PLN-19-00090 (GENERAL PLAN CONSISTENCY) -A REQUEST TO FIND THAT THE CAPITAL IMPROVEMENT PROGRAM FOR THE 2019-20 FISCAL YEAR IS CONSISTENT WITH THE GENERAL PLAN.
Pursuant to State Government Code 65401, the Planning Commission must find that the City's Capital Improvement Program (CIP) is consistent with the City's General Plan. Based on the analysis contained in this report, staff is recommending the Planning Commission adopt the following titled resolution:
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
DOWNEY ADOPTING A FINDING THAT THE CAPITAL IMPROVEMENT
PROGRAM FOR THE 2019-20 FISCAL YEAR 15 CONSISTENT WITH THE
GENERAL PLAN
BACKGROUND
The CIP identifies the proposed major projects and improvements that the City will undertake during the ensuing fiscal year. Included within the program are types of projects, costs, funding sources, and anticipated time frame. The types of projects include street improvements, purchase of property, infrastructure improvements, consulting services, equipment, and building maintenance. Although the city may carry out multiple projects not identified in the CIP, the program only includes initiatives with costs exceeding $5,000.00.
On an annual basis, the Planning Commission must review and find the program to be consistent with the City's General Plan. Section 65401 of the State of California Government Code states that the CIP, " ... shall be submitted to the county or city planning agency for review and report to said official agency as to conformity with the adopted general plan or part thereof." The Planning Commission fulfills the role of the "planning agency" while the City Council fulfills the role of the "official agency". The Planning Commission's purpose in this process is to determine that the CIP is consistent with the goals, policies, and programs found within the City of Downey's Vision 2025 General Plan. This action does not approve, fund, or authorize any individual or specific project. After action is taken on this item, the finding will then be forwarded to the City Council for their review and determination.
PC Agenda Page 1
City of Downey
FY 2019-20
Capital Improvement Program
Page 1 of 11
ACTIVITY
GENERAL
FUND
IMPACTS PRIORITY
CIP No.No. ACCT
REQ.
DEPT.PROJECT TITLE
PROJECT LOCATION
(Street Address or Cross
Streets)
$ PER
YEAR
1 - 1YR.
2 - 2YR.
3 - 3YR.
STREETS
SS601B 1 16601 PW
Paramount
Boulevard at
Firestone
Boulevard
Improvements
Southwest Corner of
Paramount
Boulevard at
Firestone Boulevard Const.2,000 1 0 0 0 0 0 0 0 0 0 59,843 0 0 0 0 0 0 0 0 0 70,000 0 0 0 0 0 0 129,843
n/a 2 16624 PW
Annual
Miscellaneous
Bridge Repairs Citywide Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 200,000 0 200,000
CIP 16-20 3 16628 PW
Old River School
Road Pavement
Rehabilitation
Old River School
Road (Imperial
Highway to Arnett
Street)Const.0 1 0 0 0 2,124,650 0 0 0 618,556 0 0 0 0 0 182,000 0 0 0 0 0 0 0 0 0 42,000 82,794 0 3,050,000
CIP 14-09 4 16692 PW
Firestone
Boulevard at
Lakewood
Boulevard
Intersection
Improvements
Firestone Boulevard
at Lakewood
Boulevard
Env. +
PS&E 0 2 0 0 0 0 0 0 0 0 500,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 500,000
CIP 14-08 5 16693 PW
Florence Avenue
Bridge
Rehabilitation at
Rio Hondo River
Florence Avenue at
Rio Hondo River
Env. +
PS&E 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 57,350 0 57,350
Federal HBP
grant
CIP 14-07 6 16710 PW
Florence Avenue
Bridge
Rehabilitation
and Widening at
San Gabriel
River
Florence Avenue at
San Gabriel River
Env +
PS&E 0 3 0 0 0 0 300,000 0 0 0 0 0 0 500,000 0 17,804 0 0 0 0 0 0 0 0 0 19,618 0 0 837,422
Federal HBP
grant
CIP 15-13 7 17728 PW
Safety Lighting
Improvement
Project Adjacent
to the I-5
Freeway, Phase
2
Area currently
occupied by Dollison
Drive (vacated due
to I-5 Fwy.
expansion) between
Fairford Avenue and
Cecilia Street Const.1,000 1 0 60,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 60,000
Zone 1 L&L District
Funding for Safety
Lighting
CIP 16-03 8 17804 PW
I-5 Freeway at
Florence Avenue
Traffic Mitigation
Improvements
Florence Avenue
(Studebaker Road to
Orr & Day Road)Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 5,000 0 0 0 0 0 0 0 0 0 0 0 0 0 5,000
Caltrans Grant for
Traffic Mitigation &
Inspection
CIP 16-05 9 17806 PW
Telegraph Road
Traffic
Throughput &
Safety
Enhancements,
Phase 2
Telegraph Road
(West City Limit to
Lakewood
Boulevard and
Passons Boulevard
to East City Limit)Const.3,000 1 0 0 0 0 0 0 0 0 0 0 0 2,787,069 4,160,000 0 0 0 0 0 0 0 0 0 916,471 0 0 0 7,863,540
g
covers 28% ($2.8 mil.)
of project cost.
Includes GPR grant
($1.46 mil.) for
landscaping and
reimbursement from
Pico Rivera ($2.7
CIP 18-05 10 16721 PW
Tweedy Lane
Pavement
Rehabilitation
Tweedy Lane
(Florence Avenue to
Suva Street) Const.0 1 0 0 0 500,000 0 0 0 0 0 0 0 0 0 45,000 0 0 0 0 0 0 0 0 0 0 0 0 545,000
CIP 14-13 11 16697 PW
Civic Center
Drive & 3rd
Street Pavement
Rehabilitation
Civic Center Drive
(3rd Street and
Brookshire Avenue)
and 3rd Street (Civic
Center Drive and
City Hall)Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 390,000 0 0 390,000
CIP 15-12 12 16712 PW
Bellflower
Boulevard
Pavement
Rehabilitation
Bellflower Boulevard
(Foster Road to
Dalen Street) and
(900 ft. N/O Imperial
Highway to Stewart
and Gray Road)
Env +
PS&E 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 20,000 0 0 0 20,000
CIP 14-14 13 16711 PW
Woodruff
Avenue
Pavement
Rehabilitation
Woodruff Avenue
(Foster Road to
Stewart and Gray
Road)
Env +
PS&E 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 20,000 0 0 20,000
LOCAL
RETURN
FUND
LOCAL
RETURN
FUND FUND FUND FUND FUND
GRANT
FUND
GRANT
FUND
GRANT
FUND
GRANT
FUND
GRANT
FUND
GRANT
FUND
MEASURE
M SEWER
TOTAL NOTES
PROP C
MEASURE
R
OTHER
(MSRC,
CALFIRE,
LOCAL
RETURN
FUND
GRANT
FUND FUND
LOCAL
RETURN
FUND BOND FUND
SALES TAX
FUND FUND FUND FUND FUND FUND GRANT FUND
GRANT
FUND
GRANT
FUND
ART IN
PUBLIC
PLACES
STORM
WATER WATER GAS TAX SB1 MEASURE S
MEASURE
S
VEHICLE
IMPACT
FEE
CAP.
PROJ.
METRO
2016
FEDERAL
METRO
MEASURE R
I-605
METRO
MEASURE
R I-710
METRO
CALL FOR
PROJECTS
METRO
CALL FOR
PROJECTS
56 57 72
AQMD
L&L
DISTRICT
TDA
ARTICLE
III
FEDERAL
STPL
CALTRANS
FEDERAL
HIGHWAY
CALTRANS
FEDERAL
HSIP
CALTRANS
ATP
40 40 50 51 54382626262626262630323335262223252626
PC Agenda Page 6
City of Downey
FY 2019-20
Capital Improvement Program
Page 2 of 11
ACTIVITY
GENERAL
FUND
IMPACTS PRIORITY
CIP No.No. ACCT
REQ.
DEPT.PROJECT TITLE
PROJECT LOCATION
(Street Address or Cross
Streets)
$ PER
YEAR
1 - 1YR.
2 - 2YR.
3 - 3YR.
LOCAL
RETURN
FUND
LOCAL
RETURN
FUND FUND FUND FUND FUND
GRANT
FUND
GRANT
FUND
GRANT
FUND
GRANT
FUND
GRANT
FUND
GRANT
FUND
MEASURE
M SEWER
TOTAL NOTES
PROP C
MEASURE
R
OTHER
(MSRC,
CALFIRE,
LOCAL
RETURN
FUND
GRANT
FUND FUND
LOCAL
RETURN
FUND BOND FUND
SALES TAX
FUND FUND FUND FUND FUND FUND GRANT FUND
GRANT
FUND
GRANT
FUND
ART IN
PUBLIC
PLACES
STORM
WATER WATER GAS TAX SB1 MEASURE S
MEASURE
S
VEHICLE
IMPACT
FEE
CAP.
PROJ.
METRO
2016
FEDERAL
METRO
MEASURE R
I-605
METRO
MEASURE
R I-710
METRO
CALL FOR
PROJECTS
METRO
CALL FOR
PROJECTS
56 57 72
AQMD
L&L
DISTRICT
TDA
ARTICLE
III
FEDERAL
STPL
CALTRANS
FEDERAL
HIGHWAY
CALTRANS
FEDERAL
HSIP
CALTRANS
ATP
40 40 50 51 54382626262626262630323335262223252626
CIP 19-05 14 16744 PW
Suva Street at
Rio Hondo River
Bridge Repair
Suva Street bridge
at the Rio Hondo
River Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 26,000 0 0 0 0 0 0 0 0 0 0 0 0 26,000
Department of Public
Works is the lead
agency and the City's
shared cost is
$26,000.
CIP 19-06 15 16745 PW
Paramount
Boulevard at
Imperial Highway
Intersection
Improvements
Paramount
Boulevard at
Imperial Highway
Env. +
PS&E 0 2 0 0 0 0 0 0 0 0 0 985,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 985,000
CIP 19-07 16 16746 PW
Lakewood
Boulevard at
Florence Avenue
Intersection
Improvements
Lakewood
Boulevard at
Florence Avenue
Env +
PS&E 0 2 0 0 0 0 0 0 0 0 950,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 950,000
CIP 19-08 17 16747 PW
Lakewood
Boulevard at
Imperial Highway
Intersection
Improvements
Lakewood
Boulevard at
Imperial Highway
Env. +
PS&E 0 2 0 0 0 0 0 0 0 0 800,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 800,000
CIP 19-09 18 16749 PW
Firestone
Boulevard
Pavement
Rehabilitation
Westbound
Firestone Boulevard
(Downey Avenue to
Myrtle Avenue)Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 400,000 0 0 0 0 0 0 0 0 0 0 0 0 400,000
CIP 19-11 19 16761 PW
FY 18/19
Miscellaneous
Concrete
Repairs and
ADA
Improvements
Council Districts 2 &
4 (miscellaneous
concrete
improvements) &
Citywide (ADA
improvements)Const.0 1 0 0 40,000 0 0 0 0 0 0 0 0 0 200,000 0 200,000 0 0 0 0 0 0 0 0 0 0 0 440,000
DUSD Agreement
$200,000
CIP 19-12 20 16762 PW
FY 2018/19
Slurry Seal
Project Council District 3 Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 300,000 0 0 0 0 0 0 0 0 0 0 0 300,000
CIP 19-13 21 16764 PW
FY 18/19
Residential
Streets
Pavement
Rehabilitation
Council Districts 1 &
2 Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 350,000 0 0 650,000 0 0 0 0 0 0 0 0 1,000,000
n/a 22 16760 PW
Pavement
Management
Information
System Update Citywide Study 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 60,000 0 0 0 0 0 0 0 0 0 0 0 0 60,000
n/a 23 16762 PW
Urban Forest
Management
Plan Citywide Const.1,000 1 0 0 0 0 0 0 0 0 0 0 0 0 345,000 0 0 0 0 0 0 0 0 0 0 0 0 0 345,000 Cal-Fire grant
CIP 20-01 24
NEW
16779 PW
FY 19/20
Miscellaneous
Concrete
Repairs and
ADA
Improvements
Council District 1
(miscellaneous
concrete
improvements) &
Citywide (ADA
improvements)
PS&E +
Const.0 1 0 0 40,000 0 0 0 0 0 0 0 0 0 0 0 350,000 0 0 0 0 0 0 0 0 0 0 0 390,000
PC Agenda Page 7
City of Downey
FY 2019-20
Capital Improvement Program
Page 3 of 11
ACTIVITY
GENERAL
FUND
IMPACTS PRIORITY
CIP No.No. ACCT
REQ.
DEPT.PROJECT TITLE
PROJECT LOCATION
(Street Address or Cross
Streets)
$ PER
YEAR
1 - 1YR.
2 - 2YR.
3 - 3YR.
LOCAL
RETURN
FUND
LOCAL
RETURN
FUND FUND FUND FUND FUND
GRANT
FUND
GRANT
FUND
GRANT
FUND
GRANT
FUND
GRANT
FUND
GRANT
FUND
MEASURE
M SEWER
TOTAL NOTES
PROP C
MEASURE
R
OTHER
(MSRC,
CALFIRE,
LOCAL
RETURN
FUND
GRANT
FUND FUND
LOCAL
RETURN
FUND BOND FUND
SALES TAX
FUND FUND FUND FUND FUND FUND GRANT FUND
GRANT
FUND
GRANT
FUND
ART IN
PUBLIC
PLACES
STORM
WATER WATER GAS TAX SB1 MEASURE S
MEASURE
S
VEHICLE
IMPACT
FEE
CAP.
PROJ.
METRO
2016
FEDERAL
METRO
MEASURE R
I-605
METRO
MEASURE
R I-710
METRO
CALL FOR
PROJECTS
METRO
CALL FOR
PROJECTS
56 57 72
AQMD
L&L
DISTRICT
TDA
ARTICLE
III
FEDERAL
STPL
CALTRANS
FEDERAL
HIGHWAY
CALTRANS
FEDERAL
HSIP
CALTRANS
ATP
40 40 50 51 54382626262626262630323335262223252626
CIP 20-02 25
NEW
16780 PW
FY 19/20 Annual
Slurry Seal
Project Council District 4
PS&E +
Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 300,000 0 0 0 0 0 0 0 0 0 0 0 300,000
CIP 20-03 26
NEW
16781 PW
FY 19/20
Residential
Streets
Pavement
Rehabilitation
Council Districts 3 &
4
PS&E +
Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 152,000 0 900,000 0 0 500,000 0 0 0 0 0 1,000,000 0 0 2,552,000
developer contribution
(KB Homes) for Parrot
Ave. N/O 5th St. and
$30k (Aldi's) for Nash
Ave.
CIP 20-04 27
NEW
16782 PW
Lakewood
Boulevard
Parkway
Improvements
Lakewood
Boulevard (Imperial
Highway and
Bellflower
Boulevard)
PS&E +
Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 400,000 0 400,000
CIP 20-05 28
NEW
16783 PW
Florence Avenue
Pavement
Rehabilitation
Florence Avenue
(Tweedy Lane to
Brookshire Avenue)
PS&E +
Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 600,000 0 600,000 0 1,200,000
CIP 20-06 29
NEW
16784 PW
3rd Street
Pavement
Rehabilitation
3rd Street (Old River
School Road to
Rives Avenue)
PS&E +
Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100,000 0 0 0 0 0 0 0 400,000 0 0 0 500,000
CIP 20-07 30
NEW
16785 PW
Paramount
Boulevard
Median
Landscape
Improvements
(Phase 1)
Paramount
Boulevard (Imperial
Highway to
Firestone
Boulevard)
PS&E +
Const.3,000 1 0 0 0 0 0 0 0 0 0 0 0 0 1,172,000 0 0 0 0 0 0 0 0 0 0 0 0 0 1,172,000
Green Project
Reserve Grant
CIP 20-08 31
NEW
16786 PW
Firestone
Boulevard
Median
Landscape
Improvements
Firestone Boulevard
(West City Limit to
Old River School
Road)
PS&E +
Const.2,000 1 0 0 0 0 0 0 0 0 0 0 0 0 696,000 0 0 0 0 0 0 0 0 0 0 0 0 0 696,000
Green Project
Reserve Grant
CIP 20-09 32
NEW
16787 PW
Entry Monument
Signs (Various
Locations)Citywide
PS&E +
Const.1,000 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 120,000 0 0 120,000
CIP 20-10 33
NEW
16788 PW
Paramount
Boulevard
Median
Landscape
Improvements
(Phase 3)
Paramount
Boulevard
(Gardendale Street
to Imperial Highway)
PS&E +
Const.2,000 1 0 0 0 0 0 0 0 0 0 0 0 0 0 500,000 0 0 0 0 0 0 0 0 0 0 0 0 500,000
CIP 20-24 34
NEW
16742 PW
Paramount
Boulevard
Median
Landscape
Improvements
(Phase 2)
Paramount
Boulevard
(Firestone
Boulevard to
Florence Avenue)
PS&E +
Const.1,000 1 0 0 0 0 0 0 0 0 0 0 0 0 672,000 0 0 0 0 0 0 0 0 0 0 0 0 0 672,000
Green Project
Reserve Grant
TOTAL
STREETS 0 60,000 80,000 2,624,650 300,000 0 0 618,556 2,250,000 1,044,843 0 3,287,069 7,402,000 1,230,804 2,500,000 0 0 1,150,000 0 70,000 0 0 1,936,471 1,591,618 1,340,144 0 27,486,155
TRAFFIC
SAFETY
n/a 35 16454 PW
Traffic Safety
Improvement
Program
Various locations
citywide 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 200,000 0 0 0 0 0 0 0 0 0 0 0 0 200,000
CIP 14-18 36 16701 PW
Paramount
Boulevard
Median
Improvements
and Pavement
Rehabilitation
(Phase 1)
Paramount
Boulevard (Imperial
Highway to
Firestone
Boulevard)Const.1,000 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7,000 0 0 0 0 0 0 0 0 544,507 100,000 0 651,507
CIP 14-19 37 16702 PW
Paramount
Boulevard
Median
Improvements
and Pavement
Rehabilitation
(Phase 2)
Paramount
Boulevard
(Firestone
Boulevard to
Florence Avenue)Const.1,000 1 0 0 0 0 0 172,600 0 392,310 0 0 0 0 77,000 0 71,090 0 0 0 0 0 0 0 0 0 1,040,000 0 1,753,000
Revenue includes
$672,000 in Green
Project Reserve grant
and $77,000 in
developer (KB
Homes) fair-share
contribution.
PC Agenda Page 8
City of Downey
FY 2019-20
Capital Improvement Program
Page 4 of 11
ACTIVITY
GENERAL
FUND
IMPACTS PRIORITY
CIP No.No. ACCT
REQ.
DEPT.PROJECT TITLE
PROJECT LOCATION
(Street Address or Cross
Streets)
$ PER
YEAR
1 - 1YR.
2 - 2YR.
3 - 3YR.
LOCAL
RETURN
FUND
LOCAL
RETURN
FUND FUND FUND FUND FUND
GRANT
FUND
GRANT
FUND
GRANT
FUND
GRANT
FUND
GRANT
FUND
GRANT
FUND
MEASURE
M SEWER
TOTAL NOTES
PROP C
MEASURE
R
OTHER
(MSRC,
CALFIRE,
LOCAL
RETURN
FUND
GRANT
FUND FUND
LOCAL
RETURN
FUND BOND FUND
SALES TAX
FUND FUND FUND FUND FUND FUND GRANT FUND
GRANT
FUND
GRANT
FUND
ART IN
PUBLIC
PLACES
STORM
WATER WATER GAS TAX SB1 MEASURE S
MEASURE
S
VEHICLE
IMPACT
FEE
CAP.
PROJ.
METRO
2016
FEDERAL
METRO
MEASURE R
I-605
METRO
MEASURE
R I-710
METRO
CALL FOR
PROJECTS
METRO
CALL FOR
PROJECTS
56 57 72
AQMD
L&L
DISTRICT
TDA
ARTICLE
III
FEDERAL
STPL
CALTRANS
FEDERAL
HIGHWAY
CALTRANS
FEDERAL
HSIP
CALTRANS
ATP
40 40 50 51 54382626262626262630323335262223252626
CIP 15-14 38 17717 PW
Firestone
Boulevard
Median
Improvements
and Pavement
Rehabilitation
Firestone Boulevard
(West City Limit to
Old River School
Road)Const.1,000 1 0 0 0 0 0 143,000 0 933,754 0 323,000 0 0 0 40,000 0 0 0 0 0 0 0 0 168,000 0 714,246 0 2,322,000
n/a 39 17808 PW
Lakewood
Boulevard/
Rosemead
Boulevard
Complete
Streets Study
Lakewood
Boulevard (North
City Limit to South
City Limit)Study 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 65,000 0 0 0 0 0 0 0 0 0 0 0 65,000
City's share of grant
received through
Gateway Cities COG
n/a 40 17829 PW
Florence Avenue
Regional
Complete
Streets Study
Florence Avenue
(West City Limit to
East City Limit)Study 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 25,000 0 0 25,000
City's share of Metro
grant procured by the
Gateway Cities COG
CIP 15-30 41 17708 PW
FY 19/20
Citywide Traffic
Striping of Major
Roadways Citywide Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 70,000 0 0 0 0 0 0 0 0 0 0 0 0 70,000
CIP 17-06 42 17825 PW
Woodruff
Avenue
Fiberoptic
Communications
& Traffic Signal
Upgrades
Project
Woodruff Avenue
(Foster Road to
Firestone
Boulevard)Const.2,000 1 0 0 0 0 0 0 0 0 0 0 608,391 0 0 0 0 0 0 0 0 0 0 0 318,000 391,609 0 0 1,318,000
Full grant amount =
$738k; local match =
$185k (20%)
CIP 17-07 43 17826 PW
Citywide Transit
Priority System
Downey LINK routes
citywide
Env +
PS&E 0 2 0 0 0 0 0 0 0 0 0 0 112,000 0 0 0 0 0 0 0 0 0 0 0 0 28,000 0 0 140,000
Full grant amount =
$1,292k; local match =
$323k (20%)
CIP 16-15 44 17827 PW
Bike Share and
Safety Education
Program Citywide Const.0 1 0 0 0 0 0 0 20,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 24,000 0 0 44,000
Full grant amount =
$180k; local match =
$114k (39%)
CIP 17-09 45 17830 PW
Paramount
Boulevard
Signalization &
Safety
Enhancements
Paramount
Boulevard
(Gardendale Street
to Telegraph Road)Const.2,000 1 0 0 0 0 0 1,750,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,750,000
Federal HSIP Cycle 7
$187,500 grant and
toll credits
PC Agenda Page 9
City of Downey
FY 2019-20
Capital Improvement Program
Page 5 of 11
ACTIVITY
GENERAL
FUND
IMPACTS PRIORITY
CIP No.No. ACCT
REQ.
DEPT.PROJECT TITLE
PROJECT LOCATION
(Street Address or Cross
Streets)
$ PER
YEAR
1 - 1YR.
2 - 2YR.
3 - 3YR.
LOCAL
RETURN
FUND
LOCAL
RETURN
FUND FUND FUND FUND FUND
GRANT
FUND
GRANT
FUND
GRANT
FUND
GRANT
FUND
GRANT
FUND
GRANT
FUND
MEASURE
M SEWER
TOTAL NOTES
PROP C
MEASURE
R
OTHER
(MSRC,
CALFIRE,
LOCAL
RETURN
FUND
GRANT
FUND FUND
LOCAL
RETURN
FUND BOND FUND
SALES TAX
FUND FUND FUND FUND FUND FUND GRANT FUND
GRANT
FUND
GRANT
FUND
ART IN
PUBLIC
PLACES
STORM
WATER WATER GAS TAX SB1 MEASURE S
MEASURE
S
VEHICLE
IMPACT
FEE
CAP.
PROJ.
METRO
2016
FEDERAL
METRO
MEASURE R
I-605
METRO
MEASURE
R I-710
METRO
CALL FOR
PROJECTS
METRO
CALL FOR
PROJECTS
56 57 72
AQMD
L&L
DISTRICT
TDA
ARTICLE
III
FEDERAL
STPL
CALTRANS
FEDERAL
HIGHWAY
CALTRANS
FEDERAL
HSIP
CALTRANS
ATP
40 40 50 51 54382626262626262630323335262223252626
CIP 17-10 46 17831 PW
Stewart & Gray
Road
Signalization &
Safety
Enhancements
Stewart & Gray
Road (Old River
School Road and
Firestone
Boulevard)Const.2,000 1 0 0 0 0 0 2,000,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2,000,000
Federal HSIP Cycle 7
grant and toll credits
CIP 17-11 47 17832 PW
South Downey
Safe Routes to
School Project
South Part of the
City
PS&E +
Const.0 2 0 0 0 0 0 0 37,000 0 0 0 0 0 0 0 203,000 0 0 0 0 0 0 0 0 0 0 0 240,000
Full grant amount =
$238k; local match =
$278k (54%)
CIP 17-12 48 17833 PW
Citywide
Pedestrian Plan Citywide Study 0 1 0 0 0 0 0 0 265,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 265,000
Full grant amount =
$300k; no local match
CIP 17-14 49 17834 PW
Traffic
Management
Center (TMC)
Upgrades City Hall Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 310,812 70,000 0 0 0 0 0 0 0 0 0 0 0 0 380,812 LA County Grant
CIP 18-07 50 16723 PW
Imperial Highway
Signalization &
Safety
Enhancements
Imperial Highway
(Old River School
Road to and
Woodruff Avenue)
PS&E +
Const.2,000 2 0 0 0 0 0 480,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 480,000
Federal HSIP Cycle 8
Grant and toll credits
$100,000 for PS&E
CIP 19-14 51 16765 PW
Downey Bike
Master Plan
Implementation
Phase 1
Downtown/Transi
t Citywide
PS&E +
Const.0 2 0 0 0 0 0 0 0 0 0 0 905,156 0 0 0 0 0 0 0 0 0 0 0 0 0 223,000 0 1,128,156
CIP 20-11 52
NEW
16789 PW
Florence Avenue
Traffic Signal
Upgrades
Florence Avenue at
Downey Avenue and
Florence Avenue at
Brookshire Avenue
PS&E +
Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 522,000 0 0 522,000
CIP 20-12 53
NEW
16790 PW
Firestone
Boulevard Traffic
Signal Upgrades
Firestone Boulevard
at Rives Avenue
and Firestone
Boulevard at
Downey Avenue Design 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 40,000 0 0 40,000
CIP 20-13 54
NEW
16791 PW
Lakewood
Boulevard Traffic
Signal Upgrades
Lakewood
Boulevard at 5th
Street-Cecilia Street
and Lakewood
Boulevard at
Alameda Street Design 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 40,000 0 0 0 40,000
TOTAL
TRAFFIC
SAFETY 0 0 0 0 0 4,545,600 322,000 1,326,064 0 323,000 1,625,547 0 387,812 380,000 346,090 0 0 0 0 0 0 0 526,000 1,575,116 2,077,246 0 13,434,475
PUBLIC
FACILITIES 0
CIP 15-26 55 17665 PW
Citywide
Playground
Structure Safety
Repairs and
Replacement Citywide Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 50,000 0 0 0 0 0 0 0 50,000
CIP 16-12 56 17713 PW
Golf Course
Driving Range
Improvements
including
Outdoor Sound
and Music
Rio Hondo Golf
Course Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 34,795 0 0 0 0 0 0 0 34,795
CIP 15-21 57 17706 PW
Wilderness Park
Lake
Improvement
Project
Wilderness Park
Lakes Const.2,000 1 0 0 0 0 0 0 0 0 0 0 0 0 1,746,842 0 0 0 0 0 189,971 0 0 0 0 0 0 0 1,936,813
Prop 84 Habitat
Conservation
Grant/RMC Grant
CIP 18-08 58 16723 PW
Maintenance
Yard Fuel
Dispenser
Canopy Project
Public Works
Maintenance Yard Const.0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 50,000 0 0 0 0 0 0 0 50,000
PC Agenda Page 10
City of Downey
FY 2019-20
Capital Improvement Program
Page 6 of 11
ACTIVITY
GENERAL
FUND
IMPACTS PRIORITY
CIP No.No. ACCT
REQ.
DEPT.PROJECT TITLE
PROJECT LOCATION
(Street Address or Cross
Streets)
$ PER
YEAR
1 - 1YR.
2 - 2YR.
3 - 3YR.
LOCAL
RETURN
FUND
LOCAL
RETURN
FUND FUND FUND FUND FUND
GRANT
FUND
GRANT
FUND
GRANT
FUND
GRANT
FUND
GRANT
FUND
GRANT
FUND
MEASURE
M SEWER
TOTAL NOTES
PROP C
MEASURE
R
OTHER
(MSRC,
CALFIRE,
LOCAL
RETURN
FUND
GRANT
FUND FUND
LOCAL
RETURN
FUND BOND FUND
SALES TAX
FUND FUND FUND FUND FUND FUND GRANT FUND
GRANT
FUND
GRANT
FUND
ART IN
PUBLIC
PLACES
STORM
WATER WATER GAS TAX SB1 MEASURE S
MEASURE
S
VEHICLE
IMPACT
FEE
CAP.
PROJ.
METRO
2016
FEDERAL
METRO
MEASURE R
I-605
METRO
MEASURE
R I-710
METRO
CALL FOR
PROJECTS
METRO
CALL FOR
PROJECTS
56 57 72
AQMD
L&L
DISTRICT
TDA
ARTICLE
III
FEDERAL
STPL
CALTRANS
FEDERAL
HIGHWAY
CALTRANS
FEDERAL
HSIP
CALTRANS
ATP
40 40 50 51 54382626262626262630323335262223252626
CIP 19-37-
01 59 13301 PW
Fire Station No.
1 Modernization
and Expansion
Project Fire Station No. 1 Const.2,000 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2,218,479 2,000,000 0 0 0 0 0 0 0 0 0 4,218,479
CIP 19-37-
02 60 13312 PW
Fire Station No.
2 Modernization
and Expansion
Project Fire Station No. 2 Const.1,000 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,859,409 1,300,000 0 0 0 0 0 0 0 0 0 3,159,409
CIP 19-37-
03 61 13313 PW
Fire Station No.
3 Modernization
and Expansion
Project Fire Station No. 3 Const.1,000 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,812,605 1,400,000 0 0 0 0 0 0 0 0 0 3,212,605
CIP 19-37-
04 62 13314 PW
Fire Station No.
4 Modernization
and Expansion
Project Fire Station No. 4 Const.1,000 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,858,909 1,300,000 0 0 0 0 0 0 0 0 0 3,158,909
CIP 19-38 63 13302 PW
Police Station
Modernization
Project Police Station
PS&E +
Const.1,000 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 634,064 0 0 0 0 0 0 0 0 0 0 634,064
CIP 19-20 64 13303 PW
Library
Modernization
Project Downey Library Const.2,000 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7,857,454 0 0 0 0 0 0 0 0 0 0 7,857,454
CIP 19-21 65 13304 PW
City Hall
Improvement
Project City Hall
PS&E +
Const.1,000 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,165,497 0 0 0 0 0 0 0 0 0 0 1,165,497
CIP 19-22 66 13306 PW
Civic Theatre
Improvement
Project
Downey Civic
Theatre
PS&E +
Const.3,000 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 868,451 0 0 0 0 0 0 0 0 0 0 868,451
CIP 19-23 67 13307 PW
Rio Hondo Event
Center
Improvements
Rio Hondo Event
Center Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 416,771 0 0 0 0 0 0 0 0 0 0 416,771
PC Agenda Page 11
City of Downey
FY 2019-20
Capital Improvement Program
Page 7 of 11
ACTIVITY
GENERAL
FUND
IMPACTS PRIORITY
CIP No.No. ACCT
REQ.
DEPT.PROJECT TITLE
PROJECT LOCATION
(Street Address or Cross
Streets)
$ PER
YEAR
1 - 1YR.
2 - 2YR.
3 - 3YR.
LOCAL
RETURN
FUND
LOCAL
RETURN
FUND FUND FUND FUND FUND
GRANT
FUND
GRANT
FUND
GRANT
FUND
GRANT
FUND
GRANT
FUND
GRANT
FUND
MEASURE
M SEWER
TOTAL NOTES
PROP C
MEASURE
R
OTHER
(MSRC,
CALFIRE,
LOCAL
RETURN
FUND
GRANT
FUND FUND
LOCAL
RETURN
FUND BOND FUND
SALES TAX
FUND FUND FUND FUND FUND FUND GRANT FUND
GRANT
FUND
GRANT
FUND
ART IN
PUBLIC
PLACES
STORM
WATER WATER GAS TAX SB1 MEASURE S
MEASURE
S
VEHICLE
IMPACT
FEE
CAP.
PROJ.
METRO
2016
FEDERAL
METRO
MEASURE R
I-605
METRO
MEASURE
R I-710
METRO
CALL FOR
PROJECTS
METRO
CALL FOR
PROJECTS
56 57 72
AQMD
L&L
DISTRICT
TDA
ARTICLE
III
FEDERAL
STPL
CALTRANS
FEDERAL
HIGHWAY
CALTRANS
FEDERAL
HSIP
CALTRANS
ATP
40 40 50 51 54382626262626262630323335262223252626
CIP 19-24 68 13308 PW
Public Works &
Utilities Yard
Improvements
Public Works &
Utilities Yard
PS&E +
Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 493,400 0 0 0 0 0 0 0 0 0 0 493,400
CIP 19-25 69 13309 PW
Downtown
Parking
Structure
Improvements
Downtown Parking
Structure
PS&E +
Const.1,000 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 394,700 0 0 0 0 0 0 0 0 0 0 394,700
CIP 19-26 70 13310 PW
Other City
Facilities
Improvements
Various locations
citywide
PS&E +
Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 986,458 0 0 0 0 0 0 0 0 0 0 986,458
CIP 19-27 71 13311 PW
ADA
Improvement
Project
Various locations
citywide
PS&E +
Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 986,799 0 0 0 0 0 0 0 0 0 0 986,799
CIP 19-28 72 13320 PW
Apollo Park
Improvement
Project Apollo Park Const.2,000 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5,369,370 0 0 0 0 0 0 0 0 0 0 5,369,370
CIP 19-29 73 13330 PW
Dennis the
Menace Park
Improvement
Project
Dennis the Menace
Park Const.2,000 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2,152,534 0 0 0 0 0 0 0 0 0 0 2,152,534
CIP 19-30 74 13340 PW
Discovery Sports
Complex
Improvement
Project
Discovery Sports
Complex Const.2,000 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2,350,330 0 0 0 0 0 0 0 0 0 0 2,350,330
CIP 19-31 75 13350 PW
Furman Park
Improvement
Project Furman Park Const.2,000 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4,889,773 0 0 0 0 0 0 0 0 0 0 4,889,773
CIP 19-32 76 13360 PW
Golden Park
Improvement
Project Golden Park Const.2,000 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3,494,513 0 0 0 0 0 0 0 0 0 0 3,494,513
CIP 19-33 77 13370 PW
Independence
Park
Improvement
Project Independence Park Const.1,000 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,633,725 0 0 0 0 0 0 0 0 0 0 1,633,725
CIP 19-34 78 13380 PW
Rio San Gabriel
Park
Improvement
Project
Rio San Gabriel
Park
PS&E +
Const.2,000 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2,826,810 0 0 0 0 0 0 0 0 0 0 2,826,810
CIP 19-35 79 13390 PW
Wilderness Park
Improvement
Project Wilderness Park Const.2,000 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,320,074 0 0 0 0 0 0 0 0 0 0 1,320,074
CIP 19-36 80 13395 PW
Treasure Island
Park
Improvement
Project Treasure Island Park
PS&E +
Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 196,550 0 0 0 0 0 0 0 0 0 0 196,550
CIP 20-14 81
NEW
16792 CD
Downey Avenue
Art
Intersections of
Downey Avenue and
2nd Street, 3rd
Street and 4th Street
PS&E +
Const.2,000 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 400,000 0 0 0 0 0 0 400,000
CIP 20-15 82
NEW
16793 CD
Downey Civic
Theatre Outdoor
Plaza Art
Sculpture
Downey Civic
Theatre
PS&E +
Const.1,000 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 375,000 0 0 0 0 0 0 375,000
CIP 20-16 83
NEW
16794 CD
Downtown
Downey
Breezeway Mural Downtown Downey
PS&E +
Const.1,000 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 30,000 0 0 0 0 0 0 30,000
CIP 20-17 84
NEW
16795 CD
Downey Angels
Walk Downtown Downey
PS&E +
Const.1,000 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 120,000 0 0 0 0 0 0 120,000
CIP 20-18 85
NEW
16796 DFD
Training Tower
Asphalt
Replacement
Downey Fire
Department Training
Tower at
Independence Park
PS&E +
Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 80,000 0 0 0 0 0 0 0 80,000
CIP 20-19 86
NEW
16797 PR
Rio Hondo Golf
Course Golf Cart
Path Repairs
Rio Hondo Golf
Course
PS&E +
Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 90,000 0 0 0 0 0 0 0 90,000
PC Agenda Page 12
City of Downey
FY 2019-20
Capital Improvement Program
Page 8 of 11
ACTIVITY
GENERAL
FUND
IMPACTS PRIORITY
CIP No.No. ACCT
REQ.
DEPT.PROJECT TITLE
PROJECT LOCATION
(Street Address or Cross
Streets)
$ PER
YEAR
1 - 1YR.
2 - 2YR.
3 - 3YR.
LOCAL
RETURN
FUND
LOCAL
RETURN
FUND FUND FUND FUND FUND
GRANT
FUND
GRANT
FUND
GRANT
FUND
GRANT
FUND
GRANT
FUND
GRANT
FUND
MEASURE
M SEWER
TOTAL NOTES
PROP C
MEASURE
R
OTHER
(MSRC,
CALFIRE,
LOCAL
RETURN
FUND
GRANT
FUND FUND
LOCAL
RETURN
FUND BOND FUND
SALES TAX
FUND FUND FUND FUND FUND FUND GRANT FUND
GRANT
FUND
GRANT
FUND
ART IN
PUBLIC
PLACES
STORM
WATER WATER GAS TAX SB1 MEASURE S
MEASURE
S
VEHICLE
IMPACT
FEE
CAP.
PROJ.
METRO
2016
FEDERAL
METRO
MEASURE R
I-605
METRO
MEASURE
R I-710
METRO
CALL FOR
PROJECTS
METRO
CALL FOR
PROJECTS
56 57 72
AQMD
L&L
DISTRICT
TDA
ARTICLE
III
FEDERAL
STPL
CALTRANS
FEDERAL
HIGHWAY
CALTRANS
FEDERAL
HSIP
CALTRANS
ATP
40 40 50 51 54382626262626262630323335262223252626
CIP 20-20 87
NEW
16798 PW
Energy Efficiency
Improvements at
City Facilities
Various City
Facilities Citywide
PS&E +
Const.4,000 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,000,000 0 0 0 0 0 0 0 1,000,000
CIP 20-21 88
NEW
16739 PW
Dais Upgrades in
City Hall Council
Chambers
City Hall Council
Chambers
PS&E +
Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100,000 0 0 0 0 0 0 0 100,000
CIP 20-22 89
NEW
16740 PW
HVAC System
Replacement at
Apollo Park
Building
Apollo Park
Historical Society
Building
PS&E +
Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 25,000 0 0 0 0 0 0 0 25,000
CIP 20-25 90 17885 CD
Rancho South
Campus Specific
Plan
Rancho Los Amigos
South Campus Study 0 1 0 0 0 0 0 0 0 0 0 0 0 0 278,914 0 0 0 0 0 0 0 0 0 0 0 0 0 278,914
CIP 20-26 91
NEW
17886 CD
Rancho Sports
Complex
Rancho Los Amigos
South Campus
PS&E +
Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 3,000,000 0 0 0 0 0 0 0 0 0 0 0 0 0 3,000,000
PC Agenda Page 13
City of Downey
FY 2019-20
Capital Improvement Program
Page 9 of 11
ACTIVITY
GENERAL
FUND
IMPACTS PRIORITY
CIP No.No. ACCT
REQ.
DEPT.PROJECT TITLE
PROJECT LOCATION
(Street Address or Cross
Streets)
$ PER
YEAR
1 - 1YR.
2 - 2YR.
3 - 3YR.
LOCAL
RETURN
FUND
LOCAL
RETURN
FUND FUND FUND FUND FUND
GRANT
FUND
GRANT
FUND
GRANT
FUND
GRANT
FUND
GRANT
FUND
GRANT
FUND
MEASURE
M SEWER
TOTAL NOTES
PROP C
MEASURE
R
OTHER
(MSRC,
CALFIRE,
LOCAL
RETURN
FUND
GRANT
FUND FUND
LOCAL
RETURN
FUND BOND FUND
SALES TAX
FUND FUND FUND FUND FUND FUND GRANT FUND
GRANT
FUND
GRANT
FUND
ART IN
PUBLIC
PLACES
STORM
WATER WATER GAS TAX SB1 MEASURE S
MEASURE
S
VEHICLE
IMPACT
FEE
CAP.
PROJ.
METRO
2016
FEDERAL
METRO
MEASURE R
I-605
METRO
MEASURE
R I-710
METRO
CALL FOR
PROJECTS
METRO
CALL FOR
PROJECTS
56 57 72
AQMD
L&L
DISTRICT
TDA
ARTICLE
III
FEDERAL
STPL
CALTRANS
FEDERAL
HIGHWAY
CALTRANS
FEDERAL
HSIP
CALTRANS
ATP
40 40 50 51 54382626262626262630323335262223252626
CIP 20-27 92
NEW
16770 CD
Furman Park
Rocket Furman Park
PS&E +
Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 30,000 0 0 0 0 0 0 30,000
CIP 20-28 93
NEW
16771 FD
Firefighter's
Memorial Civic Center
PS&E +
Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 45,000 0 0 0 0 0 0 45,000
TOTAL PUBLIC
FACILITIES 0 0 0 0 0 0 0 0 0 0 0 0 5,025,756 0 0 45,786,676 6,000,000 0 1,619,766 1,000,000 0 0 0 0 0 0 59,432,198
WATER UTILITY
n/a 94 18642 PW
Water Well
Refurbishment
Program Well Sites (Citywide)Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 500,000 0 0 0 0 500,000
n/a 95 18647 PW
Telemetry
System
Modifications
Well Sites (Citywide)
and Utilities Yard
(9252 Stewart &
Gray Rd)Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 500,000 0 0 0 0 500,000
n/a 96 18654 PW
Water
Distribution Main
Replacement
Program Citywide
PS&E +
Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 75,000 0 0 0 0 75,000
CC 686B 97 18665 PW
New Water Wells
No. 27 and No.
28
Well No. 27 - 7926
Springer Street; Well
No. 28 - Utilities
Yard 9252 Stewart &
Gray Road Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4,000,000 0 0 0 0 4,000,000 WRD Settlement
n/a 98 18666 PW
Well/Yard Site
Security
Well Sites (Citywide)
and Utilities Yard
(9252 Stewart &
Gray Road)Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 50,000 0 0 0 0 50,000
n/a 99 18674 PW
Water System
Improvement
Program Citywide Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 500,000 0 0 0 0 500,000
CIP 17-01 100 16583 PW
Site
Environmental
Remediation/Gro
undwater
Protection at
9255 Imperial
Highway
9255 Imperial
Highway Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 250,000 0 0 0 0 250,000
CIP 18-10 101 18680 PW
Bellflower
Boulevard Water
System
Improvements
Bellflower Boulevard
(Foster Road to Hall
Road)Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,100,000 0 0 0 0 1,100,000
CIP 19-01 102 18681 PW
Woodruff
Avenue Water
System
Improvements
Woodruff Avenue
(Imperial Highway to
Firestone
Boulevard)Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,250,000 0 0 0 0 1,250,000
CIP 19-02 103 18683 PW
Telegraph Road
Water System
Improvements
Telegraph Road
(West City Limit to
Lakewood
Boulevard and
Passons Boulevard
to East City Limit)Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 950,000 0 0 0 0 950,000
CIP 19-03 104 18684 PW
Pellet Street and
Ryerson Avenue
Water System
Improvements
Pellet Street
(Ryerson Avenue to
Old River School
Road) and Ryerson
Avenue (Dinwiddie
Street to Rio Flora
Place)Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 825,000 0 0 0 0 825,000
CIP 19-04 105 18685 PW
Samoline
Avenue Water
System
Improvements
Samoline Avenue
(Quill Drive to Melva
Street)Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 900,000 0 0 0 0 900,000
PC Agenda Page 14
City of Downey
FY 2019-20
Capital Improvement Program
Page 10 of 11
ACTIVITY
GENERAL
FUND
IMPACTS PRIORITY
CIP No.No. ACCT
REQ.
DEPT.PROJECT TITLE
PROJECT LOCATION
(Street Address or Cross
Streets)
$ PER
YEAR
1 - 1YR.
2 - 2YR.
3 - 3YR.
LOCAL
RETURN
FUND
LOCAL
RETURN
FUND FUND FUND FUND FUND
GRANT
FUND
GRANT
FUND
GRANT
FUND
GRANT
FUND
GRANT
FUND
GRANT
FUND
MEASURE
M SEWER
TOTAL NOTES
PROP C
MEASURE
R
OTHER
(MSRC,
CALFIRE,
LOCAL
RETURN
FUND
GRANT
FUND FUND
LOCAL
RETURN
FUND BOND FUND
SALES TAX
FUND FUND FUND FUND FUND FUND GRANT FUND
GRANT
FUND
GRANT
FUND
ART IN
PUBLIC
PLACES
STORM
WATER WATER GAS TAX SB1 MEASURE S
MEASURE
S
VEHICLE
IMPACT
FEE
CAP.
PROJ.
METRO
2016
FEDERAL
METRO
MEASURE R
I-605
METRO
MEASURE
R I-710
METRO
CALL FOR
PROJECTS
METRO
CALL FOR
PROJECTS
56 57 72
AQMD
L&L
DISTRICT
TDA
ARTICLE
III
FEDERAL
STPL
CALTRANS
FEDERAL
HIGHWAY
CALTRANS
FEDERAL
HSIP
CALTRANS
ATP
40 40 50 51 54382626262626262630323335262223252626
CIP 18-17 106 18682 PW
Paramount
Boulevard Water
System
Improvements
Paramount
Boulevard (5th
Street to Florence
Avenue)Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 50,000 0 0 0 0 50,000
CIP 19-18 107 18687 PW
Civic Center
Drive and Hall
Road Water
System
Improvements
Civic Center Drive
(3rd Street to
Brookshire Avenue)
and Hall Road
(Bellflower
Boulevard to
Coldbrook Avenue)Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 50,000 0 0 0 0 50,000
CIP 20-23 108
NEW
16799 PW
3rd Street Water
System
Improvements
3rd Street (Old River
School Road to
Rives Avenue)
PS&E +
Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 500,000 0 0 0 0 500,000
TOTAL WATER
UTILITIES 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11,500,000 0 0 0 0 11,500,000
SEWER
IMPROVEMENT
S
n/a 109 13999 PW
Sewer Main
Rehabilitation &
Repair Program Citywide Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 750,000 750,000
n/a 110 14010 PW
Sewer CCTV
Inspection
Program Citywide Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 275,000 275,000
TOTAL SEWER
IMPROVEMENT
S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,025,000 1,025,000
PC Agenda Page 15
City of Downey
FY 2019-20
Capital Improvement Program
Page 11 of 11
ACTIVITY
GENERAL
FUND
IMPACTS PRIORITY
CIP No.No. ACCT
REQ.
DEPT.PROJECT TITLE
PROJECT LOCATION
(Street Address or Cross
Streets)
$ PER
YEAR
1 - 1YR.
2 - 2YR.
3 - 3YR.
LOCAL
RETURN
FUND
LOCAL
RETURN
FUND FUND FUND FUND FUND
GRANT
FUND
GRANT
FUND
GRANT
FUND
GRANT
FUND
GRANT
FUND
GRANT
FUND
MEASURE
M SEWER
TOTAL NOTES
PROP C
MEASURE
R
OTHER
(MSRC,
CALFIRE,
LOCAL
RETURN
FUND
GRANT
FUND FUND
LOCAL
RETURN
FUND BOND FUND
SALES TAX
FUND FUND FUND FUND FUND FUND GRANT FUND
GRANT
FUND
GRANT
FUND
ART IN
PUBLIC
PLACES
STORM
WATER WATER GAS TAX SB1 MEASURE S
MEASURE
S
VEHICLE
IMPACT
FEE
CAP.
PROJ.
METRO
2016
FEDERAL
METRO
MEASURE R
I-605
METRO
MEASURE
R I-710
METRO
CALL FOR
PROJECTS
METRO
CALL FOR
PROJECTS
56 57 72
AQMD
L&L
DISTRICT
TDA
ARTICLE
III
FEDERAL
STPL
CALTRANS
FEDERAL
HIGHWAY
CALTRANS
FEDERAL
HSIP
CALTRANS
ATP
40 40 50 51 54382626262626262630323335262223252626
STORM WATER
IMPROVEMENT
S
n/a 111 13944 PW
Storm Drain
Repair Program Citywide Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 200,000 0 0 0 0 0 200,000
n/a 112 13983 PW
National Pollution
Discharge
Elimination
System
(NPDES) Permit
Compliance
Los Angeles
River/Rio Hondo,
San Gabriel River,
Los Cerritos
Channel
Watersheds Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 200,000 0 0 0 0 0 200,000
n/a 113 14011 PW
Storm Drain Lift
Station
Refurbishment
Program
Imperial Highway
(Old River School
Road to Rives
Avenue) and
Paramount
Boulevard at I-5
Freeway Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 25,000 0 0 0 0 0 25,000
n/a 114 14012 PW
Catch Basin
Inserts
Los Angeles
River/Rio Hondo,
San Gabriel River,
Los Cerritos
Channel
Watersheds Const.0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100,000 0 0 0 0 0 100,000
TOTAL STORM
WATER
IMPROVEMENT
S 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 525,000 0 0 0 0 0 525,000
0 60,000 80,000 2,624,650 300,000 4,545,600 322,000 1,944,620 2,250,000 1,367,843 1,625,547 3,287,069 12,815,568 1,610,804 2,846,090 45,786,676 6,000,000 1,150,000 1,619,766 1,070,000 525,000 11,500,000 2,462,471 3,166,734 3,417,390 1,025,000 113,402,828
TOTALS
PC Agenda Page 16