HomeMy WebLinkAbout04. CIP 14-13-Approve Plans & Specs-Auth Solicitation to Bid-Civic Center Dr & 3rd St Pavement RehabItem No.
APPROVED BY
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL CITY MANAGER
FROM: OFFICE OF THE CITY MANAGER
BY: DELFINO R. CONSUNJI, P.E., DIRECTOR OF PUBLIC WORKS/CITY ENGINJE
DATE: MAY 14, 2019
That the City Council approve the plans and specifications and authorize solicitation for
construction bids for the Civic Center Drive & 3rd Street Pavement Rehabilitation Project,
Capital Improvement Project No. 14-13.
The City's Pavement Management Information System (PMIS) is the primary tool used to
prioritize street pavement rehabilitation projects throughout the City. The City's PMIS evaluates,
ranks and prioritizes each City street segment based on surface conditions (cracking, surface
failures, etc.), pavement structural strength, and other field observations. Street segments
earmarked for improvements are identified as priorities based on the condition of the pavement
for the given street segment relative to the pavement condition of other street segments
throughout the City.
The street segments identified as priorities for improvements are either in a state of minor
deterioration and can be inexpensively repaired with minor maintenance methods such as
resurfacing while other street segments identified are deteriorated to a state of disrepair beyond
what ordinarily could be handled through routine street maintenance practices and must be
reconstructed. Ultimately, the pavement rehabilitation on the street segments will raise the
condition of the pavement to an acceptable standard and will extend the life of the infrastructure
by twenty years.
The asphalt pavement on Civic Center Drive between 3rd Street and Brookshire Avenue and
3rd Street between Civic Center Drive and City Hall are deteriorated to a state of disrepair and
must be reconstructed.
Staff has completed the preparation of plans, specifications, and a construction cost estimate for
the Civic Center Drive & 3rd Street Pavement Rehabilitation Project and this project is now
ready for solicitation of construction bids. Approximately 1,100 linear feet of asphalt pavement
will be reconstructed under this project.
The work consists of removal of existing asphalt concrete pavement, re -grading and compaction
of existing aggregate base material, construction of asphalt bus pad, and placement of asphalt
concrete pavement base course and rubberized asphalt concrete cap, striping and installation of
pavement markings, installation of minor electrical improvements on 3rd Street, removal of
CAPITAL IMPROVEMENT PROJECT NO. 14-13
CIVIC CENTER DRIVE & 3RD STREET PAVEMENT REHABILITATION PROJECT
MAY 14, 2019
PAGE 2
concrete sign and minor median island modifications at the Civic Center and Brookshire Avenue
intersection. In addition, uplifted, damaged or substandard curb, gutter, cross gutters, sidewalk,
driveway approaches and curb access ramps will be repaired or replaced in order to comply
with the latest Americans with Disabilities Act (ADA) requirements.
Construction of the Civic Center Drive & 3rd Street Pavement Rehabilitation Project is
anticipated to begin in July 2019 and be completed by September 2019.
This project is categorically exempt from the provisions of CEQA under Section 15301(c),
Existing Facilities.
Quality of Life, Infrastructure & Parks
The total estimated cost of the project is $444,000 broken down as follows:
DescriptionAmount
------ ---__ a_
Design $24,000
Construction Contract and Contingencies $375,000
Construction Inspection $20,000
Materials Testing $5,000
mmConstruction Eng ineering_and_Contract Administration $20,000
Total Estimated Project Cost: $444,000
The total approved budget for this project in the FY 2018/19 Capital Improvement Program is
$400,000 as shown in the table below:
Account
No. Funding Source Amount
30-1-6697 Gas Tax funds (expended) $764
54-1-6697 Proposition C Local Return funds (expended) $17,156
56-1-6697 Measure R Local Return funds (expended) $5,986
56-1-6697 Measure R Local Return funds $400,000
Estimated shortfall in funding 20,094
Total Project Funding; $444,000
Depending on bids received, staff may request additional appropriation at the time of award of
construction contract.
Attachment A - Location Map
Attachment B - Plans
CAPITAL IMPROVEMENT PROJECT NO. 14-13
CIVIC CENTER DRIVE & 3RD STREET PAVEMENT REHABILITATION PROJECT
MAY 14, 2019
PAGE 3
CAPITAL IMPROVEMENT PROJECT NO. 14-13
CIVIC CENTER DRIVE & 3RD STREET PAVEMENT REHABILITATION PROJECT
MAY 14, 2019
PAGE 4
1 f , , r
CAPITAL IMPROVEMENT PROJECT NO. 14-13
CIVIC CENTER DRIVE & 3RD STREET PAVEMENT REHABILITATION PROJECT
MAY 14, 2019
PAGE 5
J j
if
CAPITAL IMPROVEMENT PROJECT NO. 14-13
CIVIC CENTER DRIVE & 3RD STREET PAVEMENT REHABILITATION PROJECT
MAY 14, 2019
PAGE 6
Al
c
np
�,4E�v P 114 1 i'q OE� Q`
Al
c
np
r14
qw-
1.1
Al
c
r14
qw-
1.1
21,
3A18a U31N130 OIAIO
Al
c
CAPITAL IMPROVEMENT PROJECT NO. 14-13
CIVIC CENTER DRIVE & 3RD STREET PAVEMENT REHABILITATION PROJECT
MAY 14, 2019
PAGE 7
ElAiHaU31N30 OIAIO
u
ck
k
r------------------------------
qY
. . ......
m
CIVIC CENTER DRIVE
L--------------------------------- i
DETAIL "B"
--------------------------------------------------------------------
'Imo U�a
14
22 5,7 9 10
I j 24
rs
D VIC CENTER DRIVE 3RD. • STREET
L—----------------------------------------------------------------- i
CONSTRUC nON NOTES DETAIL "A"
(OD
==77
SEE DETAI, W
DRIVE
LEGEND
P-
DETAIL -"C"
z
C)
Er)
y
0
SEE DETAL 1.
aTk
_41
-LOCATION MAP
r------------------------------
qY
. . ......
m
CIVIC CENTER DRIVE
L--------------------------------- i
DETAIL "B"
--------------------------------------------------------------------
'Imo U�a
14
22 5,7 9 10
I j 24
rs
D VIC CENTER DRIVE 3RD. • STREET
L—----------------------------------------------------------------- i
CONSTRUC nON NOTES DETAIL "A"
(OD
==77
CITY OF DOWNEY
�ftx - Elv
�
14-13 M
DETAIL -71Z CF TELECMIC&L PLAN
C) q
M
Oo � C) >
r—
K)M z
TT
CD m
®®/
m
<
M KM
go z
w I
U) 0
L
m
m
m
z
_00
<
m
m
z
m
0
z
0
L
m
LEGEND
P-
DETAIL -"C"
CITY OF DOWNEY
�ftx - Elv
�
14-13 M
DETAIL -71Z CF TELECMIC&L PLAN
C) q
M
Oo � C) >
r—
K)M z
TT
CD m
®®/
m
<
M KM
go z
w I
U) 0
L
m
m
m
z
_00
<
m
m
z
m
0
z
0
L
m