Loading...
HomeMy WebLinkAbout02. CC 632-3C-Accept Work for Lakewood Blvd. Imp Proj Phase 3C-File Notice of CompletionItem No. APPROVED BY CITY MANAGER TO: HONORABLE MAYOR AND MEMBERS OF THE CITY FROM: OFFICE OF THE CITY BY: DELFINO R. I, P.E., DIRECTOR OF PUBLICWORKS/CITY ENGI r R DATE: JULY 23, 2019 SUBJECT: ACCEPTANCE OF •- FOR THE LAKEWOOD BOULEVARD IMPROVEME PROJECT,• NO. 632-3C I That the City Council: Accept work for the Lakewood Boulevard Improvement Project, Phase 3C under Cash Contract No. 632-3C; 2. Approve final construction contract amount of $3,167,812.52; and 3. Authorize Public Works Director/City Engineer to file Notice of Completion with the Los Angeles County Recorder's office. • On February 13, 2018, the City Council approved the plans and specifications and authorized staff to advertise for bids for the Lakewood Boulevard Improvement Project, Phase 3C from Gallatin Road to Telegraph Road. On April 24, 2018, the City Council awarded a construction contract in the amount of $2,981,400 to Sully -Miller Contracting Company. On May 29, 2018, work commenced and was completed on March 8, 2019. The work consisted of the following improvements: • Minor street widening to provide three travel lanes in each direction • Construction of new concrete sidewalks, curbs, gutters, curb access ramps and miscellaneous concrete improvements • Median island modifications to close an existing opening and extension of the southbound left -turn pocket at the Gallatin Road intersection • Installation of emergency vehicle access point within the existing median island north of Gallatin Road • Landscaping in the center median islands and parkways similar to the landscaping scheme implemented along prior project phases south of Gallatin Road • Rehabilitation of existing asphalt concrete pavement CASH CONTRACT NO. 632-3C LAKEWOOD BOULEVARD IMPROVEMENT PROJECT, PHASE 3C JULY 23, 2019 PAGE #2 • Installation of decorative LED street lighting and LED ornamental pedestrian sidewalk lighting • Construction of potable water system improvements consisting of replacement and installation of new fire hydrants, water service lines, replacement of old water meters with new remote -read water meters, and abandonment and replacement of water mains • Construction of new recycled water main to supply landscaped medians and upcoming developments in the area • Construction of a bioswale for storm water retention and infiltration in the westerly parkway of Lakewood Boulevard • Construction of an underground infiltration basin at Dennis the Menace Park for Lakewood Boulevard stormwater and dry weather flow capture • Construction of recycled water irrigation main and retrofit of irrigation system at Dennis the Menace Park • Installation of bus stop shelters, trash receptacles and an entry monument sign During construction, additional work beyond the original scope of the project deemed necessary resulted in seven contract change orders in the total amount of $198,582.31. The additional work included the reimbursement of Caltrans permit fees; additional potable water and recycled water improvements; removal, grading and installation of new sidewalk due to realignment of water main; removal and replacement of backflow preventer, gate valve and irrigation booster pump at Dennis the Menace Park; removal of asbestos cement pipe; modification of pipe outlets into bioswale; removal of reinforced concrete and unforeseen buried foundations; installation of colored concrete to match existing on-site concrete; additional sidewalk and paving related to SCE guy pole relocation; additional night-time paving costs; additional footings and conduits for bus shelter; grading and setting new electrical pull boxes; additional median landscaping; replacement of additional median curbs; replacement of median turf; and relocation of parkway trees. The project has been completed in accordance with the approved plans and specifications and staff recommends that the City Council accept the project as complete. Quality of Life, Infrastructure & Parks CASH CONTRACT NO. 632-3C LAKEWOOD BOULEVARD IMPROVEMENT PROJECT, PHASE 3C JULY 23, 2019 PAGE #3 The final cost of the construction contract, including base contract amount, net decrease in contract quantities and seven contract change orders is $3,167,812.52. The total final cost of the project is $4,360,955.21, which includes design, construction, City furnished materials, construction management & inspection, materials testing, construction engineering and contract administration. The total project cost is broken down as follows: Item Base Construction Contract Amount Net Decrease in Contract Quantities Change_ Orders Final Construction Cost Design City Furnished Materials _ Construction Management, Inspection and Materials Testing_ Construction Engineering & Contract Administration Amount -- --- $2,981,400.00 <$12,169.79> $198,582.31 $3,167,812.52 $392,493.32 $136,755.90 $329,067.04 _ 334,826.43 Total Final Project Cost: $4,360,955.21 Various project soft costs such as design, construction management, inspection and contract administration, approximately 33% of the construction cost, were higher than the average 25% to 30% soft costs spent to administer a project. These higher costs were mainly due to the California Department of Transportation's (Caltrans) design and permit requirements within Caltrans' right of way and the increased construction management and inspection costs overseeing multiple construction crews working day and night in order to meet the short construction duration to minimize impacts to local residents, businesses and motorists. Sufficient Capital Improvement Program funds are available to cover the total project cost, as shown in the following table: Account Number L Fund Name Amount Los Angeles County Metropolitan Transportation Authority (Metro) grant (Expended in FY 2012/13 26-1-6697 thru 2015/16) $140,325 Metro 1-710 Corridor Early Action Measure R 26-1-7802 (Expended in FY 2014/15 thru 2017/18) $565,904 Metro 1-710 Corridor Early Action Measure R 26-1-7802 IlBudgeted in FY 2018/19) $2,300,000 Metro 1-710 Corridor Early Action Measure R 26-1-7802 (Reimbursable Appropriation) $1,000,000 51-1-7802 Water funds (Expended in FY 2017/18) $261,106 51-1-7802 Water funds (Budgeted in FY 2018/19) $700,000 Grand Total $4, 9 67,335