HomeMy WebLinkAbout11. CIP No. 19-20-Award Contract-TELACU Construction Management-Library Modernization ProjRUM INU.
APPROVED BY
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCILCITY ANAGER
FROM: OFFICE OF THE CITY MANAGER
BY: JOHN OSKOUI, P.E., ASSISTANT CITY MANAGER
DATE: JUNE 25, 2019
SUBJECT: AWARD A CONSTRUCTION CONTRACT IN THE AMOUNT OF $4,735,000.00 TO
TELACU CONSTRUCTION MANAGEMENT FOR THE LIBRARY
MODERNIZATION PROJECT (CIP NO. 19-20)
RECOMMENDATION
That the City Council
1. Award a construction contract in the amount of $4,735,000.00 to TELACU Construction
Management, for the City Library Modernization Project, Capital Improvement Project
No. 19-20, and
2. Authorize the Assistant City Manager to execute any change orders or additional scope
of work for this project deemed necessary or desirable up to 10% of the construction
contract amount.
•
At its meeting of January 22, 2019, the City Council approved the plans and specifications and
authorized solicitation of bids for the subject project. On February 27, 2019 the City Clerk
received eleven (11) bids. The City received a bid protest from the second lowest bidder. On
March 26, 2019, the City Council rejected all bids received and authorized staff to rebid the
project.
On April 11, 2019, the City Clerk received and opened nine (9) bids. Again, the City received a
bid protest from the second lowest bidder. On May 14, 2019, the City Council rejected all bids
received and authorized staff to rebid the project. On May 16, 2019, and May 23, 2019, the
Notice Inviting Bids for this project was published in the Downey Patriot.
On May 24, 2019, an addendum was issued providing answers to questions by potential
bidders. On May 30, 2019, the City Clerk received and publicly opened eight (8) bids which
ranged from $4,735,000 to $5,365,000, as shown on the attached bid summary (Attachment A).
The apparent lowest bidder was TELACU Construction Management with a bid in the amount of
$4,735,000. On June 4, 2019, Golden Phoenix Construction Company, the apparent 3rd lowest
bidder, and Saifco Construction Company, the apparent 4th lowest bidder, submitted protest
letters. Based on a thorough review of the said bid protests by the City's outside counsel, it has
been determined that both bid protests are without merit. Moreover, verbal qualification
interviews with randomly selected TELACU Construction Management's references were
completed and the responses were all satisfactory. Staff has confirmed that TELACU
AWARD A CONSTRUCTION CONTRACT TO TELACU FOR THE LIBRARY MODERNIZATION
PROJECT (CIP NO. 19-20)
JUNE 25,-2019
PAGE 2
Construction Management possess the specified contractor license and that the license is
current and in good standing, therefore; the lowest responsive and responsible bidder is
TELACU Construction Management of Orange, California with a bid in the amount of
$4,735,000.
Below is a summary of the scope of work, implementation schedule and other relevant data
related to each project:
EXTERIOR:
• Seven (7) new accessible ADA parking stalls
• Provide code -compliant path of travel from ADA stalls to entry
• Accessible pedestrian loading area at the Main Entry
• Covered exterior bench seating at the Main Entry
• Extend the west entry
• New contemporary curtain wall at extended Main Entry
• New vibrant wayfinding Canopy at Main Entry
INTERIOR:
• Remove and replace all interior walls
Remove and replace all plumbing fixtures
• Provide four (4) additional plumbing fixtures for both Men & Women at the Main
Public Restrooms
• Remove and replace all casework, shelving and finishes
Provide four (4) "Quite Zone" Study Rooms
Provide enlarged Literacy Room
• Provide three (3) electronic Book Check Out stations
Provide descriptive "Way Finding" directional signage, flooring and wall colors
Provide The Studio (previously called the Colab) room with numerous data ports and
collaborative white boards
• Provide The Cave (previously called the Virtual Reality Lab)
• Provide vibrant "Child Friendly" reading and activity area, which includes a raised
interpretive platform and "Quiet Time" child reading area
• Provide "Family" restroom with changing tables in the Children Area
• Provide a new Cormack Room with raised telescoping bleacher seating
• Provide Teen area reading counters with data ports
• Provide two (2) "All Gender" toilet rooms and enhance break area for the staff
• Provide new ductwork to existing mechanical units
• Provide new concealed heads and lines to existing sprinkler system
• New fire alarm system
• New electrical system and Cat 6 cabling
• New opening and spread footings to be provided in existing shear wall
Construction related activities are anticipated to begin in August 2019 and to be complete in
June 2020. Staff respectfully requests that the City Council award a construction contract in the
amount of $4,735,000 to TELACU Construction Management for the City Library Modernization
Project. The Estimated Project Cost Summary is attached to this report (Attachment B).
AWARD A CONSTRUCTION CONTRACT TO TELACU FOR THE LIBRARY MODERNIZATION
PROJECT (CIP NO. 19-20)
JUNE 25, 2019
PAGE 3
Quality of Life, Infrastructure & Parks
The total estimated cost of the project, including construction cost design, inspection,
construction engineering and management services, material testing, temporary library facility,
furniture and equipment, and contingencies is $6,968,272. The City's 2018-20 Capital
Improvement Program includes the City Library Modernization Project utilizing Measure S
Funds (Account No. 33-1-3303-0520).
ATTACHMENTS
Attachment A: Bid Summary
Attachment B: Location Diagram-
Attachment
iagramAttachment C: Project Cost Summary
Attachment D: Renderings
AWARD A CONSTRUCTION CONTRACT TO TELACU FOR THE LIBRARY MODERNIZATION
PROJECT (CIP NO. 19-20)
JUNE 25, 2019
PAGE 4
CITY OFDWNEY
CIP 19-20 CITY LIBRARY MODERNIZATION PROJECT
Bid Due Date: 5/30/19 @ 11:00 am
Company Name
Bid Amount
TELACU Construction Management
$4,735,000.00
AWI Builders Inc.*
$4,4994_1140
Golden Phoenix Construction Co., Inc.
$5,052,000.00
dba Golden Phoenix Electric
Saifco Construction Company
$5,170,000.00
Horizons Construction Co, Int'I Inc.
$5,173,000.00
Morillo Construction
$5,278,000.00
Woodcliff Corporation
$5,352,000.00
KemCorp Construction, Inca
$5,365,000.00
* Non-responsive, lack of signed acknowledgment of Addendum #1
AWARD A CONSTRUCTION CONTRACT TO TELACU FOR THE LIBRARY MODERNIZATION
PROJECT(CIP NO. 19-20)
JUNE 25, 2019
PAGE 5
AWARD A CONSTRUCTION CONTRACT TO TELACU FOR THE LIBRARY MODERNIZATION
PROJECT (CIP NO. 19-20)
JUNE 25, 2019
PAGE 6
• Amount
Contingency
SUBTOTAL CONSTRUCTION•
Design $675,000.00
Inspection,• •n engineering Z contract administration(estimated)
Temporary+ 00
Furniture and Equipment $350,000.00
$6,973,272.00
AWARD A CONSTRUCTION CONTRACT TO TELACU FOR THE LIBRARY MODERNIZATION
PROJECT (CIP NO. 19-20)
JUNE 25, 2019
PAGE 7
AWARD A CONSTRUCTION CONTRACT TO TELACU FOR THE LIBRARY MODERNIZATION
PROJECT (CIP NO. 19-20)
JUNE 25, 2019
PAGE 8
AWARD A CONSTRUCTION CONTRACT TO TELACU FOR THE LIBRARY MODERNIZATION
PROJECT (CIP NO. 19-20)
JUNE 25, 2019
PAGE 9