SUBJECT: SLURRY SEAL PROJECT 'iPROJECT
NO. 13 - APPROVE PLANS AND SPECIFICATIONSAUTHORIZEi r i,FOR BIDS
1:1*9001 l :4 `, • ►i
That the City Council approve the plans and specifications and authorize solicitationfor bids for
Slurry Seal Project District 2, Capital Improvement Project No. 18-03.
i
The slurry seal program is designed to seal aged asphalt concrete pavement and extend its life
on various streets throughout the City on average of 5 to 7 years. A slurry seal program is an
effective means of preserving asphalt pavement surfaces by avoiding and/or deferring more
extensive and costly pavement rehabilitation methods such as asphalt overlay and/or
reconstruction. In order to implement a citywide systematic and efficient slurry seal program,
the City has been divided into a four (4) year cycle covering one of the four (4) areas each year.
In the previous fiscal years, a number of street segments within Council Districts 1 through 4
were slurry sealed (see attached map). Last year, a number of street were slurry sealed in
District 1
The street segments selected for slurry seal are based on the condition of the existing
pavement, as prioritized by the City's Pavement Management Information System (PMIS), field
observations and available funding. The PMIS serves as a comprehensive planning tool that
facilitates technical analysis and allows for a systematic approach to identify cost-effective
means for maintaining the citywide roadway system in the most efficient and strategic manner.
The City's PMIS evaluates, ranks, and prioritizes each street segment based on pavement
surface conditions (i.e. cracking, rutting, and roughness), pavement structural strength and
subgrade stability and provides numerical criteria necessary to ensure the most appropriate
paving application for maintenance is selected.
By utilizing the PMIS data along with the City's Geographical Information System (GIS), the list
of street segments is limited to only those which qualify as potential slurry seal candidates. This
"filtering" process ensures the optimal benefit with respect to engineering design, reliability,
time -management and construction cost savings over a period of several years.
Capital ••Project• -1
ProjectSlurry Seal District
January 23, 2018
i OR
Staff has completed the preparation of plans, specifications, and a construction cost estimate for
the Slurry Seal Project District 2 and this project is now ready for solicitation of construction
bids. A total of 45 street segments in City Council District 2, covering a total of approximately
6.9 centerline miles (36,508 linear feet) of roadway, have been selected for this project. The
streets and limits are shown on the attached Project Street List and Project Location Map.
The work to be completed generally consists of sealing cracks in the asphalt pavement,
applying emulsified Type I slurry seal coat to the pavement surface; crack sealing; replacement
of traffic striping, pavement markings, and raised pavement markers; and all necessary related
work. Some street segments will also require the removal and replacement of asphalt
pavement at certain locations, which will be handled independently of this project by City
maintenance crews prior to application of the slurry seal.
Construction of the Slurry Seal Project is anticipated to begin in April 2018 and be completed by
May 2018.
This project is categorically exempt from the provisions of CEQA under Section 15301(c),
Existing Facilities.
The estimated cost of this project, including design, construction, inspection, construction
engineering and project management, is $250,000. Senate Bill 1 (SB1) Road Maintenance and
Rehabilitation Account (RMRA) funds in the amount of $250,000 have been budgeted in the
Fiscal Year 2017-2018 Capital Improvement Program, Account No. 32-1-6718 to cover the total
project cost. A detailed cost estimate will be presented at the time of the award of the
construction contract.
Attachments:
• Four Year Slurry Seal Program Map
• Slurry Seal Project District 2 Street List
• Slurry Seal Project District 2 Location Map
Capital Improvement Project No. 18-03
Slurry Seal Project District 2
January 23, 2018
City of Downey
Four Year Slurry Seal Program Map
91
Capital Improvement Project No. 18-03
Slurry Seal Project District 2
January 23, 2018
LENGTH
WIDTH
NO.
STREET
FROM
TO
(LF)
(I -F)
AREA JSF�
1
ADOREEST
DOWNEY AV
PARAMOUNT BIL
1.837
36
66,132
2
ALBIA ST
CUL-DE-SAC WEST
BROOKSHIRE AV
872
36
31,392
3
ARNETT ST
RIVES AV
PRUESS AV
830
30
24,900
4
ARNETT ST
HORTON AV
RIVES AV
905
30
27,150
5
BENARES ST
JULIUS AV
NORLAIN AV
594
36
21,384
6
BERGMANLN
ORIZABA AV
CUL-DE-SAC
676
30
20,280
7
BORSON ST
GLYNN AV
BROOKSHIRE AV-
711
30
21,330
8
BOYSON ST
CALADRE AV
CUL-DE-SAC EAST
325
26
8.450
9
BROCKAV
ADOREEST
IMPERIAL HWY1,149
36
41,364
10
BRUNACHE ST
ORIZABA AV
-
CUL-DE-SAC EAST
- ------- --- -- ----- -- ---- - - - - ---- -
440
30
13,200
11
BYERSAV
CUL-DE-SAC WEST--
BROOKSHIRE AV
328
36
11,808
12
CALADRE A V
ORANGE ST
CUL-DE-SAC SOUTH
380
32
12,160
13
CHEYENNE AV
DOWNEY AV
PARAMOUNT BL
1,813
36
65,268
14
CLETA ST
CUL-DE-SAC WEST
PARAMOUNT BL
1,030
35.6
36,668
15
COMOLETTE ST
DOWNEYAV
GLYNN AV
374
30
11,220
16
DE PALMA ST
HORTON AV
RIVES AV
1,024
36
36,864
17
DE PALMA ST
PARAMOUNT BIL
MORNING AV
954
36
34,344
18
DONOVAN ST
BROOKSHIRE AV
DOWNEY AV
1,161
38
44,118
19
FONTANA ST
HORTON AV
HORLEY AV
738
36 .....................................
26,568
20
GLYNNAV
COMOLETTE ST
LYNDORA ST
1,148
36
41,328
21
GNEISSAV
ORANGE ST
CUL-DE-SAC SOUTH
380
28
10.640
22
GURLEYAV
NADA ST
COLE ST
199
30
5,970
23
HORLEYAV
FONTANA ST
DE PALMA ST
279
36
10,044
24
HORLEYAV
ADWENST
ARNETT ST
666
30
19,980
25
JULIUS AV
STEWART&GRAY RD
BENARES ST
1,013
36
36,468
26
JULIUS AV
ADWENST
PIVOT ST
1,144
36
41,184
27
LEEDS ST
PARAMOUNT BIL
EAST END
758
32
24.256
28
LUXOR ST
JULIUS AV
RIVES AV
1,328
36
47,808
29
LYNDORA ST
GLYNN AV ---.
DOWNEY AV
348
36'
12,528
30
NADA ST
ORIZABA AV
GURLEY AV
636
30
19,080
31
NADA ST
SUSAN AV
OLD RIVER SCHOO
853
38
32.414
32
NORLAINAV
BENARES ST
LUXOR ST
289
36
10,404
33
NORLAINAV
NEO ST
ARNETT ST
436
36
15,696
34
PARROTAV
COLE ST
CUL-DE-SAC
426
26
11,076
35
PHLOX ST
RIVES AV
HORTON AV
918
30
27,540
36
PHLOX ST
PARAMOUNT BL
DOWNEY AV
1,817
38
69,046
37
PIVOT ST
JULIUS AV
RIVES AV
1,158
30
34,740
38
POMEIRING RD
STEWART&GRAY RD
CUL-DE-SAC
587
30
17,610
39
PRUESSAV
BROCKMILL RD
CUL-DE-SAC
1,532
30
45,960
40
QUILL DR
OLD RIVER SCHOO
RIVES AV
2,092
39
81,588
41
RICHEONAV
ARNETT ST
ADWENST
653
30
19,590
42
SAMOLINEAV
QUILL DR
SPRINGER ST
609
40
24,360
43
SAMOLINEAV
ALBIA ST
CUL DE SAC NORTH
376
36
13.536
44
SPRINGER ST
SAMOLINE AV
PARAMOUNTBL187
40
7.480
45
SUSANAV
CUL DE SAC SOUTH
STEWART & GRAY RD
535
36
19,260
TOTAL
36, 500 8
1, 254,186
4
Capital Improvement Project No. 18-03
Slurry Seal Project District 2
January 23, 2018
Slurry Seal Project District
Locationsi;
a