Loading...
HomeMy WebLinkAboutMins-PWC-02-16-17 MINUTES CITY OF DOWNEY - PUBLIC WORKS COMMITTEE February 16, 2017 MEMBERS PRESENT CITY STAFF PRESENT Carrie Uva, Dist. 1 Mohammad Mostahkami, Director of PW Beth Gendreau, Dist. 2 Edwin Norris, Deputy Director of PW Kent Halbmaier, Dist. 2 Dan Mueller, Principal Civil Engineer Joan Frey, Dist 3 Aldo Schindler, Community Dev. Director Vacant, Dist. 3 Monica Esparza, Associate Planner Hellen Carcamo, Dist. 4 Sgt. Jaime Pelayo, Police Department Enrique Huerta, Dist. 4 Gigi Rodriguez, Engineering Div. Secretary Maria Lourdes Cotaya, Dist. 5 MEMBERS ABSENT OTHERS PRESENT Mariana Pacheco, Dist. 1 - Absent Julie Dixon, Dixon Resources Unlimited Don Lamkin, Dist. 5 - excused Patrick Smith, Dixon Resources Unlimited I. CALL TO ORDER: Committee Chair Frey called the meeting to order at 4:10 P.M. Ms. Carrie Uva and Ms. Hellen Carcamo were introduced as newly appointed Public Works Committee members representing Districts 1 and 4, respectively. II. ELECTION OF OFFICERS: Chair Frey opened the nomination and election of new Chair and Vice-Chair. Chair Frey was nominated and unanimously re-elected as Chair and Mr. Don Lamkin as Vice-Chair. III. CONSENT CALENDAR: Committee Member Gendreau made a motion to approve the Minutes of the November 17, 2016 meeting. The motion was seconded by Committee Member Huerta. The Minutes were approved as written. IV. OLD BUSINESS: None. MINUTES OF THE PUBLIC WORKS COMMITTEE February 16, 2017 Page 2 V. NEW BUSINESS: 1. Presentation of the Downtown Parking Study Draft Report Mr. Schindler introduced Ms. Julie Dixon of Dixon Resources Limited who in turn gave a presentation on the Downtown Parking Study Draft Report. Discussion followed. VI. PUBLIC COMMUNICATIONS 1) Stewart & Gray Rd. and Patton Rd. water leak 2) Check clogged storm drains in time for the rain VII. PUBLIC WORKS COMMITTEE COMMUNICATIONS 1. Old River School Road and Firestone Bl. – painted median does not allow left turns. Mr. Norris responded that Old River School Road will be resurfaced soon, brand new striping will be installed. 2. Florence Ave. and Arrington intersection, accidents continue to occur at this intersection. Staff will look into other options. VIII. STAFF COMMUNICATIONS Updates were given on the following: 1. Electric Vehicle Charging Stations were installed at the following: 2 civic center 1 Library 1 Downtown Parking Station 1 Barbara Riley Sr. Center 2. Bellflower and Imperial Hwy Intersection Project is still on-going. 3. Traffic Signal Upgrades Project at nine intersections will be completed in April. 4. Concrete repairs in District 4 is nearing completion. 5. Residential streets resurfacing will start soon. 6. Lakewood Blvd. Phase 3C (Gallatin Rd. to Telegraph Rd) – construction is scheduled to begin in July 2017. 7. Old River School Road Rehabilitation Project (between Imperial Hwy and Arnett) – scheduled to advertise for construction in May 2017 MINUTES OF THE PUBLIC WORKS COMMITTEE February 16, 2017 Page 3 8. Sewer Lift Station northeast part of the city is almost done. Should be completed by mid to late March. 9. Water Improvement Project on Brookshire Ave. (Gardendale to Imperial Hwy and Firestone to Florence) bid opening today – start of construction in late March. 10. Existing regulations for water conservation was extended until October 2017. 11. City consultant currently reviewing accessibility ADA requirements of all city streets and facilities except fire stations. 12. Update on Measure M and Pavement Management System. 13. Florence Avenue (Studebaker Rd.- Orr and Day Rd., Santa Fe Springs) reduced to one to two lanes in each direction while the I-5 bridge is being demolished. IX. NEXT MEETING: March 16, 2017 The Public Works Committee meeting was adjourned at 6:15 P.M.