HomeMy WebLinkAbout04. Execute MOU w-LA Co METRO for Lakewood at Florence Intersection Imp ProjTO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL APPF?OtfED JE33 FROM:' OFFICE OF THE CITY MANAGER C1 ry MAIVAG, BY: DELFINO R. CONSUNJI, P.E., DIRECTOR OF PUBLIC WORKS/CITY ENGINEER I DATE- SEPTEMBER 25, 2018 0- W I That the City Council authorize the Gity Manager to execute: 1. A Memorandum of Understanding (MOU) with the Los Angeles County Metropolitan Transportation Authority (Metro) providing $4,925,000 in Measure R Grant funding for the Lakewood Boulevard at Florence Avenue Improvement Project, Capital Improvement Project'No. 19-07; and 2. Any amendments to the MOU as necessary in a form approved by the City Attornei The City has determined that the proposed capacity enhancements and infrastructure improvements at this intersection is beneficial to the City due to the need to accommodate the projected 26% growth in traffic as well as preserve the infrastructure due to projected heavier traffic loads at this intersectioti. The estimated cost of completing the project, including environmental analysis, design and preparation of plans, specifications and estimate (PS&E), utility relocation, right-of-way acquisition and support; and construction, inspection and contract administration is $4,925,000, This project Will include the following specific elements: MOU with Metro for the Lakewood Blvd. at Florence Ave� Intersection Improvement Project, CIP No. 19-07 September 25, 2018 • Acquisition of right-of-way at the southeast corner of the intersection and widening along the east side of Lakewood Boulevard and north side of Florence Avenue to provide double left -turn lanes in the southbound and northbound directions along Lakewood Boulevard and an exclusive right -turn lane on Florence Avenue in the westbound direction; • Construction of decorative concrete crosswalks-, • Relocation of overhead utilities; * Construction of curb ramps, drive approaches and sidewalks; • Modification of existing traffic signal-, • Incidental striping and signing modifications. The Lakewood Boulevard and Florence Avenue intersection is shown on the attached Project Location Map (see Attachment A). V The City is now ready to initiate the environmental and design phases of the project. The execution of the attached MOU with Metro (see attachment B) will provide the $4,925,000 in Measure R funds from Metro to the City for this project. The funds will be made available to the City on a reimbursement basis. Upon execution of the attached MOU, the City will initiate the design and environmental phase of the project by circulating a Request for Proposals (RFP) to procure the necessary professional services. Construction is expected to begin in December 2020 and will be completed in June 2021. CITY COUNCIL PRIORITIES Efficiency & Adaptability Quality of Life, Infrastructure & Parks OrM011104 ATTACHMENTS Attachment A — Project Location Map Attachment B 0 FTIP #: LAOG1515 Project: MR315.27 Subregion ID: 1-605/SR-91/I-405 Corridors "Hot Spots" FA# 920000000MR315.27 M.-Im.mmy-mm, ZJULe=. I IM This Funding Agreement ("FA") is made and entered into effective as of June 14, 2018 ("Effective Date"), and is by and between the Los Angeles County Metropolitan Transportation Authority ("LACMTA") and City of Downey ("GRANTEE") for Lakewood Blvd. at Florence Ave. Intersection Improvements Project, LACMTA Project ID# MR315.27 and FTIP #LAOG1515 (the "Project"). This Project is eligible for fimding under Line 37 of the Measure R Expenditure Plan. N WHEREAS, LACMTA adopted Ordinance #08-01, the Traffic Relief and Rail Expansion Ordinance, on July 24, 2008 (the "Ordinance"), which Ordinance was approved by the voters of Los Angeles County on November 4, 2008 as "Measure R" and became effective on January 2, 2009. WHEREAS, the funding set forth herein is intended to fund Project Approval & Environmental Document (PA&ED), Plans, Speccations and Estimates (PS&E), Right -of it Construction of the Project. WHEREAS, the LACMTA Board, at its April 26, 2018 meeting, programmed $4,925,000, Measure R it to GRANTEE for PA&ED, PS&E,and Construction subject to th terms and conditions contained in this FA; and WHEREAS, the Funds are currently programmed as follows: $4,925,000 in Measure R Funds in Fiscal Year (FY) 2017-2018. The total designated for PAED, PS&E, ROW, and Construction of the Project is $4,925,000. The terms and conditions of this FA consist of the following and each is *incorporated by reference herein as if ftilly set forth herein: Specific Terms of the FA 2. Part II — General Terms of the FA 3. AttdchfuentA — Project Funding 4. Aftachmenf t — Measure R Expenditure Plan Guidelines 5. Aftathme�iit 1341 — Expenditure Plan- Cost & Cash Flow Budget 6. AftkhMOIAL — Scope of Work 7. Ajtga�� — Project Reporting and Expenditure Guidelines 8. AttadIM91ff 10-1 — Monthly Progress Report 9. A 10. ent ProVram,1jFTIP*_h_=- 11. Aftadjmgntj — Bond Requirements 12. Any other attachments or documents referenced in the above docurnents In the event of a conflict, the Special Grant Conditions, if any, shall prevail over the Specific Terms of the FA and any attachments and the Specific Terms of the FA shall prevail over the General Terms of the FA. Rev: 12.06.16 1 Measure R Funding Agreement — Highways - General LAOG1515 -•• ID: 1-605/SR-91/1-405 Corridors "Hot •• IlillllI ■ WIN IWA I N WITN E S S WH E RE 0 F, the parties have caused this FA to be executed by their duly Ruthorized representatives as of the dates indicated below: By: Phillip A. Washington Chief Executive Officer MARY C. WICKHAM County Counsel By: Date: pu By: Gilbert A. Livas City Manager APPROVED AS TO FORM: By: A W V Yvette M. Abich Garcia City Attorney By: Maria Alicia Duarte, CMC City Clerk Date: Date: Date: Rev: 12.06.16 2 Measure R Funding Agreement — Highways - General LA1G1515 Project#: MR315.27 Subregion ID: 1-605/SR-91/I-405 Corridors "Hot Spots" FA# 920000000MR315.27 PART I • CA 1. Title of the Project (the "Project"): Lakewood Blvd. at Florence Ave. Intersection Improvement — Project Approval & Environmental Document (PA&ED), Plans, Specifications and Estimates (PS&E), Right -of -Way, and Construction. LACMTA Project ID# MR315.27, FTIP #LAOG1515. WINEFOWW" "I 2.1 Programmed Funds for this Project consist of the following: Measure R Fund& 2.2 To the extent the Measure R Funds are available- LACMTA shall make to GRANTEE a grant of the Measure R funds in the amount of $4,925,000 (the "Fund") for theProject. LACMTA Board of Directors' action of April 26, 2018 granted the Measure R Funds for the Project. The Funds are programmed over one year for Fiscal Year FY • only. d 3 This • shall be paid • a reimbursement basis. GRANTEE must provide the appropriate supporting documentation with the Monthly Progress Report and/or the Quarterly Expenditure Report. •GRANTEE Funding Commitment, if applicable, must be spent in the appropriate proportion to the Funds with each quarter's expenditures. LACMTA will withhold five percent (5%) • eligible expenditures per • as retention pending an audit • expenditures and completion • •r- • • 4. Attadiment A the "Project Funding,, documents all souxces of fimds programmed for the Project as approved by LACMTA and is attached as Attadnnerit� A. The Project Funding includes the total programmed funds for the Project, including the Funds programmed by LACMTA and, if any, the GRANTEE Funding Commitment of other sources of fiinding. The Project Funding also includes the fiscal years *in which all the funds for the Project are programmed. The Funds are subject to adjustment by subsequent LACMTA Board Action. 5. Attacbment B.1 is the Expenditure Plan- Cost & Cash Flow Budget (the "Expenditure Plan'). It is the entire proposed cash flow, the Budget and financial plan f�r the Pr-oject, which includes the total souxces of all funds programmed to the Project, including GRANTEE and other entity fiinding commitments, if any, for this Project as well as the fiscal year and quarters the Project fimds are anticipated to be expended. GRANTEE shall update the Expenditure Plan annually, no later than December 31, and such update shall be submitted to LACMTA's Managing Executive Officer of Construction & Engineering in writing. If the LACMTA's Managing Executive Officer of Construction & Engineering concurs with such updated Expenditure Plan in writing, &AdIM!gnj B-1 shall be replaced with the new A44djfjkrft B41 setting forth the latest approved Expenditure Plan. Payments under this FA shall be consistent with Attachment B-1 as revised from time to time. In no event can the final milestone date be changed or amended by written concurrence by the LACMTA Managing Executive Officer of Construction & Engineering. Any change to the final milestone date must be made by a fiffly executed amendment to this FA. Rev: 12.06.16 3 Measure R Funding Agreement — Highways - General FTIP #: LAOG1515 Project: MR315.27 Subregion ID: 1-605/SR-91/1-405 Corridors "Hot Spots" FA # 920000000MR315.27 Rev: 12.06.16 4 Measure R Funding Agreement — Highways - General LAOG1515 Subregion ID: 1-61 5 Corridors "Hot Spots" I =11 I WITIJUNIT111311111#11VA IM Officer or his/her designee and GRANTEE. Modifications that do not materially affect the terms of this FA, such as redistributing Funds among existing budget line items or non- material schedule changes must be formally requested by GRANTEE and approved by LACMTA in writing. Non -material changes are those changes which do not affect the grant amount or its schedule, Project Funding, Financial Plan, or the Scope of Work, including the Work schedule. Los Angeles County Metropolitan Transportation Authority One Gateway Plaza Los Angeles, CA 90012 Attention: Carlos Montez LACMTA PROJECT MANAGER MAIL STOP 99-22-9 PHONE (213) 922-7099 E-MAIL MontezC@metro.net R -M City of Downey 11111 Brookshire 1ve Downey, CA 90241 Attn: Ed Norris W', d I lil-wri py-(4inti 14. LACMTA anticipates it may need to avail itself of lower cost bonds or other debt, the interest on which is tax exempt for federal tax purposes and/or Build America Bonds as defined in the American Reinvestment and Recovery Act of 2009 or similar types of bonds (collectively, the 'Bonds") to provide at least a portion of its funding commitments under this Agreement to GRANTEE. GRANTEE shall ensure that the expenditure of the Funds disbursed to GRANTEE does not jeopardize the tax -exemption of the interest, the Federal subsidy payment or the tax credit, as applicable, as specified in the Bond Requirements attached as Attadiment F to this Agreement. GRANTEE agrees to provide LACMTA with progress reports, expenditure documentation, and any other documentation as reasonably requested by LACMTA and necessary for LACMTA to ftdfill its responsibilities as the grantee or administrator or bond issuer of the Funds. With regard to LACMTA debt financing to provide any portion of the Funds, GRANTEE shall take all reasonable actions as may be requested of it by LACMTA's Project Manager for the Project, to assist LACMTA in demonstrating and maintaining over time, compliance with the relevant sections of the Federal Tax Code to maintain such bonds tax status. Rev: 12.06.16 5 Measure R Funding Agreement — Highways - General FTIP #: LAOG1515 Project: MR315.27 Subregion ID: 1-605/SR-91/I-405 Corridors "Hot Spots" FA # 920000000MR315.27 PARTII GEM.E.-R-41 TE -121 4111111 terminate upon the occurrence of all of the following, unless terminated earlier as provided herein: (i) the agreed upon Scope of Work has been completed; (ii) all LACMTA audit and reporting requirements have been satisfied; and (iii) the final disbursement of the Funds has been made to GRANTEE. All eligible Project expenses as defined in the Reporting and Expenditure Guidelines "d�� P), incurred after the FA Effective Date shall be reimbursed in accordance with the terms and conditions of this FA unless otherwise agreed to by the parties in writing. Should LACMTA determine there are insufficient Measure R Funds available for •the Project, LACMTA may suspend or terminate this FA by giving written notice to GRANTEE at least thirty (30) days in advance of the effective date of such suspension or termination. If a Proj- f- r-• pended or terminated pursuant to this section, LACMTA will not reimburse GRANTEE a y costs incurred after that susgension or te-gui-taiov date. eyce-wt t:�*se_r*-qs_1 3. INVO CE BY GRANTEE Unless otherwise stated 'in this FA, the Monthly Progress Report or the Quarterly Expenditure Report, with supporting documentation of expenses, Project progress and other documents as required, which has been pre -approved by LACMTA, all as described in Part II, Section 6.1 of this FA, shall satisfy LACMTA invoicing requirements. Grantee shall only submit for payment the LACMTA pre -approved Monthly Progress Report or Quarterly Expenditure Report Packets to the LACMTA Project Manager at the email address shown in Part I and to LACMTA Account Payable Department as shown below. mail to: Los Angeles County Metropolitan Transportation Authority Accounts Payable P. 0. Box 512296 Los Angeles, CA 90051-0296 All Voice ftiatOklalJnk�t Ontai t1k &RdWink ihh� h* Re- LACMTA Project ID# MR315.71 and FA# FA920000000MR315.71 LACMTA Project Manager, Carlos Montez; Mail Stop 99-22-9 Rev: 12.06.16 6 Measure R Funding Agreement - Highways - General LAOG1515 Project#: MR315.27 -• •; 05/SR 91/1-405 Corridors "Hot Spots" FA# 920000000MR315.27 4. USE OF FUNDS 4.1 GRANTEE shall utilize the Funds to complete the Project as described in the Scope of Work and in accordance with the Reporting and Expenditure Guidelines and th- f • pecifications for use for the transportation purposes d•escribed in the ordinance. 4.2 Attachment C shall constitute the agreed upon Scope of Work between LACMTA and GRANTEE for the Project. The Funds, as granted under this FA, can only be used towards the completion of the Scope of Work detailed in Attachment C. 4.3 GRANTEE shall not use the Funds to substitute for any other funds or projects not specified in this FA. Further, GRANTEE shall not use the Funds for any expenses or activities above and beyond the approved Scope of Work t6chmerit C without an amendment to the FA approved and signed by the LACMTA Chief Executive Officer or his Designee. To the extent LACMTA provides GRANTEE with bond or commercial paper proceeds, such Funds may not be used to reimburse for any costs that jeopardize the tax exempt nature of such financings as reasonably determined by LACMTA and its bond counsel. 4.4 GRANTEE must use the Funds in the most cost-effective manner. if GRANTEE intends to use a consultant or contractor to implement all or part of the Project, LACMTA requires that such activities be procured in accordance with GRANTEE's contracting procedures and consistent with State law as appropriate. GRANTEE will also use the Funds in the most cost-effective manner when the Funds are used to pay "in-house" staff time. GRANTEE staff or consultant with project oversight roles can not award work to companies in which they have a financial or personal interest. This effective use of funds provision will be verified by LACMTA through on-going Project monitoring and through any LACMTA interim and final audits. line" KI •doula!"JoIll 11r.109;(011t, 0 04JAILOYSIUS) INN Ik"Iffle Funds will be released on a reimbursement basis in accordance with 'invoices submitted in support of the Monthly Progress and Quarterly Expenditure reports. LACMTA will make 0 disbursements electronically unless an exception is requested in writing. Reimbursements vi Automated Clearing House (ACH) will be made at no cost to GRANTEE. GRANTEE must complete the ACH form and submit such form to LACMTA before grant payments can be made. ACH Request Forms can be found at www.metro.net/projects—studies`/calLprojects/reLdocs.htm. GRANTEE must provide detaile supporting documentation with its Monthly Progress and Quarterly Expenditure Reports. GRANTEE Funding Commitment, if any, must be spent in direct proportion to the Funds each quarter's payment. Rev: 12.06.16 7 Measure R Funding Agreement — Highways - General FTIP #: LAOG1515 Project #: MR315.27 Subregion ID: I-605/SR-91/I-405 Corridors "Hot Spots" FA # 920000000MR315.27 6. REPORTING AND AUDIT REQUIRE I ME S /PAYMENT ADIUSTMENTS NMI, the Project. If no activity has occurred during a particular quarter, GRANTEE Will still be required to submit the Monthly Progress and Quartqfly��xpetiditute 9"its indicating no dollars were expended that quarter. If a request exteo&$�0000 in j single month, then GRANTEE can submit such an invoice once per month with supporting documentatio-w.. 6.2 LACMTA, and/or its designee, shall have the right to •'Induct audits of the Project as deemed appropriate, such as financial and compliance audits, interim audits, pre- award audits, performance audits and final audits. LACMTA will commence a final audit within six months of receipt of acceptable final invoice, provided the Project is ready for final audit (meaning all costs and charges have been paid by GRANTEE and invoiced to LACMTA, and such costs, charges and invoices are properly documented and summarized in the accounting records to enable an audit without further explanation or summarization including actual indirect rates for the period covered by the FA period under review). GRANTEE agrees to establish and maintain proper accounting procedures and cash management records and documents in accordance with Generally Accepted Accounting Principles (GAAP). GRANTEE shall reimburse LACMTA for any expenditure not in compliance with the Scope of Work and/or not in compliance with other terms and conditions of this FA. The allowability of costs for GRANTEE's own expenditures submitted to LACMTA for this Project shall be in compliance with Office of Management and Budget (OMB) Circular A-87. The allowability of costs for GRANTEE's contractors, consultants and suppliers expenditures submitted to LACMTA through GRANTEE's Monthly Progress Reports and Quarterly Expenditures shall be in compliance with OMB Circular A-87 or Federal Acquisition Regulation (FAR) Subpart 31 and 2 CFR Subtitle A, Chapter II, Part 225 (whichever is applicable). Findings of the LACMTA audit are final. When LACMTA audit findings require GRANTEE to return monies to LACMTA, GRANTEE agrees to return the monies within thirty (30) days after the final audit is sent to GRANTEE. Rev: 12.06.16 8 Measure R Funding Agreement — Highways - General FTIP #: LAOG1515 Project #: MR315.27 Subregion ID: I-605/SR-91/1-405 Corridors "Hot Spots" FA # 920000000 R315.27 6.7 When business ■ associated with the Project requires use • a vehicle, the mileage incurred shall be reimbursed at the mileage rates set by the Internal Revenue Service, as in icated in the United States General Services Administration Federal Travel Regulation, Privately Owned Vehicle Reimbursement Rates, 6.8 GRANTEE shall be responsible for ensuring all contractors/ subcontractors for the Project comply with the terms of the Ordinance. GRANTEE shall cooperate with LACMTA Audit Department such that LACMTA can meet its obligations under the Ordinance. 6.9 GRANTEE shall certify each invoice by reviewing all subcontractor costs and maintaining internal control to ensure that all expenditures are allocable, allowable and reasonable and in accordance with OMB A-87 or FAR subpart 31 and 2 CFR Subtitle A, Chapter 11, part 225, (whichever is applicable) and the terms and conditions of this F.A. Rev: 12.06.16 9 Measure R Funding Agreement — Highways - General FTIP #: LAOG1515 �,ubregion ID: 1-605/SR-91/1-405 Corridors "Hot Spots" Project#: MR315.27 &�,V.Wyal I&I 6.10 GRANTEE shall also certify final costs of the Project to ensure all costs are in compliance with OMB A-87 or FAR subpart 31 and 2 CFR Subtitle A, Chapter II, part 225, (whichever is applicable) and the terms and conditions of this FA. 6.11 In addition to LACMTA's other remedies as provided in this FA, LACMTA may withhold the Funds if the LACMTA audit has determined that GRANTEE failed to comply with the Scope of Work (such as misusing Funds or failure to return Funds owed to LACMTA in accordance with LACMTA audit findings) and /or is severely out of compliance with other terms and conditions as defined by this FA, including the access to records provisions of Part II, Section 6. This is a one time only grant of the Measure R Funds subject to the terms and conditions agreed to herein. This grant does not imply nor obligate any future funding commitment on `'i, of LACMTA. 8.1 The obligation for LACMTA to grant the Funds for the Project is subject to sufficient Funds being made available for the Project by the LACMTA Board of DirOdciisIf such Funds are not m1a& available�ws anticipated from Meagure R Program .4-11116 8.3 GRANTEE shall be responsible for any and all cost overruns for the Project pursuant to Section 8.2. 8.4 GRANTEE shall be eligible for the Funds up to the grant amount •- -/ Part I section 2 of this FA ect toth-Qioarf&s�g Any Funds expended by GRANTEE prior to the Effective Date of this FA shall not be reimbursed nor shall they be credited toward the GRANTEE Funding Commitment requirement, without the prior written consent of LACMTA. GRANTEE Funding Commitment dollars expended prior to the year the Funds are awarded shall be spent at GRANTEE's own risk. Rev: 12.06.16 10 Measure R Funding Agreement — Highways - General U -TIP #: LAOG1515 Subregion ID: I-61 45 Corridors "Hot Spots" 8.5 If GRANTEE receives outside funding for the Project in addition to the Funds identified in the Project Funding and the Expenditure Plan at the time this grant was awarded, this FA shall be amended to reflect such additional funding. If, at the time of final invoice or voucher, funding for the Project (*including the Funds, GRANTEE Funding Commitment, and any additional funding) exceeds the actual Project costs, then the cost savings shall be applied in the same proportion as the sources of fimds from each party to this FA as specified in the Project Funding and both the Funds and GRANTEE Funding Commitment required for the Project shall be reduced accordingly. LACMTA shall have the jd& to use any cost savin s associated with the Funds at its sole discnktLv+-*go"1w-uA limitation, programming the unused Funds to another project or to another grantee. If, at the time of final voucher, it is determined that GRANTEE has received Funds in excess of what GRANTEE should have received for the Project, GRANTEE shall return such overage to LACMTA within 30 days from final voucher. 9.1 GRANTEE must demonstrate timely use of the Funds by-. (i) Executing this FA within ninety (90) days of receiving forinal transmittal of the FA from LACMTA, or by December 31 of the first Fiscal Year in which the Funds are programmed, whichev- r. - date is later; and (ii) Beginning Project Design, Preliminary Engineering -(PE) within six (6) months from completion of environmental clearance, if appropriate. Expending Project Development or Right -of -Way costs (including by deposit into a condemnation action) by the end of the second (2nd )fiscal year following the year the Funds were first programmed; and (IV) Executing Contracts for Construction or Capital purchase within twelve (12) months from the date of completion of design; and (v) Delivering Work in accordance with schedule; changes to the schedule will require an Amendment to Attachment C to reflect updated milestone dates. Meeting the Project milestone due dates as agreed upon by the LACMTA and GRANTEE in iment C (Scope of Work) of this FA; and (vi) Submitting the Monthly Progress and Quarterly Expenditure Reports as described in Part 11, Section 6.1 of this FA; and (vii) Expending the Funds granted under this FA for allowable costs within five years or 60 months from July 1 of the Fiscal Year in which the Funds are programmed, unless otherwise stated *in this F.A. All Funds programmed for FY 2017-18 are subject to lapse by June 30, 2022. 9.2 In the event that the timely use of the Funds is not demonstrated as described in Part 11, Section 9.1 of this FA, the Project will be reevaluated by LACMTA as part Rev: 12.06.16 11 Measure R Funding Agreement — Highways - General LA1G1515 Subregion ID: I-61 5 Corridors ,Hot Spots" I W-11UNIF111111TITITITIEVA I Mt of its annual Recertification/Debbligation process and the Funds may be reprogrammed to another project by the LACMTA Board of Directors in accordance with the Ordinance. In the event that all the Funds are reprogrammed, this FA shall automatically terminate. A Default under this FA is defined as any one or more of the following-. (i) GRANTEE fails to comply with the terms and conditions contained herein; or (ii) GRANTEE fails to perform satisfactorily or makes a material change, as determined by LACMTA at its sole discretion, to the Expenditure Plan, the Scope of Work, or the Project Funding without LACMTA's prior written consent or approval as provided herein. 11.1 in the event of a Defaultby GRANTEE, LACMTA shall provide written notice of such Default to GRANTEE with a 30 -day period to cuxe the Default. In the event GRANTEE fails to cure the Default, or commit to cure the Default and commence th- i a. 0 -day period to the satisfaction of LACMTA, LACMTA shall have the following remedies: (i) LACMTA may terminate this FA; (ii) LACMTA may make no further disbuxsements of Funds to GRANTEE; and/or (iii) LACMTA may recover from GRANTEE any Funds disbuxsed to GRANTEE as allowed by law or in equity. 11.2 Effective upon receipt of written notice of termination from LACMT1 GRANTEE shall not undertake any new work or obligation with respect to this FA unless s directed by LACMTA in writing. Any Funds expended after termination shall be the sole responsibility of GRANTEE. 11.3 The remedies described herein are non-exclusive. LACMTA shall have the right to enforce any and all rights and remedies herein or which may be now or hereafter available at law or in equity. Rev: 12.06.16 12 Measure R Funding Agreement — Highways -General FTIP #: LAOG1515 Project #: MR315.27 Subregion IDM-605/SR-91/I-405 Corridors "Hot Spots" FA # 920000000MR315.27 12.1 GRANTEE shall ensure that all Communication Materials contain recognition of LACMTA's contribution to the Project as more particularly set forth in "Funding Agreement Communications Materials Guidelines" available on line or from the LACMTA Project Manager. Please check with the LACMTA Project Manager for the web address. The Funding Agreement Communications Materials Guidelines may be changed from time to time during the course of this Agreement. GRANTEE shall be responsible for complying with the latest Funding Agreement Communications Materials Guidelines during the term of this Agreement, unless otherwise specifically authorized in writing by the LACMTA Chief Communications Officer. 12.2 For purposes of this Agreement, "Communications Materials" include, but are not limited to, press events, public and external newsletters, printed materials, advertising, websites radio and public service announcements, electronic media, and construction site signage. A more detailed definition of "Communications Materials" is Found in the Funding Agreement Communications Materials Guidelines. 12.3 The Metro logo is a trademarked item that shall be reproduced and displayed inaccord4pte with specific These guidelines ahA logo files including s6�1510 vector files will be av� through the LACMTA Project Manager. 12.4 GRANTEE shall ensure that any subcontractor, including, but not limited to, public relations, public affairs, and/or marketing firms hired to produce Project Communications Materials for public and external purposes will comply with the requirements contained in this Section. 12.5 The LACMTA Project Manager shall be responsible fir monitoring GRANTEE compliance with the terms and coriAl�s of this �9&66jj� GRANTEES fiflure to comply with the terms of this Section shall be deemed a default hereunder and LACMTA sh] have all rights and remedies set forth herein. •-- """ .. 13.1 This FA, along with its Attachments, constitutes the entire understanding between the parties, with respect to the subject matter herein. The FA shall not 'be amended nor ant, Drovis "- ,, - -h he if Nva . I I I 11 . . � . mod 1, i4lip I �� Jill I I I tole) 19101 ir! k C-14 lo I I Nice) ogra I op!] ITMIRT, FIR MI 13.2 GRANTEE is obligated to continue using the Project dedicated to the public transportation purposes for which the Project was initially approved. The Project righ ofway, the Project facilities constructed or reconstructed on the Project site, and/or Project property purchased, excluding construction easements and excess property (whose proportionate proceeds shall be distributed in an equal proportion of the grant to GRANTEE Funding Commitment ratio), shall remain dedicated to public transportation use in the sami Rev: 12.06.16 13 Measure R Funding Agreement — Highways - General 1-7Tip #: LAoG1515 -• ID: 1-605/SR-91/1-405 Corridors "Hot Spots" I W-A-MY411111101111111035 1 ■' MA proportion and •r and to the same extent as described in this FA. Equipment acquired as part • the Project, including office equipment, vehicles, shall be dedicated to that use • th- • • onomic life cycle, • any extensions • that life cycle achieved by reconstruction, rehabilitation, or enhancements. I 13.3 In the event that there is any legal court (e.g., Superior Court of the State of •r • • Los Angeles, • the U.S. District Court for the Central District • California) proceeding between the parties to enforce or interpret this FA, to protect or establish any rights or remedies hereunder, the prevailing party shall be entitled to its costs and expenses, including reasonable attorney's fees. 13.4 Neither LACMTA nor any officer or employee thereof shall be responsible for any damage or liability occurring by reason of anything done or committed to be done by GRANTEE under or in connection with any work performed by and or service provided by GRANTEE, its officers, agents, employees, contractors and subcontractors under this FA. GRANTEE shall fiffly indemnify, defend and hold LACMTA and its subsidiaries, and its officers, agents and employees harmless from and against any liability and expenses, including without limitation, defense costs, any costs or liability on account of bodily injury, death or personal injury of any person or for damage to or loss of risk of property, any environmental obligation, any legal fees and any claims for damages of any nature whatsoever arising out of the Project, including without limitation: (i) use of the Funds by GRANTEE, or its officers, agents, employees, contractors or subcontractors; (ii) breach of GRANTEE's obligations under this FA; or (iii) any act or omission of GRANTEE, or its officers, agents, employees, contractors • subcontractors in the performance • the • or the provision • the services, in connection with the Project including, without limitation, the Scope of Work, described in this FA. 13.5 Neither party hereto shall be considered in default in the performance of its obligation hereunder to the extent that the performance of any such obligation is prevented or delayed by unforeseen causes including acts of God, acts of a public enemy, and government acts beyond the control and without fault or negligence of the affected party. Each party hereto shall give notice promptly to the other of the nature and extent of any such circumstances claimed to delay, hinder, or prevent performance of any obligations under this FA. 13.6 GRANTEE shall comply with and insure that work performed under this FA is done in compliance with Generally Accepted Accounting Principles (GAAP), all applicable provisions • -•' state, and • laws, statutes, ordinances, rules, -• and procedural requirements including Federal Acquisition Regulations (FAR), and the applicable requirements and regulations of LACMTA. GRANTEE acknowledges responsibility for obtaining copies of and complying with the terms of the most recent federal, state, or local raws and regulations, and LACMTA requirements including any amendments thereto. 13.7 GRANTEE agrees that the applicable requirements of this FA shall be included in every contract entered into by GRANTEE or its contractors relating to work performed under this FA and LACMTA shall have the right to review and audit such contracts. Rev: 12.06.16 14 Measure R Funding Agreement - Highways - General FTIP #- LAOG1515 Subregion ID: I-605/SR-91/1-405 Corridors "Hot Spots" IWA-INIA1111111TITITINVAIMI 13.8 GRANTEE shall not assi2n this FA, or any part thereof, without prior approval of the LACMTA Chief Executive Officer or his designee, and any assignment witho-Ul said consent shall be void and unenforceable. 13.9 This FA shall be governed by CaUorma law. If any provision of this FA is held by a court of competent jurisdiction to be m"valid, void, or unenforceable, the remaining 13.11 Implementation of any ITS project shall be consistent with the Regional ITS Architecture. ITS projects must comply with the LACMTA Countywide ITS Policy and Proc' edures adopted by the LACMTA Board of Directors including the submittal of a completed, signed self -certification form. For the ITS policy and form, see 13.12 If any parking facilities are designed and/or constructed using the Funds, GRANTEE shall coordinate with LACMTA parking program staff (see www.metro.net for staff listing) in the planning, design and management of the facility and shall ensure that its implementation is consistent with the LACMTA adopted parking policy. For the parking policy, see 13.13 GRANTEE will advise LACMTA prior to any key Project staffing changes. 13.14 Notice will be given to the parties at the address specified in Part I, unless otherwise notified in writing of change of address. 13.15 GRANTEE, in the performance of the work described in this FA, is not a contractor nor an agent or employee of LACMTA. GRANTEE attests to no organizational or personal conflicts of interest and agrees to notify LACMTA immediately in the event that a conflict, or the appearance thereof, arises. GRANTEE shall not represent itself as an agent or employee of LACMTA and shall have no powers to bind LACMTA in contract or otherwise. Rev: 12.06.16 15 Measure R Funding Agreement — Highways - General n FTIP #: LAOG1515 Project: MR315.27 FA # 920000000MR315.27 •.1 a I D I i 11 �Mfflq M01111111RUMM - .63T&MI Expenditure -Plan To be eligible to receive Measure R revenues, an agency sponsoring a capital project or program must by state law (AB 2321) submit an expenditure • that is acceptable to the Los Angeles • Metropolitan Transportation Authority (LACMTA). Pursuant to this law, LACMTA • release Measure R • to capital project • program sponsors until an expenditure plan containing the following elements is submitted, reviewed and deemed satisfactory by LACMTA. LACMTA staff will request that an expenditure plan be submitted before making a recommendation to the LACMTA Board to program funds to that project: • The estimated total cost for each project • program and/or each project or program activity; b Funds other than Measure R that the project or program sponsor anticipates will be expended on the projects and programs and/or each project or program activity; • The schedule during which the project sponsor anticipates funds will be available for each project and program and/or each project Or program activity; and, • The expected completion dates for each project and program and/or project or progra activity. I ful-ITTIT M��re R, the Long Range Tfauspomhon Plan, •....: • • County, an& the Los Angeles Program (also a statutorily mandated • as follows: Rev: 11-1-14 1 FA Measure R Hwys Sub Attachment B Measure R Expenditure Guidelines FTIP #: LAOG1515 Project#: MR315.27 FA# 920000000MR315.27 o An annual schedule, in current dollars, of anticipated costs by the cost estimate categories described above; and; o The expected completion by month and year of project or program completion. Below is an excerpt of AB 2321 (2008, Feuer), the state legislation that requires the expenditure plan. What AB 2321 (2008. Feuer) Saw About the Ewenditure Plan: Section b (3) B Rev: 11-1-14 2 FA Measure R Hwys Sub Attachment B Measure R Expenditure Guidelines Measure R Program - Funding Agreement Projects - FA.920000000MR315.27 Project Title: Lakewood Boulevard at Florence Avenue Intersection Improvement Project Project#:MR315.27 PROGRAMMED SOURCES OF FUNDS FTIP #: LAOG1515 Project#: MR315.27 Subregion ID: I-605/SR-91/I-405 Corridors "Hot Spots Funding Agreement#: FA.920000000MR315.27 b"Mol • •• PROJECT TITLE: Lakewood Boulevard at Florence Avenue Intersection Improvement Project PROJECT LOCATION The project is located on Lakewood Boulevard at its intersection with Florence Avenue. PROJECT LIMITS: The project is located on Lakewood Boulevard at its intersection with Florence Avenue including the approach and departure legs of the intersection up to a distance of 300 feet. NEXUS TO HIGHWAY OPERATION, DEFINITION/PROJECT PURPOSE: The purpose of this project into improve traffic circulation and mobility within the 1-605 Freeway corridor by minimizing congestion along the Lakewood Boulevard and Florence Avenue corridors. PROJECT AC Lakewood Boulevard serves as the main north -south thoroughfare in the city, providing access to freeways and transit such as the 1-105 and 1-5 Freeways and Metro Green Line as well as other major traffic generators (e.g., Stonewood_ Regional Mall, Kaiser Permanente, Coca-Cola Bottling Facility, and the Los Angeles County Office of Education). Florence Avenue functions as one of the major east -west arterial corridors within the city, providing access to the 1-710, 1- 605, and 1-5 Freeways as well as other major traffic generators (i.e., downtown Downey, the Promenade, Coca Cola Bottling Facility, LA County office, etc.).Therefore, the proposed project area, the Lakewood Boulevard at Florence Avenue intersection, currently accommodates an average daily traffic (ADT) volume of approximately 72,000 vehicles per day (VPD) with existing levels -of -service (LOS) of "E" and "F" during AM and PM peak hours, respectively. The traffic volume at this intersection is expected to increase by 26% to approximately 91,000 VPD by year 2035. As such, it is expected that the LOS during AM and PM peak hours will remain at levels "E" and "F" without improvements to the Intersection. COMPONENT • PA/ED $50,00 $225100 ;1 Support,•1 0 Capital $290,001 Utility Relocation $1,700j001 • •,Support$350,001 Construction Capitalb 1 111 TotalBudget $41925,00@ Rev: 11.1.14 1 FA Attachment C Scope of Work FTIP #: LAOG1515 Project#: MR315.27 Subregion ID: I-605/SR-91/I-405 Corridors "Hot Spots" Funding Agreement#: FA.920000000MR315.27 SCOPE: The Project features include, but are not limited to, the following: Double left -turn lanes in southbound and northbound directions along Lakewood Boulevard, • Exclusive westbound right -turn lane on Florence Avenue, • Right-of-way acquisition as necessary, • Relocation of overhead utilities, • Reconstruction of the intersection with a concreteintersection, • Modification of traffic signal, and • Incidental striping, signing and pavement markings. I Preliminary Design — "Concept Report as Final Work Product: Tasks to be performed include, but are not limited to, the following: A. Retain the services of a consultant to conduct an operational analysis of the intersection to determine the design parameters of the project (i.e., lane configuration, traffic signal phasing, turn pocket lengths, intersection geometries, etc). B. Complete a comprehensive field visit at the project site to determine the preliminary layout based on the parameters provided through the focused traffic analysis. A concept plan will then be prepared. C. Based on the concept plan, determine the right-of-way and utility impacts of the proposed intersection widening. D. Identify the right-of-way acquisition area and utility relocations necessary to complete the project and show on the concept plan. E. Conduct geotechnical investigations of the areas where street widening will occur (east side of Lakewood Boulevard on the north and south sides of Florence Avneue). F. Pothole in order to locate the depths of any substructures which may have an impact on the proposed design (i.e., placement of traffic signal poles). G. Prepare and submit an Engineer's construction cost estimate for all recommended improvements identified in the report. H. Environmental Analysis: Tasks to be performed include, but are not limited to, the following: A. Define a complete and detailed project description and delineate project study areas that will meet the needs of technical analyses and Initial Study/Mitigated' Negative Declaration (IS/MND). B. Conduct the required technical analysis for the project. Rev: 11.1.14 2 FA Attachment C Scope of Work FTIP #: LAOG1515 Project#: MR315.27 Subregion ID: I-605/SR-91/I-405 Corridors "Hot Spots" Funding Agreement#: FA.920000000MR315.27 C. Prepare, following completion of appropriate technical analysis, an Administrative Draft IS, consistent with CEQA Guidelines Appendix G, for review and approval by the City. D. Prepare the Draft IS and Draft MND for public circulation. E. Prepare responses to public review of Draft and prepare a Final MND and submit for review to the City. F. Prepare an MMRP. G. Coordinate with the City and prepare permit applications/notifications for the Project as applicable. H. Delineation of the Waters of the US will be conducted within the ESL if applicable. I. Prepare a final Tree report and map. I Final Design — Plans, Specifications and Estimates (PE): Tasks to be performed include, but are not limited to, the following: A. Design the ultimate build out and ultimate improvement strategy for the project, based on the City- reviewed "Summary Letter Report". B. Prepare civil roadway plans for the required improvements, consistent with City format. At a minimum, the plan set shall include Title Sheet, Site Plan, General Construction Notes, Horizontal Control, Typical Sections and Details, Plan and Profile, Drainage/BMP Structure(s) Details, Traffic Striping/Signage/Signal Plans, Street Lighting/Electrical, and Median/Landscaping and Irrigation Plans. C. Submittal of plan set shall be delivered at 60% and 90% complete and final (five (5) sets per submittal). When project is complete, the Consultant shall provide AutoCAD files for all plan sheets. D. Prepare construction specifications consistent with City "format (SSPWC Greenbook")APWA, current edition with updates. E. Submittal of specifications shall be delivered to the City at 90% completeand final stages. When project is complete, the Consultant shall provide a digital file of specification package in Microsoft Word format. F. Prepare an engineer's construction cost estimate based on the itemized quantity take -off from the contract documents. G. Submittal of the engineer's construction cost estimate shall be delivered to the City at 90% complete and final in a spreadsheet format. Ivo Project Management and Preparation of Periodic Updated Schedule, Deliverables and Meetings: Tasks to be performed include, but are not limited to, the following: A. Meet as needed with the City to accomplish Project tasks as outlined. Meetings expected between the Consultant and City, shall be and not be limited to: Project Kick-off Meeting, presentation of "Summary Letter Report", and progress meetings. B. Provide periodic schedule updates on deliverables and meetings as changes to original schedule occur or as needed based on the needs of the project. V. Rev: 11.1.14 3 FA Attachment C Scope of Work FTIP #: LAOG1515 Subregion ID: I-605/SR-91/I-405 Corridors "Hot Spots" Right -of -Way. Project#: MR315.27 Funding Agreement#: FA.920000000MR315.27 Right -of -Way Support Tasks to be performed include, but are not limited, to the following: • Prepare legal descriptions accurately describing the proposed right -of-way takes, • Conduct real estate appraisals to determine the fair market value and just compensation for the proposed takes • Prepare offer letters to the property owners, • If the owners of the properties are not responding in a reasonable manner pursue eminent domain in which a legal firm will be retained to represent the city's interest. Right -of -Way Capital Tasks to be performed include, but are not limited to the acquisition of right-of-way necessary for the completion of the project at the following locations: • Arco Station Chevron Station The existing steel SCE utility pole located on the east side of Lakewood Blvd. north of Florence Ave. will need to be relocated approx. 600 feet to the north and all overhead SCE transmission lines will need to be undergrounded between the existing and proposed steel utility pole locations. The City will coordinate the relocation of the steel pole and undergrounding of the overhead transmission lines with the SCE Transmission group early on in the process due to the unpredictable timeline for this project task. ConstructionCapital/Construction.::. • City of Downey expects to provide construction oversight, procure a consultant for construction engineering support and management services. The Construction Manager will be responsible for, at a minimum, the following tasks during the construction phase of the project: • Coordinate, review and approve all contractor submittals; • Respond to Contractor requests -for -information (RFIs), • Prepare and submit requests -for -quotations (RFQs) to Contractor, • Review and approve Contractor's schedules, • Review contractor's" certified payroll records for labor compliance and ensure compliance with the Dept. of Industrial Relations (DIR) requirements, • Review and approve contractor invoices for payment, • Review Contractor and approve contractor change orders, • Ensure all materials testing is scheduled and completed as required, • Meet with affected businesses during construction as necessary, and • Prepare daily inspection reports and weekly statements of working days Rev: 11.1.14 4 FA Attachment C Scope of Work FTIP #: OG1515 Project#: MR315.27 Subregion ID: 1-605/SR-91/1-405 Corridors "Hot Spots" Funding Agreement#: FA.920000000MR315.27 Selected consultant shall meet as needed with the City to accomplish Project tasks as outlined. Meetings expected between the consultant and the City, shall include, but are not limited to: pre -construction meeting, construction progress meetings and preparation of response to RlFls. MILESTONES: The implementation schedule for this project will be as follows. PARED START DATE COMPLETION DATE Proposal Solicitation Develop Solicitation Packa a 9-18 10-18 Solicitation ffe�nse�_ 10-18 10-18 Evaluations 10-18 11-18 Selection 11-18 11-18 Ci Council A royal 12-18 12-18 Contract Award 12-18 12-18 Fully Executed Contract 12-18 1 -18 rianning Planni Prepare Concept Report 1-19 3-19 Prepare Feasibiljjy_Stud ... 3-19 4-19 Conduct field exploration 4-19 4-19 PreliminaryDesi n Prepare Detailed Design Plans 5-19 6-19 Prepare Project Cost Estimate 6-19 6-19 Environmental Document Prepare Environmental Document Document Ty2e. IS/MND 3-19 5-19 Scqpinq 3-19 Technical Studies 3-19 --3-19 4-19 Draft Environmental Document 5-19 5-19 Final Environmental Document 6-19 6-19 Community Outreach 6-19 6-19 Secure Project A royal 6-19 6-19 PS&E 35%® PS&E 3-19 4-19 Geometric Drawings _-Utilities 8-19 8-19 3-19 4-19 3-19 4-19 Prelimina cost Estimate 9-19 9-19 Civil Design 8-19 9-19 60%® PS&E 9-19 11-19 Right -of -Way �Ei neerinl 9-19 10-19 Prepare Project Cost Estimate 11-19 11_19 90%® PS&E Civil Desi n Plans 12-19 3-20 Project specifications 2-20 3-20 Pro ect cost estimate 3-20 3-20 Submit Final PS&E 9-20 9-20 Rev: 11.1.14 5 FA Attachment C Scope of Work LAOG1515 Project#: MR315.27 Subregion ID: 1-605/SR-91/I-405 Com*dors "Hot Spots" Funding Agreement#: FA.920000000MR315.27 CONSTRUCTION MILESTONES: The implementation schedule for this project will be as follows. CONSTRUCTION START DATE COMPLETION DATE Bid Solicitation Deve!q Bid Pckac ie 6-20 7-20 - Advertise 7-20 8-20 Open Bids 8-20 8-20 Bid Evaluation 9-20 9-20 Cit Council A royal 10-20 10-20 Contract Award 10-20 10-20 Fully Executed Contract 11-20 11-20 Pre -construction meeting 11-20 11-20 Notice -to -Proceed 12-20 12-20 Construction Support Construction Man a ementflnspection 12-20 9-21 Best MaI�ement Practices (qMEs) 1-21 8-21 Excavation Clear/Grub" 1-21 1-21 Survey 1-21 1-21 Sample borings 1-21 1-21 Grading 2-21 2-21 Compaction 3-21 4-21 Drainage 2-21 3-21 Asphalt Asphalt concrete (AC) removal 2-21 4-21 A re ate base 5-21 5-21 As halt concrete 6-21 6-21 ARHM 7-21 7-21 Adjust manholes 8-21 8-21 Concrete Form Work 3-21 3-21 Rebar Placement 3-21 4-21 Pole Placement 3-21 4-21 Pour curb and utter 3-21 3-21 Rev: 11.1.14 6 FA Attachment C Scope of Work IAOG1515 Project#: MR315.27 Subregion ID: 1-605/SR-91/I-405 Corridors "Hot Spots" Funding Agreement#: FA.920000000MR315.27 Rev: 11.1.14 7 FA Attachment C Scope of Work FTIP #: LAOG1515 Project: MR315.27 Subregion ID: 1-605/SR-91/1-405 Corridors "Hot Spots" Funding Agreement: FA.920000000MR315.27 Regional vicinity map Rev: 11.1.14 8 FA Attachment C Scope of Work FTIP : LAOG1515 Project#: MR315.27 Subregion ID: I-605/SR-91/I-405 Corridors "Hot Spots" Funding Agreement #: FA.920000000MR315.27 0 FA Attachment C Scope of Work FTIP #: LAOG1515 Project#: MR315.27 Subregion ID: 1-605/SR-91/1-405 Corridors "Hot Spots" FA # 920000000MR315.27 FA ATTACHMENT D PROJECT REPORTING & EXPENDITURE GUIDELINES Quarterly Progress/ Expenditure Report (Ah4djbkb1PM is required for all projects. The GRANTEE shall be subject to and comply with all applicable requirements of the funding agency regarding project -reporting requirements. In addition, GRANTEE will submit a quarterly report to the LACMTA at ACCOUNTSPAYABLE4!M���or by mail to Los Angeles Metropolitan Transportation Authority, Accounts Payable, P. 0. it 512296, Los Angeles, California 90051-0296. Please note that letters or other forms of documentation may not be substituted for this form. The Quarterly Progress/ Expenditure Report covers all activities related to the project and lists all costs incurred. It is essential that GRANTEE provide complete and adequate response to all the questions. The expenses listed must be supported by appropriate documentation with a clear explanation of the purpose and relevance of each expense to the project. In cases where there are no activities to report, or problems causing delays, clear explanation, including actions to remedy the situation, must be provided. GRANTEES are required to track and report on the project schedule. LACMTA will monitor the timely use of funds and delivery of projects. Project •- -•• -• eeported each quarter. The Quarterly Progress/ Expenditure Report is due to the LACMTA as soon as possibl after the close of each quarter, but no later than the following dates for each fiscal yeal Quarter July —September October - December January - March April - June November 30 February 28 May 31 August 31 Upon completion of the Project a final report that includes project's final evaluation must be submitted. Rev: 12.23.14 1 FA Local Attachment C Admin Guidelines LAOG1515 • MR315.2 Subregion ID: 1-605/SR-91/1-405 C6rridors "Hot /• FA# 920000000MR315.21 1W.4U3QI010 11 D * Any expense charged to the grant must be clearly and directly related to the project. 9 11 URR a 10 2 11 UiMbl%-O I Wel 1113UN-1101 Allowable Cost: To be allowable, costs must be reasonable, recognized as ordinary and necessary, consistent with established practices of the organization, and consistent with industry standard of pay for work classification. ExcessiveCost-. Any expense deemed "excessive" by LACMTA staff would be adjusted to reflect a "reasonable and customary" level. For detail definition of "reasonable cost", please refer to the Federal Register OMB Circulars A -87 Cost Pdncipals for Sta te and Local Governments,- andA-122 Cost Ptincipals for N6� Organizations. ineligible Expenditures: Any activity or expense charged above and beyond the approved Scope of Work is considered ineligible. Rev: 12.23.14 2 FA Local Attachment C Admin Guidelines LACMTA ATTACHMENT D-1 PROJECT TITLE: U1111W.M 11111,11.4 111 111liza GRANTEES ARE REQUESTED TO EMAIL THIS REPORT TO METRO PROJECT MANAGER after the close of each month. Please note that letters or other forms of documentation may not be substituted for this form, Refer to the Reporting and Expenditure Guidelines (Attachment D) for further information, DN 1: GENERALINFORMATIC PROJECT TITLE: FA #: MONTHLY REPORT SUBMITTEb FOR: Month:_ Year: —4 Raw 11 1.14 19 FA Measure R Hwya Gen Attachment D-1 Monthly Progress Report 2. PROJECT COMPLETION Based on the comparison of the original and actual project milestone schedules above, project is (select only one) ❑Ahead of original FA schedule =on schedule per original FA schedule ❑Between 12-24 months behind original schedule Fleas than 12 months behind original schedule F—IMQro than 24 months behind original schedule Rev 11 1,14 2. FA Measure R Monthly Hw s Gen Attachment D-1 y y Pro gress Report LACMTA ATTACHMENT D-1 PROJECT I W06 Delia Wsud s, Current Percent LACMTAApproved Approved Expenditures > Completed By F4 Mnmstr�nes - Project Budet Chan esBud et to Date Cost Variance Dollar_Aanount... PLANNING PA&ED PS&E ROW Support ROW CONSTRUCTION Support ,CONSTRUCTION 7, RISKMANAGIEWNTPLAN I PROR1 lI C3I6 _ This Risk Register shall include a listing of potential project risks. Identify project risks and provide a description of individual risk events or unplanned events that may occur and the estimated outcome or impact to project scope, cost and schedule; provide a qualitative assessment of risk potential; identify risk mitigation strategies; and provide recommendations or actions for responding to project risk. This section requires periodic updates as the project progresses and as risk events occur.. Risk Potential Risk Cat2gory Risk Event JLovv)McgjUMtt12n Risk Miti ation Strafe jes Environmental Plannin , Design ROW Construction Bid/Award Third Pa l I certify that I am the responsible Project Manager orfiscal officer and representative of and that to the best of my knowledge and belief the information stated in this report is true and correct. Signature Date Rev 11 1;14 3 FA Measure R Hwys Gen Attachment D-1 Monthly Progress Report GRANTEES ARE REQUESTED TO EMAIL THIS REPORT TO or submit by mail to: Los Angeles County Metropolitan Transportation Authority Accounts Payable P. O. Box 512296 Los Angeles, California 90051-0296 after the close of each quarter, but no later than November 30, February 28, May 31 and Au u st 31. Please note that letters or other forms of documentation may not be substituted for this form. Refer to the Reporting and Expenditure Guidelines (Attachment C) for further information. Please itemize grant -related charges for this Quarter on Page 5 of this report and include totals in this Section. LACMTA Measurerant This uarter xenityr 1tention Amount r Net Invoice Amount (L ss (Retention) Funds Expended to Date (Include 'thisQuarter) 'Total Project Budget '% of Project Budget Expended to (Date 1Balance Remaining Rev: 12.23.14 1 FA Measure R Hwys Gen Attachment D-2 Quarterly Report SECTION 2: GENERAL INFORMATION PROJECT TITLEt Lakewood Blvd at Florence Ave Intersection FA : 920000000MR315.27 Fiscal Year: ®2014-2015 02015-2016 02016-2017 02017-2018 ❑2018-2019 ❑2019-2020 Quarter: ®Q1: Jul - Sep ❑Q2: Oct - Dec ®Q3: Jan - Mar Q4: Apr - Jun DATE SUBMITTED: LAC TA MODAL CATEGORY: RSTI Pedestrian ❑Signal Synchronization TDM Bicycle ❑Goods Movement Transit Name: Carlos Montez LAC TA Project Manager Phone Number: 213 418-3241 E—mail: ii1C�r �ta[t°,rk Contact Name: Ed Nor to Job Title: Deut Director Department: Public trlcs Project Sponsor Contact Project Manager Cit / A enc : Downey Mailin2 Address: 11111 Brookshire Ave,-Down2y,; CA 90241 Phone Number. 562 904-7246 E-mail: Rev: 12.23 14 2 FA Measure R Hwys Gen Attachment D-2 Quarterly Report List all deliverables and milestones as stated in the FA, with start and end dates. Calculate the total project duration. DO NOT CHANGE THE ORIGINAL FA MILESTONE START AND END DATES SHOWN IN THE 2 ND AND 3 RD COLUMNS ELO . Grantees must make every effort to accurately portray milestone dates in the original FA Scope of Work, since this will provide the basis for calculating any project delay. If milestone start andlor end dates change from those stated in the Original FA Scope of Work, indicate the new dates under Actual Schedule below and re- calculate the project duration. However, this does not change the original milestones in your FA. PER YOUR FA AGREEMENT, ANY CHANGES TO THE PROJECT SCHEDULE MUST BE FORMALLY SUBMITTED UNDER SEPARATE COVER TO LACMTA FOR WRITTEN CONCURRENCE. FA Milestones Original FA Schedule In Scope of Work Actual Schedule Start Date End Date Start Date` End Date Environmental Clearance Design Bid & Award Design 'Right -of -Way Acquisition Construction Bid & Award ,Ground Breakin2 Event Construction 'Ribbon Cutting Event [:To:talProject Duration (Months) . PROJECT COMPLETION A. Based on the comparison of the original and actual project milestone schedules above, project is (select only one) ❑n schedule per original FA schedule ❑ Less than 12 months behind original schedule Between 12-24 months behind original schedule ❑More than 24 months behind original schedule B. as the project design started within 6 months of the date originally stateq in the FA? i c l_ Yes No Not Applicable C. Was a construction contract or capital purchase executed within 9 months after completion of design / specifications? 1-1 Yes No Not Applicable FA Measure R Hwys Gen Attachment C-1 Quarterly Progress Expenditure Report Rev. 11.1.14 Rev: 12.23.14 3 FA Measure R Hwys Gen Attachment D-2 Quarterly Report i IN List tasks or milestones accomplished and progress made this quarter. t ai�attenti n c�hedule delays. If delay Is for the same reaso rt r, 10 to � If project Is delayed, describe reasons for delay (this quarter). Pay particular attention to schedule delays. If delay I ic 10 as mentioned In previous quarters, please indicate by writing "Same as Previous Quarter". -- --- 7- s. AcTv4 qwlSro Ftesavt oELAY ms i If the project Is delayed (as described In #4), include action have been, or will be, undertaken to resolve the delay. Rev: 12.23.14 4 FA Measure R Hwys Gen Attadiment D-2 Quarterly Report SECTION 4: ITEMIZED LISTING OF EXPENSES AND CHARGES THIS QUARTER Note: All receipts, invoices, and time sheets, attached and included with this Expense Report must be listed and shown under the Invoice Number column of the Itemized Listing (above). Invoice Payment Information: LACIVITA will make all disbursements electronically'unless an exception is requested in writing. ACH Payments require that you complete an ACH Request Form and fax it to Accounts Payable at 213-922-6107, ACH Request Forms can be found at www.metro,n t/calfforprojects, Written exception requests for Check Payments sh uld be completed and faxed to Accounts Payable at 213-922-6107, I certify that I am the responsible Project Manager or fiscal officer and representative of and that to the best of my knowledge and belief the information stated in this report is true and correct. Signature Date Name Title Rev: 12 23.14 5 FA Measure R Hwys Gen Attachment D-2 Quarterly Report ATTACHMENT E Los Angeles Metropolitan Transportation Authority 2017 Federal Transportation Improvement Program ($000) Project Description: Lakewood Blvd. at Florence Avenue Intersection Improvements. Double left -turn lanes in the southbound SCA G RTP PrWd Siudyr�N(A and northbound directions along Lakewood Boulevard. Exclusive westbound right -turn lane on Florence Avenue. Right of Way is od0 Model #� PM: Edwin Norrits - (562) 904-7110 acquisition as necessary. Relocation of overhead utilities. Reconstruction of the intersection with a concrete intersection, Email: 6norKs@downeyca,orlg modification of traffic signal and incidental striping, signage and pavement markings. LS: N LS GROUP#: Conformity Category: System :Local Hwy Route: Postmile: Distance: Phase: Environmental Document/Pre-Design Phase (PAED) Completion Date 06/3012022 Lane # Extd: Lane X Prop: Impry Desc: Air Basin: SCAB Envir Doe: INITIAL STUDY/NEGATIVE DECLARATION - CE Toll Rate: Toll Coic Loc: Toll Method: Hov acs ag loc: Uza: Los Angeles -Long Sub -Area: Sub -Region: Gateway Cities Beac"anta Ana Area CTIPS ID: EA: PPNO: Prooram Code: NCRH1 - INTERSECTION IMPROVEMENTS/CHANNELIZATION Slot) Loc: PHASE PRIOR 16/17 17/18 18/19 19/20 20/21 21/22 BEYOND FROG TOTAL PE RW CON T4, z j MR20H Measure R 20% Highway PE $92 a S182 $0 $0 $274 RW $119 $4,8117 $25 $0 $2,031 CON $0 $1 $2,388 $231 $2,620 TOTAL RW: $2.031 TOTAL COW $2,620 General Comment: NIA Mdeling Comment: No significant change made TCM Comment: No significant change made Narrative: Now Project VR20H: I- Add funds in 18119 in ENG for $92, ROW for $119 ► Add funds in 19120 in ENG for $182, ROW for $1,887, CON for $1 W Add funds In 20/21 in ROW for $25, CON for $2,388 ► Add funds in 21122 in CON for $231 iot'"1511 I �C�� _P Change reason:New project Total Cost -ast Revised Amendment 17-50 - Submitted $4925 Wednesday, June 13, 2018 FTIP * LAOC1515 Subregion ID: 1-605/SR-91/I-405 Corridors "Hot Spot! ATTACHMENT F ProR315.27 Funding Agreement The provisions of thi's Attachment F apply only if and to the extent some or all of the Funds are derived from LACMTA issued Bonds or other debt, the interest on which is tax exempt For federal tax purposes and/or Build America Bonds as defined in the American Reinvestment and Recovery Act of 2009 or similar types of bonds (collectively, the "Bonds"). GRANTEE acknowledges that some or all of the Funds may be derived from Bonds, the interest on which is tax-exempt for federal tax purposes or with respect to which LACMTA receives a Federal subsidy for a portion of the interest cost or the investor receives a tax credit. GRANTEE further acknowledges its understanding that the proceeds of the Bonds are subject to certain ongoing limitations relating to the use of the assets financed or provided with such proceeds ("Project Costs" or "Project Components") in the trade or business of any person or entity other than a governmental organization (any such use by a person or entity other than a governmental organization is referred to as "Private Use"). Private Use will include any sale, lease or other arrangement pursuant to which a nongovernmental person or entity receives a legal entitlement of a Project Component and also includes certain agreements pursuant to which a nongovernmental person Will operate or manage a Project Component. Each quarterly invoice submitted by GRANTEE to reimburse prior expenditures (or to be received as an advance) shall provide information regarding the specific Project Costs or Project Components to which the Funds which pay that invoice will be allocated and whether there is or might be any Private Use associated with such Project Costs or Project Components. GRANTEE will, for the entire time over which LACMTA's Bonds or other debt remains outstanding, (1) notify and receive LACMTA' s approval prior to entering into any arrangement which will or might result in Private Use and (2) maintain records, including obtaining records from contractors and subcontractors as necessary, of all allocations of Funds to Project Costs or Project Components and any Private Use of such Project Costs or Project Components in sufficient detail to comply and establish compliance with Section 141 of the Internal Revenue Code of 1986, as amended (the "Code"), or similar code provision then in effect and applicable, as determined by the LACMTA in consultation with its bond counsel. GRANTEE will designate one or more persons that will be responsible for compliance with the obligations described in this Attachment F and notify LACMTA of such designations. Rev: 04.01.15 1 FA Measure R H Gen Attachment F Bond Requirements