HomeMy WebLinkAbout3. PLN-13-00171 - 10040 Imperial
STAFF REPORT
PLANNING DIVISION
CITY OF DOWNEY, CALIFORNIA
DATE: SEPTEMBER 18, 2013
TO: PLANNING COMMISSION
FROM: BRIAN SAEKI, DIRECTOR OF COMMUNITY DEVELOPMENT
KEVIN NGUYEN, ASSISTANT PLANNER
SUBJECT: PLN-13-00171 (CONDITIONAL USE PERMIT) – A REQUEST BY AT&T
MOBILITY TO INSTALL A WIRELESS COMMUNICATION FACILITY WITHIN AN
EXISTING 150-FOOT TALL SOUTHERN CALIFORNIA EDISON HIGH TENSION
TOWER, ON PROPERTY LOCATED ZONED R-1 (SINGLE-FAMILY
RESIDENTIAL).
LOCATION: 10040 IMPERIAL HIGHWAY (AIN 6283-024-801)
ZONING: R-1 (SINGLE-FAMILY RESIDENTIAL)
REPORT SUMMARY
The proposed Land Use Permit Application (PLN-13-00171) is a request from AT&T Mobility
seeking for approval of a conditional use permit to allow the installation of six panel antennas and a
two-foot diameter microwave dish antenna on an existing 150-foot tall Southern California Edison
high tension tower.
Based on the analysis contained within this report, staff feels that all required findings to
approve the conditional use permit can be made in a positive manner. As such, staff is
recommending the Planning Commission adopt the following titled resolution:
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DOWNEY
APPROVING PLN-10-08031 (CONDITIONAL USE PERMIT), A REQUEST BY
AT&T MOBILITY TO INSTALL SIX (6) PANEL ANTENNAS AND A TWO-FOOT
DIAMETER MICROWAVE DISH ANTENNA ON AN EXISTING 150-FOOT TALL
SOUTHERN CALIFORNIA EDISON HIGH TENSION TOWER. ADDITIONALLY,
AT&T IS PROPOSING A 228 SQ. FT. EQUIPMENT SHELTER AT THE BASE OF
THE TOWER, ON PROPERTY LOCATED AT 10040 IMPERIAL HIGHWAY,
ZONED R-1 (SINGLE-FAMILY RESIDENTIAL).
BACKGROUND
The subject site is a 151,887 square foot (3.44 acres) parcel that is located on the south side of
Imperial Highway, between Woodruff Avenue and the San Gabriel River. The site is improved
with several Southern California Edison high tension towers. It is zoned R1-5,000 (Single-Family
Residential) with a General Plan Land Use Designation of Open Space.
Conditional Use Permit (PLN-13-00171) – 10040 Imperial Hwy
September 18, 2013 - Page 2
On July 31, 2013, a representative for AT&T Mobility, Jerry Ambrose, submitted a Land Use Permit
Application for PLN-13-00171 (Conditional Use Permit). Staff completed a review of the application
on August 26, 2013, and deemed the application complete. On September 5, 2013, notice of the
pending public hearing was sent to all property owners within 500’ of the subject site and the notice
was published in the Downey Patriot.
DISCUSSION/ANALYSIS
The applicant is proposing to install six (6) antennas and one (1) microwave dish antennas to
the existing 150-foot high Edison tower. The proposed height of the panel antenna is 60 feet
above grade and the microwave dish antenna is at 48 feet. In addition, a new 228 square feet
equipment shelter will be constructed at the base of the tower. The height of all antennas will
not exceed the height of the existing Edison tower structure (see elevation sheets).
Section 9426 of the Downey Municipal Code (DMC) regulates the standards for all wireless
communications facilities. Subsection 9426.04(b)(10)(ii) states:
“Antennas that are collocated onto an existing standalone/tower facility, or on the
side of a building, may be permitted at any height, provided the height of the
standalone/tower or existing building is not increased and the antennas do not
exceed the existing height of the standalone/tower facility or building”.
Staff finds that measured at a height of 60 feet above ground, the new antennas will not be easily
noticed by the public. Staff believes that stealthing the antennas and the Edison high tension tower
is unrealistic because of the scale of the tower. However, staff feels the tower’s aesthetic impact
can be mitigated to an extent by painting all wireless antennas, dish antennas, and equipment
shelter to a color that matches the existing California Edison high tension tower. Furthermore, this
proposal is consistent with what other wireless companies have done to install antennas at the
sites similar to the subject property.
ENVIRONMENTAL ANALYSIS
Staff has reviewed the proposed expansion of use for compliance with California Environmental
Quality Act (CEQA). Upon completion of this review, it has been determined that this request is
categorically exempt from CEQA, pursuant to Guideline Section No. 15301 (Class 1, Existing
Facilities). Categorical Exemptions are projects, which have been determined not to have a
significant effect on the environment and have been exempted from the requirements of the
California Environmental Quality Act. Class 1, includes minor expansion of uses including this
request. It is staff’s opinion the installation of the proposed wireless antenna panels to the
existing structure will not have a significant effect on the environment; thereby qualifying for the
Class 1 exemption.
FINDINGS
Pursuant to Municipal Code Section 9824.06, there are four (4) findings that must be adopted prior
to the Planning Commission approving PLN-13-00171. A discussion of the findings follows:
A. The requested Conditional Use Permit will not adversely affect the purpose and
intent of this chapter or the City’s General Plan or the public convenience or
general welfare of persons residing or working in the neighborhood thereof.
Conditional Use Permit (PLN-13-00171) – 10040 Imperial Hwy
September 18, 2013 - Page 3
General Plan Policy No. 2.7.1 states that the City should “Provide adequate utility and
communications infrastructure.” Approving this project will help achieve this policy by
increasing the capacity of the existing communications network.
B. The requested use will not adversely affect the adjoining land uses and the growth
and development of the area in which it is proposed to be located.
The subject site is improved with several Southern California Edison high tension
towers. It is zoned R1-5,000 (Single-Family Residential) with multiple-family residential
land uses to the west and similarly zoned properties with Edison towers to the north and
south. Installation of the antenna panels will not prevent surrounding properties from
further being developed. Moreover, in order to mitigate aesthetic impacts on
surrounding properties, all new antennas will be painted to match existing Edison high
tension tower structure.
C. The size and shape of the site proposed for the use is adequate to allow the full
development of the proposed use in a manner not detrimental to the particular
area.
The subject site is a narrow, deep shaped lot that is improved with Edison high tension
towers and open space area. The proposed project will be located within the existing
150-foot high tower structure. The location of the antennas, and all related equipment,
will not interfere with the use of the property. Thus, the site has sufficient shape and
size to accommodate the proposed project.
D. The traffic generated by the proposed use will not impose an undue burden upon
the streets and highways in the area.
The proposed project is an unmanned wireless communications facility, which typically only
requires a single site visit once a month for maintenance. The adjoining street (Imperial
Highway frontage) has sufficient capacity to absorb any additional traffic the requested use
may create.
CORRESPONDENCE
As of the date that this report was printed, staff has not received any correspondence regarding
this matter.
CONCLUSION
Based on the analysis contained within this report, staff is recommending that the Planning
Commission adopt a resolution to approve PLN-13-00171 (Conditional Use Permit), thereby
allowing the installation and operation of a wireless communication facility (AT&T Mobility) on an
existing 150-foot tall Southern California Edison high tension tower, subject to the conditions of
approval.
Conditional Use Permit (PLN-13-00171) – 10040 Imperial Hwy
September 18, 2013 - Page 4
Exhibits
Location
Aerial Photograph
Subject Site
Conditional Use Permit (PLN-13-00171) – 10040 Imperial Hwy
September 18, 2013 - Page 5
500’ Radius Map
Zoning Map
City of
Norwalk
RESOLUTION NO. 13-_____
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DOWNEY
APPROVING PLN-10-08031 (CONDITIONAL USE PERMIT), A REQUEST BY AT&T
MOBILITY TO INSTALL SIX (6) PANEL ANTENNAS AND A TWO-FOOT DIAMETER
MICROWAVE DISH ANTENNA ON AN EXISTING 150-FOOT TALL SOUTHERN
CALIFORNIA EDISON HIGH TENSION TOWER. ADDITIONALLY, AT&T MOBILITY
IS PROPOSING A 228 SQ. FT. EQUIPMENT SHELTER AT THE BASE OF THE
TOWER, ON PROPERTY LOCATED AT 10040 IMPERIAL HIGHWAY, ZONED R-1
(SINGLE-FAMILY RESIDENTIAL).
THE PLANNING COMMISSION OF THE CITY OF DOWNEY DOES RESOLVE AS FOLLOWS:
SECTION 1. The Planning Commission of the City of Downey does hereby find,
determine and declare that:
A. An application was filed by Jerry Ambrose (hereinafter "applicant") requesting
approval of a PLN-13-00171 (Conditional Use Permit), to install six (6) wireless
panel antennas and a two-foot diameter microwave dish antenna at a height of
60 feet to the existing 150-foot high Southern California Edison high tension
tower on property at 10040 Imperial Hwy, and zoned R-1 (Single-Family
Residential) (hereinafter “subject property”) (Assessor Identification No. 6283-
024-801); and,
B. On September 5, 2013, notice of the pending public hearing was sent to all
property owners within 500’ of the subject site and the notice was published in
the Downey Patriot; and,
C. The Planning Commission held a duly noticed public hearing on September 18,
2013 and, after fully considering all oral and written testimony and facts and
opinions offered at the aforesaid public hearing, adopted Resolution No. 13- ,
subject to conditions of approval (Exhibit A).
SECTION 2. The Planning Commission further finds, determines and declares the
environmental impact of the proposed development has been reviewed and has been found to
be in compliance with the California Environmental Quality Act (CEQA) and is categorically
exempt from CEQA, pursuant to Guideline Section No. 15301 (Class 1, Existing Facilities).
SECTION 3. Having considered all of the oral and written evidence presented to it at
said public hearings, the Planning Commission further finds, determines and declares that:
A. The requested conditional use permit will not adversely affect the purpose
and intent of this chapter or the City’s General Plan or the public
convenience or general welfare of persons residing or working in the
neighborhood thereof. General Plan Policy No. 2.7.1 states that the City
should “Provide adequate utility and communications infrastructure.” Approving
this project will help achieve this policy by increasing the capacity of the existing
communications network.
B. The requested use will not adversely affect the adjoining land uses and the
growth and development of the area in which it is proposed to be located.
The subject site is improved with several Southern California Edison high tension
Resolution No. 13-_____
Downey Planning Commission
PLN-13-00171 (CUP) – 10040 Imperial Hwy
September 18, 2013 - Page 2
towers. It is zoned R1-5,000 (Single-Family Residential) with multiple-family
residential land uses to the west and similarly zoned properties with Edison
towers to the north and south. Installation of the antenna panels will not prevent
surrounding properties from further being developed. Moreover, in order to
mitigate aesthetic impacts on surrounding properties, all new antennas will be
painted to match existing Edison high tension tower structure.
C. The size and shape of the subject property proposed for the use is
adequate to allow the full development of the proposed use in a manner not
detrimental to the particular area. The subject site is a narrow, deep shaped
lot that is improved with Edison high tension towers and open space area. The
proposed project will be located within the existing 150-foot high tower structure.
The location of the antennas, and all related equipment, will not interfere with the
use of the property. Thus, the site has sufficient shape and size to accommodate
the proposed project.
D. The traffic generated by the proposed use will not impose an undue burden
upon the streets and highways in the area. The proposed project is an
unmanned wireless communications facility, which typically only requires a single
site visit once a month for maintenance. The adjoining street (Imperial Highway
frontage) has sufficient capacity to absorb any additional traffic the requested use
may create.
SECTION 4. Based upon the findings set forth in Sections 1 through 3 of this
Resolution, the Planning Commission of the City of Downey hereby approves PLN-13-00171
(Conditional Use Permit), subject to conditions of approval attached hereto as Exhibit A, which
are necessary to preserve the health, safety and general welfare of the community and enable
the Planning Commission to make the findings set forth in the previous sections. The
conditions are fair and reasonable for the accomplishment of these purposes.
SECTION 5. The Secretary shall certify the adoption of this Resolution.
PASSED, APPROVED AND ADOPTED this 18th day of September, 2013.
Louis Morales, Chairman
City Planning Commission
I HEREBY CERTIFY that the foregoing is a true copy of a Resolution adopted by the
Planning Commission of the City of Downey at a regular meeting thereof, held on the 18th day of
September, 2013, by the following vote, to wit:
AYES: COMMISSIONERS:
NOES: COMMISSIONERS:
Mary Cavanagh, Secretary
City Planning Commission
Resolution No. 13-_____
Downey Planning Commission
PLN-13-00171 (CUP) – 10040 Imperial Hwy
September 18, 2013 - Page 3
PLN-13-00171
(CONDITIONAL USE PERMIT)
EXHIBIT A – CONDITIONS OF APPROVAL
PLANNING
1) The approval of PLN-13-00171 (CUP) permits AT&T Mobility to install six (6) panel
antennas at a height of 60 feet and a two-foot diameter microwave dish antenna at a
height of 48 feet, on an existing 150-foot high California Edison high tension tower.
Additionally, the approval includes a 228 square feet equipment shelter at the base of
the tower, all located at 10040 Imperial Highway, as shown on the approved site plan
and elevations. Any deviations or exceptions from said site plan, other than those
authorized by this resolution or those that do not impact other conditions, shall not be
permitted without the approval by the Downey Planning Commission.
2) All proposed wireless panel antennas, microwave dish antenna, and equipment shelter
shall be painted to match the existing California Edison high tension tower.
3) All panel antennas and microwave dish antenna shall not extend above the Edison tower
structure.
4) Approval of this PLN-13-00171 (Conditional Use Permit) shall not be construed to mean
any waiver of applicable and appropriate zoning regulations, or any Federal, State,
County, and City laws and regulations. Unless otherwise expressly specified, all other
requirements of the City of Downey Municipal Code shall apply.
5) The City Planner is authorized to make minor modifications to the approved preliminary
plans or any of the conditions if such modifications shall achieve substantially the same
results as would strict compliance with said plans and conditions.
6) All conditions of PLN-13-00171 (Conditional Use Permit) shall be complied with before
this conditional use permit becomes valid.
7) The owner/applicant shall incorporate a copy of this Resolution No. 13- (including
Exhibit A – Conditions), into the approved set of building plans.
8) The Owner/Applicant agrees, as a condition of approval of this resolution, to indemnify,
defend and hold harmless, at Applicant's expense, City and City's agents, officers and
employees from and against any claim, action or proceeding commenced within the time
period provided in Government Code Section 66499.37 to attack, review, set aside, void
or annul the approval of this resolution, to challenge the determination made by City
under the California Environmental Quality Act or to challenge the reasonableness,
legality or validity of any condition attached hereto. City shall promptly notify Applicant of
any such claim, action or proceeding to which City receives notice, and City will
cooperate fully with Applicant in the defense thereof. Applicant shall reimburse the City
for any court costs and attorney's fees that the City may be required to pay as a result of
any such claim, action or proceeding. City may, in its sole discretion, participate in the
defense of any such claim, action or proceeding, but such participation shall not relieve
Applicant of the obligations of this condition.
Resolution No. 13-_____
Downey Planning Commission
PLN-13-00171 (CUP) – 10040 Imperial Hwy
September 18, 2013 - Page 4
PUBLIC WORKS/ENGINEERING
9) If applicable, the owner/applicant shall obtain all necessary plan approvals and permits
and shall be in conformance with the Standard Plans and Specification for Public Works
Construction and as modified by the City of Downey’s Standard Plans and
Specifications.
10) If applicable, the owner/applicant shall be required to complete a construction &
demolition (C&D) waste management plan per Article V, Chapter 8 of the Downey
Municipal Code.
11) The owner/applicant shall provide that all construction graffiti created as part of this
project in the public right of way to be removed.
FIRE
12) If applicable, the applicant/owner shall install a Knox® Rapid Entry System for the
project.
H:\Community Development\Nguyen\CASES\CUP\2013\10040 Imperial (ATT wireless)\13-00171 reso-approve.doc