HomeMy WebLinkAbout08. CIP 19-09 - Approve Plans & Specs - Auth Solicitation to Bid - Firestone Blvd Pavement RehabA1e,,,_rn,No, y ROVED Y TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL GO TYMANAGER FROM: OFFICE OF THE CITY MANAGER - BY: DELFINO R. CONSUJI, P.E., DIRECTOR OF PUBLIC WORKS/CITY E GNE DATE: AUGUST 13, 2019 APPROVE i SPECIFICATIONS AND AUTHORIZE• •, FOR BIDS FOR THE FIRESTONEBOULEVARD PAVEMENT REHABILITATION, CAPITAL IMPROVEMENT PROJECT NO. 19-09 That the City Council approve the plans and specifications and authorize solicitation for construction bids for the Firestone Boulevard Pavement Rehabilitation, Capital Improvement Project No. 19-09. The Firestone Boulevard corridor is a major arterial highway with a daily traffic volume of nearly 40,000 vehicles per day. As such, Firestone Boulevard is the heaviest traveled east -west corridor within the City, accommodating both regional as well as local traffic. In March of 2009, the City Council approved a professional services agreement for preparation of plans, specifications and bid documents for the rehabilitation of Firestone Boulevard between Old River School Road and Brookshire Avenue. The rehabilitation of the Firestone Boulevard corridor included enhancements related to safety, infrastructure, capacity and beautification Consequently, a series of seven improvement projects were constructed between August 2013 and August 2016 and these projects included the construction of storm drain improvements, potable water improvements, electrical improvements, concrete improvements, landscape & irrigation improvements, paving improvements and City monument sign improvements. Additionally, the improvements within the downtown area between Myrtle Street and Brookshire Avenue were constructed to promote pedestrian circulation and enhanced aesthetics. These enhancements included an attractive walking environment consisting of decorative hardscape, benches, safety lighting, litter receptacles, parkway trees, flower pots, decorative intersection paving, traffic signals and street lighting; palm trees in the medians, tree lighting, etc. Over the last couple of years, the outer lane of westbound Firestone Boulevard between Myrtle Street and Downey Avenue has been showing signs of premature failure. A pavement investigation was conducted and it was determined that due to the elevation of the existing concrete pavement under the existing asphalt pavement, the recommended pavement thickness of three and one-half inches could not be achieved. Additionally, the heavy bus and truck traffic is causing the asphalt pavement adjacent to the gutter lip to fail due to the difference in rigidity of the underlying concrete and asphalt pavements. Therefore, it is necessary to rehabilitate the outer lane of westbound Firestone Boulevard. CAPITAL IMPROVEMENT PROJECT NO. 19-09 FIRESTONE BOULEVARD PAVEMENT REHABILITATION PROJECT AUGUST 13, 2019 PAGE 2 The plans, specifications and construction cost estimate have been completed and the project is now ready for solicitation of construction bids. This project will consist of reconstruction of the westbound curb lane, installation of rebar dowels and concrete subsurface pavement, grinding of asphalt pavement underlying concrete pavement to a depth of three and one-half inches, installation of base pavement and rubberized asphalt pavement surface course, minor curb and gutter repairs and installation of thermoplastic traffic striping and pavement markings. Construction is anticipated to begin in October 2019 and be completed by December 2019. This project is categorically exempt from the provisions of CEQA under Section 15301(c), Existing Facilities. Quality of Life, Infrastructure & Parks IaE.Yac1NIJ,I7T The total estimated cost of the project is $280,000 broken down as follows: ----- -- - --- -- - Description Amount Design $30,000WV Construction Contract and Contingencies $250,000 Construction Inspection, Engineering and Contract Administration $15,000 - ---------- - Project Cost: $300,000 Materials Testin Total Estimated Pro_ _ 1 $ _ � .I 000 The total approved budget for this project in the FY 2019/20 Capital Improvement Program is $400,000 as shown in the table below. Account No. Funding Source Amount 30-1-6749 Gas Tax funds $400,000 __-Total Project Fung0q__$400,000 A detailed cost estimate will be presented at the time of award of construction contract. ATTACHMENTS Attachment A - Location Map Attachment B - Plans 7:z Cl"Iff-Y OF DOWNEY Cn . .. .... . .. 01 0 T g[XT SIX5 DISTRICT 3 DISTRICT 4 10708 01 3 10714 10715 lue 10715 1 071 0 10717 10720 10719 10720 1072 DISTRICT I 10,26�', 1OT29 A DISTRICT CP 107 � 2 , 10726 10727 ]Uj �2 10730 CECILI 1 G7-1 10731 t,,4tT, M M 10 8 10731 8219 117 T`1F1 H ST 10803 M N 0 , 1 — -- - --- I- I I --- N M V. n �R �21 * I 1080 M M M w la, 7 108 21 C,4 Z, 10816 VILLA �005 10819 ST ?hA2 r Cl)10829 C., J 10846 108 9�0 d'�(j!.JhTli ST im 10920 10900 -1-091 0901 40 1 w " I — 10 02 fi oc 15 Ick, 10910 109071 ;2 1 0910 1 10922 10913 : I - 10914 10 93 10926 8133 8151 83 10921 110927 THIRD ST THIRD T THIRD ST 11010 82321 �2 Oil 8200 11015 110111: 17 110210 1 �2 -- 1 1 — , - - -)-11 WIN 8141 Ui 8��M ZI �2 11033 li 32 11024 11037 04C' SECON15- SECOND ST SECOND ST U) 811 > < LU LU 8041 W11 s: w44 8145 0:18203 _T,,._ _._ ., ._ _ , 0 FIRESTONE 00 FIRESTONE BL )2Lq 8124 *' aa, "N' -„ ._ Blanco Pacheco Work 500' Radius 1000' Radius -E AV Properties Intersect 500' Radius Properties Intersect 1000' Radius DISTRICT 1 DISTRICT 2 DISTRICT 3 DISTRICT4 PIV -0T ST District 1- Blanca Pacheco Work Feet Department of Public Works - GIS 0 155 310 620 Revised: April 2, 20191 � � r x LU z z w 0 m< 'z V t � V I ti -Ig — p 9Ow I5� A " 2, i bib 5XWE 9-, �51" g LU 8hil un' -T. - i0b ?h bg Pon- 'jKR l'ply e V. . G Mw 0 k --v j%'wxgj Z INN. hP� - I �gj�:! g " R al 11 LU gee, It, tpR Ne 25 gig he li ilme n'� MED keR 9 al 11H y Hel Oil b a. z 0 6 4 z z LU w 'a) w uj o z Z 0 %-1 (L uj 1-0 �m i Mu 2 cn zo 0 ui .j > Yi WR W 0 P W U) U LU it. U. � V I ti -Ig — p 9Ow I5� A " 2, i bib 5XWE 9-, �51" g LU 8hil un' -T. - i0b ?h bg Pon- 'jKR l'ply e V. . G Mw 0 k --v j%'wxgj Z INN. hP� - I �gj�:! g " R al 11 LU gee, It, tpR Ne 25 gig he li ilme n'� MED keR 9 al 11H y Hel Oil b a. a ---------- MYRTLE ST NEW STREET (PRIVATE) A UTILITY PLAN — . --- 8144A D! TYPICAL SECTION WITH PCC SLURRY c 4 LA REINA AVE DOWNEY AVEIf 4�4 CONSTRUCTION NOTES: 1 2 1 3 � 4 � 5 � 6 a 79 �$ SE—Tfi T, TYPE Q-8 -2) CLRS SS0 GUTTER, PEA —C ND 395-1,CAR E" S10.1 AND S.. E-- X ­.. --E, SAIS- S-E—S-i— -- 24- -T—T PCC 5LtpdRY X299 PDUlR75 gF .—I PER 'YeRp Oi' TES. TD EMS— SUSACERDDS TO SI- MW - --T 9- T— — —Ni 00 TtE TREKLl9, 24 W0£ —T—T 9y- ovERLnY DT— — 21- LCK -T DmE —EG iflTN t 202-- E—ND NST— e5 S11- — V --G. AT — SS @STALL YWC a1 Sl— REOAP CIXaieppy5,1— aT @ I- DOLO %KIE LE — PER BE— -E' @ APPLY T—OPL— 1d' 5199.0 mNRE —S — I tvS1 LPE PER —T— SID —ND I — 1 2 1 3 � 4 � 5 � 6 a 79 �$ 10 l SUGGESTED ORDER OF WORK _D DOWNEY AVE El LEAD LINE DETAIL LEGEND (TYPICAL) LEGEND [TYPICAL) Lg� sa I Al =V TYPICAL SECTION (NO PCC SLURRY) Bj TYPICAL REMOVAL SECTION it xs� rut ErAftco Arpmn% %:a dy= CITY OF DOWNEY 2 CAPITAL IVPRORENT PROJECT Na. 19.19 FIRESTONE BLVD. IRE PAVEMENT REHABILITATION DETAILS AND UTILITY PLANS LEGEND CONSTRUCTION NOTES: (D K —Te T— —21 AW —ER, KR SATANC —T- ­Tm mv cT —T An —Y --T I '—A' 9WE116121- -T — 1— .—. I— 1'/- T. 2 -.T--.- @ to�— 've — .—Ay. 101 —T.I.. — TOWEL AT Si— TE4 E , —L .SNEL w CNG T W. @ —L 5— -- AT KC PAVEMENT mA. tgi amp � k� —E MTAL A I COLD MILLING TYPICAL SECTION S 11 t 5t A ---------- 'w...— -- ---- 1E14 0- 4t 81 TYPICAL PCC AT STREET INTERSECTION c 1 TYPICAL PCC AT EXPANSION JOINT IDI PCC PAVEMENT IN THE TRENCH 6t VCM F6iM5A: prvliloms . A,"v ul�p— LD BY: CITY OF DOWNEY ECT No. 1949 CAPITAL IRPRONENT PROJECT v7 FIRESTONE BLVD. PAVEMENT REHABILITATION all DETAILS AND CONSTRUCTION NOTES 3-" 49 Aqc AMR# IV -- -c iy LA RFtNA AVEC 0, Y' F� std 7 z ads R CIO m 03 FIRESTONE BLVD. iLU C.) MYRTLE ST LA REINA AVE. Ds� ".91 ter, a R7 11-P L A, REJ.A PRIVATE. TRE DOWNEY —E- T VIE Lu T m < j tu 'r t A, Ul 22/1-L/ /N - - � " ', 2 22' 2: , xn/, TA� 3ua1 w FIRESTONE BLVD. z -1 T, QQNSTRUCTION NOTES: Q-1 TO E El E—T—D D—WETl scan—TO LEGEND 3' T_ '. �., as THE IT — E, STD 'A-X — I LAAW CALTRAAO —.1 -TO. AS 0.- —Tr -E%TL- C—SE I—E I V, -O 2 -,TYK-C) A - I A, : — NVJ LA REIN—T—T 0/,— .REINA'D - DOWNEY AVE. AVE (�)— (J9 ­L.,4,STEU DOWEL 21- LOWO AT M TO MT- N- W—E F—D E -T- I— E—Y LT— MT&L IS- LOAD AT AICIT NNRE— U6714G � F-OWNT —A—Y 24- A- IZ CIO -TALL TWO STEEL RESM EIGTWG KC PAVEDENT m — AAOt'u—, —,E,, ADA�T WAA —T. 1q W. I—E DO— GO-7 PCC SLUERY 12M —AT PER YAAD M CONCRETE) 4 A, AAA CITY OF DOWNEY L CAPITAL 18PROVENT PROJECT Na. 19.1 L -IRESTORE BLVD DAVENEUREHABUTATION CONSTRUCTION PLANS 3-46-49