HomeMy WebLinkAbout05. CIP 20-29-Award Contract to CA Professional Eng., Inc-Brookshire at Everest Traffic Safety EnhancementsiteM No.
w..V_0
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCILCITY �NAA"4! E -R
' • OFFICE OF
DATE: SEPTEMBER
IMPROVEMENTSUBJECT: AWARD CONSTRUCTION CONTRACT FOR BROOKSHIRE AVENUE AT
EVEREST STREET TRAFFIC SAFETY ENHANCEMENTS, CAPITAL
PROJECT NO.20-29
That the City Council:
1) Award construction contract in the amount of $53,445 to California Professional
Engineering, Inc.for the Brookshire Avenue at Everest Street Traffic Safety
Enhancements, Capital Improvement Project No. 20-29
2) Authorize Public Works Director/ City Engineer to execute any change orders or
additional scope -of -work for this project deemed necessary or desirable up to the
approved project budget.
The City received a request to enhance traffic safety at the Brookshire Avenue and Everest
Street intersection (Attachment "A"). Staff retained the services of an engineering consultant to
evaluate the existing conditions at the intersection to determine what measures, if any, could be
implemented in order to enhance overall traffic safety at this location.
Brookshire Avenue is a four -lane minor arterial with an average daily traffic volume of
approximately 12,000 vehicles per day and a posted speed limit of 40 MPH. On -street parking
is provided on both sides of Brookshire Avenue in the vicinity of Everest Street and no separate
left -turn lanes are provided. Everest Street is a two-lane local residential street with an average
daily traffic volume of approximately 700 vehicles per day and a statutory speed limit of 25
MPH. Brookshire Avenue has a mild horizontal curve at its approaches to Everest Street.
Brookshire Park is located near the southeast corner of the intersection. In addition, Sussman
Middle School is located approximately 750 feet east of the subject intersection on Everest
Street at Birchdale Avenue. A marked white "ladder" crosswalk is currently in-place on the
south side of the intersection which serves to concentrate pedestrian crossings across
Brookshire Avenue at its intersection with Everest Street for persons walking to and from
Brookshire Park and school-age children walking to and from Sussman Middle School.
Supplementary flashing warning beacons mounted on overhead mast arms (Attachment "B")
along Brookshire Avenue in advance of Everest Street activated by pedestrian detection,
warning signs and pavement markings to augment the crosswalk and to heighten motorist
awareness of the possible presence of pedestrians are currently in-place at the intersection.
CAPITAL IMPROVEMENT PROJECT NO. 20-29
BROOKSHIRE AVENUE AT EVEREST STREET TRAFFIC SAFETY ENHANCEMENTS PROJECT
SEPTEMBER 10, 2019
PAGE 2
The evaluation conducted by the City's consultant at the Brookshire Avenue and Everest Street
intersection concluded that overall traffic safety could be enhanced at this location if the existing
flashing warning beacons were upgraded with the newer style rectangular rapid flashing
beacons (RRFBs)( Attachment "C"), which flash in a rapid on-off pattern and, hence, are more
effective in capturing motorists' attention compared to the traditional flashing beacons currently
in-place which flash in a slower on-off pattern. In addition to replacing the existing overhead
warning beacons located in advance of the intersection, new RRFBs will also be installed on
Brookshire Avenue at Everest Street, facing both northbound and southbound directions, at the
southwest and southeast corners of the intersection immediately adjacent to either side of the
crosswalk. The existing warning signs will be replaced with new fluorescent yellow -green
school crossing warning signs and new yellow school pavement markings will be installed in
place of the existing markings. New "yield" condition symbol limit lines and supplementary
pavement markings will also be installed on Brookshire Avenue in both directions immediately
before the crosswalk to reinforce the need for motorists to yield the right-of-way to pedestrians
crossing Brookshire Avenue within the crosswalk. Since Sussman Middle School is located
within 2,800 feet of the Brookshire Avenue at Everest Street intersection, there are no
intervening yellow school crosswalks between the intersection and the school other than those
located immediately contiguous to the school grounds and traffic safety could be enhanced for
children walking to and from the school campus across Brookshire Avenue at Everest Street by
installing a yellow "school" vs. a white conventional crosswalk. Consequently the new crosswalk
and supplementary pavement markings augmenting the crosswalk at the subject intersection
will be marked in yellow in accordance with the California Vehicle Code and state guidelines for
traffic control devices.
Fr •
The scope -of -work for this project will generally include the following improvements:
• Upgrading of the existing flashing warning beacons with a new rapid rectangular flashing
beacon (RRFB) system
• Replacement of all existing pedestrian crossing warning signs with fluorescent yellow -
green school crossing warning signs
• Replacement of existing white "ladder" crosswalk on the south side of the intersection
with a yellow school "ladder" crosswalk with yield symbol limit lines and supplementary
"SLOW SCHOOL XING" and "WAIT HERE" pavement markings
• Reconstruction of the curb ramps on the southwest and southeast corners
• Installation of LED safety lighting on the southwest corner.
On July 23, 2019, City Council approved the plans and specifications (Attachement D) and
authorized staff to advertise for bids.
CAPITAL IMPROVEMENT PROJECT NO. 20-29
BROOKSHIRE AVENUE AT EVEREST STREET TRAFFIC SAFETY ENHANCEMENTS PROJECT
SEPTEMBER 10, 2019
PAGE 3
The project was advertised in the Downey Patriot on August 1, 2019 and August 8, 2019 and
was posted on Planet Bids on August 1, 2019 as well as published in various trade publications.
On August 22, 2019, the City Clerk received and publicly opened nine bids ranging from
$53,445 to $87,125. The bid results were as follows:
CONTRACTOR
LOCATION
BID AMOUNT
California Professional Engineering,
La Puente, CA
$53,445
Inc.
Belco Elecnor Group
Chino, CA
$57,120
International Line Builders, Inc.
Corona, CA
$58,836
Crosstown Electrical & Data, Inc.
Irwindale, CA
$62 98
Alfaro Communication Construction,
Compton, CA
$65,000
Inc.
LA Traffic Signal Transportation, Inc.
San Dimas, CA
$70,500
JFL Electric, Inc.
Los Angeles, CA
$87,125
The lowest responsive and responsible bid in the amount of $53,445 was submitted by
California Professional Engineering, Inc. of La Puente, California as shown in the attached bid
summary (Attachment "E"). California Professional Engineering, Inc. has satisfactorily
completed similar projects for the Cities of Downey, Fontana, Pasadena, Fountain Valley and
Caltrans Districts 9 and 12. Its references have been checked and were satisfactory. California
Professional Engineering's State of California contractor's license is current and active. Finally,
California Professional Engineering is registered with the California Department of Industrial
Relations under the Public Works Contractor Registration Program for Labor Compliance. Staff
recommends that the City Council award a contract to California Professional Engineering, Inc.
for the Brookshire Avenue at Everest Street Traffic Safety Enhancements, Capital Improvement
Project No. 20-29. Alternate bid items consisting of the construction curb ramps, sidewalk and
concrete cross -gutter at the subject intersection were part of the construction bid, but are not
being awarded, given that staff will seek more competitive bid pricing for this work. Therefore,
only the base bid items consisting of the upgrading of the existing flashing beacons, signing and
striping work items will be awarded.
Construction will commence in October and project completion is anticipated in November 2019.
This project is categorically exempt from the provisions of the California Environmental Quality
Act (CEQA) under Section 15301(c), Existing Facilities.
- *-
Quality of Life, Infrastructure and Parks
The total estimated project cost, including the construction contract, contingencies, design,
construction engineering and contract administration is $77,039 broken down as follows:
CAPITAL IMPROVEMENT PROJECT NO. 20-29
BROOKSHIRE AVENUE AT EVEREST STREET TRAFFIC SAFETY ENHANCEMENTS PROJECT
SEPTEMBER 10, 2019
PAGE 4
Item Amount
- — ----------------
Des' $9,429
Design
Construction Contract and Contingencies $58,790
ConstructionEngineering and Contract AdministraTT
tionMLN $8,820
Total Estimated Proiect Cost: $77,039
- ------ - - — - ------
A total of $77,039 is currently programmed for this project in the Fiscal Year (FY) 2019-20
Capital Improvement Program in account no. 30-16454. The funding source is Gas Tax funds.
The total project funding is broken down as follows:
-- - ---------
J_A�qcouijt Nq. 1_ Funding Source Amount
26-16454 Gas Tax Fund (Expended in FY 2018-19) $7,109
26-16454 Gas Tax Fund (Budqeted in FY 2019-20) $69,930
Total Project Funding: $77,039
ATTACHMENTS
Attachment "A" — Project Location Map
Attachment "B" — Existing Flashing Beacons
Attachment "C" — Proposed Rectangular Rapid Flashing Beacons
Attachment "D" — Plan
Attachment "E" — Bid Summary
CAPITAL IMPROVEMENT PROJECT NO. 20-29
BROOKSHIRE AVENUE AT EVEREST STREET TRAFFIC SAFETY ENHANCEMENTS PROJECT
SEPTEMBER 10, 2019
PAGE 5
Existing Flashing Beacons
CAPITAL IMPROVEMENT PROJECT NO. 20-29
BROOKSHIRE AVENUE AT EVEREST STREET TRAFFIC SAFETY ENHANCEMENTS PROJECT
SEPTEMBER 10, 2019
PAGE 6
Proposed Rectangular Rapid Flashing Beacons
CAPITAL IMPROVEMENT PROJECT O. 20-29
BROOKSHIRE AVENUE AT EVEREST STREET TRAFFIC SAFETY ENHANCEMENTS PROJECT
SEPTEMBER 10, 2019
PAGE 7
SII
a
item
No. Descripbon
AASE BID ITEMS (ITEMS I AND 2)
Furnis . h ana instal CarmananSC3+15 AC LED RRF
Intersection of Brookshire Avenue at Everest Street
2 Furnish and Install Signing and Striping
Total :r;, Items (items 1 and 2)
J
Capital Improvement Project No. 20-29
Brookshire Avenue at Everest Street Intersection Traffic Safety Enhancements
BID SUMMARY
August 22, 2019
California Professional E!NineerinqBelco Elecrior Group International Line Builders- Inc
Qty Unit Unit Price [ Amount Unit Price I Amount Unit Price I Amount
M
9 L3
S 40,170.00
$ 13,275.1010
S 40,170.00
13,275.00
$ 44,31800 $ 44,318 00
$ 12,80200 $ 12,80200
J$ 42,30800 1$ 42,308 00
J$ 16,52800 $ 16,52800
Belco Elecnor Group
S
$ 53,445.00
jj
1 $ 57,120 00
58,836 00
Remove Existing Improvements & Gonstruct RUG Curb Kamp with
Detectable Warning Device 400 SF $
4 Remove Existing Improvements &Construct PCC Sidewalk 275 SF $
5 1 Remove Existing improvements & Gonsirum HG Grose -gutter
Spandrel 52JOSF $
Total Additive Alternative Bid Items - (items 3 thru 5)
Total Base Bid and Additive Alternative "A" and "B" (items 1 through 58)
LkLL BIDS RECEIVED:
CONTRACTOR
TOTAL BASE BID
California Professional Engineering
$
53,44500
Belco Elecnor Group
S
57,12000
International Line Builders, Inc
$
58,83600
Crosstown Electrical & Data, Inc
S
62,98300
Altars Communications Construction, Inc
S
65,00000
L A Traffic Signal, Inc
S
71,50000
JFL Electric
S
87,12500
25.30
$
10,120.00 $
1822 $
7,28800 $
2700 I $
i
10,80000.
33.35
$
9,171.25 $
2000 $
5,50000 $
3000 $
8250 00
42.50
$
22,100.00 $
3700 $
19,24000 $
4700 $
24,44000
$
41,391.25
$
32,02800
$
43,490 00
$
94,836.25
$
89,14800
$
102,32600