Loading...
HomeMy WebLinkAbout05. CIP 14-17 Accept Imperial Hwy Traffic Signal Comm Sys & Upg Projlitffn INU. APPROVED BY CITY MANAGER TO: HONORABLE MAYORCITY COUNCIL FROM: OFFICE OF THE CITY MANAGER Y: MOHAMMAD MOSTAHKAMI, P.E., DIRECTOR OF PUBLIC WORKS 140 SUBJECT: IMPERIAL HIGHWAY TRAFFIC SIGNAL COMMUNICATIONS SYSTEM AD UPGRADESPROJECT, .. i PROJECT NO. ACCEPTANCE OF PROJECT • � i That the City Council 1. Accept the Imperial Highway Traffic Signal Communication System, and Upgrades Project from Old River School Road to the East City Limit, Capital Improvement Project No. 14-17, as complete; and 2. Approve the final construction contract amount of $490,374.77; and 3._ Authorize the Public Works Director to file the Notice of Completion with the Los Angeles County Recorder's office. In 2009, the city applied for and was successful in securing grant funds from the Los Angeles County Metropolitan Transportation Authority (Metro) Call for Projects for a project to expand the traffic signal communication system along Imperial Highway, as well as upgrade the existing traffic signals at various intersections to enhance traffic operations, safety and surveillance capabilities along Imperial Highway from Old River School Road to the East City Limit. On May 10, 2016, the City Council approved plans and specifications for the Imperial Highway Traffic Signal Communication System, and Upgrades Project, Capital Improvement Project No. 14-17 and granted authority to advertise for bids. Additionally, the City Council authorized staff to procure the city -furnished materials for the project. On February 14, 2017, the City Council awarded a construction contract to Elecnor Belco Electric, Incorporated. 0 On May 15, 2017, work commenced and was completed on February 28, 2018. The project included the construction of fiber-optic communication infrastructure on Imperial Highway between Bellflower Boulevard and the San Gabriel River (east city limit); installation of video detection cameras at eight (8) signalized intersections along Imperial Highway and traffic signal upgrades at the Woodruff Avenue/ Imperial Highway and Paramount Boulevard / Imperial Capital Improvement Project No. 14-17 Imperial • Communicationsand Upgrades Pi ` April 10, 2018 Highway intersections in order to bring the traffic signal equipment into compliance with the California Manual of Uniform Traffic Control Devices (CAMUTCD) standards as well as enhance traffic safety and operations at these intersections; installation of miscellaneous communications equipment at signalized intersections to enable two-way communication with the city's Traffic Management Center (TMC) located at the City Hall; and integration of the new communications system with the City's TMC for remote monitoring of traffic signal operations. During construction, additional work beyond the original scope of the project deemed necessary resulting in two (2) contract change orders. The additional work included but was not limited to, furnish and install LED luminaires; furnish and install new controller cabinet and pedestrian push button at Woodruff Avenue/ Imperial Highway intersection, re-establish fiber link from the hub at Imperial Highway /Lakewood Boulevard intersection to the TMC, supply and program ten(10) Ethernet Switches to replace outdated equipment; troubleshoot connectivity and network issues at Brookshire Avenue /Imperial Highway and Old River School Road/ Imperial Highway intersections. The project is deemed complete and staff recommends that City Council accept the project as complete. The final cost of the construction contract, including the base contract amount, net increase in contract quantities, and two (2) contract change orders is $490,374.77. The total project final cost is $815,725.28, which includes the cost of design, construction, inspection, city -furnished materials, engineering and contract administration. The project cost was covered by Los Angeles County Metropolitan Transportation Authority (Metro) Call for Projects and Metro Proposition "C" Local Return funds. Project cost summary is attached. Attachments: • Attachment 1 - Project Cost Summary 0 Capital Improvement Project No. 14-17 Imperial Highway Traffic Signal Communications System and Upgrades Project April 10, 2018 pmdRgo Base Contract Amount Net Decrease in Contract Quantities (Credit) Change Orders TOTAL CONSTRUCTION CONTRACT COST Description Total Construction Contract Cost Consultant Services - Design Consultant Services - Construction Management & Inspection City Furnished Materials Construction Engineering and Contract Administration TOTAL ESTIMATED PROJECT COST: Account No. Fund 26-1-6700 Los Angeles County Metro Call for Projects Funds (Expended FY 2013/14 — FY 2016/17) 54-1-6700 Proposition "C" Local Return Funds (Expended FY 2013/14 — FY 2016/17) 26-1-6700 Los Angeles County Metro Call for Projects Funds (Budgeted FY 2017/18) 54-1-6700 Proposition "C" Local Return Funds (Budgeted FY 2017/18) TOTAL PROJECT FUNDING: Amount $452,950.00 <$11,840.00> $49,264.77 $490,374.77 Amount $490,374.77 $83,508.19 $32,440.00 $155,630.03 $53,772.28 $815,725.28 r-, T ', =.. $190,850 $53,014 $500,000 $102,448 F—ITUTITUTINIZIN