Loading...
HomeMy WebLinkAbout05. Proj No 17-15 Award Contract for Independence Park Improv Proj - Construction of Futsal CourtsItem •; T04 HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL APpF?01/ED Ely FROM: • • THE CITY MANAGER C'_ry M41VAG,,, BY: JOHN OSKOUI, ASSISTANT CITY MANAGER SUBJECT: INDEPENDENCE PARK IMPROVEMENT PROJECT -CONSTRUCTION OF FUTSAL COURTS -• NO 17-15) AWARD OF CONSTRUCTION CONTRACT It is recommended that: 1. The City Council award a construction contract in the amount of $ 479,500 to NR Development, Inc. for Independence Park Improvement Project -Construction • Futsal Courts (Project No 2. Authorize the Assistant City Manager to execute any change orders and additiona scope •' • deemed necessary up to the amount of the approved project budgi On May 8, 2018; the City Council approved the plans and specifications and authorized staff to solicit bids for Independence Park Improvement Project -Construction of Futsal Courts (Project No 17-15). Furthermore, the City Council authorized staff to procure the required sports field lighting and related equipment through an informal bid process. The subject project entails construction of three (3) new futsal courts with sports field light standards, perimeter fencing and other necessary amenities (please see Attachment A) Le I**o] 0 • September 13, 2018, a Notice Inviting Bids for the subject •• was issued. The notice was published in the Downey Patriot on September 13, 2018 and September 20, 2018. A mandatory pre-bid meeting was conducted • September 19, 2018. Twelve (12) interested contractors participated. • September 24, 2018; the City issued Addendum No. 1 , which provided answers to questio asked by some of the participating contractors. I INDEPENDENCE PARK IMPROVEMENT PROJECT -CONSTRUCTION OF FUTSAL COURTS (PROJECT NO. 17-15) AWARD OF CONSTRUCTION CONTRACT OCTOBER 9, 2018 - PAGE 2 submitted the lowest bid in the amount of $ 479,500. On September 28, 2018, staff conducted a post -bid meeting to confirm the scope of work and performance schedule. It has been determined that NRD possesses the specified contractor's license (current and in good standing), and the required resources to complete the work in the scope of work. Furthermore, staff conducted verbal qualification interviews with randomly selected NRD provided references All reference responses were satisfactory. As such, staff recommends that the City Council award a contract to the apparent lowest responsive and responsible bidder NR Development, Inc. in the amount of $ 479,500 for the Independence Park Improvement Project -Construction of Futsal Courts (Project No. 17-15). Quality of Life, Infrastructure &Parks The total estimated cost of the project including design, procurement of sports field lighting and equipment, construction contract, construction management/inspection, and contingencies is $ 647,484. The allocated budget is $ 649,000 which is funded through the General Fund ($399,000) and Measure S ($ 250,000). The project's detailed cost and budget is attached to this report (please see Attachment C). ATTACHMENTS Attachment A Project Plans Attachment Bid Summary Attachment C Cost and Budget Summary 2 I Mo 0 0 0 00 0 0000 00 °� � a O Rnx��ia 0000000 U s, I' �g u� uvih o Ex a 5� z 'D w 00 ATTACHMENT IP 17-15 - Independence Park - Futsal Courts All Bids Subject to Audit Until Approved i by the City � ,'Sa }€1'ittiu"w}Y�imy )7l NR Development Inc 12307 Woodruff Avenue Downey, CA 90241 2 G2K Construction 28348 Roadside Drive, #205 Agoura Hills, CA 91301 ROIS00 b S Golden Phoenix Construction Co. 40 N. Altadena Drive, Ste. 205 dba Golden Phoenix Electric Pasadena, CA 911071 4 ARC Construction, Inc.. 3123 Harmony Place La Cresenta, CA 91214 ABNY General Engineering 1302 Indian Springs Drive Glendora, CA 91741 6 7 8 9' ATTACHMENT 1:1roject No. 17-15 HEMM • Design and Contract Administration: • Procurement of light standards and equipment • Construction: • Construction contingencies (@ 10%) Construction Inspection and Management Projected Total Cost Account M ATTACHMENT C