Loading...
HomeMy WebLinkAbout07. CIP 19-37-Approve Plans & Specs-Auth Solicitation of Bids-Electrical Imprv for Temp Fire Station FacAPPROVED T 0.' HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCILCITY MANAGEJ . •, OFFICE OF - JOHN OSKOUI,. - APPROVE SPECIFICATIONSr AUTHORIZE SOLICITATION OF BIDS FOR THE ELECTRICAL IMPROVEMENTS RELATED TO THE TEMPORARY• ;• That the City Council approve the plans and specifications and authorize solicitation of bids for the Electrical Improvements at Fire Stations Modernization Project - Temporary Fire Station Facility (Capital Improvement Project No. 19-37). �• We As part of - Measure S funded Infrastructure and Facilities ImprovementProgram, four (4) City of Downey Fire Stations and the City Library will be renovated in the next year r half. The work is complexn requires• • - - shut -down of - stations and Library during construction. This requires housing the entire operation currently conducted out of the fire stations and partial operation of the library to store, sort and catalog books in temporary facilities while construction work is being completed. r •, The Temporary Fire Station/Library Electrical Improvements are required to provide site security, lighting, and power for: • Site perimeter • 60' x 60' Dorms & Dayroom Trailer • 24'x 60' Lockers & Showers Trailer • 40'x 60' Fire Truck Canopy • 12' x 42' Library Trailer The temporary site electrical requirements include the • Installation of two (2) a outdoor rated transformers • Two (2) 200A outdoor panels • - • 4 temporary lightpoles r flood lights Interior• Eight (8) exterior L.E.D. wall pack lights and • Numerous L.E.D. strip lights for the Fire Truck Canopy • • • of - Fire Department's -- • .•- containers APPROVE THE PLANS AND SPECIFICATIONS AND AUTHORIZE SOLICITATION OF BIDS FOR THE ELECTRICAL IMPROVEMENTS RELATED TO THE TEMPORARY FIRE STATION FACILITY (GIP NO. 19-37) MARCH 26, 2019 PAGE 2 The estimated cost of the improvements is $125,000. Staff will present a "summary of hard (construction) as well as soft costs (design, project/construction management, inspection and testing) at the time of the award of the construction contract. 07-11mm� Cost of r • • temporary power • the Temporary Fire Station and Library Storage NumbersFacility would be funded through the Fire Stations Modernization Project (Account 33-1-3301-0520, 33-1-3312-0520, 33-1-3313-0520, 1• Library ••- . • • -ct (Account No. 1 a