc. and found that Gentry Brothers, Inc. has satisfactorily completed projects in the
Cities of Alhambra, Brea, Covina, Glendora, La Verne and Whittier. Gentry Brothers, Inc.'s
state contractor's license is "current and active" they are registered with the California
Department of Industrial Relations (DIR) for Labor Compliance. Staff recommends that the City
Council award a contract to Gentry Brothers, Inc. for the construction of Samoline Avenue and
Melva Street Water System Improvements, CIP 19-04.
Construction is anticipated to begin in February 2020 and be completed by June 2020.
This project is categorically exempt per Section 15302 Class 2(c) of the California
Environmental Quality Act (CEQA) Guidelines.
Efficiency & Adaptability
Quality of Life, Infrastructure & Parks
The total estimated cost of the project, including construction contract, contingencies, design,
inspection, construction management, contract administration, and materials testing is $925,000
broken down as follows:
Description Amount
Design $49,000
Construction Contract $717,800
Contingencies (10%) $71,780
..._-- Engineering, ----._ _._ _._-- Administration Inspection, Construction En ineerin ,and Contract Admi tion $86,420_
Total Estimated Project Cost: $925,000
E
CIP NO. 19-04 SAMOLINE AVENUE AND MELVA STREET WATER SYSTEM IMPROVEMENT
PROJECT
JANUARY 14, 2020
PAGE #3
The project will be funded from the FY 2019-2020 Water Fund CIP as provided in the table
below, including transfer of $25,000 from CIP Water Fund Account No. 51-1-8674 to CIP Water
Fund Account No. 51-1-8685 through requested City Council action in order to keep all project
funds in one account.
------- - ------ - ------- ----
Account No. Fundin Source Amount
Samoline Ave. Water Improvements (Budgeted FY
51-1-8685 2019-20) $900,000
51-1-8685 tTransfer fo-r.-C-IP--Account No. 51-1-8674 $25,000
Total Project Fundir�g: $925,000
F-1 Vi 1-119.9 it -►I W,
Attachment A - Project Location Map
Attachment B - Plans
Attachment C - Bid Summary
3
CIP NO. 19-04 SAMOLINE AVENUE AND MELVA STREET WATER SYSTEM IMPROVEMENT
PROJECT
JANUARY 14, 2020
PAGE #4
203mum�=
N -7Z
CITY OF DOWNEY
DEPARTMENT OF PUBLIC WORKS UTILITIES DIVISION
PROJECT LOCATION MAP
PROJECT: SAMOLINE AVENUE AND MELVA STREET
WATER SYSTEM IMPROVEMENT PROJECT
I ITS: QUILL DRIVE TO MELVA STREET (and) RIVES AVENUE TO SAMOUNE AVENUE
0
I
UNAUTHORIZED CHANGES & USES
'Y-
-T —1
71
.LL 4a 14 rEIJ
• MHUMUNT45.
15 IV laillyl NUT IN klm 0 0 Koji VON 0
gilma 101111 ml- - Nall
§YMBOL/LEGEND
END PROJECT,,
BEGIN PROJECT
VICINITY MAP
NOT TO SCALE
NOTETOC NTRACTOR
y. CjY Or DOWNS/
TPLE SkEFTVlcpmiy MAP, mo
umti
in
ui It
h.
ku
La
LW
CD
c
umti
in
ui It
h.
ku
r xv 91.
MATCHLINE STA -50.00
SEE MEET 4
a
q - - - - - -
io
4Ikk P?
o
aAdm
jaz
of Fy Poo 1111 it
rg '
MATCHLINE STA. 77+50.00
SEE MEET
I
Zl
firs
MMCMNESM 17+50
Mine
W
VMS..
Pro
-�I` 3-111
tit
777-1
NAN
k
'Z�7-771,
r xv 91.
MATCHLINE STA -50.00
SEE MEET 4
a
q - - - - - -
io
4Ikk P?
o
aAdm
jaz
of Fy Poo 1111 it
rg '
MATCHLINE STA. 77+50.00
SEE MEET
I
6, t t^• k -j L-'] Ll 0
11 its 1115 to in; q not to 1 q it TO TO jjj I A
qi tit of A ON it to 11
a a
is top off it,
too Mti 11
-0
0 oil 1 Egg
a 1 is it ryrm
vo no -1
'no
A-0
is
CFD
z
z
Zl
firs
MMCMNESM 17+50
6, t t^• k -j L-'] Ll 0
11 its 1115 to in; q not to 1 q it TO TO jjj I A
qi tit of A ON it to 11
a a
is top off it,
too Mti 11
-0
0 oil 1 Egg
a 1 is it ryrm
vo no -1
'no
A-0
is
CFD
z
z
.0a M'o 400 . - - wM 111".
MATCHLINE STA 207-5000
aff SHE" a
14 1
'Az
Mummy,
f -d
MATCHLINE STA. 17.50.00
TY E
1., 19 1 ° L-
MATCHUNE STA 17-50
w Ix
Lo
Is
1 lilt 1
yD p
gum
Us 1—
j
oil AO
pi
lie 1"
TY E
1., 19 1 ° L-
MATCHUNE STA 17-50
w Ix
Lo
Is
1 lilt 1
j
pi
oil
'00
jp; ps 11 to son NN All I too to 6u q
its to
01 Y
to Us A H
A lot I AXA no
Mon Us I it
-4
I
Q P 1 in19 of
to! ply 1 1TJ
M
w 5 n q 1 05, all
A
11 1 ;j "j q!
lot it to of 16
- a TV
a AT An A,
1 in P 5 tlR 1 to
S' my
oy,
A A A
j
.0
-M
U41M. —2, - - - WUM —
f, t,
MATCHLINESTA. 107-10.00
See AHOVE
f ,
'I
A,
I
J,
[
- - -
- - - - - - - - - - - - - -
iw
A A
0
it
I
SEE BELOW
En
5i,
ry
fi
m
—41
AM
m
it
�.j
MATCHLINE
STA.
1440,00
SEE SHEET 4
f, t,
�g
'I
A,
tl C)
J,
A A
0
it
I
SEE BELOW
f, t,
�g
'I
A,
A A
it
I
SEE BELOW
ry
AM
�.j
J.
'I
A,
01
MATCHLINE STA. 107+10.00
SEE BELOW
A
01
MATCHLINE STA. 107+10.00
SEE BELOW
tit a.
MC
i
1W WWI WMAM
,T
a
its
AV
gf
My
1.5
US
in
loth i 1
�Ie
,
to
tit a.
MC
i
1W WWI WMAM
a
its
yr
gf
My
1.5
US
in
loth i 1
�Ie
,
to
tit a.
MC
i
1W WWI WMAM
a
its
yr
gf
My
Its
in
tit a.
MC
i
1W WWI WMAM
-7�
is n -0
I I zc=
0
L
'01
7 7
7v
—nz
-4
."Tz Ytc, m -1
CITY OF DOWNEY
DIP" 7,- P"Uuc
d'l4t,, Mm.:il iT. -Tj s-NIVW PnZC
WATER SYSTEM DETAILS
V
-----------
CITY OF DOWNEY
DEP7. OF PU8UC WORKS UTILITIES DIVISION
Tj -7- WATER SYSTEM DETAILS
CAPITAL IMPROVEMENT PROJECT NO. 19-04
(Quill Drive to Melva Street and Rives Avenue to Sarrholine Avenue)
BID SUMMARY
January 2, 2020
Potable 10yalt, Win, fill q5' 4FA Asto'katpul Implunon.mom,
8 Furnish and install new 8 -inch MJ 1126- DIP bend and Lhaicalblack 2
9 Furnish and install new 8 -inch MJ 22 50 DIP bend and thrust block I
Isolate, out and dowillour exicbrit 8 -inch main: remove existing valve, and install now 6 -inch W 0509 gate
10 Wm mO .1.'6Wd r"ot"; 2
Furnish and install now 0 -Inch x 8 -Inch FL Lee, (2) 8 -inch WxFL 0509 gate valves, 8 -inch MJxFL
11 adapters, and ans.rialr! polouitils 1
Isolate, out and devolter existing 8 -Inch main; remove oxisball too and valve, famish and install as. 8 -Inch
-lid sleaves, ii -inch CIL 52 CML DIP with potable water ID top., and associated materials; end abandon 1
92 unplug remaining proton of existing 4 -inch main I
Isolate, col, and dowelar existing 20 -inch main, remove existing tee and valve furnish and install now 20 -
inch ealial sleeves, 20 -inch CIL 52 CML DIP with potable water ID tape, and associated materials, and
13 abandon I unplug remaining portion of ardisfing 12 -inch main I
_L4_1 Rell:10 0,�Ilog md fic-111 vend -W — ant", 1`111 1
15 1 Remove existing valve box to abandon valve in place 4
EA S 500.T_j S
7. 00
$ 1.315.00
J $ 2,63000
$ 75000
$ 1.5WOO
$ 600
$ 1.2000
EA S 500.00 $
WOO
$ 1,01500
$ 1.015.00
$ 500.0
$ 500.00
$ 11.00100
$ 1.000.00
Gemr-Burithours,
$
Roberts Incorporated
1 $ 15700
$2 08,810 00
ACE
299,250 00
Wish & S.ma
L P
Ipem Deard lien
ON
Unit
j Unit Price
$ 16'00 00
Amount
Unit Prim
I Amount
Unit Prim
Amount
$ 10,050.00
Unit Prim
$ 14,00000
Amount
$ 4.000.00
92.730.00
Fire Hydrants
1
Abnndrrn and Reconnect [o }rlrUatg WYafra Main 6y Canhkrg;.uusg Per Items 4,2,3,4,9, and 6
Furnish and install no. James Jones 3700-R fire hydrant assembly(T.)
3
EA
I
$
45,000.00
$ 10,00 00
—
$ 3144000
9 8,00000
$
I Delpfi-Al'stApprex Station 50A3
9
LS
$ 94.000.00
S
114,00040
$ 9,050.00
-
9,05000
0000
it 15,WO 00
15,OW.00
$ 12,00000
$
12.000 00
2 D.Wl"ATiflAppre. Stefan 1OA0
I
LS
$ 6.000.00
1
S
16,000,00
$_I 112100
_111:125 _
(MD0$
_ L!2L
__
22 ow flo
__
$ 16,000.00
30,000
96, .E
3 Detail "ATclApprox Station 92+66
1
LS
$ 15,000Z
$
15,000.00
1,$ 14.270 00
14.270 00
$ 14,250 00
$
14,250.00
1'$' 12,00000
$
2,00000
4 Dal.iI"A4",flAppmx Sienna 15�92
1
LS
$ 1 1,OD0.00
f $
11000.011,
$13,065.00
$ 13.06500
200000
$$ 58
$
15,200.00
$ 12,00000
$
�2,OWOO
5 D.I.VAY at Affirprox Station 18.97 0
1
LS
$ 13.10DO 00
$
13, .00
$13.91500
$ J3.915.00
"
OWO
$
18.00000
$ 12.000.00
$
12.00000
6 NOTAIP-Ab" at Approx 6vanno 114+27 6
1
_8
$ 8.0w.00
$
8,00000
$ 8,M00
8,02000
it
6 Z11500
$,
12,115,00
6 1200000
$
920000
FoUblit War Not Top. Nfaabj
22
feet, furnish and install now James Jones 3775-R fire hydrant
1 J EA
Hot lap existing 8 -inch main with 8 -inch x 8 -inch MJxFL lopping sleeve, 8 -Inch FL 0509 gale valve, 8-mch
$
11,000.00
$10,38500
1
$ 85WOO $
8,50000
1
$
6,70000
Remove existing fire hydrant riser from and including 90' elbow to fire hydrant head, plug remaining portion
7 MJxFL adapter, and all mosevilbal pralbuitt.
1
I
EA
$ 15, .00
$
15,000.00
$ 9.79500
$ 9,7%00
$ 13,000 . DO
$
13,00000
$ 10.000.00
$
10.000.00
Potable 10yalt, Win, fill q5' 4FA Asto'katpul Implunon.mom,
8 Furnish and install new 8 -inch MJ 1126- DIP bend and Lhaicalblack 2
9 Furnish and install new 8 -inch MJ 22 50 DIP bend and thrust block I
Isolate, out and dowillour exicbrit 8 -inch main: remove existing valve, and install now 6 -inch W 0509 gate
10 Wm mO .1.'6Wd r"ot"; 2
Furnish and install now 0 -Inch x 8 -Inch FL Lee, (2) 8 -inch WxFL 0509 gate valves, 8 -inch MJxFL
11 adapters, and ans.rialr! polouitils 1
Isolate, out and devolter existing 8 -Inch main; remove oxisball too and valve, famish and install as. 8 -Inch
-lid sleaves, ii -inch CIL 52 CML DIP with potable water ID top., and associated materials; end abandon 1
92 unplug remaining proton of existing 4 -inch main I
Isolate, col, and dowelar existing 20 -inch main, remove existing tee and valve furnish and install now 20 -
inch ealial sleeves, 20 -inch CIL 52 CML DIP with potable water ID tape, and associated materials, and
13 abandon I unplug remaining portion of ardisfing 12 -inch main I
_L4_1 Rell:10 0,�Ilog md fic-111 vend -W — ant", 1`111 1
15 1 Remove existing valve box to abandon valve in place 4
EA S 500.T_j S
7. 00
$ 1.315.00
J $ 2,63000
$ 75000
$ 1.5WOO
$ 600
$ 1.2000
EA S 500.00 $
WOO
$ 1,01500
$ 1.015.00
$ 500.0
$ 500.00
$ 11.00100
$ 1.000.00
S 2 00.00
$
26 %000 00
1 $ 15700
$2 08,810 00
$ 225 00 lt
299,250 00
D 521 00
EA $ M000.00 $
—LS$ _1241)(1.00
20,000.09
$ 2,79000
$ 5,58) 00
$ 8,00000
$ 16'00 00
$ 2,50000
$ 5,00000
Is
12 .00
$10,05000
$ 10,050.00
$ 14.00000
$ 14,00000
$ 4.00.00
$ 4.000.00
LS S 6, .00 S 6,0000 00 $ 7,750.00 $ 7.750.0 $ 10,00000 $ 10.00000 1 $ 1,8000 $ 9,800
LS S 16. All S 16. .00 $19,37000 S 19,37000 $ 22.5000 $ 22.5m.00 7.50000 $ 7,5000
EA $ 500.00 S 500100 _$ 37000 37000 $ 1.5m.00 $ 1, 5W 00 6W.0 600.00
—— r — $ EA 1 6 SW 00 S 7.0W 00 t $546000 $ imooll 00 70000 $ 2 800 00
,Potable water Ductile Iran Pipe
j
I
16
Furnish and install now (Firch CIL 52 CML DIP with potable water ID tape
1330
LF
S 2 00.00
$
26 %000 00
1 $ 15700
$2 08,810 00
$ 225 00 lt
299,250 00
D 521 00
$
692930 00
7
Furnish ardumall new 12 -inch CL 52 CML DIP with potable water 10 (ape
165
1 LF
S 20100
11 S
33. .00
$ 52500
$ 86,625.00
$ 250.00
$
41.25000
$ 562.00
$
92.730.00
Fire Hydrants
1
Furnish and install no. James Jones 3700-R fire hydrant assembly(T.)
3
EA
S 15,000 00
$
45,000.00
$ 10,00 00
—
$ 3144000
9 8,00000
$
24,00000
—1
50,08
j $
25,50000
Isolate, cut, and dowater existing 8 -inch main and remove existing fire hydrant assembly; Furnish and instal
iiiiiillllll
19
new James Jones 3700-R No hydrant arecrably (Too)
2 FA
It 16,000,00
_S
37,000.00
$ 14,GB5.00
$ 28,7700
$ 15,00000 $
30,000
$ 9,50000
$
19,00000
Remove existing fire hydrant riser from and including 90 -degree elbow to fire hydrant head, banish and
20
install now James Jonas 3700-R fire hydrant
3 EA
$ I'L000,00
$
33, .00
S 7.74000
$ 23,220.0
$ 8.00000 $
24,000.00
$ 5,500.00
$
16,500.00
Remove exisUng fire hydrant riser from and including 90 -degree elbow to lire hydrant head, hurrah and
21
install new James Jones 3700-R fire hydrant
2 EA
S 11.000.00
It
22.00000
$ 9,15000
$ IR 300 00
$ 8.500.00 $
1700000
S 6.40000
$
12.80000
Remove existing fire hydrant riser from and including 90-degron, ofthow to lire hydrant head, extend lateral 3
22
feet, furnish and install now James Jones 3775-R fire hydrant
1 J EA
$ 11,000,00
$
11,000.00
$10,38500
$ 10,38500
$ 85WOO $
8,50000
$ 6,70000
$
6,70000
Remove existing fire hydrant riser from and including 90' elbow to fire hydrant head, plug remaining portion
23
of Fire hydrant lateral, and remove fire hydrant valve box
5 EA
$ 500.00
$
2,500,00
$ 2.950.00
$ 14.750.00
$ 550000 $
27,50000
$ 1,20000
$
6,00000
porobb, 'Not", WI -IM 1110 Strostp,
1
Remove existing, Iurmch and Install now 518 -inch fire service by-pass water motor and 520M MXtf and
1.$
24
AMR mounting bracket on existing fire service backflow
I EA
S 1„ 00
S
1100.00
1 �840 00
$ 1_64_00
500.00
$ l' $
1,50D 00
$ 750DO
$
75000
L�
25
Remove existing, furnish and install now 518 -Inch potable water molar and box
10 EA
T'LOW00
S
10,00000
$ 1,10 Do
$ 11,00000
$ gm Do $
9,00000
it 70000
$
7,00000
26
Remove/Abandon existing, furnish and install now 1 -Inch potable water service, 516 -inch motor, and box
22 EA
S 2,000.00
$
44J000.00
$ 4.82500
$ 106.150 00
$ 3.00.0 $
66,00000
$ 3.3W.00
$
72.600 00
27
R.mov.-Iiimalcin existing, furnish and install new I.Irch potable water service, 314 -inch motor, and box
7 EA
S 2,100,00
$
14,70000
$ 5,800 00
$ 40.6W.00
$ 3,20000 $
22,400D)
$ 3,40.00
$
23.60,00
28
Remove station, furnish and install now 1 -Inch potable water molar and box
2 EA
$ 1,301100
2,60) 00
$ 2,82500
$ 5,65000
$ 3,8W00 $
7,60000
$ 900.00
$
1,60000
29
Remove/Abandon existing, furnish and install now 1 -Inch potable water service, motor, and box
9 EA
$ ?—NO 00
$
16,000,00
$ 5,47000
$ 49,23000
$ 3.00000 $
27.000 00
$ 2.800
$
25,20000
Remove existing, furnish and install now 2 -inch potable wall angle motor stop on excling copper
30
C -W' ,J f1h qv`w, 910l"Ill
I I
S 3,5W.00
$
3,50000
$ 3.07008
$ 3.07000
$ 3.50000 $
3,500.00
$ 2.5W0
$
2.5000
31
Remove l Abandon existing, furnish and install now 2 -inch potable water service, meter, and box
2
EA
S 7.900.00
S
15,800.00
$ 8840.00
$ 17.600.00
$ 5,50000$
11.000.00
$ 6.200.00
$
12.400.00
downstream of now maker up to closet hose Bibb and
and install building supply line downs
32
[:LFurnish
mrm
onmovo xhl+ �,r lm, 1,,,Wd om. lo on, roovd
3
EA
$ 4,500.00
00 $ 3,940
$ 11,82000
$ 5,00000
$
15,00000
$ 2,W00
.
it
TW00
TIIAI BASE BID items 1 to 32
It 177,000,00
$ 806,205,00
S
814,065.00
$ 1,135,610.00
ALL BIDS RECEIVED:
Engineer's Estimate
718,00000
CONTRACTOR
TOTAL BASE BID
Gentry Brothers
$ 717,800.00
Roberts I ncorporated
$ 806,20500
ACE
$ 814,06500
C.Ilch & Sen., L P
$ 1,135,610 00