HomeMy WebLinkAbout06. CC 488C Firestone Blvd Improvement Project - Award ContractAGENDA MEMO
Ar'iMYOVED BY (3„ , V MANAGER DATE: February 11, 2014
TO: Mayor and Members of the City Council
9
FROM: Office of the City Manager
By: John Oskoui, P.E., Director of Public Work
SUBJECT: CASH CONTRACT NO. S.S. 488C — FIRESTONE BOULEVARD
IMPROVEMENT PROJECT (ELECTRICAL AND STREET LIGHTING
SYSTEM IMPROVEMENTS) BETWEEN OLD RIVER SCHOOL ROAD
AND BROOKSHIRE AVENUE - AWARD CONSTRUCTION CONTRACT
RECOMMENDATION
That the City Council award Cash Contract No. S.S. 488C in the amount of $246,985 to
California Professional Engineering, Incorporated for the Firestone Boulevard
Improvement Project (Electrical and Street Lighting System Improvements) between
Old River School Road and Brookshire Avenue.
BACKGROUND
The Firestone Boulevard corridor is a major arterial highway with a daily traffic volume
of nearly 40,000 vehicles per day. As such, Firestone Boulevard is the heaviest
traveled east -west corridor within the City, accommodating both regional as well as local
traffic. Due to the significance and function of this corridor, Firestone Boulevard is in
need of enhancements related to safety, infrastructure capacity and beautification in
order to bring it up to current standards.
The project entails major improvements to approximately 1.25 miles of roadway. The
scope -of -work for the project consists of pavement rehabilitation, adding new raised
landscaped median islands with new irrigation systems, reconstruction and upgrading of
existing raised median islands and replacement of existing landscaping and irrigation,
installation of streetscape enhancement features through the downtown portion of the
project including decorative pavers, ornamental street lighting and gateway monuments,
pedestrian lighting and traffic signals, median landscaping and parkway trees, street
furniture, bus shelters and bike racks; restriping of the corridor to provide three
continuous travel lanes in each direction and utilities improvements.
On February 28, 2013, seven bids were received for the Firestone Boulevard
Improvement Project. Based on staff's recommendation, at its meeting of March 26,
2013, the City Council rejected all bids received for the Firestone Boulevard
Improvement Project and directed staff to explore alternative methods for completing
the project.
CITY OF DOWNEY, CALIFORNIA
Mayor and Members of the City Council
Cash Contract No. S.S. 488C — Firestone Boulevard Improvement Project
(Electrical and Street Lighting System Improvements)
February 11, 2014
Page 2
Staff studied and analyzed various alternatives to construct this challenging project
within the constraints set by the existing budgeted funds and available resources.
Ultimately, staff recommended that the project be divided into several phases, with each
phase representing work specific to a particular construction trade (i.e. storm drain,
potable water, electrical, concrete, paving, striping, concrete pavers, miscellaneous
hardscape, landscape, etc.) and solicit for construction bids for each phase separately.
On June 25, 2013, the City Council approved staff's recommended methodology for
completing the Firestone Boulevard Improvements Project. The City Council previously
awarded construction contracts for the following projects.
Project No.
Project Name
Date of Award
Cost Savings
S.S. 488A
Storm Drain Improvements
August 13, 2013
$28,000
S.S. 488B
Potable Water System Improvements
August 27, 2013
$96,000
S.S. 488D
Concrete Improvements
January 28, 2014
$140,000
Total Cost Savings =
$264,000
Under a separate Agenda Memo, staff is recommending approval of the plans and
specifications and authorization for solicitation of bids for the fifth phase of this project,
Cash Contract No. S.S. 488E — Firestone Boulevard Improvement Project (Landscape
and Irrigation Improvements).
DISCUSSION
At its meeting of December 10, 2013, the City Council approved the plans and
specifications and granted authority to advertise for bids on Firestone Boulevard
Improvement Project (Electrical and Street Lighting System Improvements). On
January 23, 2014, seven (7) bids were received as shown on the attached bid summary
(see Exhibit "B "). The apparent lowest responsive and responsible bidder is California
Professional Engineering, Incorporated with a bid of $246,985. California Professional
Engineering, Incorporated has satisfactorily completed a project for the City of Downey
and various projects for the Cities of Orange, Pasadena and Anaheim.
Therefore, staff recommends that the City Council award Cash Contract No. S.S. 488C
in the amount of $246,985 to California Professional Engineering, Incorporated for the
construction of the Firestone Boulevard Improvement Project (Electrical and Street
Lighting System Improvements). Construction is estimated to begin in March 2014 and
be substantially complete by May 2014.
Mayor and Members of the City Council
Cash Contract No. S.S. 488C — Firestone Boulevard Improvement Project
(Electrical and Street Lighting System Improvements)
February 11, 2014
Page 3
Consequently, a considerable cost savings ($186,000) has been realized by revising
the bid items and soliciting for bids on the electrical and street lighting system
improvement work separately from other construction trades. Moreover, an additional
cost savings is expected with the procurement of major construction items directly by
the City and supplying it to the contractors for installation. These procurement items
may include street light poles, fixtures and other construction material items.
FINANCIAL IMPACT
A detailed cost accounting and funding analysis, based upon the bid received from
California Professional Engineering, Incorporated, is summarized on the below. The
total estimated cost of the project is $619,000. This amount is currently available in the
FY 2013 -2014 Capital Improvement Program consisting of $319,000 in Firestone
Boulevard Relinquishment funds and $300,000 in Proposition C Local Return funds
under Account Nos. 36 -1 -6488 and 54 -1 -6488, respectively, as shown below:
ESTIMATED PROJECT COST
Description
Amount
Bid Amount
$246,985
Contingency ( ±10 %)
$25,015
SUB -TOTAL CONSTRUCTION COST:
$272,000
City Furnished Materials
$312,000
Inspection, Construction Engineering & Contract Administration (t13 %)
$35,000
TOTAL ESTIMATED PROJECT COST:
$619,000
FUNDING SUMMARY
Account No. Fund Name Amount
36 -1 -6488 Firestone Boulevard Relinquishment funds $319,000.00
54 -1 -6488 Proposition C Local Return funds $300,000.00
TOTAL PROJECT FUNDING: $619,000.00
Attachments:
• Exhibit "N'— Project Location Map
• Exhibit "B" — Bid Summary
S: WgendaMemosCC2014 \02- 11- 2014\SS488C Firestone BI Imp Proj (Electrical) (Award)
Mayor and Members of the City Council
Cash Contract No. S.S. 488C — Firestone Boulevard Improvement Project
(Electrical and Street Lighting System Improvements)
February 11, 2014
Page 4
Project Location Map
ay?i
Y
f;�[Y
iks,
j,
h
N.T.S
CITY OF DOWNEY I
DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION
PROJECT: CASH CONTRACT NO. S.S. 488C
FIRESTONE BOULEVARD IMPROVEMENT PROJECT
(ELECTRICAL SYSTEM IMPROVEMENTS)
LIMITS: OLD RIVER SCHOOL ROAD TO BROOKSHIRE AVENUE
Exhibit "A"
Mayor and Members of the City Council
Cash Contract No. S.S. 488C — Firestone Boulevard Improvement Project
(Electrical and Street Lighting System Improvements)
February 11, 2014
Page 5
Bid Summary
January 23, 2014
ttem
Descdp5on
Qty.
Unit
Caldomia ProtesUOnal
£g inew Inc.
Pm Tech En newnt; Cory.
Steny and Company, Ina
Und Prke Am inl
Unit Price
Amaud
Unit Price
Amoud
BASE BID
$ 338288.88
New West Signal, Inc.
$ 369,639.00
JFL Elechc, Inc
1
emove ita etl-ltlhtfte, wntnase, FoOng Was. Full
Boxes and Abandon ExistngCondut In Place
31
EA
$ 890.00
$ 1 &600.00 '.
$ 950.00
$ 29,450.00
$ 62&00
$ 19,220.00
2
Remove Existing Elecbkal SeM" CaGnot
2
EA
$ 25000
$ 509.00
$ 300.00
$ 800.00
$ 500.00
$ 1,000.00
3
Furnish and Instal AS Put Box
72
EA
$ 32500
$ 23,400.00
$ 300.00
$ 21.W0.00
$ 42 &00
$ 30,8]0.00
4
Ranish and lnstalA6 Put Box
11
EA
$ 37590
$ 4,125.00
$ 35000
$ 3,850.00
$ 440.00
$ 4,840.00
5
Frnish and Install V PVC(Ult 40) Conduit In Paiwy
750
LF
$ 1200
$ 9,000.00
$ 10.00
$ 7,500.00
$ 13.45
$ 10,087.50
6
Funish and Instal l h' PVC (Sick 40) CondtAinPa*AW
3,900
LF
$ 1300
$ 50,700.09 `..
$ 1200
$ 46,830.00
$ 7.15
$ 27,885.00
7
Frnish and Instal 2' PVC(Sch 40) Conduit In Parhwy
550
LF
S 13,00
$ 7,150.00
$ 1400
$ 7,700.00
$ &15
$ 4,48250
8
Furdshand Install 3- PVC($CR 40) Conduit n PakMy
300
LF
$ 1 11,00
$ 5,400.00 f
$ 1 &00
$ 4,830.00
$ ISIS
$ 4,695.00
9
Fuash and Install 7 PV c u4m Street by
BoriV la0ing NCOrods
700
LF
$ 21.00
$ 14,70100
$ 1 &00
$ 12,600.00
$ 045
$ 34,615.00
10
Fuo'sh and Instal#12Cmrdmba
41,800
LF
$ 035
$ 14,630.00 2.
$ 1.00
$ 41,800.00
$ 0.50
$ 20,900.00
11
FunBh and lnslalMlD Conductors
2,200
LF
$ 040
$ 88000
$ 1.25
$ 2,750.00
$ 0.75
$ 1,650.00
12
rt W umi a Slreeland Pedestrian om mtion
Pdes and LED Wm(nares, Indudng Footing
62
EA
$ 1,450.00
$ 1,250.00
$ 65,000.00
$ 1,96000
$ 101,920.00
13
Funish and Install Type 1143F Sake Cabneland Foundation
2
EA
$ 2,900.00
L75,4OO.00
$ 2,500.00
$ 5,000.00
$ 3,200.00
$ 6,400.00
14
Funlsh and Install Type Of CF SerAce Cabotet ad Foudalion
2
EA
$ 4,60000
.
$ 3,500.00
$ 7,000.00
$ 4,500.00
$ 9,000.00
15
Flvnish and Instal OR PoxerReceptale
30
EA
$ 250.00
$ 50.00
$ 1,500.00
$ 390.00
$ 11,700.00
'. TOTAL BASE BID —Items l to 15
5246,985.00
$257,95000
;$288,99$.00
ALL BIDS RECEIVED:
CONTRACTOR
TOTAL
Cdikma Professional Engineering. Im.
$ 248,985.00
Pro Tech Engineering Corp.
$ 257,950.00
Sleiny and Company, Inc.
$ 288995.W
New WWSgna, Inc.
$ 300,720.00
Select Elttbic, Im.
$ 338288.88
New West Signal, Inc.
$ 369,639.00
JFL Elechc, Inc
$ 449,288.80
Exhibit "B"