Loading...
HomeMy WebLinkAboutResolution No. 18-7795-Approving the List of Proj in Proposed FY18-19 CIP to be Funded by SB1APPROVINGA RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DOWNE OF •PROPOSED IMPROVEMENTCAPITAL • TO BE FUNDED BY SENATE BILL ROAD D ACCOUNTABILITY WHEREAS, Senate Bill 1 (SB1), the Road Repair and Accountability Act of "2017 (Chapter 5, Statutes of 2017) was passed by the Legislature_ and signed into law by the Governor in April 2017 in order to address the significant multi -modal transportation funding shortfalls statewide; and WHEREAS, -SB1 includes accountability and transparency provisions that will ensure our community in the City is aware of the projects proposed for funding in our community and which projects are in progress or have been completed each fiscal year; and WHEREAS, the City must approve a list of all projects proposed to receive funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB1 by Resolution of the City Council including a description and the location of each proposed project, a proposed schedule for the project's completion, and the estimated useful life of the improvement; and WHEREAS, the City, anticipates to receive an estimated $1,580,621 in RMRA funding in Fiscal Year 2018-19 from SB1; and WHEREAS, the City used a Pavement Management System to develop the SB1 project list to ensure revenues are being used on the most high-priority and cost-effective projects; and WHEREAS, the funding from SB1 helps the City maintain, rehabilitate and preserve the infrastructure on a number of streets and construct new and repair existing active transportation infrastructure throughout the City this year and hundreds of similar projects into the future; and WHEREAS, without revenue from SB1, the City, would have otherwise been deferring projects for years throughout the community; and WHEREAS, if the Legislature and Governor failed to act, city streets would have continued to deteriorate, having many and varied negative impacts on our community; and WHEREAS, cities and counties own and operate more than 81 percent of streets and roadsin California, and from the moment we open our front door to drive to work, bike to school, or walk to the bus station, people are dependent upon a safe, reliable local transportation network; and WHEREAS, the local street and road system is also critical for farm to market needs, interconnectivity, multimodal needs, and commerce; and WHEREAS, police, fire, and emergency medical services all need safe reliable, roads to react quickly to emergency calls and a few minutes of delay can be a matter of life and death; and WHEREAS, maintaining and preserving the local street and road system in good condition will reduce drive times and traffic congestion, improve bicycle safety, and make the pedestrian experience safer and more appealing, which leads to reduce vehicle emissions helping the State achieve its air quality and greenhouse gas emissions reductions goals; and RESOLUTION NO. PAGE • WHEREAS, restoring roads before they fail also reduces construction time which results in less air pollution from heavy equipment and less water pollution from site run-off; and WHEREAS, the proposed SB1 project list, attached herein as Exhibit "A", and overall investment in our local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting-edge technology, materials and practices, will have significant positive co -benefits statewide. RESOLVENOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF DOWNEY DOES HEREBY • • SECTION 1. The City Council of the City of Downey is approving the list of projects attached herein as Exhibit "A" to be funded in fiscal year 2018-19 with Road Maintenance and Rehabilitation Account revenues. SECTION 2. The City Clerk shall certify to the adoption of this Resolution. SEAN ASHTON, Mayor ATTEST: ARI LICIA DUARTE, CMC City Clerk HEREBY CERTIFY that the foregoing Resolution was adopted by the City Council of the City of Downey at a regular meeting held on the 10th day of April, 2018 by the following vote, to wit: AYES: Council Members: Pacheco, Saab, NOES: Council Member: None. ABSENT: Council Member: Rodriguez ABSTAIN. Council Member: None. Vasquez, Mayor Ashton MARIA ALICIA DUARTE, OMAC City Clerk RESOLUTION PAGE NO. 3 List of Projects in the Proposed FY 18-19 Capital Improvement Program to be Funded by Senate Bill 1 (SB1): The Road Repair And Accountability Act Estimated Anticipated Project Description Location Useful Life Year of Construction 1. FY 17-18 Construction of new and Pedestrian repair of existing pedestrian Southeast and Improvements/ facilities (i.e. sidewalk, curb northwest 50 Years FY New Sidewalk/Ramp ramps) to enhance pedestrian quadrants of the 2018/2019 Construction & ADA circulation and to comply with city Improvements ADA requirements 2. Paramount Blvd. Construction of raised Paramount Blvd;(Imperial Hwy. - 30 Years FY Median Island Project concrete median islands Florence Ave.) 2018/2019 3.Lakewood Multijurisdictional complete Lakewood Blvd: FY Blvd./Rosemead street study of the Lakewood Blvd. -Rosemead Blvd. (Telegraph Rd. — 30 Years 2019/2020 Blvd. Corridor Study corridor Gardendale St.) Blodgett Ave., Construction of new sidewalk Adoree St., and curb ramps, signage, Airpoint Ave., 4. South Downey replacement of striping and Blodgett Ave., FY Safe Routes to pavement markings, Lankin St., Quoit 50 Years 2019/2020 School Project installation of vehicle speed St., Nada St., feedback signs and safety Julius St., education program Pomering Rd. "& Laura St. 5. FY 18-19 Construction of new and Pedestrian Improvements/ repair of existing pedestrian Northeast New Sidewalk/Ramp facilities (i.e. sidewalk, curb ramps) to enhance pedestrian quadrant of the FY 50 Years 2018/2019 Construction & ADA circulation and to comply with city Improvements ADA requirements Slurry seal residential streets 6. FY 1 Annual in order to help preserve the Northwest FY Slurry Seal Program al condition of the asphalt quadrant of the 7 Years 2018/2019 pavement on said streets for city approximately 10 more years. 7. FY 18-19 Construct rubberized asphalt Residential Street overlay on residential streets FY Pavement to extend the useful life of (see attached list) 20 Years 2018/2019 Rehabilitation said streets for approximately 20 more years. i Proposed List of FY'18-19`Residential Street Pavement Rehabilitation Locations STREET FROM TO Centu BI Cit Limit Downey Av Cole St Brookshire Av Patton Rd Dalen St Bellflower BI Ardis Av Donovan St Birchdale Av Brookshire Av Imperial BI Fronta a Rd N Imperial Hwy Im erial Hw Imperial BI Frontage Rd S Imperial Hw Im erial Hw, Patton Rd_ Stewart &Gra Rd Fontana St Patton Rd Fontana St Cleta St Seaaca St Pan born Av Cul -De -Sac Washburn Rd Woodruff Av Re entview Av Washburn Rd Bellflower BI Woodruff Av Alameda St wney Av Brookshire Av Cole St Paramount BI Downey Av Comolette St Paramount BI Downey Av De Palma St Horton Av Rives Av Horley Av Ya nke St Loop End Nada St Julius Av Cul -De -Sac Planett Av Oran a St Cul -De -Sac Rives Av Stewart & Gra Rd Burns Av_ Bluff Rd Cul -De -Sac Suva St Burns Av Old River School 660 Ft Burns Av 660 Ft Rives Av Calmcrest Dr Tweedy Ln Cul -De -Sac Count Club Dr Old River School Cul -De -Sac Elmont Av Brook ark Rd Vista Del Rosa Fontana St Salford Av Cul -De -Sac Gainford St Pomerin Rd Cu( -De -Sac Haro Av Benares St Cul -De -Sac Irwin rove Dr Sher Av Old River School La Reina Av Firestone BI Nance Av Otto St Downey Av La Reina Av Rives Av Burns Av Firestone BI Severy St Orizaba Av Cul -De -Sac Shad oak Dr Cul -De -Sac Cul -De -Sac Stamps Av Brook ark Rd Cit Limit =Tele ra h Stoakes Av Cit Limit -Tele rah Brook ark Rd Susan Av Via Rio Nido Irwin rove Dr Bellder Dr Suva St Cul -De -Sac Brookshire Av Gallatin Rd Vista Del Rio A Casanes Av Casanes Av Cul -De -Sac Chane Av Appleby St Vista Del Rio A Clancey Av Gotham St Ba sin er St Cleta St Brookshire Av Patton Rd Dacosta St Brookshire Av Cul -De -Sac Dolan Av Charloma Dr Cul -De -Sac Iowa St Downey Av Dolan Av Manzanar Av Suva St Lubec St Margaret St Lakewood BI Cul -De -Sac Raviller Dr Mattock Av Lesterford_Av Santa GerEudeS Downe _Av Brock Av Suva St Stamps Av Manzanar Av Vista Del Rio Av Brookshire Av Stoakes Av