HomeMy WebLinkAbout06. CIP 18-03 Award Contract for Slurry Seal Project Dist 2Rem No.
APPROVED 13Y
CITY MANAGER
TO: HONORABLE MAYOR ASHTON AND MEMBERS OF THE CITY COUNCIL,
FROM: OFFICE OF THE CITY MANAGER
Y: MOHAMMAD MOSTAHKAMI, P.E., DIRECTOR OF PUBLIC WORKS MIA
SLURRYPROJECT DISTRICT 2, CAPITAL IMPROVEMENT• •;
18-03 — AWARD CONSTRUCTION CONTRACT
NST,q 1 ° LIT -1 we]
That the City Council
1 Award construction contract, in the amount of $228,212.60, to Doug Martin
Contracting Company, Incorporated, for the Slurry Seal Project District 2, Capital
Improvement Project No. 18-03, and
2 Authorize the Public Works Director to execute any change orders or additional
scope of work for this project deemed necessary or desirable up to the approved
project budget.
At its meeting of January 23, 2018, the City Council approved plans and specifications and
granted authority to advertise for bids for the Slurry Seal Project District 2. On March 1, 2018
and March 8, 2018, respectively, this project was advertised in the Downey Patriot and
published in various trade publications. On March 22, 2018, the City Clerk received and publicly
opened five (5) bids ranging from $228,212.60 to $299,403.20 as shown on the attached bid
summary. The lowest responsive and responsible bidder is Doug Martin Contracting Company,
Incorporated with a bid of $228,212.60. Staff reviewed the bid proposal and references
provided by Doug Martin Contracting Company and found that said contractor has satisfactorily
completed similar projects for the City of Downey and numerous other Cities such as Walnut,
Seal Beach and Loma Linda. Doug Martin Contracting Company's State of California
Contractor's License is "current and active" and they are registered with the California
Department of Industrial Relations under the Public Works Contractor Registration Program for
Labor Compliance.
A total of 45 street segments in City Council District 2, covering a total of approximately 6.9
centerline miles (36,508 linear feet) of roadway have been identified for this project. The street
segments and limits are shown on the attached Project Street List and Project Location Map.
The work to be performed under the Slurry Seal Project District 2 generally consists of sealing
cracks in the asphalt pavement, applying emulsified Type II slurry seal coat to the pavement
surface; replacement of traffic striping, pavement markings, and raised pavement markers; and
all necessary related work. Some street segments also require the removal and replacement of
Capital Improvement Project No. 18-03
Slurry Seal Project District 2 — Award Construction Contract
April 1
asphalt pavement at certain locations, which will be handled independently of this project by
City maintenance crews prior to application of the slurry seal.
Staff recommends that the City Council award a construction contract, in the amount of
$228,212.60, to Doug Martin Contracting Company, for the Slurry Seal Project District 2.
Construction is anticipated to begin in May 2018, and be completed in June 2018.
This project is categorically exempt from the provisions of CEQA under Section 15301(c),
Existing Facilities.
The total estimated cost of the project, including construction costs and contingencies, design,
inspection, construction engineering, and contract administration, and asphalt patching, is
$250,000 as shown in the Estimated Project Cost Summary on the following page. Sufficient
funds, in the amount of $250,000, are programmed for this project in the FY 2017-18 Capital
Improvement Program under Account No. 32-1-6718 to cover the total project costs. The
funding source is Senate Bill (SB) 1 funds.
Attachments:''
• Estimated Project Cost Summary
• Bid Summary
• Four Year Slurry Seal Program Map
• Slurry Seal Project District 2 Street List
• Slurry Seal Project District 2 Location Map
Capital Im rove of roj c . 18-03
Slurry l Project District 2 — Award Construction Contract
April 10, 201
ESTIMATED PROJECT COST SUMMARY
Description
Amount
Bid Amount
$228,212.60
Contingency
$9,787.40
SUBTOTAL CONSTRUCTION COST:
$238,000.00
Design
$5,000.00
Inspection, Construction Engineering & Contract Administration (estimated)
$7,000.00
TOTAL ESTIMATED PROJECT COST:
$250,000.00
FUNDING SUMMARY
Account
Number Fund Name
Amount
32-1-6718 Senate Bill 1 Local Return
$250,000.00
TOTAL PROJECT FUNDING:
$250,000.00
Capital Improvement Project No. 18-03
Slurry Seal Project District 2 — Award Construction Contract
April 10, 2018
ALL BIDS RECEIVED:
�CONTRACTOR
TOTAL BASE BID
Doug Nbrtin Contracting Co, Inc,
$
228,212,60
American Asphalt South, Inc.
$
263,502,50
All American Asphalt
$
267,015.51
Pavement Coatings Co.
$
290,242.50
Roy Allan Slurry Seal Inc.
$
299,403,20
0
Capital Improvement Project No. 18-03
Slurry Seal Project District 2 — Award Construction Contract
April 10, 2018
City of Downey
Four Year Slurry Seal Program Map
9
Capital Improvement Project No. 18-03
Slurry Seal Project District 2 - Award Construction Contract
April 10, 2018
Slurry Seal Project District 2 - treet Lis.1
n.
LENGTH
WIDTH
I
O.
STREET
FROM
TO
(LF)
LF
AREA JSF_
1
ADORES ST
DOWNEY AV
PARAMOUNT BL
1,837
36
66,132
2-
ALBIA ST
CUL-DE-SAC WEST
BROOKSHIRE AV
872
36
31,392
3
ARNETT ST
RIVES AV
PRUESS AV
830
30
24,900
4
ARNETT ST
HORTON AV
RIVES AV
905
30
27,150
5
BENARES ST
JULIUS AV
NORLAIN AV
594
36
21,384
6
BER MANLN
ORIZABA AV
CUL-DE-SAC
676
30
20,280
7
BORSONST
GLYNN AV
BROOKSHIRE AV
711
30
21.330
8
BOYSON ST
CALADRE AV
CUL-DE-SAC EAST
325
26
8,450
9
BROCKAV
ADOREEST
IMPERIAL HWY
1,149
36
41,364
10
BRUNACHE ST
ORIZABA AV-
CUL-DE-SAC EAST
440
30
13,200
11
BYERSAV
CUL-DE-SAC WEST
BROOKSHIRE AV
328
36
11.808
12
CALADREAV
ORANGE ST
CUL-DE-SAC SOUTH
380
32
12,160
13
CHEYENNE AV
DOWNEY AV
PARAMOUNT BL
1,813
36
65,268
14
CLETA ST
CUL-DE-SAC WEST
PARAMOUNT BL
1,030
35.6
..... ... ....
36.668
15
COMOLETTE ST
DOWNEY AV
GLYNN AV
374
30
11,220
16
DE PALMA ST
HORTON AV
RIVES AV
1,024
36
36,864
17
DE PALMA ST
PARAMOUNT BL
MORNING AV
954
36
34,344
18
DONOVAN ST
BROOKSHIRE AV
DOWNEYAV
1,161
38
44,118
19
FONTANA ST
HORTON AV
HORLEY AV
738
36
26,568
20
GL AV
COMOLETTE ST
LYNDORA ST
1,148
36
41,328
21
GNEISS A V
ORANGE ST
CUL-DE-SAC SOUTH
380
28
10,640
22
GURLEYAV
NADA ST
COLE ST
199
30
5,970
23
HORLEYAV--,--
FONTANA ST
DE PALMA ST ----279
36
10,044
24
HORLEYAV
ADWENST
ARNETT ST
666
30
19.980
25
JULIUS AV
STEWART&GRAY RD
BENARES ST
1.013
36
36.468
26
JULIUSAV
ADWENST
-PARAMOUNT
PIVOT ST
1,144
36
41,184
27
LEEDS ST
BL
EAST END
758
-1-.328
32
24,256
-,28
LUXOR ST
JULIUS AV
RIVES AV
36
47.808
29
LYNDORA ST
GLYNN AV
DOWNEY AV
�348
36
12.528
30
NADA ST
ORIZABA AV
GURLEY AV
636
30
19.080
31
NADA ST
SUSAN AV
OLD RIVER SCHOO
853
38
32,414
32
NORLAINAV
BENARES ST
LUXOR ST
289
36
10,404
33
NORLAINAV
NEO ST
ARNETT ST
436
36
15,696
34
PARROTAV
COLE ST
CUL-DE-SAC
426
26
11.076
35
PHLOX ST
RIVES AV
HORTON AV_918
30
27,540
36
PHLOX ST
PARAMOUNT BL
DOWNEY AV
1.817
38
69,046
37
PIVOT ST
JULIUS AV
RIVES AV
1,158
30
34.740
38
POMERING RD
STEWART&GRAY RD
CUL-DE-SAC
587
30
17,610
39
PRUESSAV
BROCKMILL RD
CUL-DE-SAC
1,532
30
45,960
40
QUILL DR
OLD RIVER SCHOO
RIVES AV
2,092
39
81,588
41
RICHEONAV
ARNETT ST
ADWENST
653
30
19.590
42
SAMOLINEAV
QUILL DR
SPRINGER ST
609
40
24,360
43
SAMOLINEAV
ALBIA ST
CUL DE SAC NORTH
376
36
13,536
44
SPRINGER ST
SAMOLINE AV
PARAMOUNT BL
187
40
7,480
45
SUSANAV
CUL DE SAC SOUTH
STEWART & GRAY RD
535
36
19.260
TOTAL
36,508
1254186
n.
Capital Improvement Project No. 18-03
Slurry Seal Project District 2 — Award Construction •
April 10, 2018
blurry-SeaTP-ro—j-e-c-t-D-i-s-Urict 2
• Map
0