Loading...
HomeMy WebLinkAbout03. CC No. 632-3D-Accept Lakewood Blvd-Rosemead Blvd Intersection Imp Projt(altzk9lel APPROVED E3,y TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL CITY MANAGER FROM: OFFICE OF THE CITY MANAGER BY: DELFINO R. CONSUNJI, P.E., DIRECTOR OF PUBLIC WORKS/CITY ENGIAEER DATE: SEPTEMBER 25, 2018 SUBJECT, CASH CONTRACT NO. 632.3b, LAKEwoob BOULEVARD/ROSEMEAD BOULEVARD AT TELEGRAPH ROAD INTERSECTION IMPROVEMENT PROJECT — ACCEPTANCE OF PROJECT That the City Council: 1. Accept the Lakewood Boulevard/Rosemead Boulevard at Telegraph Road Intersection Improvement Project, Cash Contract No. 632-3D as complete; 2. Approve the final construction contract amount of $3,459,758.79; and 3. Authorize the Public Works Director to file the Notice of Completion with the Los Angeles County Recorder's Office. In September 2013, the City of Downey received a $2,120,000 Measure R Local Return grant from the Los Angeles County Metropolitan Transportation Authority (Metro) through the 1-605 Freeway Corridor Congestion Hot Spots Feasibility Study for capacity enhancement improvements at the Lakewood Boulevard/Rosemead Boulevard and Telegraph Road Intersection. In January 2013, the City of Pico Rivera received a $552,311 Truck Impacted Intersection grant from the Gateway Cities Council of Governments (Gateway COG) for the reconstruction of the existing pavement for the aforementioned intersection. Given that the project is located within the Cities of Downey and Pico Rivera, the project was implemented as a joint venture between the two agencies, with Downey as the lead agency. On August 26, 2014, the City Council approved the plans and specifications for the subject project and granted authority to advertise for bids. On May 12, 2015, the City Council awarded a construction contract to PALP, Incorporated dba Excel Paving Company (Excel Paving Company) in the amount of $2,992,717.80 for Cash Contract No. 632-3D. NEW 111D Irr I-aferu Cash Contract No. 632 - Lakewood Boulevard/Rosemead oulevard at Telegraph o Intersection Improvement Project Acceptance of Project September 25, 2018 and Telegraph Road intersection with concrete pavement, construction of decorative concrete crosswalks, widening of Lakewood Boulevard south of Telegraph Road and widening of south side of Telegraph Road west of Lakewood Boulevard to provide for double left -turn lanes in all four directions and exclusive right -turn lane in the eastbound direction. The project also included asphalt pavement rehabilitation, reconstruction of curbs, gutters, cross gutters, spandrels, alley approaches, curb ramps and sidewalks; adjustment of manholes, water valves and survey monuments to grade; installation of City -furnished decorative street lights and pedestrian safety lights; installation of bus shelters and trash receptacles; installation of drought tolerant landscaping and irrigation in the medians; traffic signal upgrades; water system improvements; traffic signing, striping, pavement markings and traffic control. The construction of above improvements required that the existing Southern California Edison (SCE) power poles and overhead utilities along the south side of Telegraph Road be relocated. The relocation of power poles necessitated overhead utility easements and temporary construction easements from four properties located on the south side of the street given that the overhead power lines would be located closer to the properties. The relocation of SCE power poles and overhead utilities hindered the contractor's schedule as they could not perform the work as originally planned resulting in delays and change orders (net increases) amounting to $467,040.79. The project is deemed complete and staff recommends that the City Council accept the project as complete. CITY COUNCIL PRIORITIES Efficiency & Adaptability Quality of Life, Infrastructure & Parks The final cost of the construction contract, including the original contract amount, net decrease in contract quantities, and change orders is $3,459,758.79. The total project final cost is $4,528,621.37, which includes construction contract, environmental and design services, overhead utility easement acquisition and support, construction management, inspection, materials testing, construction engineering, contract administration and City -furnished materials. The project is funded through an 1-605 Congestion Hot Spots Feasibility Study Measure R grant, Truck -Impacted Intersection Phase 2 grant, L. A. County Metro 1-710 Corridor Early Action Measure R grant, Proposition C and Water funds (Attachment 1). There are sufficient funds to cover the total project costs. The reimbursable project funds from the City of Pico Rivera will be deposited in the Los Angeles County Metro 1-710 Corridor Early Action Measure R grant (Account No. 26-1-7802) for use on the Lakewood Boulevard Improvement Project, Phase 3C that is currently under construction. ATTACHMENTS Attachment 1 — Project Cost Summary 91 Cash Contract No. 632 - Lakewood Boulevard/Rosemead oulevard at Telegraph Road Intersection Improvement Project Acceptance of Project September 25, 2018 • • • 0 Description Amount Original Contract Amount $2,992,718.00 Net Decrease in Contract Quantities <$601,388.77> Change Orders $1,068,429.56 TOTAL CONSTRUCTION CONTRACT COST $3,459,758.79 TOTAL PROJECT COST SUMMARY Description Amount Total Construction Contract Cost $3,459,758.79 Consultant Services — Environmental & Design $219,142.72 Overhead Utility Easement Acquisition $48,470.00 Overhead Utility Easement Support $69,282.50 Construction Management and Inspection $290,611.89 Materials Testing $13,700.00 Construction Engineering and Contract Administration (estimated) $218,350.89 City -furnished Materials $209,304.58 TOTAL PROJECT FINAL COST: $4,528,621.37 PROJECT FUNDING Account No. Fund Amount 26-1-7715 1-605 Congestion Hot Spots Feasibility Study Measure R Grant $2,120,000 26-1-7715 Truck -Impacted Intersection Phase 2 Grant $552,300 26-1-7802 L. A. County Metro 1-710 Corridor Early Action Measure R Funds $1,315,331 L. A. County Metro 1-710 Corridor Early Action Measure R Funds 26-1-6667 (expended FY 2014-15 & FY 2015-16) $165,335 54-1-6667 Proposition C Local Return (expended FY 2015-16) $229 54-1-6606 Proposition C Local Return (expended FY 2013-14 & FY 2014-15) $182,607 51-1-8674 Water Infrastructure Rehabilitation Funds (FY 2014-15) $315,000 Reimbursable Project Funds from City of Pico Rivera (funds to be deposited in Account No. 26-1-7802) $587,726 TOTAL PROJECT FUNDING: $5,238,528