CouncilThat the City approve the plans and specifications and authorize solicitation of
•- io- id for:
1. The Golden Park Improvements — Capital Improvement Project no. 19-32
2. The Wilderness Park Improvements — Capital Improvement Project No. 19-35
3. The Independence Park Improvements — Capital Improvement Project No. 19-33
4 The Discovery Park Improvements_• • • - -nt Project No. 19-30
5. The Furman Park Improvements• • • -nt Project No.19-31
• - •- 1 • - • -.•• =111kh- - - - •WARMEM •
ior the --•-•i improvements at variousbuildings an• parks.
a .-twit"-11• • - - • • • • - - • • - - • • • -
• Fire Stations 1, 2, 3, and 4
• Police Station
• City Hall
• City Library
• City Theatre
• Apollo Park
• Dennis the Menace Park
• Wilderness Park
• Golden Park
• Independence Park
APPROVE PLANS AND SPECIFICATIONS
AUTHORIZE SOLICITATION OF BIDS FOR PARKS
APRIL 9, 2019
PAGE 2
• Discovery Park
• Furman Park
• Rio San Gabriel Park
• Treasure Island Park
• City Public Works and Utilities Facilities
• Various Locations (ADA Improvements)
• Downtown Parking Structure
The above referenced projects must be complete by December of 2020 which requires
a very robust and fast -paced implementation program. While timely completion of these
projects is important, minimal amount of impact to our residents and the programs and
services that are offered by the Parks and Recreation Department is of paramount
importance. As such, construction activities related to the park projects will be complete
in phases.
Phase 1 which includes improvements at Apollo Park and Dennis the Menace Park was
recently awarded to a contractor. It is anticipated that work will start in June of 2019
and be complete by December of 2019. Phase 2 includes work at Wilderness Park,
Golden Park and Independence Park. Phase 2 will commence between June and
August of 2019 and will be complete between December of 2019 and March of 2020.
Phase 3 includes work at Discovery Park and Furman Park which will start in
September'of 2019 and be complete between January and April of 2020. Phase 4
includes improvements at Rio San Gabriel Park and Treasure Island Park (Parking lot
improvement only). Phase 4 work will start in April 2020 and be complete by December
2020.
a •
The plans and specifications for the subject projects are complete and the projects are
now ready for solicitation of bids. Below is a summary of the scope of work,
implementation schedule and other relevant data related to each project:
1. Measure S Project No. 19-32 Golden Park Improvements
Construction related activities are anticipated to begin in August 2019 and to be
complete in January 2020
*Community building improvements
•ADA accessible path of travel to new amenities
•5 new picnic shelters
•Rubberized surfacing at play area
• 12x20 storage shed
•Site built trash enclosure
APPROVE PLANS AND SPECIFICATIONS
AUTHORIZE SOLICITATION OF BIDS FOR PARKS
APRIL 9, 2019
PAGE 3
•Parking lot ADA improvements
•Basketball court improvements - new basketball court surfacing, new basketball
backboards/nets, 8' high chain link fence around basketball courts
•Baseball field improvements - 4' chain link homerun fence, (2) new bleachers at
baseball fields
*Decomposed granite trail
Site furnishing (picnic tables, BBQs, benches, trash receptacles, and drinking
fountain)
2. Measure S Project No. 19-35 Wilderness Park Improvements
Construction related activities are anticipated to begin in August 2019 and to be
complete in March 2020
*Community building and restroom improvements
*New restroom building
*Parking lot ADA improvements
ADA accessible path of travel to new amenities
3 new picnic shelters
*Rubberized surfacing at play area
+Site built trash enclosure
•Site furnishing (picnic tables, BBQs, benches, trash receptacles and drinking
fountain)
3. Measure S Project No. 19-33 Independence Park Improvements
Construction related activities are anticipated to begin in July 2019 and to be
complete in December 2019
*Provide one (1) new detached restroom structure, male & female restrooms (4
fixtures each gender) west of the northeast restroom building adjacent to the
northern parking lot.
Remove existing playground fall zone material and replace with rubberized
surfacing
oResurface eight (8) tennis courts
Grind and overlay eastern parking lot and restripe
•Seal western parking lot and restripe
*Minor adjustments to irrigation at proposed improvements
4. Measure S Project No. 19-30 Discovery Park Improvements
Construction related activities are anticipated to begin in September 2019 and to be
complete in January 2020
*One synthetic turf soccer field (Field 1)
APPROVE PLANS AND SPECIFICATIONS
AUTHORIZE SOLICITATION OF BIDS FOR PARKS
APRIL 9, 2019
PAGE 4
•One natural turf field striped (Field 2) and one natural turf practice field (Field 3)
*Irrigation system removal for three (3) soccer fields (Field 1, #2 & 3)
*New irrigation at Field #2 and Field #3
*20 -foot high soccer ball containment netting along entire south side of park and
along adjacent streets (east side of Field #1 and west side of Field 3)
*Upgrade of eight (8) metal halide light fixtures to LED fixtures at Soccer Field #1
and Field #2
*New concrete walk along northern side of soccer fields to create connections to
existing sidewalks at the streets
*Two (2) 10 x 10 sea boxes along concrete walk at northern side of soccer fields
*Trash enclosure at north-eastern end of park
5. Measure S Project No. 19-31 Furman Park Improvements
Construction related activities are anticipated to begin in September 2019 and to be
complete in April 2020
*Upgrade Building #1
*New interior & exterior paint
*Upgrade Building #2
o New interior & exterior paint
o Provide a new T -bar ceiling grid
o Existing restrooms to be converted to ADA unisex
o Existing carpet tiles to be replaced
*Provide one (1) new detached restroom structure, male & female restrooms (4
fixtures each gender) at rear of Building #2
*Remove glulam beams from concrete columns and add six (6) lattice trellis
structures to existing columns
*Replace irrigation system
*Remove and replace turf with sod at Baseball Field #1 and Field #2
*Upgrade primary park entrance flatwork, signage and planting at northern end of
parking lot
*Replace existing curved backstops with vertical black chain-link fabric backstops at
Fields #1 and #2
*Replace galvanized chain-link fabric on foul line and dugout fencing with black
chain-link fabric. Existing poles to fence posts to remain
*Resurface three (3) tennis courts and convert the eastern most tennis court to an
all -sport court
•Provide new asphalt parking lot at southern side of park with parking for 22 new
stalls
*Replace two (2) large picnic shelters with one (1) new large and three (3) new
medium size picnic structures
*Replace trash enclosure with new CMU enclosure to hold eight (8) roll -off bins
APPROVE PLANS AND SPECIFICATIONS
AUTHORIZE SOLICITATION OF BIDS FOR PARKS
APRIL 9, 2019
PAGE 5
Quality of Life, Neighborhood & Infrastructure
The total estimated approved budget for each project is listed below. The budgets
include hard (construction) and soft (design, construction management, inspection and
testing, as well as program management and administration) costs. A detailed
breakdown of project cost summaries will be provided at the time of award of the
construction contract.
CIP #
ACCOUNT#
PROJECT
19-32
33-1-3360
Golden Park Improvements
19-35
33-1-3390
Wilderness Park Improvements
19-33
33-1-3370
Independence Park Improvements_
19-30
33-1-3340
Discovery Park. Improvements
19-31
33-1-3350
Furman Park Improvements
ATTACHMENTS
Attachment A: Project Location Map
Attachment B: Project Illustrations
APRIL • 2019
PAGE 6
Vua>.; NA
9
(wa— Pats
ATTACHMENT A
low
�
GGis- 4.'G -IG\ GSL_ GUTS
v x �Fcv_�r �zs
tip.-, �crvc_ FLrrts
ti -L. -
,. aasi cr = �.L �. rcrvc
P e�ancvr Tce.ux 31
LII .,-'c vs
�.v4.1. LIT aoa,�veeeLw act ivPac 11-ITs
- s rva•�Eruv Fav
t --c Tagil_
e tr�_erk ary s>
=v -ve —T T� eE —1 --
Gr