Loading...
HomeMy WebLinkAbout04. CIP No. 15-21 Reject Bids Rcvd & Auth Solicitation Multiple Prime Contractor Construction Bids�� • • F OFFICE OF ■CWTIliANAGER JOHN OSKOUI, DATE: •12,2019 SUBJECT: WILDERNESS PARK POND RESTORATION -i, • AUTHORIZE. 15-21) REJECT BIDS RECEIVED AND i FOR CONTRACTOR i • f; That the City Council: 1. That the City Council reject all bids received for the Wilderness Park Ponds Restoration Project (Capital Improvement Project No. 15-21) and authorize solicitation of bids from multiple prime contractors. 2. Authorize staff to purchase a pre -fabricated pedestrian bridge system through a sole source informal bid process. In an effort to ascertain that the pond restoration would be completed by a qualified construction firm and avoid complications and delays; the City opted to employ a prequalification process of eligible contractors. The subsequent bids received well exceeded the engineer's estimate. At its meeting of August 27, 2019, the City Council rejected the two prequalified contractors' bids. At the same meeting, the City Council authorized staff to re -solicit for construction bids. On August 28, 2019, and September 5, 2019, the Notice Inviting Bids for this project was published in the Downey Patriot. On October 10, 2019, the City Clerk received and publicly opened five (5) bids as shown on the attached bid summary (Attachment A). F:�+�11��� C•T�l On October 14, 2019, the City received a bid protest from the representative of the second lowest bidder, MMC, Inc. On October 16, 2019, NR Development, the lowest bidder provided a response to the bid protest. WILDERNESS PARK POND RESTORATION PROJECT (CIP NO. 15-21) REJECT BIDS RECEIVED AND AUTHORIZE SOLICITATION FOR MULTIPLE PRIME CONTRACTOR CONSTRUCTION BIDS NOVEMBER 12, 2019 PAGE 2 16-e-cfi—on ZT-Mffe-b-id-aocuments sFaTe—sTff-al�ffi-e--G-ify--re—serves tne rignt to reject any or all proposals and to waive any or all information or technical defects, as the interest of the City may require. Award of Contract or rejection of Bid proposals will be made by the City within 45 calendar days following the Bid opening." Upon reviewing the bid protest and the corresponding response, staff recommends that the City Council reject all bids received as related to the Wilderness Park Pond Restoration Project and authorize re -solicitation of bids. Restoration of the Wilderness Park ponds involves several phases of construction activities. The first phase, which includes water and sludge removal, is now complete, The project's additional phases include extensive concrete improvements; as well as the actual pond restoration effort which includes replacing the existing damaged liner and mechanical equipment, installing a naturalized hardened shoreline, restoring wetland habitat for native species, and a new pedestrian bridge; and finally the construction of new walking trails and landscape improvements. After reviewing the bids received and analyzing the current construction market conditions, staff is •i the opinion that the subject project could •- completed in a more effective and economically efficient manner utilizing the "multi -prime" procurement •• By utilizing a • construction delivery method, the City manages a group • prime contractors with complementary scope • • The City awards WRVAPI concrete) on a low bid basis to satisfy the competitive bidding statue. rUffrer-M.Tom Me eDemo and degrass .• *Concrete improvements around Community Building 02 - WILDERNESS PARK POND RESTORATION - POND RESTORATION *Restoring the wetlands habitat at two existing ponds at Wilderness • • Replace invasive plant species with natives • Install the 40 ml. pond liner s •Naturalized hardened shoreline a • r17707 TT" • T7 17F rMile-r-MR-7 *Pedestrian bridge *Pond Outlook *Realign Electrical Vehicle Charging Station •Add Electrical Enclosure WILDERNESS PARK POND RESTORATION PROJECT (CIP NO. 15-21) REJECT BIDS RECEIVED AND AUTHORIZE SOLICITATION FOR MULTIPLE PRIME CONTRACTOR CONSTRUCTION BIDS NOVEMBER 12, 2019 PAGE 3 3 - WILDERNESS PARK POND RESTORATION — LANDSCAPE IMPROVEMENTS *Landscape improvements *Irrigation improvements New trail segments mDry creek beds Educational wayfinding signage to facilitate wetlands and native habitat awareness Moreover, because of budgetary constraints and in trying to manage the costs to the maximum extent possible, staff intends to procure the specified pre -fabricated pedestrian bridge system through a sole -source informal bid process and include installation of the bridge as an additive alternate item in the bid documents. Quality of Life, Neighborhood & Infrastructure The cost of re -solicitation of bids is estimated to be approximately $5,000 and which would be paid by the City's 2018-20 Capital Improvement Program which includes the Wilderness Park Pond Restoration Project, as well as utilizing grant funds from RMC and Habitat Conservation Fund, and the $200,000 matching fund from its General Fund (Account Nos. 26-1-7706 and 40-1-7706). ATTACHMENTS Attachment A: Bid Summary Attachment B: Location Diagram NOVEMBER 12,2019 PAGE 4 CITY OF DOWNEY CIP NO. 15-21 WILDERNESS PARK POND RESTORATION PROJECT Bid Due Date: 10/10/19 @ 1:00 pm Company Name Bid Amount NR Development, Inc. $3,798,500.00 MMC, Inc. $4,244,500.00 Los Angeles Engineering, Inc. $4,583,000.00 Caliba, Inc. $4,627,553.10 MVC Enterprises, Inc. $5,527,000.00 WILDERNESS PARK POND RESTORATION PROJECT (CIP NO. 15-21) REJECT BIDS RECEIVED AND AUTHORIZE SOLICITATION FOR MULTIPLE PRIME CONTRACTOR CONSTRUCTION BIDS NOVEMBER 12, 2019 PAGE 5