Loading...
HomeMy WebLinkAbout03. CIP 19-18-Award Contract to All Cities Eng., Inc-Water System Proj-Civic Center Dr & Hall RdTO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCILCITY MANAGER FROM: OFFICE OF THE CITY MANAGER BY: DELFINO R. CONSUNJI, P.E., DIRECTOR OF PUBLIC WORKS/CITY ENG�INE SUBJECT: CAPITAL IMPROVEMENT PROJECT NO. 19-18 — CIVIC CENTER DRIVE AN HALL ROAD WATER SYSTEM IMPROVEMENT PROJECT — AWARD CNSTRUCTION CONTRACT i O That the City Council: 1. Award a contract to All Cities Engineering, Inc. in the amount of $376,982 for Civic Center Drive and Hall Road Water System Improvement Project, Capital Improvement Project 19-18; 2. Authorize transfer of $526,680 from Capital Improvement Program Water Fund Account No. 51-1-8685 to Capital Improvement Program Water Fund Account No. 51-1-8687 to cover the total project cost; and 3. Authorize the Public Works Director to execute any change orders or additional scope of work for this project, deemed necessary or desirable up to the approved project budget. IrCeT-061111 .D Water system infrastructure along Civic Center Drive from Brookshire Avenue to Third Street, and along Hall Road from Bellflower Boulevard to Woodruff Avenue are in need of improvements to ensure reliable water service for domestic and fire protection purposes (Attachment A). Said water improvements are proposed to be completed in advance of upcoming street improvements in order to eliminate any impacts to new pavement in the future. On February 26, 2019, the City Council approved plans and specifications and granted authority to advertise the subject project for bids (Attachment B). The proposed water improvements include the replacement of existing fire hydrants; installation of additional new fire hydrants where adequate fire water protection is currently lacking; new copper water service lines; replacement of old water meters with new remote -read advanced water meters to help improve water meter reading efficiencies; abandoning of redundant undersized water main, and installation of new water mains, valves, and associated fittings and appurtenances. CIP NO. 19-18 CIVIC CENTER DRIVE AND HALL ROAD WATER SYSTEM IMPROVEMENT PROJECT APRIL 9, 2019 PAGE #2 The project was advertised in the Downey Patriot on February 28, 2019 and March 7, 2019, and published in various trade publications. On March 19, 2019, the City Clerk received and publicly opened six bids ranging from $376,982 to $697,577. The bid results were as follows: CONTRACTOR All Cities Engineering, Inc. Williams Pipeline Contractors, Inc. Palp, Inc. dba Excel Paving Gentry General Engineering, Inc. T.E. Roberts, Inc. GRBCON, Inc. LOCATION Jurupa Valley Somis Long Beach Rancho Cucamonga Orange Baldwin Park TTMO � I $376,982 $457,500 $462,531 $468,579 $616,314 $697,577 The lowest responsive and responsible bidder was All Cities Engineering, Inc. in the amount of $376,982 (Attachment C). Staff reviewed the bid proposal and references provided by All Cities Engineering, Inc. and found that All Cities Engineering, Inc. has satisfactorily completed projects in the Cities of Alhambra, Brea, Northridge, Rancho Cucamonga, and Santa Monica. All Cities Engineering, Inc.'s state contractor's license is "current and active" and they are registered with the California Department of Industrial Relations (DIR) for Labor Compliance. Staff recommends that the City Council award a contract to All Cities Engineering, Inc. for Civic Center Drive and Hall Road Water System Improvement Project, Capital Improvement Project 19-18. Construction is anticipated to begin in early May 2019 and be completed in July 2019, weather permitting. This project is categorically exempt per Section 15302 Class 2(c) of the California Environmental Quality Act (CEQA) Guidelines. Efficiency & Adaptability Quality of Life, Infrastructure & Parks The total estimated cost of the project, including construction contract, contingencies, design, inspection, construction management, contract administration, and materials testing is $540,280. The following is a breakdown of the total project costs: 2 CIP NO. 19-18 CIVIC CENTER DRIVE AND HALL ROAD WATER SYSTEM IMPROVEMENT PROJECT APRIL 9, 2019 PAGE #3 Descrit)tion Amount Construction Contract $376,982 Contingency (10%) $37,698 SUB -TOTAL CONSTRUCTION COST: $414,680 Design $13,600 Inspection, Construction Engineering/Management & Contract Admin. $112,000 TOTAL ESTIMATED PROJECT COST: $540,280 The project will be funded from the Water Fund, including the transfer of $526,680 from Capital Improvement Program Water Fund Account No. 51-1-8685 to Capital Improvement Program Water Fund Account No. 51-1-8687 through requested City Council action in order to keep all project funds in one account. ,FUNDING SUMMARY. Account os Fund Name Amount 51-1-8687 Civic Center Dr. and Hall Rd. Water Improvements CIP Account* $540,280 TOTAL PROJECT FUNDING: $540,280 * Includes transfer of $526,680 from Capital Improvement Program Water Fund Acct. No. 51-1-8685 through City Council action ATTACHMENTS Attachment A — Project Location Map Attachment B — Plans Attachment C — Bid Summary 3 CIP NO. 19-18 CIVIC CENTER DRIVE AND HALL ROAD WATER SYSTEM IMPROVEMENT PROJECT APRIL 9, 2019 PAGE #4 Project Location Location Project m 0 STEWART & GAY.7 Ww'Ey Lvzwo DOMMEY PROMENADE z uJ LL COLLWHA MEMOR SPACZAL LLJ CENMR CITY OF DOWNEY DEPARTMENT OF PUBLIC WORKS UTILITIES DIVISION PiROJ-ECT ---- LOCATIONI- MAP 7 PROJECr. CMC CENTER DRIVE AND HALL ROAD WATER SYSTEM IMPROVEMENT PROJECT FA a ffel 2 _)p DOWNEY wolit-ma DEPARM WEN-livEr, CONSTRUCTION PLANS FOR r" Tl; -1 V E J) HALL 'Tj startec ATTACHMENT B -27-7 T II Lu > BROOKSHIRE AVENUE SERVICE RECONSTRUCTION uj z uj 3RD STREETi,;- W, 1 Stantec P-IDAN EY CIVIC CENTER DRIVE FROM 3RD STREET TO BROOKSHIRE AVENUE BELLFLOWER BLVD HALL ROAD Ia AVE a AS ADENMOOR AVE COLDBROOK AVE s tiAu i�.cII.',y6A1'M Stt-9Nrrt,gmv+M�aiJFa TT3°Fm: cP E''raiaww,� . w, (oa cFEx - N- usrs 1 + • , t , nAm{a - -� P0?q4EGTiPN TO NEW MAN st.n# -- z > CAPITAL IMPROVEMENT PROJECT NO. 19-18 Engineers Estimates All Cities Engineering, Inc. Williams Pipeline Contractors, Inc PALP Inc, DBA Excel Paving dtem Description Qty Unit Unit Price Amount Unit Price Amount Unit Price Amount I I Amount Linit Price Amount Reconnect to Existing Fire Service Per Item I i 11 Detail "At' atApprox Station 48-74 1 LS $ 22,00000 $ 22,000 00 $15,000.00 $ 15,000.00 $ 23,00000 $ 23.00000 $ 32,416.00 $ 32,41600 Potable Water Hot Taps (>_4 -inch) Hot tap exisbng 10 -inch main with 10 -inch x 8 -inch MJxFL tapping sleeve, 8 -inch FL 0509 gate 2 valve, 8 -inch MJxFL adapter, and associated materials 1EA $ 9,700.00 $ 9,70000 $ 15,000.00 $ 15,000.00 $ 22,000 00 $ 22,000.00 $ 14,50000 $ 14,500.00 Hot tap existing 10 -inch main with 10 -inch x 6 -inch MJxFL tapping sleeve, 6 -inch Fl- 0509 gate 3 valve, 6 -inch MJxFL adapter, and associated materials 1 EA $ 9.40000 $ 9,40000 $ 14,500.00 $ 14,500.00 $ 16,000.00 $ 16.00000 $ 13,00000 $ 13.00000 Hot tap existing 10 -inch main with 10 -inch x 4 -inch MJxFL tapping sleeve, 4 -inch FL C509 gate 4 valve, 4 -inch MJxFL adapter, and associated materials 1 EA $ 9,100.00 $ 9,100.00 $ 14,500.00 $ 14,500.00 $ 13,00000 $ 13,00000 $ 13000.00 $ 13,00000 Potable Water Main, Fittings, and Associated Improvements 1 1 5 Furnish and install 4 -inch MJ 451 DIP bend and thrust block 2 EA $ 75000 $ 1,50000 $ 480.00 $ 960.00 1 $ 30000- $ 60000 $ 805.00 $ 1,61000 6 Furnish and install 8 -inch x 4 -inch PE DIP reducer and anchor block I EA $ 80000 $ 80000 $ 300.00 $ 300.00 $ 45000 $ 450.00 I $ 840.00 I $ 84000 Isolate, cut, and dewater existing 4 -inch main and connect to new 4 -inch main Abandon/Plug 7 remaining portion of 4 -inch main 2 LS $ 8,500 00 $ 17,000.00 $ 9,500.00 $ 19,000.00 $ 6,50000 $ 13,000.00 $ 2,60000 $ 5,200 00 Isolate, cut, and dewater existing 6 -inch main, remove interfering portions of 4 -inch main and $ connect to new 6 -inch main Abandon/Plug remaining portions of 4 -inch main 1 LS $ 9.00000 $ 9,00000 10,000.00 $ 10,000.00 $ 8.30000 $ 8,30000 $ 2,70000 $ 2,700.00 Isolate, cut, and dewater existing 10 -inch main, remove existing tee and valve, furnish and install 10 -inch solid sleeves, 10 -inch CL 52 CIVIL DIP, and associated materials Abandon/Plug 9 remaining portion of existing 4 -inch main 2 LS $ 9,50000 $ 19,00000 $ 10,000.00 $ 20,000.00 $ 10,00000 $ 20,00000 $ 6,80000 $ 13.600,00 10 Remove existing, furnish and install new water valve box 2 EA $ 2,00000 $ 4.00000 $ 750.00 $ 1,500.00 $ 85000 $ 1.70000 $ 52000 $ 1,040 00 104000 11 Remove existing valve box to abandon valve in place 5 EA 11 75000 $ 3,750.00 $ 500.00 $ 2,500.00 $ 350,00 $ 1,75000 $ 36500 $ 1,825 00 Potable Water Ductile Iron Pipe 12 Furnish and install now 4 -inch CL 52 CML DIP with potable water ID tape 50 LF $ 200.00 $ 10,;00.00 $ 180.00 900�0$ 240.00 $ 12.00000 25000 00 $ 12,50000 13 Furnish and install new 6 -inch CIL 52 CIVIL DIP with potable water ID tape 40 LF $ 25000 $ 10,000 00 $ 200.00 '00.. 00 $ 28000 $ 11.200.00 $ 300,00 $_ 12.000,00 14 Furnish and install new 8 -inch CIL 52 CML DIP with potable water ID tape 60 LF $ 300,00 $ 18.000.00 $ 215.00 $ 12,900.00 $ 25000 $ 15,00000 $ 30000 $ 18,00000 'Fire Hydrants Remove interfering fire hydrant head/riser, furnish and install new James Jones 3775-R fire 15 hydrant assembly (8 -inch x 6 -inch Hot Tap) I EA $ 17.000.00 $ 17,000 00 $ 16,222,00 $ 16,222.00 18.50000 $ 18,50000 $ 19,00000 $ 19,001 16 Furnish and install new James Jones 3700-R fire hydrant assembly (8 -inch x 6 -inch Tee) 1 EA $ 15,00000 1-$ 15,00000 $ 10,000.00 $ 10,000.00 14,50000 $ 14,50000 $ 15.30000 $ 15,300.00 Remove existing fire hydrant riser from and including 90 -degree elbow to fire hydrant head and 17 furnish and install new James Jones 3700-R fire hydrant 3 EA $ 10,00000 $ 30,000 00 $ 6,000.00 $ 18,000.00 $ 8,600 00 $ 25,80000 $ 11,10000 $ 33.30000 Remove existing fire hydrant riser from and including 90 -degree elbow to fire hydrant head and 18 furnish and install new James Jones 3775-R fire hydrant 7 EA $ 12,000.00 $ 84,000.00 $ 8,000.00 $ 56,000.00 $ 10,40000 $ 72.800.00 $ 12,500.00 $ 87,500,00 Isolate, cut and dewater existing 10 -inch main, remove existing tee, valve, and fire hydrant > assembly from main; Furnish and install 10 -inch solid sleeves, 10 -inch CL 52 CML DIP, and 19 associated materials Isolate, cut and dewater existing 64nch main, remove existing tee, valve, and fire hydrant assembly from main; Furnish and install 6 -inch solid sleeves, 6 -inch CIL 52 CML DIP, and 20 associated materials Remove existing fire hydrant riser from and including 90' elbow to fire hydrant head, plug 21 remaining portion of fire hydrant lateral, and remove fire hydrant valve box Potable Water Meters and Services 1 EA $ 10.000.00 $ 10,000-00 $ 8,000.00 $ 8,000.00 $ 12,500.00 $ 12,500.00 $ 9,200.00 $ 9,20000 1 EA $ 9,000.00 $ 9,000.00 $ 10,000.00 $ 10,000.00 $ 7,50000 $ 7,50000 1 1 EA $ 6,00000 $ 6,00000 $ 7,500.00 $ 7,500.00 $ 2,300.00 $ 2.30000 0 HAP,1111111CAPIMPICIP11-11 r1- Clnl,r 11- and H111 R11d Water System Improvement Prq,,111111 S*1 1,1-ICIP11-11 11,1 S1, $ 8,40000 $ 8,400.00 $ 4,30000 $ 4,30000 ME El vw�r CONTRACTOR All Cities Engineering, Inc Williams Pipeline Contractors, Inc PALP Inc, DBA Excel Paving CAPITAL IMPROVEMENT PROJECT NO. 19-18 Remove existing, fu-nish and install new 5/8 -inch by-pass water meter and 520M MXU on BID SUMMARY 22 existing fire service backflow; mount MXIJ to backflow with AMR mounting bracket 3 23 Remove existing, furnish and install new 5/8 -Inch potable water meter and box II 12 Remove/Abandon existing, furnish and install new 1 -inch potable water service, 518 -inch meter 24 and box 7 2019 Remove existing, furnish and install new 1 -inch potable water curb stop on existing copper 25 service, 5/8 -inch meter, and box 1 26 Remove existing, furnish and install now 1 -Inch potable water meter and box 2 27 Remove/Abandon existing, furnish and install new 1 -inch potable water service, meter, and box 1 28 Furnish and install new 1 -inch potable water service, 1 -inch curb stop, and box1 Williams Pipeline 29 Remove existing, furnish and install new 1 -1/2 -inch potable water meter and box 2 Unit Remove existing, furnish and install new 2 -inch potable water angle meter stop on existing Unit Price 30 copper service, 1 -1/2 -inch meter, and box 1 Remove/Abandon existing, furnish and install new 2 -inch potable water service, 1 -1/2 -inch meter, Unit Price 31 and box 4 32 Remove existing, furnish and install new 2 -inch potable water meter and box 2 33 Remove/Abandon existing, furnish and install new 2 -inch potable water service, meter, and box 2 34 Remove/Abandon existing service and box from main $ 1,000 00 00 $ 3,00000 TOTAL BASE BID - items 1 to 34 $ vw�r CONTRACTOR All Cities Engineering, Inc Williams Pipeline Contractors, Inc PALP Inc, DBA Excel Paving CAPITAL IMPROVEMENT PROJECT NO. 19-18 TOTAL BASE BID S 376,982 00 Corrected Bid Amount 3 4571500 00 462,53100 H \Pubworks\CAPIMP\CIP19-'8 Civic Center Drive and Hall Road Water System Improvement Project\Bid Solicitatjon\CIP19-18 Bid Sum BID SUMMARY March 19, 2019 Engineers Estimates All Cities Engineering, Inc. Williams Pipeline Contractors, Inc PALP Inc, DBA Excel Paving Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount EA $ 1,30000 $ 3,90000 $ 2,000.00---4 $ 6,000.00- $ 1,000 00 00 $ 3,00000 1.600.00 $ 4,800.00 EA $ 1,750.00 $ 21,00000 $ 1,000.00 12,000.00 $ 1,600.00 1.600.0000 $ 19,200 00 1,40000 $ 16,80000 EA $ 4,70000 $ 32.90000 $ 2,800.00 $ 19,600.00 $ 5,00000 $ 35,00000 $ 5,700 00 $ 39,90000 EA $ 2.50000 $ 2,500.00 $ 2,500.00 $ 2,500.00 $ 2.00000 $ 2,000.00 $ 2,00000 $ 2,00000 EA $ 1,90000 $ 3,80(100 $ 1,700.00 $ 3,400.00 2,200 00 $ 4,400.00 $ 1,40000 $ 2,80000 EA $ 5,000.00 $ 5,00000 $ 3,500.00 $ 3,500.00 $ 3,400.00 $ 3,40000 $ 6,000 00 $ 61000.00 EA $ 4,00000 $ 4,00000 $ 3,500.00 $ 3,500,00 $ 3,60000 $ 3,60000 I $ 5,300 00 $ 5.30000 EA $ 2,7 $ 5,50000 $ 2,750.00 $ 5,500.00 $ 3,40000 $ 6,80000 $ 2,70000 $ 5,40000 _EA $ 3,75000 $ 3.75000 $ 4,500.00 $ 4,500.00 $ 5,000.00 J $ 5,00000 $ 3 20000 $ 3,20000 EA $ 7,50000 $ 30,00000 $ 5,200.00 $ 20,800.00 $ 8,00000 $ 32,00000 $ 7,300.00 $ 291200.00 EA $ 3,00000 $ 6,00000 $ 5,500.00 $ 11,000.00 $ 5.500.00 $ 11,00000 $ 3,00000 $ 6,000 U10 EA $ 7,70000 $ 15,40000 $ 5,500.00 $ 11,000.00 $ 9,50000 $ 19,00000 $ 8,800 00 $ 17,60000 EA $ 3,00000 $ 3,00000 $ 4,800.00 I $ 4,800.00 $ 1 200.00 I $ 1120000 _J$_4,300.00 $ _ 4,30000 $ 451,000.00 $ 376,982,00 $ 457,500.00 �462,5� �1.00 TOTAL BASE BID S 376,982 00 Corrected Bid Amount 3 4571500 00 462,53100 H \Pubworks\CAPIMP\CIP19-'8 Civic Center Drive and Hall Road Water System Improvement Project\Bid Solicitatjon\CIP19-18 Bid Sum