HomeMy WebLinkAbout08. Receive & File ADA Transition Plan Annual Review & UpdateAPPROVED BY ,em rio.
CITY MANAGERR E -C E IV E0
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL 17 2018
FROM: OFFICE OF THE CITY MANAGER WS OFC'
'!Ty
C
BY: DELFT NO R. CJI, P.E., DIRECTOR OF PUBLIC WORKS/CITY ENftGIN
DATE: OCTOBER 23, 2018
SUBJECT: RECEIVE AND FILE THE CITY OF DOWNEY ADA TRANSITION PLAK
ANNUAL REVIEW AND UPDATE
That the City Council receive and file the City of Downey ADA Transition Plan annual review
and update.
XF-T10=1
The Americans with Disabilities Act (ADA) requires public agencies to perform a self-evaluation
of infrastructure, programs and activities, and develop a plan for bringing infrastructure into
compliance with the ADA. Over the last three years or so, the City of Downey began working on
an ADA program which included the development of a self-evaluation and transition plan to
bring City infrastructure into compliance with the ADA.
During 2016-2017, the self-evaluation process was conducted by the City's consultant, Disability
Access Consultants (DAC), and included inspections of City facilities and public rights-of-way.
The inspection findings, including information regarding the type of ADA upgrades and repairs,
locations, photographs of those areas, and the estimated dates the findings were scheduled to
be repaired, were subsequently developed into a transition plan.
V] H1211T Me Uty Call 60SEser's7m,
of persons with disabilities. After the self-evaluation and transition plan was completed, the
transition plan was made available for public review. The City also appointed an ADA
Coordinator to address City -related ADA matters, created an ADA grievance policy and
grievance form and dedicated a webpage on the City website for ADA matters. The public may
submit ADA complaints in person or through the web page as well as get info on the City
transition plan ADA grievance policy and procedure.
ADA TRANSITION PLAN ANNUAL REVIEW AND UPDATE
OCTOBER 23, 2018
PAGE #2
Since the development of the City's ADA program, sixty-six (66) requests for services related to
ADA matters have been received by the ADA Coordinator. Fifty-seven (57) of these requests
have been closed upon completion of the requested improvements; the remaining nine (9)
requests will be completed as part of future projects. One (1) resident requested a copy of the
ADA Non -Discrimination Policy and Grievance Procedure and five (5) Grievance Forms have
been submitted during this three-year period.
The City has completed numerous ADA repairs and upgrades to various City facilities and
public rights-of-way through the CIP program and other routine maintenance activities since the
ADA self-evaluation and transition plan has been completed. Staff has been utilizing the DAC
software to assist in tracking ADA repairs and upgrades which has allowed staff to update the
transition plan as needed. A detailed list of City facilities and public rights-of-way that have
been improved to comply with current ADA requirements through September 30,_2018 is shown
in Attachment A. The following is a summary of the detailed list of ADA repairs and upgrades
completed.
City Facilities'
Public Rights -of Ways
Type of Upgrade
Pro'ect Na Pro ect Name Locations or Re air
Annual Miscellaneous
Concrete Construction and Curb Ramps &
CIP No. 17-03 _ ___ _ Re air Pro ect, District 4 Various locations Sidewalks
Bellflower Boulevard at
Imperial Highway
Intersection Improvement Curb Ramps &
S.S. 6056 Pro�ect Bellflower Boulevard Sidewalks
Type of Upgrade
Faciltv
Locations
or Re air
Installed 2 additional ADA accessible parking
Civic Center
West Parking Lot
stalls
City Hall_
Public Entrances
Installed ADA si na eat ADA accessible doors
Library
Public EntrancesInstalled
ADA signage at ADA accessible doors
Barbara J. Riley
Community and Senior
Center
Public Entrances
Installed ADA signage at ADA accessible doors
Dennis the Menace
Park
East Parkin Lot
Installed ADA accessible portable restroom
Rio Hondo River
Installed ADA accessible ramp to access the Rio
Treasure Island Park
Trail Entrance
Hondo River Trail
Installed ADA signage for ADA accessible
Golden Park
North Parkin Lot
parkin spaces
Public Rights -of Ways
Type of Upgrade
Pro'ect Na Pro ect Name Locations or Re air
Annual Miscellaneous
Concrete Construction and Curb Ramps &
CIP No. 17-03 _ ___ _ Re air Pro ect, District 4 Various locations Sidewalks
Bellflower Boulevard at
Imperial Highway
Intersection Improvement Curb Ramps &
S.S. 6056 Pro�ect Bellflower Boulevard Sidewalks
ADA TRANSITION PLAN ANNUAL REVIEW AND UPDATE
OCTOBER 23, 2018
PAGE #3
It is also projected that ADA improvements will be implemented on the following public right-of-
FY 2016/17 Residential
Street Pavement
Curb Ramps &
CIP" No. 17-04
Rehabilitation Pro'ect
Various locations
Sidewalks
__Completion
Brookshire Avenue
FY 18/19
Curb Ramps &
CIP No. 14-16 _
1m rovement Pro'ect__
Brookshire Avenue
Sidewalks
CIP Nos. 14-21
Traffic Signal Upgrades
Lakewood Boulevard - Columbia Way to Stewart and Gray
Curb Ramps &
to 14-26 &_15-15
Project at Various Locations
Various locations
Sidewalks -m
Lakewood Boulevard -Bellflower Boulevard to Cecilia Street
Lakewood Boulevard
6/30/2020
aao
Florence Avenue - Vultee/Arrington Avenue to Birchdale
Improvement Project, Phase
Avenue
Curb Ramps&
C.C.632=3C
3C
Lakewood Boulevard
Sidewalks
Pomerin Road
FY 2017/18 Residential
6/30/2021
Florence Avenue - Western Avenue to Rives Avenue
FY 21/22
Street Pavement
Im erial Hi hway -Smallwood Avenue to Brock Avenue
Curb Ramps &
CIP No. 18-02
Rehabilitation Pro'ecf
Various locations
Sidewalks
It is also projected that ADA improvements will be implemented on the following public right-of-
way intersections and corridors as follows:
Anticipated
Construction in
Projected
Public Right of Way_.Locations
Fiscal Year
__Completion
Telegraph Road - Songfest Avenue to Passons Boulevard
FY 18/19
6/30/2019
Tele ra h Road -Sera is Avenue tb Manzanar Avenue
FY 18/19
6/30/2019
Lakewood Boulevard - Cherokee Road to 1-5 Freewa
FY 18/19 & 19/20
6/30/2020
Lakewood Boulevard - Columbia Way to Stewart and Gray
Road
FY 19/20
6/30/2021
Lakewood Boulevard -Bellflower Boulevard to Cecilia Street
FY 19/20& 20/21
6/30/2020
aao
Florence Avenue - Vultee/Arrington Avenue to Birchdale
Avenue
FY 20/21
6/30/2021
Florence Avenue - West City Limit (Susan Avenue) to
Pomerin Road
FY 20/21__
6/30/2021
Florence Avenue - Western Avenue to Rives Avenue
FY 21/22
6/30/2022
Im erial Hi hway -Smallwood Avenue to Brock Avenue
FY 21/22 & 22/23
6/30/2023
Im e�hwa - Columbia Way to Brookshire Avenue
FY 22/23
6/30/2023
Firestone Boulevard -Stewart and Gray Road to East City
Limit
FY 22/23
6/30/2023
Stewart & Gray Road - Bellflower Boulevard (Corrigan
Avenue) to Lakewood Boulevard
FY 23/24
6/30/2024
Paramount Boulevard - Irwinrc ove Dnve to Lubec Street
FY 23/24 & 24/25
6/30/2025
FY 24/25, 25/26
Gardendale Street - Brookshire Avenue to Garfield Avenue
& 26/27 _
6/30/2027
Downey Avenue - I-5 Freeway to Firestone Boulevard
FY 26/27 & 27/28
6/30/2028
Paramount Boulevard - Conrad Street to Stewart and Gray
Road
FY 28/29
6/30/2029
FY 28/29, 29/30
Paramount Boulevard - Phlox Street to 5th Street
& 30/31
6/30/2031
Firestone Boulevard - West Cit Limit to Stewart and Gray_
FY 31/32, 32/33
6/30/2034
ADA TRANSITION PLAN ANNUAL REVIEW AND UPDATE
OCTOBER 23,_2018
PAGE #4
Road
& 33/34_
Im erial Hi hwa —Smallwood Ave to Brock Ave
FY 22/23
6/30/2023
Im erial Hi hwa -Columbia Wa to Brookshire
FY 22/23
6/30/2023
Lakewood Boulevard - Columbia Way to Stewart and Gray
Road
FY 20/21
6/30/2021
Lakewood Boulevard - Cherokee Drive to 1-5 Freeway
FY 19/20
6/30/2020
Lakewood Boulevard - Bellflower Boulevard to Cecilia Street
FY 19/20
6/30/2020
Im-penial Hi hwa at Rives Ave
FY 19/20
6/30/2020
Hi hwa _at_Downe Ave
FY 19/20
6/30/2020
--Imperial
Imperial Highway at Dolan Ave
FY 19/20
6/30/2020
Im erial Highwa at Orizaba Ave
FY 19/20
6/30/2020
Imperial Highway at Old River School Road
FY 19/20
6/30/2020
Imperial Highway at La Reina Ave __
FY 19/20
6/30/2020
Im erial Hi hwa at R erson Ave
FY 19/20
6/30/2020
Imperial Highway at Erickson Ave
FY 19/20
6/30/2020
Lakewood Boulevard at Donovan
FY 19/20
6/30/2020
Lakewood Boulevard at Muller St
FY 21/22
6/30/2022
Lakewood Boulevard at 6th Street
FY 21/22
6/30/2022
Lakewood Boulevard at Priscilla St
FY 31/32
6/30/2032
Lakewood Boulevard at 7th Street
FY 21/22
6/30/2022
Lakewood Boulevard at Meadow
FY 19/20
6/30/2020
Lakewood Boulevard at Rosecrans
FY 20/21
6/30/2021
Lakewood Boulevard at Hall Blvd
FY 19/20
6/30/2020
Lakewood Boulevard at Cleta St
FY 18/19
6/30/2019
Lakewood Boulevard at Deming St
FY 20/21
6/30/2021
Lakewood Boulevard at Rose Ave
FY 19/20
6/30/2020
Lakewood Boulevard at Buckles St
FY 19/20
6/30/2020
Lakewood Boulevard at Gotham
FY 18/19
6/30/2019
Lakewood Boulevard at Gardendale
FY 31/32
6/30/2032
Lakewood Boulevard at Dalen St
FY 19/20
6/30/2020
Fiscal Responsibility
Quality of Life, Infrastructure & Parks
There is no fiscal impact associated with this action. However, the total estimated cost for the
ADA repairs and upgrades that have been completed over the last three years is$ 950,000.
ATTACHMENTS
Attachment A - Detailed List of ADA Repairs and Upgrades Completed
ADA TRANSITION PLAN ANNUAL REVIEW AND UPDATE
OCTOBER 23, 2018
PAGE #5
'Ietailed List of ADA Repairs and Upgrades Completei
(Through September12018)
City Facilities:
Barbara J. Riley Community and Senior Center
Public Entrances — Installed ADA signage at ADA accessible doors
Civic Center
• West Parking Lot — Installed 2 additional disable parking stalls
City Hall
• Public Entrances — Installed ADA signage at ADA accessible doors
Dennis the Menace Park
• East Parking Lot — Installed ADA accessible portable restroom
Golden Park
North Parking Lot — Installed ADA signage for ADA accessible parking spaces
Library
Public Entrances - Installed ADA signage at ADA accessible doors
Treasure Island Park
• Rio Hondo River Trail Entrance - Installed ADA accessible ramp to access the Rio
Hondo River Trail
Capital Improvement Project No. 17-03
Annual Miscellaneous Concrete Construction and Repair Project, District 4 (completed
04/11/17)
Curb Ramps
9439 Foster Road (at Carpenter Elementary School)
9439 Foster Road (at Carpenter Elementary School)
9439 Foster Road (at Carpenter Elementary School)
• 9439 Foster Road (at Carpenter Elementary School)
• Southwest Corner of Linsey Avenue at Cedartree Road (at Edith Unsworth Elementary
School)
Northwest Corner of Linsey Avenue at Cedartree Road (at Edith Unsworth Elementary
School)
Sidewalks
• Various sidewalk locations on Adenmoor Avenue from Hall Road to Stewart and Gray
Road
• Various sidewalk locations on Brookgreen Road from Cul -de -Sac to Pico Vista Road
ATTACHMENT A
ADA TRANSITION PLAN ANNUAL REVIEW AND UPDATE
OCTOBER 23, 2018
PAGE #6
Various sidewalk locations on Buell Street from Pangborn Avenue to Lesterford Avenue
Various sidewalk locations on Cecilia Street from Woodruff Avenue to Lesterford Avenue
Various sidewalk locations on Cedartree Road from Chaney Avenue to Lemoran Avenue
Various sidewalk locations on Cedartree Road from Klinedale Avenue to True Avenue
New Sidewalks on South Side of Cedartree Road from ±275 feet west of Lindsey
Avenue to Lindsey Avenue (at Edith Unsworth Elementary School)
Various sidewalk locations on Chaney Avenue from Brookpark Road to Cedartree Road
Various sidewalk locations on Cherokee Drive from Downey Avenue to Dolan Avenue
New Sidewalks on East Side of Columbia Way from Foster Road to ±545 feet north of
Foster Road (at Carpenter Elementary School)
o Various sidewalk locations on Crossdale Avenue from Cecilia Street to Dollison Drive
Various sidewalk locations on Davis Street from Dolan Avenue to Brookshire Avenue
Various sidewalk locations on Downey Avenue from Primrose Lane to Noren Street
Various sidewalk locations on Elmcroft Avenue from Cecilia Street to Cul -de -Sac
Various sidewalk locations on Fairford Avenue from Cecilia Street to Dollison Drive
Various sidewalk locations on Florence Avenue from Birchdale Avenue to Tristan Drive
New Sidewalks on North Side of Foster Road from Columbia Way to Julius Avenue (at
Carpenter Elementary School)
Various sidewalk locations on Gallatin Road from Arrington Avenue to Shellyfield Road
• New Sidewalks on North Side of Imperial Highway from Orizaba Avenue to Gurley
Avenue (at Imperial Elementary School)
Various sidewalk locations on Iowa Street from Dolan Avenue to Brookshire Avenue
New Sidewalks on West Side of Julius Avenue from Adwen Street to Arnett Street (at
Spencer Williams Elementary School)
New Sidewalks on West Side of Lindsey Avenue from Brookpark Road to Cedartree
Road (at Edith Unsworth Elementary School)
• Various sidewalk locations on Muller Street from Lakewood Boulevard to Haledon
Avenue
• Various sidewalk locations on Serapis Avenue from Cedartree Road to Telegraph Road
Various sidewalk locations on Woodruff Avenue from Nance Street to Stewart and Gray
Road
Cash Contract No. S.S. 6056
Bellflower Boulevard at Imperial Highway Intersection Improvement Project (completed 11/14/17)
Curb Ramps
• Southwest Corner of Bellflower Boulevard at Imperial Highway
• Southeast Corner of Bellflower Boulevard at Imperial Highway
• Northwest Corner of Bellflower Boulevard at Imperial Highway
• Northeast Corner of Bellflower Boulevard at Imperial Highway
Sidewalks
New Sidewalks on West Side Bellflower Boulevard from Dalen Street to ±900 feet north
of Imperial Highway
New Sidewalks on East Side Bellflower Boulevard from Dalen Street to ±900 feet north
of Imperial Highway
ADA TRANSITIONPLAN ANNUAL REVIEW AND UPDATE
OCTOBER 23, 2018
PAGE #7
Capital- Improvement Project No. 17-04
FY 2016/17 Residential Street Pavement Rehabilitation Project (completed 12/12/17)
Curb; Ramps
• Northeast Corner of Whitewood Avenue at Adoree Street
• Northeast Corner of Premiere Avenue at Foster Road (Frontage Road)
• Northwest Corner of Premiere Avenue at Foster Road (Frontage Road)
• Northwest Corner of Ardis Avenue at Foster Road (Frontage Road)
• Southeast Corner of Golden Avenue at Dempster Avenue
• Southwest Corner of Golden Avenue at Dempster Avenue
Northwest Corner of Golden Avenue at Barlin Avenue
• Southwest Corner of Brock Avenue at Priscilla Street
• Southwest Corner of Brock Avenue at Puritan Street
• Southeast Corner of Brock Avenue at Puritan Street
• Northwest Corner of Brock Avenue at Puritan Street
• Southwest Corner of Brock Avenue at Devenir Avenue
• Northeast Corner of Brock Avenue at Devenir Avenue
• Southwest Corner of Brock Avenue at Comolette Street
• Northeast Corner of Rio Hondo Drive at Pellet Street
• Southeast Corner of Rio Hondo Drive at Pellet Street
• Northeast Corner of Downey Avenue at Everest Street
• Southeast Corner of Downey Avenue at Everest Street
• Northwest Corner of Buell Street at Hasty Avenue
• Northeast Corner of Buell Street at Hasty Avenue
• Northwest Corner of Buell Street at Casanes Avenue
• Northeast Corner of Buell Street at Casanes Avenue
• Northwest Corner of Gallatin Road at Arrington Avenue
• Northeast Corner of Gallatin Road at Arrington Avenue
• Northwest Corner of True Avenue at Brookpark Road
• Southwest Corner of True Avenue at Brookpark_Road
• Northeast Corner of True Avenue at Blandwood Road
• Southeast Corner of True Avenue at Blandwood Road
• Northeast Corner of Blandwood Road at Pico Vista Road
• Northwest Corner of Gallatin Road at Shellyfield Road
• Northeast Corner of Gallatin Road at Shellyfield Road
• Northwest Corner of Downey Avenue at Quoit Street
• Southwest Corner of Downey Avenue at Quoit Street
• Southwest Corner of Quoit Street at Orizaba Avenue
• Southeast Corner of Quoit Street at Orizaba Avenue
Sidewalks
• Various sidewalk locations on Ardis Avenue from Foster Road to Angell Street
• Various sidewalk locations on Barlin Avenue from Golden Street to Gardendale Street
• Various sidewalk locations on Brock Avenue from Priscilla Street to Cheyenne Avenue
ADA TRANSITION PLAN ANNUAL REVIEW AND UPDATE
OCTOBER 23, 2018
PAGE #8
• Various sidewalk locations on Buell Street from Woodruff Avenue to Pangborn Avenue
• Various sidewalk locations on Everest Street from Downey Avenue to Brookshire
Avenue
Various sidewalk locations on Rio Hondo Drive from Dinwiddie Street to Pellet Street
Various sidewalk locations on Tecum Road from Florence Avenue to Dinsdale Street
• Various sidewalk locations on True Avenue from Brookpark Road to Metro Street
Capital Improvement Project No. 14-16
Brookshire Avenue Improvement Project (completed 04/24/18)
Curb Ramps
Southwest Corner of Brookshire Avenue at Puritan Street
Southeast Corner of Brookshire Avenue at Puritan Street
Northwest Corner of Brookshire Avenue at Puritan Street
Northeast Corner of Brookshire Avenue at Puritan Street
• Southwest Corner of Brookshire Avenue at Devenir Street
Northwest Corner of Brookshire Avenue at Devenir Street
- Southwest Corner of Brookshire Avenue at Comolette Street
Southeast Corner of Brookshire Avenue at Comolette Street
• Northwest Corner of Brookshire Avenue at Comolette Street
Northeast Corner of Brookshire Avenue at Comolette Street
Southwest Corner of Brookshire Avenue at Adoree Street
• Southeast Corner of Brookshire Avenue at Adoree Street
Northwest Corner of Brookshire Avenue at Adoree Street
Northeast Corner of Brookshire Avenue at Adoree Street
• Southwest Corner of Brookshire Avenue at Borson Street
• Northwest Corner of Brookshire Avenue at Borson Street
• Southwest Corner of Brookshire Avenue at Dalen Street
• Northwest Corner of Brookshire Avenue at Dalen Street
• Southwest Corner of Brookshire Avenue at Lyndora Street
• Northwest Corner of Brookshire Avenue at Lyndora Street
• Southeast Corner of Brookshire Avenue at Imperial Highway
• Southeast Corner of Brookshire Avenue at Imperial Highway
• Southwest Corner of Brookshire Avenue at 2nd Street
• Northwest Corner of Brookshire Avenue at 2nd Street
• Southwest Corner of Brookshire Avenue at 3rd Street
• Southwest Corner of Brookshire Avenue at Civic Center Drive
• Northwest Corner of Brookshire Avenue at Civic Center Drive
• Southeast Corner of Brookshire Avenue at 5th Street
• Northeast Corner of Brookshire Avenue at 5th Street
• Southwest Corner of Brookshire Avenue at 6th Street
• Southeast Corner of Brookshire Avenueat 6th Street
• Northwest' Corner of Brookshire Avenue at 6th Street
• Northeast Corner of Brookshire Avenue at 6th Street
ADA TRANSITION PLAN ANNUAL REVIEW AND UPDATE
OCTOBER 23, 2018
PAGE #9
• Southwest Corner of Brookshire Avenue at Muller Street
• Northwest Corner of Brookshire Avenue at Muller Street
• Southwest Corner of Brookshire Avenue at 7th Street
• Northwest Corner of Brookshire Avenue at 7th Street
• Southwest Corner of Brookshire Avenue at Quinn Street
• Northwest Corner of Brookshire Avenue at Quinn Street
• Southwest Corner of Brookshire Avenue at Cherokee Drive
• Southeast Corner of Brookshire Avenue at Cherokee Drive
•, Southwest Corner of Brookshire Avenue at Lexington Road
• Northwest Corner of Brookshire Avenue at Lexington Road
• Southeast Corner of Brookshire Avenue at 11th Street
• Northeast Corner of Brookshire Avenue at 11th Street
•- Southwest Corner of Brookshire Avenue at Florence Avenue
• Southeast Corner of Brookshire Avenue at Florence Avenue
Sidewalks
• Various Sidewalk Locations on West Side Brookshire Avenue from Gardendale Street to
Imperial Highway
• Various Sidewalk Locations on West Side Brookshire Avenue from Firestone Boulevard
to Florence Avenue
• Various Sidewalk Locations on East Side Brookshire Avenue from Gardendale Street to
Imperial Highway
• Various Sidewalk Locations on East Side Brookshire Avenue from Firestone Boulevard
to Florence Avenue
Capital Im rovement Project Nos. 14-21 to 14-26 & 15-15
Traffic Signal Upgrades Project at Various Locations (completed 06/12/18)
Curb Ramps
• Southwest Corner of Florence Avenue at Old River School Road/Tecum Road
• Southeast Corner of Florence Avenue at Old River School Road/Tecum Road
• Northwest Corner of Florence Avenue at Old River School Road/Tecum Road
Northeast Corner of Florence Avenue at Old River School Road/Tecum Road
• Southwest Corner of Firestone Boulevard at Woodruff Avenue (North)
• Northwest Corner of Firestone Boulevard at Woodruff Avenue (North)
• Northeast Corner of Firestone Boulevard at Woodruff Avenue (North)
• Southwest Corner of Firestone Boulevard at Woodruff Avenue (South)
• Southeast Corner of Firestone Boulevard at Woodruff Avenue (South)
• Traffic Signal Island at Firestone Boulevard at Woodruff Avenue (South)
• Northeast Corner of Firestone Boulevard at Woodruff Avenue (South)
• Northwest Corner of Bellflower Boulevard at Foster Road
• Northwest Corner of Woodruff Avenue at Foster Road
• Southwest Corner of Paramount Boulevard at 3rd Street
• Northwest Corner of Paramount Boulevard at 3rd Street
Northeast Corner of Paramount Boulevard at 3rd Street
• Southwest Corner (North) of Paramount Boulevard at 5th Street
ADA TRANSITION PLAN ANNUAL REVIEW AND UPDATE
OCTOBER 23, 2018
PAGE #10
• Southwest Corner (East) of Paramount Boulevard at 5th Street
• Northwest Corner of Paramount Boulevard at 5th Street
• Southwest Corner of Paramount Boulevard at7th -Street
• Northwest Corner of Paramount Boulevard at 7th Street
• Northeast Corner of Paramount Boulevard at 7th Street
Sidewalks
• Various "Sidewalk Locationsadjacentto the curb ramps listed above.
Cash Contract No. 632-3C
Lakewood Boulevard Improvement Project, Phase 3C (ongoing project)
Curb Ram
• Southwest Corner of Lakewood Boulevard at Southbound 1-5 Freeway off -ramp
• Southwest Corner of Lakewood Boulevard at Vista Del Rosa Street
• Northwest Corner of Lakewood Boulevard at Vista Del Rosa Street
Sidewalks
• New Sidewalks on West Side Lakewood Boulevard from Gallatin Road to Southbound I-
5 Freeway off -ramp
• New Sidewalks on West Side Lakewood Boulevard from Northbound 1-5 Freeway on-
ramp to ±300 feet north of Vista Del Rosa Street
• New Sidewalks on East Side Lakewood Boulevard from Gallatin Road to Southbound 1-5
Freeway on-ramp
• New Sidewalks on West Side Lakewood Boulevard from Northbound 1-5 Freeway off -
ramp to ±300 feet north of Vista Del Rosa Street
Capital Im rovement Project No. 18-02
FY 2017/18 Residential Street Pavement` Rehabilitation Project (ongoing project)
Curb Ramps
• Southwest Corner oflzetta Avenue at Washburn Road
• Southeast Corner of Izetta Avenue at Washburn Road
• Southwest Corner of Dunrobin Avenue at Spry Street
• Southeast Corner of Dunrobin Avenue at Spry Street
• Northwest Corner of Dunrobin Avenue at Spry Street
• NortheastCorner of Dunrobin Avenue at Spry Street
• Southwest Corner of Smallwood Avenue at Imperial Highway
• Southeast Corner of Smallwood Avenue at Imperial Highway
• Northwest Corner of Paramount Boulevard at Puritan Street
• Southwest Corner of Paramount Boulevard at Puritan Street
• Northwest Corner of Cole Street at Orizaba Avenue
• Northeast Corner of Cole Street at Orizaba Avenue
• Southwest Corner of Cole Street at Orizaba Avenue
ADA TRANSITION PLAN ANNUAL REVIEW AND UPDATE
OCTOBER 23, 2018
PAGE #11
• Southwest Corner of Orizaba Avenue at Stewart & Gray Road
• Southeast Corner of Orizaba Avenue at Stewart & Gray Road
• Northeast Corner of Old River School Road at Irwingrove Drive
• Southeast Corner of Old River School Road at Irwingrove Drive
• Southwest Corner of Julius Avenue at Irwingrove Drive
• Southeast Corner of Julius Avenue at Irwingrove Drive
• Southwest Corner of Wiley Burke Avenue at Irwingrove Drive
• Southeast Corner of Wiley Burke Avenue at Irwingrove Drive
• Northwest Corner of Wiley Burke Avenue at Florence Avenue
• Northeast Corner of Wiley Burke Avenue at Florence Avenue
• Southwest Corner of Wiley Burke Avenue at Suva Street
• Southeast Corner of Wiley Burke Avenue at Suva Street
• Northwest Corner of Manzanar Avenue at Cherokee Drive
• Northeast Corner of Manzanar Avenue at Cherokee Drive
• Northwest Corner of Dolan Avenue at Cherokee Drive
• Northeast Corner of Dolan Avenue at Cherokee Drive
• Southwest Corner of Dolan Avenue at Cherokee Drive
• Southeast Corner of Dolan Avenue at Cherokee Drive
Southwest Corner of Stamps Road at Cherokee Drive
• Southeast Corner of Stamps Road at Cherokee Drive
• Northwest Corner of Lemoran Avenue at Gallatin Road
• Northeast Corner of Lemoran Avenue at Gallatin Road
Northwest Corner of Eglise Avenue at Gallatin Road
Northeast Corner of Eglise Avenue at Gallatin Road
Southwest Corner of Cord Avenue at Gallatin Road
• Southeast Corner of Cord Avenue at Gallatin Road
Sidewalk
• Various sidewalk locations on Cherokee Drive from Downey Avenue to Brookshire
Avenue
• New sidewalk on Westside of Gurley Avenue North of Duesler Lane
• Various sidewalk locations on Gallatin Road from Lemoran Avenue to Cul -de -Sac North
• Various sidewalk locations on Irwingrove Drive from Old River School Road to Rives
Avenue
• Various sidewalk locations on Izetta Avenue from Spry Street to Washburn Road
• Various sidewalk locations on Lemoran Avenue from Haledon Avenue to Gallatin Road
• Various sidewalk locations on Old River School Road From 300 feet west of Florence
Avenue to Florence Avenue
• Various sidewalk locations on Priscilla Street from Lakewood Boulevard to Hanwell
Avenue
• Various sidewalk locations on Quinn Street from Brookshire Avenue to Cul -de -Sac
• Various sidewalk locations on Smallwood from Puritan Avenue to Imperial_ Highway
• Various sidewalk locations on Spry Street from Izetta to Cul -de -Sac
• Various sidewalk locations on Wiley Burke from Florence to Suva Street