T 0.' HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCILCITY MANAGEJ
. •, OFFICE OF
- JOHN OSKOUI,. -
APPROVE SPECIFICATIONSr AUTHORIZE
SOLICITATION OF BIDS FOR THE ELECTRICAL IMPROVEMENTS RELATED
TO THE TEMPORARY• ;•
That the City Council approve the plans and specifications and authorize solicitation of
bids for the Electrical Improvements at Fire Stations Modernization Project - Temporary
Fire Station Facility (Capital Improvement Project No. 19-37).
�• We
As part of - Measure S funded Infrastructure and Facilities ImprovementProgram,
four (4) City of Downey Fire Stations and the City Library will be renovated in the next
year r half. The work is complexn requires• • - - shut -down of - stations and
Library during construction. This requires housing the entire operation currently
conducted out of the fire stations and partial operation of the library to store, sort and
catalog books in temporary facilities while construction work is being completed.
r •,
The Temporary Fire Station/Library Electrical Improvements are required to provide site
security, lighting, and power for:
• Site perimeter
• 60' x 60' Dorms & Dayroom Trailer
• 24'x 60' Lockers & Showers Trailer
• 40'x 60' Fire Truck Canopy
• 12' x 42' Library Trailer
The temporary site electrical requirements include the
• Installation of two (2) a outdoor rated transformers
• Two (2) 200A outdoor panels
• - • 4 temporary lightpoles r flood lights
Interior• Eight (8) exterior L.E.D. wall pack lights and
• Numerous L.E.D. strip lights for the Fire Truck Canopy
• • • of - Fire Department's -- • .•- containers
APPROVE THE PLANS AND SPECIFICATIONS AND AUTHORIZE SOLICITATION OF BIDS FOR THE
ELECTRICAL IMPROVEMENTS RELATED TO THE TEMPORARY FIRE STATION FACILITY (GIP NO.
19-37)
MARCH 26, 2019
PAGE 2
The estimated cost of the improvements is $125,000. Staff will present a "summary of
hard (construction) as well as soft costs (design, project/construction management,
inspection and testing) at the time of the award of the construction contract.
07-11mm�
Cost of r • • temporary power • the Temporary Fire Station and Library Storage
NumbersFacility would be funded through the Fire Stations Modernization Project (Account
33-1-3301-0520, 33-1-3312-0520, 33-1-3313-0520, 1•
Library ••- . • • -ct (Account No. 1