Loading...
HomeMy WebLinkAbout08. CIP 17-09-Approve Agmt-City of South Gate-Proposed Traffic Signal Upgrade-Paramount-Gardendale IntiteM NO, APPROVED BY TO. HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL CITY MANAGER FROM: OFFICE OF THE CITY MANAGER Y: DELFINO R. CO SU JI, P.E., DIRECTOR OF PUBLIC WO K XITY ENG ER DATE: JUNE 25, 2019 SUBJECT: APPROVE COOPERATIVE AGREEMENT WITH THE CITY OF SOUTH GATE REGARDING THE PROPOSED TRAFFIC SIGNAL UPGRADE AT THE PARAMOUNT BOULEVARD AND GARDENDALE STREET INTERSECTION, IMPROVEMENT<• NO 17-09 That the City Council: 1. Approve Cooperative Agreement with the City of South Gate regarding the proposed traffic signal upgrade at the Paramount Boulevard and Gardendale Street Intersection, Capital Improvement Project No. 17-09; 2. Authorize Mayor to execute the agreement with the City of South Gate in a form approved by the City Attorney; and 3. Authorize City Manager to execute any and all future amendments to said agreement in form acceptable by the City Attorney. The City of Downey is proposing a series of traffic safety enhancements along Paramount Boulevard between Telegraph Road and Gardendale Street. In order to fund this effort, the City applied for and received a grant in the amount of $1,926,300 in federal funds through the Highway Safety Improvement Program (HSIP) Cycle 7. Among the safety enhancements to be completed through this project is a proposed upgrade of the existing traffic signal at the Paramount Boulevard and Gardendale Street intersection, including the following specific features: • Provision of protected -permissive left -turn phasing in the northbound and southbound directions along Paramount Boulevard; • Upgrading the electrical service; • Converting the intersection safety lights from high-pressure sodium vapor to more energy- efficient light -emitting diode (LED) lighting; • Replacement of existing controller unit with a more advanced model to be consistent with current standards and latest technology; • Upgrading video detection cameras to the latest technology with enhanced vehicle and bike detection capabilities and high-definition video resolution; and • Changing out all eight -inch vehicle indications with more visible 12 -inch indications. W CIP NO. 17-09 - COOPERATIVE AGREEMENT WITH CITY OF SOUTH GATE JUNE 25, 2019 PAGE 2 Since the South Gate city boundary coincides with the Gardendale Street centerline, the southerly half of the intersection is located within the City of South Gate. Therefore, the execution of a cooperative agreement with the City of South Gate will be necessary in order for the project to move forward. The location of the Paramount Boulevard at Gardendale Street intersection is shown in Attachment A. The design plans for the project are currently at the 95% level of completion. The construction phase of the project is estimated to begin in fall 2019 with completion anticipated in spring 2020. Staff recommends approval of the attached cooperative agreement (see Attachment "B") with the City of South Gate. The South Gate City Council approved the agreement at its meeting on May 28, 2019. Quality of Life, Infrastructure and Parks The estimated cost of completing the proposed traffic signal upgrade at the Paramount Boulevard at Gardendale Street intersection; including design, construction, City -furnished materials, contingency, inspection and project management is $172,000. The proposed improvements will be funded through the aforementioned federal HSIP grant. Approximately $157,000 has been expended to date on the design phase of the project. The remaining $1,769,300 of the $1,926,300 HSIP grant will be programmed in the FY 19-20 Capital Improvement Program in account no. 26- 17830 to fund the construction phase of the project. No local match is required. ATTACHMENTS Attachment A — Location Map Attachment B — Cooperative Agreement with the City of South Gate E CITY OF DOWNEY J A IAS - 4, _V_G_F,1,F.- -i - CK UL TJ.V�, 4, 1, 1 F_,*1 V, 101 "0111 1 THIS AGREEMENT for Paramount Boulevard at Gardendale Street Traffic Signal Modification ("Agreement") made this day of May 2019, by and between the City of Downey, hereinafter "DOWNEY", and the City of South Gate, hereinafter "SOUTH GATE" for the modification of the traffic signal at the intersection of Paramount Boulevard and Gardendale Street, hereinafter referred to as the "PROJECT." DOWNEY and SOUTH GATE are sometimes individually referred to as "Party" or collectively as "Parties." The effective date of this Agreement is May 28, 2019. WITNESSETH: WHEREAS, DOWNEY was awarded a federal grant in the amount of $1,926,300 for traffic signal upgrades and other safety enhancements along Paramount Boulevard within its City limits between Telegraph Road and Gardendale Street, and partially within the City of South Gate at the intersection of Paramount Boulevard and Gardendale Street; and WHEREAS, the scope of the PROJECT includes the modification of the traffic signal at the Paramount Boulevard at Gardendale Street intersection, consisting of the following elements - 1. Conversion to protected -permissive left -tum phasing in the northbound and southbound directions along Paramount Boulevard, 2. Upgrading of the existing electrical service to'a type III service, 3. Replacement of high-pressure sodium (PS) safety lighting with light -emitting diode (LED) safety lighting, 4. Upgrading of video detection cameras, and 5. Replacement of eight -inch vehicle indications with 12 -inch indications. WHEREAS, the PROJECT will be completed as part of same traffic signal upgrades to be implemented along Paramount Boulevard; and WHEREAS, the City boundary between DO EY and SOUTH GATE coincides with the Gardendale Street centerline; and WHEREAS, the PROJECT will be of mutual benefit to both DO EY and SOUTH 1 4773287.1 -- L235.53 Attachment T" 11,11101"IMAR, Nil laoL,[#]Loj 0 go WHEN N lwar.141*0 IoeI I I wll I M-1 I -Urc if -P aeveiopment ani MN FLU11,1011 01 UIC L41 110kl�vc& mmci - 1-" V, W", v WHEREAS, the total estimated cost of the traffic signal upgrades and other safety enhancements to be completed along Paramount Boulevard is One Million Nine Hundred Twenty -Six Thousand Three -Hundred Dollars ($1,926,300), which includes, but is not limited to, the design and preparation of complete plans, specifications and estimate; advertisement, lated improvements in accordance with the Public Contract Code; and WHEREAS, the PROJECT will be funded in its entirety through the federal grant received by DOWNEY; therefore, SOUTH GATE is not required to fund any portion of t e PROJECT nor provide local match funds; NOW, THEREFORE, in consideration of the mutual promises, covenants, and conditions herein contained, the parties agree as follows: A. DOWNEY shall be responsible for providing all design and construction engineering necessary to complete the PROJECT. This shall include but not be limited to the following: design and preparation of complete plans, specifications and estimate; advertisement, bidding and award; construction, inspection and contract administration for the contemplated improvements in accordance with the Public Contracts Code. B. DOWNEY has appropriated sufficient funds in its Capital Improvement Program budget for Fiscal Year 2018-19 for the modification of the traffic signal at the intersection of Paiwn*M ;--t said intersection, under the PROJECT. SOUTH GATE is not required to fund any portion of th* PROJECT, nor provide any local match contributions. C. DO EY and SOUTH GATE hereby approve the scope and estimated cost of the PROJECT. D. DOWNEY has prepared and delivere•to •H GATE for approval PROJECT designs and specifications which are 95% complete. SOUTH GATE shall diligently review those plans and specifications and provide its comments to DOWNEY as soon as reasonably possible. Within ten (10) business days after said delivery, DOWNEY shall promptly incorporate into those plans and specifications as many of those comments as are acceptable to DOWNEY. If any such comments are not acceptable to DOWNEY, then within five (5) business days after DOWNEY's receipt of those comments, DOWNEY and SOUTH GATE shall mutually agree on any and all remaining modifications to the plans and specifications. Upon such agreement the plans and specifications shall be revised to include those E. DOWNEY shall be responsible for preparing, delivering, posting and otherwise publicizing any and all notifications relative to the PROJECT as and when required by applicable state law and DOWNEY's city charter. The cost of the foregoing shall be paid by DOWNEY as 2 4773287A __ L235.53 no event shall DOWNEY completely close the intersection of Paramount Boulevard and r- •. Street at any time in connection with the PROJECT without first providing SOUTH GATE with a minimum of three (3) business daysprior written notice of th proposed closure and allowing SOUTH GATE to recommend alternatives to closure. G. itWNEY and SOUTH GATE agree to be responsible for maintenance of the improvements constructed and DOWNEY will continue to bill SOUTH GATE for 50% of the maintenance cost per the traffic signal maintenance agreement between DOWNEY and its traff signal maintenance contractor. H. DOWNEY agrees to protect, defend and indemnify SOUTH GATE against any claims, liabilities orjudgements arising from DOWNEY's actions or inactions in carrying out responsibility under this Agreement. SOUTH GATE agrees to protect, defend and indemnify DOWNEY against any claims, liabilities or judgments arising from SOUTH GATE's actions oi inactions in carrying out its responsibility under this Agreement. L DOWNEY shall require consultant and contractor selected to per orm t e PROJECT to protect, indemnify and defend SOUTH GATE in the manner that DOWNEY is indemnified in the contract documents. DOWNEY shall require consultant and contractor to name both DOWNEY and SOUTH GATE as additional insureds on all required insurance und( the contract documents. J. DOWNEY shall furnish an inspector during the construction of the PROJECT. SOUTH GATE may also furnish, at no cost to Downey, an inspector to inspect the construction of the PROJECT. Said inspectors shall cooperate and consult with each other, but the orders of the DOWNEY inspector to the contractor or any other person in charge of construction shall prevail and be final. K. SOUTH GATE agrees, upon approval of the construction plans•r e PROJECT, to issue a no -fee permit to DOWNEY's contractor to construct those portions of the PROJECT within SOUTH GATE's jurisdiction. At the request of either Party, the other Party shall provide copies of as -built drawings, plans, records and files applicable to the PROJECT at no cost to the requesting Party L. The parties of this Agreement are the City of Downey, a municipal corporation and charter city, having its principal office at I I I I I Brookshire Avenue, Downey, CA 90241 and the City of South Gate, a municipal corporation, having its principal office at 8650 California Avenue, South Gate, CA 90280. M. The representatives of the respective parties who are primarily responsible for the v.dministration of this Agreement, and to whom formal notices, demands and communications shall be given, are as follows: 3 4773287.1 -- L235.53 rilljo IIII III ligg 1� Delfino Consunji, P.E. Director of Public Works 44444--VsrrFeA-:R-�� P.O. Box 7016 Downey, CA 90241 (562) 904-7102 Arturo Cervantes, P.E. 1 001, N. The term of this Agreement shall be from the effective date stated hereinabove until June 3 0, 202 1, unless extended by written amendment by the parties hereto. Notwithstanding this Section M, if the construction is in progress on June 3 0, 202 1, either Party may extend in writing the Agreement until PROJECT completion and set forth a target date for tracking purposes. A copy of any writing setting forth a revised completion date shall be forwarded to the City Clerk for each Party. Further, the obligations and promises of the parties set forth in Sections G, H and I of this Agreement shall survive the termination of this Agreement. 0. Disputes regarding the interpretation or application of any provisions of this Agreement shall, to the extent reasonably feasible, be resolved through good faith negotiations between the parties. If any action at law or in equity is brought to enforce or interpret any provisions of this Agreement, the prevailing party in such action shall be entitled to reasonable attorneys' fees, costs and necessary disbursements, in addition to such other relief as may be sought and awarded. P. This Agreement supersedes all prior proposals, agreements and understandings between the parties regarding the PROJECT and may not be modified or terminated orally, and no modification, termination or attempted waiver of any of the provisions hereof shall be binding unless in writing and signed by both parties. Q. This Agreement is covered by the laws of the State of California. Any action must be filed in the Los Angeles Superior Court, Southeast Judicial District, Norwalk, California. IN WITNESS THEREOF, the parties hereto have accepted, made, and executed this Agreement upon the terms, conditions, and provisions above stated, the day and year first above written. El 4773287.1 -- L235,53 IN WITNESS THEREOF, the parties hereto have accepted, made, and executed this Agreement upon the terms, conditions, and provisions above stated, the day and year first above written. Rick Rodriguez, Mayor DATED: May _, 2019 APPROVED AS TO FORM: �Vtte M. Abich Garcia, City Attorney 5 4773287.1 -- L235.53 CITY OF UTH GATE Jorge M a es ayor DATED: ay 2019 ATTEST: Ca en Avalos, City Clerk