HomeMy WebLinkAbout19. Adopt Reso to Auth Pre-Qualification of Bidders for Wilderness Park Ponds Restoration ProjItem No. TO HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL APPROVED 13y FROM: OFFICE OF THE CITY MANAGER CITY ARANAGER BY: JOHN OSKOUI, P.E., ASSISTANT CITY MANAGER DATE: APRIL 23, 2019 SUBJECT: WILDERNESS PARK PONDS RESTORATION PROJECT REQUEST FOR PRE - QUALIFICATION OF ;i' MZ96_19M, i It is recommended that the City Council authorize PRE -QUALIFICATION of bidders for the Wilderness Park ponds Restoration Project and adopt the attached Resolution No. 19- to establish pre -qualification of bidders procedures. In a competitive market and particularly during what is commonly referred to as a "construction boom" period, typically, an influx of new contractors join the pool of existing contractors who bid on public works projects. Theoretically speaking, more competition ought to benefit public agencies by receiving competitive bids for their public works projects resulting in overall lower costs. However, because of the requirement to award a public works contract to the lowest responsible and responsive bidder, in most cases, a contract is awarded to contractors who work with smaller than usual profit margins, in an unfamiliar environment taking on a scope of work for which he/she has little or no experience. The result can become a lose -lose scenario for both the contractor and the agency. A preferred procurement method employed to ensure a successful outcome which would benefit the public agency, as well as the contractor, is a pre -qualification process. The pre -qualification process, in essence, ensures that the bid process is limited to competition among qualified contractors. Typically, the pre -qualification process is completed prior to the actual bidding of public works projects to include the names of the pre -qualified contractors in the bid documents. The California Legislature has determined that the establishment by public agencies of a uniform system to evaluate the ability, competency and integrity of bidders of public works projects is in the public interest and will result in the construction of public works projects of the highest quality for the lowest costs. The Department of Industrial Relations has adopted model guidelines for rating bidders, and drafted a standardized questionnaire. It is required to adopt and apply an objective uniform system of rating bidders on the basis of completed questionnaire and financial statements, in order to determine both the minimum requirements permitted for qualification to bid, and the type and size of the contracts upon which each bidder shall be deemed qualified to bid. WILDERNESS PARK PONDS RESTORATION PROJECT REQUEST FOR PRE -QUALIFICATION OF BIDDERS April 23, 2019 Page,2 The law allows a public agency to establish two different kinds of pre -qualification procedures for public works projects, either establish a pre -qualification procedure linked to a single project, or adopt a procedure by which a contractor may qualify to bid on projects which are put out for bid by the agency for a period of one year after the draft of initial pre -qualification. The law requires every public agency that creates either kind of pre -qualification procedures to: i;., Use a "standardized questionnaire and financial statement in a form specified by the public entity" iL Adopt and apply a uniform system of rating bidders on objective criteria, on the basis of the completed questionnaires and financial statements iii,. Create and appeal procedure, by which a contractor that is denied pre -qualifications may seek a reversal of that determination Generally, public agencies are limiting their pre -qualification process to general contractors, but the statutes do not preclude an agency from pre -qualifying subcontractors. Establishing -a process to pre -qualify bidders for a public works project is legislative decision of the City Council Staff respectfully requests that the City Council adopt the attached Resolution No. 19 to establish pre -qualification procedures for the Wilderness Park Ponds Restoration Project. Fiscal Responsibility Efficiency & Adaptability Quality of Life, Neighborhood & Infrastructure Cost of administering the pre -qualification of bidders process is part of the project management services and has been included in the budget for the subject project which is funded through the Measure S proceeds. Attachment A Resolution Attachment B: Pre -qualification Package rr -• r r • ! • ri • i WHEREAS, the City of Downey, has a need to complete the WildernessPark Ponds Restoration Project ("Project"); and WHEREAS, the City of Downey has determined that it would be in the public interest to determine the qualifications of potential bidders on the Project prior to letting the Project to bid, which would assist the City in selecting the most responsive and responsible bidder; and WHEREAS, California Public Contract code Section 20101 provides that a public agency, including the City of Downey, may elect to adopt a bidder pre -qualification system, including procedures required by section 20101, for specific projects (the "Law"); and WHEREAS, pursuant to the Law, prior to using a pre -qualification system for a specific project, the City must first establish procedures for the specific project; approve the form of pre qualification questionnaire; adopt a uniform system for the objective rating of bidders; and create an appeal procedure by which a contractor denied pre -qualification may seek a reversal of that determination. NOW, THEREFORE, BE IT RESOLVE by the City Council of the City of Downey, California, as follows: SECTION 1. There is hereby established a procedure for the pre -qualification of bidders for the City of Downey Wilderness Park Ponds Restoration Project in conformance with the Law. SECTION 2. That certain Pre -qualification Questionnaire, based on one developed by the State of California Department of Industrial relations (the "DIR) in accordance with the Law, in the form attached hereto as Exhibit A, is hereby approved for use in the pre -qualification of bidders for the Project. SECTION 3. That certain List of Scorable Questions and the Scoring Instructions developed by the DIR, with such changes as made by the City,- in the form attached hereto as Exhibit A, is hereby approved for use in the rating of bidders seeking to prequalify for the Project. SECTION 4. The appeal procedure as outlined in the Request for Pre -qualification of Bidders Commencing with Forthcoming Public Works Bid, which is a part of the Request for Pre -qualification for Wilderness Ponds Restoration Project attached hereto as Exhibit A, is hereby approved for use by any contractor seeking to reverse a determination of a denial of his or her right to bid on the Project. SECTION 5. That the Assistant City Manager be impaneled on the Appeals Panel described in the pre -qualification Questionnaire attached hereto as Exhibit A. SECTION 5. The City of Downey shall develop such other questions and documents as necessary to implement a pre -qualification system for use in the bid on the Project. 11:4101-3 PJZIICIIJZNLVA�� ATTEST: MARIA ALICIA DUARTE, CIVIC, City Clerk I HEREBY CERTIFY that the foregoing Resolution was adopted by the City Council of the City of Downey at a regular meeting held on the 23rd day of April, 2019, by the following vote, to wit: AYES: Council Members, NOES: Council Member: ABSENT: Council Member: ABSTAIN, Council Member: MARIA ALICIA DUARTE, City Clerk CITY OF • Request forPre-qualification for the Wilderness Park Ponds Restoration Project City of Downey Brookshire11111 John 0skoui, • • • NOTICE REQUESTING PRE -QUALIFICATION PACKAGES FOR WILDERNESS PARK PONDS RESTORATION PROJECTAND PROCEDURES FOR PRE -QUALIFICATION ................... ......... ...,,.,,, .....,..-,x........ ».. ,......:3 PRE -QUALIFICATION QUESTIONNAIRE .... .......:: ......... ................ ::.........; ....,...; ......... ...................7 SECTION A. CONTACT INFORMATION ......................................... ..... ........, ...................7 SECTION B. CURRENT ORGANIZATION AND STRUCTURE ............ ................. ...................8 SECTION C. CRITERIA QUESTIONS .................. .............._ .................. ......... ......... .........15 SECTION D. PRE -QUALIFICATION CRITERIA QUESTIONS........................................................17 PRIORHISTORY ........... .................. .......:. .................w , .,................ ......... .........,...... 11 CRIMINAL MATTERS AND CIVIL SUITS ................................... ........................... .........19 OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE ....... ,, .....».................. ..................20 PREVAILING WAGE AND APPRENTICESHIP COMPLIANCE RECORD ......: ................. ........,20 SECTION E. PROJECT EXPERIENCE.............................................................. ..................22 CERTIFICATION ......................................:................. .......:.................. ................... 24 PRE -QUALIFICATION CRITERIA QUESTIONS AND SCORING ..,.,.,.x w........ „ ...... ..................26 MODEL INTERVIEW QUESTIONS .......... .............<.., ; .........., ..,............ :........................... 29 APPENDIX A A. INSURANCE AND BOND REQUIREMENTS ..............:.......... ........... .......... .,.....,,,;....,.................... RESTORATION PROJECT AND PROCEDURES FOR PRE-QUALI FI CATION Notice is hereby given that the City of Downey ("City') has determined that all contractors on the Wilderness Park Ponds Restoration Project ("Project") must be pre -qualified prior bidders to submitting a bid for the Project. The City is seeking a General Engineering ("A" licensed) contractor ("Contractor") experienced in restoration of lakes and/or ponds in a public park setting for rehabilitation and restoration of the Wilderness Parks Ponds located at 10999 Little Lake Rd, Downey, CA 90241. The project consists of restoring 2.5 acres of wetlands habitat at two existing ponds at Wilderness Park, which is adjacent to the San Gabriel River. The project will improve the ponds by replacing invasive plant species with natives,, installing a naturalized hardened shoreline and a new aeration system to improve water quality, restoring wetland habitat for native species, animal wildlife and providing respite for migratory birds. Further, this project includes new trail segments that will enhance access to the adjacent 28 -mile San Gabriel River Trail and new educational wayfinding signage to facilitate wetlands and native habitat awareness. The construction cost of the Project is estimated at $4 million. The anticipated pre -qualification and bid schedule is summarized as follows: Date Milestone April 26, 2019 City issues request for pre -qualification from Contractors. May 3, 2019 Deadline for Contractors to submit questions. May 10, 2019 Deadline for Contractors to submit Pre -qualification Packages. May _15,_2019 City issues recommendation of qualified bidders list for Contractors. May 20, 2019 Last day for Contractors to appeal City's decision with respect to pre -qualification ratings and to deliver notice of appeal to City. May 24, 2019 Last day for appeals to be heard by City, June 11, 2019 City adopts approved bidders list. June 17, 2019 Project put out to bid for approved bidders. July 12, 2019 Deadline for Contractors to submit bids. July 23, 2019 Project awarded to lowest responsible bidder. It is "mandatory that all Contractors who intend to submit bids for the Project fully complete a City of Downey Page 3 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project pre -qualification package ("Pre -qualification Package"), including but not limited to the pre qualification questionnaire, provide all materials requested herein and beapproved by the City to be on the final bidders list. No bid will be accepted from a Contractor that has failed to comply with these requirements. If two or more business entities submit a bid on the Project as a joint venture, each entity within the joint venture must be separately qualified to bid. The completed Pre -qualification Package must be delivered to and received by City no later than May 10, 2019 at 5:00 p.m. Pre -qualification Packages must include three (3) hard copies and one (1) electronic copy on a disk, and be submitted under -seal and marked "CONFIDENTIAL: Wilderness Park Ponds Restoration Project — Contractor Pre -qualification Package" to the City of Downey, Attention: City Clerk, 11111 Brookshire Ave, Downey, CA 90241, City will notify all respondents of the results of the pre -qualification process in writing. Answers to questions contained in the attached questionnaire, information about current bonding capacity on an aggregate and per project limit, and the most recent reviewed or audited financial statements, with accompanying notes and supplemental information, are required. The City will use these documents to rate Contractors with respect to their qualifications to bid on the Project. City reserves the right to check any other sources available to verify Contractor's statements, prior performance and veracity. City's decision will be based on objective evaluation criteria identified herein. While it is the intent of the Pre -qualification Package and documents required therewith to assist the City in determining bidder responsibility prior to bid and aid City in selecting the lowest responsible bidder for construction of the Project, neither the fact of pre=qualification, nor any pre - qualification rating, will preclude City from a post -bid consideration and determination of whether a bidder has the quality, fitness, capacity and experience to satisfactorily perform the proposed work, and has demonstrated the requisite trustworthiness. The Pre -qualification Packages submitted by Contractors are not public records and are not open to public inspection. All information provided will be kept confidential to the extent permitted by law; however, the contents may be disclosed to third parties for the purpose of verification, investigation of allegations that may impact Contractor's pre -qualification status, and in the process of an appeal hearing. State law provides that the names of contractors applying for pre -qualification status are public records subject to disclosure, and the first page of the questionnaire will be used for that purpose. Each questionnaire must be signed under penalty of perjury in the manner designated at the end of the form, by an individual who has the legal authority to bind the Contractor on whose behalf that person is signing. The Contractor shall provide only complete and accurate information. If any information provided by a Contractor becomes inaccurate, the Contractor must immediately notify the City and provide updated accurate information in writing and under penalty of perjury. The City may verify any or all information provided in completed Pre -qualification Packages, consider information provided by sources other than the prospective bidder, and conduct such investigations as the City deems appropriate to assist in the evaluation of Contractor's responsibility, qualifications City of Downey Page 4 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project and financial capacity. The City will evaluate all completed Pre -qualification Packages on a Pass/Fail basis as well as a points- based rating system. A score sheet is included in this Pre -qualification Package (Page 26). A Contractor will be automatically pre -qualified if the responsessubmittedto all questions in Sections C and D do not raise concerns. A Contractor that does not automatically pre -qualify by "passing" Sections C and D is subject to additional scrutiny. If additional scrutiny is required, the City will review and evaluate the required supporting documentation and use a numerical scorecard to determine whether the Contractor is pre -qualified as described below. A score sheet is included in this Pre -Qualification Package on page 26. Contractor is immediately disqualified if: • Any answer to questions 1 through 6 is "NO" • Any answer to questions 7 through 13 is "YES If the Contractor is not immediately disqualified based on its answers to the questions in Section C, the City may assume that the Contractor has passed this pre -qualification section. However, the City may require additional information be submitted to verify the accuracy of the responses provided on Questionnaire. Contractors are required to answer questions 1 through 21 and must provide additional information to the City for any questions where the answer is not "0". The City will then use this information to calculate a score for Section D in order to determine eligibility for pre qualification. All questions in which the Contractor's response isnot "0" are scored. If all of the Contractor's responses to questions 1 through 21 are "0" the City may assume that the Contractor has passed this pre -qualification section. However, the City may require additional information from the Contractor to verify the accuracy of the responses provided. If the answer to any of questions 1 through 21 is not "0", additional scrutiny is required and the awarding body will analyze the issues using the following two factors: 1.- Whether the incident was a good faith mistake and, if so, the error was promptly and voluntarily corrected when brought to the attention of the Contractor or Subcontractor. MM 2. Whether the Contractor or Subcontractor has 'a'prior history or several incidents of the issue are reported. The City reserves the right to reject any or all Pre -qualification Packages and to waive any irregularities in any Pre -qualification Package submittal. The City reserves the right to determine City of Downey Page 5 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project that any Contractor isnot qualified at any time before or after the Pre -qualification Packages are received and evaluated if it finds that information provided therein is inaccurate, misleading or false, or upon evidence of collusion or other illegal practices on the part of a Contractor. The City, in its sole discretion, expressly reserves the right to cancel the pre -qualification process at any time, including but not limited to, after the deadline for the receipt of Pre -qualification Packages, reject any Pre -qualification Package received by the City and competitively bid the Project without first prequalifying bidders. The City reserves the right to adjust, increase, limit, suspend or rescind the pre -qualification rating based on subsequently learned information. Contractors whose rating changes sufficient to disqualify them will be notified, and given an opportunity for a hearing consistent with the hearing procedures described below for appealing a pre -qualification rating. The City may conduct a final review of the information submitted by the Contractor just prior to the award of the bid to confirm that the information submitted has not changed. A Contractor who has submitted a completed Pre -qualification Package, and who receives a rating of "not qualified" from the City may appeal that determination. There is no appeal from a finding that -a Contractor is not prequalified because of a failure to submit required information. A Contractor may appeal the City's decision with respect to its request for pre -qualification, and request a hearing, by giving written notice of appeal and submitting a deposit of one thousand dollars ($1,000) to the City no later than five (5) working days after City's issuance of the written notice of the Contractor's qualification status. Unless City receives the written notice of appeal and deposit within the time specified above, the Contractor waives any and all rights to challenge the qualification decision of the City, whether by administrative process, judicial process or any other legal process or proceeding. If the Contractor gives the required notice of appeal and requests a hearing, the hearing shall be conducted so that it is concluded no later than five (5) working days after the City's receipt of the Contractor's Notice of Appeal and the $1,000 filing deposit. The hearing so provided shall be an informal process conducted by a panel to whom the City has delegated responsibility to hear such appeals (the "Appeals Panel"). At or prior to the hearing, the Contractor will be advised of the basis for the City's pre -qualification determination. The Contractor will be given the opportunity to present information and present reasons in opposition to the pre -qualification determination. At the conclusion of the hearing or no later than two (2) working days after completion of the hearing, the Appeals Panel will render its decision, which will be final and binding. It is the intention of the City that the date for submission and opening of bids for the Project will not be delayed or postponed to allow for completion of an appeal process. If the Contractor's appeal is rejected by the Appeals Panel, the Contractor's $1,000 filing deposit shall be forfeited to the City. Otherwise the deposit will be returned to the Contractor following issuance of the Appeals Panel's decision. The Pre -qualification Package, its completion and submission by the Contractor, and its use by the City, shall not give rise to any liability on the part of the City to the Contractor or any third party or person. This is not a solicitation for bid. The Contractor accepts all risk and cost associated with the completion of the Pre -qualification Package without financial guarantee. City of Downey Page 6 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project A Contractor may be found not prequalified for either omission of requested information or falsification of information. City of Downey Page 7 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project Firm Name: ❑ Corporation ❑ Partnership ❑ Sole Prop. Contact Person: Address: Phone: Fax: If firm is a sole proprietor or partnership: Owner(s) of Company: Contractor's License Number(s): City of Downey Page 8 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project CONTRACTOR PRE -QUALIFICATION QUESTIONNAIRE A. L T'p,i 1"N Ci=T10N' (All Questions Must Be Answered) Firm Name (as it appears on CSLBlicense): Firm Type (Select one): ❑ Corporation ❑ LLC ❑ Partnership ❑ Sole Proprietorship ❑ Joint Venture Contact Person/Title: (List Owner(s) if Firm is a Sole Proprietorship or Partnership) Local Address (P.O. Box is not acceptable): Address 1: Address 2: City Zip: OfficeTelephone: Contact Mobile Fax Number: E-mail Address: List all California construction or other professional license numbers, classifications and expiration dates held by yourfirm: List your firm's DIR Public Works Contractor (PWCR) Registration Number(s): PWCR Number _----Eti Name Ex iration Date If any of your firm's license(s) are held in the name of a corporation, limited liability company, or partnership, list below the names of the qualifying individual(s) listed on the CSLB records who meet(s) the experience and examination requirements for each license. License Number Qualifying Individual Ex iration Date City of Downey Page 9 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project City of Downey Page 10 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project B.QLBRENT B!GAMZATIONANII) Complete the section below for the appropriate type of firm: Ur -firms Dal Am Cmgrafima: Ia. Date incorporated: 1b. Under the laws of what state: 1c. Provide all the following information for each person who is either (a) an officer of the corporation (president, vice president, secretary, treasurer), or (b) the owner of at least ten percent of the corporation's stock: Name Position Years % with Firm Ownershi ld. Identify every construction firm that any person listed above has been associated with (as owner, general partner, limited partner or officer) at any time during the last five years. NOTE: For this question, "owner" and "partner" refer to ownership of ten percent or more of the business, or ten percent or more of its stock, if the business is a corporation. Person s Name Construction Firm Date of Person's Participation with Firm d Lighilitv raranan Ia. Date Article of Organization filed: - 1b. Under the laws of what state: 1c. Provide all the following information for all members of the LLC: Name Position Years % with Firm -Ownership City of Downey Page 11 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project I d. Identify every construction firm that any person listed above has been associated with (as owner, general partner, limited partner or officer) at any time during the last five years. NOTE: For this question, "owner" and "partner" refer to ownership of ten percent or more of the business, or ten percent or more of its stock, if the business is a corporation. Person's Name Construction Firm Date of Person's Participation with Firm EQr Firrns That Arg ME la. Date incorporated: 1b. Under the laws of what state: 1c. Provide all the following information for each partner who owns ten percent or more of the firm. Name Position Years % with Firm Ownership I d. Identify every construction firm that any person listed above has been associated with (as owner, general partner, limited partner or officer) at any time during the last five years. NOTE: For this question, "owner" and "partner" refer to ownership of ten percent or more of the business, or ten percent or more of its stock, if the business is a corporation. .... ... ... . . Person's Name Construction Firm Date of Person's Participation with Firm City of Downey Page 12 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project Egrfimli Ia. Date of commencement of business 1b. Identify every construction firm that the business owner has been associated with (as owner, general partner, limited partner or officer) at any time during the last five years. NOTE: For this question, "owner" and "partner" refer to ownership of ten percent or more of the business, or ten percent or more of its stock, if the business is a corporation. Person's Name Construction Firm Date of Person's Participation with Firm &LfJt1U&LkqLLU=d tg Mak a Bid as Part of a loint VeaLure: Ia. Date of commencement of joint venture: 1b. Provide all the following information for each firm that is a member of the joint venture that expects to bid on one or more projects Note: Explain on a separate sheet. Provide all other pertinent information required in the sections above, for each Corporation, LLC, Partnership, or Sole -Proprietorship that is a part of the Joint Venture. EQ18ALL 2 At any time during the past five years, has your firm shared office space, warehouse space, yard, plant or shop facilities, staff, equipment, telecommunications or other assets with any other construction firm? (If yes, identify and explain below.) Construction Firm Description of Sharing Location of Aureement Facilities — — - - -- ------------- --- - - City of Downey Page 13 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project 3. State your firm's gross revenues for each of the last three fiscal years: Current year Previous year Year prior to previous year 4. How many years has your firm been in business in California as a contractor under your present business name and license number? 5. Bonding Capacity — Provide documentation from your surety identifying the following: Name of Bonding Company/Surety: Name of Surety Agent: Address: Telephone number: 6. If your firm was required to pay a premium of more than one percent for a performance and payment bond on any project(s) on which your firm worked at any time during the last three years, state the percentage that your firm was required to pay. You may provide an explanation for a percentage rate higher than one percent, if you wish to do so. 7. List all other sureties (name and full address) that have written bonds for your firm during the last five years, including the dates on which they were issued: Name Address Date 8. How often do you require documented safety meetings to be held for construction employees and field supervisors during the course of aproject? 9. List your firm's Experience Modification Rate (EMR) (California workers' compensation insurance) for each of the past three premium years: Current year rate: Previous year rate: Year prior to previous year rate: 10. Does your firm regularly utilize a third party consultant to review labor compliance documents of subcontractors on a public works project? 0 Yes 0 No City of Downey Page 14 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project 11. Provide the name, address and telephone number of the apprenticeship program (approved by the California Apprenticeship Council) from whom you intend to request the dispatch of apprentices to employ on any public works project awarded by [Public Entity]. 12 Provide the name, address and telephone number of the apprenticeship program (approved by the California Apprenticeship Council) from whom you have requested and/or employed apprentices in the past three years. Name Address Phone 13. If your firm operates its own State -approved apprenticeship program: (a) Identify the craft or crafts in which your firm provided apprenticeship training in the past year; (b) State the year in which each such apprenticeship program was approved and attach evidence of the most recent California Apprenticeship Council approval(s); (c) For each craft, list the number apprentices employed by your firm and the number of individuals that completed apprenticeships while employed by your firm during the last three years. Craft Year N2. A ren ices No. Completed 14. Has your firm changed names or license number inthe past five years? 0 Yes 0 No (If yes, explain on a separate sheet, including the reason for the change.) 15. Has there been any change in ownership of your firm at any time during the last five years? El Yes El No (If yes, explain on a separate sheet.) NOTE: A corporation whose shares are publicly traded is NOT required to answer this question. City of Downey Page 15 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project 16. is your firm a subsidiary, parent, holding company or affiliate ofanother construction firm? EJ Yes El N (if yes, explain on a separatesheet.) NOTE: Include infrmatin about other firms if one firm wns 5percent or more f another, or if a owner, partner, or officer of your firm holds a similar position in another firm. Ir oo0 o 17. Has any owner, partner and/or officer of your firm operated or been connected to a construction firm under any other name in the last five years not listed in Section A or Section B above at any time in the past five years? 0 Yes El No (if yes, provide the person's name, construction firm name, and dates of participation.) Name Construction Firm Dates of Participation_ City of Downey Page 16 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project 1. Does your firm possess a valid and current California Contractor's or other professional license as required by law for the projector Yes projects for which it intends to submit a bid? 2. Is your firm registered with DIR as a Public Works Contractor for Yes the current fiscal year? 3, Does your firm have a liability insurance policy with a policy limit Yes of at least $1,000,000 per occurrence and $2,000,000 aggregate? 4.Does your firm have current workers' compensation insurance Yes policy as required by the Labor Code or is your firm legally self- insured pursuant to Labor Code section 3700 et. seq.? 5N„Have you attached your firm's latest copy of reviewed or audited Yes financial statements with accompanying notes and supplemental information? * 11,4,y t I MMV acceptable. A letter verifying availability of a line of credit may also be attached; however, it will be considered as supplemental information only, and is not a substitute for the required financial statements. fl. Have you attached a notarized statement from an admitted surety insurer (approved by the California Department of Insurance) authorized to issue bonds in the State of California, which states es that: (a) your current bonding capacity is sufficient for the project for which you seek pre -qualification if you are seeking pre - qualification for a single project; • valid • a year if you are seeking pre -qualification valid for a year; and (b) your current available bonding capacity? * * NOTE: Notarized statement must be from the surety company, not an agent or broker. 7. Has your contractor's or other professional license been revoked at any time in the lastfive years? Yes 8. Has a surety firm completed a • • • behalf, • paid • completion because your firin was in default and/or terminated by Yes the r• • within the last five years? City of Downey Page 17 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project HE ZM IM 7M 0 M 7 M. MM amount,Public Contract Code section 20101(e) exempts from this requirement a contractor who has qualified as a small provided in section 1483 7(d)(1)." As of January 1, 200 1, the qualifying amount is $ 10 million, and 2 5 percent of that million. ** An additional notarized statement from the surety may be requested by [Public Entity] at the time of submission o a bid, if this pre -qualification questionnaire is submitted more than 60 days prior to submission of the bid. City of Downey Page 18 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project Circle .Answer 9. Is your firm, any of its officers, supervisors, managers, or any firm or individual identified above in Section A and/or Section B, ineligible to bid on or be awarded apublic works contract, or Yes No perform as a subcontractor on a public works contract, pursuant to Labor Code section 1777. 1, Labor Code section 1777.7, or any other federal, state, county, municipal or other local law providing for the debarment of contractors from public works? 10 Has your firm, any of its officers, supervisors, managers, or any firm or individual identified above in Section A for Section been convicted of a crime involving the awarding of a contract of a government construction project, the bidding or performance of a Yes No government contract, antitrust statutes, racketeering statutes, safety and health regulations, environmental laws, laws banning workplace discrimination, laws governing wages, hours or labor standards, or laws involving fraud, theft, or any other act of dishonesty? 11. Is your firm currently the debtor in a b ptcyce? Yes No (if yes, attach a copy of the bankruptcy petition showing thecase number and date on which the petition was filed.) 12. Has your firm, any of its officers, supervisors, managers, or any firm or individual identified above in Section A and/or Section ever been terminated from a public works contract, including but Yes No not limited to termination based on any misconduct, such as failure to comply with contractual, statutory, or other legal obligations from any public construction project? 11 Does your firm, y of its officers; supervisors managers, or any firm or individual identified above in Section Aand/or Section currently have any delinquent liability to an employee, the state, or any awarding body for any assessment of back wages or related Yes No damages, interest, fines or penalties pursuant to any final judgment, order, or determination by any court or any federal, state, or local administrative agency, including a confirmed arbitration award? amount,Public Contract Code section 20101(e) exempts from this requirement a contractor who has qualified as a small provided in section 1483 7(d)(1)." As of January 1, 200 1, the qualifying amount is $ 10 million, and 2 5 percent of that million. ** An additional notarized statement from the surety may be requested by [Public Entity] at the time of submission o a bid, if this pre -qualification questionnaire is submitted more than 60 days prior to submission of the bid. City of Downey Page 18 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project Prior History Circle Answer 1. How many times has your firm, or any of its officers, supervisors, or managers, declared bankruptcy at any time during the last five years? 01 2 5+ (This question refers only to a bankruptcy action that was not described in your answer to Question 11 in Section C. If yes, attach a copy of the bankruptcy petition showing the case number and the date on which the petition was filed, a copy of the Bankruptcy Court's discharge order or any other document that concluded the case if no discharge order was issued.) I 2. How many times has your firm, or any of its officers, supervisors, or managers, had an injunction, judgment, order, or lien entered against it 01 2 5+ for outstanding taxes assessed or fines, penalties and/or unpaid employee wages at any time in the last five years? (Explain on a separate sheet. Provide details, including the name of the government agency, caption, date, case or docket number, and disposition. Be sure to note any judgments or liens that have not been fully satisfied.) 3. How many times in the past five years, has your firm, or any of its officers, supervisors, or managers, been a party in any civil litigation or administrative proceeding alleging violation of any of the following: 01 2 5+ contract antitrust statutes, racketeering statutes, safety and health regulations, environmental laws, laws banning workplace discrimination, laws governing wages, hours or labor standards, or laws involving fraud, theft, or any other act of dishonesty? (Explain on a separate sheet. Provide details including the nature of the claims and defenses, caption, date, case or docket number, name of the court or agency before which the case is pending or which it was heard, and current status.) 4. How many times in the past five years, has your firm, or any of its officers, supervisors, or managers, been a party in any civil litigation or administrative proceeding alleging a violation by a subcontractor hired 01 2 5+ by your firm of any of the following: contract antitrust statutes, racketeering statutes, safety and health regulations, environmental laws, laws banning workplace discrimination, laws governing wages, hours or labor standards, or laws involving fraud, theft, or any other act of dishonesty? (Explain on a separate sheet. Provide details including the nature of the claims and defenses, caption, date, case or docket number, name of the court or agency before which the case is pending or which it was heard, and current status.) City of Downey Page 19 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project 5. How many times in the past five years, has your firm, or any of its officers, supervisors, or managers, paid any amount, fine or otherwise, 01 2 5+ regardless of characterization, to settle any of the allegations listed in Questions 3 and 4 above, whether with or without an admission of responsibility or liability? nu 1411017-1 M. I I LM a 1 r, 111 MM Ell U4[01911 1 BRIJ dr! L -Mg I MA 1A L91 "A"A I I Q INN' LAIMIMMM! 52 IIIN I IM 1151 6. How many times has your firm, or any of its officers, supervisors, or managers, been debarred, suspended, disqualified, denied a classification 0 1 2 5+ rating or pre -qualification or otherwise been declared not responsible to or prevented from bidding or performing work on any public works contract or subcontract in the last five years? (Explain on a separate sheet. State whether the firm involved was the firm applying for pre -qualification here or another firm. Identify by name of the company, name of the person within your firm who was associated with that company, date, owner of the project, project name and information, basis for the action, and case or docket number.) 7. How many times in the last five years has your firm been assessed and paid liquidated damages after completion of a project under a 01 2 5+ construction contract with either a public or private owner? (Explain on a separate sheet. Identify all such projects by owner, owner's address, date of completion of the project, amount of liquidated damages assessed and all other information necessary to fully explain the assessment of liquidated damages.) & How many times during the past five years, has any surety company made any payments on your firm's behalf as a result of a default, to 01 2 5+ satisfy any claims made against a perfonnance or payment bond issued on your firm's behalf, in connection with a construction project, either public or private? (Explain on a separate sheet. Identify the amount of each such claim, name and telephone number of the claimant, date of claim, grounds for claim, present status of if resolved, nature of resolution and amount, if any, at which claim wasresolved.) 9H1w many times in the last five years has any insurance carrier, for any form of insurance, refused to renew an insurance policy for yourfirm? 01 2 51 (Explain on a separate sheet. Name the insurance carrier, form of insurance, and year of refusal.) City of Downey Page 20 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project 10. How many times during the last five years, has your firm been denied bond coverage by a surety company, or has there been a period of 01 2 3 45+ time when your firm had no surety bond in place during a public works construction project when one was required? (Explain on a separate sheet. Indicate the date when your firm was denied coverage, name of the company or companies which denied coverage, and the time period during which you had no surety bond in place.) Cri inal MaLtgrN an_dCLvJi1 �.uiits Circle Answer 11. How many times has your firm, or any of its officers, supervisors, or managers, ever been convicted of a crime involving any federal, state, or 01 2 5+ local law related to construction? (Explain on a separate sheet. Identify who was involved, name of the public agency, date of conviction, and grounds for conviction.) 12. How many times has your firm, or any of its officers, supervisors, or managers, ever been found liable in a civil suit or convicted of a federal 01 2 5+ or state crime of fraud, theft, or involving any other act ofdishonesty, such as making any false claim or material misrepresentations? (Explain on a separate sheet. Identify the person or persons convicted or found liable court [the county if a state court, the district or location if federal court], year, and conduct involved.) 'Ut� Wtwmityt 117afr the owner of a project. You need not include information about disputes betweel your firm and a supplier, another contractor, or subcontractor. You need not include information about "pass-th rough" disputes in which the actual dispute I between a sub -contractor and a project owner. Also, you may omit reference to all disputes involving amounts of less than $50,000. 13. How many times in the last five years has any claim against your firm concerning your firm's work on a construction project been filed in court 0 1 2 5+ or arbitration? (Explain on a separate sheet. Identify the claim(s) by providing the project name, date of the claim, name of the claimant, a brief description of the nature of the claim, the court in which the case was filed and a brief description of the status of the claim [e.g. "pending" or, if resolved, a brief description of the resolution].) 14. How many times in the last five years has your finn made any claim against a project owner concerning work on a project or payment for a 01 2 5+ coTt.tr,?,ct z -t4, fila, � fuq.t clqiw. i. -i coud (Explain on a separate sheet. -Identify the claim(s) by providing the project name, date of the claim, name of the entity (or entities) against whom the claim was filed, a brief description of the nature of the claim, the court in which the case was filed and a brief description of the status of the claim [e.g. "pending" or if resolved, a brief description of the resolution].) City of Downey Page 21 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project Occunational ' calth and SaLeJX!LgMpfia,,qj& Circle Answer 15. How many times in the last five years has CalOSHA cited and assessed penalties against your firm for any "serious," "willful" or "repeat" 01 2 5+ violation(s) or the federal Occupational Safety and Health Administration cited and assessed penalties against your firm for violation(s) of safety or health regulations? Health Appeals Board has not yet ruled on your appeal, you need not include information about it 16. How many times in the last five years has the EPA or any Air Quality Management District or any Regional Water Quality Control Board 01 2 5+ cited and assessed penalties against either your firm or the owner of a project on which your firm was the contractor? (Explain on a separate sheet describing each citation.) 1N 7 11"ill t 777371m, =1M 11171 MMI -will ruled on your appeal, or if there is a court appeal pending, you need not include inforwu.-sJ�mmff4amN6b_;n_%kA1 17. How many times within the last five years has there ever been aperiod when your firm had employees but was without workers' compensation 01 2 5+ insurance or state -approved self-insurance? (Explain the reason for each absence of workers' compensation insurance on a separate sheet. If "None," please provide a statement by your current workers' compensation insurance carrier that verifies periods of workers' compensation insurance coverage for the last five years. If your firm has been in the construction business for less than five years, provide a statement by your workers' compensation insurance carrier verifying continuous workers' compensation insurance coverage for the period that your firm has been in the construction business.) 18. How many times during the last five years, has your firm been require to pay back wages and/or penalties related to state orfederal 012345+ prevailing wage laws for work performed by your firm? (Explain on a separate sheet. Describe the nature of each violation and identify the mik"k "2- __ W1WW-�_'-11W10VW --IN HUMUCI U1 U111ployces UIIUVI�:dlu, d11U U1I1VU11LkS) 01 Uak�&-1;dgt;Zj d11U ?;1Z;11U1L J was required to pay.) NOTE: Question 18 refers only to the violation of prevailing wage laws by your firm, not to violations by a subcontractor. City of Downey Page 22 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project Circle Answer 19. How many times during the last five years, has your firm or any subcontractors hired by your firm been required to pay back wages 0 5+ and/or penalties related to state or fgdgrALprevailing wage laws for work performed by a subcontractor? (Explain on a separate sheet. Identify the subcontractor's business name and CSLB license number, describe the nature of each violation, and identify the name of the project, date of its completion, public agency for which it was constructed, number of employees underpaid, and amount(s) of back wages and penalties your firm was required to pay.) NOTE: This question refers only to the violation of prevailing wage laws by subcontractors, not to violations by your firm. 20. How many times during the last five years, has your firm paid any penalties related to any provision of California apprenticeship laws or 0 5+ regulations, or the laws pertaining to use of apprentices on public works 1 projects, including Labor Code sections 1777.5 and 1777.7? (Explain on a separate sheet. Provide the date(s) of such findings, case number(s), and attach copies of the Department's final decision(s).) 21. How many times during the last five years, has any subcontractor hired by your firm paid any penalties related to any provision o • I5+ apprenticeship laws or regulations, or the laws pertaining to use of apprentices on public works projects, including Labor Code sections 1777.5 and 1777.7? ralrigg lasillsigmel Moira T1AFfE,._1# missions, misrepresentations ana any Mai =ure to disclose associations with other firms or any prior history of alleged violations may lead to loss of your eligibility to register as a Public Works Contractor, tim"'tialifir-2$611', of a contract. go City of Downey Page 23 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project gulTaffs Provide information about the firm's six most recently completed public works projects and its three largest completed private projects within the last three years. Names and references must be current and verifiable. Use separate sheets of paper that contain all of the following information*: For General Contractors: Only list projects your firm performed as the general contractor. For Subcontractors: Only list projects your firm performed as the prime contractor if a single trade job or as a subcontractor on a multiple trade contract. For multiple trade contracts, indicate the general contractor's name and contact information. The prospective Bidder must list at least three (3) projects completed since 2010 of size scope and complexity similar to the project including: 1. Pond Restoration Project involving installation of linear product of 40 mil or greater. 2. Ponds "Wetlands Renovation" of 2.0 acres or larger in size. Contractor must have five (5) "Yes" answers to be accepted to meet these qualification criteria. Contractor is automatically considered not gualified';if one (1) answer to any of the following questions is No. Contractor has: 1. An office in continuous operation for the last ten (10) years in Southern California. ❑ Yes ❑ No 2. Project Manager and Superintendent to be assigned to the project have successfully completed on or more Pond Restoration Projects for governmental (Federal, State, or local) or University agencies considered public sector clients under employment with contractor. LI Yes LJ No 3. Has self -performed at least 51% of the work on each of the projects. ❑ Yes ❑ No Project Name: Location: Owner: Ovmer Contact (name and current phone number): Architect or Engineering Firm: Architect or Engineer Contact (name and current phone number): City of Downey Page 24 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project Constmction Manager (name and current phone number): Inspector of Record (name and current phone number): Description of Project, Scope of Work Performed: Total Value of Construction (including change orders): Date Construction Commenced: Original Contractual Completion Deadline: Adjusted Completion Deadline Based on Time Extensions Granted by Owner: Actual Date of Completion: * You may also provide information about other projects that you have completed that are similar to the project(s) for which you expect to bid using the same format. City of Downey Page 25 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project Questionnaires submitted by corporations must be signed with the legal name of the corporation, followed by the name of the state of incorporation and by the signature and designation of the chairman of the board, president or any vice president, and then followed by a second signature by the secretary, assistant secretary, the chief financial officer or assistant treasurer. All persons signing must be authorized to bind the corporation in the matter. The name of each person signing shall also be typed or printed below the signature. Satisfactory evidence of the authority of each officer signing on behalf of a corporation shall befurnished. Questionnaires submitted by partnerships must furnish the full name of all partners and must be signed in the partnership name by a general partner with authority to bind the partnership in such matters, followed by the signature and designation of the person signing. The name of the person signing shall also be typed or printed below the signature. Each person signing below makes the following representations under penalty of perjury: The submitter of the foregoing answers to the questionnaire has read the same and the matters stated therein are true to the best of his or her own personal knowledge. This information is provided for the purpose of qualifying to bid on the Project, and any individual, company or other agency named herein is hereby authorized to supply the awarding body with any information necessary to verify the prospective bidder's statements. By signing below, the submitter and the named contractor hereby grant permission to the [Public Entity] to contact any or all of the above listed persons or entities to confirm facts or otherwise investigate the above facts and issues. The submitter understands that any statement which is proven to be false shall be grounds for immediate disqualification from bidding on the Project. The submitter whose signature appears below represents and warrants that he or she has authority to bind the named contractor. I, (Name), the undersigned, am the (Title), with the authority to act for and on behalf of (Contractor Entity Name), declare under penalty of perjury under the laws of theState of California that the foregoing information provided in this Pre -qualification Questionnaire is true, full, and correct. I understand that making a false statement may result in disqualification from bidding on any public works project, registering as a Public Works Contractor with the Department of Industrial Relations, and may be grounds for termination of a public works contract. Executed on this: - day of at— (Date) (Month / Year) (City / State) Name of Contractor Representative` Signature of Contractor Representative: City of Downey Page 26 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project City of Downey Page 27 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project 14%61.4 ITO Questions Type: Notes: The awarding body will review additional documents provided by the Contractor in response to the questions in Section D to calculate a final score using the two factors listed above: A score on a scale of 1 to 5 is assigned to each factor. Factor #1: A score of 1 is assigned where the incident is clearly the result of a good -faith mistake, and a score of 5 is assigned where the incident is clearly an overtly willful action for which the Contractor is culpable. Factor #2:A score of 1 is assigned where only a single incident exists, and a score of 5 is assigned where five or more incidents of that kind are reported. A contractor is PRE -QUALIFIED if the total score above is: 35 points orLESS.- A contractor is DISQUALIFIED if the total score above is: GREATER THAN 35 points. City of Downey Page 28 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project •r • City of Downey Page 29 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project ,A-- • - %7MMAR57M • ` 11 - identified as "project references" in Section E of the questionnaire. 2. Are there any outstanding •• • liens, • claims by the contractor that are current y unresolved on contracts for which notices of completion were recorded more than 120 days ago? (I point for each is deducted from overall score; maximum amount to be deducted is 5 points) 3. Did the contractor provide adequate personnel? 4. Did the contractor provide adequate supervision? 5. Was there adequate equipment provided on the job? 6. Was the contractor timely in providing reports and other paperwork, including change order I - 11 11 11111111 11 11 dill I III I I, 8. Was the project completed on time? 9. Did the contractor timely submit reasonable cost and time estimates to perform change order work? mm�• -• •f- • •SMOMM WIE warranty items? 13. • the contractor make timely payments to either subcontractors • suppliers? City of Downey Page 30 of 30 �•• A .� . �a. :m sr •., // a � i # • Me f- • • •; - • /- • • i:: i is s / • • : # • • indemnityprovisiom indemnityThis i.: 06dtive regardlessp.# conGurrerit active •.. • .. of Indemnitees or arise from the active negligence of City. !N§ ihde= =Ision shall survive the termination of the ConfraO or hiat payment hereunder • „ .• • er w•f • �w w # • • is #• '', w w w.... ® -:. ,« 4rw «,, f' i • +• y f ' 1 ' f � l' ' f iF f''r f !t �� t � • •i ' ii •� �� 'y t �+ monies the City has paid to obtain or renew the insurance, or the City may oset me cosi or ine f against any monies due Contractor from the City. WORKERS' COMPENSATION INSURANCE 1 . , m- — tL m of its to its employees, or anyone iL carecuy ut ai umutsy UMIJI P, iuw squtiva GIr matmj VUL V„ V. ,,,, .. ,services' performed on behalf of Contractor. Contractor shall obtain, pay for, and maintain for the duration of this Contract, complete workers' compensation insurance. The City of Downey shall not be responsible for any claims at law or in equity caused by Contractor's failure to comply with this paragraph. Contractor shall provide proof of workers' compensation coverage by furnishing the City with an insurance certificate or a certificate of consent to self -insure. All workers' compensation insurance policies shall bear an endorsement, or shall attach a rider, which provides that the carrier will notify the City, by registered mail, at least 30 days in advance of the policy's expiration, termination, or cancellation. BUILDERSRISK/COURSE OF CONSTRUCTION INSURANCE A. When specified in the Contract Special Conditions, the Contractor shall obtain and maintain during the life of the Contract, in the name of the Contractor and the City, "all risk" builders risk/course of construction insurance issued on a completed value form covering the entire work of the Contract for 100% of thereplacementvalue thereof without deductibles. Such insurance shall include items of surplus labor and materials in place or to be used as part of the permanent construction , miscellaneous materials and supplies incident to the work, temporary buildings, debris removal, and false work, staging, towers, forms and equipment, whether or not owned or rented by the Contractor, and demolition required by the enforcement of any Contract, law or regulation. Such insurance shall also include coverage for damage due to earthquake and flood. B. In the event of a loss by the perils insured against, of any or all of the work andfor materials herein provided for, at any time prior to the final completion of the Contract and the final acceptance by the City, the Contractor shall promptly reconstruct, repair, replace or restore all work or materials so destroyed. C. Nothing herein provided for shall in any way excuse the Contractor or his/her surety from the obligation of furnishing all the required materials and completing the work in full compliance with the terms of the Contract. D. The following endorsements/coverages shall be included in the policy: 1. The coverages are primary to any other applicable insurance coverage carded by the City. 2. The Contractor and the insurance company waive all rights of subrogation and contribution against the City, its officers, employees, elected officials, attorneys, members of boards and commissions, agents and volunteers; and 3. The policy shall not be canceled nor the above coverages/ endorsements reduced without 60 days written notice to the City. rpz AContractor shal( have its inst�rance carrier(s) complete and ekecUb��ft following documents, toge with a copyof each insurance pojtquired un►�ttie Coritredt Wuding all endorsements th ret which shall be delivered to the City Engineer within 14 calendar days following issuance of the Notici of Award: 1. Form entitled: Commercial General Liability[Automobile Liability/Special Endorsement, attached hereto as Exhibit "C-1." 2. Proof of Workers' Compensation Insurance, or if Contractor is self-insured for worker's compensation, a self-insuring certificate therefore from the State of California. 3. Form entitled: Certificate of Insurance, with 30 days prior notice of cancellation required as to all coverage and policies. B. The Notice to Proceed will not be issued until the aforesaid insurance documents have been received and approved by the City. City's decision as to the acceptability of all insurance documents is final. No substitution of the form of the documents or the endorsements or amendments thereto will be permitted without the prior written consent of City. X Contractor shall furnish the following bonds: 1. A Faithful _Performance Bond in an amount equal to One Hundred percent (100%) of the Contract price in the form shown in Exhibit "B-1 " attached hereto... 2. A Payment Bond (Labor and Material) in an amount equal to One Hundred percent (100%) of the total Contract price in the form shown in Exhibit °B-2" attached hereto. 3. When specified in the Contract Special Conditions: A Maintenance Bond in an amount equal to Ten percent ("101/6) of the total Contract price in the form shownin Exhibit '84' attached' hereto. B. All such bonds shall be accompanied by a power of attorney from the surety company authorizing the person executing the bond to sign on behalf of the company. If the bonds are executed outside the State of California, a California representative of the surety must countersign all copies of the bonds. The signature of the person executing the bond shall be acknowledged by a Notary Public as the signature of the person designated in the power of attorney. C. The surety or sureties on all bonds furnished must be satisfactory to the City. City will reject surety bonds obtained from any company whicrj :L an admitted surety insurer under the laws of the State of California and which does not hold a Certificate of Authority from the U.S. Secretary of the> Treasury ander 31 U.S.C. as an acceptable surety on Federal bonds. The surety must also be listed in the latest edition of U.S. Department of Treasury Circular 570, and the bonds provided must not exceed the surety's bonding limitations as set forth in Circular 570. D: If, during the continuance of the Contract, any of the sureties, in the opinion of the City, are or become aeon -responsible or otherwise unacceptable to City. City may require other new or additional sureties, which the Contractor shall furnish to the satisfaction of City within ten (10) days after notice,- and in default thereof the Contract may be suspended and the materials may be purchased or the work completed as provided in Article 5 herein. E. No modifications or alterations made in the work to be performed under the Contract or the time of performance shall, operate to release any surety' from liability on any bond or bonds required to be given herein. The surety shall waive notice of such events. F.. The Notice to Proceed will not be issued until the aforesaid bonds have been received and approved by City. City's decision as to the acceptability of all sureties and bonds is final. No substitution of the form of the documents will be permitted without the prior written consent of City. RequestforPre-qualification for WildernessPonds Pre-qUalification Packages Due May 10,, 2019 at 5:00 p.m. City of Downey 11111 Brookshire NEMEWAMMIMS For • i John Oskoui,Assistant City Manager E-mail: Phone -904-7284 ATTACHMENT B NOTICE REQUESTING PRE -QUALIFICATION PACKAGES FOR WILDERNESS PARK PONDS RESTORATION PROJECT AND PROCEDURES FOR PRE -QUALIFICATION ......:. ,®.»....: ..».,..m . .............»»,M: ......... ,»..» ,..:..3 PRE -QUALIFICATION QUESTIONNAIRE .... ...............- ........................... » .............. ........:...........7 SECTION A. CONTACT INFORMATION....................................................... ....... ...............,...:..7 SECTION B. CURRENT ORGANIZATION AND STRUCTURE ............................. ................ _._8 SECTION C. CRITERIA QUESTIONS ................................................. .15 SECTION D. PRE -QUALIFICATION CRITERIA QUESTIONS .............. ......... ...........................17 PRIOR HISTORY :........ ............... . ........_ ......................... ........... ....... ................:: .................11 CRIMINAL MATTERS AND CIVIL SUITS....................................................,.................19 OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE .................. ........ .___ .....................20 PREVAILING WAGE AND APPRENTICESHIP COMPLIANCE RECORD .....:.. ........ ................_ 20 SECTION E. PROJECT EXPERIENCE..................................................., ...,.............:.........22 CERTIFICATION,... .,......___ ..... ........ ........ ........: ........ ................:......................... 24 PRE -QUALIFICATION CRITERIA QUESTIONS AND SCORING ........ ..,..... .................:........ 26 MODEL INTERVIEW QUESTIONS...................................................................... ................. 29 APPENDIX -A A. INSURANCE AND BOND REQUIREIVIENTS .....:................. .........................w, ...................... • • .. i • i. r .. .• r •' •, i',:'i f • i • Notice is hereby given that the City of Downey ("Citi") has determined that all contractors on the Wilderness Park Ponds Restoration Project ("Project") must be pre -qualified prior bidders to submitting a bid for the Project. ULLSOOMONOUAK619 The City is seeking a General Engineering ("A" licensed) contractor ("Contractor") experienced in restoration of lakes and/or ponds in a public park setting for rehabilitation and restoration of the Wilderness Parks Ponds located at 10999 Little Lake Rd, Downey, CA 90241. The project consists of restoring 2.5 acres of wetlands habitat at two existing ponds at Wilderness Park, which is adjacent to the San Gabriel River. The project will improve the ponds by replacing invasive plant species with natives, installing a naturalized hardened shoreline and a new aeration system to improve water quality, restoring wetland habitat for native species, animal wildlife and providing respite for migratory birds. Further, this project includes new trail segments that will enhance access to the adjacent 28 -mile San Gabriel River Trail and new educational wayfinding signage to facilitate wetlands and native habitat awareness. The construction cost of the Project is estimated at $4 million, The anticipated pre -qualification and bid schedule is summarized as follows. Date Milestone April 26, 2019 City issues request for pre -qualification from Contractors. May 3, 2019 Deadline for Contractors to submit questions. May 10, 2019 Deadline for Contractors to submit Pre -qualification Packages. May 15, 2019 City issues recommendation of qualified bidders list for Contractors. Last day for Contractors to appeal City's decision with respect to May 20, 2019 pre -qualification ratings and to deliver notice of appeal to City. May 24, 2019 Last day for appeals to be heard by City., June 11, 2019 City adopts approved bidders list. June 17, 2019 Project put out to bid for approved bidders. July 12, 2019 Deadline for Contractors to submit bids. July 23, 2019 Project awarded to lowest responsible bidder. It is mandatory that all Contractors who intend to submit bids for the Project fully complete a City of Downey Page 3 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project pre -qualification package ("Pre -qualification Package"), including but not limited to the pre - qualification questionnaire, provide all materials requested herein and be approved by the City to be on the final bidders list. No bid will be accepted from a Contractor that has failed to comply with these requirements. If two or more business entities submit a bid on the Project as a joint venture, each entity within the joint venture must be separately qualified to bid. The completed Pre -qualification Package must be delivered to and received by City no later than May 10, 2019 at 5:00 p.m. Pre -qualification Packages must include three (3) hard copies and one (1) electronic copy on a disk, and be submitted under seal and marked "CONFIDENTIAL: Wilderness Park Ponds Restoration Project — Contractor Pre -qualification Package" to the City of Downey, Attention: City Clerk, 11111_ Brookshire Ave, Downey, CA 90241. City will notify all respondents of the results of the pre -qualification process in writing. Answers to questions contained in the attached questionnaire, information about current bonding capacity on an aggregate and per project limit, and the most recent reviewed or audited financial statements, with accompanying notes and supplemental information, are required. The City will use these documents to rate Contractors with respect to their qualifications to bid on the Project. City reserves the right to check any other sources available to verify- Contractor's statements, prior performance and veracity. City's decision will be based on objective evaluation criteria identified herein. While it is the intent of the Pre -qualification Package and documents required therewith to assist the City in determining bidder responsibility _prior to bid and aid City in selecting the lowest responsible bidder for construction of the Project, neither the fact of pre -qualification, nor any pre qualification rating, will preclude City from a post -bid consideration and determination of whether a bidder has the quality, fitness, capacity and experience to satisfactorily perform the proposed work, and has demonstrated the requisite trustworthiness. The Pre -qualification Packages submitted by Contractors are not public records and are not open to public inspection. All information provided will be kept confidential to the extent permitted by law; however, the contents may be disclosed to third parties for the purpose of verification, investigation of allegations that may impact Contractor's pre -qualification status, and in the process of an appeal hearing. State law provides that the names of contractors applying for pre -qualification status are public records subject to disclosure, and the first page of the questionnaire will be used for that purpose. Each questionnaire must be signed under penalty of perjury in the manner designated at the end of the form, by an individual who has the legal authority to bind the Contractor on whose behalf that person is signing. The Contractor shall provide only complete and accurate information. If any information provided by a Contractor becomes inaccurate, the Contractor must immediately notify the City and provide updated accurate information in writing and under penalty of perjury. The City may verify any or all information provided in completed Pre -qualification Packages, consider information provided by sources other than the prospective bidder, and conduct such investigations as the City deems appropriate to assist in the evaluation of Contractor's responsibility, qualifications City of Downey Page 4 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project and -�-��dal capacity. The City will evaluate all completed Packages on or basis as well as a points- based rating system. A score sheet is included in this Pre -qualification Package (Page 26). /\ Contractor will be automatically pre -qualified if the responses submitted to all questions in Sections [ and D dm not raise concerns. /\ Contractor that does not automatically pre -qualify by "passing" Sections C and O is subject to additional scrutiny. If additional scrutiny is required, the City will review and evaluate the required supporting documentation and use a numerical scorecard to determine whether the Contractor is pre -qualified as described below. A score sheet isincluded inthis Pre -Qualification Package Vnpage 26. Contractor isimmediately disqualified if: °K Any answer hmquestions Ithrough GiS"YJ{J" • Any answer tmquestions 7through 13 is "YES" If the Contractor is not immediately disqualified based on its answers to �the questions in Section {� the City may assume that the Contractor has passed this pre -qualification sect/On. However, the City may require additional information be submitted to verify the accuracy of the responses provided onthe Questionnaire. Contractors are required to answer questions l through 21 and must provide additional information to the City for any questions where the answer is not "0". The City will then use this information to calculate a score for Section D in order to determine eligibility for pre - qualification. All questions in which the Contractor's response is not "0" are scored. If all of the responses to questions 1 through 31 are "0" the City may assume that the Contractor has passed this pre -qualification section. However, the City may require additional information from the Contractor toverify the accuracy ofthe responses provided. if the answer to any ofquestions l through 21isnot "O°,additional scrutiny isrequired 'and the awarding body will analyze the issues using the following two factors: l- Whether the incident was a good faith mistakeand, ifso, the error was promptly and voluntarily corrected when brought tothe attention of the Contractor orSubcontractor. UM 2. Whether the Contractor or Subcontractor has a prior history or several incidents of the issue are reported. The �- reserves the right to reject any or all Pre -qualification Packages and to waive any irregularities in any Pre -qualification Package submittal. The City reserves the right to determine City ofDowney Page 5nf30 Request for Pre -Qualification that any Contractor is not qualified at' any time before or after the Pre -qualification Packages are received and evaluated if it finds that information provided therein is inaccurate, misleading or false, or upon evidence of collusion or other illegal practices on the part of a Contractor. The City, in its sole discretion, expressly reserves the right to cancel the pre -qualification process at any time, including but not limited to, after the deadline for the receipt of Pre -qualification Packages, reject any Pre -qualification Package received by the City and competitively bid the Project without first prequalifying bidders. The City reserves the right to adjust, increase, limit, suspend or rescind the pre -qualification rating based on subsequently learned information. Contractors whose rating changes sufficient to disqualify them will be notified, and given an opportunity for a hearing consistent with the hearing procedures described below for appealing a pre -qualification rating. The City may conduct a final review of the information submitted by the Contractor just prior to the award of the bid to confirm that the information submitted has not changed. A Contractor who has submitted a completed Pre -qualification Package, and who receives a rating of "not qualified" from the City may appeal that determination. There is no appeal from a finding that a Contractor is not prequalified because of a failure to submit required information._A Contractor may appeal the City's decision with respect to its request for pre -qualification, and request a hearing, by giving written notice of appeal and submitting a deposit of one thousand dollars ($1,000) to the City no later than five (5) working days after City's issuance of the written notice of the Contractor's qualification status. Unless City receives the written notice of appeal and deposit within the time specified above, the Contractor waives any and all rights to challenge the qualification decision of the City, whether by administrative process, judicial processor any other legal processor proceeding. If the Contractor gives the required notice of appeal and requests a hearing, the hearing shall be conducted so that it is concluded no later than five (5) working days after the City's receipt of the Contractor's Notice of Appeal and the $1,000 filing deposit. The hearing so provided shall be an informal process conducted by a panel to whom the City has delegated responsibility to hear such appeals (the "Appeals Panel"). At or prior to the hearing, the Contractor will be advised of the basis for the City's pre -qualification determination. The Contractor will be given the opportunity to present information and present reasons in opposition to the pre -qualification determination. At the conclusion of the hearing or no later than two (2) working days after completion of the hearing, the Appeals Panel will render its decision, which will be final and binding. It is the intention of the City that the date for submission and opening of bids for the Project will not be delayed or postponed to allow for completion of an appeal process. If the Contractor's appeal is rejected by the Appeals Panel, the Contractor's $1,000 filing deposit shall be forfeited to the City. Otherwise the deposit will be returned to the Contractor following issuance of the Appeals Panel's decision. The Pre -qualification Package, its completion and submission by the Contractor, and its use by the City, shall not give rise to any liability on the part of the City to the Contractor or any third party or person. This is not a solicitation for bid. The Contractor accepts all risk and cost associated with the completion of the Pre -qualification Package without financial guarantee. City of Downey Page 6 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project A Contractor may be found not prequalified for either omission of requested information or falsification of information. City of Downey Page 7 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project TnnM3MZ= PRE -QUALIFICATION QUESTIONNAIRE WILDERNESS PARK PONDS RESTORATION PROJECT Firm Name: LJ Corporation LJ Partnership LJ Sole Prop. Contact Person: Address: Phone: Fax: If firm is a sole proprietor or partnership: owner(s) of Company: Contractor's License Number(s): City of Downey Page 8 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project A. CQNJ,9dCi" BJft)0B9AXM (All Questions Must Be Answered) Firm Name (as it appears on CSLBlicense)� 0 Firm Type (Select one): 0 Corporation 0 LLC El Partnership L3 Sole Proprietorship 0 Joint Venture Contact Person/Title: (List Owner(s) if Firm is a Sole Proprietorship or PuMership) Local Address (P.O. Box is not acceptable): Address 1: Address 2: Cit Zip: Office Telephone: Contact Mobile: Fax Number: E-mail Address: List all California construction or other professional license numbers, classifications and expiration dates held by yourfirm: List your firm's DIR Public Works Contractor (PWCR) Registration Number(s)' if any of your firm's license(s) are held in the name of a corporation, limited liability company, or partnership, list below the names of the qualifying individual(s) listed on the CSLB records who meet(s) the experience and examination requirements for each license. License Number Quali City of Downey Request for Pre -Qualification Wilderness Park Pond Restoration Project City of Downey Page 10of30 Request for Pre -Qualification Wilderness Park Pond Restoration Project B. C_U RENI QHGANIZAIMS AND MULIVRE Complete the section below for the appropriate type of firm: or Firms JLhAJ Are C=oratioLls: Ia. Date incorporated: 1b. Under the laws of what state: Ic. Provide all the following information for each person who is either (a) an officer of the corporation (president, vice president, secretary, treasurer), or (b) the owner of at least ten percent of the corporation's stock: Name Position Years % with Firm Ownership Id. Identify every construction firm that any person listed above has been associated with (as owner, general partner, limited partner or officer) at any time during the last five years. NOTE: For this question, "owner" and "partner" refer to ownership of ten percent or more of the business, or ten percent or more of its stock, if the business is a corporation. Person's Name Construction Firm Date of Person's i_I Particpation with Firm - - - - - -------------- ----- or Firms That Are LiMM Lighih CamuguiesaL0. Ia. Date Article of Organization filed: - 1b. Under the laws of what state: 1c. Provide all the following information for all members of the LLC: Name Position Years % with Firm Ownership City of Downey Page 11 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project I d. Identify every construction firm that any person listed above has been associated with (as owner, general partner, limited partner or officer) at any time during the last five years. t* 66 99 NOTE: For this ques ion, owner and "partner" refer to ownership of ten percent or more of the business, or ten percent or more of its stock, if the business is a corporation. &r_,Eir=Thgt Are Partaffibia: la. Date incorporated: 1b. Under the laws of what state: 1c. Provide all the following information for each partner who owns ten percent or more of the firm. Name Position Years % with Firm Ownership I d. Identify every construction firm that any person listed above has been associated with (as owner, general partner, limited partner or officer) at any time during the last five years. NOTE: For this question, "owner" and "partner" refer to ownership of ten percent or more of the business, or ten percent or more of its stock, if the business is a corporation. Person's Name m Construction Firm Date of Person's Participation with Firm City of Downey Page 12 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project For Firms TbatAre Sola L1rgpx_tkta&MM: Ia. Date of commencement of business 1b. identify every construction firm that the business owner has been associated with (as owner, general partner, limited partner or officer) at any time during the last five years. NOTE: For this question, "owner" and "partner" refer to ownership of ten percent or more of the business, or ten percent or more of its stock, if the business is a corporation. Person's Name Construction Firm Date of Person's Participation with Firm Bid as Part eta, MaUmdm: Ia. Date of commencement of joint venture: 1. Provide all the following information for each firm that is a member of the joint venture that expects to bid on one or more projects Note: Explain on a separate sheet. Provide all other pertinent information required in the sections above, for each Corporation, LLC, Partnership, or Sole -Proprietorship that is a part of the Joint Venture. LQB,AUJJ,RM.* 2 At any time during the past five years, has your firm shared office space, warehouse space, yard, plant or shop facilities, staff, equipment, telecommunications or other assets with any other construction firm? (If yes, identify and explain below.) Construction Firm Description of Sharing Location of greement Facilities Cityof Downey Page 13 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project 3. State your firm's gross revenues for each of the last three fiscal years: Current year Previous year Year prior to previous year 4. How many years has your firm been in business in California as a contractor under your present business name and license number? 5. Bonding Capacity— Provide documentation from your surety identifying the following: Name of Bonding Company/Surety: Name of Surety Agent: Address: Telephone number: 6. if your firm was required to pay a premium of more than one percent for a performance and payment bond on any project(s) on which your firm worked at any time during the last three years, state the percentage that your firm Was required to pay. You may provide an explanation for a percentage rate higher than one percent, if you wish to do so. 7 List all other sureties (name and full address) that have written bonds for your firm during the last five years, including the dates on which they were issued: 8. How often do you require documented safety meetings to be held for constructi• • - oyees and field supervisors during the course of aproject? 9. List your firm's Experience Modification Rate (EMR) (California workers' compensation insurance) for each of the past three premium years: Current year rate: Previous year rate: Year prior to previous year rate: - 10. Does your firm regularly utilize a third party consultant to review labor compliance documents of subcontractors on a public works project? 0 Yes L1 No City of Downey Page 14 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project apprentices11. Provide the name, address and telephone number of the apprenticeship program (approved by the California Apprenticeship Council) from whom you intend to request the dispatch of ! employ on public worksproject • ! by [Public 12- Provide the name, address and telephone number of the apprenticeship program (approved by the California Apprenticeship Council) from whom you have requested and/or employed apprentices in the past three years. Na iie Address Phone 13 If your firm operates its own State -approved apprenticeship program: (a) Identify the craft or crafts in which your firm provided apprenticeship training in the past year; (b) State the year in which each such apprenticeship program was approved and attach evidence of the most recent California Apprenticeship Council approval(s); (c) For each craft, list the number apprentices employed by your firm and the number o individuals that completed apprenticeships while employed by your firm `n the last three years. Craft Year No. -Apprentices No. Corn lete 14. Has your firm changed names or license number in the past five years? ❑ Yes ❑ No (If yes, explain on a separate sheet, including the reason for the change.) 15: Has there been any change in ownership of your firm at any time during the last five years? ❑ Yes ❑ No (If yes, explain on a separate sheet.) NOTE: A corporation whose shares are publicly traded is NOT required to answer this question. City of Downey Page 15 of 3 Request for Pre -Qualification - Wilderness Park Pond Restoration Project 16. Is your firm a subsidiary, parent, holding company or affiliate ofanother construction firm? ❑ Yes ❑ No (if yes, explain on a separatesheet.) NOTE: Include information about other firms if one firm owns 50 percent or more of another, or if an owner, partner, or officer of your firm holds a similar position in another firm. 17. Has any owner, partner and/or officer of your firm operated or been connected to a construction firm under any other name in the last five years not listed in Section A or Section B above at anytime in the past five years? ❑ Yes ❑ No (if yes, provide the person's name, construction firm name, and dates of participation.) Name Construction Firm Dates of Partici ation City of Downey Page 16 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project Does your firm possess a valid and current California Contractor's or other professional license as required by law for the projector Yes projects for which it intends to submit a bid? 2. Is your firm registered with DIR as a Public Works Contractorfor Yes the current fiscal year? 3. Does your firm have a liability insurance policy with a policy limit Yes of at least $ 1,000,000 per occurrence and $2,000,000 aggregate? 4. Does your firm have current workers' compensation insurance Yes policy as required by the Labor Code oris your firm legally self- insured pursuant to Labor Code section 3700 et. seq.? 5Have you attached your firm's latest copy of reviewed or audited Yes financial statements with accompanying notes and supplemental information? * ftlf , an -at ai1,7 2%, acceptable. A letter verifying availability of a line of credit may also be attached; however, it will be considered as supplemental information only, and is not a substitute for the required financial statements. Have you attached a notarized statement from an admitted surety insurer (approved by the California Department of Insurance) Yes authorized to issue bonds in the State of California, which states your current bonding capacity is sufficient for the project for which you seek pre -qualification if you are seeking pre - qualification for a single project; or valid for a year if you are seeking pre -qualification valid for a year; and (b) your current available bonding capacity? * * NOTE: Notarized statement must be from the surety company, not an agent or broker. T Has your contractor's or other professional license been revoked at any time in the lastfive years? Yes 8. Has a surety firm completed a contract On your behalf, or paid for completion because your firm was in default and/or terminated by Yes the project owner within the last five years? City of Downey Page 17 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project IM M. me 7M ZM M Mil - 0 * Public Contract Code section 20 10 1 (e) exempts from this requirement a contractor who has qualified as a small '#,v,Awxs r WITI-M MbqtA.483_7_`1dM if the bid is "no more than 25 percent of the quaamount provided in section 14837(d)(1)." As of January 1, 200 1, the qg amount is $ 10 million, and 25 percent of that amount, therefore, is $2.5 million. An actaitional notanzeci sia # Friw. bid, if this pre -qualification questionnaire is submitted more than 60 days prior to submission of the bid. City of Downey Page 18 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project Circle Answer 9Is your firm, any of its officers, supervisors, managers, or any firm or individual identified above in Section A and/or Section B, ineligible to bid on or be awarded a public works contract, or Yes No perform as a subcontractor on a public works contract, pursuant to Labor Code section 1777. 1, Labor Code section 1777.7, or any other federal, state, county, municipal or other local law providing for the debarment of contractors from public works? 10. Has your firm, any of its officers, supervisors, managers, or any firm or individual identified above in Section A and/or Section B been convicted of a crime involving the awarding of a contract of a government construction project, the bidding or performance of a Yes No government contract, antitrust statutes, racketeering statutes, safety and health regulations, envirom-nental laws, laws banning workplace discrimination, laws governing wages, hours or labor standards, or laws involving fraud, theft, or any other act of dishonesty? 11. Is your firm currently the debtor in a bankruptcy ease? Yes No (if yes, attach a copy of the bankruptcy petition showing thecase number and date on which the petition was filed.) 12. Has your firm, any of its officers, supervisors, managers, or any firm or individual identified above in Section A and/or Section B ever been terminated from a public works contract, including but Yes No not limited to termination based on any misconduct, such as failure to comply with contractual, statutory, or other legal obligations from any public construction project? 13. Does your firm, any of its officers, supervisors, managers, or any firm or individual identified above in Section A and/or Section B currently have any delinquent liability to an employee, the state, or any awarding body for any assessment of back wages or related Yes No damages, interest, fines or penalties pursuant to any final judgment, order, or determination by any court or any federal, state, or local administrative agency, including a confirmed arbitration award? * Public Contract Code section 20 10 1 (e) exempts from this requirement a contractor who has qualified as a small '#,v,Awxs r WITI-M MbqtA.483_7_`1dM if the bid is "no more than 25 percent of the quaamount provided in section 14837(d)(1)." As of January 1, 200 1, the qg amount is $ 10 million, and 25 percent of that amount, therefore, is $2.5 million. An actaitional notanzeci sia # Friw. bid, if this pre -qualification questionnaire is submitted more than 60 days prior to submission of the bid. City of Downey Page 18 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project D. Pri Lffi. toCircle Answer 1. How many times has your firm, or any of its officers, supervisors, or managers, declared bankruptcy at any time during the last five years? 01 2 5+ (This question refers only to a bankruptcy action that was not described in your answer to Question I I in Section C. If yes, attach a copy or the bankruptcy petition showing the case number and the date on which the petition was filed, a copy of the Bankruptcy Court's discharge order or any other document that concluded the case if no discharge order was issued.) 2. How many times has your firm, or any of its officers, supervisors, or managers, had an injunction, judgment, order, or lien entered against it 01 2 5+ for outstanding taxes assessed or fines, penalties and/or unpaid employee wages at any time in the last five years? (Explain on a separate sheet. Provide details, including the name of the government agency, caption, date, case or docket number, and disposition. Be sure to note any judgments or liens that have not been fully satisfied.) 3. How many times in the past five years, has your firm, or any of its officers, supervisors, or managers, been a party in any civil litigation or administrative proceeding alleging violation of any of the following: 01 2 5+ contract antitrust statutes, racketeering statutes, safety and health regLilations, environmental laws, laws banning workplace discrimination, laws governing wages, hours or labor standards, or laws involving fraud, theft, or any other act of dishonesty? (Explain on a separate sheet. Provide details including the nature of the claims and defenses, caption, date, case or docket number, name of the court or agency before which the case is pending or which it was heard, and current status.) 4. How many times in the past five years, has your firm, or any of its officers, supervisors, or managers, been a party in any civil litigation or administrative proceeding alleging a violation by a subcontractor hired 01 2 5+ by your fimi of''any of the following: contract antittitst statutes, racketeering statutes, safety and health regulations, environmental laws, laws banning workplace discrimination, laws governing wages, hours or labor standards, or laws involving fraud, theft, or any other act of dishonesty? (Explain on a separate sheet. Provide details including the nature of the claims and I defenses, caption, date, case or docket number, name of the court or agency before which the case is pending or which it was heard, and current status.) City of Downey Page 19 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project 5. How many times in the past five years, has your firm, or any of its officers, supervisors, or managers, paid any amount, fine or otherwise, 01 2 5+ regardless of characterization, to settle any of the allegations listed in Questions 3 and 4 above, whether with or without an admission of responsibility or liability? . �Providedetails �inclu�ding the ca�_1=__daLe_ case or docket number, and name of the court or agency before which the case was brought.) 6. How many times has your firm, or any Of its officers, supervisors, or managers, been debarred, suspended, disqualified, denied a classification 0 1 2 5+ rating or pre -qualification or otherwise been declared not responsible to or prevented from bidding or performing work on any public works contract or subcontract in the last five years? (Explain on a separate sheet. State whether the firm involved was the firrn applying for pre -qualification here or another firm. Identify by name of the company, name of the person within your firm who was associated with that company, date, owner of the project, project name and information, basis for the action, and case or docket number.) 7. How many times in the last five years has your firm been assessed and paid liquidated damages after completion of a project under a 01 2 5+ construction contract with either a public or private owner? (Explain on a separate sheet. Identify all such projects by owner, owner's address, date of completion of the project, amount of liquidated damages assessed and all other information necessary to fully explain the assessment of liquidated damages.) 8. How many times during the past five years, has any surety company made any payments on your firm's behalf as a result of a default, to 01 2 5+ satisfy any claims made against a performance or payment bond issued on your firm's behalf, in connection with a construction project, either public or private? (Explain on a separate sheet. Identify the amount of each such claim' name and telephone number of the claimant, date of claim, grounds for claim, present status of method b which claim was resolved if resolved, nature of resolution and amount, if any, at which claim wasresolved.) 9How many times in the last five years has any insurance carrier, for any form of insurance, refused to renew an insurance policy for yourfirm? 01 2 5+ (Explain on a separate sheet. Name the insurance carrier, form of insurance, and year of refusal.) City of Downey Page 20 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project 10. How many times during the last five years, has your irmbeenclenie bond coverage by a surety company, or has there been a period of 012345+ time when your firm had no surety bond in place during a public works construction project when one was required? (Explain on a separate sheet. Indicate the date when your firm was denied coverage, nzmc­-�tf the c*-m1gAy*r c*i%17.?def,&,#verzge, ?:&i tke &%e which you had no surety bond in place.) Crimin_al Maltsm an d -C Lv 1 5A ut Circle Answer 11. How many times has your firm, or any of its officers, supervisors, or managers, ever been convicted of a crime involving any federal, state, or 01 2 5+ local law related to construction? (Explain on a separate sheet. Identify who was involved, name of the public agency, date of conviction, and grounds for conviction.) 12. How many times has your firm, or any of its officers, supervisors, or managers, ever been found liable in a civil suit or convicted of a federal 01 2 5+ or state crime of fraud, theft, or involving any other act ofdishonesty, such as making any false claim or material misrepresentations? (Explain on a separate sheet. Identify the person or persons convicted or found liable, court [the county if a state court, the district or location if federal court], year, and conduct involved.) the owner of a project. You need not include information about disputes between your firm and a supplier, another contractor, or subcontractor. You need not include information about "pass-through" disputes in which the actual dispute is between a sub -contractor and a project owner. Also, you may omit reference to all disputes involving amounts of less than $50,000. 13. How many times in the last five years has any claim against your firm concerning your firm's work on a construction project been filed in court 0 1 2 5+ or arbitration? (Explain on a separate sheet. identify the claim(s) by providing the project name, dat of the claim, name of the claimant, a brief description of the nature of the claim, the i'lln't i'l ul'ficlt 41 M1 'W" illi -111 'loi- 10, iliiililmhiii iii staWisue,f Ae clzru. re.1— n mug IM, a vi I UqKqrvJ*M I I *A I tol I ILOA M I gmogm is, I ILI I I In M 14. How many times in the last five years has your firm made any claim against a project owner concerning work on a project or payment for a 01 2 5+ contract and filed that claim in court or arbitration? (Explain on a separate sheet. Identify the claim(s) by providing the project name, date of the claim, name of the entity (or entities) against whom the claim was filed, a brief description of the nature of the claim, the court in which the case was filed and a brief description of the status of the claim [e.g. "pending" or if resolved, a brief description of the resolution].) City of Downey Page 21 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project Qccul2aligngif If0fth and Safety Comoliance Circle Answer 15. How many times in the last five years has CalOSHA cited and assessed penalties against your firm for any "serious," "willful" or "repeat" 01 2 5+ violation(s) or the federal Occupational Safety and Health Administration cited and assessed penalties against your firm for violation(s) of safety or health regulations? NOTE: If you have filed an appeal of a citation, and the Occupational Safety and Health Appeals Board has not yet ruled on your appeal, you need not include information about it. 16. How many times in the last five years has the EPA or any Air Quality Management District or any Regional Water Quality Control Board 01 2 5+ cited and assessed penalties against either your firm or the owner of a project on which your firm was the contractor? (Explain on a separate sheet describing each citation.) NOTE® If you have filed an appeal of a citation and the Appeals Board has not yet ruled on your appeal, or if there is a court appeal pending, you need not include information about the citation. 17. How many times within the last five years has there ever been a period when your firm had employees but was without workers' compensation 01 2 5+ insurance or state -approved self-insurance? -sheet. If "None," please provide a statement by your current workers' compensation the last five years. If your firm has been in the construction business for less than five I/ears, provide a statement by your workers' compensation insurance carrier verifying continuous workers' compensation 'insurance coverage for the period that your firm h been in the construction business.) i 18. How many times during the last five years, has your firm been required to pay back wages and/or penalties related to A& otfedeLal 01 2 3 45+ prevailing wage laws for work performed by your firm? (Explain on a separate sheet. Describe the nature of each violation and identify the name of the iroject, date of its comWetion, •ublic a4ency for which it was constructed, was required to pay.) Its: Question 18 refers only to the violation of prevailing wage laws by your firm, not to violations by a subcontractor. City of Downey Page 22 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project Circle Answer 19. How many times during the last five years, has your firm or any subcontractors hired by your firm been required to pay back wages 0 5+ and/or penalties related to state or federal prevailing wage laws for work performed by a subcontractor? (Explain on a separate sheet. Identify the subcontractor's business name and CSLB license number, describe the nature of each violation, and identify the name of the M0U1K#DUJicgenc;p for which it was constructed, number of employees underpaid, and amount(s) of back wages and penalties your firm was required to pay.) NOTE: This question refers only to the violation of prevailing wage laws by subcontractors, not to violations by your firm. 20. How many times during the last five years, has your firm paid any penalties related to any provision of California apprenticeship laws or 0 5+ regulations, or the laws pertaining to use of apprentices on public works 1 projects, including Labor Code sections 1777.5 and 1777.7? (Explain on a separate sheet. Provide the date(s) of such findings, case number(s), and attach copies of the Department's final decision(s).) 21. How many times during the last five years, has any subcontractor hired by your fin -n paid any penalties related to any provision of California 0 5+ apprenticeship laws or regulations, or the laws pertaining to use of apprentices on public works projects, including Labor Code sections 1777.5 and 1777.7? (Explain on a separate sheet. Provide the date(s) of such findings, case number(s), and attach copies of the Department's final decision(s).) M MWIT0909111IT"T 1. . 'Vi- ►- I to disclose associations with other firms or any prior history of alleged violations may lead to loss of your eligibility to register as a Public Works Contractor, 2 61T,41L1U r-gr(IM:L 11"1)_r_ter:1C hwk of a contract. I A& City of Downey Page 23 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project Provide information about the firm's six most recently completed public works projects and its three largest completed private projects within the last three years. Names and references must be current and verifiable. Use separate sheets of paper that contain all of the following information*: For General Contractors: Only list projects your firm performed as the general contractor. For Subcontractors: Only list projects your firm performed as the prime contractor if a single trade job or as a subcontractor on a multiple trade contract. For multiple trade contracts, indicate the general contractor's name and contact information. The prospective Bidder must list at least three (3) projects completed since 2010 of size scope and complexity similar to the project including: 1. Pond Restoration Project involving installation of linear product of 40 mil or greater, 2. Ponds "Wetlands Renovation" of 2.0 acres or larger in size. Contractor must have five (5) "Yes` answers to be accepted to meet these qualification criteria, Contractor is automatically considered not p„ualifiedif one (1) answer to any of the following questions is No. Contractor has: 1. An office in continuous operation for the last ten (10) years in Southern California. LI Yes U No 2. Project Manager and Superintendent to be assigned to the project have successfully completed on or more Pond Restoration Projects for governmental (Federal, State, or local) or University agencies considered public sector clients under employment with contractor. ❑ Yes LJ No 3. Has self -performed at least 51% of the work on each of the projects. ❑ Yes LI No Project Name: Location:, Owner: Owner Contact (name and current phone number): Architect or Engineering Firm;: Architect or Engineer Contact (name and current phone number): City of Downey Page 24 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project Construction Manager (name and current phone number): Inspector of Record (name and current phone number): Description of Project, Scope of Work Performed: Total Value of Construction (including change orders): I Xltl-mt 'rfflela 111WRI. "MR.10 wraWFIRARTNITNTIMS Adjusted Completion Deadline Based on Time Extensions Granted by Owner: Actual Date of Completion: al Co-ttwAtor' miectUataver (lead conta,it. In office . if aoDlicab CLgynFty_�& i uaL= -t i' T I . t oii nroiect S tU 1. 11 -7Uu1,LAP0le* * You may also provide information about other projects that you have completed that are similar to the project(s) for which you expect to bid using the same format. City of Downey Page 25 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project Questionnaires submitted by corporations must be signed with the legal name of the corporation, followed by the name of the state of incorporation and by the signature and designation of the chairman of the board, president or any vice president, and then followed by a second signature by the secretary, assistant secretary, the chief financial officer or assistant treasurer. All persons signing must be authorized to bind the corporation in the matter. The name of each person signing shall also be typed or printed below the signature. Satisfactory evidence of the authority of each officer signing on behalf of a corporation shall befurnished. Questionnaires submitted by partnerships must furnish the full name of all partners and must be signed in the partnership name by a general partner with authority to bind the partnership in such matters, followed by the signature and designation of the person signing. The name of the person signing shall also be typed or printed below the signature._ Each person signing below makes the following representations under penalty ofperjury The submitter of the foregoing answers to the questionnaire has read the same and the matters stated therein are true to the best of his or her own personal knowledge. This information is provided for the purpose of qualifying to bid on the Project, and any individual, company or other agency named herein is hereby authorized to supply the awarding body with any information necessary to verify the prospective bidder's statements. By signing below, the submitter and the named contractor hereby grant permission to the [Public Entity] to contact any or all of the above listed persons or entities to confirm facts or otherwise investigate the above facts and issues. The submitter understands that any statement which is proven to be false shall be grounds for immediate disqualification from bidding on the Project. The submitter whose signature appears below represents and warrants that he or she has authority to bind the named contractor. I, (Name), the undersigned, am the (Title), with the authority to act for and on behalf of (Contractor Entity Name), declare under penalty of perjury under the laws of theState of California that the foregoing information provided in this Pre -qualification Questionnaire is true, full, and correct. I understand that making a false statement may result in disqualification from bidding on any public works project, registering as a Public Works Contractor with the Department of Industrial Relations, and may be grounds for termination of a public works contract. Executed on this day of at (Lute) (Month l Year) (City / State) Name of Contractor Representative: Signature of Contractor Representative. City of Downey Page 26 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project City of Downey Page 27 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project • Notes: The awarding body will review additional documents provided by the Contractor in resX&r score on a scale of 1 to 5 is assigned to each factor. Factor #1: A score of 1 is assigned where the incident is clearly the result of a good -faith mistake, and a score of 5 is assigned where the incident is clearly an overtly willful action for which the Contractor is culpable. Factor 2:A score of 1 is assigned where only a single incident exists, and a score of 5 is assigned where five or more incidents of that kind are reported. City of Downey Page 28 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project LM City of Downey Page 29 of 30 Request for Pre -Qualification Wilderness Park Pond Restoration Project 13-10103 RX701 IN .04WOMMOOM -rrI7MMT,rjM . • - IF •- I - 11 a- - --- �-- M7177MM identified as "project references" in Section E of a 1. Give a brief description of the project. 2. Are there any outstanding stop notices, liens, or claims by the contractor that are currently (I point for each is deducted from overall score; maximum amount to be deducted is 5 points) 5. Was there adequate equipment provided on thejob? 6. Was the contractor timely in providing reports and other paperwork, including change ord] 8. Was the project completed on time? 9. Did the contractor timely submit reasonable cost and time estimates to perform change order work? 10. How well did the contractor perform work after a change order was issued, and how well did iiiiiiii IIII III I Milli 1, warranty items? 12. Given the nature of the project, were there an unusually high number of claims or unusual difficulty in resolving them? 13. Did the contractor make timely payments to either subcontractors or suppliers? 14. How would you rate the quality of the work overall? City of Downey Page 30 of 30 ■� � '' r + i • � • ` 1 i . i r .. i/ r r` • __. _ r �.r ii ru it • nit r •i • r afr i r • / two. ` performance / failure to perform any term,pro, indemnity provision. �.ri • • S•r ".. me Convamrsnau MM i` respFFIFIFF OF udVIUM• i i i of Indemnitees or arise from the active negligence of City. � r. 4■ t � ■Ft�� s �i t �1 r + i • • r i • i4 r . . " / it N � � • / 1 .. �.. .i i...,.a ..: i . a' a'.: � • /:. a.. / ` .i' . i:i i` / i f i i IN NOW it till. MOM #Ys�*Wrt6 ndt�e b ft C4 o any poljOy c�ocello*, ��i*ion�-of redW!bb In ft amwnt of to�e. TadISO cerlicat JaWt go materials in place or b be used as pad of the permanent surplus miscellaneous materials and supplies incident t6 the wo(�, temporary buildq* �dtIJ68 removal, and false work, staging, towers, forms and equipment, whether or not owned or rented by the Contractor, and demolition required by the enforcement of any Contract, law or regulation. Such insurance shall also include coverage for damage due to earthquake and flood. B. In the event of a loss by the perils insured against, of angor all of the work andfor materials herein provided for, at any time prior to the final completion of the Contract and the final acceptance by the City, the Contractor shall promptly reconstruct, repair, replace or restore all work or materials so destroyed. C. Nothing herein provided for shall in any way excuse the Contractor or his/her surety from the obligation of furnishing all the required materials and completing the work in full compliance with the terms of the Contract. D. The following endorsements/coverages shall be included in the policy: 1. The coverages are primary to any other applicable insurance coverage carried by the City. 2. The Contractor and the insurance company waive all rights of subrogation and contribution against the City, its officers, employees, elected officials, attorneys, members of boards and commissions, agents and volunteers; and 3. The policy shall not be canceled nor the above coverages/ endorsements reduced without 60 days written notice to the City. A.p Cont*V shall have its insurance 0810ier(s) comlete and WG6t6 the idlowing documents, together with a 00 of each insurance policy required und6r1he Con� includin4 all endorsements Mf6� which shall be delivered to the City Engineer within 14 calendar days following issuance of the Notice of Award: 1. Form entitled: Commercial General Liability/Automobile Liability/Special Endorsement, attached hereto as Exhibit "C-1." 2. Proof of Workers' Compensation Insurance, or if Contractor is self-insured for worker's compensation, a self-insuring certificate therefore from the State of Califomia. 3. Form entitled: Certificate of Insurance, with 30 days prior notice of cancellation required as to ail coverage and policies. B. The Notice to Proceed will not be issued until the aforesaid insurance documents have been received and approved by the City. City's decision as to the acceptability of all insurance documents is final. No substitution of the form of the documents or the endorsements or amendments thereto will be permitted without the prior written consent of City. i.Contractor shall furnish the following bon s: 1, A Faithful Peon_anceBond in an amount equal to One Hundred percent (100%) of the Contract price in the form shown in Exhibit '°B-1'° attached hereto. 2. A Eayrnent Bond (Labor and Material) in an amount equal to One Hundred percent (100%) of the total Contract price in the form shown in Exhibit "B-2'° attached hereto. 3. When specified in the Contract Special Conditions: A Maintenance Bond lin an amount equal to Ten percent (10%) of the total Contract price in the fora shown in Exhibit "B-3 attached hereto. i 11 f r 1- r • 1. ^1 ♦ . 11 - + a ► �. _ 1 i r 1 _ r -f oil 11 111 • f • + � 1; 1 • r / f.,.. + .. f1 i- 1-... _f .. f • is •.-