Loading...
HomeMy WebLinkAbout2. PLN-18-00102 - 7224 FlorenceSTAFF REPORT PLANNING DIVISION DATE: JUNE 19, 2019 TO: PLANNING COMMISSION SUBMITTED BY: ALDO E. SCHINDLER, DIRECTOR OF COMMUNITY DEVELOPMENT REVIEWED BY: CRYSTAL LANDAVAZO, CITY PLANNER PREPARED BY: ALFONSO HERNANDEZ, SENIOR PLANNER SUBJECT: PLN-18-00102 (SITE PLAN REVIEW, ZONE CHANGE) – A REQUEST TO CONSTRUCT A 12 UNIT MULTI-FAMILY DEVELOPMENT AND TO CHANGE THE ZONING FROM P-B (PARKING BUFFER) TO R-3 (MULITPLE-FAMILY RESIDENTIAL) LOCATION: 7224 FLORENCE AVENUE ZONING: R-3 (MULTIPLE-FAMILY RESIDENTIAL) & P-B (PARKING BUFFER) REPORT SUMMARY This is a request for a Site Plan Review (SPR) to construct a twelve unit multifamily development. The project will consist of six separate three-story buildings, each building designed with two side-by-side units of 1,701 square feet. In conjunction with this application, a Zone Change is requested to remove the zoning designation of P-B (Parking Buffer) from the rear 46 feet of the property and convert the entire lot to R-3 (Multiple-Family Residential). Based on the analysis contained in this report, staff is recommending the Planning Commission adopt the following titled resolutions: 1.A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DOWNEY APPROVING A SITE PLAN REVIEW (PLN-18-00102), THEREBY ALLOWING THE CONSTRUCTION OF TWELVE 1,701 SQUARE FOOT RESIDENTIAL UNITS LOCATED AT 7224 FLORENCE AVENUE 2.A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DOWNEY RECOMMENDING THAT THE CITY COUNCIL APPROVE A ZONING MAP AMENDMENT (PLN-18-00102), THEREBY CHANGING THE ZONING DESIGNATION OF THE SOUTH 46 FEET OF THE PROPERTY FROM P-B (PARKING BUFFER) TO R-3 (MULTIPLE-FAMILY RESIDENTIAL) LOCATED AT 7224 FLORENCE AVENUE PC AGENDA PAGE 1 Site Plan Review & Zone Change - PLN-18-00102 June 19, 2019 - Page 2 BACKGROUND The site is currently developed with six buildings consisting of six separate dwelling units. The units vary in size with the smallest dwelling at 776 square feet and the largest at 956 square feet. Construction of all units was completed in 1955, and no major renovations have occurred since that time. The site is currently non-conforming as it relates to side and rear setbacks, parking, and landscaping. Overall, the site is a .72 acre interior lot. It is within the city’s R-3 (Multiple-Family Residential) zone, and has a General Plan land use designation of Medium Density Residential. The site is accessible via a “frontage road” (or side road) branching out from Florence Avenue. The subject site is surrounded by single-family dwellings zoned R-1 to the south, and multifamily uses in the adjacent R-3 zones to the east and west. To the east of the property is the Rio Hondo River and Florence Avenue overpass. Lastly, the parcel located to the north is zoned C-2, but occupied by apartment buildings. On June 28, 2018 the applicant filed a request for a Site Plan Review and Zone Change. Subsequently, the applicant was issued an incomplete letter on July 26, 2018. A complete letter was issued on November 21, 2018, but later deemed incomplete again, with the permission of the applicant, in order to correct the design of the building. A final complete letter was issued on June 5, 2019. On June 5, 2019, notice of the pending public hearing was published in the Downey Patriot and mailed to all property owners within 500 feet of the subject property. Existing Front Elevation Along Florence Avenue DISCUSSION Site Plan Review The Site Plan Review includes evaluations to the proposed site changes, landscaping, and compliance with the Downey Municipal Code. The proposed development includes demolition of the existing buildings onsite and the construction of twelve dwelling units. The proposed units will be located within six separate three-story buildings, each with two side-by-side 1,701 square foot dwelling units. Each dwelling unit will also include a 400 square foot two-car garage, 110 square feet of storage, and a 67 square foot balcony. PC AGENDA PAGE 2 Site Plan Review & Zone Change - PLN-18-00102 June 19, 2019 - Page 3 Overall, the site will have a total habitable space of 26,532 square feet. The project will also include 6,094 square feet of landscape area, two separate recreational areas with amenities, and six guest parking spaces (30 parking spaces overall). Major development standards for this project are as follows: Standard Zoning Code Standards Proposed Lot Coverage 50% 25.23% Building Height 35 ft. / 3 stories 35 ft. / 3 stories Setbacks: Front Rear (3 story building abutting an R-1) Side 15 ft. Min. 46 ft. Min. 5 ft. Min. 17 ft. 94 ft. 2 in. 5 ft. Parking 30 Spaces (24 covered, 6 guest parking) 30 spaces (24 covered, 6 guest parking) All elements of the proposed Site Plan Review are in compliance, or are conditioned to comply, with the Downey Municipal Code. Architecture The proposed design for all buildings is most closely associated with craftsman style architecture. All buildings are designed nearly identical in terms of material and interior layout, but some deviation does exist within the exterior elevations. The units fronting the street are designed to be oriented towards Florence Avenue, unlike the other units which are oriented to the interior of the lot. Two separate color patterns will be used throughout to provide added deviation among the six separate buildings. The building materials include a weathered brick veneer entirely around the first floor and at the second floor for the front and outer side elevations (Rough “Heritage” Texture Brick; Color: “Autumn Lane”). All other façade elevations, including the entire third floor, will consist of horizontal hardiplank made to look like wood siding (Smooth Texture; Color: “Artichoke” and “Rocky River”). The buildings will incorporate accent features such as recessed windows, tapered columns, rafter tails, exposed beams, and planter boxes to further enhance modulation on the buildings. PC AGENDA PAGE 3 Site Plan Review & Zone Change - PLN-18-00102 June 19, 2019 - Page 4 Front Elevation (Facing Florence Ave.) Rear Elevation Interior Side Elevation Outer Side Elevation PC AGENDA PAGE 4 Site Plan Review & Zone Change - PLN-18-00102 June 19, 2019 - Page 5 Zone Change The site currently consists of two zoning designations, R-3 and P-B (for the rear 46 feet). The zone change is requested to eliminate the P-B zone and designate the entire lot as an R-3 zone. The R-3 designation is consistent with the adjacent lots facing Florence Avenue. The proposed zoning is also consistent with the General Plan land use designation (Medium Density Residential) for the site. The P-B zone is identified as obsolete within the City’s Zoning Map and holds no applicable provisions upon the subject property. Standards previously applicable to the P-B zone were eliminated as part of a previous comprehensive update to the Zoning Ordinance, on October 14, 2008. Although the zone was eliminated from the code, modifications were not made to the zoning map and the map still contains the P-B zones. This application is an effort to amend the City’s Zoning Map to achieve consistency with the Downey Municipal Code and General Plan. DEVELOPMENT REVIEW COMMITTEE On July 26, 2018, the Development Review Committee (DRC) discussed and evaluated the project as it pertains to Planning, Police, Fire, Public Works, and Building and Safety matters. The Fire Department expressed concerns regarding fire access to the site, and protection of the site. Therefore, the applicant is conditioned to locate a fire hydrant on site and include a truck turnaround at the rear of the property. No other departments expressed concerns or opposition over the project, and issued standard conditions. Recommended conditions of approval have been included in the attached Resolution to address potential impacts. ENVIRONMENTAL ANALYSIS Staff has reviewed the proposed Site Plan Review for compliance with the California Environmental Quality Act (CEQA). Upon completion of this review, staff has determined that this request is categorically exempt from CEQA, pursuant to Guideline Section No. 15332 (Class 32 – In-Fill Development Projects). Class 32 exemptions consist of projects: consistent with the City’s General Plan and Municipal Code, on a site no greater than five (5) acres and surrounded by urban uses, with no value as a habitat for threatened species, in which an approval would not result in any significant impacts, and the site can be adequately served by all required utilities. FINDINGS Pursuant to Municipal Code Section 9820.08, there are seven (7) findings that must be adopted prior to approving the Site Plan Review. The findings are as follows: A. That the site plan is consistent with the goals and polices embodied in the General Plan and other applicable plans and policies adopted by the Council; The project is consistent with all applicable goals and policies specified in the City’s General Plan and policies adopted by the City Council. In addition, the project’s objective to revitalize the site helps achieve various long-term goals. Specifically, the following policies are promoted by the Site Plan Review: Policy 8.1.1 – Promote architectural design of the highest quality. Policy 8.2.2 – Promote the upgrading of properties. PC AGENDA PAGE 5 Site Plan Review & Zone Change - PLN-18-00102 June 19, 2019 - Page 6 The proposed architecture is a significant upgrade from the existing facilities on site, and is compatible in terms of use with surrounding properties although it will be newer than most developments within its proximity. The redevelopment of this site has the potential of serving as an example of higher quality architecture for future developments within the city. B. That the proposed development is in accordance with the purposes and objectives of this article and the zone in which the site is located; The purpose of the R-3 (Multiple-Family Residential) zone, as stated in the Downey Municipal Code, “is intended to provide for the development of multiple-family residential living areas compatible with the neighborhood environment and outdoor recreation potential of the community. Such areas are envisioned as being located and designed to be complementary to adjacent uses and at the same time provide suitable space for multiple-family living quarters.” The proposed application is in full conformance with the objectives stated above. C. That the proposed development’s site plan and its design features, including architecture and landscaping, will integrate harmoniously and enhance the character and design of the site, the immediate neighborhood, and the surrounding areas of the City; The proposed design of the project will integrate harmoniously with this area by providing aesthetically pleasing architecture and landscaping. The renovations to the site serve as a significant upgrade from the existing facilities. In addition, the streetscape will be enhanced as well as the transition from the street onto the site through the proposed landscaping, pedestrian access, and upgraded driveway and driveway approach. D. That the site plan and location of the buildings, parking areas, signs, landscaping, luminaries, and other site features indicate that proper consideration has been given to both the functional aspects of the site development, such as automobile and pedestrian circulation, and the visual effects of the development from the view of the public streets; The site design and overall integration of the landscaping, building orientation, and driveway access was well-envisioned by the applicant. The landscaping around the front building façades creates a nice transitional buffer between the residences and the public right of way and streets, particularly Florence Avenue. Exterior light lamps are carefully placed on the garage entrance and the front porch to ensure both vehicles and pedestrians are able to move around the site in a safe manner. This project also incorporates a decorative paved driveway entrances to the subject site, thus preventing a long barren driveway with no visual appeal. E. That the proposed development will improve the community appearance by preventing extremes of dissimilarity or monotony in new construction or in alterations of facilities; The proposed project reflects true craftsman style architecture, and reflects a high quality of architectural design. In addition, it is staff’s opinion that the proposed architectural style is neither dissimilar nor monotonous from other buildings in the area and this project will upgrade the overall appearance of the site and, in turn, improve the community appearance. Lastly, this proposed development will be keeping with the PC AGENDA PAGE 6 Site Plan Review & Zone Change - PLN-18-00102 June 19, 2019 - Page 7 quality of design recently approved projects within the city, but will not mimic those improvements. F. That the site plan and design considerations shall tend to upgrade property in the immediate neighborhood and surrounding areas with an accompanying betterment of conditions affecting the public health, safety, comfort, and welfare; The proposed architecture is a significant upgrade to the existing facilities on site, and is compatible with surrounding properties in terms of use and density although it will be newer than most developments within its proximity. In addition, the redevelopment of this site has the potential of serving as an example for higher quality architecture for future developments within the City of Downey. Lastly, the operational procedures of the proposed development are also conditioned in an effort to ensure that any potential effects in public health, safety, comfort and general welfare are mitigated as much as possible. G. That the proposed development’s site plan and its design features will include graffiti-resistant features and materials in accordance with the requirements of Section 4960 of Chapter 10 of Article IV of this Code; The project has been conditioned to meet the requirements specified in Section 4960 of the Downey Municipal Code. Section 4960 discusses the installation of anti-graffiti materials and the appropriate allotted time limit for the removal of graffiti. Pursuant to Municipal Code Section 9824.06, there are five (5) findings that must be adopted prior to approving the Zone Change. The findings are as follows: A. That the zone change is necessary and desirable for the development of the community in harmony with the objectives of the General Plan and this chapter and is in the interests or furtherance of the public health, safety, and general welfare. The City Council adopted a comprehensive update to the Zoning Ordinance, on October 14, 2008, which eliminated the P-B (Parking Buffer) zoning category. The change of zone from P-B to R-3 (Multiple-Family Residential) will make the zoning of the site not only consistent with the current Zoning Code but also with the General Plan, as the General Plan Land Use designation of the site is Medium Density Residential. Furthermore, the change in zoning for this property does not grant the subject property any added liberties it did not previously already have. Therefore, with this action there is no opportunity to negatively affect the public health, safety, or general welfare of the community. B. That the zone change will be compatible and complementary to existing conditions and adjoining property in the surrounding area. The site is currently comprised of two separate zones, R-3 and P-B for the rear 46’ feet of the lot. The intent of the zone change is to remove the P-B and provide one consistent zoning designation of R-3 for the entire site. This is ultimately compatible with the existing and proposed use on the subject property. It is also compatible with the surrounding area, as nearby properties located to the north and south on Florence Avenue are zoned R-3 or are currently developed multifamily uses. PC AGENDA PAGE 7 Site Plan Review & Zone Change - PLN-18-00102 June 19, 2019 - Page 8 C. That the site is adequate in size to accommodate the uses permitted in the zone requested and that all applicable property development standards can be complied with. The .72 acre site is substantially greater than the minimum required lot size of 10,000 square feet for the R-3 zone. The minimum lot size is established in part to ensure sites can appropriately meet development standards and accommodate allowed uses. Furthermore, this proposed development will comply with all applicable development standards. D. That the site properly relates to streets and highways designed and fully improved to carry the type and quantity of traffic that is expected to be generated in the area and that utilities exist or are planned which will adequately serve the property as rezoned. The zone change does not alter the existing development potential of the site because the R-3 (Multiple-Family Residential) zone already exists for the majority of the lot. The R-3 zone is also present among adjacent properties facing Florence Avenue. Therefore, the existing streets are already designed to accommodate the traffic generated by multifamily developments. The same is true of existing utilities and other infrastructure. E. That the proposed zone change is in general conformance with the General Plan and General Plan land use designation for the parcel. The zone change will eliminate the current inconstancy between the zoning code and the zoning map and General Plan. The entire property will now be zoned R-3 (Multiple- Family Residential) as it is intended per the General Plan. CORRESPONDENCE As of the date that this report was printed, staff has not received any correspondence regarding this application. CONCLUSION Based on the analysis contained within this report, staff is concluding that the proposed Site Plan Review and Zone Change (PLN-18-00102) aim to enhance the site and surrounding area, and in addition will not create significant adverse effects to adjoining properties. Furthermore, staff is concluding that all findings required for approval can be made in a positive manner. As such, staff is recommending that the Planning Commission approve the application (PLN-18- 00102), thereby approving a twelve unit multifamily development. EXHIBITS A. Maps B. Draft Resolutions C. Project Plans PC AGENDA PAGE 8 Site Plan Review & Zone Change - PLN-18-00102 June 19, 2019 - Page 9 Location Aerial Photograph Subject Property PC AGENDA PAGE 9 Site Plan Review & Zone Change - PLN-18-00102 June 19, 2019 - Page 10 Zoning PC AGENDA PAGE 10 RESOLUTION NO. 19-____ A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DOWNEY RECOMMENDING THAT THE CITY COUNCIL APPROVE A ZONING MAP AMENDMENT (PLN-18-00102), THEREBY CHANGING THE ZONING DESIGNATION OF THE SOUTH 46 FEET OF THE PROPERTY FROM P-B (PARKING BUFFER) TO R-3 (MULTIPLE-FAMILY RESIDENTIAL) LOCATED AT 7224 FLORENCE AVENUE THE PLANNING COMMISSION OF THE CITY OF DOWNEY DOES RESOLVE AS FOLLOWS: SECTION 1. The Planning Commission of the City of Downey does hereby find, determine and declare that: A. On June 28, 2018, the applicant filed a request for Site Plan Review and Zone Change (PLN-18-00102) to construct twelve new dwelling units and the change the zone from P-B (Parking Buffer) to R-3 (Multiple-Family Residential); and, B. On July 26, 2018, the applicant was issued a letter deeming the application incomplete; and, C. On November 21, 2018, the application was deemed complete after all required documents were submitted and reviewed; and, D. On January 24, 2019, the application was again deemed incomplete with permission from the applicant; and, E. On June 6, 2019, the application was deemed complete after all required documents were submitted and reviewed; and, F. On June 6, 2019, a notice of the public hearing was sent to all property owners within 500’ of the subject site and the notice was published in Downey Patriot; and, G. The Planning Commission held a duly noticed public hearing on June 19, 2019, and after fully considering all oral and written testimony, facts, and opinions offered at the aforesaid public hearing adopted this resolution. SECTION 2. The Planning Commission further finds, determines, and declares that the proposed project was reviewed for compliance with the California Environmental Quality Act (CEQA), and is exempt from CEQA, pursuant to Guideline Section 15061 (b)(3). SECTION 3. Having considered all of the oral and written evidence presented to it at said public hearings regarding the Zone Change, the Planning Commission further finds, determines and declares that: A. The zone change is necessary and desirable for the development of the community in harmony with the objectives of the General Plan and this chapter and is in the interests or furtherance of the public health, safety, and general welfare. The City Council adopted a comprehensive update to the Zoning PC AGENDA PAGE 11 Resolution No. 19- Downey Planning Commission PLN-18-00102 – 7224 Florence Avenue June 19, 2019 - Page 2 Ordinance, on October 14, 2008, which eliminated the P-B (Parking Buffer) zoning category. The change of zone from P-B to R-3 (Multiple-Family Residential) will make the zoning of the site not only consistent with the current Zoning Code but also with the General Plan, as the General Plan Land Use designation of the site is Medium Density Residential. Furthermore, the change in zoning for this property does not grant the subject property any added liberties it did not previously already have. Therefore, with this action there is no opportunity to negatively affect the public health, safety, or general welfare of the community. B. The zone change will be compatible and complementary to existing conditions and adjoining property in the surrounding area. The site is currently comprised of two separate zones, R-3 and P-B for the rear 46’ feet of the lot. The intent of the zone change is to remove the P-B and provide one consistent zoning designation of R-3 for the entire site. This is ultimately compatible with the existing and proposed use on the subject property. It is also compatible with the surrounding area, as nearby properties located to the north and south on Florence Avenue are zoned R-3 or are currently developed multifamily uses. C. The site is adequate in size to accommodate the uses permitted in the zone requested and complies with all applicable property development standards. The .72 acre site is substantially greater than the minimum required lot size of 10,000 square feet for the R-3 zone. The minimum lot size is established in part to ensure sites can appropriately meet development standards and accommodate allowed uses. Furthermore, this proposed development will comply with all applicable development standards. D. The site properly relates to streets and highways designed and fully improved to carry the type and quantity of traffic that is expected to be generated in the area and that utilities exist or are planned which will adequately serve the property as rezoned. The zone change does not alter the existing development potential of the site because the R-3 (Multiple-Family Residential) zone already exists for the majority of the lot. The R-3 zone is also present among adjacent properties facing Florence Avenue. Therefore, the existing streets are already designed to accommodate the traffic generated by multifamily developments. The same is true of existing utilities and other infrastructure. E. The proposed zone change is in general conformance with the General Plan and General Plan land use designation for the parcel. The zone change will eliminate the current inconstancy between the zoning code and the zoning map and General Plan. The entire property will now be zoned R-3 (Multiple-Family Residential) as it is intended per the General Plan. SECTION 4. Based upon the findings set forth in Sections 1 through 3 of this resolution, the Planning Commission of the City of Downey hereby recommends that the City Council approve a zone change (PLN-18-00102) and update the Comprehensive Zoning Map to rezone the subject property to R-3 (Multiple-Family Residential), as outlined in Exhibit A of this resolution. PC AGENDA PAGE 12 Resolution No. 19- Downey Planning Commission PLN-18-00102 – 7224 Florence Avenue June 19, 2019 - Page 3 SECTION 5. The Secretary shall certify the adoption of this Resolution. PASSED, APPROVED AND ADOPTED this 19th day of June, 2019. Steven Dominguez, Chairman City Planning Commission I HEREBY CERTIFY that the foregoing is a true copy of a Resolution adopted by the Planning Commission of the City of Downey at a regular meeting thereof, held on the 19th day of June, 2019, by the following vote, to wit: AYES: COMMISSIONERS: NOES: COMMISSIONERS: ABSENT: COMMISSIONERS: ABSTAIN: COMMISSIONERS: Mary Cavanagh, Secretary City Planning Commission PC AGENDA PAGE 13 Resolution No. 19- Downey Planning Commission PLN-18-00102 – 7224 Florence Avenue June 19, 2019 - Page 4 EXHIBIT A Existing Zoning Proposed Zoning P-B PC AGENDA PAGE 14 RESOLUTION NO. 19- A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DOWNEY APPROVING A SITE PLAN REVIEW (PLN-18-00102), THEREBY ALLOWING THE CONSTRUCTION OF TWELVE 1,701 SQUARE FOOT RESIDENTIAL UNITS LOCATED AT 7224 FLORENCE AVENUE THE PLANNING COMMISSION OF THE CITY OF DOWNEY DOES RESOLVE AS FOLLOWS: SECTION 1. The Planning Commission of the City of Downey does hereby find, determine and declare that: A. On June 28, 2018, the applicant filed a request for Site Plan Review and Zone Change (PLN-18-00102) to construct twelve new dwelling units and the change the zone from P-B (Parking Buffer) to R-3 (Multiple-Family Residential); and, B. On July 26, 2018, the applicant was issued a letter deeming the application incomplete; and, C. On November 21, 2018, the application was deemed complete after all required documents were submitted and reviewed; and, D. On January 24, 2019, the application was again deemed incomplete with permission from the applicant; and, E. On June 6, 2019, the application was deemed complete after all required documents were submitted and reviewed; and, F. On June 6, 2019, a notice of the public hearing was sent to all property owners within 500’ of the subject site and the notice was published in Downey Patriot; and, G. The Planning Commission held a duly noticed public hearing on June 19, 2019, and after fully considering all oral and written testimony, facts, and opinions offered at the aforesaid public hearing adopted this resolution. SECTION 2. The Planning Commission further finds, determines and declares that the proposed project was reviewed for compliance with the California Environmental Quality Act (CEQA), and is categorially exempt from CEQA, pursuant to Guideline Section 15332 (Class 32, In-Fill Development Projects). Class 32 consists of projects that are consistent with the General Plan and zoning, on a site that is less than five acres and does not have any protected habitat, and can be adequately served by utilities. The proposed project meets all of these requirements, thus qualifies for a Class 32 exemption. SECTION 3. Having considered all of the oral and written evidence presented to it at said public hearings regarding the Site Plan Review, the Planning Commission further finds, determines and declares that: A. The site plan is consistent with the goals and polices embodied in the General Plan and other applicable plans and policies adopted by the Council. In addition, the project’s objective to revitalize the site helps achieve various long-term goals. Specifically, the following policies are promoted by the Site Plan Review: PC AGENDA PAGE 15 Resolution No. 19- Downey Planning Commission PLN-18-00102 – 7224 Florence Avenue June 19, 2019 - Page 2 Policy 8.1.1 – Promote architectural design of the highest quality. Policy 8.2.2 – Promote the upgrading of properties. The proposed architecture is a significant upgrade to the existing facilities on site, and is compatible in terms of use with surrounding properties although it will be newer than most developments within its proximity. The redevelopment of this site has the potential of serving as an example of higher quality architecture for future developments within the city. B. The proposed development is in accordance with the purposes and objectives of this article and the zone in which the site is located. The purpose of the R-3 (Multiple-Family Residential) zone, as stated in the Downey Municipal Code, “is intended to provide for the development of multiple-family residential living areas compatible with the neighborhood environment and outdoor recreation potential of the community. Such areas are envisioned as being located and designed to be complementary to adjacent uses and at the same time provide suitable space for multiple-family living quarters.” The proposed application is in full conformance with the objectives stated above. C. The proposed development’s site plan and its design features, including architecture and landscaping, will integrate harmoniously and enhance the character and design of the site, the immediate neighborhood, and the surrounding areas of the City. The proposed design of the project will integrate harmoniously with this area by providing aesthetically pleasing architecture and landscaping. The renovations to the site serve as a significant upgrade from the existing facilities. In addition, the streetscape will be enhanced as well as the transition from the street onto the site through the proposed landscaping, pedestrian access, and upgraded driveway and driveway approach. D. The site plan and location of the buildings, parking areas, signs, landscaping, luminaries, and other site features indicate that proper consideration has been given to both the functional aspects of the site development, such as automobile and pedestrian circulation, and the visual effects of the development from the view of the public streets. The site design and overall integration of the landscaping, building orientation, and driveway access was well-envisioned by the applicant. The landscaping around the front building façades creates a nice transitional buffer between the residences and the public right of way and streets, particularly Florence Avenue. Exterior light lamps are carefully placed on the garage entrance and the front porch to ensure both vehicles and pedestrians are able to move around the site in a safe manner. This project also incorporates decorative stamped concrete at the driveway entrances to the subject site, thus preventing a long barren driveway with no visual appeal. E. The proposed development will improve the community appearance by preventing extremes of dissimilarity or monotony in new construction or in alterations of facilities. The proposed project reflects true craftsman style architecture, and reflects a high quality of architectural design. In addition, it is staff’s opinion that the proposed architectural style is neither dissimilar nor monotonous from other buildings in the area and this project will upgrade the overall appearance of the site and, in turn, improve the community appearance. PC AGENDA PAGE 16 Resolution No. 19- Downey Planning Commission PLN-18-00102 – 7224 Florence Avenue June 19, 2019 - Page 3 Lastly, this proposed development will be keeping with the quality of design recently approved projects within the city, but will not mimic those improvements. F. The site plan and design considerations shall tend to upgrade property in the immediate neighborhood and surrounding areas with an accompanying betterment of conditions affecting the public health, safety, comfort, and welfare. The proposed architecture is a significant upgrade to the existing facilities on site, and is compatible with surrounding properties in terms of use and density although it will be newer than most developments within its proximity. In addition, the redevelopment of this site has the potential of serving as an example for higher quality architecture for future developments within the City of Downey. Lastly, the operational procedures of the proposed development are also conditioned in an effort to ensure that any potential effects in public health, safety, comfort and general welfare are mitigated as much as possible. G. The proposed development’s site plan and its design features will include graffiti- resistant features and materials in accordance with the requirements of Section 4960 of Chapter 10 of Article IV of this Code. Section 4960 discusses the installation of anti-graffiti materials and the appropriate allotted time limit for the removal of graffiti. SECTION 4. Based upon the findings set forth in Sections 1 through 3 of this Resolution, the Planning Commission of the City of Downey hereby approves a Site Plan Review (PLN-18-00102), subject to conditions of approval attached hereto as Exhibit ‘A’, which are necessary to preserve the health, safety and general welfare of the community and enable the Planning Commission to make the findings set forth in the previous sections. The conditions are fair and reasonable for the accomplishment of these purposes. SECTION 5. The Secretary shall certify the adoption of this Resolution. PASSED, APPROVED AND ADOPTED this 19th day of June 2019. Steven Dominguez, Chairman City Planning Commission I HEREBY CERTIFY that the foregoing is a true copy of a Resolution adopted by the Planning Commission of the City of Downey at a regular meeting thereof held on the 19th day of June 2019, by the following vote, to wit: AYES: COMMISSIONERS: NOES: COMMISSIONERS: ABSENT: COMMISSIONERS: ABSTAIN: COMMISSIONERS: Mary Cavanagh, Secretary City Planning Commission PC AGENDA PAGE 17 Resolution No. 19- Downey Planning Commission PLN-18-00102 – 7224 Florence Avenue June 19, 2019 - Page 4 PLN-18-00102 (SITE PLAN REVIEW) EXHIBIT A - CONDITIONS PLANNING 1. The approval of this Site Plan Review (PLN-18-00102) allows for the construction of six three-story buildings, each building designed with two side-by side units of 1,701 square feet. The development consists of twelve total dwelling units located at 7224 Florence Avenue. 2. No later than July 19, 2019, the applicant and the property owner shall sign and return an affidavit of Acceptance of Conditions, as provided by the City of Downey. 3. The site shall remain in substantial conformance with this request and the approved set of plans. 4. Approval of the Site Plan Review (PLN-18-00102) shall not be construed to mean any waiver of applicable and appropriate zoning regulations, or any Federal, State, County, and City laws and regulations. Unless otherwise expressly specified, all other requirements of the City of Downey Municipal Code shall apply. 5. Approval of the Site Plan Review (PLN-18-00102) shall become null and void should the City Council deny the Zone Change request associated with PLN-18-00102. 6. The Owner/Applicant agrees, as a condition of approval of this resolution, to indemnify, defend and hold harmless, at Applicant's expense, City and City's agents, officers and employees from and against any claim, action or proceeding commenced within the time period provided in Government Code Section 66499.37 to attack, review, set aside, void or annul the approval of this resolution, to challenge the determination made by City under the California Environmental Quality Act or to challenge the reasonableness, legality or validity of any condition attached hereto. City shall promptly notify Applicant of any such claim, action or proceeding to which City receives notice, and City will cooperate fully with Applicant in the defense thereof. Applicant shall reimburse the City for any court costs and attorney's fees that the City may be required to pay as a result of any such claim, action or proceeding. City may, in its sole discretion, participate in the defense of any such claim, action or proceeding, but such participation shall not relieve Applicant of the obligations of this condition. 7. The City Planner is authorized to make minor modifications to the approved preliminary plans or any of the conditions if such modifications shall achieve substantially the same results as would strict compliance with said plans and conditions. 8. For security purposes, lighting shall be placed in such a way as to illuminate the area surrounding the trash enclosure. This lighting shall be un-switched and photo-sensor controlled. All lighting must be designed to eliminate spillover to the street and adjoining properties and to ensure lighting is shielded so as not to direct light on any street or abutting property. PC AGENDA PAGE 18 Resolution No. 19- Downey Planning Commission PLN-18-00102 – 7224 Florence Avenue June 19, 2019 - Page 5 9. Property line walls and trash enclosures must remain decorative in nature, and pursuant to Downey Municipal Code Sections 9520 and 9528. 10. All buildings and walls must be finished with graffiti resistant materials pursuant to Downey Municipal Code Section 4960. 11. Any graffiti applied to the site shall be removed within 48 hours. 12. The approved craftsman architectural style, finish material, and colors shall remain in strict conformance with the approved elevations and materials board reflecting weathered brick veneer, siding, and finishes. Changes to the facades and/or colors shall be subject to the review and approval of the City Planner. At his/her discretion, the City Planner may refer changes to the facades and/or colors to the Planning Commission for consideration. 13. All finished materials must be in full conformance with the submitted materials board reflecting weathered brick veneer, siding, and finishes. Changes to building materials (including but not limited to window type, wall texture, and brick veneer) must be granted by the City Planner prior to the issuance of Building Permits. 14. The applicant shall comply with the art in public places requirements set forth in Downey Municipal Code 8950 et seq. This shall include payment of all required fees prior to the issuance of building permits. Should the applicant exercise their right to install public art on site, the public art application (including payment of all deposits) shall be submitted prior to the issuance of building permits. 15. The Applicant shall incorporate a copy of this Exhibit A - Conditions of Approval, into the approved set of building plans. 16. All driveway approaches shall be improved with radius returns. 17. Driveway approaches shall be improved with stamped color concrete and/or pavers across the driveways. Specifications and details of the pavers must be provide before issuing building permit and must be as approved by the City Planner. 18. All landscaping must remain in compliance with the Downey Municipal Code, be composed of drought tolerant plants, and strictly conform to the approved set of plans. Any revisions to the proposed landscape plans will first require approval from the City Planner. 19. A minimum five (5) foot wide landscape strip shall be maintained along the southern property line abutting the proposed open space, which abuts R-1 zoned properties. This landscape area shall be maintained in conformance with landscape plan date stamped June 10, 2019, which requires trees or shrubs not less than six (6) feet in height at the time of planting, and not less than fifteen (15) feet in height at maturity. 20. Two amenities, one within each recreational area, must occupy 50% of the proposed open space, and comply with the provisions set forth in section 9312.08(b)(10) of the Downey Municipal Code. These amenities must be installed prior to the issuance of final building permits. The type of amenity must be proposed and approved by the City Planner prior to the issuance of building permits. PC AGENDA PAGE 19 Resolution No. 19- Downey Planning Commission PLN-18-00102 – 7224 Florence Avenue June 19, 2019 - Page 6 21. Prior to the final of building permits, all landscaping and irrigation shall be installed. The type, size and number of landscaping shall be as noted on the final approved landscape plan. All landscape shall be installed and permanently maintained. 22. Prior to the final of building permits, all installed landscaping shall be certified by a licensed Landscape Architect. The licensed Landscape Architect shall be on-site during the delivery of all trees to certify that all trees and plants are the right species and size. 23. All exterior lights on the property shall be LED and shall be directed, positioned, and/or shielded such that they do not illuminate surrounding properties and the public right-of- way. Parking lot light poles shall be round and have a decorative base. The style and size of the decorative base shall be approved by the City Planner prior to building permit final. 24. All above grade back-flow preventers, check valves, shall be painted green and screened from view from the public right-of-way. 25. All proposed above ground transformers shall be screened with live landscaping and wrapped in a screen print to mimic landscape. 26. Any bollards on the site shall be decorative in nature and shall be approved by the City Planner. BUILDING 27. All construction shall comply with the most recent adopted City and State building codes: a) 2019 California Building Code. b) 2019 California Electrical Code. c) 2019 California Mechanical Code. d) 2019 California Plumbing Code. e) 2019 California Fire Code. f) 2019 California Green Code. 28. Special Inspections – As indicated by California Building Code Section 1704, the owner shall employ one or more special inspectors who shall provide special inspections when required by CBC section 1704. Please contact the Building Division at time of plan submittal to obtain application for special inspections. 29. The Title Sheet of the plans shall include: a) Occupancy Group. b) Occupant Load. c) Description of use. d) Type of Construction. e) Height of Building. f) Floor area of building(s) and/or occupancy group(s). 30. School Impact fees shall be paid prior to permit issuance. PC AGENDA PAGE 20 Resolution No. 19- Downey Planning Commission PLN-18-00102 – 7224 Florence Avenue June 19, 2019 - Page 7 31. Dimensioned building setbacks and property lines, street centerlines and between buildings or other structures shall be designed on plot plan. 32. All property lines and easements must be shown on plot plan. A statement that such lines and easements are shown is required. 33. The project design will conform with energy conservation measures articulated in Title 24 of the California Code of Regulations and address measures to reduce energy consumption such as flow restrictors for toilets, low consumptions light fixtures, and insulation and shall use to the extent feasible draught landscaping. 34. A design professional will be required at time of construction drawings, to prepare plans for proposed improvements per the Business and Professions’ Code. 35. Public and private site improvements shall be designed in accordance with the Americans with Disabilities Act and Chapter 11 of the California Building Code. Site plan shall include a site accessibility plan identifying exterior routes of travel and detailing running slope, cross slope, width, pedestrian ramp, curb ramps, handrails, signage and truncated domes. Path of travel shall be provided from the public right of way and accessible parking to building. The design professional shall ensure that the site accessibility plan is compliance with the latest Federal and State regulations. 36. Construction hours shall be limited to 7:00 a.m. to 7:00 p.m., Monday through Friday and 8:00 a.m. to 5:00 p.m., Saturdays. There shall be no construction on the site outside of these hours. FIRE 37. The following conditions pertain to a limited fire review of a design review plan submittal. The comments contained herein shall not be construed as complete or encompassing all fire-life safety code requirements set forth in local, State, and/or National local codes. 38. Premises shall be appropriately addressed. An approved address identification shall be provided that is legible and placed in a position that is visible from the street/road. Sizing shall be approved and at a minimum meet requirement of CA Fire Code [CA Fire Code §505.1]. 39. Provide key boxes (e.g. Knox Boxes) to occupancy [CA Fire Code §506.1]. 40. Installation of any security gates across fire department access road; or which may interfere with fire access, shall be approved by the fire department [CA Fire Code §503.6]. 41. Dead-end access roads in excess of 150 feet in length shall be provided with an approved area for turnaround of fire apparatus [CA Fire Code §503.2.5]. Submit a fire access plan with detail on fire access roadway and turnaround. 42. Fire lane designation and stripping shall adhere to sign requirements set forth in Fire Code and Downey Municipal Code [CA Fire Code D103.6; DMC 3327]. PC AGENDA PAGE 21 Resolution No. 19- Downey Planning Commission PLN-18-00102 – 7224 Florence Avenue June 19, 2019 - Page 8 43. Deferred automatic fire sprinkler plan submittal required for Residential Group R-2 occupancy. Automatic fire sprinkler system design, installation, and testing shall be per NFPA 13R [CFC § 903]. Automatic fire sprinkler system shall be monitored for water flow. 44. Standpipe systems shall be installed were required by CA Fire Code in Residential Group R occupancies [CA Fire Code §905.3; 905.3.1]. 45. An approved on-site hydrant shall be provided in accordance with CA Fire Code and DMC 3610. 46. Deferred fire alarm and detection system plan submittal required. Automatic fire alarm and detection system design, installation, and testing shall be per NFPA 72 [CFC § 907]. Fire alarm manual system shall be installed in Group R-2 Occupancies per NFPA 72 and CFC §907.2.9 unless exceptions in §907.2.9.1 apply. 47. Smoke alarm shall installed in Group R-2 on ceiling or wall or each separate sleeping areas, rooms used for sleeping, in each story within the dwelling [CA Fire Code §907.2.11.2]. PUBLIC WORKS 48. Install LED street lights with full-cutoff fixture optics on new City standards with underground service. The applicant shall provide a site plan showing the location of the existing and proposed streetlights. Contact the Public Works Engineering Division for details. 49. All public utilities shall be installed underground. 50. Proposed public improvements shall comply with the latest edition of Standard Plans and Specifications for Public Works Construction, City of Downey standards and the Americans with Disabilities Act (ADA). 51. Owner/Applicant shall obtain permits from the Public Works Department for all improvements within the public right of way at least two weeks prior to commencing work. Contact Brian Aleman, Assistant Civil Engineer II, at (562) 904-7110 for information. 52. Owner/Applicant shall remove and replace damaged, uneven or sub-standard curb, gutter, sidewalk, driveway, disabled ramps, and pavement to the satisfaction of the Public Works Department. Contact the Public Works Inspector at (562) 904-7110 to identify the limits of the areas to be removed and replaced at least 48 hours prior to commencing work. 53. Prior to obtaining permits from Public Works Department, owner/applicant shall submit public improvement plan(s) for review and approval by Public Works Department. 54. All unused driveways shall be removed and constructed with full-height curb gutter, and sidewalk to match existing improvements. PC AGENDA PAGE 22 Resolution No. 19- Downey Planning Commission PLN-18-00102 – 7224 Florence Avenue June 19, 2019 - Page 9 55. Owner/Applicant shall construct two (2) new tree wells and plant new 24-inch box street trees along the property’s frontage along Florence Avenue Frontage Road. Protect any existing street trees in-place. Construct additional tree wells and plant additional 24-inch box street trees as needed to provide consistent spacing with the existing street trees (contact City arborist for tree species and spacing). The species of any new street trees to be planted shall be in accordance with the City’s Tree Master Plan. 56. If applicable owner/applicant shall construct new driveway at least five (5) feet away from any above-ground obstructions in the public right-of-way to the top of the driveway “X.” Otherwise, the obstruction shall be relocated at the applicant’s expense. Ensure that each driveway provides proper pedestrian access across, in compliance with ADA standards. The final layout and site driveway design shall be subject to the review and approval by the Public Works Department. 57. Remove and replace the asphalt street pavement from the edge of the gutter (gutter lip) to edge of gutter along the property’s frontage along Florence Avenue Frontage Road. Restore pavement markings as needed. Repair any visible utility-cut pavement failures up to the street centerline. 58. Remove all Underground Service Alert (USA) temporary pavement markings immediately following the completion of the work / Final permit inspection. 59. Paint property address numbers (4” height) on the curb face in front of the proposed development to the City’s satisfaction. 60. Any utilities that are in conflict with the development shall be relocated at the owner/applicant's expense. 61. Any acquired property in the form of easement, fee simple or irrevocable offer shall be in form acceptable by the city engineer and the city attorney prior to its recordation. 62. Upon completion of off-site public improvements, owner/applicant shall submit red-lined construction plans to City noting all changes to the plan. Such changes shall be incorporated into a final record drawing mylar which shall be signed and stamped by the original engineer and/or architect of record and submitted to the City along with digital files (AutoCAD – latest edition). 63. The owner/applicant shall furnish and install approximately 250 linear feet of public potable water improvements including installation of a new minimum 8-inch main on Florence Avenue Frontage Road, installation shall include all associated fittings and appurtenances. 64. The owner/applicant shall furnish and install separate water service lines, meters, and boxes for each tenant space. Connect new separate water service lines to new 8-inch main located on Florence Avenue Frontage Road. 65. The owner/applicant shall furnish and install one new fire hydrant and all associated materials in accordance with Fire Department and Department of Public Works standards and requirements including removal and abandonment of existing fire hydrants. New fire hydrants shall be connected to new 8-inch main located on Florence Avenue Frontage Road. PC AGENDA PAGE 23 Resolution No. 19- Downey Planning Commission PLN-18-00102 – 7224 Florence Avenue June 19, 2019 - Page 10 66. The owner/applicant shall retrofit any existing fire hydrants along the property frontage in accordance to latest Fire Department and Department of Public Works standards including but not limited to furnishing and installation of a new riser, fire hydrant head, and associated fittings. 67. The owner/applicant shall provide a fire sprinkler system(s) in accordance with Fire Department and Building and Safety standards. Should such fire sprinkler system(s) require the installation of dedicated fire service lateral(s), such lateral(s) shall be constructed in accordance with the latest Department of Public Works and Fire Department standards including backflow devices, fire department connections and other appurtenances as required. New fire service lateral(s) shall be connected to existing 8-inch main located on Florence Avenue Frontage Road and shall be dedicated for fire service only. 68. The owner/applicant shall furnish and install irrigation, domestic, and fire water backflow devices in accordance with City of Downey standards and as required by State and LA County Department of Public Health. Backflow devices shall be located on private property, readily accessible for emergency and inspection purposes, and screened from view by providing sufficient landscaping. 69. Backflow devices shall be certified in the field by a licensed LA County Department of Public Health certified tester prior to placing into service and such certification provided to City. 70. Existing potable and fire water service lines and associated appurtenances must be removed and abandoned from existing water main. 71. Owner or tenant must establish accounts with the City Cashier prior to the City activating and the tenant using any fire, potable, or recycled water service and meter. 72. The owner/applicant shall provide separate water improvement plan sets for review and approval consisting of the following: a) Potable Water Improvement Plans (all City-owned potable water and fire service lateral improvements) Final City approved potable water plans shall be submitted on mylars and shall be signed and stamped by a State of Calif ornia licensed civil engineer. Improvement plans for either potable or recycled water main improvements shall be both plan and profile. 73. Upon completion of water improvements, owner/applicant shall submit red-lined construction plans to City noting all changes to the plan and profile of all water improvements installed. Such changes shall be incorporated into a final record drawing mylar which shall be signed and stamped by the original engineer and/or architect of record and submitted to the City along with digital files (AutoCAD – latest edition). 74. The owner/applicant shall provide and record utility easement(s) for access to, and inspection and maintenance of, public water lines, meters, and appurtenances. 75. Submit a copy of the sewer plans to the City and to the Sanitation Districts of Los Angeles County for review and approval. Approval must be assured prior to filing this subdivision map. Contact Los Angeles County Sanitation District for their requirement. PC AGENDA PAGE 24 Resolution No. 19- Downey Planning Commission PLN-18-00102 – 7224 Florence Avenue June 19, 2019 - Page 11 76. The owner/applicant shall consult the Department of Public Works to determine the sewer location and design requirements. 77. The owner/applicant shall conduct a sewer capacity study. 78. All lots shall be served by adequately sized water supply facilities, which shall include fire hydrants of the size, type and location approved by the Fire Chief. 79. The water mains shall be of sufficient size to accommodate the total domestic and fire flow required for the subdivision. The domestic/fire water flows required are to be checked and approved by the Dept. of Public Works or the water provider for size and velocity. Fire flows required are to be determined by the Fire Chief. 80. Plans and specifications for the water supply system shall be submitted for approval to the Dept. of Public Works or the water company serving the site. The subdivider shall submit evidence, satisfactory to the City Engineer, indicating that the developer has entered into a subdivision agreement with financial security (such as bond, letter of credit, personal check, or a cashier check) with the servicing water provider guaranteeing payment and installation of the water improvements. 81. Any deviation from the city standards in constructing the water and sewer lines shall be approved by the Los Angeles County Health Department. 82. Submit an engineered grading plan and/or hydraulic calculations and site drainage plan for the site (prepared and sealed by a registered civil engineer in the State of California) accompanied by a soil and geology report for approval by the Engineering Division and Building and Safety Division. Lot(s) shall not have less than one (1%) percent gradient on any asphalt or non-paved surface, or less than one quarter (1/4%) percent gradient on any concrete surface. Provide the following information on plans: topographic site information, including all building pad and other elevations, dimensions/location of existing/proposed public improvements adjacent to project (i.e. street, sidewalk, parkway and driveway widths, catch basins, pedestrian ramps); the width and location of all existing and proposed easements, the dimensions and location of proposed dedications; (for alley dedications, show elevations of the four corners of the dedication and centerline of alley, existing and proposed underground utility connections); the location, depth and dimensions of potable water, reclaimed water and sanitary sewer lines; chemical and hazardous material storage, if any, including containment provisions; and the type of existing use, including the gross square footage of the building and its disposition; construction details of drainage devices and details of Low Impact Development (LID) plan. 83. Include any other applicable site-specific conditions. 84. The owner/applicant shall comply with the National Pollutant Discharge Elimination System (NPDES); Ordinance 1142 of the Downey Municipal Code (DMC); and the Low Impact Development (LID) Plan. Furthermore, the applicant shall be required to Certify and append Public Works standard “Attachment A” to all construction and grading plans as required by the LACoDPW Stormwater Quality Management Plan (SQMP). 85. The owner/applicant shall secure a WDID number along with his SWPPP. PC AGENDA PAGE 25 Resolution No. 19- Downey Planning Commission PLN-18-00102 – 7224 Florence Avenue June 19, 2019 - Page 12 86. If any hazardous material is encountered on the site that has the potential to reach the ground water supply, the owner/applicant shall secure a permit for the State Regional Water Quality Control Board. 87. If any hazardous material is encountered on the site, the owner/applicant shall secure an ID number from the EPA. 88. The owner/applicant shall deploy Best Management Practices during and after construction. 89. The owner/applicant hereby consents to the annexation of the property into the Downey City Lighting Maintenance District in accordance with Division 15 of the Streets and Highways Code, and to incorporation or annexation into a new or existing Benefit Assessment or Municipal Improvement District in accordance with Division 10 and Division 12 of the Streets and Highways Code and/or Division 2 of the Government Code of the State of California. 90. The facility must provide for recycling facilities, i.e., storage and handling areas for recycling facilities. 91. Complete a construction & demolition (C&D) waste management plan per Article V, Chapter 8 of the Downey Municipal Code. 92. Construct onsite pavement, consisting of a minimum section of 4” thick aggregate base, and a minimum 2-1/2” thick asphalt concrete pavement. 93. Remove all construction-related Underground Service Alert (USA) temporary pavement markings created as part of this project within the public-right-of-way in a timely manner. 94. The owner/applicant must comply with all applicable Federal, State and local rules and regulations, American Disabilities Act (ADA), including compliance with South Coast Air Quality Management District (SCAQMD) regulations. 95. Remove all construction graffiti created as part of this project within the public-right-of- way in a timely manner. 96. The owner/applicant shall provide that no easements of any type be granted over any portion of the subdivision to any agency, utility or organization (private or public), except to the City of Downey prior to recordation of the tract or parcel map. The owner/applicant shall grant easements in the name of the City, including: a) Vehicular easements b) Walkway easements c) Drainage easements d) Utility easements [End of Conditions] PC AGENDA PAGE 26 8+%+0+6;/#2 241,'%65+6'241,'%65+6' Planning Response 07.27.17 Planning Response 11.05.18 Planning Response 05.20.19 ‹7KH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21$OOULJKWVUHVHUYHG1R part of this document may be reproduced in any form or by any means without SHUPLVVLRQLQZULWLQJIURPWKH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21 T-1 03.20.18 RG 2017.019 ,74+5&+%6+10#.#22418#.5 5;/$1.5 DETAIL DETAIL IDENTIFICATION SHEET WHERE DRAWN WALL SECTION BUILDING SECTION EXTERIOR ELEVATION CUT LINE - DEFINES THE DETAILED ELEMENT INTERIOR ELEVATION DETAIL IDENTIFICATION SHEET WHERE DRAWN CUT LINE - DEFINES THE DETAILED ELEMENT DETAIL IDENTIFICATION SHEET WHERE DRAWN DETAIL IDENTIFICATION SHEET WHERE DRAWN DETAIL IDENTIFICATION SHEET WHERE DRAWN TRUE NORTH INDICATOR DOOR TAG DOOR NUMBER - REFER TO SCHEDULE WINDOW, RELITE OR LOUVER TAG EQUIPMENT TAG ROOM MARK ROOM NAME ROOM NUMBER COLUMN GRID PROJECT NORTH INDICATOR NORTH ARROW WINDOW LETTER - REFER TO SCHEDULE EQUIPMENT NUMBER - REFER TO SCHEDULE REVISION CLOUD AND DELTA 2 2412'46;&'5%4+26+10 #55'5514ž52#4%'.07/$'4ÄÄ )18'40+0)%1&'5 +557' %1&'  %#.+(140+#$7+.&+0)56#0&#4&5%1&'5  %#.+(140+#)4''0$7+.&+0)56#0&#4&5%1&'5  %#.+(140+#$7+.&+0)%1&'  %#.+(140+#':+56+0)$7+.&+0)%1&'  %#.+(140+#4'5+&'06+#.$7+.&+0)%1&'  %#.+(140+#'0'4);%1&'  %#.+(140+#/'%*#0+%#.%1&'  %#.+(140+#/'%*#0+%#.%1&'  %#.+(140+#2.7/$+0)%1&'  %#.+(140+#'.'%64+%#.%1&'  %+6;1(&190';/70+%+2#.%1&' #$$4'8+#6+105 ACOUS. ACOUSTICAL /1/#5104;12'0+0) #&#AMERICANS WITH DISABILITIES ACT /4/1+5674'4'5+56#06 #&,ADJACENT /7../7..+10 #((ABOVE FINISHED FLOOR /6&/1706'& #*,#76*14+6;*#8+0) ,74+5&+%6+10 0+% 016+0%1064#%6 #.7/ #.7/+07//6./'6#. #01& #01&+<'&0+% 016+0%1064#%6 #2241: #2241:+/#6'.;01/ 01/+0#. $& $1#4&065 016615%#.' $(( $'.19(+0+5*'&(.114 1#18'4#.. $.&) $7+.&+0)1%10%'06'4 $.- $.1%-1&18'4(.19&4#+0 $.-ž) $.1%-+0)1*18'4*'#& $/ $'#/12) 12'0+0) $16 $1661/122 12215+6' $690 $'69''0 2602#46+6+10 %$ %#6%*$#5+0 2'42 2'42'0&+%7.#4 %) %140'4)7#4&2.2.#6' %+ %#56+410 2.2412'46;.+0' %+2 %#56+02.#%'2.#5.#/ 2.#56+%.#/+0#6' %. %'06'4.+0'2.;9& 2.;911& %.4CLEAR 2.$) 2.7/$+0) %.)CEILING 20.2#0'.2#0'.+0) %/7 CONCRETE MASONRY UNIT 242#+4 %1.COLUMN 241, 241,'%6 %10%CONCRETE 248 24'5574'4'&7%+0) 8#.8' %106CONTINUOUS 2624'5574'64'#6'& %10564 %105647%6+10 3637#44;6+.' %6 %'4#/+%6+.'364 37#46'4 &$.&17$.'44#&+75 &+/&+/'05+10 4%4'(4+)'4#6+10 %1064#%614 &6. &'6#+.4%2 4'(.'%6'&%'+.+0)2.#0 &( &4+0-+0)(1706#+0 4&411(&4#+0 &5 &19052176 4.4#+0.'#&'4 &9) &4#9+0)4'%ž& 4'%'+8'& '# '#%*4'(4+) 4'(4+)'4#6+10 '(5 ':6'4+14(+0+5*5;56'/ 4'+0( 4'+0(14%+0) '+(5 ':6'4+14+057.#6+10#0& (+0+5*5;56'/ 4'3ž& 4'37+4'& '.'8 '.'8#6+10 41417)*12'0+0) '.'% '.'%64+%#.5#0 5#0+6#4; '0%. '0%.1574'5%51.+&%14' '3 '37#.5*65*''6 ':* ':*#756 5+/5+/+.#4 ':+56 ':+56+0)5+1 5722.+'&#0&+056#..'& $;190'4 ' ':+56+0)5+8 5722.+'&#0&+056#..'& $;8'0&14 ':6':6'4+14 51+% 5722.+'&$;190'4 +056#..'&$; %1064#%614 (& (.114&4#+0 53537#4' (&0 (170&#6+10 555'48+%'5+0- (( (#%614;(+0+5*556 56#+0.'5556''. (*5 (.#6*'#&5%4'9 56&56#0&#4& (. (.114 56.56''. (+1 (740+5*'&#0&+056#..'& $;190'4 5647%6 5647%674' 5647%674#. (+0 (+0+5*5752 5752'0&'& (422 (+$'44'+0(14%'&2.#56+% 2#0'. 5;55;56'/ (46 (+4'4'6#4&#0664'#6'& 664'#& (6) (116+0)61, 6121(,1+56 )# )#7)'61/ 6121(/#5104; )#.8 )#.8#0+<'&612 6121(2#4#2'6 )% )'0'4#.%1064#%614 615 6121(56''. )9$ );257/9#..$1#4&619 6121(9#.. *$*15'$+$$6 $612#0&$1661/ */*1..19/'6#.6'.6'.'2*10' *14+< *14+<106#.6'/2 6'/2'4'& *2*+)*21+06 6;26;2+%#. *6*'+)*6 76+. 76+.+6; *64 *'#6'4 701 70.'55016'& 16*'49+5' *8#% *'#6+0)8'06+.#6+10#0& #+4%10&+6+10+0) 8%6 8+0;.%1/215+6+106+.' +057. +057.#6+10 8'468'46+%#. +06+06'4+14 8+( 8'4+(;+0(+'.& ,6,65 ,1+06,1+065 99+6* ..10).'0)6*91 9+6*176 .#/ .#/+0#6'.#/+0#6'& 9&911& .( .+0'#4(''6 9&99+0&19 .2.1921+06 9*5 9'.&'&*'#&567& .6(+:6.+)*6(+:674'929#6'42411( .696.+)*69'+)*6 949#6'44'5+56#06 .+3 .+37+&969'+)*6 /#: /#:+/7/99(9'.&'&9+4'(#$4+% /$5 /'6#.$7+.&+0)5722.+'4 ;&;#4&&4#+0 /'%* /'%*#0+%#.969'+)*6 /() /#07(#%674+0)99(9'.&'&9+4'(#$4+% /(4/#07(#%674'4 ;&;#4&&4#+0 /*/#0*1.' /+0 /+0+/7/ /+2/'6#.+057.#6'&2#0'. /+5% /+5%'..#0'175 WALL TAG WALL LETTER - REFER TO SCHEDULE1 241,'%6&'5%4+26+10 5%12'1(914- $7+.&+0)5+6' 1((5+6'$7+.&+0) 6*'241,'%6+56*'&'/1.+6+101(':+56+0) +/2418'/'065#0&%105647%6+101(0'9 Ä5614;/7.6+Ä(#/+.;#2#46/'06+/2418'/'065 6*#6%1/24+5'&'6#%*'&5647%674'5'#%* 9+6*#66#%*'&&9'..+0)70+65#0&5+6' +/2418'/'065+0%.7&+0)2#8'/'06(14 2'&'564+#05#0&8'*+%7.#475'#4'#51( .#0&5%#2+0)#0&10'/107/'065+)0&9'..+0) 70+65#4'#2#46/'065 &'/1.+6+101(':+56+0)+/2418'/'065 0'9%105647%6+101(Ä5614;Ä70+6$7+.&+0)5 +0%.7&+0)5647%674' (+0+5*'5'.'%64+%#. /'%*#0+%#. 2.7/$+0)5;56'/5#22.+#0%'5 '37+2/'06 5+6' &'/1.+6+101(':+56+0)+/2418'/'065 0'92'&'564+#02#8+0)8'*+%7.#42#8+0)%74$ )766'4.#0&5%#2+0) +44+)#6+10/107/'065+)0 .+)*6+0) 1((5+6' 010' 5*''6+0&': 241,'%66'#/ 190'4 2#8#0/#&&+ 5176*564''657+6' %'44+615%#  #4%*+6'%6 6*')¥.8'<Ä#4#0)1#4%*+6'%674#. %14214#6+10 /1410)1564''6 (1706#+08#..';%#  %106#%64#/¬0)¥.8'<Ä#4#0)1 #4%*%Ä .#0&5%#2' #4%*+6'%6 %4#+)9'$'4 #551%+#6'5 5#06+#)1#8'07' .10)$'#%*%#  %106#%6%4#+)9'$'44.# 01&'5%4+26+10 2.#0 $.&) 6Ä6+6.'5*''6241,'%6&#6# .24'.+/+0#4;.#0&5%#2'2.#0 #5Ä&'/1.+6+105+6'2.#05+6'2.#0 #5Ä#%%'555+6'2.#05+6'#4'#52.#0 #5Ä '0.#4)'&2#46+#.5+6'2.#0 #ÄC 56(.1142.#0 4'8 $%'( #ÄC 0&(.1142.#0 4'8 $%'( #ÄC 4&(.1142.#0 4'8 $%'( #ÄD 56(.1142.#0 4'8 #& #ÄD 0&(.1142.#0 4'8 #& #ÄD 4&(.1142.#0 4'8 #& #ÄC 411(2.#0 4'8 $%'( #ÄD 411(2.#00&(.114 4'8 #& #ÄD 411(2.#04&(.114 4'8 #& #ÄD 411(2.#0 4'8 #& /5Ä# /#6'4+#.%1.145#/2.'5%1.145%*'/'# /5Ä$ /#6'4+#.%1.145#/2.'5%1.145%*'/'# #ÄC ':6'4+14'.'8#6+10(4106 4'8 $%'( #ÄC ':6'4+14'.'8#6+105+&'5 4'8 $%'( #ÄC ':6'4+14'.'8#6+104'#4 4'8 $%'( #ÄD ':6'4+14'.'8#6+10(4106 4'8 #& #ÄD ':6'4+14'.'8#6+105+&'5 4'8 #& #ÄD ':6'4+14'.'8#6+104'#4 4'8 #& #Ä 2#46+#.5+6'5'%6+10 )'0'4#.016'5 )'0'4#.4'37+4'/'065 #4%*+6'%674#.&4#9+0)5*#8'$''024'2#4'&10#014+)+0#.5*''65+<'1(Z 1/+55+10514%10(.+%65$'69''08#4+175'.'/'0651(6*'&4#9+0)5016'5#0&&'6#+.55*#.. $'$417)*6616*'#66'06+101(6*'#4%*+6'%6#0&4'51.8'&$'(14'241%''&+0)9+6*6*' 914- &+/'05+105 &10165%#.'6*'&4#9+0)5611$6#+0&+/'05+10594+66'0&+/'05+105)18'4075'#%67#. (+'.&/'#574'/'065016+(;6*'#4%*+6'%6+(#0;&+5%4'2#0%+'5#4'(170&  &+/'05+105#4'616*' Ä%'06'4.+0'1(%1.7/0514)4+& Ä%'06'4.+0'1(12'0+0)5 Ä(#%'1(567&5 Ä(#%'1(%10%4'6'14/#5104; 01/+0#.  #..&1145016.1%#6'&$;&+/'05+105102.#0514&'6#+.55*#..$'Ä(41/6*'(#%'1( +06'45'%6+0)9#..61'&)'1(&11412'0+0) #..&+/'05+105016'&%.'#45*#..$'/#+06#+0'&#0&5*#..#..19(146*+%-0'551(#.. (+0+5*'5+0%.7&+0));2$&%#42'6+0)6+.'#0&64+/ Ä70+6#2#46/'06&'8'.12/'06(.14'0%'#8'07'&190'; $.&)%1&'&#6# 1%%72#0%;)4172 44'5+&'06+#. 75'44'5+&'06+#.1%%72#0%; 07/$'41(&9'..+0)70+65  07/$'41($7+.&+0)5  %105647%6+106;2'8$ 07/$'41(5614+'5  (+4'524+0-.'45 2418+&'& 5/1-'%1&'6'%6+10 2418+&'& '.'%64+%#.5'48+%'#/2 52'%+#.+052'%6+105 0164'37+4'& &'('44'&57$/+66#.5 010' %'%%.+/#6'<10' %+6;1(&190';2.#00+0)&#6# #$%& 1 <10'4Ä/7.6+Ä(#/+.;4'5+&'06+#. 2 4'37+4'&':+56+0)241215'&%10(14/+0) 3 .16#4'#Ä/+0 53(6 01%*#0)' 4 .16#4'#2'4&9'..+0) 70+6Ä/+0+/7/ 53(6 (14.165 )4'#6'46*#053 (6 016#22.+%#$.'Ä ':+56+0)61$' &'/1.+5*'&  53(6 &9'..+0)70+65 5 .169+&6*Ä/+0+/7/ (6 01%*#0)' 6 .16&'26*Ä/+0+/7/ (''6 .1655*#..%10(14/61 6*'#8'4#)'&'26*1( #&,#%'06.165 .165%10(14/5616*' #8'4#)'&'26*1( #&,#%'06.165 01%*#0)' 7 .16%18'4#)'Ä /#:+/7/ 2'4%'06 016#22.+%#$.'Ä ':+56+0)61$' &'/1.+5*'&  53(62'4$.&)   :$.&) 53(6 53(6 53(6.16 8 $7+.&+0)*'+)*6Ä /#:+/7/ (''6 /#+0$7+.&+0)(''6 146*4''5614+'5 9*+%*'8'4+5.'55 #%%'5514;$.&)(6 016#22.+%#$.'Ä ':+56+0)61$' &'/1.+5*'& (65614+'5 (41/6121(%74$" (.14'0%'#8'07' 9 ;#4&5'6$#%-5Ä /+0+/7/ (''6 (4106(6 4'#4(6 +06'4+145+&'(6 564''65+&'(6 (4106(6 4'#4(6 +06'4+145+&'(6 01564''65+&' (4106(6 4'#4(6 +06'4+145+&'(6 01564''65+&' 10 &9'..+0)70+65+<'Ä /+0':%.75+8'1( #%%'5514;#4'#5 53(6 6*4''  $'&411/ 016#22.+%#$.'Ä ':+56+0)61$' &'/1.+5*'& 6*4''  $'&411/ 11 $7+.&+0)5'2#4#6+10Ä /+0+/7/ (''6 016#22.+%#$.'Ä ':+56+0)61$' &'/1.+5*'&  12 /#+0$7+.&+0)#0& &'6#%*'&)#4#)' 5'2#4#6+10Ä/+0+/7/ (''6 016#22.+%#$.'Ä ':+56+0)61$' &'/1.+5*'& 016#22.+%#$.' 13 75#$.'12'052#%' #4'#2'4&9'..+0)70+6 Ä/+0+/7/ 53(6 53(6 53(6&9'..+0) 70+6 :&7 016#22.+%#$.'Ä ':+56+0)61$' &'/1.+5*'& 53(6 )4#&'.'8'.75'#$.' 12'052#%'%1//10 #4'#53(6 )4#&'.'8'.75'#$.' 12'052#%'%1//10 #4'#53(6 53(6#4'# 53(6#4'# 53(6 14 .#0&5%#2+0).+)*6+0) #0&9#..5 2'4 D   (4106 ;#4&5Ä/#:+/7/2#8+0) *#4&5%#2' 9+6*+0 616#.(41065'6$#%- 016#22.+%#$.'Ä ':+56+0)61$' &'/1.+5*'& (4106;#4&/#:+/7/ 2#8+0) *#4&5%#2'  53(6(4106;#4& 5'6$#%- Ä= 5( (4106;&5$.&5%2 #4'#   53(6 (4106;&5$.&5%2 #4'# ?  53(6 2#8'45   53(6 /107/'065+)0  53(62#8'&#4'# 53(62#8'&#4'# 53(6(4106;#4& 5$ (.114#4'#&#6#2.#0 4'8'45' #4'#5 53(62'4&9'..+0)70+62.#0 53(62'4$7+.&+0)$7+.&+0)5# & 56(.114*#$+6#$.' 0&(.114*#$+6#$.' 4&(.114*#$+6#$.' 616#.*#$+6#$.' )#4#)' 0&(.114&'%- )4#0&616#. (.114#4'#&#6#2.#0 4'8'45' #4'#5 53(62'4&9'..+0)70+62.#0 53(62'4$.&)$7+.&+0)5$%' ( 56(.114*#$+6#$.' 0&(.114*#$+6#$.' 4&(.114*#$+6#$.' 616#.*#$+6#$.' )#4#)' 0&(.114&'%- )4#0&616#. (.114#4'#&#6#$7+.&+0)5 $.&) 2.#05 *#$+6#$.'(.114#4'#5 53(6 #%%'5514;(.114#4'#5 53(6 #4'8    $ 4'8    % 4'8    & 4'8    ' 4'8    ( 4'8    616#.5  )4#0&616#. PC Agenda Page 27 11 1 1 1 1 1422 2 3 2 1 2 1 3 35466 66 6 23 7 7 7 7 76 7 7 88 88 9 10 11 12 13 14 131 15 16 T T 6'-0" EASEMENT PER RECORD SURVEY 6'-0" EASEMENT PER RECORD SURVEY 15'-0" FRONT YARD SETBACK 5'-0" SIDE YARD SETBACK 15'-0" 5' - 0 " 94'-2" 10'-0" 15'-0 " 5' - 0 " 32 ' - 0 " 10'-0" 5' - 0 " 5' - 0 " 5' - 0 " 5' - 0 " 90'-1118" 90'-918" 93'-117 8" 32 ' - 0 " 37'-10" 5' - 0 " SI D E Y A R D S E T B A C K SLOPE PER CIVIL SLOPE PER CIVIL SLOPE PER CIVIL SLOPE PER CIVIL SLOPE PER CIVIL SLOPE PER CIVIL SLOPE PER CIVIL SLOPE PER CIVIL SLOPE PER CIVIL SLOPE PER CIVIL SLOPE PER CIVIL S L O P E PE R C I V I L S L O P E PE R C I V I L S L O P E PE R C I V I L SLOPE PER CIVIL SLOPE PER CIVIL S L O P E PE R C I V I L S L O P E PE R C I V I L SLOPE PER CIVIL SLOPE PER CIVIL S L O P E PE R C I V I L S L O P E PE R C I V I L SLOPE PER CIVIL SLOPE PER CIVIL S L O P E PE R C I V I L S L O P E PE R C I V I L S L O P E PE R C I V I L S L O P E PE R C I V I L S L O P E PE R C I V I L SLOPE PER CIVIL 30 ' - 0 " R2 8 ' - 0 " F. D . M I N . S L O P E PE R C I V I L S L O P E PE R C I V I L S L O P E PE R C I V I L SL O P E PER C I V I L S L O P E P E R C I V I L 52'-0" BUILDING ALL FLOORS - TYP. 29 ' - 0 " B U I L D I N G 1S T F L O O R - T Y P . UNIT 10 PLAN 1 UNIT 9 PLAN 1 REVERSE UNIT 8 PLAN 1 UNIT 7 PLAN 2 REVERSE UNIT 6 PLAN 1 REVERSE UNIT 5 PLAN 1 UNIT 4 PLAN 1 REVERSE UNIT 3 PLAN 1 UNIT 2 PLAN 1 REVERSE UNIT 1 PLAN 2 UNIT 12 PLAN 1 UNIT 11 PLAN 1 REVERSE S L O P E PE R C I V I L S L O P E PE R C I V I L SLOPE PER CIVIL 46'-0" REAR YARD SETBACK S L O P E PE R C I V I L 3' - 0 " O. H . - T Y P . FRONT SETBACK LANDSCAPE AREA 2: 496 S.F. FRONT SETBACK LANDSCAPE AREA 1: 574 S.F. 20'-0" F.D. MIN. 43'-65 8" 53'-65 8" 26 ' - 0 " C L E A R . @ 13 ' - 6 V E R T I . C L E A R A N C E GRADE LEVEL USEABLE OPEN SPACE AREA 1: 1,509 S.F. GRADE LEVEL USEABLE OPEN SPACE AREA 2: 1,788 S.F. 4'-218" V.I.F. R28'-0 " F.D. M I N . 6'-0" V.I.F. 4'-0" ROOF O.H. 4'-0" ROOF O.H. 1'-6" ROOF O.H. ENCROACHMENT INTO S.B. 1'-6" ROO F O . H . E N C R O A C H M E N T I N T O S . B . 13'-812" TENANT RECREATION AREA TENANT RECREATION AREA 9'-418"9'-418"9'-418" 20 ' - 0 " 20 ' - 0 " 9'-418" 10'-0"8'-0"10'-012" 20 ' - 0 " 10'-0" 62'-814" 24 ' - 1 " 34 ' - 1 1 " 53'-412" 20 212021 20 21 2021 2021 2021 202120212021202120212021 222222 222222 24 24 25 26 6'-0" EASEMENT PER RECORD SURVEY 6'-0" EASEMENT PER RECORD SURVEY 15'-0" FRONT YARD SETBACK 5'-0" SIDE YARD SETBACK 15'-0" 15'-0 " 5'-0" SIDE YARD SETBACK 46'-0" P-B ZONE (PARKING BUFFER) TO BE REZONED TO R-3 AA A A A A HB B C B A B A C C ADDD DDD FFF FFFF G G E J J BHHHH H H H H K K 5ECNG&'/1.+6+105+6'2.#0 žÄ 5+6'2.#0-';016'5 2412'46;.+0' 5'6$#%-.+0'  '#5'/'06.+0' $7+.&+0).+0'#6)4#&'  $7+.&+0)18'4*#0)  %10%4'6'%74$Ä5''%+8+.&4#9+0)5 .#0&5%#2'#4'#Ä5''.#0&5%#2'#4%*+6'%674'&4#9+0)5  #52*#.6+%%10%4'6'2#8+0)Ä5''%+8+.&4#9+0)5  2#4-+0)564+22+0)  9*''.5612 &4#+0+0.'6Ä5''%+8+.&4#9+0)5 /107/'065+)070&'45'2#4#6'2'4/+6  (6*6/#5104;9#.. *6/#5104;9#..  )4#&'.'8'.75'#$.'12'052#%'#4'#  )4#&'.'8'.75'#$.'12'052#%'#4'# /+0%.'#4(+4'&'26#%%'55  012#4-+0)(+4'.#0'5+)0#)'  #%%'55+$.'2#6*1(64#8'.  70+6214%* 70+6'064; %10%4'6'2#&(14#%'37+2/'06 %+6;1(&190';%10%4'6'5+&'9#.-%74$ )766'4#0&&4+8'9#;#2410016+0241,'%65%12' %18'4'&'064;('#674'  #4'#4'<10'&(41/2Ä$614Ä  2#8'45 0 4' 8' 16'32' 1/16" = 1'-0" 5ECNG241215'&5+6'2.#0 žÄ 0 4' 8' 16'32' 1/16" = 1'-0" &'/1.+6+105+6'2.#0 -';016'5 #2412'46;.+0' $5'6$#%-.+0' % '#5'/'06.+0' &&'/1.+5*5647%674' '%+6;1(&190';%10%4'6'5+&'9#.-%74$ )766'4#0&&4+8'9#;#2410 ( &'/1.+5*.#0&5%#2+0) ) &'/1.+5*2#8+0) * &'/1.+5*911&('0%' ,&'/1.+5*/#5104;9#.. - &'/1.+5*%*#+0.+0-('0%' Planning Response 07.27.17 Planning Response 11.05.18 5*''6)'0'4#.016'5 6*+52.#09#5241&7%'&9+6*$170&#4;&#6#(41/4'%14&1(5748';$;,9/75+#. .5 &#6'&#0&9+6*+/2418'/'065&#6#(41/6121)4#2*+%5748';2.#0$;) )'0)+0''4+0) +0% %+8+.01% &#6'&ÄÄ 016'24'.+/+0#4;&'5+)0&+/'05+105#4'#2241:+/#6'(+0#.&+/'05+1055*#..$'%10(+4/'&+0 %105647%6+10&1%7/'065 Planning Response 05.20.19 .')'0& 2412'46;.+0' 5'6$#%- '&)'1(5647%674'18'4*#0)+0)56(.114 '&)'1(411( 5'6$#%-#4'# .#0&5%#2+0)#4'# 2#8'&#4'# ‹7KH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21$OOULJKWVUHVHUYHG1R part of this document may be reproduced in any form or by any means without SHUPLVVLRQLQZULWLQJIURPWKH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21 AS-1.1 03.20.18 RG 2017.019 PC Agenda Page 28 17 19 18 1818 18 19 11 1 1 1 1 1 2 1 54 66 66 6 6 7 7 7 7 76 7 7 88 8 12 1 T T 15'-0" FRONT YARD SETBACK 5'-0" SIDE YARD SETBACK 15'-0" 5' - 0 " 94'-2" 10'-0" 15'-0 " 5' - 0 " 32 ' - 0 " 10'-0" 5' - 0 " 5' - 0 " 5' - 0 " 5' - 0 " 90'-111 8" 90'-918" 93'-117 8" 32 ' - 0 " 37'-10" 5' - 0 " SI D E Y A R D S E T B A C K SLOPE PER CIVIL 30 ' - 0 " R2 8 ' - 0 " F. D . M I N . 52'-0" BUILDING ALL FLOORS - TYP. 29 ' - 0 " B U I L D I N G 1S T F L O O R - T Y P . UNIT 10 PLAN 1 UNIT 9 PLAN 1 REVERSE UNIT 8 PLAN 1 UNIT 7 PLAN 2 REVERSE UNIT 6 PLAN 1 REVERSE UNIT 5 PLAN 1 UNIT 4 PLAN 1 REVERSE UNIT 3 PLAN 1 UNIT 2 PLAN 1 REVERSE UNIT 1 PLAN 2 UNIT 12 PLAN 1 UNIT 11 PLAN 1 REVERSE 46'-0" REAR YARD SETBACK 3' - 0 " O. H . - T Y P . 20'-0" F.D. MIN. 43'-65 8" 53'-65 8" 26 ' - 0 " C L E A R . @ 13 ' - 6 V E R T I . C L E A R A N C E 4'-218" V.I.F. R28'-0 " F.D. M I N . 6'-0" V.I.F. 13'-812" 31'-111 4" 52'-7" 40 ' - 0 " 33 ' - 7 " 43'-712" 20 T T 6'-0" EASEMENT PER RECORD SURVEY 6'-0" EASEMENT PER RECORD SURVEY 15'-0" FRONT YARD SETBACK 5'-0" SIDE YARD SETBACK 15'-0" 5' - 0 " 94'-2" 10'-0" 15'-0 " 5' - 0 " 32 ' - 0 " 10'-0" 5' - 0 " 5' - 0 " 5' - 0 " 5' - 0 " 90'-1118" 90'-91 8" 93'-117 8" 32 ' - 0 " 37'-10" 5' - 0 " SI D E Y A R D S E T B A C K SLOPE PER CIVIL SLOPE PER CIVIL SLOPE PER CIVIL SLOPE PER CIVIL SLOPE PER CIVIL SLOPE PER CIVIL SLOPE PER CIVIL SLOPE PER CIVIL SLOPE PER CIVIL SLOPE PER CIVIL SLOPE PER CIVIL S L O P E PE R C I V I L S L O P E PE R C I V I L S L O P E PE R C I V I L SLOPE PER CIVIL SLOPE PER CIVIL S L O P E PE R C I V I L S L O P E PE R C I V I L SLOPE PER CIVIL SLOPE PER CIVIL S L O P E PE R C I V I L S L O P E PE R C I V I L SLOPE PER CIVIL SLOPE PER CIVIL S L O P E PE R C I V I L S L O P E PE R C I V I L S L O P E PE R C I V I L S L O P E PE R C I V I L S L O P E PE R C I V I L SLOPE PER CIVIL 30 ' - 0 " R2 8 ' - 0 " F. D . M I N . S L O P E PE R C I V I L S L O P E PE R C I V I L S L O P E PE R C I V I L SL O P E PER C I V I L S L O P E P E R C I V I L 52'-0" BUILDING ALL FLOORS - TYP. 29 ' - 0 " B U I L D I N G 1S T F L O O R - T Y P . UNIT 10 PLAN 1 UNIT 9 PLAN 1 REVERSE UNIT 8 PLAN 1 UNIT 7 PLAN 2 REVERSE UNIT 6 PLAN 1 REVERSE UNIT 5 PLAN 1 UNIT 4 PLAN 1 REVERSE UNIT 3 PLAN 1 UNIT 2 PLAN 1 REVERSE UNIT 1 PLAN 2 UNIT 12 PLAN 1 UNIT 11 PLAN 1 REVERSE S L O P E PE R C I V I L S L O P E PE R C I V I L SLOPE PER CIVIL 46'-0" S L O P E PE R C I V I L 3' - 0 " O. H . - T Y P . FRONT SETBACK LANDSCAPE AREA 2: 496 S.F. FRONT SETBACK LANDSCAPE AREA 1: 574 S.F. 20'-0" F.D. MIN. 43'-65 8" 53'-65 8" 26 ' - 0 " C L E A R . @ 13 ' - 6 V E R T I . C L E A R A N C E GRADE LEVEL USEABLE OPEN SPACE AREA 1: 1,509 S.F. GRADE LEVEL USEABLE OPEN SPACE AREA 2: 1,788 S.F. 4'-218" V.I.F. R28'-0 " F.D. M I N . 6'-0" V.I.F. 4'-0" ROOF O.H. 4'-0" ROOF O.H. 1 ' R O O 13'-812" TENANT RECREATION AREA TENANT RECREATION AREA 9'-418"9'-418"9'-418" 20 ' - 0 " 20 ' - 0 " 9'-418" 10'-0"8'-0"10'-012" 20 ' - 0 " 10'-0" 62'-814" 24 ' - 1 " 34 ' - 1 1 " 53'-412" A BCD 5ECNG#%%'555+6'2.#0 žÄ 0 4' 8' 16'32' 1/16" = 1'-0" #%%'555+6'2.#0-';016'5 2412'46;.+0' $7+.&+0).+0'#6)4#&'  $7+.&+0)18'4*#0)  %10%4'6'%74$Ä5''%+8+.&4#9+0)5  #52*#.6+%%10%4'6'2#8+0)Ä5''%+8+.&4#9+0)5  2#4-+0)564+22+0) /107/'065+)0 (+4'&'2#46/'06'37+2/'06#%%'55  012#4-+0)(+4'.#0'5+)0#)'  #%%'55+$.'2#6*1(64#8'.  5''%+8+.&4#9+0)5(14(+4'*;&4#06.1%#6+10#0&&#6# 5ECNG5+6'#4'#52.#0 žÄ 0 4' 8' 16'32' 1/16" = 1'-0" 5+6'#4'#2.#0-';016'5 #5+6'#4'#53(6 $$7+.&+0)(11624+06#4'#553(6 $.&)5# &53(6$.&)5$%' (53(6  %8'*+%7.#42#8+0)#4'#553(6 &.#0&5%#2'&#4'#553(6 ÄÄ Planning Response 07.27.17 Planning Response 11.05.18 5*''6)'0'4#.016'5 6*+52.#09#5241&7%'&9+6*$170&#4;&#6#(41/4'%14&1(5748';$;,9/75+#. .5 &#6'&#0&9+6*+/2418'/'065&#6#(41/6121)4#2*+%5748';2.#0$;) )'0)+0''4+0) +0% %+8+.01% &#6'&ÄÄ 016'24'.+/+0#4;&'5+)0&+/'05+105#4'#2241:+/#6'(+0#.&+/'05+1055*#..$'%10(+4/'&+0 %105647%6+10&1%7/'065 Planning Response 05.20.19 ‹7KH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21$OOULJKWVUHVHUYHG1R part of this document may be reproduced in any form or by any means without SHUPLVVLRQLQZULWLQJIURPWKH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21 AS-1.2 03.20.18 RG 2017.019 .')'0& 5+6'#4'#$170&#4; 5'6$#%- '&)'1(5647%674'18'4*#0)+0)56(.114 '&)'1(411( $7+.&+0)(11624+06#4'# -';016'$ .#0&5%#2+0)#4'# -';016'& 8'*+%7.#42#8+0)#4'# -';016'% 2'&'564+#02#8'&#4'# .')'0& 2412'46;.+0' 5'6$#%- '&)'1(5647%674'18'4*#0)+0)56(.114 '&)'1(411( 5'6$#%-#4'# .#0&5%#2+0)#4'# 2#8'&#4'# (+4'&'2#46/'06'37+2/'06#%%'55 -';016' #%%'55+$.'2#6*1(64#8'. -';016' PC Agenda Page 29 1 142 1 2 1 3 3 66 6 23 7 7 7 7 8 12 13 14 131 6'-0" EASEMENT PER RECORD SURVEY 15'-0" FRONT YARD SETBACK 5'-0" SIDE YARD SETBACK 15'-0" 5' - 0 " 15'-0 " 5' - 0 " 32 ' - 0 " 5' - 0 " 5' - 0 " 37'-10" 5' - 0 " SI D E Y A R D S E T B A C K SLOPE PER CIVIL SLOPE PER CIVIL SLOPE PER CIVIL SLOPE PER CIVIL SLOPE PER CIVIL S L O P E PE R C I V I L S L O P E PE R C I V I L S L O P E PE R C I V I L S L O P E PE R C I V I L SLOPE PER CIVIL PLAN 1 REVERSE UNIT 8 PLAN 1 UNIT 7 PLAN 2 REVERSE UNIT 2 PLAN 1 REVERSE UNIT 1 PLAN 2 S L O P E PE R C I V I L S L O P E PE R C I V I L SLOPE PER CIVIL FRONT SETBACK LANDSCAPE AREA 2: 496 S.F. FRONT SETBACK LANDSCAPE AREA 1: 574 S.F. 6'-0" V.I.F. 4'-0" ROOF O.H. 4'-0" ROOF O.H. 1'-6" ROOF O.H. ENCROACHMENT INTO S.B. 1'-6" ROO F O . H . E N C R O A C H M E N T I N T O S . B . 13'-81 2" 20 ' - 0 " 9'-418" 10'-0"8'-0"10'-01 2" 20 ' - 0 " 20 21 2021 20212021 22 22 24 24 26 5+6'2.#0-';016'5 2412'46;.+0' 5'6$#%-.+0'  '#5'/'06.+0' $7+.&+0).+0'#6)4#&'  $7+.&+0)18'4*#0)  %10%4'6'%74$Ä5''%+8+.&4#9+0)5 .#0&5%#2'#4'#Ä5''.#0&5%#2'#4%*+6'%674'&4#9+0)5  #52*#.6+%%10%4'6'2#8+0)Ä5''%+8+.&4#9+0)5  2#4-+0)564+22+0)  9*''.5612 &4#+0+0.'6Ä5''%+8+.&4#9+0)5 /107/'065+)070&'45'2#4#6'2'4/+6  (6*6/#5104;9#.. *6/#5104;9#..  )4#&'.'8'.75'#$.'12'052#%'#4'#  )4#&'.'8'.75'#$.'12'052#%'#4'# /+0%.'#4(+4'&'26#%%'55  012#4-+0)(+4'.#0'5+)0#)'  #%%'55+$.'2#6*1(64#8'.  70+6214%* 70+6'064; %10%4'6'2#&(14#%'37+2/'06 %+6;1(&190';%10%4'6'5+&'9#.-%74$ )766'4#0&&4+8'9#;#2410016+0241,'%65%12' %18'4'&'064;('#674'  #4'#4'<10'&(41/2Ä$614Ä  2#8'45 0 2' 4' 8'16' 1/8" = 1'-0"5ECNG241215'&2#46+#.'0.#4)'&5+6'2.#0 žÄ Planning Response 07.27.17 Planning Response 11.05.18 5*''6)'0'4#.016'5 6*+52.#09#5241&7%'&9+6*$170&#4;&#6#(41/4'%14&1(5748';$;,9/75+#. .5 &#6'&#0&9+6*+/2418'/'065&#6#(41/6121)4#2*+%5748';2.#0$;) )'0)+0''4+0) +0% %+8+.01% &#6'&ÄÄ 016'24'.+/+0#4;&'5+)0&+/'05+105#4'#2241:+/#6'(+0#.&+/'05+1055*#..$'%10(+4/'&+0 %105647%6+10&1%7/'065 .')'0& 2412'46;.+0' 5'6$#%- '&)'1(5647%674'18'4*#0)+0)56(.114 '&)'1(411( 5'6$#%-#4'# .#0&5%#2+0)#4'# 2#8'&#4'# -';/#2 Planning Response 05.20.19 ‹7KH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21$OOULJKWVUHVHUYHG1R part of this document may be reproduced in any form or by any means without SHUPLVVLRQLQZULWLQJIURPWKH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21 AS-1.3 03.20.18 RG 2017.019 PC Agenda Page 30 3' - 1 1 2 " 20 ' - 2 1 2 " C L R . 20'-03 4" CLR. 3'-35 8" 5' - 1 1 1 4 " 8' - 0 3 4 " 13 ' - 2 " 1' - 1 0 " 14 ' - 0 " 15 ' - 0 " 29 ' - 0 " 18'-518" 7'-27 8" EQUAL EQUAL GARAGE 103 25'-8" 20'-6"5'-2" 3' - 1 1 2 " 16'-0"2'-5"2'-1"3'-4"1'-10" 20 ' - 2 1 2 " C L R . 20'-03 4" CLR. 5' - 1 1 1 4 " 8' - 0 3 4 " 13 ' - 2 " 1' - 1 0 " 14 ' - 0 " 15 ' - 0 " 29 ' - 0 " 18'-518" 7'-27 8" EQUALEQUAL 6'-35 8" 1 2 3 4 5 6 7 8 9 10 11 12 13 140 10'-312"10'-312" 1234567891011121314 0 0'-8" 25'-8" 20'-6"5'-2" 16'-0"2'-5"2'-1"3'-4"1'-10" 52'-0"52'-0" 6'-35 8"2'-312" 3'-35 8" 2'-31 2"6'-35 8"0'-8" 15'-13 4" 52'-0" PORCH 001 ENTRY 101 STORAGE 104CLOS. 102 GARAGE 103 PORCH 001 ENTRY 101 STORAGE 104 CLOS. 102 STAIR 1-2 100 PLAN 1 PLAN 1 REVERSE STAIR 1-2 100 6'-35 8" 5'-2"5'-2" 2'-312"2'-31 2" 17'-07 8"17'-07 8" 4' - 9 " 5' - 1 0 " 4' - 9 " 5' - 1 0 " 3'-0"3'-0" 1' - 0 " 16'-1118"18'-13 4"16'-1118" ‹7KH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21$OOULJKWVUHVHUYHG1R part of this document may be reproduced in any form or by any means without SHUPLVVLRQLQZULWLQJIURPWKH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21 A-1.1a 03.20.18 RG 2017.019 5ECNG56(.1142.#0 žÄ 0 1' 2' 4'8' 1/4" = 1'-0" Planning Response 07.27.17 Planning Response 11.05.18 BUILDINGS B, C, E & F 5*''6)'0'4#.016'5 PRELIMINARY DESIGN DIMENSIONS ARE APPROXIMATE. FINAL DIMENSIONS SHALL BE CONFIRMED IN CONSTRUCTION DOCUMENTS. Planning Response 05.20.19 -';/#2 (.114#4'#&#6#2.#0 4'8'45' #4'#5 53(62'4&9'..+0)70+62.#0 56(.114*#$+6#$.' 0&(.114*#$+6#$.' 4&(.114*#$+6#$.' 616#.*#$+6#$.' )#4#)' 0&(.114&'%- )4#0&616#. PC Agenda Page 31 25'-8" 52'-0" 29 ' - 0 " 25'-8" 3' - 0 " 32 ' - 0 " 7' - 2 1 2 " 5' - 3 1 2 " 6'-3" 13'-11 2"12'-612" 3' - 9 1 2 " 5' - 3 1 2 " 3' - 3 1 2 " 11 ' - 2 1 2 " 16'-612"9'-112" 3'-312"2'-111 2"2'-7" 2' - 0 " 27 ' - 0 " 5' - 0 " 3' - 5 " 0'-8" 3'-312"4'-212" 10'-95 8"7'-43 8" 3'-95 8"2'-8" 16'-612" 6'-5"6'-112" 0'-2"0'-2" 2'-8" 25'-8" 29 ' - 0 " 25'-8" 3' - 0 " 32 ' - 0 " 7' - 2 1 2 " 5' - 3 1 2 " 6'-3" 13'-112"12'-61 2" 3' - 9 1 2 " 5' - 3 1 2 " 3' - 3 1 2 " 11 ' - 2 1 2 " 16'-612"9'-11 2" 3'-31 2"2'-1112"2'-7" 2' - 0 " 27 ' - 0 " 5' - 0 " 3'-31 2"4'-212" 10'-95 8"7'-43 8" 3'-95 8"2'-8" 16'-612" 6'-5"6'-112" 0'-2"0'-2" 2'-8" STAIR 2-3 201 STAIR 1 2XX POWDER 202 LIVING 204 DINING 205 KITCHEN 206 DECK 207 CLOS. 203 STAIR 1 2XX POWDER 202 LIVING 204 DINING 205 KITCHEN 206 DECK 207 CLOS. 203 STAIR 1-2 200 3' - 5 " STAIR 2-3 201 STAIR 1-2 200 PLAN 1 PLAN 1 REVERSE 8'-83 8" 17'-113 4" 3' - 5 " 2'-6"2'-6" 3' - 5 " 8'-83 8" 4'-95 8"4'-95 8" 1' - 0 " 16'-1118"18'-13 4"16'-1118" 5ECNG0&(.1142.#0 žÄ 0 1' 2' 4'8' 1/4" = 1'-0" Planning Response 07.27.17 Planning Response 11.05.18 BUILDINGS B, C, E & F 5*''6)'0'4#.016'5 PRELIMINARY DESIGN DIMENSIONS ARE APPROXIMATE. FINAL DIMENSIONS SHALL BE CONFIRMED IN CONSTRUCTION DOCUMENTS. Planning Response 05.20.19 ‹7KH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21$OOULJKWVUHVHUYHG1R part of this document may be reproduced in any form or by any means without SHUPLVVLRQLQZULWLQJIURPWKH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21 A-1.2a 03.20.18 RG 2017.019 -';/#2 (.114#4'#&#6#2.#0 4'8'45' #4'#5 53(62'4&9'..+0)70+62.#0 56(.114*#$+6#$.' 0&(.114*#$+6#$.' 4&(.114*#$+6#$.' 616#.*#$+6#$.' )#4#)' 0&(.114&'%- )4#0&616#. PC Agenda Page 32 25'-8" 52'-0" 32 ' - 0 " 5' - 3 1 2 " 11'-0" 3' - 0 " 12'-412" 14'-0" 14 ' - 5 " 12 ' - 3 1 2 " 10 ' - 5 " 4' - 0 " 3' - 4 1 2 " 6'-13 4"4'-101 4" 2'-31 2" 6'-33 8"6'-118" 0'-8" 3'-912"2'-312"5'-31 2" 4'-512" 9'-63 8" 6' - 3 1 2 " 25'-8" 7'-05 8"3'-9"5'-4" 0'-8" 3'-95 8" 6' - 0 " 9'-1" 3' - 5 " 16'-7" 5' - 7 1 2 " 5' - 4 " 1' - 1 0 " 4' - 5 3 4 " 4' - 5 3 4 " 1' - 1 0 1 2 " 1' - 2 1 2 " 14 ' - 5 " 1' - 1 0 " 0'-2" 3'-23 4" 2'-11 4" 2' - 3 1 2 " 8' - 1 1 1 2 " 3' - 5 1 2 " 10 ' - 1 1 1 2 " 25'-8" 32 ' - 0 " 5' - 3 1 2 " 3' - 0 " 11'-0"12'-412" 14'-0" 12 ' - 3 1 2 " 10 ' - 5 " 14 ' - 5 " 4' - 0 " 3' - 4 1 2 " 6'-13 4"4'-101 4" 2'-31 2" 6'-33 8"6'-118" 3'-91 2"2'-31 2"5'-312" 4'-512" 9'-63 8"7'-05 8"3'-9"5'-4" 0'-8" 3'-95 8" 6' - 0 " 6' - 3 1 2 " 9'-1" 3' - 5 " 16'-7" 25'-8" 5' - 7 1 2 " 5' - 4 " 1' - 1 0 " 4' - 5 3 4 " 4' - 5 3 4 "1' - 2 1 2 " 1' - 1 0 1 2 " 14 ' - 5 " 0'-2" 3'-23 4" 2'-11 4" 8' - 1 1 1 2 " 2' - 3 1 2 " 1' - 1 0 " 10 ' - 1 1 1 2 " 3' - 5 1 2 " STAIR 2-3 300 BATH 2 303 CLOS. 304 BATH 3 306 CLOS. 305 (MASTER) BED 1 302 HALL 301 BED 2 309 CLOS. 310 LIVING 308 BED 3 307 STAIR 2-3 300 BATH 2 303 CLOS. 304 BATH 3 306 CLOS. 305 (MASTER) BED 1 302 HALL 301 BED 2 309 CLOS. 310 LIVING 308 BED 3 307 PLAN 1 PLAN 1 REVERSE 2'-6"2'-6" 1' - 0 " 18'-15 8"15'-83 4"18'-15 8" 5ECNG4&(.1142.#0 žÄ 0 1' 2' 4'8' 1/4" = 1'-0" Planning Response 07.27.17 Planning Response 11.05.18 BUILDINGS B, C, E & F 5*''6)'0'4#.016'5 PRELIMINARY DESIGN DIMENSIONS ARE APPROXIMATE. FINAL DIMENSIONS SHALL BE CONFIRMED IN CONSTRUCTION DOCUMENTS. Planning Response 05.20.19 ‹7KH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21$OOULJKWVUHVHUYHG1R part of this document may be reproduced in any form or by any means without SHUPLVVLRQLQZULWLQJIURPWKH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21 A-1.3a 03.20.18 RG 2017.019 -';/#2 (.114#4'#&#6#2.#0 4'8'45' #4'#5 53(62'4&9'..+0)70+62.#0 56(.114*#$+6#$.' 0&(.114*#$+6#$.' 4&(.114*#$+6#$.' 616#.*#$+6#$.' )#4#)' 0&(.114&'%- )4#0&616#. PC Agenda Page 33 3' - 1 1 2 " 20 ' - 2 1 2 " C L R . 20'-03 4" CLR. 3'-35 8" 5' - 1 1 1 4 " 8' - 0 3 4 " 13 ' - 2 " 1' - 1 0 " 14 ' - 0 " 15 ' - 0 " 29 ' - 0 " 18'-518" 7'-27 8" EQUAL EQUAL GARAGE 103 27'-1" 20'-6" 6'-7" 3' - 1 1 2 " 16'-0"2'-5"2'-1" 20 ' - 2 1 2 " C L R . 20'-03 4" CLR. 7' - 8 3 4 " 6' - 3 3 8 " 13 ' - 2 7 8 " 14 ' - 0 " 15 ' - 0 " 29 ' - 0 " 18'-518" 7'-27 8" EQUALEQUAL 3'-0" 6'-35 8" 1 2 3 4 5 6 7 8 9 10 11 12 13 140 10'-312"10'-312" 1234567891011121314 0 0'-8" 25'-8" 20'-6"5'-2" 16'-0"2'-5"2'-1"3'-4"1'-10" 53'-5"53'-5" 6'-35 8"2'-312" 3'-35 8" 3'-0" 2'-31 2"6'-35 8"0'-8" 15'-13 4" 52'-0" PORCH 001 ENTRY 101 STORAGE 104CLOS. 102 GARAGE 103 PORCH 001 ENTRY 101 STORAGE 104 CLOS. 102 STAIR 1-2 100 PLAN 1 PLAN 2 REVERSE 1'-5" STAIR 1-2 100 6'-35 8" 5'-2"5'-2" 2'-31 2"2'-31 2" 17'-07 8"17'-07 8" 4' - 9 " 5' - 1 0 " 4' - 9 " 5' - 1 0 " 1' - 1 1 4 " 1' - 9 1 8 " EQ U A L EQ U A L 0' - 4 1 8 " EQ U A L EQ U A L 1' - 5 " 2'-10" 8'-0" 1'-5" 1' - 0 " 16'-1118"18'-13 4"16'-1118" 5ECNG56(.1142.#0 žÄ 0 1' 2' 4'8' 1/4" = 1'-0" Planning Response 07.27.17 Planning Response 11.05.18 BUILDINGS A & D 5*''6)'0'4#.016'5 PRELIMINARY DESIGN DIMENSIONS ARE APPROXIMATE. FINAL DIMENSIONS SHALL BE CONFIRMED IN CONSTRUCTION DOCUMENTS. Planning Response 05.20.19 ‹7KH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21$OOULJKWVUHVHUYHG1R part of this document may be reproduced in any form or by any means without SHUPLVVLRQLQZULWLQJIURPWKH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21 A-1.1b 03.20.18 RG 2017.019 -';/#2 (.114#4'#&#6#2.#0 4'8'45' #4'#5 53(62'4&9'..+0)70+62.#0 56(.114*#$+6#$.' 0&(.114*#$+6#$.' 4&(.114*#$+6#$.' 616#.*#$+6#$.' )#4#)' 0&(.114&'%- )4#0&616#. (.114#4'#&#6#2.#0 4'8'45' #4'#5 53(62'4&9'..+0)70+62.#0 56(.114*#$+6#$.' 0&(.114*#$+6#$.' 4&(.114*#$+6#$.' 616#.*#$+6#$.' )#4#)' 0&(.114&'%- )4#0&616#. PC Agenda Page 34 25'-8" 52'-0" 29 ' - 0 " 25'-8" 3' - 0 " 32 ' - 0 " 7' - 2 1 2 " 5' - 3 1 2 " 6'-3" 13'-11 2"12'-612" 3' - 9 1 2 " 5' - 3 1 2 " 3' - 3 1 2 " 11 ' - 2 1 2 " 16'-612"9'-112" 3'-312"2'-1112"2'-7" 2' - 0 " 27 ' - 0 " 5' - 0 " 3' - 5 " 0'-8" 2'-6" 3'-312"4'-212" 10'-95 8"7'-43 8" 3'-95 8"2'-8" 16'-612" 6'-5"6'-11 2" 0'-2"0'-2" 2'-8" 25'-8" 29 ' - 0 " 25'-8" 3' - 0 " 32 ' - 0 " 7' - 2 1 2 " 5' - 3 1 2 " 6'-3" 13'-112"12'-61 2" 3' - 9 1 2 " 5' - 3 1 2 " 3' - 3 1 2 " 11 ' - 2 1 2 " 16'-612"11'-9" 3'-31 2"2'-1112"2'-7" 2' - 0 " 27 ' - 0 " 5' - 0 " 2'-6" 3'-31 2"4'-212" 10'-95 8"7'-43 8" 3'-95 8"2'-8" 16'-612" 6'-5"6'-112" 0'-2"0'-2" 2'-8" STAIR 2-3 201 STAIR 1 2XX POWDER 202 LIVING 204 DINING 205 KITCHEN 206 DECK 207 CLOS. 203 STAIR 1 2XX POWDER 202 LIVING 204 DINING 205 KITCHEN 206 DECK 207 CLOS. 203 STAIR 1-2 200 3' - 5 " STAIR 2-3 201 STAIR 1-2 200 PLAN 1 PLAN 2 REVERSE 2'-71 2" 15 ' - 6 7 8 " 3' - 5 " 8'-83 8"8'-83 8" 4'-95 8"4'-95 8" 0' - 3 " 1' - 0 " 16'-1118"18'-13 4"16'-1118" 5ECNG0&(.1142.#0 žÄ 0 1' 2' 4'8' 1/4" = 1'-0" Planning Response 07.27.17 Planning Response 11.05.18 BUILDINGS A & D 5*''6)'0'4#.016'5 PRELIMINARY DESIGN DIMENSIONS ARE APPROXIMATE. FINAL DIMENSIONS SHALL BE CONFIRMED IN CONSTRUCTION DOCUMENTS. Planning Response 05.20.19 ‹7KH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21$OOULJKWVUHVHUYHG1R part of this document may be reproduced in any form or by any means without SHUPLVVLRQLQZULWLQJIURPWKH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21 A-1.2b 03.20.18 RG 2017.019 -';/#2 (.114#4'#&#6#2.#0 4'8'45' #4'#5 53(62'4&9'..+0)70+62.#0 56(.114*#$+6#$.' 0&(.114*#$+6#$.' 4&(.114*#$+6#$.' 616#.*#$+6#$.' )#4#)' 0&(.114&'%- )4#0&616#. (.114#4'#&#6#2.#0 4'8'45' #4'#5 53(62'4&9'..+0)70+62.#0 56(.114*#$+6#$.' 0&(.114*#$+6#$.' 4&(.114*#$+6#$.' 616#.*#$+6#$.' )#4#)' 0&(.114&'%- )4#0&616#. PC Agenda Page 35 25'-8" 52'-0" 32 ' - 0 " 5' - 3 1 2 " 11'-0" 3' - 0 " 12'-41 2" 14'-0" 14 ' - 5 " 12 ' - 3 1 2 " 10 ' - 5 " 4' - 0 " 3' - 4 1 2 " 6'-13 4"4'-101 4" 2'-312" 6'-33 8"6'-118" 0'-8" 3'-91 2"2'-312"5'-312" 2'-6"2'-6" 4'-51 2" 9'-63 8" 6' - 3 1 2 " 25'-8" 7'-05 8"3'-9"5'-4" 0'-8" 3'-95 8" 6' - 0 " 9'-1" 3' - 5 " 16'-7" 5' - 7 1 2 " 5' - 4 " 1' - 1 0 " 4' - 5 3 4 " 4' - 5 3 4 " 1' - 1 0 1 2 " 1' - 2 1 2 " 14 ' - 5 " 1' - 1 0 " 0'-2" 3'-23 4" 2'-11 4" 2' - 3 1 2 " 8' - 1 1 1 2 " 3' - 5 1 2 " 10 ' - 1 1 1 2 " 25'-8" 32 ' - 0 " 5' - 3 1 2 " 3' - 0 " 11'-0"12'-41 2" 14'-0" 12 ' - 3 1 2 " 10 ' - 5 " 14 ' - 5 " 4' - 0 " 3' - 4 1 2 " 6'-13 4"4'-101 4" 2'-312" 6'-33 8"6'-118" 3'-912"2'-31 2"5'-31 2" 2'-6"2'-6" 4'-51 2" 9'-63 8"7'-05 8"3'-9"5'-4" 0'-8" 3'-95 8" 6' - 0 " 6' - 3 1 2 " 9'-1" 3' - 5 " 16'-7" 25'-8" 5' - 7 1 2 " 5' - 4 " 1' - 1 0 " 4' - 5 3 4 " 4' - 5 3 4 "1' - 2 1 2 " 1' - 1 0 1 2 " 14 ' - 5 " 0'-2" 3'-23 4" 2'-11 4" 8' - 1 1 1 2 " 2' - 3 1 2 " 1' - 1 0 " 10 ' - 1 1 1 2 " 3' - 5 1 2 " STAIR 2-3 300 BATH 2 303 CLOS. 304 BATH 3 306 CLOS. 305 (MASTER) BED 1 302 HALL 301 BED 2 309 CLOS. 310 LIVING 308 BED 3 307 STAIR 2-3 300 BATH 2 303 CLOS. 304 BATH 3 306 CLOS. 305 (MASTER) BED 1 302 HALL 301 BED 2 309 CLOS. 310 LIVING 308 BED 3 307 PLAN 1 PLAN 2 REVERSE 1' - 0 " 18'-15 8"15'-83 4"18'-15 8" ‹7KH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21$OOULJKWVUHVHUYHG1R part of this document may be reproduced in any form or by any means without SHUPLVVLRQLQZULWLQJIURPWKH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21 A-1.3b 03.20.18 RG 2017.019 5ECNG4&(.1142.#0 žÄ 0 1' 2' 4'8' 1/4" = 1'-0" Planning Response 07.27.17 Planning Response 11.05.18 -';/#2 BUILDINGS A & D 5*''6)'0'4#.016'5 PRELIMINARY DESIGN DIMENSIONS ARE APPROXIMATE. FINAL DIMENSIONS SHALL BE CONFIRMED IN CONSTRUCTION DOCUMENTS. Planning Response 05.20.19 (.114#4'#&#6#2.#0 4'8'45' #4'#5 53(62'4&9'..+0)70+62.#0 56(.114*#$+6#$.' 0&(.114*#$+6#$.' 4&(.114*#$+6#$.' 616#.*#$+6#$.' )#4#)' 0&(.114&'%- )4#0&616#. (.114#4'#&#6#2.#0 4'8'45' #4'#5 53(62'4&9'..+0)70+62.#0 56(.114*#$+6#$.' 0&(.114*#$+6#$.' 4&(.114*#$+6#$.' 616#.*#$+6#$.' )#4#)' 0&(.114&'%- )4#0&616#. PC Agenda Page 36 4'-0"4'-0" 1' - 6 " 2' - 0 " PLAN 1 PLAN 1 REVERSE 12 3 4 5 4 5ECNG411(2.#0 žÄ 411(2.#0-';016'5 &#5*'&.+0'1(9#..$'.19411( 411(+0)%1/215+6+105*+0).'  4+&)' (#5%+#)766'4 $#4)'$1#4& 4#-'(#5%+#  0 1' 2' 4'8' 1/4" = 1'-0" Planning Response 07.27.17 Planning Response 11.05.18 5*''6)'0'4#.016'5 PRELIMINARY DESIGN DIMENSIONS ARE APPROXIMATE. FINAL DIMENSIONS SHALL BE CONFIRMED IN CONSTRUCTION DOCUMENTS. ‹7KH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21$OOULJKWVUHVHUYHG1R part of this document may be reproduced in any form or by any means without SHUPLVVLRQLQZULWLQJIURPWKH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21 A-2.1a 03.20.18 RG 2017.019 Planning Response 05.20.19 BUILDINGS B, C, E & F -';/#2 PC Agenda Page 37 PLAN 1 PLAN 2 REVERSE 5 4 4 1 2 3 5 ‹7KH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21$OOULJKWVUHVHUYHG1R part of this document may be reproduced in any form or by any means without SHUPLVVLRQLQZULWLQJIURPWKH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21 A-2.1b 03.20.18 RG 2017.019 5ECNG411(2.#00&(.114 žÄ 0 1' 2' 4'8' 1/4" = 1'-0" Planning Response 07.27.17 Planning Response 11.05.18 Planning Response 05.20.19 BUILDINGS A & D -';/#2 411(2.#0-';016'5 &#5*'&.+0'1(9#..$'.19411( 411(+0)%1/215+6+105*+0).'  4+&)' (#5%+#)766'4 $#4)'$1#4& 4#-'(#5%+#  5*''6)'0'4#.016'5 PRELIMINARY DESIGN DIMENSIONS ARE APPROXIMATE. FINAL DIMENSIONS SHALL BE CONFIRMED IN CONSTRUCTION DOCUMENTS. PC Agenda Page 38 PLAN 1 PLAN 2 REVERSE 4 1 2 3 5 4 5ECNG411(2.#04&(.114 žÄ 0 1' 2' 4'8' 1/4" = 1'-0" Planning Response 07.27.17 Planning Response 11.05.18 ‹7KH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21$OOULJKWVUHVHUYHG1R part of this document may be reproduced in any form or by any means without SHUPLVVLRQLQZULWLQJIURPWKH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21 A-2.2b 03.20.18 RG 2017.019 Planning Response 05.20.19 BUILDINGS A & D -';/#2 411(2.#0-';016'5 &#5*'&.+0'1(9#..$'.19411( 411(+0)%1/215+6+105*+0).'  4+&)' (#5%+#)766'4 $#4)'$1#4& 4#-'(#5%+#  5*''6)'0'4#.016'5 PRELIMINARY DESIGN DIMENSIONS ARE APPROXIMATE. FINAL DIMENSIONS SHALL BE CONFIRMED IN CONSTRUCTION DOCUMENTS. PC Agenda Page 39 1 4'-0"4'-0" 1' - 6 " 2' - 0 " PLAN 1 PLAN 2 REVERSE 2 3 4 5 4 4 ‹7KH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21$OOULJKWVUHVHUYHG1R part of this document may be reproduced in any form or by any means without SHUPLVVLRQLQZULWLQJIURPWKH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21 A-2.3b 03.20.18 RG 2017.019 5ECNG411(2.#0 žÄ 411(2.#0-';016'5 &#5*'&.+0'1(9#..$'.19411( 411(+0)%1/215+6+105*+0).'  4+&)' (#5%+#)766'4 $#4)'$1#4& 4#-'(#5%+#  0 1' 2' 4'8' 1/4" = 1'-0" Planning Response 07.27.17 Planning Response 11.05.18 5*''6)'0'4#.016'5 PRELIMINARY DESIGN DIMENSIONS ARE APPROXIMATE. FINAL DIMENSIONS SHALL BE CONFIRMED IN CONSTRUCTION DOCUMENTS. Planning Response 05.20.19 BUILDINGS A & D -';/#2 PC Agenda Page 40 /#6'4+#.%1.145#/2.'5 411(+0)(4106&114$1#4& $#66'0 )#4#)'&114 #%%'06+6'/5 9+0&195+&+0)$4+%- $4+%-/146#4 %1.7/0$#5'%#2 ‹7KH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21$OOULJKWVUHVHUYHG1R part of this document may be reproduced in any form or by any means without SHUPLVVLRQLQZULWLQJIURPWKH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21 NOT FOR CONSTRUCTION NOT FOR CONSTRUCTION MS-A 03.20.18 RG 2017.019 5ECNG(4106'.'8#6+10 žÄ 0 1' 2' 4'8' 1/4" = 1'-0"5ECNG5+&''.'8#6+104+)*61((4106'.'8#6+10 žÄ 0 1' 2' 4'8' 1/4" = 1'-0" Planning Response 07.27.17 Planning Response 11.05.18 '.'8#6+10-';016'5%1.145%*'/'# #$%&')* '.'/'06 /#6'4+#. /(4/1&'.6;2' %1.14 5174%' %1.140#/' (+0+5* 411(+0) #52*#.6 %1/215+6+10 5*+0).' )#(6+/$'4.+0' 0#674#. 5*#&19 )#($#4-911&$;/(4 $#4)'$1#4& 911&0#911& 5*'49+0Ä 9+..+#/5 5#0&$#4 59 2#+065#6+0 (#5%+# )766'4 /'6#. 6$&*#.(Ä4170& 5'#/.'55 #.7/+07/ $;/(4 &19052176 /'6#. 6$&4170& 5'#/.'55 #.7/+07/ $;/(4 4#(6'46#+.911&0#911&2#+065#6+0 *14+<106#. .#25+&+0) (+$'4 %'/'06 ,#/'5 *#4&+' *#4&+'2.#0-5*'49+0Ä 9+..+#/5 #46+%*1-' 59 5/116* 9+0&19 8+0;./+.)#4& 8+0;./+.)#4& 6#0 $;/(4 (4106&114 (+$'4).#55 6$&(+$'4).#55 5*'49+0Ä 9+..+#/5 9*+4.211. 59 2#+06 5'/+Ä).155 64+/$1#4&(+$'4 %'/'06 ,#/'5 *#4&+' *#4&+'64+/ 5*'49+0Ä 9+..+#/5 5#0&$#4 59 5/116* $1#4& $#66'0 (+$'4 %'/'06 ,#/'5 *#4&+' *#4&+'64+/ $1#4&5 9*+4.211. 59 5/116* $'#/ 241,'%6+10 911&0#911& 5*'49+0Ä 9+..+#/5 5#0&$#4 59 2#+065#6+0 01675'& 01675'& 01675'& 01675'&01675'& 01675'& 4#+.+0) 911&0#911&5#0&$#4 59 2#+065#6+0 $#5'%#2 %10%4'6' 0#0#0#674#. 5'#.'&(.#6 $4+%-$4+%- 8'0''4 #%/'$4+%- $4+%- 8'0''4 #%/'$4+%- #767/0.#0'*'4+6#)' 6':674' $4+%- /146#4 /146#4 .#6+%4'6' /8+58'0''4 /146#4 .#6+%4'6' /75*411/ $;/(4 )#4#)' &114 /'6#. 6$&6$&5*'49+0Ä 9+..+#/5 9*+4.211. 59 2#+065#6+0 2.#06'4$1: 911&6$&6$&5*'49+0Ä 9+..+#/5 5#0&$#4 59 2#+065#6+0 #$$4'8+#6+105 ,*,#/'5*#4&+'595*'49+09+..+#/5 0#016#22.+%#$.'6$&61$'&'6'4/+0'& Planning Response 05.20.19 PC Agenda Page 41 5ECNG(4106'.'8#6+10 žÄ 0 1' 2' 4'8' 1/4" = 1'-0"5ECNG5+&''.'8#6+104+)*61((4106'.'8#6+10 žÄ 0 1' 2' 4'8' 1/4" = 1'-0" /#6'4+#.%1.145#/2.'5 411(+0)(4106&114$1#4& $#66'0 )#4#)'&114 #%%'06+6'/5 9+0&195+&+0)$4+%- $4+%-/146#4 %1.7/0$#5'%#2 Planning Response 07.27.17 Planning Response 11.05.18 ‹7KH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21$OOULJKWVUHVHUYHG1R part of this document may be reproduced in any form or by any means without SHUPLVVLRQLQZULWLQJIURPWKH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21 NOT FOR CONSTRUCTION NOT FOR CONSTRUCTION MS-B 03.20.18 RG 2017.019 '.'8#6+10-';016'5%1.145%*'/'$ #$%&')* '.'/'06 /#6'4+#. /(4/1&'.6;2' %1.14 5174%' %1.140#/' (+0+5* 411(+0) #52*#.6 %1/215+6+10 5*+0).' )#(6+/$'4.+0' 0#674#. 5*#&19 )#($#4-911&$;/(4 $#4)'$1#4& 911&0#911& 5*'49+0Ä 9+..+#/5 %1%110 59 2#+065#6+0 (#5%+# )766'4 /'6#. 6$&*#.(Ä4170& 5'#/.'55 #.7/+07/ $;/(4 &19052176 /'6#. 6$&4170& 5'#/.'55 #.7/+07/ $;/(4 4#(6'46#+.911&0#911&2#+065#6+0 *14+<106#. .#25+&+0) (+$'4 %'/'06 ,#/'5 *#4&+' *#4&+'2.#0-5*'49+0 9+..+#/5 41%-;4+8'4 59 5/116* 9+0&19 8+0;./+.)#4&8+0;./+.)#4&6#0 $;/(4 (4106&114 (+$'4).#55 6$&(+$'4).#55 5*'49+0Ä 9+..+#/5 ('.6'&911. 59 2#+06 5'/+Ä).155 64+/$1#4&(+$'4 %'/'06 ,#/'5 *#4&+' *#4&+'64+/5*'49+0Ä 9+..+#/5 %1%110 59 5/116* $1#4& $#66'0 (+$'4 %'/'06 ,#/'5 *#4&+' *#4&+'64+/ $1#4&5 5*'49+0Ä 9+..+#/5 ('.6'&911. 59 5/116* $'#/ 241,'%6+10 911&0#911& 5*'49+0Ä 9+..+#/5 %1%110 59 2#+065#6+0 01675'& 01675'& 01675'& 01675'&01675'& 01675'& 4#+.+0) 911&0#911&%1%110 59 2#+065#6+0 $#5'%#2 %10%4'6' 0#0#0#674#. 5'#.'&(.#6 $4+%-$4+%- 8'0''4 #%/'$4+%- $4+%- 8'0''4 #%/'$4+%- #767/0.#0'*'4+6#)' 6':674' $4+%- /146#4 /146#4 .#6+%4'6' /8+58'0''4 /146#4 .#6+%4'6' /75*411/ $;/(4 )#4#)' &114 /'6#. 6$&6$&5*'49+0Ä 9+..+#/5 ('.6'&911. 59 2#+065#6+0 2.#06'4$1: 911&6$&6$&5*'49+0Ä 9+..+#/5 %1%110 59 2#+065#6+0 #$$4'8+#6+105 ,*,#/'5*#4&+'595*'49+09+..+#/5 0#016#22.+%#$.'6$&61$'&'6'4/+0'& Planning Response 05.20.19 PC Agenda Page 42 5ECNG'.'8#6+10(4106 žÄ 0 1' 2' 4'8' 1/4" = 1'-0" BUILDINGS B, C, E & F Planning Response 07.27.17 0 6" 1' 2'4' 1/2" = 1'-0" &114-';016'5 %4#(65/#056;.'&114  2#+06'&64+/ 5ECNG6;2+%#.'064;&114 žÄ Planning Response 11.05.18 Planning Response 05.20.19 ‹7KH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21$OOULJKWVUHVHUYHG1R part of this document may be reproduced in any form or by any means without SHUPLVVLRQLQZULWLQJIURPWKH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21 A-4.1a 03.20.18 RG 2017.019 5*''6)'0'4#.016'5 PRELIMINARY DESIGN DIMENSIONS ARE APPROXIMATE. FINAL DIMENSIONS SHALL BE CONFIRMED IN CONSTRUCTION DOCUMENTS. -';/#2 -';016'5 411(+0) $#4)'$1#4& (#5%+#)766'4 &19052176 4#(6'46#+. *14+<106#..#25+&+0) 9+0&19 (4106&114 64+/$1#4& $1#4& $#66'0 $'#/241,'%6+10 01675'& 4#+.+0) $#5'%#2 $4+%- $4+%-/146#4 )#4#)'&114 2.#06'4$1: PC Agenda Page 43 5ECNG'.'8#6+105+&' .'(65+&'1((4106'.'8#6+10 žÄ 0 1' 2' 4'8' 1/4" = 1'-0"5ECNG'.'8#6+105+&' 4+)*65+&'1((4106'.'8#6+10 žÄ 0 1' 2' 4'8' 1/4" = 1'-0" BUILDINGS B, C, E & F BUILDINGS B, C, E & F Planning Response 07.27.17 Planning Response 11.05.18 Planning Response 05.20.19 ‹7KH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21$OOULJKWVUHVHUYHG1R part of this document may be reproduced in any form or by any means without SHUPLVVLRQLQZULWLQJIURPWKH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21 A-4.2a 03.20.18 RG 2017.019 -';/#2 5*''6)'0'4#.016'5 PRELIMINARY DESIGN DIMENSIONS ARE APPROXIMATE. FINAL DIMENSIONS SHALL BE CONFIRMED IN CONSTRUCTION DOCUMENTS. -';016'5 411(+0) $#4)'$1#4& (#5%+#)766'4 &19052176 4#(6'46#+. *14+<106#..#25+&+0) 9+0&19 (4106&114 64+/$1#4& $1#4& $#66'0 $'#/241,'%6+10 01675'& 4#+.+0) $#5'%#2 $4+%- $4+%-/146#4 )#4#)'&114 2.#06'4$1: PC Agenda Page 44 5ECNG'.'8#6+104'#4 žÄ 0 1' 2' 4'8' 1/4" = 1'-0" BUILDINGS B, C, E & F Planning Response 07.27.17 Planning Response 11.05.18 Planning Response 05.20.19 ‹7KH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21$OOULJKWVUHVHUYHG1R part of this document may be reproduced in any form or by any means without SHUPLVVLRQLQZULWLQJIURPWKH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21 A-4.3a 03.20.18 RG 2017.019 -';/#2 5*''6)'0'4#.016'5 PRELIMINARY DESIGN DIMENSIONS ARE APPROXIMATE. FINAL DIMENSIONS SHALL BE CONFIRMED IN CONSTRUCTION DOCUMENTS. -';016'5 411(+0) $#4)'$1#4& (#5%+#)766'4 &19052176 4#(6'46#+. *14+<106#..#25+&+0) 9+0&19 (4106&114 64+/$1#4& $1#4& $#66'0 $'#/241,'%6+10 01675'& 4#+.+0) $#5'%#2 $4+%- $4+%-/146#4 )#4#)'&114 2.#06'4$1: PC Agenda Page 45 ‹7KH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21$OOULJKWVUHVHUYHG1R part of this document may be reproduced in any form or by any means without SHUPLVVLRQLQZULWLQJIURPWKH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21 A-4.1b 03.20.18 RG 2017.019 5ECNG'.'8#6+10(4106 žÄ 0 1' 2' 4'8' 1/4" = 1'-0" BUILDINGS A & D Planning Response 07.27.17 Planning Response 11.05.18 Planning Response 05.20.19 -';/#2 5*''6)'0'4#.016'5 PRELIMINARY DESIGN DIMENSIONS ARE APPROXIMATE. FINAL DIMENSIONS SHALL BE CONFIRMED IN CONSTRUCTION DOCUMENTS. -';016'5 411(+0) $#4)'$1#4& (#5%+#)766'4 &19052176 4#(6'46#+. *14+<106#..#25+&+0) 9+0&19 (4106&114 64+/$1#4& $1#4& $#66'0 $'#/241,'%6+10 01675'& 4#+.+0) $#5'%#2 $4+%- $4+%-/146#4 )#4#)'&114 2.#06'4$1: PC Agenda Page 46 5ECNG'.'8#6+105+&' .'(65+&'1((4106'.'8#6+10 žÄ 0 1' 2' 4'8' 1/4" = 1'-0"5ECNG'.'8#6+105+&' 4+)*65+&'1((4106'.'8#6+10 žÄ 0 1' 2' 4'8' 1/4" = 1'-0" BUILDINGS A & DBUILDINGS A & D Planning Response 07.27.17 Planning Response 11.05.18 Planning Response 05.20.19 ‹7KH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21$OOULJKWVUHVHUYHG1R part of this document may be reproduced in any form or by any means without SHUPLVVLRQLQZULWLQJIURPWKH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21 A-4.2b 03.20.18 RG 2017.019 -';/#2 5*''6)'0'4#.016'5 PRELIMINARY DESIGN DIMENSIONS ARE APPROXIMATE. FINAL DIMENSIONS SHALL BE CONFIRMED IN CONSTRUCTION DOCUMENTS. -';016'5 411(+0) $#4)'$1#4& (#5%+#)766'4 &19052176 4#(6'46#+. *14+<106#..#25+&+0) 9+0&19 (4106&114 64+/$1#4& $1#4& $#66'0 $'#/241,'%6+10 01675'& 4#+.+0) $#5'%#2 $4+%- $4+%-/146#4 )#4#)'&114 2.#06'4$1: PC Agenda Page 47 5ECNG'.'8#6+104'#4 žÄ 0 1' 2' 4'8' 1/4" = 1'-0" BUILDINGS A & D Planning Response 07.27.17 Planning Response 11.05.18 Planning Response 05.20.19 ‹7KH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21$OOULJKWVUHVHUYHG1R part of this document may be reproduced in any form or by any means without SHUPLVVLRQLQZULWLQJIURPWKH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21 A-4.3b 03.20.18 RG 2017.019 -';/#2 5*''6)'0'4#.016'5 PRELIMINARY DESIGN DIMENSIONS ARE APPROXIMATE. FINAL DIMENSIONS SHALL BE CONFIRMED IN CONSTRUCTION DOCUMENTS. -';016'5 411(+0) $#4)'$1#4& (#5%+#)766'4 &19052176 4#(6'46#+. *14+<106#..#25+&+0) 9+0&19 (4106&114 64+/$1#4& $1#4& $#66'0 $'#/241,'%6+10 01675'& 4#+.+0) $#5'%#2 $4+%- $4+%-/146#4 )#4#)'&114 2.#06'4$1: PC Agenda Page 48 5ECNG2#46+#.5+6'5'%6+104Ä#$766+0)4Ä4'#4;#4&*'+)*6.+/+6#6+10 žÄ 5'%6+10-';016'5 2412'46;.+0' (+0+5*'&)4#&' žÄ/#:+/7/*'+)*6/#5104;9#..#62412'46;.+0' &')4''.+0'1(5+6'(41/6121(/#5104;9#..#62412'46;.+0' 0 2' 4' 8'16' 1/8" = 1'-0" 5ECNG2#46+#.5+6'2.#0 žÄ 02.28.21 Planning Response 07.27.17 Planning Response 11.05.18 5*''6)'0'4#.016'5 PRELIMINARY DESIGN DIMENSIONS ARE APPROXIMATE. FINAL DIMENSIONS SHALL BE CONFIRMED IN CONSTRUCTION DOCUMENTS. 0 2' 4' 8'16' 1/8" = 1'-0" Planning Response 05.20.19 ‹7KH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21$OOULJKWVUHVHUYHG1R part of this document may be reproduced in any form or by any means without SHUPLVVLRQLQZULWLQJIURPWKH*É/9(=$5$1*2$5&+,7(&785$/&25325$7,21 A-5 03.20.18 RG 2017.019 PC Agenda Page 49 MATERIAL LIST NO. BOTANICAL NAME COMMON NAME SIZE QTY WUCOLS REMARKS REG. 3 PROPOSED TREES: 2 - 48” box & 2 - 36” box trees shall be specifically located on final landscape plan submittal T1 ARBUTUS ‘MARINA’STRAWBERRY TREE 48” BOX 2 LOW MULTI TRUNK ARBUTUS ‘MARINA’STRAWBERRY TREE 24” BOX 8 LOW MULTI TRUNK T2 LOPHOSTEMON CONFERTUS BRISBANE BOX 15 GAL. 25 MODERATE STD. TRUNK T3 PLATANUS RACEMOSA CALIFORNIA SYCAMORE 48” BOX 2 MODERATE LOW BRANCHING PLATANUS RACEMOSA CALIFORNIA SYCAMORE 24” BOX 6 MODERATE LOW BRANCHING T4 SCHEFFLERA ELEGANTISSIMA FALSE ARALIA 24” BOX 4 MODERATE MULTI TRUNK / LOW BRANCHING PROPOSED SHRUBS: S1 ACCA SELLOWIANA PINEAPPLE GUAVA 5 GAL. 19 LOW LOW BRANCHING FORM S2 ALOE STRIATA CORAL ALOE 5 GAL. 103 LOW S3 CALLISTEMON ‘LITTLE JOHN’DWARF BOTTLEBRUSH 5 GAL. 41 LOW S4 DIETES GRANDIFLORA FORTNIGHT LILY 5 GAL. 51 LOW S5 MYRTUS COMMUNIS ‘COMPACTA’ DWARF MYRTLE 5 GAL. 20 LOW S6 PRUNUS ILICIFOLIA SSP. LYONII CATALINA CHERRY 5 GAL. 51 LOW SCREENING HEDGE S7 RHAPHIOLEPIS INDICA ‘CLARA’ INDIA HAWTHORN 5 GAL. 54 LOW PROPOSED GROUNDCOVERS: G1 MYOPORUM PARVIFOLIUM PROSTRATE MYOPORUM FLATS 18” o.c.LOW G2 ROSMARINUS ‘PROSTRATUS’PROSTRATE ROSEMARY 1 GAL. 36” o.c.LOW PROPOSED LAWN: L MARATHON II SOD SOD PROPOSED ENTERTAINMENT PARK: EP ENTERTAINMENT PARK WITH ARTIFICIAL TURF PROPOSED KID PARK: KP KID PARK WITH ARTIFICIAL TURF August 2018 BUILDING F BUILDING E BUILDING D BUILDING C BUILDING B BUILDING A T1 - ARBUTUS 'MARINA'T2 - LOPHOSTEMON CONFERTUS T3 - PLATANUS RACEMOSA T4 - SCHEFFLERA ELEGANTISSIMA S1 - ACCA SELLOWIANA S2 - ALOE STRIATA S3 - CALLISTEMON 'LITTLE JOHN'S4 - DIETES GRANDIFLORA S5 - MYRTUS 'COMPACTA'S6 - PRUNUS SSP. LYONII S7 - RAPHIOLEPIS 'CLARA'G1 - MYOPORUM PARVIFOLIUM G2 - ROSMARINUS 'PROSTRATUS' SITE LANDSCAPE AREA LANDSCAPE AREA = 6,820 SQ. FT. TURF = 429 SQ. FT. SYNTHETIC TURF = 2,142 SQ. FT. TOTAL LANDSCAPE PROJECT AREA = 9,391 SQ. FT. PLANT LIST NO.BOTANICAL NAME COMMON NAME SIZE QTY WUCOLS REMARKS RATING PROPOSED TREES: 2 - 48" box Arbutus & 2 - 36" box Platanus trees shall be graphically located on final landscape plan submittal T1 ARBUTUS 'MARINA'STRAWBERRY TREE 48" BOX 2 LOW MULTI TRUNK, GRAPHICALLY LOCATED ON FINAL PLANTING PLAN ARBUTUS 'MARINA'STRAWBERRY TREE 24" BOX 8 LOW MULTI TRUNK T2 LOPHOSTEMON CONFERTUS BRISBANE BOX 15 GAL.28 MODERATE STD. TRUNK T3 PLATANUS RACEMOSA CALIFORNIA SYCAMORE 36" BOX 2 MODERATE LOW BRANCHING, GRAPHICALLY LOCATED ON FINAL PLANTING PLAN PLATANUS RACEMOSA CALIFORNIA SYCAMORE 24" BOX 6 MODERATE LOW BRANCHING T4 SCHEFFLERA ELEGANTISSIMA FALSE ARALIA 24" BOX 4 MODERATE MULTI TRUNK / LOW BRANCHING EXISTING SHRUBS: S1 ACCA SELLOWIANA PINEAPPLE GUAVA 5 GAL.24 LOW LOW BRANCHING FORM S2 ALOE STRIATA CORAL ALOE 5 GAL.96 LOW S3 CALLISTEMON 'LITTLE JOHN'DWARF BOTTLEBRUSH 5 GAL.30 LOW S4 DIETES GRANDIFLORA FORTNIGHT LILY 5 GAL.51 LOW S5 MYRTUS COMMUNIS 'COMPACTA'DWARF MYRTLE 5 GAL.21 LOW S6 PRUNUS ILICIFOLIA SSP. LYONII CATALINA CHERRY 5 GAL.66 LOW SCREENING HEDGE S7 RHAPHIOLEPIS INDICA 'CLARA'INDIA HAWTHORN 5 GAL.41 LOW PROPOSED GROUNDCOVERS: G1 MYOPORUM PARVIFOLIUM PROSTRATE MYOPORUM FLATS 18" o.c.LOW GRAPHICALLY LOCATED ON FINAL PLANTING PLAN G2 ROSMARINUS 'PROSTRATUS'PROSTRATE ROSEMARY 1 GAL.36" o.c.LOW GRAPHICALLY LOCATED ON FINAL PLANTING PLAN PROPOSED LAWN: L MARATHON II SOD SOD HIGH PROPOSED PAVERS: P PAVERS PROPOSED ENTERTAINMENT PARK: EP ENTERTAINMENT PARK WITH ARTIFICIAL TURF PROPOSED KID PARK: KP KID PARK WITH ARTIFICIAL TURF WATER EFFICIENT LANDSCAPE CALCULATIONS PER 2015 REVISED MODEL WATER EFFICIENT LANDSCAPE ORDINANCE REFERENCE EVAPOTRANSPIRATION (ETo) 50.1 PLANT DESCRIP.PLANT FACTOR (PF)IRRIGATION METHOD IRRIG. EFFICIENCY (IE)ETAF (PF / IE)LAND. AREA ETAF X AREA ETWU HIGH USE 0.7 DRIP 0.81 0.86 429 368.9 11,459 GAL. / YR. MODERATE WATER 0.5 DRIP 0.81 0.62 370 228.3 7,091 GAL. / YR. LOW USE 0.2 DRIP 0.81 0.25 6,450 1612.5 50,087 GAL. / YR. NO USE N/A N/A N/A N/A 2,142 N/A 0 GAL. / YR. TOTAL 9,391 S.F.2209.7 ETWU TOTAL 68,637 GAL. / YR. MAWA TOTAL 160,437 GAL. / YR. MAXIMUM APPLIED WATER ALLOWANCE (MAWA) MAWA = (ETo) (0.62) [(ETAF X LA) + ((1-ETAF) X SLA)] MAWA = (50.1) (0.62) [(0.55 X 9,391) + (0.45 X 0)] MAWA = 160,437 GAL. / YR. ETAF CALCULATIONS (AVERAGE ETAF FOR REGULAR LANDSCAPE AREAS MUST BE .55 OR BELOW FOR RESIDENTIAL AREAS) TOTAL ETAF X AREA = 2209.7 TOTAL AREA = 9,391 S. F. AVERAGE ETAF = 0.23 HYDROZONE INFORMATION TABLE HIGH WATER USE HYDROZONE = PROPOSED TURF AREAS (429 SQ. FT. = 4% OF LANDSCAPE) MODERATE WATER USE HYDROZONE = RWS FOR PROPOSED LOPHOSTEMON, PLATANUS AND SCHEFFLERA TREES (370 SQ. FT. = 4% OF LANDSCAPE) LOW WATER USE HYDROZONE = ALL PROPOSED LANDSCAPE ARES, EXCLUDING TURF, ARTIFICIAL TURF AND TREES IN ABOVE CATEGORY (6,450 SQ. FT. = 69% OF LANDSCAPE) NO WATER USE HYDROZONE = ALL PROPOSED SYNTHETIC TURF AREAS (2,142 SQ. FT. = 23% OF LANDSCAPE) JUNE 2019KGW AS SHOWN 1416 October 2019 PC Agenda Page 50 H2S Engineers Inc. L U M I N A I R E S C H E D U L E S y m b o l L a b e l Q t y F i l e L u m e n s L L F W a t t s C a t a l o g N u m b e r D e s c r i p t i o n L a m p A - 5 4 G A R - 0 8 0 - L E D - E 1 - 5 - G L O W - C A G E . i e s 7 5 3 7 0 . 9 5 9 7 . 9 W P - A 3 4 4 G A R - 0 8 0 - L E D - E 1 - 3 - G L O W - C A G E . i e s 7 7 6 7 0 . 9 5 9 7 . 9 G A R - 0 8 0 - L E D - E 1 - 5 - - G L O W - C A G E M c G R A W - E D I S O N P O S T T O P W I T H A T Y P E V P R I S M A T I C R E F R A C T O R W I T H A R C H I T E C T U R A L C A G E [ 6 ] 4 0 0 0 K L E D S G A R - 0 8 0 - L E D - E 1 - 3 - - G L O W - C A G E M c G R A W - E D I S O N P O S T T O P W I T H A T Y P E I I I P R I S M A T I C R E F R A C T O R W I T H A R C H I T E C T U R A L C A G E [ 6 ] 4 0 0 0 K L E D S S T A T I S T I C S D e s c r i p t i o n S y m b o l A v g M a x M i n M a x / M i n A v g / M i n C a l c Z o n e # 3 4 . 8 f c 1 7 . 9 f c 0 . 6 f c 2 9 . 8 : 1 8 . 0 : 1 P C A g e n d a P a g e 5 1 H2S Engineers Inc. P C A g e n d a P a g e 5 2