Loading...
HomeMy WebLinkAbout03. CIP 17-11-Approve PSA w-KOA Corp-Engineering, Public Relations & Safety Education Svcs-South Downey Safe Routes to SchoolE�R TME SOUTH DOWNEY SAFE ROUTES TO SCHOOL PROJECT (CIP 17-11) JULY 23, 2019 # W a was a a a • Utility search, research, information and data collection and surveying • Public participation and outreach 0 Preparation of sidewalk and curb ramp construction design plans, specifications and cos"I estimate The approval and execution of professional services agreement (Attachment B) will allow KOA Corporation to proceed with the aforementioned engineering, public outreach and safety education services. Upon approval and execution of the agreement, the City will issue KOA Corporation a purchase order followed by Notice to Proceed. The overall estimated duration of design, publi* outreach and safety education components of the South Downey Safe Routes to School Project is 12 months, with completion in August 2020. I PROFESSIONAL ENGINEERING, PUBLIC RELATIONS AND SAFETY EDUCATION SERVICES FOR THE SOUTH DOWNEY SAFE ROUTES TO SCHOOL PROJECT (CIP 17-11) JULY 23, 2019 Quality of Life, Infrastructure & Parks The total estimated cost of this project, including the professional consulting services and in-house staff support, is $331,000 broken down as follows: Desc_ription_ Professional consulting services In-house staff support $3Amount 12, 852.96 $18,147.04 Total Estimated Project Cost: $331,000.00 A total of $235,502 is currently available in the FY 2019/20 Capital Improvement Program budget as shown in the table below. Also shown are previous FY expenditures and additional funds to be appropriated through this City Council action. With the additional appropriation as requested, sufficient funding will be provided in the FY 2019/20 Capital Improvement Program in order to support this project. Account No. Funding Source _ Amount 26-1-7832 _State ATP Cycle 2 grant funds (expended in FY 2018/19) $4,497.63 26-1-7832 State ATP Cycle 2 grant funds (budgeted in FY 2019/20) $32,502.37 32-1-7832 Senate Bill 1 (SB1) funds (budgeted in FY 2019/20) $203,000 25-1-7832 Transportation Development Act (TDA) Article III* $28,000 32-1-7832 SB1 funds* $63,000 Total Project Funding: $331,000 *Additonal funds to be appropriated. ATTACHMENTS Attachment A - Project Location Map Attachment B - Professional Services Agreement 3 SOUTH DOWNEY SAFE ROUTES TO SCHOOL PROJECT ■ 17-11) JULY 23, t I CITY OF DOWNEY PROFESSIONAL SERVICES AGREEMENT WITH •• CORPORATION FOR THE SOUTHDOWNEY SAFE ROUTES TO SCHOOL PROJECT 1. PARTIES AND DATE. This Agreement is made and entered into this 23rd day of July, 2019 by and between the City of Downey, a California municipal corporation and charter city with its principal place of business at 11111 Brookshire Avenue, Downey California 90241 ("City") and KOA Corporation, a California Corporation, with its principal place of business at 1100 Corporate Center Drive, Suite 201, Monterey Park, California 91754 ("Consultant"). City and Consultant are sometimes individually referred to as "Party" and collectively as "Parties." 2. RECITALS. Consultant desires to perform and assume responsibility for the provision of certain professional engineering services required by City on the terms and conditions set forth in this Agreement. Consultant represents that it has demonstrated competence and experience with Safe Routes to School Projects, is licensed in the State of California, and is familiar with the plans of City. City desires to engage Consultant to render such services for the preparation of the South Downey Safe Routes to School Project ("Project") as set forth in this Agreement. 3.1.1 General Scope of Services. Consultant promises and agrees to furnish to City all labor, materials, tools, equipment, services, and incidental and customary work necessary to fully and adequately supply the professional services necessary for the Project ("Services"). The Services are more particularly described in Exhibit "A" attached hereto and incorporated herein by reference. All Services shall be subject to, and performed in accordance with, this Agreement, the exhibits attached hereto and incorporated herein by reference, and all applicable local, state and federal laws, rules and regulations. 3.1.2 Term. The term of this Agreement shall be from August 1, 2019 to June 30, 2021, unless earlier terminated as provided herein. Consultant shall complete the A _A Services within the term of this Agreement, and shall meet any other established schedules and deadlines. The term of this Agreement may be extended by written amendment to this Agreement signed by the City Manager and the Consultant. 3.2.1 Control and Payment of Subordinates- Independent Contractor. The Services shall be performed by Consultant or under its supervision. Consultant will determine the means, methods and details of performing the Services subject to the requirements of this Agreement. City retains Consultant on an independent contractor basis and not as an employee. Consultant retains the right to perform similar or different services for others during the term of this Agreement. Any additional personnel performing the Services under this Agreement on behalf of Consultant shall also not be employees of City and shall at all times h= ; intj=r (r%nci affonfle mv,-h iciV,= Air,�`e4inn nnA fnn+rrNI. il+nr-%+ chnil I.— - � �.. �%oLIWI I "I IM �Wl ILI WI �Wl 1-01JILGAI IL Q1 I�AII pay all wages, salaries, and other amounts due such personnel in connection with their performance of Services under thi-- Agreement and as requirerl hw law Consultant shall be responsible for all reports and obligations respecting such additional personnel, including, but not limited to- social security taxes, income tax withholding, unemployment insurance, tlisability insurance, and workers' compensation insurance. In the event that Consultant or any employee, agent, or subcontractor of Consultant providing services under this Agreement claims or is determined by a court of competent jurisdiction or the California Public Employees Retirement System (CaIPERS) to be eligible for enrollment in CalPERS as an employee of City, Consultant shall indemnify, defend, ant hold harmless CITY for the payment of any employee and/or employer contributions for CalPERS benefits on behalf of Consultant or its employees, agents, or subcontractors, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of City. Schedule of Services, Consultant shall perform the Services expeditiously, within the term of this Agreement, and in accordance with the Schedule of Services set forth in Exhibit "A" attached hereto and incorporated herein by reference. Consultant represents that it has the professional and technical personnel required to perform the Services in conformance with such conditions. In order to facilitate Consultant's conformance with the Schedule, City shall respond to Consultant's submittals in a timely manner. Upon request of City, Consultant shall provide a more detailed schedule of anticipated performance to meet the Schedule of Services. The parties acknowledge that the Schedule of Services may be amended by mutual agreement due to changes in circumstances, including changes in the performance schedules of other third parties performing work for the City on the Project, which affect the timing of Consultant's performance of the Services. 3.2.3 Conformance to Applicable Requirements. All work prepared by Consultant shall be subject to the approval of City. 3.2.4 -Substitution of Kev Personnel.. Consultant has represented to City that certain key personnel will perform and coordinate the Services under this Agreement. Should one or more of such personnel become unavailable, Consultant may substitute other personnel of at least equal competence upon written approval of City. In the event that City and Consultant cannot agree as to the substitution of key personnel, City shall be entitled to terminate this Agreement for cause. As discussed below, any personnel who fail or refuse to perform the Services in a manner acceptable to the City, or who are determined by the City to be uncooperative, incompetent, a threat to the adequate or timely completion of the Project or a threat to the safety of persons or property, shall be promptly removed from the Project by the Consultant at the request of the City. 3.2.5 City's Representative. The City hereby designates Delfino R. Consunji, or his designee, to act as its representative for the performance of this Agreement ("City's Representative"). City's Representative shall have the power to act on behalf of the City for all purposes under this Contract. Consultant shall not accept direction or orders from any person other than the City's Representative or his designee. 3.2.6 Consultant's Representative. Consultant hereby designates Min Zhou, or her designee, to act as its representative for the performance of this Agreement ("Consultant's Representative"). Consultant's Representative shall have full authority to represent and act on behalf of the Consultant for all purposes under this Agreement. The Consultant's Representative shall supervise and direct the Services, using his best skill and attention, and shall be responsible for all means, methods, techniques, sequences and procedures and for the satisfactory coordination of all portions of the Services under this Agreement. 3.2.7 Coordination of Services. Consultant agrees to work closely with City staff in the performance of Services and shall be available to City's staff, consultants and other staff at all reasonable times. 3.2.8 Standard of Care: Performance of Fmolovees. Consultant shall perform all Services under this Agreement in a skillful and competent manner, consistent with the standards generally recognized as being employed by professionals in the same discipline in the State of California. Consultant represents and maintains that it is skilled in the professional calling necessary to perform the Services. Consultant warrants that all employees and subcontractors shall have sufficient skill and experience to perform the Services assigned to them. Finally, Consultant represents that it, its employees and subcontractors have all licenses, permits, qualifications and approvals of whatever nature that are legally required to perform the Services, including a City Business License, and that such licenses and approvals shall be maintained throughout the term of this Agreement. As provided for in the indemnification provisions of this Agreement, Consultant shall perform, at its own cost and expense and without reimbursement from the City, any services necessary to correct errors or omissions which are caused by the Consultant's failure to comply with the standard of care provided for herein. Any employee of the Consultant or its sub -consultants who is determined by the City to be uncooperative, incompetent, a threat to the adequate or timely completion of the Project, a threat to the safety of persons or property, or any employee who fails or refuses to perform the Services in a manner consistent with the standard of care set forth herein, shall be promptly removed from the Project by the Consultant and shall not be re-employed to perform any of the Services or to work on the Project. 3.2.9 Laws and Regulations.. Consultant shall keep itself fully informed of and in compliance with all applicable local, state and federal laws, rules and regulations in force at the time the Services are performed by Consultant and in any manner affecting the performance of the Project or the Services, including all applicable Cal/OSHA requirements, and shall give all notices required by law. Consultant shall be liable for all violations of such laws and regulations in connection with Services. If the Consultant performs any work knowing it to be contrary to such laws, rules and regulations and without giving written notice to thp Citv Cnmiltant sha I] hp -,nlpiv rp-,nnn-.;i hip fnr n I I rn.Rt.q nri-,inn thprpfrnm rnn-,I I Itn nt shal I defend, indemnify and hold City, its officials, directors, officers, employees and agents free and harmless, pursuant to the applicable indemnification provisions of this Agreement, from any claim or liability arising out of any failure or alleged failure to comply with such laws, rules or regulations. Consultant's violation of such laws, rules and regulations shall also constitute a material breach of this Agreement. 3.2.10.1 Tirne for-CompHance. Consultant shall not commence the City that it has secured all insurance required under this section. In addition, Consultant shall not allow any subcontractor to commence work on any subcontract until it has provided evidence satisfactory to the City that the subcontractor has secured all insurance required under this section. The City reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience with insurer, coverage or other special r-irr-witstwices. 3.2.10.2 Minimum Requirements. Consultant shall, at its expense, procure and maintain for the duration of the Agreement insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the Agreement, the Services or the Project by the Consultant, its agents, representatives, employees or subcontractors. Consultant shall also require all of its subcontractors to procure and maintain the same insurance for the duration of the Agreement. Such insurance shall meet at least the following minimum levels of coverage: (A) Minimum Scope of insurance. (1) Commercial General Liability (CGL): Insurance Services Office Form CG 00 01 covering CGL on an "occurrence" basis including products and completed operations, property damage, bodily injury and personal and advertising injury; (2) Automobile Liability- Insurance Services Office Form Number CA 0001 covering Code 1 (any auto) or if Consultant owns no autos, Code 8 (hired) and 9 (non -owned); and (3) Workers' Compensation: Workers' Compensation insurance as required by the State of California with Statutory Limits; and (4) Employer's Liability Insurance. (B) Minimum Limits of Insurance. Consultant shall maintain limits no less than: (1) Commercial General Liability (CGL): No less than $2,000,000 per occurrence for products and completed operations, bodily injury, property damage and personal and advertising injury. If Commercial General Liability Insurance or other form with general aggregate limit applies, either the general aggregate limit shall apply separately to this Agreement/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit; (2) Automobile Liability: No less than $2,000,000 per accident for bodily injury and property damage; and (3) Workers' Compensation. Workers' Compensation limits as required by the Labor Code of the State of California with Statutory Limits; (4) Employer's Liability: Employer's Liability limits of no less than $2,000,000 per accident for bodily injury or disease. Employer's Liability coverage may be waived by the City if City receives written verification that Consultant has no employees. If the Consultant maintains broader coverage and/or higher limits than the minimum shown in this subdivision 3.2.10.2, the City requires and shall be entitled to the broader coverage and/or the higher limits maintained by the Consultant. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City. 3.2.10.3 Professional Liability (Errors & Omissions). Consultant shall procure and maintain, and require its sub -consultants to procure and maintain, for a period of five (5) years following completion of the Services or the Project, errors and omissions liability insurance appropriate to its profession. Such insurance shall be in an amount not less than $2,000,000 per occurrence or claim and $2,000,000 in the aggregate, and shall be endorsed to include contractual liability. If the Consultant maintains broader coverage and/or higher limits than the minimum shown in this subdivision 3.2.10.3, the City requires and shall be entitled to the broader coverage and/or higher limits maintained by the Consultant. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City. 3.2.10.4 Insurance Endorsements. The insurance policies shall contain the following provisions, or Consultant shall provide endorsements on forms approved by the City to add the following provisions to the insurance policies: (A) Additional Insured Status. The Commercial General Liability policy shall be endorsed to state that: (1) the City, its directors, officials, officers, employees, agents and volunteers shall be covered as additional insureds with respect to liability arising from the work, Services, Project or operations performed by or on behalf of the Consultant, including materials, parts or equipment furnished in connection with such work, Services. Project or operations; and (2) the insurance coverage shall be primary insurance as respects the City, its directors, officials, officers, employees, agents and volunteers, or if excess, shall stand in an unbroken chain of coverage excess of the Consultant's scheduled underlying coverage. Commercial General Liability insurance coverage may be provided in the form of an endorsement to the Consultant's insurance (at lease as broad as ISO Form CG 20 10 11 85 or both CG 20 10, CG 20 26, CG 20 33 or CG 20 38; and CG 20 37 forms later revisions are used). (B) Waiver of Subroqation, Consultant hereby grants to City a waiver of any right to subrogation which any insurer of said Consultant may acquire against the City by virtue of the payment of any loss under said insurance policies set forth herein. subrogation, but this provision applies regardless of whether or not the City has received a waiver of subrogation endorsement from the insurer. (Cl All CoveLaqcs. Each insurance policy required by this Agreement shall be endorsed to state that: (A) coverage shall not be suspended, voided, reduced or canceled except with written notice by certified mail, return receipt requested to the City, and (B) any failure to comply with reporting or other provisions of the policies, includino breaches of warranties- shall not affect rnvpr;;np nrnvitlpd to the Citv its rfirPr.tnr.q officials, officers, employees, agents and volunteers. 3.2.10.5 Primary Coveraq(L For any claims related to this Aareement, the Consultant's insurance coverage shall be primary insurance and primary coverage at least as broad as ISO CG 20 01 04 13 with respect to the City, its directors, officials, officers, employees, agents and volunteers. Any insurance or self-insurance maintained by the City, its directors, officials, officers, employees, agents and volunteers shal'. be excess of the Consultant's insurance and shall not be called upon to contribute with it in any way. 3.2.10.6 �S?�earation of Insureds: No Soecial Limitations. All insurance required by this Section shall contain standard separation of insureds provisions. In addition, such insurance shall not contain anv s iall �Ilimitajtij%hn jhl (mtectio-t 0 J M 11 1,011PUZ-10 a MA 4 1 L-71LRR 'I. 'Lot,, 3.2.10.7 Deductibles and Self -Insurance Retentions. Any deductibles or self-insured retentio—ns —must be declared to an require Consultant to provide proof of ability to pay losses and related investigations, claim administration and defense expenses and costs within the retention. The policy language shall provide or be endorsed to provide that the self-insured retention may be satisfied by either the named insured or City. 3.2.10.8 Acceptabflity_pf InSUrers. Insurance is to be placed with insurers with a current A.M. Best's rating no less than A -VII, authorized to do business in California, and satisfactory to the City. policy endorsements to the City before the commencement of work under this Agreement. However, failure to obtain the required documents prior to the commencement of work under this Agreement shall not waive the Consultant's obligation to provide them to the City. The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements, at any time. 3.2.10.10 Claims -Made Policies. If any of the policies provide coverage on a claims -made basis: (A) The retroactive date must be shown and must be before the date of this Agreement or the date work commences under this Agreement, whichever is earliest; (B) Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of the Services provided under this Agreement; (C) If coverage is canceled, non -renewed, and not replaced with another claims -made policy form with a retroactive date prior to the effective date of this Agreement or the date work commences under this Agreement, whichever is earliest, the Consultant must purchase extended reporting coverage for a minimum of five (5) years after completion of the Services under this Agreement. 3.2.11 Safetv. Consultant shall execute and maintain its work so as to avoid injury or damage to any person or property. In carrying out its Services, the Consultant shall at all times be in compliance with all applicable local, state and federal laws, rules and regulations, and shall exercise all necessary precautions for the safety of employees appropriate to the nature of the work and the conditions under which the work is to be performed. Safety precautions as applicable shall include, but shall not be limited to: (A) adequate life protection and life-saving equipment and procedures; (B) instructions in accident prevention for all employees and subcontractors, such as safe walkways, scaffolds, fall protection ladders, bridges, gang planks, confined space procedures, trenching and shoring, equipment and other safety devices, equipment and wearing apparel as are necessary or lawfully required to prevent accidents or injuries; and (C) adequate facilities for the proper inspection and maintenance of all safety measures. A. Total Compensation. The method of payment for this contract will be based on actual cost plus a fixed fee. ,Consultant shall receive, compensation on a fixed fee basis, including authorized actual costs, for all Services rendered under this Agreement at the rates set forth in Exhibit "B" attached hereto and incorporated herein by reference. The total compensation, including actual costs and the fixed fee, shall not exceed THREE HUNDRED TWELVE THOUSAND EIGHT HUNDRED FIFTY-TWO DOLLARS AND 96/100 ($312,852.96) ("Total Compensation"). performed in each milestone and each project as applicable. Invoices shall follow the format stipulated for the approved Cost Proposal, attached hereto as Exhibit "B", and shall reference this contract number and project title. Final invoice must contain the final cost and all credits due City. The final invoice should be submitted within 60 calendar days after completion of Consultant's work. City shall, within thirty (30) days of receiving such invoice, review the invoice and pay all approved charges thereon. Invoices shall be mailed to City's Representative at the following address: City of Downey 11111 Brookshire Avenue Downey, CA 90241 I. Salary increases will be reimbursable if the new salary is within the salary range identified in the approved Cost Proposal and is approved by City's Representative. For personnel subject to prevailing wage rates as described in the California Labor Code, all salary increases, which are the direct result of changes in the prevailing wage rates are reimbursable. 3.3.2 Prevailinq Wages. Pursuant to Downey Municipal Code Section 2935, the requirements of California Labor Code Sections 1720 et seq. and 1770 et seq., as well as California Code of Regulations, Title 8, Section 16000 et seq. ("Prevailing Wage Laws"), which require the payment of prevailing wage rates and the performance of other requirements on certain "public works" and "maintenance" projects, shall apply to the Project. Consultant agrees to fully comply with such Prevailing Wage Laws. City shall provide Consultant with a copy of the prevailing rates of per diem wages in effect at the commencement of this Agreement. Consultant shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the Services available to interested parties upon request, and shall post copies at the Consultant's principal place of business and at the Project site. Consultant shall defend, indemnify and hold the City, its elected officials, officers, employees and agents free and harmless from any claims, liabilities, costs, penalties or interest arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. If applicable, Consultant shall be registered at all times with the Department of Industrial Relations under the Public Works Contractor Registration Program for Labor Compliance. 3.4.1 Maintenance and Inspection. Consultant shall maintain complete and accurate records with respect to all costs and expenses incurred under this Agreement. All such records shall be clearly identifiable. Consultant shall allow a representative of City during normal business hours to examine, audit, and make transcripts or copies of such records and any other documents created pursuant to this Agreement. Consultant shall allow inspection of all work, data, documents, proceedings, and activities related to the Agreement for a period of three (3) years from the date of final payment under this Agreement. 3.4 .2.1 Any dispute concerning a question of fact arising under an interim or post audit of this Agreement that is not disposed of by this Agreement, shall be reviewed by City's Director of Finance. 4.4.2.2 Not later than 30 days Y ant In a j Vi a e i a feT I M, Ir.7tiiiiiiij T'i i I I ami, I i 'issues. The request for review will be submitted in writing. 3.423 Neither the pendency of a dispute nor its consideration by City will excuse Consultant from full and timely performance, in accordance with the terms of this Agreement. 3.4.2.4 Consultant and sub -consultant contracts, including cost proposals and indirect cost rates (1CM, are subjee ct to audits nr r viws such as, but not I k . — e i limited to, a contract audit, an incurred cost audit, an ICR Audit, or a CPA ICR audit work paper review. If selected for audit or review, the Agreement, cost proposal and ICR and related work papers, if applicable, will be reviewed to verify compliance with 48 CFR, Part 31 and other related laws and regulations. In the instances of CPA ICR audit work paper review, it is Consultant's responsibility to ensure federal, state, or local government officials are allowed full access to the CPA's work papers including making copies as necessary. The Agreement, cost proposal, and ICR shall be adjusted by Consultant and approved by City Representative to conform to the audit or review recommendations. Consultant agrees that individual terms of costs identified in the audit report shall be incorporated into the Agreement by this reference if directed by City at its sole discretion. Refusal by Consultant to incorporate audit or review recommendations, or to ensure that the federal, state or local governments have access to CPA work papers, will be considered a breach of contract terms and cause for termination of the Agreement and disallowance of prior reimbursed costs. Grounds for Termination. City may, by written notice to for the City's convenience and without cause by giving written notice to Consultant of such termination, and specifying the effective date thereof, at least seven (7) days before the effective date of such termination. Consultant may only terminate this Agreement for cause upon giving the City not less than seven (7) calendar days"written notice. OMM 161140"NOTM - a- -6 a a a w 0 1 M 0— AMA ff Consultant for all services adequately rendered and all reimbursable costs incurred by Consultant up to the date of termination, in accordance with the payment provisions of this Agreement. The following reasons shall constitute "cause" for which either party may terminate this Agreement as provided herein: • Substantial failure by the other party to perform in accordance with the terms of this Agreement and through no fault of the terminating party, • Assignment of this Agreement or transfer of the Project by either party to any other entity without the prior written consent of the other party; • Suspension of the Project or the Consultant's Services by the City for more than ninety (90) calendar days, consecutive or in the aggregate, without good cause; • Material changes in the conditions under which this Agreement was entered into, the Scope of Services or the nature of the Project, and the failure of the parties to reach agreement on the compensation and schedule adjustments necessitated by such changes. 3.5.1.2 Effect of Termination. If this Agreement is terminated as provided herein, City may require Consultant to provide all finished or unfinished Documents and Data and other information of any kind prepared by Consultant in connection with the performance of Services under this Agreement. Consultant shall be required to provide such Documents and Data and other information within fifteen (15) days of the City's request. 3.5.1.3 Additional Services. In the event this Agreement is terminated in whole or in part as provided herein, City may procure, upon such terms and in such manner as it may determine appropriate, services similar to those terminated. 3.5.2 pelivery of Notices. All notices permitted or required under this Agreement shall be given to the respective parties at the following address, or at such other address as the respective parties may provide in writing for this purpose: M KOA Corporation 1100 Corporate Center Drive, Suite 201 Monterey Park, California 91754 Phone: (323) 260-4703 Fax: (323) 260-4705 Attn: Min Zhou, P.E., Deputy CEO/Principal City of Downey I 11111 Brookshire Avenue Downey, California 90241 Phone: (562) 904-7102 Fax- (562) 904-7296 Attn: Delin o R. Consunji, P.E., Director of Public Works/City Engineer City of Downey City Attorney's Office 11111 Brookshire Aven Downey, California 9021 Such notice shall be deemed made when personally delivered or when mailed, forty- eiqht (48) hours after deposit in the U.S. Mail, first class postage prepaid and addressed to the party at its applicable address. Actual notice shall be deemed adequate notice on the date actual notice occurred, regardless of the method of service. 3,53 0wriorshin of Matorials and Confidentiality. 3.5.3.1 Documents & Data: L��icen ��Ilectual Property. This Agreement creates a non-exclusive and perpetual license for City to copy, use, modify, reuse, or sublicense any and all copyrights, designs, and other intellectual property embodied in plans, specifications, studies, drawings, estimates, and other documents or works of authorship fixed in any tangible medium of expression, including but not limited to, physical drawings or data magnetically or otherwise recorded on computer diskettes, which are prepared or caused to be prepared by Consultant under this Agreement ("Documents & Data"). Consultant shall require all subcontractors to agree in writing that City is granted a non-exclusive and perpetual license for any Documents & Data the subcontractor prepares under this Agreement. Consultant represents and warrants that Consultant has the legal right to license any and all Documents & Data. Consultant makes no such representation and warranty in regard to Documents & Data which were prepared by design professionals other than Consultant or provided to Consultant by the City. City shall not be limited in any way in its use of the Documents and Data at any time, provided that any such use not within the purposes intended by this Agreement shall be at City's sole risk. 3.5.3.2 Confidentiality. All ideas, memoranda, specifications, plans, procedures, drawings, descriptions, computer program data, input record data, written information, and other Documents and Data either created by or provided to Consultant in connection with the performance of this Agreement shall be held confidential by Consultant. Such materials shall not, without the prior written consent of City, be used by Consultant for any purposes other than the performance of the Services. Nor shall such materials be disclosed to any person or entity not connected with the performance of the Services or the 12 Project. Nothing furnished to Consultant which is otherwise known to Consultant or is generally known, or has become known, to the related industry shall be deemed confidential. Consultant shall not use City's name or insignia, photographs of the Project, or any publicity pertaining to the Services or the Project in any magazine, trade paper, newspaper, television or radio production or other similar medium without the prior written consent of City. 3.5.4 Cooperation; Further Acts. The Parties shall fully cooperate with one another, and shall take any additional acts or sign any additional documents as may be necessary, appropriate or convenient to attain the purposes of this Agreement. 3.5.5 Attorne 'sus. In the event of any litigation, whether in a court of law, administrative hearing, arbitration, or otherwise, arising from or related to this Agreement of the services provided under this Agreement, the prevailing party shall be entitled to recover from the non -prevailing party all reasonable costs incurred, including staff time, court costs, attorneys' fees and all other related expenses in such litigation. 3.5.6 Indemnification. 3.5.6.1 General Indemnification. Except as provided in subdivision 3.5.6.2 below which is applicable to "design professionals" only, Consultant shall defend (with counsel acceptable to City), indemnify and hold the City, its officials, officers, employees, volunteers and agents free and harmless from any and all claims, demands, causes of action, costs, expenses, liability, loss, damage or injury, in law or equity, to property or persons, including wrongful death, in any manner arising out of or incident to any alleged negligent acts, errors, omissions or willful misconduct of Consultant, its officials, officers, employees, agents, consultants and contractors arising out of or in connection with the performance of the Services, the Project or this Agreement, including without limitation the payment of all consequential damages and attorneys' fees and other related costs and expenses. Consultant shall defend, at Consultant's own cost, expense and risk, any and all such aforesaid suits, actions or other legal proceedings of every kind that may be brought or instituted against City, its directors, officials, officers, employees, agents or volunteers. Consultant shall pay and satisfy any judgment, award or decree that may be rendered against City or its directors, officials, officers, employees, agents or volunteers, in any such suit, action or other legal proceeding. Consultant shall reimburse City and its directors, officials, officers, employees, agents and/or volunteers, for any and all legal expenses and costs incurred by each of them in connection therewith or in enforcing the indemnity herein provided. Consultant's obligation to indemnify shall not be restricted to insurance proceeds, if any, received by the City, its directors, officials officers, employees, and agents or volunteers. Consultant shall not be obligated to defend, indemnify or hold the City harmless in any manner whatsoever for any claims or liability arising solely out of the City's own negligent acts, errors or omissions or willful misconduct. 3.5.6.2 Design Professionals. The provisions of this subdivision 3.5.6.2 shall apply only in the event that Consultant is a "design professional" within the meaning of California Civil Code section 2782.8(c). If Consultant is a "design professional" 13 US ........ ................ I I I LWJ L-7AW M 3.5.7 Entire Aqreemen . This Agreement contains the entire Agreement of the parties with respect to the subject matter hereof, and supersedes all prior negotiations, understandings or agreements. 'Governinq Law. This Agreement shall be governed by the laws of the State of California. Venue shall be the courts in Los Angeles County. 3.5.9 Time of Essence. Time is of the essence for each and every provision of this Agreement. 3.5.10 City�s �Ri bIIq_EDI&v Other Consultants. City reserves right to employ other consultants in connection with this Project. 3.5.11 Successors and Assigns. This Agreement shall be binding on the successors and assigns of the parties. 3.5.12 Assiqnment or Transfer. Neither party shall assign, hypothecate, or iransfer, either directly or by operation of law, this Agreement or any interest herein without the prior written consent of the other party. Any attempt to do so shall be null and void, and any assignees, hypothecates or transferees shall acquire no right or interest by reason of such attempted assignment, hypothecation or transfer. M, 3.5.13 Construction; References; Caotions. Since the Parties or their agents have participated fully in the preparation of this Agreement, the language of this Agreement shall be construed simply, according to its fair meaning, and not strictly for or against any Party. Any term referencing time, days or period for performance shall be deemed calendar days and not work days. All references to Consultant include all personnel, employees, agents, and subcontractors of Consultant, except as otherwise specified in this Agreement. All references to City include its elected officials, officers, employees, agents and volunteers except as otherwise specified in this Agreement. The captions of the various articles and paragraphs are for convenience and ease of reference only, and do not define, limit, augment, or describe the scope, content, or intent of this Agreement. 3.5.14 Amendment; Modification. No supplement, modification, or amendment of this Agreement shall be binding unless executed in writing and signed by both Parties. 3.5.15 Waiver. No waiver of any default shall constitute a waiver of any other default or breach, whether of the same or other covenant or condition. No waiver, benefit, privilege, or service voluntarily given or performed by a Party shall give the other Party any contractual rights by custom, estoppel, or otherwise. 3.5.16 No Third Party Beneficiaries. There are no intended third party beneficiaries of any right or obligation assumed by the Parties. 3.5.17 Invaliditv; Severability. If any portion of this Agreement is declared invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions shall continue in full force and effect. 3.5.18 Prohibited Interests. Consultant maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Consultant, to solicit or secure this Agreement. Further, Consultant warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Consultant, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. For breach or violation of this warranty, City shall have the right to rescind this Agreement without liability. For the term of this Agreement, no member, officer or employee of City, during the term of his or her service with City, shall have any direct interest in this Agreement, or obtain any present or anticipated material benefit arising therefrom. 3.5.19 Equal Opportunity Fmolovment. Consultant represents that it is an equal opportunity employer and it shall not discriminate against any subcontractor, employee or applicant for employment because of race, religion, color, national origin, handicap, ancestry, sex or age. Such non-discrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination. Consultant shall also comply with all relevant provisions of any City 15 Minority Business Enterprise program, Affirmative Action Plan or other related programs or guidelines currently in effect or hereinafter enacted. 3.5.20 Labor Certification. By its signature hereunder, Consultant certifies that it is aware of the provisions of Section 3700 of the California Labor Code which require every employer to be insured against liability for Worker's Compensation or to undertake self- insurance in accordance with the provisions of that Code, and agrees to comply with such provisions before commencing the performance of the Services. 3.5.21 ALIthoritv to Enter Acireernent. Consultant has all requisite power and authority to conduct its business and to execute, deliver, and perform the Agreement. Each Party warrants that the individuals who have signed this Agreement have the legal power, right, and authority to make this Agreement and bind each respective Party. 3.5.22 COUnternarts. This Aqreement mav be executed in counterparts, each of which shall constitute one and the same instrument. NWNHIX! i� In the event of any conflict, inconsistency, or incongruity between any provision of this Agreement, any of its exhibits, attachments, purchase order, or notice to proceed, the provisions of this Agreement will govern and control. Consultant's signature affixed herein, shall constitute a certification under penalty of perjury under the laws of the State of California, that Consultant has complied with Title 2 CFR, Part 180, "OMB Guidelines to Agencies on Government wide Debarment and Suspension (nonprocurement)", which certifies that he/she or any person associated therewith in the capacity of owner, partner, director, officer, or manager is not currently under suspension, tebarment, voluntary exclusion, or determination of ineligibility by any federal agency; has not been suspended, debarred, voluntarily excluded, or determined ineligible by any federal agency within the past three (3) years; does not have a proposed debarment pending; and has not been indicted, convicted, or had a civil iudgment rendered against it by a court of competent jurisdiction in any matter involving frauj or official misconduct within the past three (3) years. Any exceptions to this certification must be disclosed to City. .......... In .......... m CITT OF DUT i E77% a California municipal corporation and charter cit', KOA Corporation, a By� By: Rick Rodriguez, Mayor in XH-o6—,-P,E. Its: Deputy CEO/Principal Maria Alicia Duarte, CMC City Clerk YvetteMI/Abich Garcia, City Attorney w SSIONAL ENGINEERT"''G, PUBLIC VELATIONS AND EDUCATION SERVIC . FOR THE SOUTH DOWNEY SAFE ROUTES T!-) SCHOOL PROJECT I 1"4 1"*", I � I 'o MUSH11141VA'A", kills MLIL41 TO Mr. Edwin J. Norris, PE Deputy Director of Public Works City of Downey 1111 Brookshire Avenue Downey, CA 90241 enorris@downeyca.org Fne-%M F FX%j i R V A I r. C a r 197 Ve in-' s q u e Z Proiert Manager Uvf-la5n11ez@koarnrnr m I- L-1 P-0... 260-4-103 F: (3 2 3) 260-4705 RFP No. 19-001 for Prof ssion NUNN' I Is NAMIBIA@ 11111 KI 00-10-y"RIMINPI"" "11"MM" Southern California made up ot over 100 staff members; including California reqistered Civil and Traffic Enqineer-c, and Certified Planners. program recommendations, §-Fichool Project Our public facilitation and education expertise has helped us conduct over 1SO pedestrian and bicycling audits over the last year. In order to bolster our educational, encouragement, and safety programming component DATE for this proposal, KOA is partnering with Safe Moves, a renowned school June 7, 2019 outreach and safety programming organization. KOA is also partnering with , a leading surveying firm, in order to prepare accurate and comprehensive rE products. This proposal is valid for 90 calendar days from the date of submission. KOA acknowledges that we have received and reviewed all provided documents pertaining to the REP. # 1 LOX] on, rWR&r# .T1F,1![fMFZ* #MY Min Zhou, PE Deputy CEO I Principal PROJECT With 20 schools and approximately 23,000 students, the Downey Unified School District (DUSD) is one of the largest school districts (by student population) in Los Angeles County. Most of the transportation and sidewalk infrastructure around its schools is adequate or has been recently improved (Firestone Boulevard, Lakewood Boulevard, bus stops, etc.). However, for some of those schools, particularly in the neighborhoods in South Downey, several of the surrounding streets need improvement. In several key street segments that feed directly to school entrances, there are missing sidewalks and pedestrian network gaps. Such a condition forces students to walk on the roadway which exposes them to vehicle traffic. Recognizing these deficiencies, the City applied and won Caltrans Active Transportation Program (ATP) Cycle 2 funding to improve pedestrian access and safety by constructing new sidewalks at ten locations near five schools located in the neighborhoods of South Downey. The locations are near five schools and include the construction of 6,750 linear feet of sidewalk. The five subject schools are: 1. Old River Elementary School 2. West Middle School 3. Imperial Elementary School 4. Ward Elementary School 5. Carpenter Elementary School Furthermore, the City recognized that providing infrastructure was not enough to improve overall student safety. As such, safety education programming was incorporated into these efforts. The education/encourage programming will provide the schools with a tailored curriculum that will educate students on the rules of the road and general safety practices as they walk and bike to and from school. In order to further understand the pedestrian conditions around the five schools, the KOA team conducted an initial field investigation to identify potential project challenges as well as solutions that will be leveraged to meet the Project goals. PROJECT The most a a deficiency around • • a sn-existent sidewalk or sidewalkabruptly Y: a r r • r. • r • a a c:r a �' As the KOA team assesses the most appropriate strategy for constructing sidewalks, one potential issue that must be overcome is to accurately identify the public and private property lines at locations such as these. As the photos below illustrate, there is private fencing, plants, and other features that will need to be removed in order to complete the sidewalk network. F? fltJ.°t 7. `l`lr tU .,ti.1,tVilF;`.}t' t?t1rTE %C1 "C.}1t3L'F,h7J}', Laura Street sidewalk, is side, between Pomering Road and Julius Avenue Laura Street sidewalk, south side, between Pomering Road and Old River School Rood Conditions such as these have the potential of creating resident opposition since any proposed construction will reduce what may be perceived as private property. The KOA team will overcome this potential challenge by ensuring that all residents in the project area are aware of this project and have the opportunity to engage with the City and voice their concerns. The KOA team is uniquely qualified to ensure a successful dialogue since our bilingual planners and engineers will be present at every meeting and provide ample opportunities (digital and traditional) for residents to communicate with the Project team. KOA's planners and engineers have conducted outreach (including entirely in Spanish) for numerous safe routes to school projects throughout the Los Angeles region and have been successful in creating consensus and ensuring project progress. A related challenge observed in the field is that several of these locations also contain facilities controlled by utilities, such as street light poles. Along Premiere Avenue near Carpenter Elementary, the street light poles are located along or near where sidewalks will be constructed. Although the potential impacts are not known, any construction near these facilities may affect operations and would require coordination with the local utility. Even if the City controls these, coordination with those departments will be necessary. Southwest corner of Premiere Avenue and Foster Road (Frontage) KOA's engineering team is well-suited to overcome this challenge as we have dealt with such conditions in the past for numerous other sidewalk reconstruction or road re -pavement projects. In such projects, KOA issues utility notices and works closely with those entities to ensure minor disruption to their operations and ensure that the project is completed. Another aspect that the KOA team identified when out in the field was the fact that some intersection locations lacked proper signage, striping, or needed better maintenance. For example, at Laura Street and Old River School Road, the existing ladder crosswalk is fading and needs to be repainted and/or upgraded to a continental -style crosswalk (like those used in the City of Los Angeles). Continental crosswalks provide several benefits over ladder -style crosswalks, primarily in that there is no "ladder" portion, so there is less paint to be faded and thus less maintenance, while still providing a highly visible facility for pedestrians to cross. 5 CITY OF DOWNEY Intersection -of Lauro-Strect-ond Old -River School -Roo-! r,n other locations, such as Airpoint Avenue and Adoree Street, there is no crosswalk striping (whether it's across Airpoint- Avenue or to cross Adoree Street). KOA understands that the intersection does not provide ali-way stop control (or a Im i t. it Avenue, looking North to Adoree Street and Word Elementary School 6 As part of this project, the team will reviewnot only proposed sidewalk and curb ramp locations, but will also assess intersection conditionsthoserment ends and pr r general recommendations to ensure safe student passage between neighborhoods and the school sites. PROJECT APPROACH KOA will implement a comprehensive and tailored approach for completing this project. First, our team will begin with collecting all necessary data and conducting field work to better understand the school environment. In preparation of this proposal, KOA developed a pedestrian -collision map that focused on all five schools, to gain a better idea of how non-existent pedestrian facilities might be leading to pedestrian -related collisions. As the map below shows, there are not many collisions around the proposed sidewalk locations, but there are numerous pedestrian -related collisions in other parts of the immediate school area. During the data collection phase, KOA will review the primary collision factors (PCF) that led to these collisions and make the appropriate observations and potential recommendations on what can be done to reduce their frequency. L—o.Old Arae r" Pill h laememtlugC,$ck $ehoW. fehaal tl' ,o C"V �4 3 1T ' iarrp9<iak �_ g+�' .� drxmaniaay N�.� SPIRa9e3 M SOl11H Ward eaL Demeni � la, SeiaaN i. Gi .uzm,m„ , LCC rte, n m'.. ...,.,..,,,., �..... Damenury PAR4MOl1111 School ,fsltla,�lr(•T� I PEDESTRIAN RELATED COLLISIONS (2013 -201'7) pi.pW ii Pedestrian Collision Imaseraon/�nls a. School i _ i City Boundary ' 114 Mlle Buffer 0 7)e 5 0'5 Pedestrian -Related Collision Map in the Vicinity of Project Schools OR ii me ®• 7 r SoCITY OF CONEY k0b LS hyo I� 4� �r 6m SOl11H Ward eaL Demeni � la, SeiaaN i. Gi .uzm,m„ , LCC rte, n m'.. ...,.,..,,,., �..... Damenury PAR4MOl1111 School ,fsltla,�lr(•T� I PEDESTRIAN RELATED COLLISIONS (2013 -201'7) pi.pW ii Pedestrian Collision Imaseraon/�nls a. School i _ i City Boundary ' 114 Mlle Buffer 0 7)e 5 0'5 Pedestrian -Related Collision Map in the Vicinity of Project Schools OR ii me ®• 7 r SoCITY OF CONEY Wvd Ettmefdaty PARAMOUNT 5-rm, Fd=1ft(2013 2017) POPULATION 24 YEAR OLD AND UNDER, CITY OF DOWNEY (20171 <100 <300 00 i <710 No Dale School City Boundary 114 Mile Buffer 0 025 05 miL-s School -Age Population in the Vicinity of Project Scho KOA will use these tools to develop baseline conditions for the project and utilize this as foundational information when conducting the five community workshops. The five workshops will be fully bilingual and create an environment where residents can directly interact with team staff and provide their input on any materials that are provided. Community Workshop Mapping Exercise in Bell Gardens Upon reaching community consensus, the KOA team will commence the PS&E portion of the project and work closely with the City to develop the necessary materials that will lead to project implementation and construction. SUMMARY OF OUR APPROACH KOA's strength is our in-house planning and engineering disciplines that cover all facets of infrastructure project implementation. Our team has taken projects from initial planning, outreach, conceptual design, PS&E, to construction. For this project, the goal will be similar; KOA will develop a comprehensive outreach approach that will generate consensus and project support in each of the school communities, develop all necessary supporting material and existing condition documentation, and will guide the project through PS&E with the ultimate goal of construction. Another strength is our knowledge and experience with ATP funding program, Caltrans' Local Assistance Procedures Manual (LAPM) and Local Assistance Programs Guidelines (LAPD). This project is funded through ATP Cycle 2 which ultimately requires Caltrans' E-76 authorization for construction. KOA has successfully assisted funding allocation for two ATP Cycle 2 funded projects while completing PS&E bid documents for agencies. We will offer our expertise of ATP grant management to City of Downey to ensure the successful construction of the project. `Ip:kN,C)..r7. SQ1J. HJtlCi4l+fY SFE7RC7]J S'TQ S' H?7J `ilC7ET4. `,af EAIsfli kcs and Pi ooc,,,ed Blcvde Locations Sidewalk inventory Rarnp 3nventary L>�i��rng and Proposed Crosswaiks/Mid-block Crossings Street Light Inventory Pedestrian Trails Network Land Use- Existinq Land Use Planned Land Use Existin Q and Planned School - s—'-11 Lxistincl-and Planned Parks Activity Centers/Attractions Parcels Raster Digital Elevation Model (DEM)/Hillshade Safe Collision Data Can use SWITIRS if not available Crime Data Transit School Bus Routes School Bus Stops Local & Regional Bus Routes and Schedules Local & Le2lOna' —'US S'oPs-----. Local Bus Ridership Data Truck Routes Vehicular Movement Vehicular Average Daily Trips (ADTs) Traffic Counts (Pedestrian, Bicycle, Students) Speed Limits_ Road Pavement/Curb-to-Curb Widths Right -of -Ways Number of Lanes Street Classification 'Traffic Control Devices Inventory 6ther Needs Location of School Crossing Guards iOverweight, Obesity' and Diabetes Rates Physical Activity Levels ,reenh use (--, F-i-i— Data needs request list, prepared by KOA and customized by proj C1 1 0 F D OW N EY KiM TASK 2: UTILITY SEARCH, RESEARCH, INFORMATION AND DATA COLLECTION & SURVEYING KOA's GIS specialist will develop a web -based map that will be shared with City staff, The map can be uploaded on to the Project web site and allow residents to provide input and comments on problem areas. Furthermore, KOA will make sure that the map is accessible via a mobile web -application in order to increase its reach. KOA will work with the City to obtain record drawings and documents relevant to the Project corridors. Record drawings and documents can include, but are not limited to existing improvement plans, topographic maps, assessor maps, centerline ties, corner records, as -built plans, utility plans, traffic counts, previous traffic studies, etc. We will send our requests for record drawings and documents through the City's Project Manager. KOA will obtain a list from the City of utility companies known to own and operate facilities in the City of Downey. KOA will create utility notices in the form provided by the City and coordinate with the City to send notices with a utility response form and a map of the project site to all relevant utility companies. We will request information from them including record drawings of their facilities, prior rights information, and any planned upgrades expected in the near future. Utility responses will be logged and information regarding existing facilities will be shown on our plans. KOA will provide the City Project Manager with a utility response list and maps and/or data received when all utility companies have responded. „S..•,1�SC111�` >.d0,EJ';>:: nl, �(•f dY � m' ry f 0, 9 y,.new^ I µ A .. t i µ" n w rer p x " p II' I Wg, ., Web -based map prepared by KOA's GIS experts for the City of Commerce Bicycle and Pedestrian Plan Project KOA will work with the City to obtain record drawings and documents relevant to the Project corridors. Record drawings and documents can include, but are not limited to existing improvement plans, topographic maps, assessor maps, centerline ties, corner records, as -built plans, utility plans, traffic counts, previous traffic studies, etc. We will send our requests for record drawings and documents through the City's Project Manager. KOA will obtain a list from the City of utility companies known to own and operate facilities in the City of Downey. KOA will create utility notices in the form provided by the City and coordinate with the City to send notices with a utility response form and a map of the project site to all relevant utility companies. We will request information from them including record drawings of their facilities, prior rights information, and any planned upgrades expected in the near future. Utility responses will be logged and information regarding existing facilities will be shown on our plans. KOA will provide the City Project Manager with a utility response list and maps and/or data received when all utility companies have responded. „S..•,1�SC111�` >.d0,EJ';>:: Upon receipt of the topographic survey any available as -built records from the City, we will visit each project location to fully evaluate existing conditions. We will: Verify record drawings. Investigate and verify existing street improvements. Verify existing pull boxes, utility manholes/valves, street lighting, power poles, cabinets, fire hydrants, etc. I Identify all necessary proposed improvements Lk& J mint I' or r pair, and curb ramp upgrades Assess eyisti*g cu4 r2x*Ac_z*1 *!rivexwYys-f*r AJI compliance. I KOA will send our experienced and knowledgeable civil engineer-. to the project -lite to fully document and evaluate the existing site conditions. Our engineers will ramp improvements. Our engineers will also be looking to visually identify any curb ramps and driveways that are not in conformance with current Americans with Disabififies Act (ADA) requirements, We will doctiment the site visit with photos and field notes. KOA will work our surveyor, KDM Meridian (KDM), to obtain and plot existing right-of-way lines at the project locations using record maps, assessor maps, etc. Tr KDM will provide a design level topographic survey for the project corridor. The topographic survey will include: Establishing right-of-way through records research and/or survey. Field survey at 25' cross sections obtaining field data at all control/critical points including, but not limited to centerline, BCR/ECR, grade breaks, curb, flowline, edge of gutter, visible utilities. Field survey will extend 5'-10beyond the right-of- way line. R'esl -k-"n6al ' As part of our field review, we will make note of any residential properties with: La ndsca pi ng/ha rdsca ping features (trees, shrubs, flowers, decorative rock, Walls, fences, gates, decorative lighting, etc. Garages located at the front of the residence where existing driveway parking may conflict with new sidewalk. 2,8 Pedestrian Detection Inventory KOI staff will inventory pedestrian detection at signalized intersections in addition to the existence of countdown pedestrian signal heads. Other features suc 'I wk.I u6muq),, fc be noted. A general assessment will be made on how they could attract more pedestrians. V -11I �,I-_ '01111 U VIL U 1 0 11, existing and planned transit lines a d facilities in the vicinity of the project area. it is important for the team to make this effort relativel simple for the principals and parents to conduct so that we get a high response rate. I 11 A... will also coordinate with principals at each school to distribute travel tallies/surveys to students, These surveys will ask students about their travel mode to school, and about the issues and barriers they face walking or bicycling to school. The team needs to gain a or bicycle. Like with the parent surveys, it will also be I 111 7!17147 Travel Time To/From school School's Level of Encouragement r#177773�� Preferred Grades Child May Walk to School Without Adult Supervision Top S Factors that of affect walkability to school I I I Summary of School Parent Survey Responses for the Burbank Safe Routes to School and PS&E Project I 11 iipiljii�! qjl'm ell. off and afternoon pick-up time periods. KOA will note mi g1wil lima W 0i lualwjlo,�- �'A As part of this task, KOA will also review school transportation policies and/or regulations. These include, but are not limited to: existing safe route to school maps, education programming, pick-up/drop-off guidelines, student valets, crossing guard history, and any other pertinent information. a 'A -xperienced team will lead this effort. An -a MORPHINE _W kf*j�rlllelm 1 lzkast�� 141ANIA1111111 .0 40 participation on the part of the parents, thus the audit focus may be more student -focused. This means that outreach will be conducted directly with school clubs and societies, math, science, enciineerina. or •-i .• OWN "M with students, the pedestrian and bicycle audits may happen during school hours. The Pedestrian and Bike audit at each school will begin with a brief introduction to participants regarding format and goals. The KOA team will work with school officials t* 4m'" #V -F.A404 & _Vik F! Kim swa* and debrief, After the brief introduction, participants will 7-7-77 47 Z SRI take a walk with the key stakeholders including parents, students, school principals/vice principals, crossing guards, school facilities personnel, police, city staff, and other interested parties around the vicinity of each school to discuss and document the safety issues and other barriers to walking and bicycling to that school. Participants will be provided with a clipboard to hold a map showing the school grounds with its pedestrian entrance(s), surrounding streets, and school attendance boundary map and a marker pen foriotting notes during both the workshop and the walk audit. Consultant staff will be split among the participants based on preferred language and areas of expertise. Some of the issues to be discussed: Missing or poorly maintained sidewalks, Missing curb ramps, Intersections that are difficult to cross, Common unsafe behaviors of rL;; Parking, Lack of signs, Lack of bikeways, Stray dogs, Crime, Hot Spots, 1W owl' 0-2 0600111WRINWORWRI it nej7s,�jL4�es To aciaress, an* Dr"Vlim a general forum for discussion. Information summarized here will be utilized by the KOA team to address key safety issues at each school. Crpotp an interective web-bo5ed niop and provide to Ctnwithin do.;,s of kickoff meeting Dish ribUterind collect porent ond student survcv5, traffic condition observation, school site wn1klbiAe cluditc Utility of built recnrds and oc7pnryrespon5e lis#- Topomophic Survey s(qj?cd 1)'G/ o Coliform a licpned sui vq/ Field notes Ond photos Esperanza Elementary School THURSDAY, MAY 11TH, 2017 1 12:30PM - 2:15PM .� WHAT: Walklno Safety Auuon»nt .� waw rroatn„w,tn s<rool aarc.read.!rsww:m�a,:l.,s...,.,Nnuv mR'dris, and Lne sh;e srnNi a[aa ro leenuw hynt� was [ewiwre.s mr ePuxnt; .Yan,vlaanm nw,�ea b/M1em GPwer;ze FlemenPary SMovL (isiha Na wsi40;.:p Oohs.lna nur vadL Na Sk95' Iwm x111 dacu'ranl wu.cw.:em: and dksuss p: [sbb wbn>na w' WHY:SSna.sh Rout•. Safety Plan. K md Mu.atlu�Ieem w[Inwpc.ete ywa les,4aa<M lMa ar. detlpngf ansa: mp�ciemenlaand sekLY eM.:elbn E.en gk[ol4TV;uvwrwnls nay heb@�iesswekq slaaed has;>[. Y✓P: slsnek end ;r3�e g WHO: The School Community !# wa aMPa mr[.,L, a�a�.ewra'Ls, ena,Jor.•..a�evwwxn�yle.,,,..a ,r.,, .... 4.ra U:yule N Ins waMmO Satary AevvnmL WHERE: E.pomnza Elamentaty School Front Entrance �Y+eL.r aJtlS;evnet uo:zlm.,as nonlJ�;an m,m,tes hata<, role :la<Im aceuetul �alt wle ac gmY„xdhy:ha f%ot mnear nmvn ., rhe .�.P waw x RESERVE LA FECHA scuela Primaria Esperanza JUEVES 11 DE MAYO DE 2017 1 12:30PM - 2;1SPM OUE: Eyaluaclon da S.Rurlded Po.tonal _.� Caettrc Ntno ccn of Parsonalda la o:aaeta lrmaestrox bz pemrcsl N'aex Nsmmbmde L. <�Avn:e� Y cl e4'ka+de SATs aBeded.e del bee de LL e-ni<®� pa;atdmllflca A. harems p� N a9ioa we e[lutlaHte<wxe..ehaiat cxa:nr n mdmdum F'IXbPa ha:b{deeds b Ecseh a ha�;Ba Exneai:a Dwwpe of LLJe' ; pro ;yue a we:l.a ca�nnrAa d egJ[sa de SAl s da�meMam as[RsvwPa:4rnx Y m[[uLL%ewsdikis6a:bvs ", POR OUE: Diaoflo de Rutas Seams r s., ,;g.;[x, •ae +a',.,+v^:P 2e r—nt..ae..m r, er..+.;.; ae, nm,w..tt,...+. C,v'rd;l.,, M,mnoma wlJm n:?abosur✓� r.rgw we.vre: n„gei.x .ew.idtl ka+ t . tl! o uNwl:u. pb. ;. row a=.en evswA d". OU16N: L. Comunldod Seoul., q$ awxanm.[at,wze[,acwatr,. tswexcnl-s..sae: ,+xm.:aym;Ymn ao A!�n.-rose a<:unat;:n>< sn S�EvalssxY aM:sywWe•J hwvnal D6NDEI EntMd..l fronts do la Eaeuolm Fromm FsawMre el ogvpo de SRiS mia we�1a paNpml da b evsrck i2rtdewlvs mise b lahcaa do nl.[e I e aRn6dgre'n me la+e:wb p':.Porc .w�A dealas v9.eknabs en he pG.rraa exavn e; !1$1QN VISION i`riM}5+Y 8}FO Wtt� 4.� S Nfii xae',vmau awry.4wtt.Ae,[" „; .� �'i zYw} P �'ii.e � i. r r i r r �� i'r r r � �•- � Jif � •e � s• � �;. KOA Project Manager, Carlos Vel6squez, conducting a bilingual walk audit in South Los Angelm r. NtJ. 17-11 ` t i1 H''C O NtY SAF ' R Vel .• .. '. T� .. ' � '~; .���", 4 W)K: J'. VLR3LJ(. l,'AR'IIC.WAIJ0N AND UL) lIU_A(.H 31 Stakeholder Dalaba5o as, but not Hnnited to: residents, school PTAs, community-based organizations, neighborhood councils, etc. Downey has very active community groups and the KOA team will work with the City to identify those that should be incorporated onto the Project. Groups like the Downey Bicycle Coalition, the Downey Arts Coalition, Downey Seniors Club, and tgraiy!,at mi,,O,76 ii-iterest im V_Iestri2n i;-ifr2stryctyre, iAqr#vemeAts wifl-!#e 244ei-U Xe stakeholder list. The stakeholder database will be constantly updated and shared with the City's Project Manager and maintained throughout the life oil the Project. nul;ng eac' outreach even,- 1 -1-1 ;+- -,11, ,.,4;+ ­­­;+­ Mee+;- p+, I U I I I - I � L ksC11001 SICE. VVOIK OUUIL, ��1111'1w­ky V ..... — lil"J, ­­) the list will be updated as participants provide their contact information. Those participants will then be contacted when input is needed and other outreach events are taking place. UT-, F6aF Fn, Uli er� CD •. ....... ...... . . .. . .to ........ DI -2 mea 41M I]emx4t LOMOBtrkremvw IWVM LAM WAD LAVA VAW IAW A LAW MCE-C—As, Hoye Orw P.•1 Deply CD .1 /': i Ni KONs bilingual staff and graphic designers will prepare a package of collateral materials that will serve as the basis for any project communication. A list of these materials will be maintained by KOA. For this task, KOA will produce the following: 1. Project Fact Sheet - this will include project details, any illustrations, maps and other contact information and will be provided at any outreach event and schlool walk audit. 2. Project information and graphics - these will be provided to the City so that they can be uploaded onto the project webpage and any other materials 3. Meeting notices, sign -in sheets, comments cards, agendas, and presentations will be prepared for each event 17 DI -2 mea 41M I]emx4t Hoye Orw P.•1 Deply .1 /': i Ni KONs bilingual staff and graphic designers will prepare a package of collateral materials that will serve as the basis for any project communication. A list of these materials will be maintained by KOA. For this task, KOA will produce the following: 1. Project Fact Sheet - this will include project details, any illustrations, maps and other contact information and will be provided at any outreach event and schlool walk audit. 2. Project information and graphics - these will be provided to the City so that they can be uploaded onto the project webpage and any other materials 3. Meeting notices, sign -in sheets, comments cards, agendas, and presentations will be prepared for each event 17 Thirty pears ago, mmn: Nen (.4 peeeam of rhlldren YOVTk1_WALjUNQ1jWHKIN%TQWHQPL ..d t-, —1W W xhol YV.W.1 - """I g— y-th . ­ .( f ­W. end — ty. ,11,�g d— W enjoy0, fresh ", Zp =bod',d 1907 66% .pp—t—l" t. g. I. Wnw Then —ghb.,+­d WINk.'"'Ithlir wady 1then*y Thyd� 11 � d4f2017 �.,[A—­' jkZ,1 m Onty 13 P"y_d'_ bgu I. T.T.IffiTTIa SAFEROUTES BIKEOPEDESTAIAP4 AUDITS TRW*7,TA7X.',N, TOSCHOOL COMMITTEE ........... ...... ...... VA' P—W W_mds Thirty pears ago, mmn: Nen (.4 peeeam of rhlldren YOVTk1_WALjUNQ1jWHKIN%TQWHQPL ..d t-, —1W W xhol YV.W.1 - """I g— y-th . ­ .( f ­W. end — ty. ,11,�g d— W enjoy0, fresh ", Zp =bod',d 1907 66% .pp—t—l" t. g. I. Wnw Then —ghb.,+­d WINk.'"'Ithlir wady 1then*y Thyd� 11 � d4f2017 �.,[A—­' jkZ,1 m Onty 13 P"y_d'_ bgu I. T.T.IffiTTIa SAFEROUTES BIKEOPEDESTAIAP4 AUDITS TRW*7,TA7X.',N, TOSCHOOL COMMITTEE P—W W_mds Parents signing before a walk audit of Dayton Heights E I 1C u1 ..... . ... .... . . .. .. ... . . .. . . . . . . . . f So WONWALMININ-01 T1 -0 KoAwill organize live conrii-mrifty workshops at each School nPicillbo(hood The 9(-4 of the on) tilt! Ili t voori sho;-.­, will Ise to educate the stakeholders oil the importance and need for the project, Furthprinorp, it will provjd(� 1111 OpPoi`Wflity for the residents to voice their concerns with the Project, address any civerail safety issues arOUnd the schools, and UffillrateiY build overall conseilsus. N�= 1. Work with the City to develop meeting parameters that will ensure a consistent message across all five meetings. A general format and list of display materials will also be agreed upon, 2 A, master meeting schedule will be developed with the City. This will be largely contingent oil the availability of inceling spaces. As such, KOA will work tire Gtv or schools to identify meeting areas (whether they are iipf#,j at (ity-ront rolled facim ies st�pcft as cc-mmunity rooms/centers or at the schools) and develop a meeting schedule. 3. Upon agreeing on meeting parameters, schedule, and venue availability, KOA will conduct five community 'I'l , - trip Project, its gcial�,,and, overall rt� )A 1 �as Pt ovidud a J lol I pi meedm'I goal, For these workshops, KOA i!; proposina hayinq them he mnw, intrTrarfive incorpoiatinc Illapping ex ercise that allows lmrt I w it ants to prnvir If, inril! Mthe rel' elina. Tht, option v.,ill cr;pcvvc,i residents and meeting aucriclees and create an erivironn'lent where i free flow of ideas can take shape, 4. A logistics outline will be developed by A. This will include elements such as meeting timeline, materials needed, AV equipment, set-up, and clean-up procedures. Documentation (photos) and refreshments will also be provided by KOA staff. 5, Meeting materials and notices won be prepared by KOA Crud distributed III coordination with the City. K will work with the City oil on [tic agreeing - best method for meeting marketing. For example, meeting notices can be included in the City's website, a weekly e -blast, social media channels, etc.. Flyers will be distributed at public venues such as libraries, recreational facilities, schools, etc. KOA Project Manager, Carlos Vel6squez, conducting a community presentation, entirely in Spanish, for the Bell Gardens Complete Streets Plan 7,2 17 11 i : i-„"%,.' ",-, I , , , g, ,�tai i�'llivi�,,�����',f,�,>ll'�'ll��"IVII�ll,t!—""i�'I""""'I Ifs ....... ....... 7��TjPR77 ,7, F "0 J­ IJulius Avenue Pomering Road I Lankin Street SIDE OF STREET Pomering Road to Cul-de-sac w/o North & South Pomering Road Richeon Avenue to Horley Avenue North Old River School Road to Susan Avenue : South Laura Street to Nada Street West Stewart & Gray Road to Cul-de-sac n/o West Stewart & Gray Road �Lr APPROX.• • LENGTH ANTICIPATED (LF) CURB RAMPS 495 0 370 2 536 0 560 1 Old River School Road to Julius Avenue North 135 0 Old River School Road to Julius Avenue South 455 1 _.._._..._..._........_........... ........ ._....m_ ........... __.._.-___..--___... Orizaba Avenue to Downey Avenue South 855 2 Quoit Street Orizaba Avenue to Downey Avenue South 566 2 �Barlin Adoree Street Avenue to Blodgett Avenue South 500 12 Airpoint Avenue Adoree Street to Cheyenne Street West 420 2 Adoree Street to Cheyenne Street East 400 2 Blodgett Avenue Adoree Street to Cheyenne Street West 260 2 Premiere Avenue Foster Road to Angell Street West 800 2 TOTAL f6,7fiYi KOA will prepare street improvement plans to accommodate the design of the proposed improvements in this project. The street improvement plans will include the design of curb ramps, sidewalk, and modifications to driveways, landscaping, etc. Most of the proposed curb ramps are located on local streets and will not encounter many conflicts (if any). For these cases we have proposed to provide the curb ramp case and type only. At the intersection of Laura Street & Old River School Road there is existing signal equipment that will need to be taken into consideration for design, therefore we will provide a more detailed design with elevations and grades to minimize conflicts during construction. The street improvement plans will be prepared at Y=20' scale and contain a detailed horizontal layout, typical sections, construction notes, and applicable details. Task 4 Deliverables ® Design meeting and project pions of the 50%, 90%, and 100% design stages 4`r-', %v x,:'�: ;...lta,'r'!1. d i{a� t t,.!,2,ttti.t tit 4,c,?�t,2u,4i„1ft,t,tl+tt; tr�t#i�t'ittt{tyity tJ)is trti:. t4sttt " 2LQ�41MS4 CONNER NC -LP HMDSCOPE S ACTS MID KV W PIW NR I. Al K .,SP.SM ON BW n'sE' iu V ME PER SFPK SM. PIAN 12@-2, A2-5 V MID PIA, PIK SM ft" *0-11 N24 V ME PER VM SM ft. 110-1 12-0 6TH 6, No "A SIM SM %.4 ISo-Z SM PL. M-5 rl9, PID n" "N7 g 111l rT111 V1. �ow A4 .111"c I cgaWuiT ANP m To ww PALL box STREET ®r—,N TASK 51 — PREPARATION OF PROJECT SPECIFICATIONS KOA will prepare the project specifications using the City's boilerplate template. We will use the Standard Specifications for Public Works Construction (latest edition) throughout the course of this project as a basis for specification preparation. Specifications will be submitted at the 90% and 100% design stages. Specifications at the 90'ICI clod 100% design stages TASK 6 — PREPARATION OF ENGINEER'S ESTIMATE KOA will prepare a cost estimate that will be submitted with each design submittal. The purpose of this task will be to evaluate the proposed improvements against the overall project budget, if the initial design is over the available budget, we will work with the City to refine the design as needed. KOA will apply market construction costs for each bid item to the quantities measured. Cost estimates will be derived from a combination of available sources including Caltrans pu b! is hed data, rece nt bid prices f rom other loc a-11 p- r u-jects-, an d d- ny othe r data that the C ity rnay ch 0 U -Se to provii de for our use. The resulting deliverable will be a line by line estimation of quantities, i•• sub -totals and one grand total of the estimated cost to construct these improvements. KOA will update the cost estimates based on the refinement of the quantities throughout the project and will submit at the 50%, 90%, and 100% design stages. 6 g 0� A" 0 W,'1�t M_ IV— .1 PASED 101, N, r L�GEE ND: AC S= �.p SIT, 0' FURWK S. 2-1 F OF W INMIS_Cty ^11 L I —,amv"�', 0 —0 0— �, 11 11ST SF �[ I -1i Im", 01 d 1— 1,.;. -r br 5,w� xw ACP -14T I�oo CITY OF BURBANK �3AFF ROUTF21 TO 7�CHCYX JSPM� - IOU- . ...... PUBLK' VfORFS DEPARTMENT FTH STRE ET AT C-AMPRIDGE DRWE P R _E�,kvi 6W TASK 51 — PREPARATION OF PROJECT SPECIFICATIONS KOA will prepare the project specifications using the City's boilerplate template. We will use the Standard Specifications for Public Works Construction (latest edition) throughout the course of this project as a basis for specification preparation. Specifications will be submitted at the 90% and 100% design stages. Specifications at the 90'ICI clod 100% design stages TASK 6 — PREPARATION OF ENGINEER'S ESTIMATE KOA will prepare a cost estimate that will be submitted with each design submittal. The purpose of this task will be to evaluate the proposed improvements against the overall project budget, if the initial design is over the available budget, we will work with the City to refine the design as needed. KOA will apply market construction costs for each bid item to the quantities measured. Cost estimates will be derived from a combination of available sources including Caltrans pu b! is hed data, rece nt bid prices f rom other loc a-11 p- r u-jects-, an d d- ny othe r data that the C ity rnay ch 0 U -Se to provii de for our use. The resulting deliverable will be a line by line estimation of quantities, i•• sub -totals and one grand total of the estimated cost to construct these improvements. KOA will update the cost estimates based on the refinement of the quantities throughout the project and will submit at the 50%, 90%, and 100% design stages. i -.+ice TASK 7: DEVELOP AND IMPLEMENT A SAFETY EDUCATION PROGRAM Task 7.1 Safe=ty Prograrn Development Safe Moves will create a database of the five (5) schools (4 elementary and 1 middle). The database will include school profiles featuring the following information: • Name of school principal and/or student activity coordinators • PTA/PTO officials • School address, telephone and fax number • Email address of principal and/or student activity coordinators • Number of students • Number of students per class per grade level • Student -language -needs --- -- • Student transportation policies • Pedestrian collision data for the immediate area • Presence of crossing guards, student drop-off and pick-up areas, student valet program • Problem areas around school and community This database will allow a streamlined system for scheduling programs. Safe Moves will detail the programs to be conducted in an Educational Action Plan reflecting an equitable distribution of programming. Safe Moves will address the diverse environments and geographical boundaries by presenting an educational program that addresses the priority problems in each community. City staff will be provided a calendar of scheduled programs and be notified of any changes. The educational programs will be conducted in English and Spanish to accommodate the needs of each school. In addition, if other languages are spoken, Safe Moves will work with each individual school to arrange for the appropriate translation. All the literature and visual aids will be in English and Spanish. If there are special language needs for printed material, Safe Moves will work with the school to provide the appropriate materials for students. Safe Moves will implement a tracking protocol to record and evaluate the success of the educational programs. All educational programs will be evaluated and certified by each school contact with a Program Certification Form with all information such as school, number of students, grade levels and start/end time of each workshop verified. A portion of the form will request feedback on the program as well as a name, date, title and signature of school official verifying the information provided. Results along with Certification Forms, photos, videos and any electronic and print coverage will be included in Month End Reports. Photos and videos will be provided to each school for posting on school websites and/or air on the school's TV channel. Task 7,2 Safety Education Programs Workshops: Grades K — 3 Students in grades K-3 participate in a workshop program called "Play2BSafe, Healthy and Wise" These workshops involve students participating in an interactive exercise about walking to school. Elements of traffic safety, improving -air-quality and -getting exercise -are all -part of the workshop. This program component combines creativity, improvisation, student participation and humor to help students learn about walking as a fun, safe and effective way to get to and from school. Workshops: Grades 4 — 8 Students in grades 4-8 participate in a workshop program conducted in a game show format called "Traffic Jam" with the instructor as the game show host. This program component engages the students in active learning by challenging their critical thinking skills that are age and grade appropriate. "Traffic Jam" covers safety, health, environment and consequences of traffic congestion and air pollution. Workshops include interactive exhibits to demonstrate traffic situations. • Twenty-five (25) Workshops QSµ"` It it. ... „ ,.t .I � t,i, S i�a�1 ,TC.* ! 0' S.CH0, i=i'3?. I'SO kW Y i 'I >t } S tf fl i7t4t:{ #{} {ilsb ( £t j 1{i i 3,,ins a,cf {si.ht tt, iu � tf its r.<t. � Y.� {,� Safe Moves will schedule, promote and conduct fu .......... MUM'",_7 - 06, a traffic simulation course called "Safe Moves City." "Safe Moves City" is a miniature city featuring: • Sidewalks • Streets • Intersections ® Houses with garages • Schools • Alleyways • Parking lots • Business district with stores • Cars ruck Bus * Train ® Railroad tracks through lesson plans that are age-appropriate and administered by Safe Moves safety instructors. Lesson plans and traffic situations become more challenging for the upper grades so as to accommodate their "real life traffic challenges." The goal of the program is to not only make students aware of ways to stay safe but to help them develop the knowledge into an automatic behavioral response. In order to promote walking as effective choices for commuting, Safe Moves sets up treadmills for students to walk on. The goal is to show how far they can walk in a few minutes. Our experience in using treadmills has resulted in students being "amazed" how far they can walk in a few minutes with minimal effort. This lesson anywhere. WR� Explanation/simulation of traffic environment (infrastructure) Understanding of driver behaviors • School transportation/traffic policies (pick-up and drop-off procedures) • Explanation of the school route/neighborhood maps Importance of walking for physical fitness Effects of walking for a cleaner environment Explanation & promotion of Walking School Buses and Walk to School Days Identification & avoidance of hot spots (crime, bullies, hazards, corners & crosswalks, truck traffic) Defiverables Flp-f^n (I ' j Pndonc and evaluating Walking School Buses at the five (5) schools (4 elementary and 1 middle) with the goal of establishing walking school buses on a regular basis. of each school, their academic calendar and preferred communication style. Safe Moves will be responsible for promoting the Walkini,v School Bus with the following: a. School newsletter articles. b. Posters at schools c. Local news articles d. Announcements through the PTA e. School e-mails or websites f. Neighborhood association meetings a communications is Announcement in Student Workshops, Rodeos and Parent Workshops The lesson plans include: V__WW • 5_ — � Safe places to walk Walking School Buses at the elementary schools •will be Unsafe places to walk structured and highly organized to address the concern Explanation of traffic signs and signals of school officials and parents. Safe Moves will be Rights and responsibilities of pedestrians responsible for coordinating the recruitment of voluntee Recognition and avoidance of common pedestrian and confirming all volunteers have gone through the collisions Live Scan process with the Downey Police Department. Explanation and demonstration of the role of crossing guards fY OF DOWNEY Safe Moves, with input from the City, Downey Police Department and the Downey Unified School District, will design suggested routes for schools. These routes will be posted on each school website as well as featured in the school newsletters and flyers. ® Five (S) Walking School Bases When students walk to school, they improve their health, gain independence and confidence, and arrive at school ready to learn. Safe Moves will implement Walk to School Day events that promote these goals and be a simple starting place for getting elementary school students safely walking to school, and introducing schools, families, and community groups to Safe Routes to School. To engage middle school students, Safe Moves will piumute walkiny wlLh "AiiyLhhiy BuL a Cat Days." Middle School students will be encouraged to reduce their "carbon footprint" by getting to school any way other than a car. The events will include parents and other stakeholders who will welcome students to school on "Walk to School Day" with music, refreshments and a photo wall where students can be photographed with their friends (with prior parental approval) . Each student who participates in "Walk to School Day" will receive a raffle ticket to be entered into a drawing to win one (1) bicycle and one (1) helmet. Each school will have a bicycle and helmet prize. All bicycles and helmet will be provided without cost to the City. Note: The prizes are based on City approval. Research shows that schools with flourishing and sustainable SRTS programs have attributed their success in part to program champions who have enthusiasm and time to provide leadership for the group and keep things moving. Safe Moves will work to identify parents, school staff and qualified community volunteers who will continue organizing "Walk to School Days" with the goal of a sustainable program that will continue after the grant has concluded. Safe Moves believes, by changing behaviors, whether it be safe choices in traffic or the decision to walk to school, students and parents must be motivated and committed to making these changes. Simply giving students, parents and the schools the information is not enough. In addition to "Walk to School Day", a successful on-going encouragement program needs to incorporate on-going events such as "Walkin Wednesdays" to change student and parent choices of travel to and from school. Safe Moves uses the S.M.A.R.T. (Specific, Measurable, Achievable, Realistic, Timely) principle for encouragement programs. Example: "I will walk to school every Wednesday for the next 4 weeks and pay attention to traffic and make safe choices" The goal is specific, measurable, and achievable using a map or counting steps), realistic, and timely (deadline for the goal — 4 weeks). The ultimate goal is this is eventually expanded to a weekly routine with the ultimate goal of a daily routine, Students and parents will face barriers to maintain their committed behavioral changes sooner or later. Personal, social, and environmental barriers vary; however, Safe Moves will address the common barriers and identify solutions for effectively overcoming these barriers. After students have set their goals and expected outcomes, teachers can introduce a self- monitoring system in which students can evaluate their own progress weekly or monthly. Safe Moves will develop an encouragement plan that will be offered at all schools, with enough adaptability to be customized for each school's needs around their academic calendar and preferred communication style. We will present each school principal with a clear request for his or her approval, and clarify what staff can expect. We will focus encouragement activities so that they provide multiple opportunities to participate and result in the long-term commitment of active transportation choices to and from school. Safe Moves recognizes that walking to school may be more challenging for some families than others for geographic reasons. Safe Moves will identify and promote park -and -walk sites. Deliverables When permitted and approved by the City and the school Five (S) Wolk to School Gays district, with proper student release forms, Safe Moves will solicit print and electronic media coverage of events. . 2S . ITY OF DO tvsNEE ,' Please see our QA/QC plan to ensure quality control for the duration of the project including maintaining organization and communication over the entire project team, cost and schedule monitoring and a constructability review of the project plans, specifications and estimate upon their completion located in the Appendix of this proposal. ;+�f�N�}°:17=11;�(�U H<i?QNE'Y�AFE FZ�IJfEI`C� SCH(�.C�L Pf�flJECT.. rilli�wwmq Carlos Vel6squez, AJCP Ivy Hang * Roger Pelayo* Task Lead Trask Lead Ryland Lu* Brianne Masukawa Data & Graphics Outreoch Logistics Support Braulio Hoyos Support Support CROWN IM KOA safe Moves 777 ON 770 g gp, 77 7 m E' E2• •M 07MwK&M=- Key Personnel Table . ..... . . ............ Min Zhou, PE Principal -in -Charge Ivy Hang Existing Conditions Task Lead Ryland Lu Existing Conditions Data & Graphics Support Roger Pelayo Outreach & Design Task Lead IBrianne Masukawa Outreach Logistics Braul . io H . oyos Outreach & Design Support [Giuseppe Canzonieri, PE Plans, Specifications, & Cost Estimates Task Lead Joe Bernal Plans, Specifications, & Cost Estimates Support Anthony Wong Plans, Specifications, & Cost Estimates Support Pat Hines Marni Spencer Devlin Richard Maher, PLS lafety Education Program Task Lead .afety Education Program Support .- - ......... ---- 45%' 30% 55% 50% 45% 45% 45% 35%1 29 CITY OF DOWNEY K weA SECTION 5: KEY PERSONNEL I RESUMES CARLOS VELASQUEZ, AICP PROJFCT MANAGER Senior Planner I KOA Mr, Vel6squez brings over ten years of project experience, specializing in safe routes to school planning and programming, active transportation projects, corridor studies, and roadway operational analyses. He has managed numerous project for KOA involving: transportation planning, bicycle/pedestrian planning, transit access and operations, and traffic circulation analyses. He has worked on pruiects addressing bikeway planning and safety education, pedestrian EDUCATION circulation, First Last Mile, Tactical Urbanism, complete streets, and traffic studies. He has been involved in the development of numerous safe routes to school plans, including the LADOT's Top 50 School Plans Project, the 11-ity of Burbank's PS&E SRTS Project, and various others. Over the last two years, Mr. Vel6squez has led over forty walk audits throughout Southern California and has managed the implementation of a tactical urbanism pilot project to address pedestrian c,fety® yn C,&cnr rk6ienz A%,on@,,o in i _5 Angeles. He has farilitntarl niotranrin meetings and presented to city councils and traffic commissions. REGISTRATIONS RELEVANT EXPERIENCE • Santa Clarita Safe Routes to School Plan, Santa Clarita, CA PROFESSIONAL AFFILIATIONS * Safe Routes to School Plan for the Top 50 Schools with Most Need, Los Angeles, CA * Burbank Safe Routes to School PS&E, Burbank, CA * City of Commerce Bicycle and Pedestrian Master Plan, Commerce, CA MIN ZHOU, PE DRINCIPAL-IN-CHARGE & QA/Q10 Deputy CEO I KOA AW4 In the last seven years, Ms. Zhou has become the leading force for all of KOA:s active transportation projects. She has 25 years of transportation engineering and planning experience in both public and private sectors, developing exceptional professional expertise in roadway and traffic design, transportation studies and modeling, active transportation planning, database management, and statistical analysis. She has managed numerous large-scale projects involving multiple EDUCATION stakeholder groups and has high reputation of delivering projects both on-time MS , Civil Engineering, Michiclan Statp Univeisity, East Lansinci, Mi and under budget. RELEVANT EXPERIENCE • SBCTA Countywide SR2S Phase 11, San Bernardino County, CA City of Indio Safe Routes to School Master Plan, Indio, CA • Town of Apple Valley Safe Routes to School Master Plan, Apple Valley, 'CA • SCG City of Garden Grove Safe Routes to School- Phase 1 Plan, Garden Grove, CA • City of Moreno Valley SRTS Program, Moreno Valley, CA KWIS I KA:r!C)N • City of San Jacinto SkTS Program, San Jacinto, CA P�ofessional Engineer • City of Barstow Active Transportation Program (Cycle I) Funding, Barstow, CA (Civil), CA P66448 • 19 ATP Cycle 4 Grant Applications, CA PLANS, SPECIFICATIONS & COST ESTIMATES Senior Engineer I KOA Mr. [anzmniehhas performed numerous projects for both public and private developments throughout Southern California. He has considerable experience working with street lighting design, roadway design, traffic signal design, signing &s1hping design, traffic control design, construction specifications and cost estimates. He has served as project manager on many civil and traffic engineering design projects forthe[itiesofRanchoPm|osVerdes,Thousand Oaks, Los Angeles, West Hollywood, Santa Monica and Arcadia. Mr. Canzonieri is also known for his quality control capabilities and providing clients with high quality construction documents. He has significant knowledge working with multiple design platforms including AutoCAD, Civil 31)\ and K0icnzgation. EDUCATION BS, CiviEngineering, California State Polytechnic University, Pomona'CA REGISTRATION Professional Engineer, Civil, [A #79O06 RELEVANT EXPERIENCE ^ Claremont Foothill Boulevard Master Plan PS&E,Claremont, [A PROFESSIONAL AFFILIATIONS ~ Jefferson Boulevard Stoeetmcape and Pedestrian and Bicycle Access Improvements atHetzler Road, Culver City, [A ~ Safe Routes toSchool Traffic [a|nning'Thouaand(]aks'[A ~ Safe Routes toSchool Plan for the Top 5OSchools with Most Need, Los Angeles, CA Burbank Safe Routes to School PS&E, Burbank, CA ROGER PELAYO OUTREACH B!ENGAGEMENT Senior Planner |KI3A � Mr. Pelayo is a Senior Planner atkOV\with more than lOyears ofexperience specializing in o wide range of studies. He has prepared circulation elements for general plans, community plans, mobility studies onneighborhood and community scales, parking studies, and impact studies throughout Southern California. He is also proficient in intersection capacity software ' and has expehenceinGeneral Plan assessment and Pngec1Study reports. EDUCATION background His experience provides him with abackm»mundinArcGlSfor mapping, BS'Urban 8/Regional Planning, research and analysis. Hehas been akey contributor impreparing vah CaUfo,niaStatePo|ytmchnicUniversit�ous Pomona, [� studies that provided a �amewvorktoguide the growth and development of ' the transportation infrastructures of jurisdictions with the goal to provide a WiGpogmphic n(ormat/m� balanced, mu|d'moda|transportation system that addresses both short and �y��+rn�C»|ik.,nia Po|ytpdhnic long term needs. Below isalist ofprojects thathaveshapedhisexpehence. RELEVANT EXPERIENCE PROFESSIONAL AFFILIATIONS ° City ofColton Active Transportation Plan, Colton, C4 American Planning Association ^ City ofCommerce Bicycle and Pedestrian Master Plan, Commerce, CA ~ City nfBarstow Active Transportation Plan, Barstow, [4 ~ Town ofApple Valley Safe Routes toSchool Master Plan, Apple Valley, [A ^ Safe Routes toSchool Plan for the Top 5USchools with Most Need, Los Angeles, CA 31 IVY HANG EXISTING CONDITIONS Senior Associate Planner I KOA Ms. Hang is a Senior Associate Planner at KOA with more than 10 years of experience in transportation/transit planning. Ms. Hang has prepared numerous traffic impact studies, parking studies, and sections of environmental documents, She has performed traffic operation analyses, construction impact analyses, parking demand and shared parking analyses, signal warrant analyses, vehicle queuing calculations, etc. She is proficient in data collection EDUCATION and managing large datasets. Ms. Hang is an expert in Geographic information Systems (GIS). !A r, 1-r r-UnrMTr-% Or-F- RELE'VMIN I r-ArCrN11ZN%,-1: City of Commerce Bicycle and Pedestrian Master Plan, Commerce, CA Huntington Drive Safe Streets Corridor Plan, San Marino, CA California High Speed Rail — Burbank to Los Angeles to Anaheim Corridor, Los Angeles, CA REGISrTRAT'ON Metro East San Fernando Valley Transit Corridor Study, Los Angeles, CA East LA Specific Plan EIR, Los Angeles, CA South Gate Citywide Street Lighting Master Plan, South Gate, CA PROFESSIONAL AFFILIATIONS • South Bay Metro Green Line Extension, Los Angeles County, CA PAT HINES SAFETY EDUCATION PROGRAM Founder & 1.vecutive Director I Safe Moves As founder of Safe Moves, Pat has served as the executive director from 1983 to present. As a former bicycle racer, Pat learned firsthand the vulnerability of bicyclists and the dangers of the lack of education. Her best friend was killed in a bicycle accident in 1983 while the two were riding together. Neither Pat nor her triend were wearing helmets or following basic traffic laws. In response to the tragic loss of her friend, she established Safe Moves in 1983. Pat has experience in managing resources, controlling the scope, and ensuring that the work completed within the project timeframe. She is able to understand the vision the BS, Pre-Med/Mass Communications project and the ability to articulate it, and has clear communication about go.ls, University of Miami responsibility, performance, expectations and feedback as well as the ability to University of Miami Medical School effectively negotiate to ensure the success of the team and project. AREAS OF EXPERTISE RELEVANT EXPERIENCE Safe Routes to School Programs School Bicycle Safety and '11'ransit Fducotion, City of Los Angeles, Traffic Safety Education Department of Transportation School and Community Relationships Bicycle and Pedestrian Safety Education, City of Fremont Promotion and Marketing Vehicle Emi5siofls RIC-ductions Based at School Program, City of Mountain View, Public Works Safe Routes to School - City of Long Beach, Department Of Public Works Project; City of Costa Mesa, Department of Public Works,- City of Stockton, Public Works DepartmPni � Comity of Riverside, Dept, of Public Health ; San Bernardino COUntv of Public Health 32 MARNT SPENCER DEVD@ SAFETY EDUCATION PROGRAM Scheduler 8kEvent Facilitator |Subconsudant-Safe Moves yWannihas served asaProgram Scheduler and Program Facilitator for Safe Moves from 2U15tothe present. Her areas ofexperience are school and community outreach, program scheduling and marketing (graphic design and production). RELEVANT EXPERIENCE ~ Safe Routes UzSchool, City ofLong Beach' Department ofPublic Works Project ~ Safe Routes toSchool, City ofCosta Mesa, Department ofPublic Works ^ Bicycle and Pedestrian Safety Education, City ofFremont ~ Safe Routes School, San Bernardino County ofPublic Health PLANS, SPECIFICATIONS & COST ESTIMATES Rich Maher began his career inthe land surveying andcivi|engineehng industries inl9g(l Aaafounding owner ofKDM Meridian, heprovides the driving force behind the excellence of service expected of his entire staff. Hewill ensure each project's requinenmentsaremet,oveoee the application ofproper quality control and assurance procedures, and commit corporate resources to meet every projects objectives and schedule. Mr. Maher has worked extensively in all facets of land surveying with over one hundred different local, county, and state agencies and utilities districts. He has provided right-of-way engineering, annexations, heavy and light construction staking, design topographic surveys, aerial control networks, legal descriptions' boundary surveys, records ofsurvey, and parcel and tract map preparation and checking. He maintains his knowledge ofatate'of-the'arttechnology, hardware, and software used industry -wide. EDUCATION Bache�nis of Art Llniver�,Jty of San Jose AREAS DFEXPERTISE Safe Ro�Aes �u Schnn| Pnoglams Traffic. Safety Education School and Community Relationshps P omohonaod Marketing 100110,11i U21MM Univeoityod[a|i[om/a, Piveoide E��ten-Jon: GPS T�-chrlcdog.Y 2010-2012 Beverly & Robertson Boulevards — West Hollywood: Topographic Survey, Mapping Record Data, Storm Drain Dips California Professional Land Surveyo Yorba Linda Town Center: Topographic Base -Mapping, ALTA Survey, PLS 7564 Record of Survey, Legal Descriptions & Plats, and Manhole Dipping Miraleste Drive- Rancho Palos Verdes: Topographic Surveying & Mapping, Monument Perpetuation BURBANK SAFE ROUTES TO SCHOOL PLANNING S E URBANK,CA KOA I Sofe Moves KOA is providing safe routes to school planning and engineering services for three schools in the City of Burbank, The project consists of conducting walk and bicycle audits of the street conditions around the three schools as well as conducting travel surveys. In addition to the school outreach, KOA staff has conducted general community outreach, which together with the school - related activities, were used to develop an alternatives analysis to assess the most appropriate infrastructure countermeasures to address safety deficiencies in the school vicinity. KOA staff prepared full plans, specifications, and cost estimates for each school site. This information will then be taken by the City to construct the recommended improvements. As part of this project, the KOA SRTS team conducted bicycling and walking safety activities at each school. CLIENT NAME City of Burbank 275 E. Olive Avenue, P.O. Box 6459 Burbank, CA 91510-6459 REFERENCE Hannah Woo (818) 238-5270 hwoo@burbankca.gov YEAR COMPLETED Ongoing, estimated 2019 TOTAL PROJECT $130,000 STAFF Carlos Velasquez, AICP Brianne Masukawa Giuseppe Canzonieri, PE Anthony Wong Pat Hines 35CITY (--)F DOWFIEY 61MIC61HIMMUMAU111 r r SAFE ROUTES TO SCHOOL DESIGN PROJECT SOUTH GATE, CA KOA KOA provided engineering design and construction management services for the City of South Gate's Safe Route to School Cycle 8 and 9 Project (City Project No. 449 -TRF). This was an important project for the City in that it provided needed infrastructure improvements for pedestrians and cyclists. This state funded project involved civil engineering design, construction management and environmental documents preparation and utility coordination. Major components of the project included: • Installation of 98 pedestrian countdown signal heads • Installation of 17 solar powered speed awareness signs • Installation of 6 speed humps with regulatory signage. • Flashing beacons at the intersection of Santa Ana St. and Madison Ave. • Installation of 8,200 LF of Class I Bike Path along Southern Avenue • Installation of 2,000 LF of Sidewalk on Tweedy Boulevard • Installation of 1,200 LF of Raised Median Islands on Southern Avenue • Installation of 6,500 LF of Class II Bike Lane on Alexander Avenue CLIENT NAME City of South Gate, CA Public Works Department 8650 California Avenue South Gate, CA 90280-3075 REFERENCE Kenneth Tang, MS, PE Senior Civil Engineer City of South Gate (323) 563-9574 ktang@sogate.org TOTAL PROJECT"i $207,000 STAFF Giuseppe Canzonieri, PE Min Zhou, PE ,. {T Oi*J x., Ttl{\t RN'T,�r G CNOiI ' BC `71 ji i, J1 A. CITY OF INDIO SAFE ROUTES TO SCHOOL MASTER PLAN INDIO, CA KOA KOA developed a Safe Routes to School (SRTS) Master Plan for all 19 elementary, middle, and high schools located within Indio. The plan was based on five community workshops, walking safety assessments at each school, student travel tallies and parent surveys, and input from a variety of stakeholders, It included a vision and policy statement, a community engagement action plan that included a summary of the public input process, descriptions and characteristics of each school, a description of the existing travel environment and barriers, proposed improvements to increase active transportation, and a phased implementation plan. The master plan integrated health, fitness traffic relief, environmental awareness, and safety—as _sested by the California Department of Public Health. The plan included a list of priority projects; encouragement, enforcement, education, and engineering strategies; a time schedule for phased implementation strategies; a map of the areas covered by the plan; and an explanation of how the program would be evaluated. The plan identified next steps, including environmental work, Perrnitting, and prelirninMY engineering The plan centered on non -motorized 'ransportation options within a one-half mile radius around the schools. The 'an incorporated the six "E's" of safe routes to school planning, which were: . ucation, encouragement, engineering, enforcement, evaluation and equity. CLIENT NAME City of Indio M a I I PO Drawer 1788 Indio, CA 92201 REFERENCE Toyen Blake Aaii �_"dda YEAR COMPLETED � nl 0 'Vio TOTAL PROJECT COST $246,000 0� Jz i ".044AWA 0• PLAN COMMERCE, CA KOA KOA is currently working with the City of Commerce to develop the City's first bicycle and pedestrian master plan. KOA will be managing several aspects of the project, including public outreach, data collection/analysis, network development, feasibility/costs, and final plan production. KOA crafted an outreach action plan that will outline how the City's residents, the local industrial council, and major goods movement stakeholders will be engaged during the process. KOA staff will also conduct field investigations and develop feasible and constructible bicycle and pedestrian recommendations that will look to satisfy the City's goals of connecting the City's disparate neighborhoods to each other and to destinations outside of the City. KOA staff will do so by not only taking into account the active transportation needs of the residents but also the goods movement infrastructure, traffic, and business needs. I CLIENT NAME City of Commerce 2535 Commerce Way Commerce, CA 90040 REFERENCE Maryam Babaki, PE Director of Public Works & Development Services (323) 722-4805 mbabaki@ci.commerce.ca.us 1• i i r • lerelifile TOTAL PROJECT COST $225,000 STAFF Carlos Velasquez, AICP Roger Pelayo Ivy Hang Brianne Masukawa f.10,,,7,,,,,:rOIIT '$L:7.IL;4«SAFEc,tiTE S.TO SC1001.J[ i� ('I :v 4°,r<,,. t nrsv,4) ,I, rS< }k.,n.i.rsrhxcr `k3r;. z, }, r' iY,,. z',,=<t tyts ,tt • K 0 SECTION 6: RELEVANT EXPERIENCE Subconsultant(Safe Moves)t Experience Agency a City of Los Angeles, Department of Transportation Project Safe Routes to School Contact Name & Title: Howard Huang —Transportation Engineer Address: 100 Spring Street, Los Angeles, CA 90010 Telephone: 213.972.4958 Email: Howard.Huang@lacity.org Year Completed: Ongoing, estimated 2021 Total Cost: $324,000 Scope of Services: Safe Moves managed 1,500 school workshops and 100 traffic safety rodeos for elementary and Safe Moves managed 250 school workshops and 50 traffic safety rodeos for elementary and middle schools, Walk & Bike to School Days, Pre & Post Program data collection (per year) Agency e: City of Stockton, Department of Public Works Project Name: Safe Routes to School Contact Name & Title: Monique Stockton Address: 22 E. Weber Ave. Stockton, CA 95204 Telephone: 209.937.8613 ail: Monique.Raqueno@stocktonca.gov Year Completed: Ongoing, estimated Oct 2020 Total Cost: $350,000 Scope of Services: Safe Moves managed 250 school workshops and 50 traffic safety rodeos for elementary and middle schools, Walk & Bike to School Days, Encouragement Programs, Pre & Post Program data collection Agency City of Mountain View Project e: Vehicle Emissions Reductions Based at Schools Contact Name & Title: Dennis Drennan — Real Property Administrator Address: 500 Castro Street, Mountain View, CA 94039 Telephone: 650.903.6633 Email: dennis.drennan@mountainview.gov Year Completed: Ongoing, estimated 2019 Total Cost: $500,000 Scope of Services: Safe Moves managed 220 school workshops and 100 traffic safety rodeos for elementary and middle schools; Walk & Bike to School Days, Encouragement Programs, Pre & Post Program data collection Agency City of Glendale Project Name: Safe Routes to School Contact Name & Title: Juan Gonzales, Neighborhood Services Supervisor Address: 633 East Broadway # 201, Glendale, CA 91206 Telephone: 818.937.8322 Year Completed: Ongoing, estimated June 2019 Total Cost: $250,000 Scope of Services: Safe Moves managed 200 school workshops and 45 traffic safety rodeos for elementary and middle schools; Walk & Bike to School Days, Encouragement Programs, Pre & Post Program data collection. fIP.�1,� 417,1 t, O:LJfH I�i+3�Iu }F''y4AfEttftOU,TI+„� S.};''l��lti`;.„�� �} t$t�,tat ,t}Jtt,tf tit itF J.. r,.?�4j.}ta x tyl tt :im {kryiil4�,tG,)„�$4J1 4 City of Moreno Valley Juan Bautista De Anza Trail Improvements Margery Lazarus, PE, Senior Engineer 14177 Frederick Street, PO Box 88005, Moreno Valley, CA 92552 (951) 4107 3133 mai geiyWrnoval-org Ongoing $7M Subconsultant to KOA. Preparation of base maps for design of bike trail imprcivenieni design totaling approximately 12,000 feet in length. The work included coordination with school distric-, staff, ftiverside COUnily Flou' Cuiiiiul, Pnr!: Department, KD M located existing monunletilation and obtained Preliminary Title Reports in SUDPtlf t of possible future Right -of -Way takes, City of Claremont Foothill Blvd PS&E Vincent Ramos 207 Harvard Avenue, Claremont, CA 91711-0880 (909) 399-5395 vramos@ci.claremont.ca.us 2018 $15.5 M Sunconsultant to A. The project is contained to a two (2) mile stretch along Foothill Boulevard between Town Avenue and The City Boundary. The project includes roadway improvements, bio-swales, storm drains, bicycle lanes, separated bicycle lanes, intersection bulb -outs, median and parkway landscaping, traffic signal modification, sidewalk improvements, and street/ pedestrian lighting. City of Yorba Linda Yorba Linda Town Center Elizabeth Reyes 22 Executive Park, Suite 200, Irvine, CA 92614 (949) 655-3900 x2382 2018 The City of Yorba Linda planned to take a 5 -block region, originally subdivided in 1912, and redevelop it into a new commercial Town Center. To aid that goal , KCS M was hired to perform several survey services. 42 CITY OF DOWNEY MOM Project Rick -Off Meeting 1.2 Ongoing C000rdination (task deliverables, approvals, etc.) 1.3 Meeting Agendas and Minutes 1.4 Project Schedule Develooment 2.1 'lleb-Based 4op-- 2.2 Records Research 2.3 Utility Research & Notifications 2.4 Field Review & Site Evaluation 2.5 Right -of -Way Research 2.6 Topographic Survey 2.7 Residental Property Research 2.8 Pedestrian Detection Inventory 2.9 Transit Research 2.10 SRTS Surveys at Five Schools 2.11 Traffic Pattern Observations 2.12 Research Transportation Policies at Schools 2 13 SMOF TA U:..- Y - 4A 90% Submittal 4.5 100% Submittal 5.1 Project Specification Preparation (Tasks 5.2 - 5.3) 5.2 90% Specifications 7.1 Design Pedestrian Safety Education Programs 7.2 Conduct Pedestrian Safety Education Programs 7-3 Distribution of Education Materials SECTION 9: CERTIFICATIONS I NON -COLLUSION AFFIDAVIT YOA SOUTH DOWNEY 910MA•i: i fl -4 NON -COLLUSION AFFIDAVIT (Title 23 United States Code Section 112 and Public Contract Code Section 7106) FM, 0 U-1 M&I k ire] a a I'm In accordance with Title 23 United States Code Section 112 and Public Contract Code 7106 the BIDDER declares that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the BIDDER has not directly or indirectly induced or solicited any other BIDDER to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived or agreed with any BIDDER or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the BIDDER has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the BIDDER or any BIDDER, or to fix any overhead, profit, or cost element of the bid price, or of that of any other BIDDER, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the BIDDER has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid. Note: The above Non -collusion Affidavit is part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Non -collusion Affidavit. BIDDERS are cautioned that making a false cc r�u I ic � i t i o �_ntpa � I 'ect the vurfli.fier to criminal prosecution. - 09 Signed - --7;" State of California County of Subscribed and sworn to (or affirmed) before me on this _ day of _ , 20_ , by proved to me on the basis of satisfactory evidence to be the person(s) who appeared before me. Notary Public Signature Notary Public Seal ............ ....... . . "M . . .. .. 777T,,,", mill SECTION 9: CERTIFICATIONS I NON -COLLUSION AFFIDAVIT KOA CALIFORNIA JURAT WITH AFFIANT STATEMENT GOVERNMENT CODE 18202 I(See Attached Document (Notary to cross aut lines 1®6 below) a See Statement Below (Lines 1-6 to be completed only by document signals], not Notary( Signature Signature of Document Signer No, 2 (if onyx .3 - of Document Signer No. 1 which this certificate Is attached, and not the truthfulness, accuracy, or validity of that document, State of California Countyof R' 0S Nirr'll-if-S NIKITA CHOI Y L_" . gale County letrninlll'"290531 I Subscribed and sworn to (or affirmed) before me 9 on this '1 " - , A day of 20 by Deep Month Year (and (2) Nome(s) ofSlgner(s) proved to me on the basis of sallsfactM evidence to be the person(s) who appeared before me. Signature Sitio it o It rif of Notary Public fraudulent reattachment of this form to on unintended document. Description of Attached Document Title or Type of Document: -top �f(jaal`ltj' of DowKi,ij, , �;i(� &AM Document Date: Number of Pages: Slgner(s) Other Than Named Above: win 02017 National Notary Association SECTION 9: CERTIFICATIONS I NON -LOBBYING CERTIFICATION KOA SOUTH DOWNEY NXIIII-Walleft WIVION) R It"2013M the prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that: I . No federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any federal contract, the making of any federal grant, the making of any federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any federal contract, grant, loan, or cooperative agreement. 2. if any funds other than federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence any officer or employee of any federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this federal contract, grant loan, loan or cooperative agreement, the undersigned shall complete and submit a "Disclosure of Lobbying Activities". This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into, Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure. The prospective participant also agrees by submitting his or her bid or proposal that he or she shall require that the language of this certification be included in all lower tier subcontracts, which exceed $100,000 and that all such sub recipients shall certify and disclose accordingly. Firm KOA Corporation Signed and Printed Name: In Zhou Title Deputy CEO Date 3/22/2019 ..... ....... g, j,gg , "." ", ""M �g '411110 Tp� T N- IR a 7-7 'illihii 616,16 1, T "'Mani SECTION 9: CERTIFICATIONS I NON-DISCRIMINATION CERTIFICATIOR KOA I NON-DISCRIMINATION CER,rIFICATION SOUTH DOWNEY The undersigned contrador or corporate officer, during the performance of this contract, certifies as follows: The Contractor shall not discriminate against any employee or applicant for employment because of race, color, religion, sex, or national origin. The Contractor shall take affirmative action to ensure that applicants are employed, and that employees are treated during employment without, regard to their race, color, religion, sex, or national origin. Such action shall include, but not be limited to, the following: or transfer-, recruitment or recruitment advertisinjgt,-�off or terminatiom rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination clause. 2. The Contractor shall, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, state that all qualified applicants will receive consideration for employment without regard to race, color., religion, sex, or national origin. 3. The Contractor shall send to each labor union or representative of workers with which he/she has a collective bargaining agreement or other contract or understanding, a notice to be provided advising the said labor union or workers' representatives of the Contractor's commitments under this section, and shall post cY pies of the notice in conspicuous places available to employees and applicants for employment, 4. The Contractor shall comply with all provisions of Executive Order 11246 of September 24, 1965, and of the rules, regulations, and relevant orders of the Secretary of Labor. 5. The Contractor shall furnish all information and reports required by Executive Order 11246 of September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his/her books, records, and accounts by the administering agency and the Secretary of Labor for purposes of investigation, to ascertain compliance with such rules, regulations, and orders. 6. In the event of the Contractor's non-compliance with the nondiscrimination clauses of this contract or with any of the said rules, regulations, or orders, the contract may be canceled, terminated, or suspended in whole or in part and the Contractor may be declared ineligible for further Government contracts or federally assisted construction contracts in accordance with procedures authorized in Execution Order 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of September 24, 1965, or by rule, regulations, or order of the Secretary of Labor, or as otherwise provided by law. 001111.101 W11 777 SECTION 9: CERTIFICATIONS I NON -DISCRIMINATION CERTIFICATION KOA 7. The Contractor shall include the portion of the sentence immediately preceding paragraph (1) and MT provisions of paragraphs (1) through (7) in every subcontract or purchase order unless exempted by rul regulations, or orders of the Secretary of Labor issued pursuant to Section 204 of Executive Order 11246, September 24, 1965, so that such provisions will be binding upon each subcontract or purchase order as t administering agency may direct as means of enforcing such provisions, including sanctions noncompliance; provided, however, that in the event the Contractor becomes involved in, or is threatell- with, litigation with a suntractr r vendor as a result of such direction by the ad ministering agency, t Contractor may request that the United States enter into such litigation to protect the interests of the Unitl bcooo� States. 8. Pursuant to California Labor Code Section 1735, as added by Chapter 643 Stats. 1939, and as amended, No discrimination shall be made in the employment of persons upon public works because of race, religious creed, color, national origin, ancestry, physical handicaps, mental condition, marital status, or sex of such persons, except as provided in Section 1420, and any contractor of public works violating this Section is subject to all the penalties imposed for a violation of the Chapter. Signed: Title: Deputy CEO Firm: KOA Corporation Dale: 3/22/2019 -7 .. . ........ .,#1111''d 7 pgg, 7 KOeA SECTION 9: CERTIFICATIONS I DEBARMENT AND SUSPENSION CERTIFICATION KOA DERARMENTAND SUSPENSION CERTIFICATION HTH"AQ. CODF, ()17 1-,F.[)FRA1 R1=uULY\T10NS. PA16 21) Vch VUAJWr5�—,VVSTM=Nrdr, -F1 — ��� 11 1 1 I'll 11C therewith in the capacity of owner, partner, director, officer, manager: a Is not currently under suspension, debarment, voluntary exclusion, or determination of ineligibility by any Federal agency; 0 Has not been suspended, dcbarred, voluntarily excluded or determined ineligible by any Federal agency within the past 3 years; Does not have a proposed debarment pending; and Has not been indicted, convicted, or had a civi I judgment rendered against it by a court of competent jurisdiction in any matter involving fraud or official misconduct within the past 3 years. If there are any exceptions to this certification, insert the exceptions in the following space. Exceptions will not necessarily result in denial of award, but will be considered in determining bidder responsibility, For any exception noted above, indicate below to whom it applies, initiating agency, and dates of action. Notes: Providing false information may result in criminal prosecution or administrative sanctions, The above certification is part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute. signature of this Certification. FED -1 11 SECTION 9: CERTIFICATIONS I NON -COLLUSION AFFIDAVIT Sofe Moves SOUTH DOWNFY ft �11 I J Public Contract Code Section 7106) In accordance with Title 23 United States Code Section 112 and Public Contract Code 7106 the BIDDER declares that the bid iS 1101, luildtf iif OW i7rrVflVs1 of q1t i4o k4lAh, ol, mly undisclosed per.wn, paruwmhp, a%,;ocja, corper-t6ow, thm the hid t% p �pwghw 'Jild iml collusive or sharn: that the 131I)1.t1A hqs not directly or indiructly induved ur 'nob sled Ajry other RIDDER io plit in 0 !Wrc or sl, no I)id, .vid ism not difec.fly x)t ii1direetly cottfpvcd or agr'wd with ihnY BIDDEA or ajlys')nc c1sc to pul in to Nhain bid, ("'r 111kit WsYone shall reir;'aira ROM biddatg; That The WA)ER has not in any manner, directly or indirectly, sought by agreement, conuountcatioij, or emO�rcnce wilh anyone to fix iiia bid pric"C' of the BIDDER or any BIDDER, or to fix any overhead, profit, or cost element of the bid price, or of that of any other BIDDER, or to secure any advantage against the public bod> awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the BIDDER has not directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, ortoany member or agent thereof to effectuate a collusive orsham bid. Note:collusimi Affidavit is part of tire Proposal. signing this proposal on the signature portion ere. we signature of chis Non -collusion Affidavit. BIDDERS are cautioned that making a false the certifier to criminal prosecution. Signed State of Umilwwa Count), of e 43- Subscribed and sworn to (or affirmed) belore nic on this day of C _ J_ , 201 by TY air g It? (2s' proved to me on the basis of satisfactory evidence to be the persons who appeared before me, Novir Public Signature Notary Public Seal cowm*" 2104"1 W*Y p4k - CWN011 Lu A"On Uo* ow 0 2019 2=2r11 SECTION 9: CERTIFICATIONS I NON -LOBBYING CERTIFICATION Safe Moves SOUTH DOWREY fflvalj_01�11 the prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that: 1, No federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any federal contract, the making of any federal grant die making of any federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any federal contract, grant, loan, or cooperative agreement. 2. If any funds other than federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence any officer or employee of any federal agency, a Member of Congress, an officer or employee of Congress, or an r.mninyre of a Member of Congress in connection with this federal contract, grant loan, loan or cooperative agreement, the undersigned shall complete and submit a "Disclosure of Lobbying Activities". This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 3 1, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $ 10,000 and not more than $100,000 for each such failure. The prospective participant also agrees by submitting his or her bid or proposal that he or she shall require that the language of this certification be included in all lower tier subcontracts, which exceed $ 100,000 and that all such sub recipients shall certify and disclose accordingly, Firm Signed and Printed Name: past lliille,,�­_­­__ Title Fxecutive DirectoriPi"icicia Date March 28, 2019 SECTION 9: CERTIFICATIONS I NOW DISCRIMINATION CERTIFICATION Sofe Moves SOUTH DOWNEY lentil til' i ' it; The undersigned contractor ®r corporate officer, during the performance of this contract, certifies as follows: The Contractor shall not discriminate against any employee or applicant for employment because Of race, color, religion, sex, or national origin. The Contractor shall take affirmative action to ensure that applicants are eroployed, and that employees are treated during employment without, regard to their race, color, religion, sex, or national origin. Such action shall include, but not be limited to, the following: tn_nr�@ransfer, recruitment or recruitment advertisinZ: laooff or terTnination;. rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment. notices to be provided setting forth the provisions of this nondiscrimination clause. 2. The Contractor shall, In all solicitations or advertisements for employees placed by or on behalf or the Contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, or national origin. 3. The Contractor shall send to each labor union or representative of workers with which he/she has a collective bargaining agreement or other contract or understanding, a notice to be provided advising the said labor union or workers' representatives of the Contractor's commitments under this section, and shall post copies of the notice in conspicuous places available to employees and applicants for employment, 4. The Contractor shall comply with all provisions of Executive Order 1] 246 of September 24, 1965, and the rules, regulations, and relevant orders of the Secretary of Labor. I 5. The Contractor shall furnish all information and reports required by Executive Order 11246 of September 24. 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his/her books, records, and accounts by the administering agency and the Secretary of Labor for purposes of investigation, to ascertain compliance with such rules, regulations, and orders. 6. In the event of the Contractor's non-compliance with the nondiscrimination clauses of this contract or wim any of the said rules, regulations, or orders, the contract may he canceled, terminated, Or suspended in whom or in part and the Contractor may be. declared ineligible for further Government contracts or federal assisted construction contracts in acc%%s% + orized in Execution Order 11246 September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided Executive Order 11246 of September 24, 1965, or by rule, regulations, or order of tire Secretary of Labor, as otherwise provided by law. I SECTION 9: CERTIFICATIONS I NON- DISCRIMINATION CERTIFICATION Safe Moves The Contractor shall include the portion of the sentence immediately preceding paragraph (1) and the provisions of paragraphs (1) through (7) in every subcontract or purchase order unless exempted by rules, regulations, or orders of the Sectetiry ol'Labor issued pursuant to ficcfi()n 204 of'Executive; Order 11246 of September 24, 1 I)f)5, so that such provisions will be binding upon cath subcontract or purchaste order its the administering agency may direct as means of enforcing such provisions, including sanctions for noncompliance; provided, however, that in the event the Contractor becomes involved in, or is threatened with, litigation with a subcontractor or vendor as a result of such direction by the administering agency, the Contractor may request that the United States enter into such litigation to protect the interests of the United States. 8. Pursuant to California Labor Code Section 1735, as added by Chapter 643 Slats. 1939, and as amended, No discrimination shall be made in the employment of persons upon public works because of race, religious creed, color, national origin, ancestry, physical handicaps, mental condition, marital status, or sex of such persons, except as provided in Section 1420, and any contractor of public works violating this Section is subject to all the penalties imposed for a vi� lat gin, of the Chapter, Signed: Vat I I ifics Title: ExecutiyA Dire�ctnr/Preqident Firm: safe Moves K 01 KOP,fA SECTION 9: CERTIFICATIONS I DEBARMENT AND SUSPENSION CERTIFICATION fffi� therewi �h in the capacity of owner, partner, direct o officer, manager; • Is not currently under suspension, debarment, voluntary exclusion, or determination of ineligibility by any Federal agency; • Has not been suspended, debaTred, voluntarily excluded or determined ineligible by any Federal agency wi�hin flic 3 y�ar,,,� • Does not have a proposed debarment pending; and hnd cM1 �vd�-rnent rpndared aga�ns it h a court of c mnetent jurisdiction in any matter involving fraud or official misconduct within the past 3 years, If there are any exceptions to this certification, insert the exceptions in the following space. Exceptions will not necessarily result in denial of award, but will be considered in determining bidder responsibility. For any exception noted above, indicate below to whom it applies, initiating agency, and dates of action. Notes: Providing false information may result in criminal prosecution or administrative sanctions. The above certification is part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Certification. FEN 11 Jill liitigical- _11 LV.Vffjt�. dl ft M ! 0 lie IFAS 2112HIJI M I I I mll'r•= Pub] ic Contract Code Section 7106) n t directiv or in irectly- sought by agreement—communicatiDn- orc� of the BIDDER or any BIDDER, or to fix any overhead, profit, or cost element of the bid price, or of that of any other BIDDER, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the BIDDER has not, directly or indirectly, submitted his or her bid -,;rice or any, breakdown thereof or the contents thereof or divulged infori-nation or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid. Note: The above Non -collusion Affidavit is part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Non -collusion Affidavit. BIDDERS are cautioned that making a false cull fi ...fl rn tti11y'SU1111, . 101 VOIRIM to criminal prosecution, Signed State of Ci�is mmi County 1s}" by Subscribed and swom to (or affirmed) before me on flw�-` 'IM proved to me on the basis of satisfactory evidence to be the perp;mQwbo all li mc 0, TFWNO COMM. 0 2274032 X NOIARY " 011 =Nrg WC EV JAY 21,2021 Notary Public Signature Notary Public Seal ............... A i"N _Y"SA ... . . . .... X"T 3f -71,77 777, N" 77 Ml AgN . . . .. .... GT A 1MMITY1211 All� III 101111 11 1 � I'll I III I F 11 111 I'll 1; 111 111 i,i I i NON-DISCIMMINNATION1 CFAITIFIC.-MON, SOUTH DOWNEY lift"MIMMM The wideisigned contractor or corporate officer, during the pv� formance of this contract, certifies as follows: 'o"MN xvmu KLA SECTION 9: CERTIFICATIONS I DEBARMENT AND SUSPENSION CERTIFICATION 1 274 I The bidder, under penalty of perjury, certifies that, except as noted below, he/she or any other person associated therewith in the capacity of owner, partner, director, officer, manager: • Is not currently under suspension, debarment, voluntary exclusion, or determination of ineligibility by any Federal agency; TR U E • Has not been suspended, debarred, voluntafily excluded or determined ineligible by any Federal agency within the past 3 years; TRUE • Does not have a proposed debarment pending; and TRUE • Has not been indicted, convicted, or had 4 civil judgment rendered against it by a court of competent jurisdiction in any matter involving fraud or official misconduct within the past 3 years. TRU E If there are any exceptions to this certification, insert the exceptions in the following space. Exceptions will not necessarily result in denial of award, but will be considered in determining bidder responsibility, For any exception noted above, indicate below to whom it applies, initiating agency, and dates of action. Notes: Providing false information may result in criminal prosecution or administrative sanctions. The above certification is part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Certification. ...... .. . vY 01" 411114'11171111� "N"I"P, KOA CORPORNHON I 100 Corporate Center Drive, Smite 201 PLANNING & Monterey Park, CA 91754 MONTEREY PARK - CULVER CITY - ONTARIO - ORANGE - SAN DIEGO M. - =-- wwwvul 1055 Corporate Center Drive Suite 300 Monterey Park, CA 91754 (323) 260-4703 Main (323) 260-4705 Fax Date: May 2009 Re: QUALITY ASSURANCE POLICY In our effort to produce the highest quality work appropriate for each project and process we undertake, this policy is being distributed to all employees. Here forth, we expect that each employee familiarize him or herself with this manual and help us adhere to alements within this manual, ift"WiNIN61116 .11 . .. . . 1 .- 911GICZ 6�qllra T•- 0 W 1; 114 11142 0i, 0 $ 0 F a 0 0 •• I - - r�111WIIR;111161 e - - - - a QIMIRWOIMF F� -41 11111�� KOA Corporation is committed to producing products and services to the highest professional standards. We further committed to continue to upgrade the quality of those products and services. KOA Corporation's employees and their SUb consUltants --gre directed to comply with KOA Corporation's QUAI, ITY ASSURANCF PROGRAMand to take actions and perform such duties to ensure that all work complies with the project requirements and high quality professionals standards. Approved: Acknowledge& President Vice President of Operations Z— Date NOME18=2 V Wel I M -kL ft7A4 Tf - UCFj'JJ - ie rl,• • _ I• project deliverables. This document is issued and distributed by the QA/QC Manager. The table of contents indicates the current version number and release date of each section. A] 11koll wi%zle Roll Gill lie, KOJ w- I I 1 0 ;4-1 (101 IRS Ma 111 01 011FIQ AtIZ-4116,2024 or-KyWO 0- KOA CORPORATION PLANNING 1, IN6111111ING TABLE OF CONTENTS issue Date: 05/06 I Rev Date: 05/09 1 Definitions 2 Design Preparation Procedures 3, Design QC Review Procedures a. Design QC Color Codes b. Design QC Flow Chart 4. Design Checklist a. Traffic Signal Design Checklist b. Traffic Control Design Checklist c. Signing and Striping Design Checklist d. Street Lighting Design Checklist a. Civil Design Checklist 5 Cost Estimate Procedures 6, Study Preparation Procedures 7. Study QC Review Procedures a. Design QC Color Codes b. Design QC Flow Chart & Study Checklist 9 Software/Spreadsheets Procedure 10, Audit Procedures 11. Training Procedures 12. Checklist Procedures 1& Calculation Procedures 14, Specification Procedures M�*il No: V.1 Rev No: V.2 7,V DEFINITIONS o: Issue Date: 05/06 NV. I I I Rev Date: 05/09 1 Rev No: V.2 Ml: ull�c KOA CORPORNHON Page 1 of 3 IIANNING 1, INGINIIIING PROCEDURE FONS AND PR DEFINITIINCIPLES Issue Date: 05106 No: V, I Rev Date; 05/09 J Rev No: V.2 QUALIT Y ASSURANCE: PA) A program-wide approach that establishes and oversees project related policies, o,rocedures, standards uidelines and training .0 ,, aimed at nroducino, an acceptable level of quality. QA is the responsibility of the principal-in-charge. QUALITY CONTROL (QC) The project specific activities that apply the QA policies, procedures, standards, 2:=44�dx#-q A-rn2)n(2krF.-V6 of sound project management, guidance, and review. QC is the responsibility of the Project Manager. ONGOING REVIEWS Inter- and Intra-discipline reviews, managed by 'the Project Manager, thatfuccus on day- to-day checking for accuracy and coordination. FORMAL REVIEWS Formal reviews are made by persons who are not directly involved in the project to provide independent reviews for reasonableness, logic, constructability, and coordination of the design between sections and disciplines. TOTAL QUALITY MANAGEMENT (TQM) TQM means that each individual has the responsibility to check and verify the quality of their work before it is passed on to someone else. STANDARD OF PRACTICE Standard of practice refers to those standards of care, procedures, guidelines, methods and checks to be routinely employed by each discipline as generally accepted to be prudent and responsible by the industry in performing professional services of the discipline within a project. Standards of practice may change from time to time and from project to project and must be maintained current to the requirements of each. QUALITY ASSURANCE PRINCIPLE The individual producing the work has the responsibility for its quality, NOT only the person checking the work. PRINCIPAL-IN-CHARGE Each project has a principal-in-charge whose responsibilities include the oversight of the project and typically sealing and signing products to be submitted. In regards to the QA/QC plan, the principal-in-charge will review the QA/QC plan for the project, assess the appropriateness of the plan to the complexity and requirements of the project and assist in identifying an active role in the QA1QC Plan execution when the principal-in- charge has the technical credentials and available time to devote to such efforts. KOACORPORMION Page 2 of 3 • PLANNING & ENGINEERING PROCEDURE DEFINITIONS AND PRINCIPLES Issue Date: 05106 No: V.1 Rev Date: 05/09 Rev No: V.2 PROJECT MANAGER A Project Manager is assigned to each project undertaken. The Project Manager's responsibilities are to organize and sometimes perform the services under the contract, apply resources and monitor progress of the operative individuals responsible to produce project deliverables to a quality consistent with the intent of the client as of practice. PROJECT ENGIREER Each project will have a Project Engineer assigned to it. The Project Engineer's responsibilities are to perform the services under the contract and to oversee the design details of the project. The project engineer will directly report to the project manager and know the status of the project at all time. The project engineer will make sure that the quality of the products are consistent with the intent of the client as indicated by the terms of the client contract and consistent with the applicable standards of practice. DISCIPLINE LEADER The Discipline Leader is responsible to the project manager and/or the don manager for the quality of services produced within that particular technical area of activity. Responsibilities include establishing operating guidelines, assign specifically accountable responsibilities within the unit, implement the use of standards of practice to be followed by technical staff assigned to projects for production of reports, drawings, calculations and computer computations. Other responsibties include monitoring the checking procedures to determine if procedures are being followed, maintain the level of training of the staff, keep the project manager advised of any unusual circumstances or problems that may require project manager attention including the quality of deliverables, performance within budget and schedule and the cooperation among disciplines. The discipline leader also must assist and cooperate with the project manager in accomplishing an in-house review of discipline services and review and sign off on completed services before transmitting to the project manager for submission to the client. QA/QC MANAGER The QA/QC Manager is someone who has been recognized by his or her peers for their distinguished technical achievement and is authorized by the firm to use the title QA/QC Manager. The individuals chosen to be QA/QC Managers are technical resources recognized in specific and defined technical practice areas. The QA/QC Manager's responsibilities include contributing through example and sharing of their technical expertise to the quality of technical performance within their respective areas of professional practice and to provide the primary in-house resources to review technical services being performed by the firm, provide audits of the adequacy of skills and technology of staff assigned to the project. KOA CORPORATION 4 Page 3 of 3 NANNING & ENGINEERING PROCEDURE DEFINITIONS AND PRINCIPLES J Issue Date: 05106 N. V I Rev Date: 05/09 1 AUDITS Audits are periodic reviews that ensure that the QA/QC plans will be implemented assurance program; verify that the QA/QC plan has been complied with; identify areas where there is a need for improvement to the quality assurance plan; provide the Principal -in -Charge and the Project Manager with an overview of the quality trends; ensure that all concepts, calculations, reports, analyses, drawings and specifications are checked at the appropriate milestones', ensure that copies of all design and planning computations and drawings are signed and dated by both the designer/planner and the checker and are kept in the project file; and ensure that a contract document/deliverable review checklist is used as means of ensuring compliance with the contract documents and deliverable requirements. The Audits will be conducted at random intervals. Issue Date: 05/06 No: X7.1 Rev Date: 05/09 1 Rev No: V.2 FKOA CORPORYMON Page I of 2 M 4 PLANNING 11 INGINIIIING PROCEDURE DESIGN PREPARA TION PROCEDURE Issue Date: 05/06 No: V.1 Rev Date; 05/09 Rev No: V-2 PURPOSE To establish guidelines for the preparation of drawings, calculations and/or specifications for technical and formal review. DRAWING PREPARATION The Project Manager informs the Project Engineer/Designer of the project drawing requirements including the following: a. Drawing level of effort b. Drawing size and format c. Drawing type d. Appropriate number of drawings e. Drawing title block requirements f. Drawing numbering requirements g. Requirements for stamping the drawing h. Requirements for in CADD standards — KOA's, Client's or Agency's L Deliverable drawing requirements j. Project budget k. Scheduled drawing deadlines I. Material requirements m. Special requirements The Project Engineer implements the Scope of Work by producing the required drawings. KOA CORPORATION Page 2 of -Q - PLANNING & ENGINEERING PROCEDUR15 DESIGN ATIA TION"-PR"O CUR Issue bate: 05/06 No: V I Rev Date: 05/09 Rev No: V.2 The Project Engineer coordinates the drawings on a continual basis with regard to the following issues: a. Project design requirements b. Owner's requirements c. Other discipline's requirements d. Revisions which affect the other discipline's drawings e. Project specifications f. Regulatory agency specifications g. KOA's and/or client's drawing standards The Project Engineer notifies the Project Manager and his Discipline Leader if he foresees problems in meeting either the project schedule or budget, and together they determine and implement a course of corrective action. 1 11 11 Ve7JAWN1W --- - - I zte:l, should be accomplished on portions of the submittal in accordance with the Design Review Procedures. 1 -411mol WHIM Moist C-INIZzor*11 I21L*11K47Vt11C-*z2 all The Client and other affected agencies and utility companies will review drawings at contractually mandated formal project submissions. The Project Manager conducts coordination of the review comments received from the client and outside affected agencies and utility companies. The Project Manager will collect all written comment responses from each sub - consultant and disciplines, reviews them and transmits them to the client and other reviewers. The Project Engineer completes the title block and the drawings are stamped (sealed) and signed as required by the contract and the agency having jurisdiction. Issue Date: 05106 No: V. 1 —1 Rev Date: 05/09 1 Rev Nu�:V.2 7 7-7 1 Sl ("31:1 N R E V I E W PROCEDURES KOA CORPORN-FION Page 1 of 4 PLANNING & ENGINEERING PROCEDURE DESIGN REVIEW PROCEDURE Issue Date: 05/06 No. V I I Rev Date: 05/09 1 F V"W'FTiiWM7'1gTr# TEM =eirinl =F =eR =&T f I.M11V peclymuyrm 17, for technical and formal review. 3E= a, The Originator prepares the document in accordance with the applicable drafting/CADD standards and contract procedur and contract requirements established by the client. I b. Within approximately 2 weeks after the calculations for a design element are completed, the Originator makes a photocopied check set st that checking can be performed in close parallel to the design. C, When document preparation, other than calculations, is advanced to a level sufficient for a submittal, the discipline leader will direct the staff for the QC review based upon the level of development and the project schedule. The Originator makes a check set consisting of originals of the drawings or photocopied check set of other documents. d. The Originator stamps each drawing or calculations with the discipline sign -off stamp (see ATTACHMENT 1) or other documents and forwards to the Checker. a. The Checker (someone other than the Originator with the same level o technical knowledge) examines the document prepared by the Originat as a minimum for: - Requirements of the project, adherence to the clients and/or standards and practices, as appropriate - Technical adeq uacy/accu racy - Presentation quality (Plan readability) - Compatibility with other project elements/documents - Conformance with applicable drafting/CADD standards Complies with all applicable city departments, and other applicable jurisdictional agencies I W, The Checker determines if the document is suitable and adequate to accomplish the required function by referencing the intra-discipli nary KOA CORPORATION Page 2 of 4 PLANNING 1, INGINIIIING PROCEDURE DESIGN REVIEW PROCEDURE Issue Date: 05/06 V -," Rev Date: 05/09 R N. V2 m. portion of the general review and discipline appropriate checklists. Refer to Use of Checklists Procedure to ensure checklists are completed correctly. C. The Checker SHALL INDICATE with YELLOW HIGHLIGHT on the che6l print each item that is correct and mark in RED on the check prints the required corrections (additions or deletions). If required for clarity, deletions may be encircled in GREEN, -off stamp/sheet and returns the The Checker signs and dates the sign A check prints to the Originator (usually the CMDD operator or designer/drafterr) for correction. C'11111111111111111111�1I - 0. k 0 . 9. The Updater (Originator) shall revise the original documents to include the changes identified by the Checker. 41. The Updater (Originator) shall indicate with each of the FRIED or GREEN corrections to denote that each part has been properly updated. C. The Updater (Originator) will then staple the new, corrected copy on top of the previous copy (s). This document package shall always have the most recent version stapled on top and the original review drawing on thi bottom. d The Updater (Originator) shall sign and date the check print and forward the new revised document package and the check print to the Backchecker. Is. Comments or notes to the Back -checker shall be made in BLUE or BLACK. a. The Back -checker (usually the Checker or a peer of the Checker) shall review the revised drawing and the check print/set. KOA CORPORATION Page 3 of 4 PLANNING & ENGINEERING PROCEDURE DESIGN REVIEW PROCEDURE Issue Date: 05/06 NO: V ' I I Rev Date: 05/09 1 Rev No: V.2 checker, and/or Originator shall be submitted to the Reviewer (Project Engineer or the Project Manager) for resolution. 6. The Back -checker shall sign and date the check prints and forward the check prints tor If acceptable — Supervising Engineer; or If not acceptable — Originator. In this event, the Originator will identify revisions made and will re -submit the document to the Back -checker. The Originator will initiate a new check print in the event major revisions are required to facilitate re -checking the plan. VERIFIER a. The Verifier checks the final changes from the back -checker review. The Verifier SHALL INr[AICATE with YELLOW HIGHLIGHT on the che print each item that is correct and mark in RED on the check prints the. required corrections (additions or deletions). If required for clarity, �eletions may be encircled in GREEN. e, The Verifier signs and dates the sign -off stamp/sheet and returns the check prints to the Originator (usually the CADD operator or desig ner/d rafter) for correction. MEMMEqkMUFWiTi-W:l li. The Reviewer (usually a Senior level person with the technical knowledgz and experience to review the appropriate design drawings) shall review the final drawing and the check print/set. bThe Reviewer shall make any comments (not in Red, Yellow, or Green), identify with initials and date. KCA CORPORATION Page 4 of 4 PLANNING & ENGINEERING PROCEDURE DESIGN REVIEW PROCEDURE Issue Date: 05/06 No: V' I Rev Date: 05/09 Rev No: V.2 C. The Reviewer shall sign and date the check prints and forward the check prints to: acceptable — Project Manager for submittal to client or reviewing agency;or ii. If not acceptable — Originator. In this event, the Originator will identify revisions made and will re -submit the document to the Back -checker. The Originator will inate a new check print in the event major revisions are required to facilitate re -checking the plan. Project manager shall be notified of major changes. M gg - W'x REV r 1 11 EwEb-BY (Pm) FINAL REVIEW BY (DISCIPLINE LEADER) CHECK PRINT KOA Corporation NAME KOA CORPORNnON Page 1 of 1 PLANNING & ENGINEERING PROCEDURE DESIGN QC COLOR CODES Issue Date: 05/06 No: V I Rev Date: 05109 Rev No: V,2 1. ® Typed Text, Blue Line Prints, Black/White Copy, Not in Red, Yellow or Green. Comments in Blue or Black 2. Checker: Yellow for correct r r rna�yej� "Red for Corections" "Additions or Qoeleficr 3. Updater * - When Updated (Originator): 4. Back Checker Green Check Marks for Agreement (Checker): Itcorections" A Stef efim!,7av X "Add0T&TA--0e**i*i ® Verifier.� Yellow over Red and Green to Indicate Updated Correctly "Corections" "Additions or Del ", - 6. Reviewer: Comments Identified by Initials and Date. Not in Red, Yellow or Green DESIGN QC PROCEDURE FLOW CHART _"_'_""___ ....... ... Drawing prepared by Designer Drawing Checked by Design Lead Correction reviewed by designer Page 1 of 1 P R 0 C E D-U-1lit. , E Issue Date: 05106 No: VN I Rev Date: 05/09 Revo: V.2 * Follow all color use identified in procedure * Always maintain one current working file of each DING showing all reviews (with color markinM s and filled-in review stamp and date) * The latest, with no markings, DVVG, on top * The top drawing must have review stamp shovAng that it is up to date Each diSCiDline maintain their own review sets Each pro - ject completion, send review drawinqs to permanent archive No Disagreement Agree? resolved with W' designer or 3rd party input Yes No wChanges by CADD operatorDisagreement resolved with Agree? designer or 3rd party input Yes Changes back checked? Changes made by, CADD operator N® y? Corrections - ------ _-Y made? Changes back checked T Yes DING forwarded for No/My? independent review if required Corrections made? DWG checked by Yes Independant Review Temporary archive QC by lead and f until project approved completion Corrections review by designer PM KOA CORPORATION PLANNING & ENGINEERING Page 1 of 1 PROCEDURE DESIGN CHECKLIST Issue Date: 05/06V.1 Rev Date: 05/09 Rev No: V-11 DESIGN CHECKLIST KOA CORPOR)NnON PLANNING & ENGINEERING DESIGN REVIEW SUMM�RY INSTRUCTION Prior to any submittal at any of the stages shown the review to the satisfaction of the Office Discipli DESIGN REVIEW CHECKLIST Project Name: Project #: Project Manager: Prepared By: Submittal Date: Accepted By.,_,.,, Field Check By Date B 113ase Preparation Field Check By Date B 70% Design (1 st Subrnittal) ®o Design _(2nd,,Submittal) 100% Design (3rd Submittal) �4th. Submittal, if needed 15th Submittal, if needed QA/QC Review By Date B Final Desi (Mylars) Page 1 of 1 C H E C K L I S T Issue Date: 05/06 No: V. I Rev Date: 05/09 1 Rev No: V,2 below, this form must be completed indicating ne Manager. CAD Check Corrected Back Check y Date By 1 Date By Date By Date CAD Check Corrected Back Check y Date By Date By Date By Date Final Plot y Date KOA CORPORNHON PIANNING & ENGINEERING Desiqrl Plan (Cover Sheet, if neededl, 1. Work to Be Done Statement 2. 3. Standard Drawings (current or preferred date) 4. Traffic Signal General Notes 5. Detector • 6. Construction Notes 7. Existing Phase Diagram 9. Proposed Phase Diagram 3. Pole Schedule 10. Pole Placement Details 11. Conductor Schedule Additional Details 1. Conduit Fill % Calculations 2. Mast Arm • 3. North Arrow & Scale 4. Signal Head details (4 -section, etc.) 5. Roads Labeled 6. Signal Head Phase Label 7. Signal Head placement on Mast Arm 8. Mast Arm Length and Load Calculations 9. Service Point Located 10. Safety Lighting • 11. Pedestrian Signal Heads 12. ADA Access 13. Pedestrian Ramps 14. Bike Loops needed Page I of 3 C H E C K LI S T TRAFFIC SIGNAL DESIGN I Issue Date: 05/06 I No: V I Rev Date: 05/09 Rev No: V.2 FPIrTqe ct PrqJ. No. Project Description: Project Manager: Checker Name: Start Date: - Checker Signature: Finish Date: INSTRUCTION This checklist is to be used for each Traffic Signal Design prepared prior to all submittals All Sheets Shown Correct Date 1. Sheet numbers 2. Title block, Work Order etc 3. Engineer Block & Stamp (date) For final mylar 4. CADD Standards 5. Design Units Desiqrl Plan (Cover Sheet, if neededl, 1. Work to Be Done Statement 2. 3. Standard Drawings (current or preferred date) 4. Traffic Signal General Notes 5. Detector • 6. Construction Notes 7. Existing Phase Diagram 9. Proposed Phase Diagram 3. Pole Schedule 10. Pole Placement Details 11. Conductor Schedule Additional Details 1. Conduit Fill % Calculations 2. Mast Arm • 3. North Arrow & Scale 4. Signal Head details (4 -section, etc.) 5. Roads Labeled 6. Signal Head Phase Label 7. Signal Head placement on Mast Arm 8. Mast Arm Length and Load Calculations 9. Service Point Located 10. Safety Lighting • 11. Pedestrian Signal Heads 12. ADA Access 13. Pedestrian Ramps 14. Bike Loops needed Pj KOA CORPORATION PLANNING & ENGINEERING Page 2 of 3 C H E C K L I S T TRAFFIC SIGNAL DESIGN Issue Date: 05/06 No: V, I Rev Date: 05/09 Rev No: V1 Shown Correct Date 15. Left Turn Phase/Split Phase 16. Advance Loops and Placement 17 Sneed Limit 18. Limit Line Loops for Left Turn 19. Limit Line Loops for Through 20EVPE 21. Safety Lighting locations and Wattage 22. Poles Labeled (A, B, C, etc.) 23. Remove and Salvage Existing Equipment 24. Abandon Existing Conduit 25. Loops Labeled 26. Underground Service Alert Note. 27. Pole Quadrant 28. Signal head pole mountings 29. Pull Box locations and sizes 30. Proper Lane Striping, verify with Civil as necessary 31. "F" distance for mast arm mounted signal heads 32. Traffic Signal Maintenance (Electrical) easement 33. Lane Dimensions/U nits 34. ROW label 35. Screen existing to be removed equipment and striping 36. Bold (cyan) proposed equipment 37. Text Heights Correct 38. Drawing File name shown ------ 39. Service Cabinet 40. Controller Cabinet Placement and Type 41. Revision Date 42. BCR/ECR Shown 43. Intersection Geometry 44. Design consistent with other disciplines 45. Video Detection 46. Interconnect 47.Transit Priority Loops 4&- 49, 5G1.- 1- _.. _....-._.._..._ . -. _. %...... . . 0.1- . 53. 54. 55.11 56. 57. 58. KOA CORPORATION PLANNING & ENGINEERING Page 3 of 3 C H E C K L I S T TRAFFIC SIGNAL DESIGN Issue Date: 05/06 No: V.1 Rev Date: 05/09 Rev No: V.2 Shown Correctdaiie % 1 1 Quality Assurance Reviewer QA Manager Date: Page 1 of 2 C H E C K L I S T [ TRAFFIC CONTROI DESIGN Issue Date: 05/06 N®: V 1 Rev Date; 05/09 Rev No: Proiect Proi. No,: Project Description: Project Manager: Chec"k- er, Na' in e: Start Date: Checker Signtiture: Finish Date: This checklist is to be used for each Traffic Control Design prepared prior to the first submittal All Sheets Shown Correct Date 1 RhPPfNiimhPr(Tr 4)1 Ptr) 2. Title block data, (Work Order etc) 3. Engineer Block & Stamp (date) for final mylar Cover Sheet 1. Current Standard Traffic Control Notes 2. General Notes 3. Other agency contacts 4. Vicinity Map 5. ___-- cation Map with sheet index 6. Symbol List 7. Inclusive Sign Legend (MUTCD or CA Codes) Lavout Sheets 1. Design Speed Spacing Chart 2. or Hours 3. North Arrow & Scale 5. Symbol List 6. Road Label and Phase 7. If Required; Signal Note, Bus stop note, Emergency & Access notes, etc. 8. Standard Traffic Control to Referral 9. Detour if required 10. Check for; a ) Work area adequacy b) Shift or merge use correct lane closure design c) Pedestrian Circulation and Access d ) Bike Lane Access e) Bus stops, trolley tracks, stations, etc. Raised Medians & One way Streets require signs on both sides g) Traffic Signals h) Show Temporary no -parking areas i) Dimensioning of taper, buffer & advanced signing j) Flashing arrow board k) Changeable Message signs it t C H E C K L I S T TRAFFIC CONTROL DESIGN Issue Date: 05106 No: V. I L Rev Date: 05/09 1 Rev No: V.2 Laa ogj_5heets (con't), Shown Correct I Date 1) Temporary striping details m) Temporary signal details n) Temporary street lighting details o) Glue -down delineators vs. traffic cones p) ADA compliance for temporary pedestrian paths q) Adequate work zone signing r) Flaggers s) High level warning devices Detour 1. Identify restricted circulation movements & provide detour for that movement. 2. Start and end detour C1 to C7 3. Provide advanced notification signs with posting notes N UV IWAIV 4111111®RAMIM10111 �� Approved? QA Manager Date; PJ KOA CORPORATION PLANNING & ENGINEERING Page 1 of 2 C H E C K L I S T Issue Date- 05106 No: V I SIGNING AND STRIPING DES'TIGN ' /0��� "to ��Rev Date: 05/09 Rev No: �V_2 Project. ProJ. No.: Project Description: Project Manager: Checker Naine: Start Date: Checker Signature: Finish Date: INSTRUCTION This checklist is to be used for each Signing and Striping Design prepared prior to the first submittal. All Sheets F -Shown Correct Da ­ to --- 1. Sheet Number (SS -01, etc) 2. 'Title block data, (Work Order etc) 3. Engineer Block & Stamp (date) for final mylar 4. Lint es and CADD Standards DesiuL 1. Current Striping and Signing Notes 2. General Notes 3. North Arrow & Scale 4. Road Label 5. Symbol List 6. Inclusive Sign Legend (MUTCD or CA Codes) 7. Proper Taper Transition Length 8. Lane Dimensioning 9. Centerline and ROW 10. Lane Widths 11. Sidewalk Width 12. Left Turn Pocket Length 11 Parking Restrictions 14. Bike Lanes 15. Crosswalks 16. Pavement Markings 17. Signage 18. Pedestrian Ramps/Driveway Ramp 19. Improvements Consistent with Civil Improvements 20. School Zone Signage and Striping 21. Curb Painting 22. Transition from Existing to New Striping 23. Advance Warning Signs 24. 25. 26. 27, 28. KOA CORPORATION PLANNING & ENGINEERING Page 2 of 2 C H E C K L I S T SIGNING AND STRIPING DESIGN Issue Date: 05/06 No: V I Rev Date: 05/09 Rev No: V.2 29. 30. 31, 32. 33. 34. 35- 36. 37. 38. 39, 40. 41. 42. 43. 44. 4& Quality Assurance Reviewer Approved? QA Manager Date: KOA CORPORATION PLANNING & ENGINEERING Page 1 of 2 C H E C K L I S T STREET LIGHTING DESIGN Issue Date: 05/06 No: V, I Rev Date: 05/09 Rev No: V.2 Tmiect Proj. No.: Project Descri tion: Project Manager: Checker Name: Start Date: Checkej_§ipature: Finish Date: • This checklist is to be used for each Street Lighting Uesign prepared prior to the first submittal. All Sheets is6own - Correct Date i. o 114u of IL OL-U 1, M- 1, ULU) 2. Title block data, (Work Order, etc) 3. Engineer Block & Stamp (date) for final mylar 4. Linotype and CADD Standards Qesiqn -Sheet 1. Current Standard Lighting Notes 2. General Notes 3.Legend 4. Voltage Drop Calculations 5. Service Point 6. Serving Utility Contacts 7. Service Disconnect Cabinet (Type III BF, etc) 8. Light Pole Type 9. Lurninaire Wattage 10. Conductors 11. Light Pole Foundation 12, Pull Box 13. Conduit Size 14. Circuit Size 15. Wiring Diagram 16. Lighting Calculations 17. Pole Location and Spacing 18, Transformers 19. Existing Circuits (series or parallel) 20- 21. 22. 23, 24 2& 2& 27. 28. 29. C H E C K L I S T .t. 5106 STREET LIGHTING DESIGN R.D D 5109 L Rev V ,, N V. �2 do-rrect-'l Date 30, 31, 32. 33. 34. 35. 36. 37. 38. 39, 40, ly-M ft'lololmom I- QA M anager I rom KOA CORPORATION PLANNING & ENGINEERING Page 1 of 2 C H E C K L I S T CIVII Issue Date: 05/06V-1 [rev C1aflc: 05!09 R.v NO: V 2 Project:PrQi. No.: Project Description: Project anager: Checker Name:Start Date: - - ------ - -- Checker Signature: Finish Date: INSTRUCTION This checklist iso be used for each Civil Design prepared prior to the first submittal. All Sheets Shown Correct I -Date 1. Sheet Number (L-01, etc) 9, Title block data, (Work Order PtO 3. Engineer Block & Stamp (date) for final mylar 4. Lin etypes and CADD Standards Title Sheet 1. Current Standard Notes 2. General Notes 3. Other agency notes and contacts 4. Vicinity Map 5. Location Map with sheet index 6. Symbol List 7. Responsible Charge Statement 8. Benchmark Information 10. 12, LavOLIt Sheets 1. Construction Notes 2. North Arrow & Scale 3. All new curb locations 5. Proposed walls and roadwork 6. ADA Pedestrian Ramps 7. Sidewalk width 8. Right of way requirements clearly defined 9. Existing and new utility lines clearly defined 10. Drainage pipes to be abandoned shown on plans 11. Elevations of inverts clearly indicated at drainage structure 12. Rim elevations shown 13. Drainage plans indicate general basin and pipe layout 14.Storm drainage pipe connections and sizes indicated 15.Verify direction of flow in pipes KOA CORPORATION PLANNING & ENGINEERING Page 2 of 2 C H E C K L I S T CIVIL DE$IGN I ------Flsesue Dale: 05/06 No: V.1 V Date: 05/09 Rey NO: V,2 Shown j Correct Date 16.Exising ground lines and ground elevations shown 17.EIR/EIS Mitigation Measures 18. Utility Access to local agency mains approved 19. All utility lines should be accurately sized and called out 20.Verify existing power/telephone poles, pole guys, street signs, drainage inlets, valve boxes, manhole castings, etc. 21.Verfly limits of clearing, grading, etc. 22. Verify fire hydrants, street light poles. 23.Verify profile sheets 24. Verify horizontal and vertical curves nm 25, 26. 27. 28. 29. Approved? QA Manager Date: COST ESTIMATES Issue Date: 05/06 --- 1-7 A:%! — V I Avg e: 05/09 Rev , �V2 COST KOA CORPORATION PLANNING & ENGINEERING F_ COST ESTI MRTES Issue Date: 05/06 No: V I Rev Date: 05/09 Rev No: V 2 INSTRUCTION To establish guidelines for developing and maintaining project Cost Estimates. The Project Manager, in consultation with the Client and Cost Estimator, defines the contractual cost estimating criteria by applying the following general information as a minimum. a. Complete Client Name b. Project Name C. Project Location d. Project Number e. Project Description f. Client's Budget g. Program Requirements h. Required Estimates (Levels of Submittal i. Schedule of Deliverables j. KOA Corporation's Standards The standard elements of a cost estimate are as follows: a. Quantity take -off b. Unit prices including lump sum estimates for construction items. c. Client required bid items (e.g. Mobzation, Site Specc Work Plans, Storm Water Pollution Prevention Plan, etc,) d. Project construction contingency e. Program -level costs , including agency costs, escalation, and program management See ATTACHMENT 1 for example, The Project Manager and each Project Engineer/Planner shall carefully review the cost estimate. Incongruities shall be resolved with the Cost Estimator and the Project Manager. Variations related to the client's budget shall be reviewed with the client and the appropriate directions incorporated into the estimate and r documents. The Project Manager shall provide final review of the deliverable construction cost estimate, correct items of concern, and direct preparation of the final deliverable documents. NOW= ig =_ [big] It -1 I go M 101 a K01611i W_R11""KW_a1*Jt111-_KH Ir -11111 (__I8 K403 I &,A I a I I" (Lei I KIK$I*.I a Mv. 6J I M1 KUL" 1I Lei a Rojo F-cOSTESTIMATES RECORDS Records, if any, to demonstrate compliance. ATTACHMENT I KOA CORPORKTION N AN f4�Nu Page 2 of 2 PROCEDURE 1 7 - Issue Date: 05106- `/.I I Rev - Date: 05/09 RE N. V72 1000M CIP Nm 8161 Eng;ysoar's Estimate DESCRIPTION OF WORK UNIT UNff PRICES CITY IT TOTAL LS �i—.00000 —1 ---iZ 000 0-0 2 T(PlacctlWifilEmOmial LS $10.000.00 1 $10.000.00 L-infinr4 lornpomfv SY;17in Ann a S 9169j". 0 on 1 s; o 000 0 Sys I to . m T I eoling and I Dow I pre , nt , all on LS 210.0ocia I 510.000.00 5 Furnish & install 24 Hoof yMF0 Cents =[F 2400 13,575 54 ao� 564.31 00 a Furnish & install 6 FiberWIF0 Cable LF $3.00 825 r I 7 Trench 2- PVC Consult (Trenching) EA 524.00 2,950 _ji?,47566' 570.800.00 8 Fu?010 6 tn�jall Ratk-slawiloo F3bv Oplic "larn, cphuo Mvife, LF $3�000.00 4 512,000.00 cables 9 Furnish & install actual Closure BA UNDO— —3 &Z 10000 10 "Foisish and Install No. 6 Pull Box WIN Eidension FA $70000 14 $9.800.00 76e—move and salvage exuaing spread spectrum tqulp—meniana ReTeTed— Eqlo,pn*nl at Sunset M,e and South Meln),Se Drive StinAl, Buena11 Vale (3ove and SQij1h Melrose Drive "na5. award al Rinrjn@m Padr Drive LS IP1,500,00 1 $1,500.00 and Sycamore Avenue signal, Replace existing cu4ilroVer with now 170E ooniroller ai Snadowntlee 12 Drive and 5- Ah Per,.17. LS $4.000.00 1 $4,000.00 Replace existing drowellsholl In controller cabinet at Intersection of 13 Shadowridge Drive and Scukh Malrose Drive, LS $500.00 1 $50000 Fit1 new drawer or shell In orWinsher cabinet at interiaii-11(�n at Lime 14 Oa kfLonghorn and South Melrose Drive LS $500.00 1 $Wo 00 15 Dramnss; (per ansel) 5 FA V"'oo 9 S4,500.00 SUBTOTAL I $196,47500 10% Contingency $10,647.50 TOTAL Prepared By: 059366 612112008 RCE No. Date Project No.: ' JA82036 Drawing No: — 8161 STUDYPROCEDURE Issue Date: 05/06 No: V. I I Rev Date: 05/09 1 Rev No: V 2 Ir lilit �ill Ulm ksue ®ate: 05/06 No: REPORT PREPARATION PROCEDURE V' Rev Date: 05/09 Rev N.- V.2 graphics for technical and formal review. 33= VASN���� The Project Manager directs the Project Engineer/Planner to proceed with the project described in the Scope of Work. Based on the final Scope of Work in the contract, the Project Manager prepares a work breakdown structure by each sub -consultant or discipline. A schedule of deliverables will be distributed which will dictate the effort completeness and the quantity of design drawing production. The Project Manager informs the Project Engineer/Planner of the project study and report requirements including the following: I a. Report level of effort b. Report format c. Study type d. Appropriate analyses a. Study standards — KOA's or client f. Deliverable report requirements g. Project budget h. Scheduled report deadlines i. Material requirements j. Special requirements I and reports. The Project Engineer coordinates the report on a continual basis with regard to the following issues: a. Project requirements b. Owner's requirements c. Other discipline's requirements d. Revisions which affect the other discipline's work e. Regulatory agency specifications f. KOA's and/or client's report for standards REPORT PREPARATION PROCEDURE Issue Date: 05/06 V I I I Rev Date: 05/09 �Rev No V 2 The Project Engineer/Planner notifies the Project Manager and his Discipline Leader if he foresees problems in meeting either the project schedule or budget, and t••- • - gedetermine and implement a course of corrective action. When the study report reaches a status of completion suitable for checking, the QC review should be accomplished on portions of the submittal in accordance with the Study Review Procedures. It 'i IN A a (ON 4 11=XGJ I Dal I qLal Sol 4 11-7A WIN I t-1 V LZA ovi 19 10120MIL-149011 14 [111][61 &41103 I'll i The Client and other parties may review reports at contractually mandated formal projel submissions. The Project Manager conducts coordination of the review comments received from the client and other parties. I The Project Manager will collect all written comment responses from each sub consultant and disciplines, reviews them and transmits them to the client and other reviewers. [slag I WKIRMA Irtliz 01:28JOIT116 Me a — ss 1 F- QC COLOR CODES PROCEDURE Issue Date, 051 -V06 Rev Date: 0Rev No. V.2 5/09 Originator., Typed Text, Blue Line Prints, Black/White Copy, Not in Re Yellow or Green. Comments in Blue or Black Checker: 'Tellow for correct Updater (Original)- Green Check Marks for Agreement �gcorections" A Green Stet and Crossout when it is 54r 11 ex? "Additions or bIqq:_ b,,J�'Ezgm= Verifier-, Yellow over Red and Green to Indicate Updated Correctly "Cro/or ecti lis" ti/ A Ste egveael "Additions or Reviewers: Comments Identified by Initials and Date. Not in Red, Yellow or Green LSTUDY QC PROCEDURE FLOWCHART fisque Date: 05/06 1 Rev Date: 05/09 Originator Sends Report to P.M. or Independent Reviewer Corrections/Comments Made Originator Reviews Corrections/Comments Agree Originator Reviews Corrections/Comments I I 49 Report Complete To Project Manager "IWO Rev No: V.2 Must have Review Stamp and signatur on cover sheet. Stack -up review sets - the latest on topDi STUDY CHECKLISTS Page 1 of I PROCEDURE Dot.-. 05106 No: V.1 --IIssue Rev Da - Rev No: V,2 FFKOA CORPORATION PLANNING & ENGINEERING STUDY— PROCESS STEPS L Project : Proj. No.: Project Description: Project Manager: Checker Name: Start Date: Checker Signature: Finish Date: ITEM/ PRIMARY STUDY ELEMENTS TO BE REVIEWED STEP O. I Project Description and Project Year is Complete and Identified 2 KOA has the Site Plan 3 Study Intersections Have Been Identified and Finalized (LOS Method Confirmed) 4 Street S�Sgments to be Analyzed Have Been Identified and Finalized Arterials to be Analyzed Have Been Identified and Finalized Ramps to be Analyzed Have Been Identified and Finalized C H E C K L I S T Nsue Date. 05106 No: V I Rev Date: f)5109 Rev No V 2 Initial when Reviewer Irn item is itial whe, complete item has been checked Freeways to be Anal,ezed Have Been Identified and Finalized 5 Trip Generation Assumptions Have Been Developed 6 Trip Distribution Assumptions Have Been Developed 7 Periods of Analysi5 Have Been Finalized 8 Traffic Counts Have Been Ordered Cumulative Proiects Have Been Requested Ramp Meter Rates Have Been Requested Freeway Mainline Counts Have Been Obtained 9 Field Work Has Been Scheduled (Note Date) 10 Field Work Has Been Completed Analyst Has Been to Project Site in Peak Hour I I Requisite Ancillary Data Has Been Collected 1 12 Graphics Have Been Set up/Ordered 13 Traffic Model Has Been Built/Error Checked L Comments KOA CORPORATION PLANNING & ENGINEERING STUDY— PROCESS STEPS -Project : Proi. No.: Project Description: Project Manager: Checker Name: Start Date: Checker Signature: Finish Date: ITEM/ STEP NO - 14 III IN M ma� Issue Datf- 05,,06 No: V. I Rev Date: 051i09 Initial wher?. l Viewe;, PRIMARY STUDY ELEMENTS TO BE REVIEWED item is Initial when Comments Long-term without Arterial Conditions Analyzed/Geometry Checked/Volumes Checked Long-term without Ram Conditions Analyzed/Geometry CheckedJVolumes Checked Long-term without Freeway Conditions Analyzeded/Volumes 0 complete it =m has. b --en checked Existing Intersection Conditions Analyzed/Geometry Checked/Volumes Checked Existing _§2ement Conditions Analyzed/Geometry Checked/Volumes Checked — ------ Existing Arterial Conditions Ana]Xzed Geometry Checked/Volumes Checked Existing Ramp Conditions Ana' zed/Geomet Checkes[Nolumes Checked Existing Freeway Conditions Analyzed/GeoMStH Checked/Volumes Checked 4 -- Near-term without Intersection Conditions Analyzed/Trips Assignment Verified Near-term without Segment Conditions Analyzed/Geometry C-Secked/Volumes Che=lked Near-term without Arterial Conditions Analyzed/Geometry Checked/Volumes Checked Near-term without RaMD Conditions Analvzed/Geometry Checked/Volumes Checked Near-term without Freeway Conditions Analyzed/Geometry Checked/Volwnnes Checked Near-term with Intersection Conditions Analyzed/Trips Assignment Verified Near-term with Segment Conditions Analyzed/Geometry Checked'Volumes Checked Near-term with Arterial Conditions Analyzed/Geometry Checked/Volumes Checked Near- !ErTn with amp Conditions Analyzed/Geome!a Checked/Volurnes Checked Near-term with Freeway Conditions Aalyzed./GeomSty Checked/Volumes Checked— Lon.2-term without Intersection Conditions Analvzed/TriDs Assignment Verified Long-term without Segment Conditions Analyzed/Geometry Checked/Volumes Checked Long-term without Arterial Conditions Analyzed/Geometry Checked/Volumes Checked Long-term without Ram Conditions Analyzed/Geometry CheckedJVolumes Checked Long-term without Freeway Conditions Analyzeded/Volumes 0 Project Project Description: Checker Name: Checker SigLiature: Checked N PrqJ. No.; Project Manager: 01 Start Date: Finish Date: PRIMARY STUDY ELEMENTS TO BE REVIEWED 1 0. DaiL: 06 Re, Oat= 0 �K C H E C K L I S T No: V-1 Rev No: V 2 Initial when Reviewer item is Initial when Comments complete item has been checked 15 Long-term with Intersection Conditions Analyzed/Tri2s !Lssi _ ent Verified Long-term with Segment Conditions Analyzed/Geo met D�hecked/Volumes Checked LLong-te with Arterial Conditions Anal zed/Geometry Checked/Volumes Checked Long-term with Ramco -Conditions Analyd/Geomctm Checked/Volumes Checked Long-term with Freeway Conditions Analyzed/Geometry Checked/Volumes Checked 16 Project Conditions Analyzed 17 Parking Analysis Required 7 18 Parking Analysis Completed _ 19 Site Access/Egress Analyzed 20 J Traffic Report Outlined 21 Traffic Report Started 22 Proieci Impacts Identified'? (Conce I ptual Mitigations Developed W/KOA SR. Engineer?) 23 Potential Mimmation Measures Coordinated with Lead Aged? 24 Mitigation Drawil! & Required /Developed Principal Engineer/ Senior Engineer has reviewed proposed mitigation Proposed Mitigation Accepted Ey Agency that owns the Facility 25 Draft Traffic Study for Internal Review (State Date) 26 Any Special Study Conditions/Analysis KOACORPORATION ?ANMNG & EN--,NEMNC7 STUDY ® PROCESS STEPS Issue Date: 05/06 Rtv Date 05/09 Project a ro. No.: Project Description: Project Manager: Checker Name: Start Date: Checker Signature: Finish Date: Initial when Reviewer 1 ITEW ADDITIONAL ELEMENTS TO BE REVIEWED ho -n -;s r Initial when STEP (ADD ADDITIONAL LINES AS NECESSARY) complete item has been NO. checked 27 28 Quality Assurance Reviewer Approved? Page 4 of 4 CHECKLIST No: V, I Rev No: V-2 KOA CORPORATION N G N 1-711 N � E P'; 1 F_ Pro�jecv Project Description: Checker Name: Checker Signature: ANALYSIS - Intersection Scenario Scenario names Scenario parameters Paths Valid Paths In/out 100% Trip generation AM In/out ,Trip generation PM In/out Trip generation No project Trip- —distribution gates Total 1 oc% AM Volumes PM Volumes Growth Factor 'Ped Volumes Page 1 of 9 C H E C K L1 S T No: 11 e A6 STUDY REVIEW CHECKLIST Ue Dat0_5 II Rt dale Re 1, Proi. No.: Project Manager: 0j Start Date, Finish Date: Existing _ _ ear -ter Lon -term Without With Without With Without With Q F_ Q/C Corrected L /C I orrecedL(?�C� Corrected, Q/C �Corrected E7/C Corrected Q/C Corrected _ 1- "1 A KOA CORPORATION F i A 4 N I NG, & EN G IN E F. R i'r G Prcqect: Project Description: Checker Name: Checker Signature; Issue Dale: 05A6 No: V. I Rev Note: 05109 Rev No, V 2 Prof. No.: ProjectManager- SStart Date. Finish Date, Existing Near-term J Long-term____ Without WithWjout With Without With --F— Q/C lCorrected l Q/C 'Correctedl QIC FCorrected TQTC. Correct Q/C lCorrecte=dQ/C lCorrecied ANALYSIS -1 t r (con't) Cumulative Projects Lanes Signal Control Signal Timing HC M factors --------- — L ANALYSIS - Roadway Segment Volumes Capacity/classification Cumulative Projects Growth Factor Trip Generation Trip Distribution PKOA CORPORATION P "A 7\1 N 1 NG & F N G I N EE R I N C� STUDY RVI CHECKLIST Project: Proi. No.: Project Description: Project Manager: Checker Name: Start Date: Checker Signature: Finish Date: ANALYSIS - Ramp Meter Ramp meter rate correc-, Ramp demand correct Excess demand. delay, queue correct Ramp meter change in delay calculated 22n—ca NALYSIS - Freeway Segwent Volumes Capacity Cumulative Projects Heavy Vehicles "Growth Factor Trip Generation ,Trip Distribution Datc, 0506 u�, Date Page 3 of 9 C H E C K E ' t' Near-terrin Long-term Without With Without With Without With QJC Corrected Q/C ICorrected l Q/C, I Corrected .',,,Q/C _"J'!Corrected J Q/C �Correcled Q/C I Corrected LProject; Project Description-. Checker Name: IL Checker Signature: F , QUA.999am- correct North Arrow facina correct directiot 'Vicinity Arrow/project site star in correct location !GRAPHICS - Site Plan Date, Project Number, and Study Title correct North Arrow facing correct direction Most up to date version of site plan included GRAPHICS - Otheir Graphics Date, Project Number, and Study Title 'correct .North Arrow facing correct direction Roadways labeled correctly, all labels facing, same direction Prof; No_ Project Manager: Start Date: Finish Date: Issue Dat,2: 05/06 Rcv Darr: 05YO9 C H E C K L I S T No: V I Rev No V 2 Existing Near-term Lonc, Without With Without W11h Without R. ICorrectedl Q/C Corrected', Q(C Corrected Q/r, lCorrected] Q/C lCorrected M" KOA CORPORATION P;ANNINIG & FNGINNEERING FSTUDY REVIEW GHECKLIST Project: Prqi. No.: Project Description: Project Manager - Checker Name: Start Date: Checker Signature: Finish Date: 't #0 - .0 1 Appropriate Legends Eig lure numbers/titles match report Distribution matches analysis Intersection geometries match analysis Intersection project trips match analysis Intersection volumes match analysis Intersection delay/LOS matches analysis Roadway segment geometries match analysis Roadway and freeway segment project trips match analysis Roadway and freeway segment volumes match analysis 'Roadway and freeway segment LOS matches analysis Dal, 01,06 )9 Page 5 of 9 C H E C K L I S T V I Existing Near-term Long-term Without With Without With Without With rre:� � _]Corrected 0 ted Q/C Corrected Q/C , I Corrected Q/C Corrected Q/C C orrec�tejd Q/C Corrected Q/C LSTUDY REVIEW CHECKLIST I o1 Pr . ect: I Pro'. `�;o.: ! .; J IPject Description: Project Manager- r0i Checker Narne—: Start Date: Checker Signature Finish Date: Existing TABLES – General Table numbers/titles are correcie Column tables are correct TABLES - Par in Table Parking rates correct n parking table Required parking spaces correct in parking Required table ' TABLES - TripGeneration Table Project trip rates correct in Crip generation table Protect trips ccrrectja_tri generation table TABLES - Intersection Analysis Tables Intersection delay/LOS matches analysis Intersection summary table matches analysis Issue Date- 0/06 Rev Date 05/09 C H E C K L I S T No: V-1 Rev No: V 2 With Without Q/C 1Cor7 Q/C ico�re�cted r-ci KOA CORPORATION PLANNING & ENGINEERING rage , ol 9 C H E C K L I S T STUDY REVIEWCNC KLIST IssueDate:: 05)'06 No: V I Rev Date 0500 Rev No V 2 Project: Prof, No.: Project Description: Project Manager. Checker Name: Start Date: Checker Signature: Finish Date: Existing_ ®t Long-term Withoutyvlth Without With Without With Q/C [Corrected l Q/C lCorrected Q/C d Corrected C Corrected /C Corrected /C Corrected TABLES — Road Seument Analysis Tables Segment lanes, classification, LOS E capcity correct segment V/C and LOS matches analysis Segment summary table matches analysis TABLES - Ramp Meter Apaylsis Tables Ramp meter rate correct Ramp demand correct Excess demand, delay, queue correct Ramp meter change in delay calculated correctly Ramp meter significance calculated correctly Ramp meter summary table matches analysis STUDY REVIEW CHECKUST Issue Date: 05106 No: V I Rev Date 0,'09 ROV NO. V 2 Project: Pr i, No.: I Manager: Project Description: Projo--t Checker Name: Start -Date: Checker Signature: Finish Date: NMOMM Existing Near-term Lon -ternm L WiQ1, tWi hout th Without With Without With Q/C O/C Corrected Corrected QIC Corrected TABLES — Freewgy §egment Analysis tables Freeway V/C and LO!S matches analysis 7 j 1J EPORTTEXT Correct date, study title, and project number on cover and all footers Verbal bal description of conditions matches Table of Contents accurate Consecutive page numbers Table numbers correct in text Figure -numbers -correct in text Protect description ccrrect Read for spelling and grammatical mistakes ,Appendices up-to-date and com lete p Rcl KOA CORPORATION Page 9 of 9 C H E C K L I S T I SOFTWARE PROCEDURE Issue Date: 05106 No: V.1 Rev Date: 05/09 1 Rev No: V.2 SOFTWARE PROCEDU'REJ�.,,, KOA CORPORATION PLANNING & ENGINEERING Page 1 of 1 PROCEDURE _PVI Rev Date: 05/09 Re, No: V1 SOFTWARE CONTROL Issue Date: 05/06 PURPOSE To establish methods and requirements for approving, verifying and documenting computer software. 011M*7. ' i1 This procedure applies to both in-house and licensed commercial software used for engineering design or technical analysis work. To the extent possible, only programs that are widely used or approved should be used. Verification of the accuracy of these programs is the responsibility of all primary users and is limited to running sample problems with known solutions. N77 =-qFJ-TrF7UFR-1WtWXTYJ rograms 1307675r, SUTY or coliecl information or data, For programs that are not widely used or approved, verified by the primary user will include checking the mathematical modeling, numerical analysis, and computer program logic and then making one of the following demonstrations: 1 . That the computer program's solutions to a series of test problems are in substantial agreement with those obtained by a similar, independently written program with sufficient history to justify its applicability and validity without further demonstration. 2. That the program's solutions to a series of test problems are in substantial agreement with those obtained by hand calculations. Verification should be done before using the computer program and re -verified every f months if the program is not widely used. It is particularly important that spreadsheet computer calculations be verified. This shall be done by the originator of the spreadsheet demonstrating agreement with results obtained by hand calculations. In addition, the vercation shall include an exhibit showing the operation performed in each cell of the spreadsheet. See the procedure for checking calculations. The Project Manager is responsible for the proper selection, use, and verification of computer software. The means of program or spreadsheet calculation verification, :ncluding methods used, details of independent calculations (manual or computer), AUDITS PROCEDURF Issue Date: 05/06 Rev Date: 05/09 AUDITS Page 1 of 1 PROCEDURE Rev No: V.2 KOA CORPORATION PLANNING & ENGINEERING AUDITS Issue Date: 05/06 NO: V.1 Rev Date: 05/09 Rev No: V.2 PURPOSE To define the processes and responsibilities for performing Quality Assurance/Quality Control audits of KOA Corporation's project activities. Audits are conducted on a continuing basis to ensure effective implementation of contract and quality requirements, Audits are scheduled at a frequency commensurall with the nature of the activity. Regularly scheduled audits are supplemented by unscheduled audits and surveillances. 11-74011111 NICZ1934 LM99*4111611111111111 03 11t. 14 Le The Project Quality Manager is responsible for implementing audit programs that systematically evaluates the quality and effectiveness of project activities. Audits are planned and verified by examination, interview, and evaluation of objective evidence th applicable elements of the QA/QC program are implemented in accordance with the contract and company operating procedure requirements. The Project Quality Manage is responsible for organizing and conducting the audit and for preparing the Audit Report. 11 •`f The Project Quality Manager is responsible for preparing audit schedules for eac project to which assigned. The schedule may be revised to reflect project schedu changes, levels of actives, or as quality performance history dictates. J1 W0 - 0 . 0 - - 0 0 -1 0 - 0 - - 0 =111111NINIVIN WN.1 - .- Changes, which affect the QA/QC Program, such as functional reorganization or changes to procedure/process. It is suspected that the quality of operation or product may be compromised. A systematic problem is suspected. Verification of corrective action effectiveness when requested by the Project Manager. Page 2 of 3 PROCEDURE AUDITS Issue Date: 05/06 No: V.1 Issue 05/09 Rev No: V2 ON -mm, The Project Quality Manager is responsible for determining the scope of the audit. Tht Audit Plan is a listing of subject areas to be addressed for the specific audit. Audit lyjplementatipr) 1. The Project Quality Manager reviews the results of previous audits or other related information for the areas to be covered during the planned audit. 2. Letter or telephone, as appropriate, by the Project Quality Manager, makes notification of scheduled audit. 3. If appropriate, the Project Quality manager conducts a pre -audit meeting with audited organization's Management representative(s). The pre -audit meeting may be formal or informal at the discretion of the Project Quality Manager. Pre -audit meeting addresses the following: Introduce f Team. Confirm the Audit scope and review the Audit Plan. a Establish time, attendees, and location of the post -audit conference. is A Technical Specialist may be used as a member of the Audit Team when specM knowledge or expertise is required to evaluate conformance to specific technical requirements. The Technical Specialist functions as an Audit Team member in accordance with this procedure, EMPE=11 11 11 11 11 1 1 1111 11 111 1 1 F 1 11111111 1 11 11 6. Each potential finding is discussed with a responsible individual of the audited organization at the time of idencation to ensure understanding. Condons corrected on the spot and considered to be an isolated occurrence is noted. further corrective action is required. I 7. Conditions determined to be nonconforming to Contract, Specifications, Proceduri are documented. 8. Nonconforming conditions/situations that affect safety are brought immediately to t attention of the Project Engineer or Project Manager. i 9. The Project Quality Manager conducts a post audit meeting with the [banagement or responsible representative of the audited organization to: PJ KOACORPORATION PLANNING & ENGINEERING Page 3 of 3 PROCEDURE AUDITS Issue Date: 05/06 No: V I Rev Date: 05/09 Rev N • Review results of the audits and clarify any issues. Provide draft copies of the results to the audited organization representatives to facilitate prompt corrective action. • Identify required corrective action(s) or plan of corrective action(s) and the individual(s) responsible for taking action and scheduled completion dates. If the required corrective action(s) and/or corrective action completion dates cannot be obtained at the post Audit meeting, the Project Quality Manager will establish corrective action due dates. NEMK= Audit Reports are formally sent to the manager of the audited organization. Distribution shall include at a minimum: a. • Project Quality Manager, and b. Project Manager. flNG PROCEDURES Page 1 of I PROCEDURE Issue Date: 05/06 Ni x! Rev Date: 05/09 Rev } \ \ � } � §} \ \: . } \ � �� 7 fll jji 1 7 0 "', M"IFOW MH FMKOA CORPORATION 4 PLANNING & ENGINEERING WI V aalzi F-11 U a 4 us"T Page 1 of 2 PROCEDURE TRAINING Issue Date: 05/06 No: V ' I Rev Date: 05/09 Rev NO: V.2 IT.Tlff= The Project Manager or designee arranges for training of employees and subcontracto personnel in the use of the procedures and checklists that they will be using. The Project Manager or designee invites the appropriate personnel. The KOA Quality Manager, in association with the client's Quality Manager will be the instructors and wil give the training session. The Project Manager or designee reserves the conference room, prepares sufficient copies of training material, provides overhead project or other aids as required and makes sure that sufficient seating will be available. The Project Manager or designee documents attendance by preparing and using a sigi in sheet which gives the instructors, date time and topic of the training session and provides space. (See Attachment 1.) The Project Manager or designee provides separate training sessions for employees who have not been trained and documents attendance in the same manner as for the original training session. The Project Manager or designee provides a copy of training materials to all attendees The Project Manager or designee submits a copy of all materials for the QA file and for the project file, ATTACHMENT UE3Mn-0T-2K= KOA CORPORATION MANNING & ENGINEERING Page 2 of 2 PROCEDURE _T' �5,Dat. ro5109 TRAINING o _I_ .I„ Training Sign -in TRAINING SESSION ATTENDANCE SHEET Project Description KOA Project No. Date 'time Tonic I Instructor Print Name —ft -nature tore Parra f Attach: y of training at ri is CC: QA File Project File No. PROCEDURE CHECKLIST PROCEDURES Issue Date: 05/06 N®: VJ Rev Date: 05/09 Rev N®: V.2 CHECKLIST PROCEDU"RES PM KOA CORPORATION PLANNING & ENGINEERING CHECKLIST PROCEDURE Issue Date: 05106 11] rev Bate: 05/09 PURPOSE nfm Iffle"Taffiffi No: V.1 Rev No: V.2 1. 1 Ile Project Manager and 'the Quality Manager jointly prepare a schedule for fl] - checking of documents prior to the submittal to the client. 2. Each Discipline Chief is responsible for developing a checklist by which his/her respective work are to be reviewed. The discipline checklist can be changed at any time during the project with the approval of both the Project Manager and the client. 3. The Discipline checklists are distributed with the "Project", "Project No." and "Submittal Description" field completed, to all discipline employees involved on accordance with the schedule. III 'I I 1111111111111111qJ111111pill lI III IIIIII11upIlpill, A. Identifying r reports, etc., in the space provided 'in the checklist title block, to ensure each checklist refers to only the document(s) specified. B. Indicating by "N/K any items that are not applicable and initiating in the CHKD initial box. C. Indicating by initialing the CHKD Initial box that each applicable item has been checked and found satisfactory. D. Marking the reviewed document in red, in accordance with the procedure for checking, any items not found to be satisfactory. The CHKD Initial box on the checklist will be left empty. E. Indicating by initialing the CHKD Initial box next to those items that were originally found to be not satisfactory but on re -review have been found to be satisfactory. Signing and dating each completed checklist sheet in the space provided at the top. CHECKLIST PROCEDURE Issue Date: 05/06 No: V.1 I Rev Date: 05/09 1 Rev No V.2 G. Returning the completed and signed checklist to the Discipline Chief. 5. The Discipline Chief retains a copy of each checklist and gives the original to the Quality Manager. 6. The Quality Manages reviews the checklist and reviewed documents for conformance to procedures and reviews the log • ••- items to make certain that open items have been closed • or identified to the client in the transmittal letter. When all is satisfactory, the Quality Manager signs and dates the checklisi and client comment incorporation reviews and puts into file. ff*r*T:T§N CALCULATIONS PROCEDURE Issue Date: 05/06 No: V, I Rev Date: 05/09 Rev N.: V.2 C A L 0 CL A T'l U PROCEDURES KOA CORPORATION PLANNING & ENGINEERING Page 1 of 5 PROCEDURE CALCULATIONS Issue, Date: 05/06 No: V. I Rev Date: 05/09 Rev No: V,2 PURPOSE To establish guidelines and requirements for the preparation of design and quantity calculations. This procedure applies to all projects. This procedure does not apply to computer generated calculations, see Computer Software Control procedure. General The final calculations, or copies thereof when they are delivered to the client, shall be placed in the project files. The calculations must form a complete record of the design process and not merely the end results. Methods and means, which are tried and rejected, should be recorded. Organization The calculations shall, as a minimum, contain the following information. - a. The cover shall be typed or prepared by other mechanical means. Ea discipline shall prepare their own cover page, with their company logo, any, but must contain, as a minimum the project name and contrai number, originator's name including his/her PE identification, PE sta upon completion and submission of the calculation (the PE stamp shall of California Registered professional having valid and current license practice in the field in which the calculations are performed), subjectii calculations, design criteria basis including applicable codes use reference, if any, revisions block, client name, date of submission a signature block to be used in reviews. bA comprehensive table of contents is to be placed at the beginning each volume of calculations. If more than one volume is needed, t complex index for all volumes is to be included in each volume. The tab - of contents shall be typed or prepared by other mechanical means. C. A list of the governing design criteria, including year of publication ane any interims, references, design manuals, standard drawings, clie materials, etc. This should be in addition to the information identified i item "a" above. • A clear and concise statement of all assumptions made in thecompletio of all calculations. If no assumptions were made during the completii t PJF KOA CORPORATION PLANNING & ENGINEERING Page 2 of 5 PROCEDURE . .. ...... ..... --71, VN CALCULATIONS Issue Date: 0)5/06 No: I '109 RD ev ate: 05109 Revo: V.2 any calculations, a statement of declaration is to be included stating as such. eThe design calculations, including both manual and comput It calculations. f, Computer program validation, computer program name, reon version number and a signed certification that the program has be validated, if calibrated or revised to meet specific needs for the project f which it is being used, and signature, title and PE number of the individ u 1i who performed the changes. calculations. The footer at the bottom of each sheet shall be filled in completely each day. The project manager shall furnish the information to be used. The designer and checker a - ITI-lim MAW 10TWINIMMMI11-1 number of steets are involved, A preliminary sketch or sketches should be shown to define certain basic information such as previously established dimensions, elevations, etc. This information can normally be shown in a small sketch occupying a portion of the sheet, but if necessary, an entire sheet can be used for this purpose and references noted at appropriate points in the computations. Even though it is not necessary to draw sketches to scale, they should be drawn in the correct proportion. ISM -11 III I MI. -I a I W-IFAL-A 1-144IL-111 IIALM� 1A PPKOA CORPORATION ,, PLANNING & ENGINEERING Page 5 of 5 PROCEDURE CALCULATIONS Issue Date: 05/06 NO: V. I Rev Date: 05/09 Rev No: V. — — ------ -- — - I 2I computer input shall be checked for correctness of the input. Sketches of the assumed correctness data used as input to commercial programs, and/or listing of input assumptions, annotated as appropriate, shall accompany the printed output as appropriate to facilitate the review of the computations. The Project Manager shall be responsible for the assembly of all computations at the end of a project for final submission and filing in document control. The Project Engineer shall make sure that each designer on the project team is familiar with the design methodology. I or -1111- FF -19 IV18•W11 1111111 ILA I &@is] SPE C/ TIONS PROCEDURE Issue Date: 05/06 No: %! Rev Date: 05/09 J Rev No: V2 &I '% SPECIFICAT105"NS PROCEDURES Fee erogosal: City of Downey - South Downey Safe Routes to School Dated: June 7, 2019 KMA 1100 Corporate Center Drive, Suite 201 Monterey Park, CA 91754 Hourly Rates (Fully 1.1 Ptalsel 1(0 -Off Meeting 4 24u--_ 4 7-0 8% 4 a $50 $6.527.84528 gnion (task dolliverables. approvals. etc. --2-1%- 1.3 Meeting Agendas and MInules .324.48 $4,324 1.4% 1.4 Project Schedule Deva!opmonl 4 1 36 Ir 9 0,31% 4 $0 1 S969,48 21 Web Based Map $955 4 �60 $2,694AS 7. $2,594 $6 $1,916,94 $1,917 0.6% -2 2 Records Research -2.3 32 14 $4,313 1.4% 3.3 Community Workshops (5) $0 $957.00 $957 0. 6UIiiy Research & Notifications $10,184.94 2 3A Resident Follow up 4 , 0 1 12% 11 .--l- $300 $4,593.76 $4,594 1.5% 2.4 Field Review & Site Evaluation T&I;* A, OMCOAONTIAM MTP ',tuM9:WA1 fJA 16 is 8 8 38 197 $100 $4,572,80 $4,573 1.5% 2.5 Righl-of-Way Research4 $35,740.00 $312,062.11 1o0A% Percentage 3A% 9.2% 5.4% 1I.J% 3.6 13.9% f3.4% $0 - i-5-00.48 $560 0.2% 2.6 topographic Survey 100.0% 1 2 50 $362.18 $38.765.00 $39,127 12.6% 27 Residential Property Research 4 8 8 $100 $2,606.32 • $2,606 0.8% 2.8 Pedestrian Detection Inventory 2 4 $50 $1,581.34 $1,581 0.5% 2.9 I ransil Research 4 4 1 12 $0 $2,200,88 $2,20i 0.7% 2.10 SRTS Suiveys at Five Schools 12 $50 $5,694,48 - _j5 i64' 1.9 2 1 Traffic Pattern Observations 412 16 $50 v3,5-60.8-13 $3,581 2.12 Research Tfatmpotiason Policies at Sehools 1 4 8 18 $0 $3.062,86 $3,063 1.0% 2.13 School Welk Audits 4 40 le 32 1 120 $150 $23,704.06 3,704 781h 3 1 . I I - Slak - eltolder Database $955 4 �60 $2,694AS 7. $2,594 03% 3.2 Project Brandin and Collateral Materials PF0dUL1I0 9 n .4 2 8 32 14 $4,313 1.4% 3.3 Community Workshops (5) 8 46 24 120 $200 $0 $10,184.94 I 3A Resident Follow up 4 16 W 1 12% 11 .--l- 2-4 S50 $0,422,88 VAASA T&I;* A, OMCOAONTIAM MTP ',tuM9:WA1 fJA 16 Yat x'*te Un 38 197 104 240 08 "a I 4.1 Dcaign Mck-Off Meeting - 4.2 Construction Plan Preparation (Tasks -4-.3-- 4.5) 4.3 50% Submittal 4.4 90% Submilial 2 4.6 100% Submittal 5 1 Project Speclhealion ProperaVen lTns*,-, 5 2 - 5.3) 5,2 90% Specifications 5.3 100% Spocif"tIons 8.1 Conalruchon Cost Estimate 6.2 90% Costs 6,3 100%cosis 2 to so $1.914.16 $0 $957.00 7 $o wzifi $955 $25 $95455 $0 0.0% so $0.00 iA 120 160 $0 $36,762.00 12_ 69 $0 $0 $18,381.46 4e 0 $0 $10,184.94 I 6'2ro 00 $3,884 1 12% 11 .--l- A A 'i37'"�, VAASA TOTAL SERVICES 38 197 104 240 08 "a .325X0 111011,08744 2 to so $1.914.16 $0 $957.00 7 $o wzifi $014 09%__ -i957 0.3% _ .,ji 0.1% ----t- i ;''1i 1nu 7 1 Design PodusInan Safety Education Programs $955 0.3% "1 $0 0.0% $3.134 $36,763 11.6% 8 so $1 .185 33% 25.7% - i-3 Dlslribullon of Education Materials _ 4 -i:5-0 $633,88 6'2ro 00 $3,884 $014 09%__ -i957 0.3% _ .,ji 0.1% ----t- i ;''1i 1nu 7 1 Design PodusInan Safety Education Programs 4 "1 $633.88 $2 500 00 $3.134 1,0% 7.2 Conduct Pedestrian Safety Education programs 8 so $80,418 25.7% - i-3 Dlslribullon of Education Materials _ 4 -i:5-0 $633,88 6'2ro 00 $3,884 1 12% 11 .--l- 'i37'"�, VAASA TOTAL SERVICES 38 197 104 240 08 "a .325X0 111011,08744 $85000,00 $35,740.00 $312,062.11 1o0A% Percentage 3A% 9.2% 5.4% 1I.J% 3.6 13.9% f3.4% 0.4% 60.4% 27.2% 12.4% 1000% 100.0% �C N CITY OF DOWNEY i FEE PROPOSAL K0,vA KOA Local Assistance Procedures Manual EX IT 10-1-11 Cost Proposal Exhibit 10-H1 Cost Proposal g 1tc'tssitl{'asst-[Tuts-Hied Vcg, or L mrs Su'n (Firm Fixed Price) contracts (Design, Engineering and Environmental Studies) Now, Mark-ups are Not Allowed Prime Consultant ❑ Subconsulhants Consultant KOA Corporation Project No Contract No Date 6/5/2019 1)IRL('T LABOR Classification/Tltle Name (Principal-in-Clenge Min Zhou ]Project Manager/Senior Carlos Velasquez 'Senior Ernineer 11 Varies Senior Planner_ [varies anes Senior AssociatePlannef �Settior Associate Engineer[ Vanes Associate Planner 'Varies Associate Engineer 'Varies _^Hours m Actua! Hourly Rate Total 35 $104.44 $ 3,50000 197 $53 00 $ 10,441.00 104 $59.50 $ 6,18800 - 0 $53.00 $ 96 — $4250 $ 4.080.00 268 $48.00 $ 12.R6400 436 $35 00 S 15,260 00 440 T�-- $36 00 5 15.840 00 $000 $ $0.00 $ $0,00 $ N LABOR COSTS a) Subtotal Direct Labor Costs $ 68,173.00 b) Anticipated Salary Increases (see page 2 for calculation) $3,408.65- c) TOTAL DIRECT LABOR COSTS [(a) + (b)] $ 71,581.65 INDIRECT COSTS d) Fringe Benefits Rate. 34.86% c) Total Fringe Benefits [(c) x (d)] $ 24,953.36 f) Overhead Rate: 32,59% g) Overhead f(c) x (f)] $23,328.46 h) General and Administrative Rate: 71 01 % i) Gen & Admin [(c) x (h)] $50,830 13 J) TOTAL INDIRECT COSTS [(e) + (g) + (i)] $ 119,111,95 FEE (Profit) Rate: 1000% k) TOTAL FIXED PROFIT [[(c) i (j)] x Fee Rate %] $ 17,069,36 CONSULTANT'S OTHER DIRECT COSTS (ODC) - lTEAIIZLII (Flus; additional pagca if ncressn"') Description Quantity Unit Unit Cost Total I other Direct Costs 1 LS $ 1,325 00 $ 1 325 00 1) TOTAL OTHER DIRECT COSTS $ 1,325 00 m) SUCONSULTANTS' COSTS (Add additional pages if necessary) Subconsultant 1: Safe Moves S 85,000.00 Subconsultant 2: KDM $ 38,765 00 Subconsultant 3: $ Subconsultant 4: S m) TOTAL SUCONSULTANTS' COSTS $ 123,765.00 n) TOTAL OTHER DIRECT COSTS INCLUDING SUBCONSULTATNS [(I) + (m) ] $ 125,090 00 TOTAL COST [(c) + (j) + (k) + (n)] $ 312,852.96 NOTES • All costs must comply with the Federal cost principles Subconsultants will provide their own cost proposals • The cost proposal formal shall not be amended Indirect cost rates should be based on consultant's annual accounting period and established by a cognizant agency of accepted by Caltrans. • Anticipated salary increases calculation (page 2) must accompany, Page 1 January 2018 N FEE PROPOSAL K01P, Local Assistance Procedures Manual 93 Exhibit 10-111 Cost Proposal l" uot, Fen lo J-�qtljl-Slkiq t Firm Fired price) coul r.,qc te (Design', Engineering and Environmental Studies) Note: klad-ups are NPQ Allowed Prime Consultant ❑ Subconsultants CmogtllaW --lo .{A Project No, Cmivaut No Date 6/512019 DIU( U tial OU Chnixificallon/Tifle Yincipal-in-Char �c �,'Pmiect Name in Zhou Hours 35 Actual Hourly Rate Total 3,500 on $100.09 S senior Manaaer/Senior Cl'rlos Velasquez l97 $53 00 $ l0*1 00 'Nenior Engineer 11 �a­n;s' 104 X5�) , 50 $ 6,18800 'Senior Planner— rc Varie 0 96 $5300 $ 542,50 100 4,08 0 'Senior Associate EnginceilVaneq 268 S4800 $ 12,864-00 Varies 4P:36 _f $35 00 a 15,26000 Associate to EmLineer Varies 440 $36 00 S 15.84000 $0-00 $ L Woo $ LABOR COSTS Labor Com S 68,17300 Anlicipated SalaFy Increi-ics (see page 2 for,*rdstion) $3,408.65 c 1"I OTAL DIRECT LABOR COSTS [(a) + (b)] J_71,581.65 INDIRECT COSTS d) Craige Benefits Pair 34.861'6 e) Total Fringe Benefits [(c) x (d)] — $ 24,953,36 it Overhead Rwe: 7 2 5"c", Rl Overhead f(c) x (D] $23,328A6 h) General rand Administrauvo Rate 71.M% i) Gen & Admin [(c) x (h)l $50,830 13 i) TOTAL INDIRECT COSTS [(c) + (g) + (i)] 1-99, 111 .95 FEE (Profit) Rate: 1000% k)TOTAL FUZED PROFIT ff(c) + (j)] x Fee Rate %] $ 17,069,36 CONSULTANT'S OTHER DIRECT COSTS (OW I - ITEMIZED (Add additional Isor," if itcervatir.yy F Descriptionii)Itty o-1 Unit Unit Cost Total PerDire'ri Costs i LS S 132500 $ 1325 001 $ $ 1) TOTAL OTHER DIRECT COSTS $ 1,325,00 m) SU CONSULTANTS' COSTS (Add additional pages if necessary) Subconsultant I Safe Moves 11 85,00000 Subconsultant 2 KDM S 39,765,00 Subconsultant 3 $ Subconsultant 4 $ - in) TOTAL SUBCONSULTANTS' COSTS $ 123,76500 J1 n) TOTAL OTHER DIRECT COSTS INCLUDING SUBCONSULTATNS [(1)+ (m) I S 125,090,00 TOTAL COST 1(c) - (j) + (k) + (n)] $ 312,85196 NOTES. All cogs inuat -ornply with the Federal cost principles Subconsultruns will provide their own cost proposal- • The cost proposal format shall not be amended Indirect cost Pates should be based on consultant's annual accounting period and established by a cognizant agency or accepted by Caltrans. o Anticipated salary increases calculation (page 2) must accompany Page I January 2018 93 I FEE PROPOSAL Safe Moves Local Assistance Procedures Manual KO,, oA EXHBIT 10 -HI Cost Proposal Page I January 20111 "Alf, Ill Exhibit 10 -HI Cost Proposal _ uSum (Firm Fixed Price) contracts L__.ntp (Design, Engineering and Environmental Studies) Note Mark-ups are Not Allowed ❑ Prime Consultant Q subconsultants Consultant Safe Moves Project No Contract No Date 6/3/2019 DIRECIA LABOR Classificationry Name Hours Actual Hourkv Rate Total Proicut Coordinator Pat H11105 li 295 $8245 $ 24,322 75 —Project Scheduler JPainell a Nve 150 $28,94 $ 4,326 00 Instructor Cvrahin Gonzalez 21[3 $2200 S 4,686 00 :Instructor . ......... . .. Martha sicaircs 213 $19.00 $ - 4,047o0 ;Instructor Quinn Danz 275 $1900 $ 5.225 00 LABOR COSTS a) Subtotal Direct Labor Costs 42,606-75 b) Anticipated Salary Increases (see page 2 for calculation) $0.00 c) TOTAL DIRECT LABOR COSTS l(a) + (b)) $ 42,606.75 INDIRECT COSTS d) Fringe Benefits Rate: 14 15% c) Total Fringe Benefits [(c) x (d)] $ —78 —15% 6,028.86 f) Overhead Rate: g) Overhead 1(c) x (f)] $24,775.83 h) General and Administrative Rate: i) Gen & Admin [(c) x (h)] $000 i) TOTAL INDIRECT COSTS r(e) + (g) + wi $ . . ..... .... 30,80468 FEE (Profit) Rate: 1000% k) TOTAL FIXED PROFIT ff(c) + (j)] xFcc Rate %] $ 7,341 14 CONSULTANT'S OTHER DIRECT COSTS (000) - ITEMIZED (Add additional pages if necesKiary) Description Quantity Unit Unit Cost Total Trinted Material I LS $ 3.25000 $ 3.250,06' Mileage/Travel I 1'(100 (10 $ '60 1) TOTAL OTHER DIRECT COSTS $ 4,250,00_ m) SU CONSULTANTS' COSTS (Add additional pages if necessary) Subconsultant I $ Subconsultant 2 $ Subconsultant 3 - —S Subconsultant 4 $ in) TOTAL SUBCONSUI;FANTSI COSTS $ n) TOTAL OTHER DIRECT COSTS INCLUDING SUBCONSULTATNS [(1)+ (M) ] $ 4,250.00 • TOTAL COST [(c) + 0) + (k) + (n)] $ 85,00257 NOTES: • All costs must comply with the Federal cost principles Subconsultunts will provide their own cost proposals • The cost proposal format shall not be amended Indnect cost rates should be based on consullanes annual accounting period and established by a cognizant agency or accepted by Caltrans * Anticipated salary increases calculation (page 2) must accompany Page I January 20111 "Alf, Ill FEE PROPOSAL KOeA safemovef Task 7 7.1 Design/development programs Fee: $2,500.00 7.2 Safety Education Programs FiCarpeEnter ES Quantity ECoEstper Unit E Total P Saf So (30 lay 2B Safe Workshops 5 5 250.0 $ 1,250.00 rSafe Moves City Rodeo 2 $ 2,000.00 4,00000 ' ' 'v" '" 'o' - — fl Wa=lking Scqhool Bus 1 $ 5,000.00 $ 5,000.00 'Walk to School Day 1 S 5,000.00 S 5,000.00 It ,Su b -Total 15,250.00 2u _VV I imperial ES Quantity Cost per Unit Total Play 2B Safe Workshops 5 $ 250.00 $ 1,250.00 Safe Moves City Rodeo 2 $ 2,000.00 $ 4,000.00 'Walking School Bus _1 1 $ 5,000.00 $ 5,000.00 'Walk to School Day 1 $ 5,000.00 $ 5,000.00 Sub -Total 15,250.00 Stauffer Middle School Quantity Cost per Unit Total Play 2B Safe Workshops 5 $ 250.00 _$ 1,250.00 'Safe Moves City Rodeo 3 $ 2,000.00 S 6,000.00 'Walking School Bus 1 $ 5,000.00 $ 5,000.00 'Walk to School Day 1 $ 5,000.00 $ 5,000-00 Sub -Total - $ 17, 2 5:070 Oj Quantty Cost per Unt Total rPlay tii 2B Safe 5 $�2 5 0. 0 0 $ 1,250.00 Safe Moves City Rodeo 2 $ 2,000.00 $ 4,000.00 Walking School Bus 1 $ 5,000.00 $ 5,000.00 Walk to Scl Da�' 1 5,000.00 $ 5,000.00 Sub -Total 5 CITY OF DOWNEY FEE PROPOSAL Safe Moves ard ES Cuan i tv ost per Unit Total W Play 2B Safe Workshops 5 250.00 1,250.00 yy I t'Safe Moves City Rodeo 2 2j000.00 4,000.00 Valking School Bus 1 $ 5,000.00 $ 5,000.00 . . ...... ....... . ­ Walk to School Day 1 $ 5,000.00 $ 5,000.00 Sub-Total I5,250.001 ...... .. .. Programs Quantity Cost per Unit Total Play 2B Safe Workshops 25 $ 250.00 6,250.0_0_; -SafV.e Moves City Rodeo 2,000.00 22,000.00 Valking School Bus 5,000.00 25,000.00 .... ..... ... .. ............... . .. Walk to School Day 5 5,000.00 $ 25,000.00 Sub-Total 78,250.00 7.3 Printed Material Workshops 25 Rodeos 11 Fee $3,250.00 Walking School Bi 5 W2SD 5 Fee Summary Task Total 7.1 $ 2,500.00 7.2 $ 78,250.00 7.3 $ 3,250.00 Mileage/Travel $ 1,000.00 Total 85,000.00 6 CITY OF DOWNEY 01 KOVA FEE PROPOSAL Local Assistance Procedures Manimll EXHBIT 10-111 Cost Proposal Exhibit 10-111 Cost Proposal Actuid Com -Plus -Fixed Fre no, tt4rup"N'UpO (Firut visood N'Rel vorolvAct-N (Dcqigri, Engineering and Environmental Studies) Note. Mark-ups arc Not Allowed Prime Consultant L'j Subconsultants Consultant KDM Meridian Project No C1PNo 17-11 Contract No Date 6/51201(1 Classification/Title Name on re Actual Hourly Rate' Total stinvy Manager Ilialiditkilarl To— $50.00 $ 1000ol WDi—m—E& �Wff Andrew Salve —54250 S 85000 SurvayTediolaian Vedas 63 $23,00 , partychief S 4,062 96 .Duh -- Iia nvarks 81 1 WAS q I'S VI d 9 ditifts Aistrativit I $29.50 T -9 MF. 2;6 00, o Men L kBOR COSTS 0 Sublutal Du-ccl LghoT Costs t I I '7m4- b) Anticipated Salary Increase.,,, (see page 2 tbr calculation) 0 TOTAL DIRECT LABOR COSTS (b)] $ 11,78644 IN DIRECT COSTS d) Fringe Benefits Rate: 67,0075 e) Total Fringe Benefit,,; [(c) x (d)] S 7,896,91 0 Overhead Rate: g) Overhead [(C)X(f.r h) (stnicrai and Admimsmtsvc Rate: 132,00% i) Gen & Admin [(c) x (h)) 515,558 10 j) TOTAL INDIRECT COSTS [(e) + (g) + (i)] $ 23,45502 FEE (Prof -it) Rate: 10.00% k) TOTAL MED PROFIT [[(e)+ (j)] c, Fee Rtne %] $ 3,524,15 CONSULTANT'S OTHER DIRECT COSIS tOl)(') lTF'Ml/A, 1) (Add udditiolud paau:s ifnvce%xnrk,) .—it ty unit Unit Cost Tol_.i Descrilothan 10ti. —Direct Costs I LS ])TOTAL OTHER DIRECT COSTS $ in) SUBCONSULTANTS' COSTS (Add additional Pages if necessary) Subconsultant 1: $ Subconsultant 2, Subconsultant 3: Subconsultant 4: m) TOTAL SUBCONSULTANTS'COSTS S n)TOTAL OTHER DIRECT COSTS INCLUDING SUBCONSULTATNS [(I)+(m) $ TOTAL COST [(c) + 0) + (k) + (n)] $ 3K765.60 NOTES: ® All osis swri compiy with the Federal cv,s Pt h1c;plei 1011 PT-3de inei, own cost prop"sais - The coq Tnoptnal tonnal shell not be amendod Jndirwcl cost TatcssboWd be h2,ed nn consuliaso'n arro.31 accounting period and, pyg esmbl�shed by as cognizant 39MY OF ACCepted be Caltrans Amictpwed satary 4KNOWS UiCRIOM (P+IgC 2) MD&I 8CCIAnpany Page I January 2019