HomeMy WebLinkAbout06. CIP 18-03 Award Contract for Slurry Seal Project Dist 2Rem No. APPROVED 13Y CITY MANAGER TO: HONORABLE MAYOR ASHTON AND MEMBERS OF THE CITY COUNCIL, FROM: OFFICE OF THE CITY MANAGER Y: MOHAMMAD MOSTAHKAMI, P.E., DIRECTOR OF PUBLIC WORKS MIA SLURRYPROJECT DISTRICT 2, CAPITAL IMPROVEMENT• •; 18-03 — AWARD CONSTRUCTION CONTRACT NST,q 1 ° LIT -1 we] That the City Council 1 Award construction contract, in the amount of $228,212.60, to Doug Martin Contracting Company, Incorporated, for the Slurry Seal Project District 2, Capital Improvement Project No. 18-03, and 2 Authorize the Public Works Director to execute any change orders or additional scope of work for this project deemed necessary or desirable up to the approved project budget. At its meeting of January 23, 2018, the City Council approved plans and specifications and granted authority to advertise for bids for the Slurry Seal Project District 2. On March 1, 2018 and March 8, 2018, respectively, this project was advertised in the Downey Patriot and published in various trade publications. On March 22, 2018, the City Clerk received and publicly opened five (5) bids ranging from $228,212.60 to $299,403.20 as shown on the attached bid summary. The lowest responsive and responsible bidder is Doug Martin Contracting Company, Incorporated with a bid of $228,212.60. Staff reviewed the bid proposal and references provided by Doug Martin Contracting Company and found that said contractor has satisfactorily completed similar projects for the City of Downey and numerous other Cities such as Walnut, Seal Beach and Loma Linda. Doug Martin Contracting Company's State of California Contractor's License is "current and active" and they are registered with the California Department of Industrial Relations under the Public Works Contractor Registration Program for Labor Compliance. A total of 45 street segments in City Council District 2, covering a total of approximately 6.9 centerline miles (36,508 linear feet) of roadway have been identified for this project. The street segments and limits are shown on the attached Project Street List and Project Location Map. The work to be performed under the Slurry Seal Project District 2 generally consists of sealing cracks in the asphalt pavement, applying emulsified Type II slurry seal coat to the pavement surface; replacement of traffic striping, pavement markings, and raised pavement markers; and all necessary related work. Some street segments also require the removal and replacement of Capital Improvement Project No. 18-03 Slurry Seal Project District 2 — Award Construction Contract April 1 asphalt pavement at certain locations, which will be handled independently of this project by City maintenance crews prior to application of the slurry seal. Staff recommends that the City Council award a construction contract, in the amount of $228,212.60, to Doug Martin Contracting Company, for the Slurry Seal Project District 2. Construction is anticipated to begin in May 2018, and be completed in June 2018. This project is categorically exempt from the provisions of CEQA under Section 15301(c), Existing Facilities. The total estimated cost of the project, including construction costs and contingencies, design, inspection, construction engineering, and contract administration, and asphalt patching, is $250,000 as shown in the Estimated Project Cost Summary on the following page. Sufficient funds, in the amount of $250,000, are programmed for this project in the FY 2017-18 Capital Improvement Program under Account No. 32-1-6718 to cover the total project costs. The funding source is Senate Bill (SB) 1 funds. Attachments:'' • Estimated Project Cost Summary • Bid Summary • Four Year Slurry Seal Program Map • Slurry Seal Project District 2 Street List • Slurry Seal Project District 2 Location Map Capital Im rove of roj c . 18-03 Slurry l Project District 2 — Award Construction Contract April 10, 201 ESTIMATED PROJECT COST SUMMARY Description Amount Bid Amount $228,212.60 Contingency $9,787.40 SUBTOTAL CONSTRUCTION COST: $238,000.00 Design $5,000.00 Inspection, Construction Engineering & Contract Administration (estimated) $7,000.00 TOTAL ESTIMATED PROJECT COST: $250,000.00 FUNDING SUMMARY Account Number Fund Name Amount 32-1-6718 Senate Bill 1 Local Return $250,000.00 TOTAL PROJECT FUNDING: $250,000.00 Capital Improvement Project No. 18-03 Slurry Seal Project District 2 — Award Construction Contract April 10, 2018 ALL BIDS RECEIVED: �CONTRACTOR TOTAL BASE BID Doug Nbrtin Contracting Co, Inc, $ 228,212,60 American Asphalt South, Inc. $ 263,502,50 All American Asphalt $ 267,015.51 Pavement Coatings Co. $ 290,242.50 Roy Allan Slurry Seal Inc. $ 299,403,20 0 Capital Improvement Project No. 18-03 Slurry Seal Project District 2 — Award Construction Contract April 10, 2018 City of Downey Four Year Slurry Seal Program Map 9 Capital Improvement Project No. 18-03 Slurry Seal Project District 2 - Award Construction Contract April 10, 2018 Slurry Seal Project District 2 - treet Lis.1 n. LENGTH WIDTH I O. STREET FROM TO (LF) LF AREA JSF_ 1 ADORES ST DOWNEY AV PARAMOUNT BL 1,837 36 66,132 2- ALBIA ST CUL-DE-SAC WEST BROOKSHIRE AV 872 36 31,392 3 ARNETT ST RIVES AV PRUESS AV 830 30 24,900 4 ARNETT ST HORTON AV RIVES AV 905 30 27,150 5 BENARES ST JULIUS AV NORLAIN AV 594 36 21,384 6 BER MANLN ORIZABA AV CUL-DE-SAC 676 30 20,280 7 BORSONST GLYNN AV BROOKSHIRE AV 711 30 21.330 8 BOYSON ST CALADRE AV CUL-DE-SAC EAST 325 26 8,450 9 BROCKAV ADOREEST IMPERIAL HWY 1,149 36 41,364 10 BRUNACHE ST ORIZABA AV- CUL-DE-SAC EAST 440 30 13,200 11 BYERSAV CUL-DE-SAC WEST BROOKSHIRE AV 328 36 11.808 12 CALADREAV ORANGE ST CUL-DE-SAC SOUTH 380 32 12,160 13 CHEYENNE AV DOWNEY AV PARAMOUNT BL 1,813 36 65,268 14 CLETA ST CUL-DE-SAC WEST PARAMOUNT BL 1,030 35.6 ..... ... .... 36.668 15 COMOLETTE ST DOWNEY AV GLYNN AV 374 30 11,220 16 DE PALMA ST HORTON AV RIVES AV 1,024 36 36,864 17 DE PALMA ST PARAMOUNT BL MORNING AV 954 36 34,344 18 DONOVAN ST BROOKSHIRE AV DOWNEYAV 1,161 38 44,118 19 FONTANA ST HORTON AV HORLEY AV 738 36 26,568 20 GL AV COMOLETTE ST LYNDORA ST 1,148 36 41,328 21 GNEISS A V ORANGE ST CUL-DE-SAC SOUTH 380 28 10,640 22 GURLEYAV NADA ST COLE ST 199 30 5,970 23 HORLEYAV--,-- FONTANA ST DE PALMA ST ----279 36 10,044 24 HORLEYAV ADWENST ARNETT ST 666 30 19.980 25 JULIUS AV STEWART&GRAY RD BENARES ST 1.013 36 36.468 26 JULIUSAV ADWENST -PARAMOUNT PIVOT ST 1,144 36 41,184 27 LEEDS ST BL EAST END 758 -1-.328 32 24,256 -,28 LUXOR ST JULIUS AV RIVES AV 36 47.808 29 LYNDORA ST GLYNN AV DOWNEY AV �348 36 12.528 30 NADA ST ORIZABA AV GURLEY AV 636 30 19.080 31 NADA ST SUSAN AV OLD RIVER SCHOO 853 38 32,414 32 NORLAINAV BENARES ST LUXOR ST 289 36 10,404 33 NORLAINAV NEO ST ARNETT ST 436 36 15,696 34 PARROTAV COLE ST CUL-DE-SAC 426 26 11.076 35 PHLOX ST RIVES AV HORTON AV_918 30 27,540 36 PHLOX ST PARAMOUNT BL DOWNEY AV 1.817 38 69,046 37 PIVOT ST JULIUS AV RIVES AV 1,158 30 34.740 38 POMERING RD STEWART&GRAY RD CUL-DE-SAC 587 30 17,610 39 PRUESSAV BROCKMILL RD CUL-DE-SAC 1,532 30 45,960 40 QUILL DR OLD RIVER SCHOO RIVES AV 2,092 39 81,588 41 RICHEONAV ARNETT ST ADWENST 653 30 19.590 42 SAMOLINEAV QUILL DR SPRINGER ST 609 40 24,360 43 SAMOLINEAV ALBIA ST CUL DE SAC NORTH 376 36 13,536 44 SPRINGER ST SAMOLINE AV PARAMOUNT BL 187 40 7,480 45 SUSANAV CUL DE SAC SOUTH STEWART & GRAY RD 535 36 19.260 TOTAL 36,508 1254186 n. Capital Improvement Project No. 18-03 Slurry Seal Project District 2 — Award Construction • April 10, 2018 blurry-SeaTP-ro—j-e-c-t-D-i-s-Urict 2 • Map 0