HomeMy WebLinkAbout06. CIP 19-12-Approve Plans & Specs-Auth Solicitation to Bid- Slurry Seal Proj, Dist. 3 FY 2018-2019Item \•
APPROVED
f, 1
TO: • i'+ r OF ti
FROM: OFFICE OF
ky'�,RBY: DELFINO R. CONSUNJI, P.E., DIRECTOR OF PUBLIC WORKS/CITY ENGIN -rF
M
SUBJECT: APPROVE PLANS AND SPECIFICATIONS AND AUTHORIZE SOLICITATION
FOR i FOR i18/19 SLURRY SEAL PROJECT DISTRICT
IMPROVEMENT PROJECT ,•. 119-112
That the City Council approve the plans and specifications and authorize solicitation for
construction bids for FY 2018/19 Slurry Seal Project District 3, Capital Improvement Project No.
19-12.
The slurry seal program is designed to seal aged asphalt concrete pavement and extend its life
on various streets throughout the City an average of 5 to 7 years. A slurry seal program is an
effective means of preserving asphalt pavement surfaces by avoiding and/or deferring more
extensive and costly pavement rehabilitation methods such as asphalt overlay and/or
reconstruction. In order to implement a citywide systematic and efficient slurry seal program,
the City has been divided into a four year cycle covering one of the four areas each year. Over
the last three years, street segments in Council Districts 1, 2 and 4 were slurry sealed
(Attachment A). This year, staff is proposing to slurry seal street segments in Council District 3.
The street segments selected for slurry seal were based on the condition of the existing
pavement as prioritized by the City's Pavement Management Information System (PMIS), field
observations and available funding. The PMIS serves as a comprehensive planning tool that
facilitates technical analysis and allows for a systematic approach to identify cost-effective
means for maintaining the citywide roadway system in the most efficient and strategic manner.
The City's PMIS evaluates, ranks, and prioritizes each street segment based on pavement
surface conditions (i.e. cracking, rutting, and roughness), pavement structural strength and
subgrade stability and provides numerical criteria necessary to ensure the most appropriate
paving application for maintenance is selected.
Staff has completed the preparation of plans, specifications, and cost estimate for the Slurry
Seal Project District 3 and this project is now ready for solicitation of construction bids
(Attachment 13). A total of 41 street segments in City Council District 3 covering a total of
approximately 7.1 centerline miles (37,226 linear feet) of roadway have been selected for this
project. The streets and limits are shown on the attached Project Street List (Attachment C) and
Project Location Map (Attachment D).
CAPITAL IMPROVEMENT PROJECT NO. 19-12
FY 2018/19 SLURRY SEAL PROJECT DISTRICT 3
MAY 14, 2019
PAGE 2
The work consists of sealing cracks in the asphalt pavement, applying emulsified Type I slurry
seal coat to the pavement surface; crack sealing; replacement of traffic striping, pavement
markings, and raised pavement markers; and appurtenant work. Some street segments will
also require removal and replacement of asphalt pavement at certain locations, which will be
handled independently of this project by City maintenance crews prior to application of slurry
seal.
Construction of the Slurry Seal Project is anticipated to begin in July 2019 and be completed by
August 2019.
This project is categorically exempt from the provisions of CEQA under Section 15301(c),
Existing Facilities.
Quality of Life, Infrastructure & Parks
The total estimated cost of the project is $300,000 broken down as follows:
Description
Design
Construction Contract and Contingencies
Amount
Inspection $8,000
Construction Engineering and Contract Administration- $10,000
Total Estimated Project Cost; $300,000
Funding in the amount of $300,000 is budgeted in the FY 2018/19 Capital Improvement
Program as shown in the table below:
Account
No,. Funding Source ------- Amount
6762 Senate Bill 1 (SB1) funds $300,000
Total Project Funding; $300,000
A detailed project cost summary will be provided at the time of the award of the construction
contract.
ATTACHMENTS
Attachment A - Four Year Slurry Seal Program Map
Attachment B - Plans
Attachment C - Slurry Seal Project District 3 Street List
Attachment D - Slurry Seal Project District 3 Location Map
City of Downey
Four Year Slurry Seal Program Map
COUNCIL DISTRICT 4
FY 2015/16
COUNCIL DISTRICT 1
FY 2011 1
ANEOR991,54�ss Z
14
ANEOR991,54�ss Z
If
A -
QWBENCH MARK
g %v
SLURRY SEAL MAP
Cr -0 3
SP TRIF 0 IFJ D 0 Wj N STE,
PUBLIC WORK11 I)mPjLItwwmNw
CONSTRUCTION PLANS
FOR
CAPITAL IMPROVEMENTS PROJECT NO. 19-12
FY 2018-19 SLURRY SEAL PROJECT DISTRICT 3
7
LADDERCROSSVVAU DETAIL
BY:
CITY OF DOWNEY SHEET 1
CAPITAL IMPROVEMENT PROJECT NO 19-12 1; T S
FY 2018/19 ANNUAL SLURRY SEAL
PROGRAM
LENGTH
WIDTH
AREA
| NO.
| STREET
FROM
|
TO
! (��|(LF)
(SF) �
1
4LUER&uLESr
| GUATEMALA AV
� GMALLWOODAV ---
895
30
e0.050 -
2
ALcEwGRpVESr
TWEEDY LN _-
DxNxEnSSr
' 921 -
_3229,472�_-
3
8AIRNSD4csST
GUATEMALA AV
SMALLWOODxV
1.154
80
34.620
| 4
BANGLE RD
CUL-DE-SAC WEST
TWEEDY LN
907
297
28.720
i e
8mC/CeESrRD
CUL DESAC WEST
B|RCH8ARKAv
523
28
14.044
8
BIRQHCRES7eo
B|RCHBARKAV
CUL oESAC EAST
523
28
14.644
7
BIeC*LEAFAY
enOOxPARKno
] CEDARTREE RD
984
32
31.488
8
CfD4RnpsEeo
STAMPS RD
8T0AKESAV
000
30
19,980
9
CO0LGRDVEQR
GUATEMALA AV
TWEEDY LN
1,720
38
0.820
| 10
OANVBRS Sr
_ GUATEMALA AV
GMALLWOODAV
_ 990
30
29J00
_11
oEPALMA 87
CITY LIMIT
�SALFORD Av�
1.976_
40
79.040
DOS mOSno
8LENCUFFOR
8HADYOAKDR
817
40
32,680
13
DOS e0SRQ
6*xoYQ^mon
CUL DESAC NORTH
1.932
30
69.552
14
EIGHTH Sr
RIVES AV
| CUL osSAC E0SMALLw00o
725
38
27.550
15
sLST)wAV
nR00KPxRmno
VISTA DEL nO8A
704
��
22.920
15
FARM ST
RIVES AV
GMAuwOODAV
553
30
17.070
17
FnmEu4LEoR
CUL nsSAC VV0DOS n|OG
CUL DESAC E0DOS n0S
805 |
30
28,550
| 18
pINEK4LE8R
GUATEMALA AV
HORLEYxv
720
30
21,600
19
FIRESTONE PL
OLD RIVER SCHOOL no
p0wsR|NGRD
unR
36
20.088
_2l_
6wmF0RDST
GUATEMALA AV
TECUMRD
400
30
12.000
21
GUATEMALA AV
ALosRDALEGT
BANGLE RD
600
36
23.700
22
HOncsvAx
LUBEC3T
| SUVA ST
1381
JG
49.718
23
*V*LEyA�
-__ - --
8UvnGT
ALLENG�OvsDT
1.849
30
rD�1O4
'
24
LA REINA Au
THIRD ST
FIFTH ST
826
30
29,736
zo
LxREINA 4x
FIRESTONE BL
_IHIRD ST
728 |
35
26.208__
| zo
MORNING AV
FARM ST
|RV V|NGROVE on
711
32
22.r52
_��_
NEN/S7
SECOND ST
FIFTH ST
1,191
86
42.870
28
DRuZAa4Av
GALLAT|NRD
SANTA GERTRUoE8no
027
30
24.810
29p�ERwELLxv
�
STEWART&GRAY RD
DE PALMA Sr
446
38
10.948
30
PDM3RIvQeD
| FLORENCE AV
| LUBsC6T
1.351
36
48,038
POxmERmGeo
FIRESTONE BL
| THIRD ST
880
34.1
23.180 |
32
mvESA-,V_
|
F|msw^Lson
COOLGRVVEoR
040
30
19.200
RYERS0vAv
CUL OESAC S0O|NWmD|s
RIO FLORA pL
1.313
36
47.268
_��_
_34
|
/ SECOND ST
P{MERING lo
W|LEYBURKEAV
536
38
20,388
85
SEVENTH ST
RIVES AV
PARAMOUNT BL
1.522
36.7
55.857
36
SMwLLWVVoAv
_CUL-DE-SAC SOUTH
COOLGROVE DR
279
30
8,370
_371_
SoAcLWD0DAV
ALLENGnOvsGT
ALDERDALE ST
836
38
30.098
( 38
SUSAN AK
|
FLORENCE AV
CUL DE SAC NORTH
310
39
YEC0wno
GUATEMALA AV
| LUocC ST
430
_38L1I04__
20
12.040 |
�CUMRD
D|NGDALsGT
GA|NFORDGT
541
��
_4
-41--1
_
VIA AMoRI7ASHERRY
Ay
| OLD RIVER SCHOOL RD
1,483
_3B_ _
_1�__
53.388
7OTAL
37 2 26 |
1.27470
LEGEND
(D
A
A
DISTRICT 3 BOUNDARY
00
TOO
I IIJL
CITY OF DOWNEY
DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION.
PROJECT: CAPITAL IMPROVEMENT PROJECT NO. 19-12
FY 18/19 SLURRY SEAL PROJECT DISTRICT 3
IMMII���C