Loading...
HomeMy WebLinkAbout04. CIP 19-37A-Awrd Const Contract to Huntington Beach Electric-Fire Station Modernization Proj■r a�iwi•a D 1 AWARD A CONSTRUCTION• • OF 1 i 1 T• • i • • i • ..• •.,. STATIONIMPROVEMENTS— CAPITAL IMPROVEMENT ii • That the City Council: Award a construction contract, in the amount of $91,440.00 to Huntington Beach Electric, for the Fire Station Modernization Project/Temporary Fire Station Electrical Improvements, Capital Improvement Project No. 19-37A; and 2. Authorize the Assistant City Manager to negotiate a Change Order with Huntington Beach Electric to expand the scope of work related to the Temporary Library facility; and 3. Authorize the City Manager to execute any change orders or additional scope of work for this project deemed necessary or desirable up to $9,144.00. At its meeting of March 26, 2019, the City Council approved the plans and specifications and authorized solicitation of bids for the subject project. On March 28, 2019, and April 4, 2019, the Notice Inviting Bids for this project was published in the Downey Patriot. On April 11, 2019, the City Clerk received and publicly opened three (3) bids which ranged from $91,440 to $305,000, as shown on the attached bid summary (Attachment A). The lowest responsive and responsible bidder is Huntington Beach Electric of Huntington Beach, California with a bid in the amount of $91,440. Staff has confirmed that Huntington Beach Electric possess the specified contractor license and that the license is current and in good standing. Additionally, verbal qualification interviews with randomly selected Huntington Beach Electric's references were completed and the responses were all satisfactory. AWARD A CONSTRUCTION CONTRACT IN THE AMOUNT OF $ 91,440.00 TO HUNTINGTON BEACH ELECTRIC FOR THE FIRE STATION MODERNIZATION PROJECT/TEMPORARY FIRE STATION ELECTRICAL IMPROVEMENTS- CAPITAL IMPROVEMENT PROJECT NO. 19-37A APRIL 23, 2019 PAGE 2 The original scope of work was for the Temporary Fire Stations and Temporary Library mobile and storage units located on the east side of Downey Promenade which include the following: • The Temporary Fire Station/ Temporary Library Facilities power, lighting and site security lighting. • The Temporary Fire Station/Temporary Library Facilities power distribution including installation of two (2) 75kva outdoor rated transformers and two (2) 200A outdoor panels. Recently, as result of a need to accommodate Library staff in a temporary facility, a portable office building was placed behind the Discovery Learning Center. There is a need to connect electrical power and data service to this temporary office building. The necessary work can be completed by Huntington Beach Electric. The estimated cost is $15,000-00. Work is anticipated to begin in April 2019 and be complete in May 2019. Staff respectfully requests that the City Council award a construction contract in the amount of $125,584.00 to Huntington Beach Electric and authorize staff to negotiate a change order not to exceed $15,000.00 for the work related to the Library Temporary office building located behind the Discover Learning Center. Work will start in April 2019 and be completed in May 2019. The Estimated Project Cost Summary is attached to this report (Attachment B). Quality of Life, Neighborhood & Infrastructure The total estimated cost of the project, including construction costs, original and recommended additional scope of work, design, inspection, construction engineering and management services, material testing, temporary library facility, FF&E, and contingencies is $125,584.00. The City's 2018-20 Capital Improvement Program includes the Fire Stations Modernization Project (Account Nos. 33-1-3301-0520, 33-1- 3312-0520, 33-1-3313-0520, 33-1-3314-0520) and the City Library Modernization Project utilizing Measure S Funds (Account No. 33-1-3303-0520). ARD A CONSTRUCTION CONTRACTAMOUNT OF ' 91,440.00 TO HUNTINGTON BEAC ELECTRIC FOR THE FIRE STATION MODERNIZATION PROJECT/TEMPORARY FIRE STATION ELECTRICAL IMPROVEMENTS- CAPITAL IMPROVEMENT PROJECT NO. 19-37A APRIL 23, 2019 PAGE ATTACHMENTS TS Attachment ` Bid Summary Attachment B: ProjectCost Summary AWARD A CONSTRUCTION CONTRACT IN THE AMOUNT OF $91,440.00 TO HUNTINGTON BEACH ELECTRIC FOR THE FIRE STATION MODERNIZATION PROJECT/TEMPORARY FIRE STATION ELECTRICAL IMPROVEMENTS— CAPITAL IMPROVEMENT PROJECT NO. 19-37A APRIL 23, 2019 PAGE 4 CITY OF DOWNEY CIP 19-37A ELECTRICAL IMPROVEMENTS -TEMPORARY FIRE STATION FACILITY Bid Due Date: 4/11/19 @ 11:00 am Company Name Bid Amount Huntington Beach Electric $91,440.00 PMK Professional Inc. $178,000.00 Baker Electric $305,000.00 a i s AWARD A CONSTRUCTION CONTRACT IN THE AMOUNT OF $ 91,440.00 TO HUNTINGTON BEACH ELECTRIC FOR THE FIRE STATION MODERNIZATION PROJECT/TEMPORARY FIRE STATION ELECTRICAL IMPROVEMENTS- CAPITAL IMPROVEMENT PROJECT NO. 19-37A APRIL 23, 2019 PAGE 5 Bid Amount Additional scope (Temporary Library Office Building at Discovery Learning Cent- • •- SUBTOTAL CONSTRUCTION COST: Design Construction engineering & contract administration (estimated) 5000;00 5,000.00 $125.584,011