T 0.' HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL CITY MANAGER
-• • • THE CITY MANAGER
BY:
•, R. • P.E., DIRECTOR OF PUBLIC WORKSICITY
SUBJECT- AWARD CONSTRUCTION CONTRACT FOR CIVIC CENTER DRIVE & 3RD
STREET PAVEMENT REHABILITATION, CAPITAL IMPROVEMENT PROJECT
• 14-13
That the City Council:
1. Award a construction contract in the amount of $342,710 to Sequel Contractors,
Incorporated for Civic Center Drive & 3rd Street Pavement Rehabilitation, Capital
Improvement Project No. 14-13;
2. Approve the appropriation amount of $36,094 in Measure R Local Return funds in
Account No. 56-1-6697 to cover the estimated total project cost shortfall;
3. Authorize Public Works Director/City Engineer to execute any change orders or
additional scope of work for this project deemed necessary or desirable up to the
approved project budget.
Through the City's Pavement Management Information System (PMIS), street segments
earmarked for improvements are identified as priorities based on the condition of the pavement
for the given street segment relative to the pavement condition of other street segments
throughout the City. Civic Center Drive between 3rd Street and Brookshire Avenue and 3rd
Street between Civic Center Drive and City Hall (Attachment A) have been identified as
priorities for improvements because the asphalt pavement is deteriorated to a state of disrepair
and must be reconstructed.
PR=0
On May 14, 2019, the City Council approved the plans and specifications (Attachment B) and
authorized staff to advertise for bids for Civic Center Drive & 3rd Street Pavement
Rehabilitation, Capital Improvement Project No. 14-13. The project was advertised for bids in
the Downey Patriot on May 16, 2019 and May 23, 2019, posted on Planet Bids on May 21,
2019, and published in various trade publications.
Approximately 1,100 linear feet of asphalt pavement will be reconstructed under this project and
the work consists of removal of existing asphalt concrete pavement, re -grading and compaction
of existing aggregate base material, construction of asphalt bus pad, and placement of asphalt
CAPITAL IMPROVEMENT PROJECT NO. 14-13
CIVIC CENTER DRIVE & 3RD STREET PAVEMENT REHABILITATION PROJECT
JUNE 25, 2019
PAGE #2
concrete pavement base course and rubberized asphalt concrete cap, striping and installation of
pavement markings, installation of minor electrical improvements on 3rd Street, removal of
concrete sign and minor median island modifications at the Civic Center and Brookshire Avenue
intersection. In addition, uplifted, damaged or substandard curb, gutter, cross gutters, sidewalk,
driveway approaches and curb access ramps will be repaired or replaced in order to comply
with the latest Americans with Disabilities Act (ADA) requirements.
On June 6, 2019, the City Clerk received and publicly opened five bids ranging from $342,710
to $381,925. The bid results were as follows:
The lowest responsive and responsible bid, in the amount of $342,710, was submitted by
Sequel Contractors, Incorporated of Santa Fe Springs, California (Attachment C). Sequel
Contractors has satisfactorily completed similar projects for the Cities of Bellflower, La Canada,
Orange and Pico Rivera. Its references have been checked and were satisfactory. Sequel
Contractors' State of California contractor's license is current and active. Finally, Sequel
Contractors and its subcontractors are registered with the California Department of Industrial
Relations under the Public Works Contractor Registration Program for Labor Compliance. -Staff
recommends that the City Council award a contract to Sequel Contractors, Incorporated for the
Civic Center Drive& 3rd Street Pavement Rehabilitation, Capital Improvement Project No. 14-
13.
Construction is anticipated to begin in August 2019 and be completed in October 2019,
Quality of Life, Infrastructure & Parks
ir•_
The total estimated project cost, including construction contract, contingencies, design,
inspection, materials testing, construction engineering and contract administration is as follows:
CAPITAL IMPROVEMENT PROJECT NO. 14-13
CIVIC CENTER DRIVE & 3RD STREET PAVEMENT REHABILITATION PROJECT
JUNE 25, 2019
PAGE #3
The total approved budget for this project in the FY 2018/19 Capital Improvement Program is
$400,000 as shown in the table below:
Account
No. Funding Source Amount
30-1-6697 Gas Tax funds (expended) $764
54-1-6697 Pro osition C local Return funds ex ended $17,156
56-1-6697 Measure R Local Return funds (expended) $5,986
56-1-6697 Measure R Local Return funds $400,000
56-1-6697 Measure R Local Return funds Additional A ro riation $36,094
Total Pro'ect Fundin $460,000
Additional funding in the amount of $36,094 is required to cover the estimated total project cost.
Staff recommends the additional appropriation of $36,094 in Measure R Local Return funds in
Account No. 56-1-6697 to cover the estimated total project cost shortfall.
ATTACHMENTS
Attachment A — Location Map
Attachment B — Plans
Attachment C — Bid Summary
WOMWOMYN o
l UP! q !"1061KK � T��a
ana�w'
,gX„
�t
Ww Pm # �
hmdd
3 �
t��
�� za ' g Jl � �f
fru ss..@ s a ril
,Po
$''w' � na xg P, add e A u� ,. ��.? € +A 1,9 9
6 ..4s� x% a r`5.. $�S a�sPr s F srza
S I e '�e t5 ',+' d e �. : �I. oR,
r
v
E- U
�d C)
C
IO RRF a 5 I5 i 0&.Rr11
�
fiollgh
E'on<Yg
LL
..E-.
5
yy
�
�cc1.
ow
y"
&&
6 &
9xWN
W
GI Mm
3
9919 M�,�Yv S`
E—
�. 107
E
5
a
i
orf
�r
n
ME
§
l UP! q !"1061KK � T��a
ana�w'
,gX„
�t
Ww Pm # �
hmdd
3 �
t��
�� za ' g Jl � �f
fru ss..@ s a ril
,Po
$''w' � na xg P, add e A u� ,. ��.? € +A 1,9 9
6 ..4s� x% a r`5.. $�S a�sPr s F srza
S I e '�e t5 ',+' d e �. : �I. oR,
r
v
l UP! q !"1061KK � T��a
ana�w'
,gX„
�t
Ww Pm # �
hmdd
3 �
t��
�� za ' g Jl � �f
fru ss..@ s a ril
,Po
$''w' � na xg P, add e A u� ,. ��.? € +A 1,9 9
6 ..4s� x% a r`5.. $�S a�sPr s F srza
S I e '�e t5 ',+' d e �. : �I. oR,
r
�
a
a
pgog
6
? p
P iffi. 3
aHP
s
#
k
a� xepoo0 q,NY , N $- ,
iij,g i,
u�.fi d. tT hION.;
"9
Tj
3. N a
k
,PI
ffi " .y;a
A`�.h n�#
=
it
5511 nth
ia
D
c) 8 o C o 0 0 0
G
�
a
a
pgog
6
�M
s
�Jy
k
Poll
pgog
6
- _cm .,tea
x���
' Al I
1
IN
fl
t
❑ L SE EFEE R71CI
9
1
IN
--------------------
i M
_ r
3hd 3alHSNOOa®
•" did �; w
`
0
Npn'�°°
a31N30 OIAM 1j .1
r
i
id SummaryJune 6, 2019
Sequel Callril lOrs. Incl
Onyx Paving
Comussy,
Ise
All Amenc an Asphalt
Ileo
No
Descrilion
Oly Unit
UnllPnce
Amount
-.__UniiPrice
___Amount
Unit Price
-Amount...
PARI A-S1ET1 R NIS
Traffic Conirel, Public Convenience &Safely jNol to- xcee 5 of
--
_
1
the Total Bid)
1 L,13
$ ; 15000,00
$...
10494 00
$
10394.00
$ 6817200
$
68173[x1
2
Clearing and Grubbing _. -
1 LS
S ':10,000.00
;. S
10.000.00
$
30000 00
$
30,000..00
$ _. 2,546 00
$
2,546.00
3 :
Cold Mil Existing Asphalt Pavement, 3 -Inch Deep
60,600 SF
S 0.58
S
35 090.00
$
0 41
$
24,80500
$ 0 35
,$
21,175 00
q
R®.grade and Recompacl (95%) Existing Aggregate Base
-
60,700 SF
S : 0,20
:" $
1?,140.00
$
0 13 '.
$
7,891,(X1
$:. 019
$
11,5331X1
5
Unclassified Excavation
;30 CY
$ '..: 10000
S3,OOO.QO
$
30000
$
90(X1.0'1
$ 7100
$
130.00
6 '
ConslWAs hall Concrete Pavement HMA)Base Course
825 TON
S 80.00
S
80000.00
$
_ 8500
$
7012500
$ 7900
$
6,5,17500
7
Construct As halt Rubber Hot Mix (ARHM GG) Surface Course
765 TON
S 95.00
S
7267500
$
10010,
$
76500 00
$ 10000
$
7650000
8
Remove Exist in PCC Curb
lei IIF
$ 24.00
! S
2,09000
$
15 00
$
1,275,00
$ 2100
$
1,78500
q
-Construct PCO Curb (Type A1-6)
65 ILF
S 1009
S
1300.00
'$
55.00 :.$
3575.00
$ 3900
'$
2535.00
10
Remove Exorinq and Reconstruct PCC Curb and Guller lT pe A2-6)
220 ILF
S 65.00
S
14 300.00
$
6900 '.
$
15 180.00
$ 61,00
$
13,860.00
Remove Exisling and Reconslrucl PCC Curb and Gutter (Type A2-6
11
n ExslinA Crws Guller)
35 ILF
S 65.00
S
2,275.00
$___
6900
$
2.41500
$ 8900
$
3,11500
Remove Existing I mprovemenis and Construct PCC Curb Ramp with
--
12 1i__.Delectable
Warning Surface
___697 SF
S + 30.00
S
20,700.00
$___.
1607 '..$
11„04000
$-- 1600
:$
11„040:00
Install Delectable Warning Device (Trurn.afedDomes) on Exishng.
13
-- Curb Ramp
96 SF
S 3500
S
3,360.00
$ _
5000
$
4 &OO OJ
$ 5000
$
4,80000
14
Adjust Existing Water Valve Frame and Cover to Grade
2 1=A
S 1,000.00
$
2,000.00
$.
1,00000
$
2,0DO 00
$ 52500
$
.1,05000
Remove Exis ing "Downey Give Center Concrete and Metal Sign,
15
Concrete Posts and Foolings
1 LS
$ 3,000.00
`: $
3.000.00
$
3 000 00
$
3,000.00
$ 1725.00
: $
1,723:00
Remove Exisling'Public Parking' Sign, Posl and Fooling, Salvage
16
Sign and PEI to the City Nlainlenance Yard
1 LS
$ 1,500,00
li $
150000
$
3 00010
$
000
$ 1,148 00
$
1,148.00
17
Traffic Singing, Pavement Markmq, and Signinq
1.. I S
S 15,000.00
S
15,000.00
:$...
22000 00
$..
. 22,.000.00
$-.14,438 00
, .$
14,438.00
Sub[ otalPad A (hems1l017)
_
;,. S
285,380.00
_'.
$
297,000.00 u
$
002726.00
FART -ELECTRICAL IMPRMWENTS
Furrish and Install One Mayor Cabinet NEVC20u 1 (Type III -BF),
Unmetered, Pedestal Mount, 240/120 yet[, with l8-Circuils Service Pane[
On, 100 Amp 2 Pole Main Breaker, Twelve 20 Amp Single Pole Breakers,
18
Two 4 Pole Lighting Callacer and Two Test Switch
1 LS
$ 5.00000
$
1,000,00
$
6 000 00
$
6,00000 4
$ ... 5,498 00
$
6,4W. 00
19
Furnish and Install t -inch PVC Condut --
370 1 L F
$ 11 20, 0
': $
,40000
$
-- 23 00
$
8 510.00
$ 19 00
$
7°030 00
20
Furnish and Install 2 -inch PVC Condu[
_ KIP
$ ” 30.00
5
10 wkilgQ
$ -
.231X1
$
806000
$ 1300
$
4,55000
: 21
: Furnish and Install #5 Pull box .
7 JEA
S 000.00
S
51000,00
$
60000 :.
$
3 500.00
$ 66300
$
4,64100 '.
22
Furnsh and Install #6%1 boxtraffic rated cover
i IrA
$ 1,500.00
S
1,500.00
$:
1,00000
$
1,00000
$ .:.1,04900
$
1,04900
23
Furnish and Install #12 Conductor
1,400 ILF
,$ 0,75
#
1_1 $
_. 1 00
'...... $
1 40(1.Cf.1
$ _.. 1 co
$
1,400,00
24
Furnish and Install #10 Conductor
2 300 LF
S 1,00
+! $
2 3(10,00
$
100
$
2,30000
$ 100
$
Z300 00
25 :
Furnish and Install #8 Conductor
240 I F
S :. Z00
$
480.00
2 01
' $
480.00
$ 135
$
32400
26
Furnish and Install 46 Conduclor
700 LF
S ' Z00
$
1 400.00
$:
200
$
1,400.00
$ 162
$
1,13400
Furnsh and Install 100Amp, 2Pole, 2401120VoilBreakerw4hin Existing
27
- Serace Panel
1 EA
$ 200.00
S
200.00
$
50000
$
50000
$ 24700
$
247.00
28 ::
FuMsh and Install GFCI Duplex Receptacle
19- EA
S :. 300.00
S
5,700.00
$
30000
:. $
5,700.00
$ 51900
$
9,861.00
29
Furnsh and Install Cord End Receptacle within Pull Box
2 EA
S : 1.000.00
S
2.000.00
$
1,50000
$
3,000..00
$ 77900
$
1,558.00
30
Furnish and Install ln[ermalic ET 90215C Timer
11 EA
$ 1120000
S
11200.00
$---1,50000
$
1,50000
$__.188800
$
188800
Install City Fumished LED Neon Lighl in Existing Sign Grooves
31
': (Approlemalely70feet)
1 LS
$ ', 3,000,00
S
3,000.00
'.:$
1,50000
$
1.500.00 -
$ 2,067.00
$
2,067.00
Elec[ncal Demolition, Including Remove and Salvage all Electrical
32
-.. Co onerts as Shawn an Plans
1 LS
$ :10,000,00
S
10,000.00
$ -
-- 3,960 00 :
$
3:.160.00
$ 2,06700
$
.2,06700
Subtotal Part B - (Items 19 to 32
S
57,330.00
$
48,00000
$
45,614 00
Total Bid Base Items (Items 1 through 32)
S
342,710.00
$
345,000.00
S
348.140.00
ALL BIDS RECEIVED:-
CONTRACTOR-
TOTAL BASE BID
Sequel Contract ors, Inc:
$ 342,71000
Onyx Paving Company, Inc,,.
$ 345,000,00
All American Asphalt
$ 348,340,00
Shawnan
$ 348,460.00
PALP, Inc dba Excel Paving
$ 381,925,00