TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: OFFICE OF THE CITY MANAGER
BY: DELFINO R. CONSUNJI, P.E., DIRECTOR OF PUBLIC WORKS/CITY ENGINES$
DATE: OCTOBER 8, 2019
SUBJECT: APPROVE PLANS AND SPECIFICATIONS AND AUTHORIZE SOLICITATION
FOR BIDS FOR FY 2019/20 SLURRY SEAL PROJECT DISTRICT 4, CAPITAL
IMPROVEMENT PROJECT O. 20-02
— -----------
RECOMMENDATION
That the City Council approve the plans and specifications and authorize solicitation for
construction bids for FY 2019/20 Slurry Seal Project District 4, Capital Improvement Project No.
20-02.
The slurry seal program is designed to seal aged asphalt concrete pavement and extend its life
on various streets throughout the City an average of five to seven years. A slurry seal program
is an effective means of preserving asphalt pavement surfaces by avoiding and/or deferring
more extensive and costly pavement rehabilitation methods such as asphalt overlay and/or
reconstruction. In order to implement a citywide systematic and efficient slurry seal program,
the City has been divided into a four-year cycle covering one of the four areas each year. Over
the last three years, street segments in Council Districts 1, 2 and 3 were slurry sealed
(Attachment A). This year, staff is proposing to slurry seal street segments in Council District 4.
The street segments selected for slurry seal were based on the condition of the existing
pavement as prioritized by the City's Pavement Management Information System (PMIS), field
observations and available funding. The PMIS serves as a comprehensive planning tool that
facilitates technical analysis and allows for a systematic approach to identify cost-effective
means for maintaining the citywide roadway system in the most efficient and strategic manner.
The City's PMIS evaluates, ranks, and prioritizes each street segment based on pavement
surface conditions (i.e. cracking, rutting, and roughness), pavement structural strength and
subgrade stability and provides numerical criteria necessary to ensure the most appropriate
paving application for maintenance is selected.
DISCUSSION
Staff has completed the preparation of plans, specifications, and cost estimate for the FY
2019/20 Slurry Seal Project District 4 and this project is now ready for solicitation of construction
bids (Attachment B). A total of 35 street segments in City Council District 4 covering a total of
approximately six centerline miles (31,901 linear feet) of roadway have been selected for this
project. The streets and limits are shown on the attached Project Street List (Attachment C) and
Project Location Map (Attachment D).
CAPITAL IMPROVEMENT PROJECT NO. 20-02
FY 2019/20 SLURRY SEAL PROJECT DISTRICT 4
OCTOBER 8, 2019
PAGE 2
The work consists of sealing cracks in the asphalt pavement, applying emulsified Type I slurry
seal coat to the pavement surface; crack sealing; replacement of traffic striping, pavement
markings, and raised pavement markers; and appurtenant work. Some street segments will
also require removal and replacement of asphalt pavement at certain locations, which will be
handled independently of this project by City maintenance crews prior to application of slurry
seal.
Construction is anticipated to begin in January 2020 and be completed by March 2020.
This project is categorically exempt from the provisions of the California Environmental Quality
Act under Section 15301(c), Existing Facilities.
• • z
Quality of Life, Infrastructure & Parks
The total estimated cost of the project is $300,000 broken down as follows:
Description Amount
Design $4,000
Construction Contract and Contingencies $280,000
Inspection $8,000
Construction Enclineenlillin- and Contract Administration $8,000
Total Estimated Project Cost'. $300,000
Funding in the amount of $300,000 is budgeted in the FY 2019/20 Capital Improvement
Program as shown in the table below:
Account
No. Fundin Source Amount
32-1-6780 Senate Bill 1 SB1 funds $300,000
Total Project Funding: $300,000
A detailed project cost summary will be provided at the time of the award of the construction
contract.
ATTACHMENTS
Attachment A - Four Year Slurry Seal Program Map
Attachment B - Plans
Attachment C - Slurry Seal Project District 4 Street List
Attachment D - Slurry Seal Project District 4 Location Map
City of Downey
Four Year Slurry Seal • • r:
J�
H
®c
r�
LL
qI- 1 .t p1
w v
0
� � iii �
in,ZW
ry
h
a^'I#
§' LFE
73
L L-
7/7
yy h
�ui
_ 4
ATTACHMENT B
LENGTH
WIDTH
AREA
0.
STREET
FROM
TO
LF
LF
SF
1
BELLANAV
FIFTH ST
CUL-DE-SAC NORTH
203
30
6,090
2
BIRCHDALEAV
TENTH ST/BAYSINGER AV
FLORENCE AV
469
36
16,884
3
BIRCHDALEAV
TENTH ST
SOUTH END
331
36
11,916
4
CASANESAV
GOTHAM
VIA AMORITA
935
36
33,660
5
CECILIA ST
STUDEBAKER RD
FAIRFORD AV
1,335
36
48,060
6
CECILIA ST
FAIRFORD AV
ORR & DAY RD
1;174
36
42,264
7
CEDARTREE RD
SERAPIS AV
CHANEY AV
773
36
27,828
8
CLAN CEYAV
GALLATIN RD
VISTA DEL RIO A
1,525
36
54,900
9
CORD AV
FOSTORIA ST
CECILIA ST
..518
30
15,540
10
CORD AV
PELLET ST
CUL-DE-SAC NORTH
466
30
13,980
11
DACOSTA ST _
BROOKSHIRE AV
CUL-DE-SAC WEST
344
32
11,008
12
DINSDALE ST
HALEDON AV
CUL-DE-SAC EAST
230
28
6,440
13
DONEYAV
GALLATIN RD
VISTA DEL RIO AV
1,033
37.9
39,151
14
DO NEY SANFORD SR RD
_w
HASTY AV
GALLATIN RD/SID
1,399
36
50,364
15
FOS RIA ST
WOODRUFF AV
CUL-DE-SAC EAST
574
30
17,220
16
GALLATIN RD
LAKEWOOD BL
LEMORAN AV
2,217
38
84,246
17
GOTHAM ST
WOODRUFF AV
PANGBORN AV
1,617
36
58,212
18
HASTYAV
_GOTHAM ST
VIA AMORITA
930
30
27,900
19
LEFLOSSAV
CECILIA ST
NORTH END
472
36
16,992
20
LEXINGTON RD
DOWNEY AV
BROOKSHIRE AV
1,260
36
45,360
21
LINDSEYAV
BROOKPARK RD
CEDARTREE RD
695
36
25,020
22ANZANARAV
GALLATIN RD
VISTA DEL RIO AV
1,203
36
43,308
23
MARBEL AV
FIFTH ST
CUL-DE-SAC NORTH
223
26
5,798
24
MULLER ST
CUL-DE-SAC WEST
TRISTAN DR
938
29.1
27,296
25
OTTO ST
CUL-DE-SAC WEST
BELLDER DR
518
30
15,540
26
PATTON RD
CLETA ST
FIRESTONE BL-
1,989
38
75,582
27
PELLET ST
CUL-DE-SAC WEST
PANGBORN AV
1,062
36
38,232
28
PICO VISTA RD
CUL-DE-SAC NORTH
395SOUTHERLY
395
36
14,220
29
RAVILLER DR
BROOKSHIRE AV
BIRCHDALE AV
708n36
25,488
30
SERAPIS AV
S/O CEDARTREE RD
TELEGRAPH RD -
596
38
22,648
31
SEVENTH ST
DOWNEY AV
BROOKSHIRE AV
1,426
36
51,336
32
SHELLEYFIELD RD
CECILIA ST
GOTHAM ST
1,508
30
45,240
33
STOAKESAV
GALLATIN RD
VISTA DEL RIO AV
1,286
35.6
45,782
34
VISTA DEL RIO AV
DOWNEY AV
STOAKES AV
684
36
24,624
35
VISTA DEL RIO AV
STOAKES AV
BROOKSHIRE AV
865
28
24,220
TOTAL
31,901