HomeMy WebLinkAbout03. CIP 19-19 Auth to Bid - Florence Ave Bridge at San Gabriel River Maint. and Repair2018
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
U!
FROM: OFFICE OF THE CITY MANAGER IS =S OF
BY: DELFINO R. CONSUNJI, P.E., DIRECTOR OF PUBLIC WORKS/C R
DATE: OCTOBER 23, 2018
SUBJECT' FLORENCE AVENUE BRIDGE AT SAN GABRIEL RIVER MAINTENANCE
AND REPAIR PROJECT, CAPITAL IMPROVEMENT PROJECT NO. 19-19
APPROVE PLANS AND SPECIFICATIONS AND AUTHORIZE SOLICITATION
FOR BIDS
That the City Council approve the plans and specifications and authorize solicitation for bids for
the Florence Avenue Bridge at San Gabriel River Maintenance and Repair Project, Capital
Improvement Project No. 19-19.
Xe-TT91FIM
7.17riTtler-A-Tre-ET's 13 A
of all bridges countywide every two years. Caltrans bridges are not inspected by the LACDP
as part of this program. I
The City received a list of recommended maintenance and repairs from the LACD"i for the
bridge on Florence Avenue at the San Gabriel River. Some of the recommended repairs ha
already been completed by City maintenance staff; however, the remaining repairs including
concrete bridge deck patching and expansion joint cleaning and sealing would require hiring
contractor to perform the repairs. I
W�e I
Biggs Cardosa Associates, Inc. to prepare the plans, specifications and cost estimate for this
project. The design has been completed and the project is now ready for solicitation of bids.
The repair work consists of cleaning out expansion joints and resealing; repairing •.:.. is
concrete areas of the bridge deck; shot blasting the deck; applying a protective coat on the
bridge deck; and restriping.
Capital Improvement Project No. 19-19
Florence Avenue Bridge at San Gabriel River Maintenance and Repair Projell
October 23, 2018
7 707-1 " r M -7-1 M
Funds in the amount of $200,000 in Measure M have been programmed in the current FY
2018/2019 Capital Improvement Program Budget under Account No. 57-1-6624 to cover the
total project cost.
Desi n $9,000
Construction cost estimate $150,000
Contin ge
--Contract Administrationj3% _--- $5,000
Construction cost & inspection (15%) $21,000
Total Project cost: $200,000
Depending on actual bids received, additional appropriation may be requested at the time of
construction contract award.
ATTACHMENTS
WeTOT-NOT 3 & M -e
9
A 'TTACHMENT A