Loading...
HomeMy WebLinkAbout05. CIP 19-37 - Approve Plans & Specs Auth Solicitation of Bids - Fire Station Improvement ProjIM1011L APPW.,IVED BY G'ER CITY 1,,VANX�6 FROM: OFFICE OF THE CITY MANAGER BY: JOHN OSKOUI, P.E., ASSISTANT CITY MANAGER �JI[4161:3 1LOJO I :J ;tell] :[$I M I: i A 4ili I 1LO] I That the City Council approve the plans and specifications and authorize solicitation Q bids for the Fire Stations Modernization Project — Temporary Fire Station Facility — Capital Improvement Project No. 19-37. 1 As part of the Measure S funded Infrastructure and Facilities Improvement Program, all four City of Downey Fire Stations will be renovated in the next year and half. The work is complex and requires complete shut -down of the stations during construction. This requires housing the entire operation currently conducted out of the fire stations in a temporary facility while construction work is being completed. Approximately a 1.7 acre portion of this vacant lot will be utilized for a period of 18 months. This would be accommodated through a "Sublease Agreement" by and between the PCCP IRG, Downey, LLC, and IRG DOWNEY, LLC; and the City of Downey. Staff will present the "Sublease Agreement" to the City Council at its January 22, 2019 meeting. CIP NO. 19-37 - FIRE STATIONS MODERNIZATION PROJECT JANUARY 8, 2019 PAGE 2 The 1.7 acre of land must be improved so that the temporary facilities, including portable buildings, could be placed and covered for parking of engines and ladder trucks, and so that paramedic units could be constructed. The improvements include grading of the existing site, installation of water, sewer and electrical infrastructure, as well as placement of miscellaneous pavement base materials and asphalt pavement, and other miscellaneous related work. The plans and specifications for the above described work are complete and the project is ready for solicitation of construction bids. The estimated cost of improvements is $375,000. Staff will present a summary of hard (construction) as well as soft costs (design, project/construction management, inspection and testing) at the time of the award of the construction contract. The City's 2018-19 Capital Improvement Program includes the Fire Stations Modernization Project utilizing Measure S Funds (Account No. 33-4-3301-0520). ATTACHMENTS Attachment A: Aerial Map Attachment B: Plans 2 m uj LL ui m L4 p®rl, ll" A wIr mi v. o P lh� 17 m uj LL ui m PROPOSED LOCATION FOR F -F -T -T TEMPORARY FIRE STATION 0 20 40 80 Feet L4 p®rl, ll" A PROPOSED LOCATION FOR F -F -T -T TEMPORARY FIRE STATION 0 20 40 80 Feet 1 -7 - OR .1-1 11-M.1 UZ) CY'D 0 n CL no ta (zo 0 U I .. ....... �3J Loom SE CTM '82' W . x ClOiST PQC75:44 WD TIES SECT' irr--E ---- Vpa AL stantec CITY OF DOWNEY MEASURE S 'Y( Y, N r-0N3—iP�XTKjN NOTES jr f i -) -- -_- -- --- 41 I x f r '',+-�- ~` co cr , s�i I WASHBURN ROAD _ Y � REDWOOD HEADER DETAIL ! -N- N=PAV 3 PAVEMENT PARKING STALL DETAIL w Stanteci CITY OF DOWNEYMEASURE S f= I. St..t.r IZ, N I -,-- WAS FOURN ROAD St..t.r I II .N- LEGEt4D CITY OF DOWNEY MEASURE "S" CONSGTK)N NOTES A % 0 -2 0 j -iTE 1 WA URN ROAD -,F,. TILL I II .N- LEGEt4D CITY OF DOWNEY MEASURE "S"