Loading...
HomeMy WebLinkAbout04. CIP 19-02-Award Contract-All Cities Engineering, Inc.-Telelgraph Rd. Water System ImprovementsItem No. _PM',9 BY TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL c, 'Y MA.—AGER FROM: OFFICE OF THE CITY MANAGER BY: DELFINO R. CONSUNJI, P.E., DIRECTOR OF PUBLIC WORKS/CITY ENGINEER I =1 JI I I Ji I a ZLqVJL, I NU ztepl 2-01 bVis Award contract to All Cities Engineering, Inc. in the amount of $1,374,625 for Telegraph Road Water System Improvements, Capital Improvement Project (CIP) 19-02; 2. Authorize transfers of $750,000 and $60,000 from CIP Water Fund Account Nos. 51- 1-8684 and 51-1-8680 to CIP Water Fund Account No. 51-1-8683 to cover the total project cost; 3. Authorize Mayor to execute contract agreement in a form approved by City Attorney; and 4. Authorize Public Works Director to execute any change orders or additional scope of work for this project, deemed necessary or desirable up to the approved project budget. P&Ialeu On June 11, 2019, the City Council approved plans and specifications and granted authority to advertise the subject project for bids (Attachment B). The proposed water improvements include replacement of existing fire hydrants; installation of additional fire hydrants where adequate fire water protection is currently lacking; installation of new copper water service lines; replacement of old water meters with new remote -read advanced water meters to help improve water meter reading efficiencies; abandoning of redundant undersized water mains, and installation of new water mains, valves, fittings, and appurtenances. CI P NO. 19-02 TELEGRAPH ROAD WATER SYSTEM IMPROVEMENT PROJECT JULY 23, 2019 PAGE #2 gjor—] fitzltwltoll� &-a v I Ig III V 0 1& CONTRACTOR LOCATION BID AMOUNT All Cities Engipee(ing, Inc.--",--- Jurupa Valley . ..... $1,374,625 Big Ben, Inc. Irvine $1,531,665 Williams Pipeline Contractors, Inc. Somis $108J'3'6-" MNR Construction, Inc. La Verne $2,044,850 Construction is anticipated to begin in late July 2019 and be completed in December 2019, weather permitting. This project is categorically exempt per Section 15302 Class 2(c) of the California Environmental Quality Act (CEQA) Guidelines. I" I ArALS0111 21 D1 I W:J V w,' "M The total estimated cost of the project, including construction contract, contingencies, design, inspection, construction management, contract administration, and materials testing is $1,760,000. The following is a breakdown of the total project costs: 9 CIP NO. 19-02 TELEGRAPH ROAD WATER SYSTEM IMPROVEMENT PROJECT JULY 23, 2019 PAGE #3 Description Amount Construction Contract $1,374,625 Contingency (10%) $137,463 SUB -TOTAL CONSTRUCTION COST: $1,512,088 Design $23,800 Inspection, Construction Engineering/Management & Contract Admin. $224,112 TOTAL ESTIMATED PROJECT COST: $1,760,000 The project will be funded from the Water Fund, including transfers of $750,000 and $60,000 from Capital Improvement Program Water Fund Account Nos. 51-1-8684 and 51-1-8680 to Capital Improvement Program Water Fund Account No. 51-1-8683 through requested City Council action in order to keep all project funds in one account. FUNDING SUMMARY Account No, Fund Name Amount 51-1-8683 Telegraph Road Water Improvements CIP Account* 1,760,00Q Includes transfers of $750,000 and $60,000 from CIP Water Fund Acct. Nos. 51-1-8684 and 51-1-8680 through City Council action ATTACHMENTS Attachment • — Project Location Map Attachment B — Plans Attachment C — Bid Summary N CIP NO. 19-02 TELEGRAPH ROAD WATER SYSTEM IMPROVEMENT PROJECT JULY 23, 2019 PAGE #4 la=wmmmm Jim. Cily OF DOWNEY DEPARTMENT OF PUBLIC WORKS PROJECT LOCATION MAP NTS PRWECT- TELEGRAPH ROAD WATER SYSfEM IMPROVEMENT PROJECT ILIMITS- WEST CITY LIMITS TO EAST CITY LIMITS GTMY OWNCONSTRUCTION NOTES IRr DOEY IMPUBIRKAJO W01JERMN DEPJAMMUMEIRNIVE, CONSTRUCTION PLANS FOR j -:,LI IT 17 T I T'l 0v cr POVIlWy (3stantec co IFaO HONDO CHANNEL CITY OF PICO FWERA �v - _ tu co W -- X1, -- CITY OF DOWNEY- U a TELEGRAPH ROAD ® ~ t I= ?D - --- $tant9C IIY4{�WRMY#Ua4-W[SS CtxT t#C115 tct R;i45 AVY)1 U! AGDflF55 T 1 3 . tM. Kms'---..—�..-.=....T_...._..:. a fi[M K EMC2) MER IidEl'E W Nt,'d Ki MMll Pob Po`h4 SRE N 0. - --- $tant9C INDUSTRY AVENUE CRIDER AVENUE co' a a o w CITY OF PICO RIVERA—_ ; _ w FRONTAGE ROAD co w w Lu o Q t Q h In W Lu v CITY OF DOWNEY i x g5 m - _ RIVES AVE. TELEGRAPH ROAD TWEEDY LANE ,..- Stantec -w r LOWMAN AVENUE SAMOLINE AVENUE PARAMOUNT BOULEVARD CONSTRUCTION NOTES g � i v f j CrrY PIOO RIVE'RA j co S 's 2 - - - - LLI Lu O - - - __ oo uj CUTY OF DOWNEY F LOWMAN AVENUE "�— -- ---—T�tGxd9=N i+✓P k-%k!R AkStaCSi (Q GYPoi#'d�OHi TELEGRAPH ROAD €K�# t.t<flb i to aiHP t'aaEa=`tN1§C1ARID IiE ! X�E4Nk'[ f% D px+FrF SF4( k4W t�AEY'fR ! MXU H4. NPE G3utMFN'S. - - -µx r �s-.. ELMONT AVENUE FERNADEL AVENUE BIRCHBARK AVENUE CONSTRUCTION NOTES GYTY OF MCO RIVERA 1 t Lu co : FRONTAGE ROAD = o i m Lu w CITY OF DOWEY {to w co TELEGRAPH ROAD a Q w D .. IVY StanteC i TELEGRAPH ROA® STAMPS ROAD �i Stantec co r - -- -- Lu = h CITY OF DO Y i t#3X£ A6ASi-39tRW g'SPE iFiR€i1�RRK �'iW1PC 45583 AY8Na� � ''°° ass - -�U E se[ �� x �faEW nxyu na mE I PD0.axaENPS xCY e. :cE btD OG SOS 'k� s MANZANAR AVENM t , W' CITY OF PLCO RTVERA w o co; 50,1,oj PSI I� STOKES AVENUE •€FlGsatM aO✓eSs SQ'dCsi 5l�%e3 iSRMVY 445 A�s1°kGSbY atiAAy{ �— �,�£� WroSSRUCtWNI E'C k1ET<W IXiEnVd�'�ER MEIFA MEfPo WOhS £ LEXINGTON GALLATIN ROAD ARRNGTON AVENUE �. TELEGRAPH ROADco cc w CITY OF MOO RIVERA W LU a =. fill W O OU m Lu < a CITY OF DO Y -, i LINDELL AVE ARRINGTON AVENUE -- f - - - Stantec - ' i` - r 1� 4 f' tis N i stantec SERAPH AVENUE 0D TELEGRAPH ROAD W Ul u W w LLI UJ -i Lu 03 ri) �o tc) "A w 71 uj < CfTY OF DOWNEY sm 1.tt.w stantec CHANEY AVENUE TELEGRAPH ROAD CITY OF PICC RIVERA LU LLI ► LU N LU LU w co 0) 0i V) LU z LU < CrFY OF DOWNEY PASSONS BOULEVARD CORD AVEN E Q{ ,1 TELEGRAPHN _ } CITY OF PICO RIVERA 1 W W fA colw 01 co co LU § J CITY OF DOWNEY 1 r Stantec CIT OF MCO RVERA- W .,---', -- ---'------ W W LU W W cnto" m_ - t U TELEGRAPH ROAD ` it 1 CITY OF DOWNEY c � CEDARTREE ROA � -- — _--__ Rl[LRaP�i Rf A',s.'A'LVTN U4t'- &3so�5 �}flgiVaa3Fx44.5RGkLiP Dbf4t I �• :.. >.: ,, �� MkU Hm � mmE � .._ tgxaaRExas i r- � �SMAa dam..+ rW KLINEDALE AVENUE CLARA AVENUE MY OF PILO RI ' C'j Ll � � E WI -�'__� _ a ..�.,.� s _ ...sem.. _ �i -•� - - \ } - - L a FRONTAGE ROAD. - I uj - ---. - I - o a (y 3 - - - - - FRONTAGE ROAD cTY OF DOWNEY ti - TELEGRAPH ROAD SONGFEST DRIVE .Z ? SAN GABRIEL RIVER UJ F 1 v; J o „ - -- i CITY OF DOWNEYI Q }1 gI o T I > N" r 1 4 Z."i 91X p' ir��Mr Ln L. till, ; I i �' sJ Y 1 9 di •Z � _ I° �rxRx 4�i r� r m 1h ;rl ` p .t ISO 0 1 l i ` a {' ll r 1 4 Z."i 91X p' ir��Mr lItem D—giAkm Zmelonand Reconnect to Existing Water Main by Cimatmeiing Par Itincer, I and 2 1 1 D.Im1'AI'.l1I11Telegraph Road Octet 'Bl' at 9300 Telegraph Road JR.utahi He. T.. fwmchi Hol top axisPing 11i an,,, will 11-mcl , 11-oal 1,11,111,1 11 C", gale valve, 90 -inch MJxFL adapter, and all associated materials Hot top mia[lng 8-iP.h ormn with 8 -inch x 6 -inch MJxFL lapping sleeve, 6 -inch FL C509 gate 4 valve, 6 -much MdxFL adeder, and allausocuded pandromis coast. Water for., ruinous, And O'nue4weat fetpraapmenla 5 Furnish and install 6 -inch MJ 1125° DIP bend Furnish and match 6 -inch MJ 22 5' DIP bend 7 F.rmah mad-fiall 6-meh MJ 45' DIP bend Furnish Ph arclunald 6 -inch MJ sai rah end n :m�� P -mw IJ 1Y DIP bond 10 Furnish.nlo92-inch xtl-inch WxPE DIP reducer it Furnish and install 10 -much x 6 -ouch WxPE DIP reducer Furnish and install now 8-mclux 6 -inch FL Lee, 6 -inch MJxFL C509 gale valve, 6 -inch MJxFL 12 C509 gate valve, and all .—sumed malexpal. Furnish and install new 8-mah x6-mch MJxFL Lee, 6-nich FL C509 gale valve, 6-onch MJxFL 93 adapter, and ...stated materials Furnish and install now 10-mch x 8 -inch FL Press, 10-mah Vi C509 gale valve 10 -inch MJxFL adapter, 81 MJxFL C509 gate valve, 8 -inch MJxFL adapter, and assecuiled [_14materialsIsolate, cul, and dowaler musling cinch main, remove existing valve, and furnish and install 1 5 new 6 -inch MJ or MJxFL C509 gate valve Isolate, out, and dowaler existing B-mch main, remove existing valve, and furnish and firsell 16 now 8 -inch MJ or MdxFL C509 gate valve Isolate, cul, and doevaer existing 8-mch main, remove existing tee and valve Furnish and undall as. 8 -inch what sleeves, B-meh CIL 52 CML DIP, and a.ed.ld onrlidale AbandonlPlug remaining portion of existing main (Ste 115403 Ste 147421, Ste 147+65, ppp 17 St. 150,31, St. 189467, and Ste 202455) Isolate, on[, and deactor a,usling 4 -inch main, remove exisling fee, furnish and insult new 4 - inch solid sleeves, 4 -inch CL 52 CML DIP, and associated materials AbPnd.,IPIag nourelung 18 Portion of existing 4 -inch main (thi Avenue and Bircircreal Road) isolate, cal, and deander existing mains, Furnish and install new 12 inch x 8 -inch FL lee, 12- nch Mi C509 gate valve, 12-unch MAFL adapter, B -inch MJxFL adapter, ri AJ 45° DIP vertical bends, and connect exishng 8 -much main to 12 -inch main AboadoWPIng remaining 19 portion of existing 8 -arch main (Ste 204481) Isolate, on[, and dowelor existing mains, Furnish and install new 12-mah x 61 MJxFL tee, 6 inch FL C509 gale valve 6 -inch MJxFL adapter, 6 inch W 45° DIP vertical bends, and connect rourarng 6-mch main to existing 12 inch main AbandanPlug remaining portion of 20 existing i asom (St. 206426) Isolate, cut and deader existing 61 main, Furnish and install now 6 -inch FL tee, (2) 6 -inch MJxFL C509 gate valves, 6 -inch MJ 45° DIP vertical bends, end connect new 6-onch main to 21 r : 0rc k P'fi — " im, r + .0; Isolate, cul, and d .. to, evalum, I -moth mein, Formal ,d,,,Ill no, 6-mch -to sleeves, 6- inch CL 52 CAL DIP, 6 -much MJ 45° DIP vertical bends, and connect now 3-unch main to existing 6 -inch main Abandon/Plug remaining portion of existing 6 -inch mom (Ste 125+75 22 and St. 142+20) Isolate, cut, and dowaler existing 0 -inch main, Furnish and install new 8 -inch solid sleeves, 3 - inch CL 52 CIVIL DIP, and commal new 8-mch main to eausiong 8 -inch main Abandon/Plug 23 remaining Portion of existing 8 -Inch main Sle 142,60end Sia 174+62) Isolate cul, and dowelerexiding 12 -inch main, remove existing bend and furnish and install now 12 -inch solid sleeves, 12 -Inch CL 52 CML DIP, and connect now 12 -much main is exisiong 24 12 -inch mein (Ste 135+98) Isolate, out, and clawater existing 6-unch main, Furnish and install new 8 -inch MJ 45° DIP bends, 8-on'th CL 52 CML DIP, and conneol new B-onch main to exietrog 8 -inch main 25 Athmodmini remaining portion of oxne1mg 6 -inch main (Ste 126400) Isolate, mi. and deviator existing 8 -inch Prom, Furnish and install now 8-mch MJ 91 DIP bond mod connect Pa. B-mch main to existing 8 -inch main Abandon/Plug remaining region of 26 eneduff 8 -inch main (Ste 174430) suL, and doomar ,,,I,n, Ii main, Furnish and install new 6 -inch MJ 45* DIP bend and conned now 6 -inch main [a exuarng 6-onch main Abandengning remaining portion of ggg 21 exist,, 6 -inch man ,It, 114462) Isolate, cut, and dowder existing 5-mch main, remove ernefing valve, and furnish and finslall 28 new 6 -inch solid sleeves, 6 -inch CL 52 CML DIP, and associated materials (Ste 206+36) ?a Remove interfering 6 -inch main (4-10 LF) Ste (12440) Remove interfering water valve and ami porhous of 6-inch/8-inch water mains to be 30 abandoned (Ste 142+19) 31 Remove existing and furnish and install new water valve box 32 Adjust ..[or valve be, to grade 91 Rome. .,is[,Pg via. box to abandon od—un piece 1P.1abli, War., Ductile Iran Pipe 34 Furnish end install new 6 -inch CL 52 CML DIP with potable water ID tape 35 Furnish and metal new E-nuch CL 52 CML DIP with polable water ID tape 36 Furnish and install new 101 CL 52 CML DIP ve Ili potable wea, ID tape 37 Furnish and install now 12 -inch CL 52 CML DIP with Potable water ID lose II'mm e Hych.. III H Forrusib andomeld new James Jones K. -R firs, h,drPn1.s-m1rIyflHol TPg1 �39 Furnish and mated now James Jones 3775-R fire hvdardiussourbiv IHol TaPI CAPITAL IMPROVEMENT PROJECT NO. 19-02 151 S 10,00,00 1 $ 20,00000 $ 8,30000 Telegraph Road Water System Improvement Project $ 17.20000 $ 1030000 $ 2060000 ILS (West City Limits to East City Limits) 5 1000000 $ 1200000 $ 1 ? 000 00 $ 8.70000 $ 6,70000 BID SUMMARY $ 9,90000 1 LS $ 10,00000 $ 10,000.00 $ 8.20000 July 2, 2019 $ 940000 S 940000 $ 930000 $ 930000 All Cithis, En Ineenflang. Inc Biq Ran. Inc Williams Pipeline Contractors Inc VNR Construction Inc ON Unil Unit Price Amount Unit Price Amount Unit Price Amlunl Unit Price Amount 1 10 $ 15,300i S 15,30000 1 2A MO 00 2R 076 Ott $ 00 Or, $ 23,70000 $ 23.70000 1 LS s 18,80000 S 18.600.00 $ 33,00000 $ 33,00000 $ 34.70000 $ 34.70000 $ 27.50000 $ 2750000 1 EA $ 17,00000 A17900-00 $ 38,00000 $ 3800000 IS 2300000 $ 23 000 00 $ 1960000 9 BOO 00 I EA $ 14,500,00 $ 1100 IS 19,00000 $ 12,30000 $ 12.30000 $ 13,30000 �9 $ 330000 2 EA S 45000 S 000.00 $ 57500 $ 115000 59f) DO $ 1,00000 $ 70000 $ 1.40000 1 EA 3,50000 57500 $ 575 DO $ 50000 $ 500 00 $ 70000 $ 70000 FA S 40000 $ 800.00 $ 57500 $ 1.15000 11 500 00 $ 1 000 00 $ 70000 S 1,40000 3 EA7—f 250.00 S 750.00 IS 1,00 $ 3$ 00 1110, 9 IS 5.70000 S 4 0D 00 120000 6 EA $ 50000 S 3.000.00 $ 1.10000 s 6D. 1 $ a600 oo 800 00 $ 4800S 00 1 S 750.00 S 750.00 $ 1 500 00 S 1500OO S 1 38000 S 1,38000 $ 120000 $ 1,200 00 _EA 1 FA 9 45000 S 460.00 $ 220000 $ 2,20000 $ 1,20000 $ 1.20000 $ 1.00000 $ 1,00000 1 LS S 0.000.00 S 0J00090 $ 6 700 00 $ 6 700 00 S 6 500 00 $ 650000 $ 17 700 00 $ 17 700 OQ _5 5 4.500.00 6 4.500.00 $ 3 900 00 S 3 900 00 S 4 700 00 IS 4 700 00 $ 13300 OD $ 13,30000 LS 10,00000 $ 10,000,00 $ 20,00000 $ 20,00000 $ 9,00000 $ RODO 00 $ 1240000 $ 1240000 1 EA 8.5011.00 $ 8.50000 $ 6,50000 $ 6.50000 $ 1000000 S 1000000 $ 970000 9 9,70000 3 EA S 10 ,000.00 i—Al-q-191 In— $ 710000 $ 21,30000 $ 10,80000 $ 32,40000 $ 8,80000 $ 2640000 u ILS 8.000.00 S 48.00000 $ 7,40000 $ 4440000 S 1120000 $ 6720000 S 690000 $ 41,40000 -1 LS S 8,500.00 S 8.50-0-09I.- S 5 700 00 S 5 700 00 $ 5 800 00 $ 5 BOO 00 $ 7,30000 $ 7.300 OD I 1_3 S 15.00000 It 15,000.00 $ 2400000 $ 2400000 $ 2100000 $ 2100000 S 23.500 00 $ 7.350000 1 LS 3 15'00000 f 11900.00 I LS $ 10,000.00 $ 10.000.00 2 L5 $ 10.000,00 5 20.00000 S 1950000 9 1950000 $ 12,600(X1 $ 12,60000 $ 19,30000 $ 19,30000 $ 15.00000 $ 15,00000 $ 820000 $ 820000 S 1750000 $ 1750D 00 $ 7,50000 $ 15,00000 $ B.30000 $ 16,60000 $ 970000 1940000 2 151 S 10,00,00 1 $ 20,00000 $ 8,30000 $ 16,60000 $ 8,60000 $ 17.20000 $ 1030000 $ 2060000 ILS 510,000,00 5 1000000 $ 1200000 $ 1 ? 000 00 $ 8.70000 $ 6,70000 $ 9,90000 $ 9,90000 1 LS $ 10,00000 $ 10,000.00 $ 8.20000 $ 8,20000 $ 940000 S 940000 $ 930000 $ 930000 I LS Il_L0.000 J00 1$ 10.00000 $ 7.50000 $ 7.50000 $ 900000 $ 900000 S 970000 $ 970000 1 LS $ 10,000.00 $ 10.000.00 IF 8.30000 $ 8 300 00 $ 8 500 00 S 8 500 00 S 8,80000 S 8.800 00 1 LS IS 10,000.00 S 10.000.00 $ 5.70000 $ 5 700 00 $ 8 900 00 $ 890000 $ 9 700 00 $ 9 700 00 I LS S 10.000.09S 10,000.00 $ 209000 $ 200000 — 1,00000 $ 1.000 00 $ 3,60000 $ 3,60000 1 LS 5 1 (IM0,011 1 �$ 0,00000 _:::--:00 1 2 ni DO ZOO 00 .190000 $ 3,50000 $ 4,90000 $ 4,90000 .50 FA $ 1,200,00 $ 7795 00 $ 38.75000 95000 $ 47.50000 $ 70000 $ 3500000 1 EA $ 1,500.00 S 1,500.00 $ 65000 $ 65000 $ 95000 $ 95000 $ 50000 S 50000 -3 [A S 25D.00 6 750. $ 50000 S 1500 DO $ 75000 2_L9DT $ 50000 S 1,5500 00 500 LF $ 200.00 $ 100,00000 i $ 17100 $ 85,50000 $ 20000 Is 10000000 If 28000 $ 14000000 630 LF $ 25000 S 207.60000 $ 16700 $ 136 610 00 $ 31500 S 261 450 00 S WOOD $ 249000 00 115 LF S 27000 S 31,050.00 S 25200 S 28.98000 9 35000 $ 40,25000 $ 35000 $ 40,25000 10 LF 9 2701 1 2,70000 $ 85000 $ 6,50000 $ 55000 $ 5,50000 $ 1.00000 $ 1 ODOR 00 FA 14,50000 S 22,00000 $ 23,00000 1 $ 46,00000 $ 22,00000 $ 44,00000 $ 27.000 00 IS 5400000 13,00000 S 26,0110 00 $ 21,00000 $ 42,00000 $ 17,65000 $ 35.30000 $ 25.00000 S 5000000 ATTACHMENT 41. , Ilem Description 40 Furnish and install new James Jones 3700-R (re hydrant assembly Tee) 41 Furnish and install new James Jones 3775-R Pre hydrant assembly (Tee) Remove existing fire hydrant neer from and including 90 -degree elbow to fire hydrant head, 42 furnish and install new James Jones 3700-R fire hydrant Remove existing fire hydrant user from and including 90degreeelbow to fire hydrant heed, 43 famish and install new James Jones 3775-R fire hydrant Rem weexisting fire hydrant riser From and including 90 -degree elbow to ere hydrant head, 44 extend lateral 4 feet, Furnish and install new James Jones 3775-R Fire hydrant Isolate, cul, and &water existing 6 -inch main and remove existing Fire hydrant essembly, 45 Furnish and install new James Jones 3700-R fire hydrant assembly STee) Isolate, cut, and dowaler existing 8-mch main and remove existing ere hydrant assembly, 46 Furnish and install new James Jones 3775-R fire hydrant assembly (Tee) Iselale, but and dawater existing 8 -inch main, remove existing lee, valve, and Fire hydrant assembly from main, and furnish and install new 6-mch solid sleeves, 8 -inch CL 52 CML DIP 47 :,1 ...,,. Remove exisfing fire hydrant neer From and including 900 elbow to fire hydrant heed, plug 4B remaining portion of fire hydrant lateral, and remove fire hydrant valve box [Potable Water Maters and Servtcs. RemovelAbandon existing, Furnish end insl®ll new 1 -inch potable water service, 518 -inch qg meter and box Remove existing, furnish and install new 314 -inch by-pass water motor and box on exishng fire 50 _as lateral Remove exishng furnish and install new 1 -inch potable waterFactorand lid (reuse existing 51 box) Remove existing, fumish and install new 1 -Inch potable water meter and trarrc-rated lid (reuse 52 exishng box) _ 53_ _', _ Remove existing furnish and install now 1 -inch notable water meter and box Remove/Abandon exishng, fumish and install new 1-mch polable water bervice, meter, and 54 box Remove exishng, furnish and install new 1 -1/2 -inch potable water meter and lid (reuse exmhng 55 box) Remove existing, famish and install new 2 -inch potable water angle meter slop an exishng 56 copper service, 1 -112 -inch meter, and box Remove/Abandon exishng, furnish and install new 2 -inch potable water service, 1 -112 -inch _ 57 meter and box Remove existing, furnish and install new 2-mbh potable water meter and lid (reuse existing 58 box) 59 Furnish and install new 2 -inch potable water course, meter, and box Remove/Abandon exishng, furnish and install new 2 -inch potable water service, meter, and 60 box RemovelAbandon existing, furnish and install new 4-mch potable water service, 3 -inch potable 61 water meter and 30-inch(W)x48-inch(L)x48-inch(H)box Remove exishng, furnish and install new 4 -inch Wtlkms Rre Service Doable, Check IDC) 52 Model 310, 3/4-mch by -Dass water malar, and 1 -inch box 63 RemovelAbandon ereisenq sernce, meter, end box From mein Furnish and install building supply line downstream of meter up to closest hose Gibb and 84 remove water source connection to backyard water meter 65 Adjust water meter boxes to grade andeni sod TOTAL BASE BID- Items 1 to 65 Qty 2 2 14 5 1 3 1 C 28 1 36 15 2 6 1 CAPITAL IMPROVEMENT PROJECT NO, 19-02 Telegraph Road Water System Improvement Project (West City Limits to East City Limits) BID SUMMARY July 2, 2019 9 EA S 4000.00 S 400000 6 410000 S 410000 $ 430000 $ 4,30000 $ 8,60000 All Cities En Ineadn ,Ino. Bia Ben. Inc Williams P_is_el_in_eContractors Inc MNR Construction Inc Unit Unit Pdoe J $ Amount Unit Price Ampunl Unit Price Amount Unit Price Amount $ 2 900 00 $ 2 900 00 20600 $ 20 000 00 $ 20.00000 �; 11,00000 $ 11,00000 $ 15,00000 $ 15,00000 EA S 0.000.00 �; S 18,0110 00 $ 2100000 S 42(x)000 $ 11,00000 $ 22,00000 $ 17,50000 $ 35,00000 EA 8,00000 'I $ 18, 00 _9 8(X1000 $ _ 160D000 $ 9,60000 $ 19,60000 $ 15,50000 $ 31,00000mm 1 FA S 28000.00 $ 20,00000 $ 21,00000 $ 21.00000 $ 22.60000 $ 2260000_ _ $ 2750000 EA S 7,500,00 S 105,00000 $ 910000 S 127,400 00 $10, 500 00 $ 147 000 00 S 12 500 00 $ 175,000 00 EA f 7,500,00 f 37,500,00 $ 10.80000 $ ,__ 54,00D. 00 :.. $ 10,80D00 $ 54,00000 - __... $__1-3.300 $ 66,50000 EA S 8,500.00 $ 8,500.00 $ 19,500 00 $ 19,5D0 00 $ 17,300 00 9 17 300 00 IS 12 700 00 $ 12 700 00 EA S 8,800,00 $ 26400,00 $ 21,00000 $ 63,00000 $ 5,60000 ISI $ 16,80000 $ 14,90000 $ 44.70000 LS $ 10,000,00 $ 10,000.00 $ 8,40000 $ 61400 W $ 8 200 00 Iff $ 8 20D 00 $ 12 300 00 $ 12.300 00 EA S 7,800.00 S m 23,400.00 $ 3 500 00 $ 10 500 00 S 4,10000 S 12 300 00 }$ $ R80000 $ 26,400 00 FA $ 250000 S 70,000,00 $ 3,80000 $ 106,40000 $ 5,00000 14000000 $ 400000 $ 112,00000 FA $ 1,00000 $ 1,00000 $ 1,50000 $ 1,50000 $ 1,70000 $ 1,70000 $ 480000 $ 480000 t FA S 800.00 S 32.400 00 $ 1.00000 $ 36 000 00 $ 1 10000 S 39 600 00 $ 2 900 00 $ 104 40000 EA S 1.10000 S 18500,00 $ 100000 S 15.00000 $ 1,25000 $ 18,75000 $ 3,30000 $ 49,50000 EA ; 1.00000 f 2,000.00 S 1.20000 $ 2,40000 $ 2,50000 $ 5,00000 $ 4.00000 1; 800000 EA jS 2,800.00 S 18.800,00 $ 4,00000 $ 24.00000 $ 3 000 00 $ 1800000 $ 420000 $ 2520000 EA I $ 2,200.00 S 2,200.09 $ 2,500 00 $ 2,50000 $ 2 500 00 5 2 500 00 $ 7 000 00 $ 7, 000 00 9 EA S 4000.00 S 400000 6 410000 S 410000 $ 430000 $ 4,30000 $ 8,60000 $ 8,80000 3 EA $ 5,000.04 1 S 15,000.00 $ 8,00000 $ 24,00000 $ 850000 J $ 2500000 $ 7.90000 $ 2370000 I EA S 2.300 00 f 2,300.00 JAI _2 900 00 $ 2 900 00 $ 2 900 00 $ 2 900 00 $ 8,50000 $ 135001(y) 2 EA f 5,500,00 S 11.00000 $ 780000 S 1560000 $ 760000 $ 95,20009 $ 92,00000 $ 24,00000 16 EA S 5,500.00 S 88.000,00 $ 7 750 00 S 124000 00 $ 8 500 00 $ 136 000 00 S 9,90000 $ 158 400 00 1 FA S 28000.00 $ 20,00000 $ 21,00000 $ 21.00000 $ 22.60000 $ 2260000_ _ $ 2750000 $ 2750000 1 EA S 16,80000 $ 18.800.00 $ 700000_ I $ 7,00000 $ 9,40000 $ 9,40000 $ 23,70000 $ 23,70000 4 EA S 200000 S 11,20000 S 150000 $ 6 I 00 �$ 2,60000 $ 10,40000 $ 4,00000 $ 16,00000 3 EA S 4.500.00 S 13,500 00 $ 2 500 00 $ 7 500 00 $ 3 600 00 S 10 600 00 S 4700 00 $ 29 100 (1(1 1 LS S 500.00 w S 500.00 $ 2 0M 00 S 2 000 00 $ 2-10000 $ 2 500 00 $ 35 000 00 $ 35,00000 51,374,625.00 S 1,531,88500 $ 1,678,130.00 $ 2,044,850.00 ALL BIDS RECEIVED CONTRACTOR TOTAL BASE BID All Cities Engineering, Inc a 1,374,62500 Big Ben, Inc '; 1,531,66500 Williams Pipeline Contractors, Inc S 1,678,130 W MNR Construction, Inc 2,044,85000