Loading...
HomeMy WebLinkAbout4. PLN-16-00206 Rev to PLN-14-00214PLN-16-00206 Revision “A” to PLN-14-00214 511 Firestone Boulevard And 11104 Pangborn Avenue September 7, 2016 - Page 2 Since then, the applicant has moved forward with the project by submitting plans to the City for plan check. That process is nearly complete; however, the Building and Safety Department cannot issue permits for the project and the Applicant cannot begin construction because the civil engineer’s preparation of Final Parcel Map No. 73738 map lagged behind the building plan review process. As a result, the final map has not been submitted to the Public Works Department for review, which means that it is not ready to present to the Planning Commission or the City Council. DISCUSSION Construction activities for the proposed fast food restaurant have not begun because a condition of approval for Tentative Parcel Map No. 73738 requires Planning Commission and City Council approval of the final map before the issuance of building permits. In an effort to avoid losing months of time to begin construction, the Applicant is proposing to change the wording of Condition No. 7 of the Conditions of Approval for Tentative Parcel Map No. 73738 that reads as follows: “The final parcel map shall be accepted by the Planning Commission and City Council before building permits are issued.” The Applicant is requesting that the Planning Commission amend the wording of Condition No. 7 to read as follows: “Prior to the final approval of any building permits or before granting occupancy of the restaurant building associated with PLN-14-00214, Final Parcel Map No. 73738 shall be approved by the City and recorded with the County of Los Angeles.” The proposed revision to Condition No. 7 will allow the Applicant to obtain permits and begin construction of the fast food restaurant. The City will maintain authorization for final approval of the building permit and can withhold building occupancy until the Final map is approved by the City Council and the map is recorded with the County. RECOMMENDATION: Staff supports the request and recommends that the Planning Commission adopt a resolution to amend Condition No.7 of Resolution No. 16-2965 as proposed, thereby allowing the City to issue a building permit for the fast food restaurant before the City Council accepts Final Map No. 73738. EXHIBITS Applicant’s Letter (Received August 15, 2016) Resolution March 16, 2016, Planning Commission Staff Report Resolution No. 16-2965 H:\Community Development\Davis\cases\Tentative Maps\PLN-16-00206 (9511 Firestone and 11104 Pangborn)\Staff Report (9-7-16).docx PC Agenda Page 2 RESOLUTION NO. 16- A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DOWNEY APPROVING PLN-16- 00206 (REVISION “A” TO PLN-14-00214) – A REQUEST TO AMEND CONDITION NO. 7 OF RESOLUTION NO. 16-2965, TO ALLOW BUILDING PERMITS TO BE ISSUED BEFORE THE CITY COUNCIL ACCEPTS FINAL MAP NO. 73738 THE PLANNING COMMISSION OF THE CITY OF DOWNEY DOES RESOLVE AS FOLLOWS: SECTION 1. The Planning Commission of the City of Downey does hereby find, determine and declare that: A.On March 16, 2016, the Planning Commission approved PLN-14-00214; a proposal to develop a Jack in the Box restaurant with a drive through lane at the northeast corner of Firestone Boulevard and Pangborn Avenue. B.PLN-14-00214 required the City’s approval of five entitlements to develop the subject property as intended: 1) a general plan amendment; 2) a zone change; 3) Tentative Parcel Map No. 70738, 4) a conditional use permit and 5) a site plan review application. The Planning Commission also revoked a long-standing zone exception for the property. In addition to the Commission’s actions, the City Council approved an amendment to the General Plan on April 12, 2016, that changed the land use categories of the properties at 9551 Firestone Boulevard and 11104 Pangborn Avenue from General Commercial and Medium Density Residential to Neighborhood Commercial. The City Council also adopted an ordinance to change the zoning of the southerly fifty two feet (52’) of the property at 9511 Firestone Boulevard and the adjoining property at 11104 Pangborn Avenue from parking buffer to neighborhood commercial. C.Construction activities for the proposed fast food restaurant have not begun because Condition No. 7 of the Conditions of Approval for Tentative Parcel Map No. 73738 (stated in Resolution No. 16-2965) requires Planning Commission and City Council approval of the final map before the issuance of building permits. D.To avoid losing months of construction time, the Applicant submitted a Land Use Permit Application (PLN-16-00206), requesting that the Planning Commission revise the wording of Condition No. 7 of Resolution No. 16-2965. B.On August 25, 2016, notice of the pending public hearing for PLN-16-00206 was published in the Downey Patriot on and it was mailed to all property owners within 500 feet of the subject site. C.The Planning Commission held a duly-noticed public hearing on September 7, 2016, and after fully considering all oral and written testimony and facts and opinions offered at the aforesaid public hearing, adopted Resolution No. _____, approving PLN-16-00206 (Revision “A” to PLN-14-00241), subject to the conditions of approval. SECTION 2. Having considered all of the oral and written evidence presented to it at said public hearing in light of the request to amend the wording of Condition No. 7 of Resolution No. 16-2965, the Planning Commission further finds, determines and declares that: PC Agenda Page 3 Resolution No. _____ Page 2 Page 2 A.That the proposed map is consistent with the General Plan. The City of Downey Land Use Element has adopted as one of its goals to address changes in land use and zoning trends (Goal 1.3) and encourages land uses consistent with the area’s designation as properties recycle (Program 1.3.1.5). Approval of the Tentative Parcel Map 73035 will result in a land use that is consistent with its proposed Neighborhood Commercial zoning (a fast food restaurant with a drive thru lane), and the eventual demolition of two vacant buildings, one residential the other commercial; consequently, approval of Tentative Parcel Map 73035 is consistent with the goals, policies, programs, and land uses of applicable elements of the General Plan. B.That the site is physically suitable for the type and density of development. The project site exceeds the minimum area requirement for new lots in the C-1 (Neighborhood Commercial) zoning classification the applicant is seeking as part of this development proposal. The minimum area requirement for a new lot in the requested zone is 6,000 square feet, whereas the project site measures approximately 33,481 square feet, slightly less than an acre. The project consists of developing the site as a fast-food restaurant, with a drive-through lane, and with thirty-one parking spaces. The minimum parking requirement for the restaurant is 30 spaces, compared to the 31 spaces that will be provided; the minimum vehicle stacking requirement for a restaurant’s drive-through lane is 8 spaces, which the project’s drive-thru lane will provide. C.That the design of the subdivision or type of improvements is not likely to cause serious public health problems. The proposed subdivision seeks to consolidate two parcels into one. The project will not cause serious public health problems to the future occupants of the proposed development, nor persons living nearby, since there are no sites nearby that pose health hazards, and because the proposed development is for a commercial use (fast food restaurant with a drive- thru lane) that is appropriate for this area. D.That the design of the subdivision or the type of improvements will not conflict with easements, acquired by the public at large, for access through or use of property within the proposed subdivision. Tentative Parcel Map No. 73738 proposes to consolidate the two parcels that comprise the 33,481 square foot site, 9511 Firestone Boulevard (APN 6287024007) and 11104 Pangborn Avenue (APN 6287024007), into one legal parcel. The new Parcel 1 will contain 37,824 square feet of gross land area and 33,481 square feet of net land area. The City developed Pangborn Avenue to its ultimate right of way width years ago, but fourteen feet of the subject property remain in the public right of way. The street dedication proposed on Tentative Map No. 73738 will clear this discrepancy. Otherwise, there are no public access easements through or across the site. Additionally, the City has reviewed the request and determined that the approval of the map will not conflict with utility easements on the site. E.That the design of the subdivision or the proposed improvements is not likely to cause substantial environmental damage or substantially and avoidably injure wildlife or their habitat. The subject property is developed with an 850 square foot single-family residence and detached garage, built in 1949 on the Pangborn site, while site improvements for 9511 Firestone Boulevard consist of a PC Agenda Page 4 Resolution No. _____ Page 3 Page 3 single-story, 6,261 square foot stucco building with parking areas in the front and rear. Tentative Parcel Map No. 73738 proposes to consolidate the two parcels that comprise the 33,481 square foot site to facilitate its development into a 3,000 square foot fast food restaurant with a drive thru lane. There are no known areas within the City that host wildlife or their habitat, most particularly species identified as a candidate, sensitive, or special status species. As such, it is staff’s opinion that the proposed the project will not impact wildlife resources. SECTION 3. On April 26, 2016 the Downey City Council adopted a Mitigated Negative Declaration for the proposed project. SECTION 4. Based upon the findings set forth in Sections 1, 2 and 3 of this Resolution, the Planning Commission of the City of Downey hereby approves PLN-16-00206, subject to the conditions of approval attached hereto as Exhibit A. SECTION 5. The Secretary shall certify the adoption of this Resolution. APPROVED AND ADOPTED this ____ day of ________ 2016. Matias Flores, Chairman City Planning Commission I HEREBY CERTIFY that the foregoing Resolution was duly adopted by the City Planning Commission of the City of Downey at a meeting held on the ____ day of _____, 2016. AYES: COMMISSIONERS: NOES: COMMISSIONERS: ABSTAIN: COMMISSIONERS: ABSENT: COMMISSIONERS: Mary Cavanagh, Secretary City Planning Commission PC Agenda Page 5 Resolution No. _____ Page 4 Page 4 EXHIBIT A – CONDITIONS OF APPROVAL PLN-16- 00206 (REVISION “A” TO PLN-14-00214) TENTATIVE PARCEL MAP NO. 73738 PLANNING 1.This approval is to consolidate two (2) lots into one parcel, identified as Parcel 1 on Tentative Parcel Map No. 73738, which will contain 33,481 square feet (net) and it includes the properties at 9511 Firestone Boulevard (APN 6287024007) and 11104 Pangborn Avenue (APN 6287024007), as shown on the approved plan dated March 16, 2016. Deviations or exceptions from said plan shall not be permitted without the approval of the City Planning Commission. 2.The Planning Commission shall retain jurisdiction to amend or add conditions with a public notice and public hearing to assure compatibility with the purpose and intent of the Comprehensive Zoning Ordinance and to protect the health, safety and general welfare. 3.The applicant/developer shall demolish the residence at 11104 Pangborn Avenue and the commercial building at 9511 Firestone Boulevard before the Planning Commission and City Council accept Final Parcel Map No. 73738. 4.All conditions of Tentative Parcel Map No. 73738 shall be complied with before this application becomes valid. 5.This approval shall expire in 24 months from the effective date of the tentative map’s approval. 6.If City approval is contingent upon any changes to the plans as submitted, the applicant shall submit three copies of the revised plans, incorporating all approved amendments, overlays, modifications, etc. to the Planning Division prior to the issuance of building permits. 7.The final parcel map shall be accepted by the Planning Commission and City Council before building permits are issued. Prior to the final approval of any building permits or before granting occupancy of the restaurant building associated with PLN-14-00214, Final Parcel Map No. 73738 shall be approved by the City and recorded with the County of Los Angeles. 8.The Owner/Applicant agrees, as a condition of approval of this resolution, to indemnify, defend and hold harmless, at Applicant's expense, City and City's agents, officers and employees from and against any claim, action or proceeding commenced within the time period provided in Government Code Section 66499.37 to attack, review, set aside, void or annul the approval of this resolution, to challenge the determination made by City under the California Environmental Quality Act or to challenge the reasonableness, legality or validity of any condition attached hereto. City shall promptly notify Applicant of any such claim, action or proceeding to which City receives notice, and City will cooperate fully with Applicant in the defense thereof. Applicant shall reimburse the City for any court costs and attorney's fees that the City may be required to pay as a result of any such claim, action or proceeding. City may, in its sole discretion, participate in the defense of any such claim, action or proceeding, but such participation shall not relieve Applicant of the obligations of this condition. PC Agenda Page 6 Resolution No. _____ Page 5 Page 5 PUBLIC WORKS 9.The owner/applicant hereby consents to the annexation of the property into the Downey City Lighting Maintenance District in accordance with Division 15 of the Streets and Highways Code, and to incorporation or annexation into a new or existing Benefit Assessment or Municipal Improvement District in accordance with division 10 and Division 12 of the Streets and Highways code and/or Division 2 of the Government Code of the State of California. 10.The applicant shall dedicate fourteen feet (14’) for right-of-way purposes along the frontage of Pangborn Avenue and a seventeen feet (17’) corner cut off property dedication at the intersection of Pangborn Avenue and Firestone Boulevard to the standards of the Engineering Division. 11.The owner shall install all proposed utilities underground. 12.The owner/applicant shall be required to complete a construction & demolition (C&D) waste management plan per Article V, Chapter 8 of the Downey Municipal Code. 13.The owner/applicant shall submit an engineered grading plan and/or hydraulic calculations and site drainage plan for the site (prepared and sealed by a registered civil engineer in the State of California) for approval by the Engineering Division and Building and Safety Division. Proposed parking lot shall not have less than one (1%) percent gradient on any asphalt or non-paved surface, or less than one quarter (1/4%) percent gradient on any concrete surface. Provide the following information on plans: topographic site information, including elevations, dimensions/location of existing/proposed public improvements adjacent to project (i.e. street, sidewalk, parkway and driveway widths, catch basins, pedestrian ramps), the width and location of all existing and proposed easements. Broken, uneven, or sub-standard curb, gutter, sidewalk, driveway, disabled ramps and pavement, shall be replaced to the satisfaction of the Public Works Department. Contact the Public Works Inspection Office at (562) 904-7110 to have these areas identified just prior to initiating a grading plan. The owner/applicant shall obtain all necessary plan approvals and permits and shall provide that the standards of improvements, construction materials, and methods of construction shall be in conformance with the Standard Plans and Specification for Public Works Construction and as modified by the City of Downey’s Standard Plans and Specifications. 14 All driveway approaches shall be as wide as the driveway or parking aisle they serve. All unused driveways shall be removed and reconstructed with full-height curb, gutter and sidewalk. 15.The owner/applicant shall install street trees along Pangborn Avenue frontage per City Tree Masterplan. 16.The owner/applicant shall install pavement, which consists of a minimum section of 4” thick aggregate base, and a minimum 2-1/2” thick asphalt concrete pavement. PC Agenda Page 7 Resolution No. _____ Page 6 Page 6 17.The owner/applicant shall comply with the National Pollutant Discharge Elimination System (NPDES) requirements of the Federal Clean Water Act; the General Construction Activities Stormwater Permit (GCASP) of the State Water Resources Control Board; the Standard Urban Stormwater Mitigation Plan (SUSMP); and Ordinance 1142 of the Downey Municipal Code (DMC) Low Impact Development (LID) plan. 18.The owner/applicant shall provide that all construction graffiti created as part of this project in the public right of way to be removed. 19.The owner/applicant shall furnish and install a new (min. 1-inch) dedicated potable water service line, meter, and meter box for each unit. 20.The owner/applicant shall furnish and install backflow device(s) in accordance with the Department of Public Works and the State and County Department of Health Services requirements. 21.The owner/applicant shall furnish and install the public potable water improvements, including extension and/or replacement of existing mains and associated facilities, necessary to provide adequate fire flow and pressure to the site. 22.The owner/applicant shall retrofit existing fire hydrant located at the Southwest corner of Pellet Street and Pangborn Avenue and other appurtenances as required by the Department of Public Works and the Downey Fire Department. Such improvements may include, laterals, backflow devices, and associated facilities with new facilities to current Downey standards and materials. Backflow devices, fire department connections, and associated appurtenances are to be located on private property and shall be readily accessible for emergency and inspection purposes. Backflow devices shall be screened from street view by providing sufficient landscaping to hide it. 23.The owner/applicant shall provide and record utility easement(s) for access to, and inspection and maintenance of, public water lines, meters and appurtenances, and backflow devices. 24.The owner/applicant shall furnish and install sanitary sewer lateral(s) and associated facilities within the public right of way in accordance with the requirements of the Department of Public Works. 25.The owner/applicant shall identify the point(s) of connection for the sanitary sewer lateral(s) and confirm that sufficient capacity exists in the publicly owned facilities in conformance with the requirements of the Department of Public Works and the County Sanitation Districts of Los Angeles County (CSDLAC). 26.The owner/applicant shall furnish and install the public sanitary sewer improvements, including extension and/or replacement of existing mains and associated facilities, necessary to provide adequate capacity for the site as approved by the Department of Public Works and CSDLAC. 27.The owner/applicant is responsible for coordinating with Building & Safety permit fees and payment(s) to the City and CSDLAC for all sanitary sewer connection and capacity charges. PC Agenda Page 8 Resolution No. _____ Page 7 Page 7 28.The owner/applicant shall provide improvement plan mylars, record drawing mylars, and record drawing digital (AutoCAD – latest edition) files in accordance with the requirements of the Department of Public Works that have been signed by a civil engineer licensed in the State of California. Final approval of new utilities shall be dependent upon submittal and approval of record drawing mylars and scanned, uncompressed TIFF images of record drawings on a CD/DVD-ROM media per City’s GIS Requirements. 29.Utility plans shall be submitted to and approved by the Department of Public Works prior to the issuance of the grading plan permit. Submit plans to Building & Safety and Planning Divisions regarding the following: a.The use of drought tolerant plants b.Drip irrigation c.Latest Green Code standards for water fixtures, etc. BUILDING DIVISION 26.Obtain all necessary plan approvals and permits. 28.All electrical and telephone utilities shall be installed underground to the standards of the City Engineering and Building & Safety Divisions. 29.Future development shall comply with all handicap accessibility requirements for site per CAC T-24, Part II, Section 11 B. PC Agenda Page 9 PC Agenda Page 10 STAFF REPORT PLANNING DIVISION DATE: MARCH 16, 2016 TO: PLANNING COMMISSION SUBMITTED BY: ALDO SCHINDLER, DIRECTOR OF COMMUNITY DEVELOPMENT REVIEWED BY: WILLIAM E. DAVIS, CITY PLANNER PREPARED BY: WILLIAM E. DAVIS, CITY PLANNER SUBJECT: PLN-14-00214 - A REQUEST FOR APPROVAL OF THE FOLLOWING: REVOKE ZONE EXCEPTION CASE NO. 929 IN ACCORDANCE WITH SECTION 9828 OF THE ZONING ORDINANCE; A GENERAL PLAN AMENDMENT TO CHANGE THE LAND USE CATEGORIES OF THE SUBJECT PROPERTIES FROM GENERAL COMMERCIAL AND MEDIUM DENSITY RESIDENTIAL TO NEIGHBORHOOD COMMERCIAL; A ZONE CHANGE FROM PARKING BUFFER TO NEIGHBORHOOD COMMERCIAL; TENTATIVE PARCEL MAP NO. 73738, TO CONSOLIDATE TWO LOTS; A CONDITIONAL USE PERMIT TO ALLOW THE DEVELOPMENT OF A DRIVE-THROUGH LANE; SITE PLAN REVIEW OF THE DEVELOPMENT, DESIGN AND USE STANDARDS TO CONSTRUCT A 3,000 SQUARE FOOT JACK IN THE BOX RESTAURANT; AND ADOPT A MITIGATED NEGATIVE DECLARATION OF ENVIRONMENTAL IMPACT LOCATION: 9511 FIRESTONE BOULEVARD AND 11104 PANGBORN AVENUE ZONING: C-1 (NEIGHBORHOOD COMMERCIAL) AND PB (PARKING BUFFER) REPORT SUMMARY PLN-14-00214 is a proposal to develop a Jack in the Box restaurant with a drive through lane at the northeast corner of Firestone Boulevard and Pangborn Avenue. Two properties comprise the project site: 9551 Firestone Boulevard and 11104 Pangborn Avenue. A shuttered carpet store occupies the Firestone Boulevard property, while the Pangborn property supports a single-family residence and detached garage. The applicant holds title to both parcels and proposes to raze the structures, combine the lots, and develop the fast food restaurant. Together, the two properties total 33,481 square feet. The assembled site is rectangular shaped and fronts on both Firestone Boulevard and Pangborn Avenue; it maintains 96 feet of frontage on Firestone Boulevard and nearly 300 feet on Pangborn Avenue. The project site currently maintains two zoning classifications: 9511 Firestone Boulevard is zoned Parking Buffer (P-B) and Neighborhood Commercial (C-1), while 11104 Pangborn Avenue is zoned P-B. The project site also maintains two General PC Agenda Page 11 PLN-14-00214 9511 Firestone Boulevard And 11104 Pangborn Avenue March 16, 2016 - Page 2 Plan categories: the former carpet store property is designated General Commercial, whereas the residential parcel is classified Medium Density Residential. The Applicant requires five entitlements to develop the subject property as proposed: 1) a general plan amendment; 2) a zone change; 3) a parcel map, 4) a conditional use permit and 5) a site plan review application. In addition to the entitlements, the Applicant is requesting the Planning Commission consider revoking a zone exception permit that is in effect for 9511 Firestone Boulevard. Zone Exception Permit No. 929, which was granted in 1970, permitted a carpet store to operate at this location. Then in 1995, the Planning Commission modified the carpet store’s site plan and several of the zone exceptions conditions of approval; and one of the conditions stipulated the following. Deviations or exceptions from the approved conceptual site plan shall not be permitted without the approval of the Planning Commission. A Mitigated Negative Declaration was prepared for the project by the environmental and engineering firm DUDEK, to assess its potential environmental effects (a copy is attached). After reviewing the Applicant’s request, staff recommends that the Planning Commission adopt the following resolutions: A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DOWNEY REVOKING ZONE EXCEPTION CASE NO. 929 FOR PROPERTY AT 9511 FIRESTONE BOULEVARD IN ACCORDANCE WITH SECTION 9828 OF THE ZONING ORDINANCE A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DOWNEY RECOMMENDING THE CITY COUNCIL APPROVE AN AMENDMENT TO THE GENERAL PLAN BY CHANGING THE LAND USE CATEGORIES OF THE PROPERTIES AT 9551 FIRESTONE BOULEVARD AND 11104 PANGBORN AVENUE FROM GENERAL COMMERCIAL AND MEDIUM DENSITY RESIDENTIAL TO NEIGHBORHOOD COMMERCIAL AND ADOPT A MITIGATED NEGATIVE DECLARATION OF ENVIRONMENTAL IMPACT FOR THE GENERAL PLAN AMENDMENT A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DOWNEY RECOMMENDING THE CITY COUNCIL APPROVE A ZONE CHANGE APPLICATION BY CHANGING THE ZONING OF THE SOUTHERLY FIFTY TWO FEET OF THE PROPERTY AT 9511 FIRESTONE BOULEVARD AND THE ADJOINING PROPERTY AT 11104 PANGBORN AVENUE FROM PARKING BUFFER TO NEIGHBORHOOD COMMERCIAL AND ADOPT A MITIGATED NEGATIVE DECLARATION OF ENVIRONMENTAL IMPACT FOR THE ZONE CHANGE APPLICATION A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DOWNEY APPROVING TENTATIVE PARCEL MAP NO. 73738, AN APPLICATION TO CONSOLIDATE THE TWO LOTS AT 9511 FIRESTONE BOULEVARD AND 11104 PANGBORN AVENUE AND ADOPT A MITIGATED NEGATIVE DECLARATION OF ENVIRONMENTAL IMPACT FOR THE PARCEL MAP PC Agenda Page 12 PLN-14-00214 9511 Firestone Boulevard And 11104 Pangborn Avenue March 16, 2016 - Page 3 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DOWNEY APPROVING SITE PLAN REVIEW APPLICATION PLN-14-00214, A REQUEST TO DEVELOP A 3,000 SQUARE FOOT JACK IN THE BOX FAST-FOOD DRIVE-THROUGH RESTAURANT ON THE 33,481 SQUARE FOOT SITE AT 9551 FIRESTONE BOULEVARD AND 11104 PANGBORN AVENUE AND ADOPT A MITIGATED NEGATIVE DECLARATION OF IMPACT FOR THE APPLICATION A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DOWNEY APPROVING A CONDITIONAL USE PERMIT APPLICATION TO PERMIT THE DEVELOPMENT OF A DRIVE-THROUGH LANE FOR THE PROPOSED JACK IN THE BOX FAST- FOOD RESTAURANT ON THE SITE AT 9511 FIRESTONE BOULEVARD AND 11104 PANGBORN AVENUE AND ADOPT A MITIGATED NEGATIVE DECLARATION OF ENVIRONMENTAL IMPACT FOR THE APPLICATION BACKGROUND The applicant operated a Jack in the Box restaurant at the northwest corner of the Firestone Boulevard/Woodruff Avenue intersection next to Stonewood Center. However, he did not renew the lease for this location and purchased the project site to develop a Jack in the Box there instead. As noted above, two parcels makeup the 33,481 square foot site: 9511 Firestone Boulevard and 11104 Pangborn Avenue. The Pangborn Avenue property measures 8,500 square feet and its improvements consist of an 850 square foot single-family residence and detached garage, built in 1949. The property is zoned PB (Parking-Buffer) but it is designated MDR (Medium Density Residential) on the General Plan Land Use Diagram. Site improvements for 9511 Firestone Boulevard consist of a single-story, 6,261 square foot stucco building with parking areas in the front and rear. The building was constructed in 1953 and its first tenant was a grocery/produce store, according to Building Division records. In 1970, the Planning Commission granted a zone exception permit (ZEC No. 929) to allow a carpet store to operate at this address. Back then the property was also zoned C-1 and carpet stores were not listed as a permitted use in the C-1 zone; thus, the need for the zone exception. During the mid -1980s, the carpet store discontinued operations and was replaced by a nursery/florist, which operated for the next few years. In the late 1980s, another carpet store replaced it and was allowed to do so because the zone exception permit was still valid. In 1995, the Planning Commission held hearings to consider revoking the zoned exception permit because the carpet store’s outdoor activities were impacting neighboring residents negatively. Carpet installers were generating noise in the morning when they loaded/unloaded their trucks; installers were also blocking Pangborn Avenue and the sidewalk when unloading/loading. In response, the Planning Commission held several hearings and ultimately decided to modify the store’s site plan and several of the zone exception’s conditions of approval; the changes enabled the business to continue operating, without impacting neighboring residents, until it moved out in 2007. A tile and marble store eventually replaced the carpet store. It ceased operations in October, 2013 and the building has been empty ever since. PC Agenda Page 13 PLN-14-00214 9511 Firestone Boulevard And 11104 Pangborn Avenue March 16, 2016 - Page 4 AERIAL PHOTOGRAPH SURROUNDING LAND USES Properties on Firestone Boulevard and Pangborn Avenue in the vicinity of the project site support a variety of uses including various retail stores, a fast-food restaurant, a private elementary school, apartment complexes, and a single-family neighborhood. Apartment complexes occupy the neighboring properties north and east of the project site. It should be noted that apartment complexes occupy the three Firestone Boulevard properties immediately east of the project site and the two properties to the north on Pangborn Avenue. SUBJECT SITE 9511 FIRESTONE BL. / 11104 PANGBORN AVE. PC Agenda Page 14 PLN-14-00214 9511 Firestone Boulevard And 11104 Pangborn Avenue March 16, 2016 - Page 5 The adjoining property to the east, 9525 Firestone Boulevard, supports a 2-story, 18-unit complex, known as the Rustic Villa, which was built in 1962 after the Planning Commission approved Zone Exception Case No. 257. This decision permitted the development of the multi-family complex as a deviation from the property’s C-1 and P-B zoning (both classifications are still in effect today). The building maintains a 52-foot front setback, contains 14,230 square feet of floor area, while the property measures 23,550 square feet. Additionally, the building is oriented so its west-facing building wall sides up to the prospective Jack in the Box property. The complex also features open parking in front of the building, with carports and tuck-under parking in the rear. A 2-story, 30-unit apartment building, the Monte Carlo, occupies the property just east of the Rustic Villa complex and both share some of the same characteristics. For example; both are zoned C-1 and P- B and the Planning Commission adopted a zone exception case that permitted the Monte Carlo to be developed from its commercial zoning. (ZEC No. 266 was adopted in 1962). The building also maintains a 52-foot front setback and parking is provided in both the front and rear of the building. Surface parking is provided in the front, while tuck under parking, carports and surface parking is provided in the rear. The property measures about 36,389 square feet; it has 101 feet of Firestone Boulevard frontage and is 360 feet deep. A 23-unit complex occupies the property north of the project site, while the property north of it supports a 12-unit complex. Both apartment buildings are developed in an east/west orientation, unlike the Firestone Boulevard complexes which face south. The parcel abutting the Jack in the Box property, 11100 Pangborn Avenue, is a flag-shaped lot with 60 feet of frontage. This site totals 20,271 square feet and it is zoned P-B. The two-story, 23-unit complex was built in 1959 with surface parking. The 12-unit apartment building is located at 11026 Pangborn Avenue. The property contains 19,638 square feet, and it is narrow and deep with measurements of 63.79 feet of frontage and 312.51 feet in depth. It was built in 1969 when the Planning Commission granted a zone exception permit, ZEC No. 798, to develop the complex from its P-B zone. By contrast the property’s General Plan designation is Medium Density Residential, which unlike its zoning, reflects the apartment complex. The 12-unit apartment building is a two-story structure measuring 10,050 square feet. The property features both covered and surface parking. A McDonald’s drive-through restaurant, a private Christian elementary school and a single- residence occupy the properties on the west side of Pangborn Avenue, across from the project site. As the map shows, McDonald’s occupies the northwest corner of the Firestone/Pangborn intersection, while the private elementary school wraps around the McDonald’s property, bordering both the north and west sides of the restaurant property. A single-family residence occupies the property north of the school. This residence is part of an extensive single-family neighborhood that extends as far north as Florence Avenue and is sandwiched between Woodruff Avenue and the City’s easterly boundary. McDonald’s took over the restaurant from Burger King in 2004. The property measures approximately 23,960 square feet (150 feet of Firestone Boulevard frontage by 160 feet), while the restaurant contains 3,066 square feet. The Jack in the Box site, in comparison, measures 33,481 square feet, with the restaurant totaling 3,000 square foot. Thus, the Jack in the Box site is 28% or 9,521 square feet larger than the McDonald’s parcel. In terms of site layout, the McDonald’s restaurant building sits in the middle of the property, while its parking spaces line three sides of the lot. McDonalds’ drive-through lane begins on the east side of the building, wraps around the north side, and terminates on the west side where the pickup window is located. PC Agenda Page 15 PLN-14-00214 9511 Firestone Boulevard And 11104 Pangborn Avenue March 16, 2016 - Page 6 The private elementary school, Kirkwood Christian Elementary, sits on an L-shaped site that fronts both Pangborn Avenue and Firestone Boulevard. The school site consists of two properties, which total 27,284 square feet. The school facility contains 6,320 square feet and consists of four indoor classrooms, an outdoor play yard, a pool, an outdoor lunch area, and a covered art area. Off-street parking is provided in the front portion of both the site’s Pangborn and Firestone properties. Kirkwood Elementary has been operating at this location since 1972. It provides education for kindergarten through Grade 3 and has a student population of 120. The school operates year round and is open Monday through Friday, from 6:30 a.m. to 6:00 p.m. In 1986, the Planning Commission granted Kirkwood school two entitlements, allowing it to expand to its present configuration. Entitlements included Conditional Use Permit No. 231, which allowed the school to add 4,200 square feet of building area, thereby increasing its size from 2,120 square feet to 6,320 square feet. The second entitlement, Zone Variance No. 450, allowed the school to exceed the C-1 zone’s 3,000 square foot floor area cap for an individual business. This standard was in effect until 2008. The project site occupies the northeast corner of the Firestone Boulevard/Pangborn Avenue intersection, where the two streets meet forming a stop sign controlled,” T”- intersection. Both streets provide access to the project site. The General Plan’s Circulation Chapter classifies Firestone Boulevard as a “Major Arterial.” A “Major Arterial”, according to the Circulation Chapter, is intended to serve as a through route for traffic crossing the city, and provide access to the freeway system. Firestone Boulevard is Downey’s primary east/west retail commercial corridor and it essentially halves the community. The section of Firestone next to the site is 106 feet wide and is composed of three travel lanes in each direction, a raised landscaped median, and 10-foot wide sidewalks. It carries about 37,500 vehicles daily, which is less than the roadway’s capacity (approximately 54,000 vehicles per day). The posted speed on Firestone Boulevard is 40 miles per hour and on-street parking is prohibited to maximize the street’s capacity. Pangborn Avenue, by contrast, is classified as a “Collector Street” in the Circulation Chapter. It consists of one travel lane in each direction, while providing curbside parking on both sides of the street. “Collector” streets are designed to link local streets to both arterial roads and the regional roadway network, according to the General Plan. Pangborn Avenue is the only north/south street between Woodruff Avenue and the City’s easterly boundary that stretches uninterrupted from Firestone Boulevard north to Florence Avenue. As such, it serves as the collector street for the intersecting east/west residential streets. Recent traffic counts indicate Pangborn Avenue carries about 5,770 vehicles per day, which is also less than its capacity: 8,000 vehicles per day. ANALYSIS The Applicant is proposing to develop the subject site by constructing a fast food restaurant with a drive through lane. The project requires the Planning Commission’s approval of the following entitlements or discretionary actions: a general plan amendment, a zone change, a tentative parcel map, site plan review and a conditional use permit. It also requires the Planning Commission to consider revoking ZEC No. 929, which allowed a carpet store to occupy the project site. Following is an analysis of these aspects of the application: PC Agenda Page 16 PLN-14-00214 9511 Firestone Boulevard And 11104 Pangborn Avenue March 16, 2016 - Page 7 1. General Plan Amendment The Applicant is requesting to change the site’s two General Plan designations to “Neighborhood Commercial.” The proposed fast food restaurant is a retail use that falls within the requested “Neighborhood Commercial” category. The site’s C-1 (Neighborhood Commercial) zone is the City zoning classification and corresponds with the requested General Plan category. Currently the project site maintains two General Plan designations; the parcel that the former carpet store occupied is designated “General Commercial,” while the property with the single- family dwelling is designated “Medium Density Residential. “Neighborhood Commercial” is the land use category that is best suited for the project site due to factors such as its limited size, the nearby residential neighborhood and its Firestone Boulevard frontage. Its current “General Commercial” category allows for a wide range of commercial uses and project types; some with extensive trade areas, like regional shopping centers, new and used automobile dealerships, hotels, office buildings and hospitals. Uses associated with the “General Commercial” designation are typically more intense so this category is appropriate in areas with large sites that provide buffers for adjoining land uses. This suggests that the project site, which contains about 33,481 square feet, is not large enough to accommodate the above-mentioned uses. The “Neighborhood Commercial” category, by contrast, is intended for neighborhood-serving retail uses, which draw customers from adjoining neighborhoods, and not areas from outside the city or region. Consistent with this intent, uses described as “Neighborhood Commercial” are typically small in scale with respect to floor area, building height and operational activities. When the City adopted its first comprehensive General Plan in 1973, the former carpet store property was designated “Neighborhood Commercial;” (a carpet store occupied the property in 1973 and began operations there in 1970). The 1973 General Plan labeled the property as a suitable location for retail and personal uses related to serving neighborhood needs. Then in 1992 when the City conducted its first General Plan Update, the City Council changed the land use designation of the site along with the other properties on the north side of Firestone Boulevard between Pangborn and Newville Avenues to “General Commercial”. City Council members, especially mindful of the properties’ Firestone Boulevard frontage, amended the designation hoping a future developer would assemble and redevelop the adjoining properties (i.e., converting the mostly apartment complexes into a large commercial project). However, the land use designation change failed to spur redevelopment and these properties still support apartment complexes, which date back to the 1960s. The other property that makes up the northerly portion of the subject property, 11104 Pangborn Avenue, supports a single-family residence. It is designated “Medium Density Residential” and is zoned parking buffer (P-B). The property measures 8,500 square feet and the residence, built in 1949, is a 1-story building with a detached garage. This property was designated “Medium Density Residential” in 1973 with the adoption of the first General Plan and the City Council re-classified it to “General Commercial”, as part of the 1992 General Plan Update. Then, in 2005, the Council changed the designation back to “Medium Density Residential.” The property’s limited size makes developing a multi-family project unlikely because the required R-3 (Medium-Density Residential) development would yield only two units on the site. Furthermore, developers typically shy away from a project with so few units. In reality, PC Agenda Page 17 PLN-14-00214 9511 Firestone Boulevard And 11104 Pangborn Avenue March 16, 2016 - Page 8 the only use this property can support is a single-family residence; as such, its land use classifications should ideally be changed to reflect the dwelling. However, it is the only single-family residence east of Pangborn Avenue and to reclassify it to Low Density Residential and R1 smacks of spot zoning. Also noteworthy is the property’s General Plan/zoning ordinance inconsistency. Its parking buffer (P-B) zone does not correspond with its “Medium Density Residential” General Plan category, and the P-B zone no longer exists since it was eliminated from the Zoning Ordinance in 2008 when the ordinance was updated. In recognition of the action, properties in Downey with the P-B zoning are rezoned when they file discretionary actions). Besides the inconsistency, neither land use classification reflects the property’s single-family improvements. Facing these circumstances, the ideal course of action is to merge the property with an adjoining parcel. Doing so results in a larger parcel with greater development potential. It provides more options with respect to project layout and design and provides more space to meet applicable development standards. Unfortunately, the ability to combine properties does not present itself very often; however, such an opportunity has surfaced with this development proposal. The project applicant holds title to the two properties that make up the project site, which allows him to consolidate the properties through the tentative parcel map process and develop the drive-through restaurant on the assembled lot. 2. Zone Change The Applicant is requesting a zone change in association with the General Plan Amendment. In this case, the request is to change the P-B portions of the subject property (the southerly fifty-two feet of 9511 Firestone Boulevard and all of 11104 Pangborn Avenue) to C-1. The reasons for the change are: a. The “Neighborhood Commercial” is the zoning category that is best suited for the project site due to factors such as its limited size, the nearby residential neighborhood and its Firestone Boulevard frontage. Similarly-zoned properties exist on the north side of Firestone Boulevard east and west of the subject site and have existed this way since the subject property was developed in 1970 and the current zoning was established in 1992. b. The P-B zone no longer exists since it was eliminated from the Zoning Ordinance in 2008 when the ordinance was updated. In recognition of the action, properties in Downey with the P-B zoning are rezoned when they file discretionary actions. c. The proposed zone change will correspond to the Neighborhood Commercial designation proposed by the general plan amendment. d. The entire site will maintain the same zoning. PC Agenda Page 18 PLN-14-00214 9511 Firestone Boulevard And 11104 Pangborn Avenue March 16, 2016 - Page 9 [Grab your reader’s attention with a great quote from the document or use this space to emphasize a key point. To place this text box anywhere on the page, just drag it.] ZONING MAP (CURRENT ZONING) 3. Tentative Parcel Map 73738 Tentative Parcel Map No. 73738 proposes to consolidate the two parcels that comprise the 33,481 square foot site, 9511 Firestone Boulevard (APN 6287024007) and 11104 Pangborn Avenue (APN 6287024007), into one legal parcel. The new Parcel 1 will contain 37,824 square feet of gross land area and 33,481 square feet of net land area. It is worth noting that the map illustrates the difference between the existing property line along Pangborn Avenue and the proposed property line along this area, as well as the proposed street dedication on Pangborn. The City developed Pangborn Avenue to its ultimate right of way width years ago, but fourteen feet of the subject property remain in the public right of way. The street dedication proposed on Tentative Map No. 73738 will clear this discrepancy. Section 9314.06 of the Downey Municipal Code, identifies the development standards for all commercial zones in the City. The following Table summarizes those standards for new lots in the C-1 zone in relation to the lot Tentative Parcel Map No. 73738 proposes: Lot Requirements for Properties in the C-1 (Neighborhood Commercial Zone) Standard Requirement Lot 1 Lot Area Minimum (Sq. Ft.) 6,000 Sq. Ft. 33,481 Sq. Ft. Lot Width Minimum (Feet) 60 Feet 108.54 Feet Lot Depth Minimum (Feet) 100 feet 299.79 Feet SUBJECT PROPERTY PC Agenda Page 19 PLN-14-00214 9511 Firestone Boulevard And 11104 Pangborn Avenue March 16, 2016 - Page 10 PC Agenda Page 20 PLN-14-00214 9511 Firestone Boulevard And 11104 Pangborn Avenue March 16, 2016 - Page 11 The Table illustrates that the lot proposed by Tentative Parcel Map No. 73738 satisfies the minimum Code requirements for lot area, lot width, and lot depth. 4. Site Plan Review Section 9820 of the Code discusses the intent and purpose of site plan review, which is to provide a streamlined administrative review process for verifying a project’s compliance with the requisite development, design, and use standards, while assuring interested parties that proposed uses, structures, designs, and site improvements comply with the provisions of the Code before preparation of plans for building permits. a. Land Use Statistics Land Area 33,481 sq. ft. Building Floor Area: 3,000 sq. ft. Lot Coverage Maximum Allowed 50% Proposed 9% Parking Required Restaurant (1/100) 30 spaces Parking Provided: 31 spaces Landscaping Required: (10% of the Total Parking Area) 590 sq. ft. Provided: (16.2% of the total parking area) 958 sq. ft. b. Circulation The subject property is rectangular shaped, measures approximately 109 feet in width and 300 feet in depth. The narrow portions of the building face south (Firestone Boulevard) and north, while the longer sides are aligned toward the west (facing Pangborn Avenue) and east. The orientation of the proposed fast food restaurant building follows this pattern to provide safe and efficient on-site circulation and vehicle parking. Two driveway entrances, one on each street, provide vehicular access to the site. A drive-through lane will commence on the northerly side of the building then continue along the west side of the building adjacent to the Pangborn Avenue frontage before emptying onto Firestone Boulevard. Sixteen on-site parking spaces are adjacent to the east side of the proposed restaurant, which places them more than thirty-six feet away the apartment building on the adjacent property. Fifteen parking spaces are within the northerly portion of the subject property along both sides of the Pangborn Avenue facing driveway aisle. c. Architecture PLN-14-00214 proposes a simple, modular design for the fast food restaurant featuring three tower elements, sand-float plaster finishes, metal awnings, and decorative banding. The tower elements would locate on the south, east, and west elevations, and stand 21 feet above grade, which is three feet taller than the remaining walls of the building. These towers will emphasize the entrances to the restaurant and the drive-thru window cashier PC Agenda Page 21 PLN-14-00214 9511 Firestone Boulevard And 11104 Pangborn Avenue March 16, 2016 - Page 12 area. Control joints imbedded into the plaster finishes in horizontal and vertical patterns to prevent cracks from occurring will provide visual interest for the wall surfaces. Building accents include metal awnings (painted red and grey) and decorative straight-arm wall lights. The building will reflect the corporate colors in vogue for Jack in the Box Restaurants: Fireweed (brick red), Balanced Beige, and Downing Straw (dark yellow). The proposed signs are corporate signage scaled moderately. PC Agenda Page 22 PLN-14-00214 9511 Firestone Boulevard And 11104 Pangborn Avenue March 16, 2016 - Page 13 PC Agenda Page 23 PLN-14-00214 9511 Firestone Boulevard And 11104 Pangborn Avenue March 16, 2016 - Page 14 d. Landscaping PLN-15-00214 proposes a variety of plants to create visual interest for the fast food restaurant. The following Table identifies these plants: PLANT MATERIALS Botanical Name Common Name TREES: Brachychiton Populneus, Kurrajung 10% 48” Box 10% 36” Box, Bronze Loquuat 15% 24” Box 20% 15 Gallon Goldenrain Tree Hybrid Crape Myrtle Callistemon “Little John” Dwarf Bottle Brush Tauutle Natal Plum SHRUBS: Leucophyllum Frutescens “Green Cloud” Texas Ranger Ligustrum Texanum Texas Privet 25% 15 Gallon, 75% 5 Gallon Carissa Macrocarpa Tuttle Compact Myrtle Pittosporum Tenuifolium Kohuhu Rhaphiolepis Indica Pinkie Pinkie Indian Hawthorne Westringia Fruiticosa Coast Rosemary SMALL SHRUBS AND PERINNIALS Lantana New Gold Golden Spreading Lantana 100% 1 Gallon Senecio Mandraliscae Blue Ice Plant Agave Desmettiana Smooth Agave Anigozanthos 'Bush Ranger' Bush Ranger Kangaroo Paw ACCENT PLANTS Dianella Tasmanica Little Rev Little Rev Flax Lilly 30% 5 Gallon 70% 1 Gallon Dietes Bicolor Bicolor African Iris Hesperaloe Parviflora Red Yucca Strelitzia Reginae Bird Of Paradise VINES: 100% 5 gallon Ficus Pumila Creeping Fig GROUNDCOVERS: Flats Dymondia Margararetae Silver Carpet BIO RETENTION PLANTS Carex Pansa California Meadow Sedge 100% 1 Gallon Chondropetelaum Tectorum Small Cape Rush PC Agenda Page 24 PLN-14-00214 9511 Firestone Boulevard And 11104 Pangborn Avenue March 16, 2016 - Page 15 PC Agenda Page 25 PLN-14-00214 9511 Firestone Boulevard And 11104 Pangborn Avenue March 16, 2016 - Page 16 5. Conditional Use Permit Section 9406 of the Downey Municipal Code provides the regulations and development standards for drive-in businesses, such as banks, drug stores and fast food restaurants that provide drive-in facilities for serving customers within their automobile. It states that the Commission may grant a Conditional Use Permit for a drive-in business provided the proposed use meet those standards. Therefore, the proposed Jack in the Box Restaurant requires a CUP because it features a drive through lane along the north and west sides of the building. The Drive-In Business Lane Standards are described as follows: “(m) Drive-In Business Lane Standards. (1) All businesses that provide drive-in facilities for serving customers within their automobile shall provide stacking space that meets the requirements in Table 9.4.1. Table 9.4.1. Drive-In Business Stacking Space Use Required Stacking Space Per Service Lane Banks 5 Coffee Facilities Before order board 4 Between order board and pick-up window 4 Drug Stores / Pharmacies 4 Dry Cleaning 4 Fast-Food Restaurants Before order board 4 Between order board and pick-up window 4 Photo Service 4 Car Washes (Self-Service, Coin-Operated) a Entry 2 Exit 1 Car Washes (Full-Service) Entry 6 Exit 2 Notes: a Wash stalls shall not count as stacking space. (2) Each stacking space shall be computed on the basis of a vehicle being nine (9) feet in width and twenty (20) feet in length. Each stacking lane shall be a minimum of twelve (12) feet in width. PC Agenda Page 26 PLN-14-00214 9511 Firestone Boulevard And 11104 Pangborn Avenue March 16, 2016 - Page 17 (3) Clear identification and delineation between the drive-in lane(s) and parking lot shall be provided. (4) Where the lot dimensions allow, all drive-in business shall provide an escape lane that allows other vehicles to pass those waiting to be serviced. (5) The stacking lane shall be independent of any on-site parking, parking maneuvering areas, public streets, or alley or traffic ways serving other on-site and/or off-site uses. (6) The minimum required length of any stacking space may be increased if it is determined that additional stacking area will be required to adequately serve the use. (7) A traffic study addressing both on-site and off-site traffic and circulation impacts may be required. The proposed project meets or exceeds the minimum development standards for drive in businesses and for drive thru lanes. 6. Revoke Zone Exception No. 929. In April 1970, the Planning Commission approved ZEC No. 929 for the property at 9511 Firestone Boulevard, which governed the operations of a carpet store at this location. In 1995, the Planning Commission conducted several public hearings to examine of the activities of the carpet store that was operating there at the time, because it was impacting neighboring residents negatively. As a result of those hearings, the Planning Commission revised the store’s site plan and modified several of the zone exception’s conditions of approval in an effort to buffer the store’s activities from the neighboring residents. A tile store was the last business to occupy the property and it ceased operations in October, 2013. Nevertheless, Zone Exception No. 929 remains in effect until it is revoked by the Planning Commission. PC Agenda Page 27 PLN-14-00214 9511 Firestone Boulevard And 11104 Pangborn Avenue March 16, 2016 - Page 18 In connection with the Jack in the box development proposal, the owner of project site, who also doubles as the project applicant, filed a request with the Community Development Department to revoke the zone exception. According to Zoning Ordinance Section 9828.06, a property owner may initiate the revocation procedure by filing a written request. This code section states that a permit may be revoked by a majority of the Planning Commission at a public hearing upon finding any one of the following six conditions to be true: 1. That the use is being operated in a manner that is detrimental to the public health, safety, welfare, and public convenience or is a public nuisance; 2. That the permit or variance was obtained by fraud; 3. That the use for which the permit or variance was granted is not being exercised; 4. That the use is being conducted in violation of the terms and conditions of the permit or variance or in violation of any statute, ordinance, law or regulation; 5. That the use for which the permit or variance was granted has ceased or has been suspended for one (1) year or more; and 6. That the time period for which the permit or variance was granted has lapsed or been violated. Conditions No. 3 and No. 5 are true in this case because the last business to occupy the building ceased operations there more than two years ago. In light of the time lapse, Staff recommends the Planning Commission adopt the attached resolution, revoking Zone Exception 929 for the property at 9511 Firestone Boulevard. ENVIRONMENTAL In accordance with the provisions of the California Environmental Quality Act (CEQA), The City of Downey obtained the services of DUDEK, an environmental consulting firm, to prepare an Initial Study and Negative Declaration to assess the potential consequences of implementing the development proposal. Transportation and Traffic impacts were among the issues assessed by Dudek in this environmental assessment. The traffic analysis prepared for the project analyzed the traffic volumes and levels of service in the study area and concluded that the proposed project will result in a less than significant impact on transportation and traffic. The study area evaluated Firestone Boulevard, Pangborn Avenue, Woodruff Avenue, Stewart and Gray Road, and Newville Avenue. It also studied intersections where Woodruff Avenue, Pangborn Avenue, and Stewart and Gray Road intersect Firestone Boulevard. The study concluded that the project would result in less than significant impact to the level of service on Firestone Boulevard; the project will result in less than significant impact due to a design feature because, the project would not generate incompatible uses within the surrounding uses and does not create hazards for vehicles, bicycles, or pedestrians entering or exiting the site; the project will have less than significant impact with regard to emergency access, project generated traffic will not prevent emergency vehicles from entering the site and the site is located in an established, developed area with ample access for emergency service providers; and the project’s access points have been designed with the City’s circulation standards and would not conflict with adopted policies, plans, or programs related to public transit, bicycle, or pedestrian facilities, and impacts would be less than significant. DUDEK concluded that although the proposed Jack in the Box Restaurant could have a significant effect on the environment, there will not be a significant effect in this case because of mitigation measures that have already been made by the applicant. Therefore, DUDEK PC Agenda Page 28 PLN-14-00214 9511 Firestone Boulevard And 11104 Pangborn Avenue March 16, 2016 - Page 19 prepared a Mitigated Negative Declaration. Staff circulated the environmental documents for public review and comment for 21 days, pursuant to the review period in the City’s Guidelines for implementing CEQA. The comment period started on November 26, 2015 and ended on December 17, 2015. Staff received comments in the form of two letters and petitions signed by 31 persons DEVELOPMENT REVIEW COMMITTEE On September 3, 2015, the Development Review Committee (DRC) discussed and evaluated various aspects of the project PLN-14-00214 proposes that pertain to Planning, Police, Fire, Public Works, and Building and Safety matters. Building and Safety and Fire did not express any concerns with the proposed project, stating that their issues will be addressed through the plan check process. The Police Department had no concerns with the applicant’s proposal. Public Works primary concerns involved securing a fourteen foot (14’) dedication along the Pangborn Avenue frontage of the subject site and a seventeen foot (17’) corner cutoff dedication at the intersection of Pangborn Avenue and Firestone Boulevard, to the standards of the Engineering Division. FINDINGS General Plan Amendment Subsection 9834.08 of the Code provides that the Council shall make the following findings to approve an amendment to the General Plan: A. That the proposed General Plan Amendment is consistent with all other goals, policies, programs, and land uses of applicable elements of the General Plan. Implementing the requested General Plan Amendment is consistent with two General Plan programs. Specifically, Program 1.1.4.4. “Phase out and re-designate the land use classifications for selected strip commercial areas” and “Program 1.3.2.7. Encourage the grouping of adjoining small odd shaped parcels in order to create more viable developments”. Changing the affected site’s land use classifications to “Neighborhood Commercial” translates into phasing out the land use category of a site with Firestone Boulevard frontage, which can be characterized as a strip commercial property. The site’s existing classifications do not match its characteristics, however. Specifically, the site is not large enough and lacks sufficient frontage to accommodate the kind of uses that the “General Commercial” category envisions. Furthermore, the project site is proximate to a large, single-family neighborhood and the kind of uses that the existing General Commercial designation allows would negatively impact residents due to the site’s small size and lack of buffer areas. Implementing the development proposal includes a tentative parcel map application, a request to merge a large lot with a small, adjoining lot. The merged parcel, measuring about 33,481 square feet, enables the applicant to develop an efficient site layout for the proposed fast food drive-through restaurant, while also complying with all applicable development standards. B. That the proposed General Plan Amendment will not adversely affect surrounding properties or the surrounding environment. Amending the affected site’s General Plan categories to the requested “Neighborhood Commercial” will not impact neighboring properties or the surrounding environment. The land uses that the requested land use category allows are much less intense than the existing classification permits. The requested “Neighborhood Commercial” designation PC Agenda Page 29 PLN-14-00214 9511 Firestone Boulevard And 11104 Pangborn Avenue March 16, 2016 - Page 20 supports neighborhood-serving uses which are intended to serve only the limited need for convenience and service goods for neighboring residents. . C. That the proposed General Plan Amendment promotes the public health, safety and general welfare and serves the goals and purposes of this article. The Applicant is requesting to change the site’s two General Plan designations to “Neighborhood Commercial.” The site’s C-1 (Neighborhood Commercial) zone is the City zoning classification and corresponds with the requested General Plan category. “Neighborhood Commercial” is the land use category that is best suited for the project site due to factors such as its limited size, the nearby residential neighborhood and its Firestone Boulevard frontage. Its current “General Commercial” category allows for a wide range of commercial uses and project types; some with extensive trade areas, like regional shopping centers, new and used automobile dealerships, hotels, office buildings and hospitals. Uses associated with the “General Commercial” designation are typically more intense so this category is appropriate in areas with large sites that provide buffers for adjoining land uses. This suggests that the project site, which contains about 33,481 square feet, is not large enough to accommodate the above- mentioned uses. The “Neighborhood Commercial” category, by contrast, is intended for neighborhood-serving retail uses, which draw customers from adjoining neighborhoods, and not areas from outside the city or region. Consistent with this intent, uses described as “Neighborhood Commercial” are typically small in scale with respect to floor area, building height and operational activities. D. That the proposed General Plan Amendment will not conflict with the provisions of this article, including the City’s subdivision ordinance. The requested change of the site’s two General Plan designations to “Neighborhood Commercial “is consistent with the provisions of Article IX of the Downey Municipal Code (Land Use), because the C-1 (Neighborhood Commercial) Zone is intended to provide for the development of limited neighborhood shopping areas situated adjacent to, or surrounded by, residential neighborhoods. These shopping areas are intended to serve only the limited need for convenience goods and services in their immediate locality and should fit easily into a residential environment without detriment to the character of the area. The proposed development includes a 3,000 square foot fast food restaurant building with a drive through lane and 31 parking spaces on a 33,481 square foot site. It satisfies the property development standards, site area requirements, vehicular access, landscaping and other factors that allow the subject property to maintain its compatibility with surrounding uses. The project site exceeds the minimum area requirement for new lots in the C-1 (Neighborhood Commercial) zoning classification the applicant is seeking as part of this development proposal. The minimum area requirement for a new lot in the requested zone is 6,000 square feet, whereas the project site measures approximately 33,481 square feet, slightly less than an acre. Zone Change Section 9830.06 of the Code states that the Commission, prior to making written recommendations to the Council and the Council prior to approving a Zone Change shall make all of the following findings: PC Agenda Page 30 PLN-14-00214 9511 Firestone Boulevard And 11104 Pangborn Avenue March 16, 2016 - Page 21 A. That the requested zone change is necessary and desirable for the development of the community in harmony with the objectives of the General Plan and Chapter 1, Zoning, of Article IX, Land Use, of the Downey Municipal Code and is in the interests or furtherance of the public health, safety and general welfare. The requested C-1 zone is in harmony with the General Plan since it is consistent with it and will implement several provisions of the plan. Specifically, the C-1 zone is the classification that is the equivalent or conforms to the Neighborhood Commercial General Plan category proposed for affected property. It is designed through its development standards and list of permitted uses to implement the goals and policies of the site’s General Plan category. Additionally, adopting the proposed zoning will implement General Plan Policy No. 1.3.2.3., which directs the City to “Change the zoning of properties where inconsistent with the General Plan land use designation”. Other General Plan provisions that the C-1 zone will implement include Land Use Chapter Policy 1.1.4, which encourages the City to provide an appropriate amount of land area for people to provide goods and services and Economic Development Chapter Goal 9.1: Attract and Retain Businesses. B. That the requested zone change will be compatible and complementary to existing conditions and adjoining property in the surrounding area. Properties on Firestone Boulevard and Pangborn Avenue in the vicinity of the project site support a variety of uses including various retail stores, a fast-food restaurant, a private elementary school, apartment complexes, and a single-family neighborhood. Other retail businesses (including a carpet store and a tile store) have occupied the subject site since 1953. The requested zone change will permit the development of a fast food restaurant with a drive-thru lane that will be very similar to the fast food business across the street. In addition, a new project will be subject to the City’s design review process that will provide for an attractive project that complements the area. C. That the site is adequate in size to accommodate the uses permitted in the zone requested and that all applicable property development standards can be complied with. The property under consideration is more than adequate in size to successfully accommodate the permitted uses and development standards of the requested C-1 zone. It totals 33,481 square feet, compared to 6,000 square feet, which is the minimum lot size. It also exceeds the minimum dimension lot width and lot depth requirements of the proposed zone. The property measures approximately 109 feet by 300 feet. By comparison, the minimum width is 60 feet and the minimum lot depth for properties in the C-1 zone is 100 feet. D. That the site properly relates to streets and highways designed and fully improved to carry the type and quantity of traffic that is expected to be generated in the area and that utilities exist or are planned which will adequately serve the property as rezoned. The project site occupies the northeast corner of the Firestone Boulevard/Pangborn Avenue intersection, where the two streets meet forming a stop sign controlled,” T”- intersection. Both streets provide access to the project site. The General Plan’s Circulation Chapter classifies Firestone Boulevard as a “Major Arterial.” A “Major Arterial”, according to the Circulation Chapter, is intended to serve as a through route for traffic crossing the city, and provide access to the freeway system. Firestone Boulevard is Downey’s primary east/west retail commercial corridor and it essentially halves the community. The section of Firestone next to the site is 106 feet wide and is composed of three travel lanes in each direction, a raised landscaped median, and 10-foot wide sidewalks. It carries about 37,500 vehicles daily, which is less than the PC Agenda Page 31 PLN-14-00214 9511 Firestone Boulevard And 11104 Pangborn Avenue March 16, 2016 - Page 22 roadway’s capacity (approximately 54,000 vehicles per day). The posted speed on Firestone Boulevard is 40 miles per hour and on-street parking is prohibited to maximize the street’s capacity. Pangborn Avenue, by contrast, is classified as a “Collector Street” in the Circulation Chapter. It consists of one travel lane in each direction, while providing curbside parking on both sides of the street. “Collector” streets are designed to link local streets to both arterial roads and the regional roadway network, according to the General Plan. Pangborn Avenue is the only north/south street between Woodruff Avenue and the City’s easterly boundary that stretches uninterrupted from Firestone Boulevard north to Florence Avenue. As such, it serves as the collector street for the intersecting east/west residential streets. Recent traffic counts indicate Pangborn Avenue carries about 5,770 vehicles per day, which is also less than its capacity: 8,000 vehicles per day. E. That the proposed zone change is in general conformance with the General Plan and General Plan land use designation for the parcel . Currently, the General Plan land use designations for the subject property are General Commercial and Medium Density Residential. The proposed C-1 zone is consistent with the Neighborhood Commercial General Plan designation proposed for the affected property. F. In taking this action, the Planning Commission has considered the effects of the decision on the housing needs of the region in which the City is located and balanced these needs against the public service needs of City residents and available fiscal and environmental resources. Tentative Parcel Map No. 73738 The following five (5) findings must be adopted in order to approve the tentative parcel map. A discussion of the findings follows: A. That the proposed map is consistent with the General Plan. The City of Downey Land Use Element has adopted as one of its goals to address changes in land use and zoning trends (Goal 1.3) and encourages land uses consistent with the area’s designation as properties recycle (Program 1.3.1.5). Approval of the Tentative Parcel Map 73035 will result in a land use that is consistent with its proposed Neighborhood Commercial zoning (a fast food restaurant with a drive thru lane), and the eventual demolition of two vacant buildings, one residential the other commercial; consequently, approval of Tentative Parcel Map 73035 is consistent with the goals, policies, programs, and land uses of applicable elements of the General Plan. B. That the site is physically suitable for the type and density of development. The project site exceeds the minimum area requirement for new lots in the C-1 (Neighborhood Commercial) zoning classification the applicant is seeking as part of this development proposal. The minimum area requirement for a new lot in the requested zone is 6,000 square feet, whereas the project site measures approximately 33,481 square feet, slightly less than an acre. The project consists of developing the as a fast-food restaurant, with a drive-through lane, and with thirty-one parking spaces. The minimum parking requirement for the restaurant is 30 spaces, compared to the 31 spaces that will be provided; the minimum vehicle stacking requirement for a restaurant’s drive-through lane is 8 spaces, which the project’s drive-thru lane will provide. PC Agenda Page 32 PLN-14-00214 9511 Firestone Boulevard And 11104 Pangborn Avenue March 16, 2016 - Page 23 C. That the design of the subdivision or type of improvements is not likely to cause serious public health problems. The proposed subdivision seeks to consolidate two parcels into one. The project will not cause serious public health problems to the future occupants of the proposed development, nor persons living nearby, since there are no sites nearby that pose health hazards, and because the proposed development is for a commercial use (fast food restaurant with a drive-thru lane) that is appropriate for this area. D. That the design of the subdivision or the type of improvements will not conflict with easements, acquired by the public at large, for access through or use of property within the proposed subdivision. Tentative Parcel Map No. 73738 proposes to consolidate the two parcels that comprise the 33,481 square foot site, 9511 Firestone Boulevard (APN 6287024007) and 11104 Pangborn Avenue (APN 6287024007), into one legal parcel. The new Parcel 1 will contain 37,824 square feet of gross land area and 33,481 square feet of net land area. The City developed Pangborn Avenue to its ultimate right of way width years ago, but fourteen feet of the subject property remain in the public right of way. The street dedication proposed on Tentative Map No. 73738 will clear this discrepancy. Otherwise, there are no public access easements through or across the site. Additionally, the City has reviewed the request and determined that the approval of the map will not conflict with utility easements on the site. E. That the design of the subdivision or the proposed improvements is not likely to cause substantial environmental damage or substantially and avoidably injure wildlife or their habitat. The subject property is developed with an 850 square foot single-family residence and detached garage, built in 1949 on the Pangborn site, while site improvements for 9511 Firestone Boulevard consist of a single-story, 6,261 square foot stucco building with parking areas in the front and rear. Tentative Parcel Map No. 73738 proposes to consolidate the two parcels that comprise the 33,481 square foot site to facilitate its development into a 3,000 square foot fast food restaurant with a drive thru lane. There are no known areas within the City that host wildlife or their habitat, most particularly species identified as a candidate, sensitive, or special status species. As such, it is staff’s opinion that the proposed the project will not impact wildlife resources. Conditional Use Permit Pursuant to Municipal Code Section 9824.06, four (4) findings must be adopted prior to the Planning Commission approving a Conditional Use Permit. Staff has reviewed the proposal and has developed the following findings for the approval of the PLN-14-00214: A. That the requested conditional use permit will not adversely affect the intent and purpose of this article or the City of Downey’s General Plan or the public convenience or general welfare of persons residing or working in the neighborhood thereof. Policy 2.5.1 of the Downey General Plan (Downey Vision 2025) is “Provide for adequate parking supply to meet parking demands” and Program 2.5.1.8 is “Promote safe and efficient design for parking areas.” The orientation of the proposed fast food restaurant and its drive thru lane provide safe and efficient on-site circulation and vehicle parking. Two driveway entrances, one on each street, provide vehicular access to the site. The drive-through lane will commence on the northerly side of the building then continue along the west side of PC Agenda Page 33 PLN-14-00214 9511 Firestone Boulevard And 11104 Pangborn Avenue March 16, 2016 - Page 24 the building adjacent to the Pangborn Avenue frontage before emptying onto Firestone Boulevard. Sixteen on-site parking spaces are adjacent to the east side of the proposed restaurant, which places them more than thirty-six feet away the apartment building on the adjacent property. Fifteen parking spaces are within the northerly portion of the subject property along both sides of the Pangborn Avenue facing driveway aisle. Coupled with the aforementioned design features, the proposed fast food restaurant will enhance the character and design of the site, the immediate neighborhood, and the surrounding areas. Additionally, the proposed conditional use is not expected to adversely impact people working or residing in the vicinity of the project site because the activities typically associated with the requested use will not carry over onto neighboring properties. Design measures incorporated into the project include property line buffers composed of block walls and landscaping featuring an uninterrupted screen of shrubs and trees. B. That the requested use will not adversely affect the adjoining land uses and the growth and development of the area in which it is proposed to be located. An apartment building is immediately adjacent to the eastern boundary of the subject property. The site layout takes this placement into consideration by placing the proposed fast food restaurant to the westerly side of the subject site. It also locates the drive thru lane on the west side of the restaurant building, which makes those activities less of an issue. The site plan positions sixteen parking spaces adjacent to the restaurant building and in the northerly area of the subject site. This placement helps to reduce impacts on the apartment building along the east property line and another apartment building to the north. C. That the size and shape of the site proposed for the use is adequate to allow the full development of the proposed use in a manner not detrimental to the particular area. The project site exceeds the minimum area requirement for new lots in the C-1 (Neighborhood Commercial) zoning classification the applicant is seeking as part of this development proposal. The minimum area requirement for a new lot in the requested zone is 6,000 square feet, whereas the project site measures approximately 33,481 square feet, slightly less than an acre. The project consists of developing the as a fast-food restaurant, with a drive-through lane, and with thirty-one parking spaces. The minimum parking requirement for the restaurant is 30 spaces, compared to the 31 spaces that will be provided; the minimum vehicle stacking requirement for a restaurant’s drive-through lane is 8 spaces, which the project’s drive-thru lane will provide. D. That the traffic generated by the proposed use will not impose an undue burden upon the streets and highways in the area. The project site occupies the northeast corner of the Firestone Boulevard/Pangborn Avenue intersection, where the two streets meet forming a stop sign controlled,” T”- intersection. Both streets provide access to the project site. The General Plan’s Circulation Chapter classifies Firestone Boulevard as a “Major Arterial.” A “Major Arterial”, according to the Circulation Chapter, is intended to serve as a through route for traffic crossing the city, and provide access to the freeway system. Firestone Boulevard is Downey’s primary east/west retail commercial corridor and it essentially halves the community. The section of Firestone next to the site is 106 feet wide and is composed of three travel lanes in each direction, a raised landscaped median, and 10-foot wide sidewalks. It carries about 37,500 vehicles daily, which is less than the roadway’s capacity (approximately 54,000 vehicles per day). The posted speed on Firestone Boulevard PC Agenda Page 34 PLN-14-00214 9511 Firestone Boulevard And 11104 Pangborn Avenue March 16, 2016 - Page 25 is 40 miles per hour and on-street parking is prohibited to maximize the street’s capacity. Pangborn Avenue, by contrast, is classified as a “Collector Street” in the Circulation Chapter. It consists of one travel lane in each direction, while providing curbside parking on both sides of the street. “Collector” streets are designed to link local streets to both arterial roads and the regional roadway network, according to the General Plan. Pangborn Avenue is the only north/south street between Woodruff Avenue and the City’s easterly boundary that stretches uninterrupted from Firestone Boulevard north to Florence Avenue. As such, it serves as the collector street for the intersecting east/west residential streets. Recent traffic counts indicate Pangborn Avenue carries about 5,770 vehicles per day, which is also less than its capacity: 8,000 vehicles per day. The project will provide a drive-through lane for the fast food restaurant facilities to provide sufficient onsite parking so vehicles accessing the site during the restaurant’s peak hours won’t queue into the adjoining streets. CORRESPONDENCE On December 16, 2015, staff received correspondence from Kathy Yolton, owner of the Pinewood Apartments at 11100 and 11026 Pangborn Avenue. She expressed numerous concerns about the project related to health and safety, noise, traffic concerns, crime, and commercial uses in close proximity to residential. On December 31, 2015, staff received letters from Mr. Allen Korneff, owner of the Rustic Villas Apartments (9525 Firestone Boulevard) along with a petition signed by 31 individuals expressing opposition to the proposed project due to a number of traffic-related issues and concerns. CONCLUSION Staff supports the proposal and recommends that the Planning Commission: 1. Adopt a resolution recommending that the City Council approve an amendment to the General Plan by changing the land use categories of the properties at 9551 Firestone Boulevard and 11104 Pangborn Avenue from General Commercial and Medium Density Residential to Neighborhood Commercial, and to change the zoning of the southerly fifty two feet of the property at 9511 Firestone Boulevard and the adjoining property at 11104 Pangborn Avenue from parking buffer to neighborhood commercial; and 2. Adopt resolutions to revoke Zone Exception Case 929, approve Tentative Parcel Map No. 73738, approve PLN-14-00214 for Site Plan Review and a conditional use permit, and to adopt a Mitigated Negative Declaration. Attachments: Site Photographs Resolutions Correspondence Mitigated Negative Declaration PC Agenda Page 35 PLN-14-00214 9511 Firestone Boulevard And 11104 Pangborn Avenue March 16, 2016 - Page 26 SITE PHOTOGRAPH - 9511 FIRESTONE BLVD SITE PHOTOGRAPH - 11104 PANGBORN AVE PC Agenda Page 36 RESOLUTION NO. 16- 2965 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DOWNEY APPROVING TENTATIVE PARCEL MAP NO. 73738, AN APPLICATION TO CONSOLIDATE THE TWO LOTS AT 9511 FIRESTONE BOULEVARD AND 11104 PANGBORN AVENUE AND ADOPT A MITIGATED NEGATIVE DECLARATION OF ENVIRONMENTAL IMPACT FOR THE PARCEL MAP THE PLANNING COMMISSION OF THE CITY OF DOWNEY DOES RESOLVE AS FOLLOWS: SECTION 1. The Planning Commission of the City of Downey does hereby find, determine and declare that: A. An application was filed on by Mr. Sam Fong, (hereinafter "Applicant") requesting approval of Tentative Parcel Map No. 73738, to consolidate two parcels identified as 9511 Firestone Boulevard (APN 6287024007) and 11104 Pangborn Avenue (APN 6287024007), into one legal parcel containing 33,481 square feet. B. The project site currently maintains two zoning classifications: 9511 Firestone Boulevard is zoned Parking Buffer (P-B) and Neighborhood Commercial (C-1), while 11104 Pangborn Avenue is zoned P-B; however, the Applicant has requested a change of zoning for the subject property to C-1 (Neighborhood Commercial). C. Currently the project site maintains two General Plan designations; 9511 Firestone Boulevard is designated “General Commercial,” while the property with the single- family dwelling is designated “Medium Density Residential; however, the Applicant has requested a change of the subject property’s land use designation to Neighborhood Commercial. D. On March 4, 2016, notice of the pending public hearing for PLN-14-00214 was published in the Downey Patriot on and it was mailed to all property owners within 500 feet of the subject site March 4, 2016. E. The Planning Commission conducted a duly-noticed public hearing on March 16, 2016, and after fully considering all oral and written testimony and facts and opinions offered at the aforesaid public hearing, adopted Resolution No. 2965, approving Tentative Parcel Map No. 73738. SECTION 2. Having considered all of the oral and written evidence presented to it at said public hearing, the Planning Commission further finds, determines and declares that: A. That the proposed map is consistent with the General Plan. The City of Downey Land Use Element has adopted as one of its goals to address changes in land use and zoning trends (Goal 1.3) and encourages land uses consistent with the area’s designation as properties recycle (Program 1.3.1.5). Approval of the Tentative Parcel Map 73035 will result in a land use that is consistent with its proposed Neighborhood Commercial zoning (a fast food restaurant with a drive thru lane), and the eventual demolition of two vacant buildings, one residential the other commercial; consequently, approval of Tentative Parcel Map 73035 is consistent with the goals, policies, programs, and land uses of applicable elements of the General Plan. PC Agenda Page 37 Resolution No. _____ Page 2 Page 2 B. That the site is physically suitable for the type and density of development. The project site exceeds the minimum area requirement for new lots in the C-1 (Neighborhood Commercial) zoning classification the applicant is seeking as part of this development proposal. The minimum area requirement for a new lot in the requested zone is 6,000 square feet, whereas the project site measures approximately 33,481 square feet, slightly less than an acre. The project consists of developing the as a fast-food restaurant, with a drive-through lane, and with thirty-one parking spaces. The minimum parking requirement for the restaurant is 30 spaces, compared to the 31 spaces that will be provided; the minimum vehicle stacking requirement for a restaurant’s drive-through lane is 8 spaces, which the project’s drive-thru lane will provide. C. That the design of the subdivision or type of improvements is not likely to cause serious public health problems. The proposed subdivision seeks to consolidate two parcels into one. The project will not cause serious public health problems to the future occupants of the proposed development, nor persons living nearby, since there are no sites nearby that pose health hazards, and because the proposed development is for a commercial use (fast food restaurant with a drive- thru lane) that is appropriate for this area. D. That the design of the subdivision or the type of improvements will not conflict with easements, acquired by the public at large, for access through or use of property within the proposed subdivision. Tentative Parcel Map No. 73738 proposes to consolidate the two parcels that comprise the 33,481 square foot site, 9511 Firestone Boulevard (APN 6287024007) and 11104 Pangborn Avenue (APN 6287024007), into one legal parcel. The new Parcel 1 will contain 37,824 square feet of gross land area and 33,481 square feet of net land area. The City developed Pangborn Avenue to its ultimate right of way width years ago, but fourteen feet of the subject property remain in the public right of way. The street dedication proposed on Tentative Map No. 73738 will clear this discrepancy. Otherwise, there are no public access easements through or across the site. Additionally, the City has reviewed the request and determined that the approval of the map will not conflict with utility easements on the site. E. That the design of the subdivision or the proposed improvements is not likely to cause substantial environmental damage or substantially and avoidably injure wildlife or their habitat. The subject property is developed with an 850 square foot single-family residence and detached garage, built in 1949 on the Pangborn site, while site improvements for 9511 Firestone Boulevard consist of a single-story, 6,261 square foot stucco building with parking areas in the front and rear. Tentative Parcel Map No. 73738 proposes to consolidate the two parcels that comprise the 33,481 square foot site to facilitate its development into a 3,000 square foot fast food restaurant with a drive thru lane. There are no known areas within the City that host wildlife or their habitat, most particularly species identified as a candidate, sensitive, or special status species. As such, it is staff’s opinion that the proposed the project will not impact wildlife resources. PC Agenda Page 38 Resolution No. _____ Page 3 Page 3 SECTION 3. Based upon the findings set forth in Sections 1 and 2 of this Resolution, the Planning Commission of the City of Downey hereby approves Tentative Parcel Map No. 73738, subject to the conditions of approval attached hereto as Exhibit A. SECTION 4. The Secretary shall certify the adoption of this Resolution. APPROVED AND ADOPTED this 16th day of March 2016. Originally signed by Matias Flores Matias Flores, Chairman City Planning Commission I HEREBY CERTIFY that the foregoing Resolution was duly adopted by the City Planning Commission of the City of Downey at a meeting held on the 16th day of March, 2016. AYES: COMMISSIONERS: Morales, Lujan, Owens, Rodriguez, and Flores NOES: COMMISSIONERS: None ABSTAIN: COMMISSIONERS: None ABSENT: COMMISSIONERS: None Originally signed by Mary Cavanagh Mary Cavanagh, Secretary City Planning Commission PC Agenda Page 39 Resolution No. _____ Page 4 Page 4 EXHIBIT A - CONDITIONS TENTATIVE PARCEL MAP NO. 73738 PLANNING 1. This approval is to consolidate two (2) lots into one parcel, identified as Parcel 1 on Tentative Parcel Map No. 73738, which will contain 33,481 square feet (net) and it includes the properties at 9511 Firestone Boulevard (APN 6287024007) and 11104 Pangborn Avenue (APN 6287024007), as shown on the approved plan dated March 16, 2016. Deviations or exceptions from said plan shall not be permitted without the approval of the City Planning Commission. 2. The Planning Commission shall retain jurisdiction to amend or add conditions with a public notice and public hearing to assure compatibility with the purpose and intent of the Comprehensive Zoning Ordinance and to protect the health, safety and general welfare. 3. The applicant/developer shall demolish the residence at 11104 Pangborn Avenue and the commercial building at 9511 Firestone Boulevard before the Planning Commission and City Council accept Final Parcel Map No. 73738. 4. All conditions of Tentative Parcel Map No. 73738 shall be complied with before this application becomes valid. 5. This approval shall expire in 24 months from the effective date of the tentative map’s approval. 6. If City approval is contingent upon any changes to the plans as submitted, the applicant shall submit three copies of the revised plans, incorporating all approved amendments, overlays, modifications, etc. to the Planning Division prior to the issuance of building permits. 7. The final parcel map shall be accepted by the Planning Commission and City Council before building permits are issued. 8. The Owner/Applicant agrees, as a condition of approval of this resolution, to indemnify, defend and hold harmless, at Applicant's expense, City and City's agents, officers and employees from and against any claim, action or proceeding commenced within the time period provided in Government Code Section 66499.37 to attack, review, set aside, void or annul the approval of this resolution, to challenge the determination made by City under the California Environmental Quality Act or to challenge the reasonableness, legality or validity of any condition attached hereto. City shall promptly notify Applicant of any such claim, action or proceeding to which City receives notice, and City will cooperate fully with Applicant in the defense thereof. Applicant shall reimburse the City for any court costs and attorney's fees that the City may be required to pay as a result of any such claim, action or proceeding. City may, in its sole discretion, participate in the defense of any such claim, action or proceeding, but such participation shall not relieve Applicant of the obligations of this condition.. PUBLIC WORKS PC Agenda Page 40 Resolution No. _____ Page 5 Page 5 9. The owner/applicant hereby consents to the annexation of the property into the Downey City Lighting Maintenance District in accordance with Division 15 of the Streets and Highways Code, and to incorporation or annexation into a new or existing Benefit Assessment or Municipal Improvement District in accordance with division 10 and Division 12 of the Streets and Highways code and/or Division 2 of the Government Code of the State of California. 10. The applicant shall dedicate fourteen feet (14’) for right-of-way purposes along the frontage of Pangborn Avenue and a seventeen feet (17’) corner cut off property dedication at the intersection of Pangborn Avenue and Firestone Boulevard to the standards of the Engineering Division. 11. The owner shall install all proposed utilities underground. 12. The owner/applicant shall be required to complete a construction & demolition (C&D) waste management plan per Article V, Chapter 8 of the Downey Municipal Code. 13. The owner/applicant shall submit an engineered grading plan and/or hydraulic calculations and site drainage plan for the site (prepared and sealed by a registered civil engineer in the State of California) for approval by the Engineering Division and Building and Safety Division. Proposed parking lot shall not have less than one (1%) percent gradient on any asphalt or non-paved surface, or less than one quarter (1/4%) percent gradient on any concrete surface. Provide the following information on plans: topographic site information, including elevations, dimensions/location of existing/proposed public improvements adjacent to project (i.e. street, sidewalk, parkway and driveway widths, catch basins, pedestrian ramps), the width and location of all existing and proposed easements. Broken, uneven, or sub-standard curb, gutter, sidewalk, driveway, disabled ramps and pavement, shall be replaced to the satisfaction of the Public Works Department. Contact the Public Works Inspection Office at (562) 904-7110 to have these areas identified just prior to initiating a grading plan. The owner/applicant shall obtain all necessary plan approvals and permits and shall provide that the standards of improvements, construction materials, and methods of construction shall be in conformance with the Standard Plans and Specification for Public Works Construction and as modified by the City of Downey’s Standard Plans and Specifications. 14 All driveway approaches shall be as wide as the driveway or parking aisle they serve. All unused driveways shall be removed and reconstructed with full-height curb, gutter and sidewalk. 15. The owner/applicant shall install street trees along Pangborn Avenue frontage per City Tree Masterplan. 16. The owner/applicant shall install pavement, which consists of a minimum section of 4” thick aggregate base, and a minimum 2-1/2” thick asphalt concrete pavement. 17. The owner/applicant shall comply with the National Pollutant Discharge Elimination System (NPDES) requirements of the Federal Clean Water Act; the General Construction Activities Stormwater Permit (GCASP) of the State Water Resources Control Board; the Standard Urban Stormwater Mitigation Plan (SUSMP); and Ordinance 1142 of the Downey Municipal Code (DMC) Low Impact Development (LID) plan. 18. The owner/applicant shall provide that all construction graffiti created as part of this project PC Agenda Page 41 Resolution No. _____ Page 6 Page 6 in the public right of way to be removed. 19. The owner/applicant shall furnish and install a new (min. 1-inch) dedicated potable water service line, meter, and meter box for each unit. 20. The owner/applicant shall furnish and install backflow device(s) in accordance with the Department of Public Works and the State and County Department of Health Services requirements. 21. The owner/applicant shall furnish and install the public potable water improvements, including extension and/or replacement of existing mains and associated facilities, necessary to provide adequate fire flow and pressure to the site. 22. The owner/applicant shall retrofit existing fire hydrant located at the Southwest corner of Pellet Street and Pangborn Avenue and other appurtenances as required by the Department of Public Works and the Downey Fire Department. Such improvements may include, laterals, backflow devices, and associated facilities with new facilities to current Downey standards and materials. Backflow devices, fire department connections, and associated appurtenances are to be located on private property and shall be readily accessible for emergency and inspection purposes. Backflow devices shall be screened from street view by providing sufficient landscaping to hide it. 23. The owner/applicant shall provide and record utility easement(s) for access to, and inspection and maintenance of, public water lines, meters and appurtenances, and backflow devices. 24. The owner/applicant shall furnish and install sanitary sewer lateral(s) and associated facilities within the public right of way in accordance with the requirements of the Department of Public Works. 25. The owner/applicant shall identify the point(s) of connection for the sanitary sewer lateral(s) and confirm that sufficient capacity exists in the publicly owned facilities in conformance with the requirements of the Department of Public Works and the County Sanitation Districts of Los Angeles County (CSDLAC). 26. The owner/applicant shall furnish and install the public sanitary sewer improvements, including extension and/or replacement of existing mains and associated facilities, necessary to provide adequate capacity for the site as approved by the Department of Public Works and CSDLAC. 27. The owner/applicant is responsible for coordinating with Building & Safety permit fees and payment(s) to the City and CSDLAC for all sanitary sewer connection and capacity charges. 28. The owner/applicant shall provide improvement plan mylars, record drawing mylars, and record drawing digital (AutoCAD – latest edition) files in accordance with the requirements of the Department of Public Works that have been signed by a civil engineer licensed in the State of California. Final approval of new utilities shall be dependent upon submittal and approval of record drawing mylars and scanned, uncompressed TIFF images of record drawings on a CD/DVD-ROM media per City’s GIS Requirements. PC Agenda Page 42 Resolution No. _____ Page 7 Page 7 29. Utility plans shall be submitted to and approved by the Department of Public Works prior to the issuance of the grading plan permit. Submit plans to Building & Safety and Planning Divisions regarding the following: a. The use of drought tolerant plants b. Drip irrigation c. Latest Green Code standards for water fixtures, etc. BUILDING DIVISION 26. Obtain all necessary plan approvals and permits. 28. All electrical and telephone utilities shall be installed underground to the standards of the City Engineering and Building & Safety Divisions. 29. Future development shall comply with all handicap accessibility requirements for site per CAC T-24, Part II, Section 11 B. PC Agenda Page 43