Loading...
HomeMy WebLinkAbout05. CIP 14-16-Accept the Brookshire Ave Pavement Rehab ProjRUM i U. APPROVED BY CITY MANAGER TO: HONORABLE MAYOR ASHTON AND MEMBERS OF THE CITY COUNCIL FROM: • ;_ OF MANAGER MOHAMMAD MOSTAHKAMI,P.E., DIRECTOROF WORKS 1ATE- APRIL 24, 201E SUBJECT- BROOKSHIRE AVENUE PAVEMENT REHABILITATION PROJECT FROM GARDENDALE STREET TO IMPERIAL HIGHWAY AND FIRESTONE BOULEVARD TO FLORENCE- •PROJECT NO. OF • That the City Council: 1. Accept the Brookshire Avenue Pavement Rehabilitation Project from Gardendale Street to Imperial Highway and Firestone Boulevard to Florence Avenue, Capital Improvement Project No. 14-16, as complete; and 2. Approve the final construction contract amount of $1,274,667.05; and 3. Authorize Transfer of $89,324 from Measure R Local Return funds budgeted in the FY 2017/18 Capital Improvement Program in Account No. 56-1-7828 to Account No. 56-1- 6715 to cover the total project cost shortfall; and 4. Authorize the Public Works Director to file the Notice of Completion with the Los Angeles County Recorder's office. 7170TITeMelm On January 10, 2017, the City Council approved plans and specifications for the Brookshire Avenue Pavement Rehabilitation Project from Gardendale Street to Imperial Highway and Firestone Boulevard to Florence Avenue, Capital Improvement Project No. 14-16 and granted authority to advertise for bids. On July 11, 2017, the City Council awarded a construction contract to R.J. Noble Company. On September 25, 2017, work commenced and was completed on February 14, 2018. The project included pavement rehabilitation on two sections of Brookshire Avenue, between Gardendale Street and Imperial Highway and between Firestone Boulevard and Florence Avenue and signing and striping for bike lanes on Brookshire Avenue from Gardendale Street to Imperial Highway and a bike route along the portion of the street between Imperial Highway and Capital r • - - • 6666 April :; Florence Avenue. The pavement rehabilitation work consisted of reconstruction of failed pavement areas, cold -milling of existing pavement, subgrade compaction, construction of asphalt concrete base course and leveling course and construction of rubberized asphalt concrete overlays. The project work also included reconstruction of existing concrete improvements including curbs, gutters, cross gutters and spandrels, alley approaches, curb ramps and sidewalk; adjusting of manholes, water valves and survey monuments to grade; installation of traffic signing, traffic striping, pavement markings and traffic control. During construction, additional work beyond the original scope of the project deemed necessary resulting in one (1) contract Change Order. The additional work included, but was not limited to, additional surveying, pavement grinding, curb ramps and restoration of parkway and/or onsite concrete pavers and retaining block walls associated with the curb ramps, removal of pavement striping and traffic control. The project is deemed complete and staff recommends that City Council accept the project as complete. The final cost of the construction contract, including the base contract amount, net increase in contract quantities, and one (1) contract change order is $1,274,667.05. The total project final cost is $1,578,279.43, which includes the cost of design, construction, inspection, contract administration, construction engineering and material testing. Funds in the amount of $172,956 were previously expended in FY 2015/16 and 2016/17._ Budgeted funds in the amount of $1,316,000.00 under Account No. 54-1-6715, 56-1-6715, 57-1- 6715 and 51-1-6715 were programmed for this project in the FY 2017/18 Capital Improvement Program. Additional funds in the amount of $89,324 are required to cover the total project cost. Therefore, staff recommends the transfer of $89,324 of Measure R Local Return funds from FY 2017/18 Capital Improvement Program in Account No. 56-1-7828 to Account No. 56-1-6715 to cover the total project cost shortfall. Project cost summary is attached. Attachments: Attachment 1 - Project Cost Summary Capital Improvement Pr ject No. 14-16 01 Brookshire Avenue Pavement RehabilitationProject Acceptance •Project April ' Description Base Contract Amount Net Increase in Contract Quantities Change Orders TOTAL CONSTRUCTION CONTRACT COST Description Total Construction Contract Cost Consultant Services - Design Construction Engineering and Contract Administration (estimated) Materials Testing TOTAL ESTIMATED PROJECT COST: Account No. Fund 54-1-6695 Proposition C (Expended FY 2015/16) 54-1-6695 Proposition C (Expended FY 2016/17) 54-1-6697 Proposition C (Expended FY 2015/16) 54-1-6697 Proposition C (Expended FY 2016/17) 54-1-6715 Proposition C (Expended FY 2015/16) 54-1-6715 Proposition C (Expended FY 2016/17) 54-1-6715 Metro Proposition C Local Return (Budgeted FY 2017/18) 56-1-6715 Metro Measure R Local Return (Budgeted FY 2017/18) 57-1-6715 Metro Measure M Local Return (Budgeted FY 2017/18) 51-1-6715 Water (Budgeted FY 2017/18) 56-1-6715 Measure R Local Return Funds (Transfer from Account No. 56-1-7828) TOTAL PROJECT FUNDING: Amount $1,087,500.50 $119,120.18 $68,046.37 $1,274,667.05 Amount $1,274,667.05 $132,189.88 $160,000.00 $11,422.50 $1,578,279.43 Amount $43,043 $11,748 $25,537 $9,220 $60,380 $23,028 $350,000 $466,000 $300,000 $200,000 $89,324