HomeMy WebLinkAbout08. CIP 19-37-01 & 19-37-03-Award Const Contract to PCN3 Inc for Fire Stations 1 & 3 Modernization & Exp ProjTO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNSITY MANAGER FROM: OFFICE OF THE CITY MANAGER BY: JOHN OSKOUI, P.E., ASSISTANT CITY MANAGER i ii SUBJECT: AWARD A CONSTRUCTION CONTRACT IN THE AMOUNT OF $7,958,000.00 T PCN3, Inc., FOR THE FIRE STATIONS NUMBER 1 AND NUMBER 3 MODERNIZATION AND EXPANSION PROJECTS (CIP No. 19-37-01 and CIP N 19-37-03) 1 That the City Council: Award a construction contract in the amount of $7,958,000.00 to PCN3, Inc. fco the Fire Stations 1 and 3 Modernization and Expansion, CIP No. 19-37-01 an CIP No. 19-37-03, and I 2. Authorize the City Manager to execute any change orders or additional scope of work for this project deemed necessary or desirable up to 10% of the construction contract amount. At its meeting of January 22, 2019, the City Council approved the plans and specifications and authorized solicitation of bids for the subject project. On January 31, 2019, and February 7, 2019, the Notice Inviting Bids for this project was published in the Downey Patriot. On February 21, 2019 an addendum was issued changing the bid opening date to March 13, 2019 at 2:00 pm. On March 13, 2019, the City Clerk received and publicly opened four (4) bids which ranged from $7,958,00 to $8,500,000, as shown on the attached bid summary (Attachment 1). The lowest responsive and responsible bidder is PCN3, Inc. of Los Alamitos, California with a bid in the amount of $7,958,000. Staff has confirmed that PCN3, Inc. possess the specified contractor license and that the license is current and in good standing. Additionally, verbal qualification interviews with randomly selected PCN3, Inc.'s references were completed and the responses were all satisfactory with the exception of one mentioning a case regarding tax issues and payroll discrepancies which has been dismissed. AWARD A CONSTRUCTION CONTRACT FOR THE FIRE STATIONS NO. LAND NO. 3 MODERNIZATION AND EXPANSION PROJECTS (CIP NO. 19-37-01 AND CIP NO. 19-37-03) MARCH 26, 2019 PAGE 2 Below is a summary of the scope of work, implementation schedule and other relevant data related to each project: FIRE STATION 1 MODERNIZATION AND EXPANSION PROJECT; •Modernized station will be a two-story facility •New modernized raised floor Command Center and Data Center •Replacement of three (3) existing dorm rooms, 6 sleeping alcoves in group dormitory space, gang toilet room, showers and locker room with 13 single occupancy dorm rooms sharing individual bathrooms at a typical ratio of 1 bathroom for every 2 dorm rooms *New modernized support spaces including exercise room, dayroom, kitchen, and separate dining area Interior improvements to the existing Annex Building •Refreshed exterior palette of metal panels, aluminum frame windows, and stucco plus updated building graphics •Existing Station Area 11,800 sf •Total New Station Area 13,139 sf FIRE STATION 3 MODERNIZATION AND EXPANSION PROJECT: +Modernized station will be a two-story facility o Enlarged and improved Apparatus Bay *Replacement of three (3) existing dorm rooms, a single shared bathroom, shower area and shared locker room with 7 single occupancy dorm rooms sharing individual bathrooms at a typical ratio of 1_bathroom for every 2 dorm rooms •New modernized support spaces including exercise room, dayroom, kitchen, and separate dining area *Refreshed exterior palette of metal panels, aluminum frame windows, and stucco plus updated building graphics *Existing Station Area 3,727 sf •Total New Station Area 8,191 sf Staff respectfully requests that the City Council award aconstruction contract in the amount of $7,958,000 to PCN3, Inc. for the Fire Stations 1 and 3 Modernization and Expansion Project. Construction will start on May 20, 2019 and be completed on November 15, 2019. The Estimated Project Cost Summary is attached to this report (Attachment 3). Quality of Life, Neighborhood &infrastructure liq AWARD A CONSTRUCTION CONTRACT FOR THE FIRE STATIONS NO. 1 AND NO. 3 MODERNIZATION AND EXPANSION PROJECTS (CIP NO. 19-37-01 AND CIP NO. 19-37-03) MARCH 26, 2019 PAGE 3 The total estimated cost of the project, including construction costs (based on the bid amount and contingencies, design, inspection, construction engineering and management services, material testing, temporary facility, FF&E, Station Alerting System and contingencies) is $10,634,343.00. The City's 2018-20 Capital Improvement Program includes the Fire Station 1 Modernization and Expansion Project and Fire Station 3 Modernization and Expansion Project utilizing Measure S Funds (Account Nos. 33-1-3301-0520 and 33-1-3313-0520). FTITEKTUITINMI Attachment 1- Bid Summary Attachment 2 - Location Diagram Attachment 3 - Project Cost Summary K CITY OF DOWNEY CIP NO. 19-37-01 - FIRE STATION 1 MODERNIZATION AND EXPANSION PROJECT; and, CIP NO. 19-37-03 - FIRE STATION 3 MODERNIZATION AND EXPANSION PROJECT Bid Opening Date: 3/13/19 @ 2:00 pm ATTACHMENT 1 �a�n sr�ar�n a ti ,t4 kyr. W—g;. �Yro Rnps.�n Fd r ' jh ne j t it t r.� e z .. A i Fire 4tar7nn I Flre ftivon 4 v ». n� „r ✓ur. ce rt. «hr :y 59 +q h. $5u"wrym x.a ya inky � a r P99dR Bid Amount Contingency SUBTOTAL CONSTRUCTION COST: Design Inspection, construction engineering & contract administration (estimated) Temporary Facility FF&E $7,958,000.00 $795,800.00 $8,753,800.00 $615,378.00 $583,604.00 $295,880.00 $385,681.00 ATTACHMENT 3