HomeMy WebLinkAbout03. Cash Contract No. S.S. 628 Brookshire Ave Pavement RehabAPPROVED BY
CITY MANAGER
AGENDA MEMO
TO: Mayor and Members of the City Council
FROM: Office of the City Manager
By: John Oskoui, P.E., Director of Public Works
DATE: July 24, 2012
SUBJECT: CASH CONTRACT NO. S.S. 628
BROOKSHIRE AVENUE PAVEMENT REHABILITATION PROJECT -
APPROVE PLANS AND SPECIFICATIONS AND AUTHORIZE
SOLICITATION FOR BIDS
RECOMMENDATION:
That the City Council approve the plans and specifications and authorize solicitation for
bids for Cash Contract No. S.S. 628 — Brookshire Avenue Pavement Rehabilitation
Project.
BACKGROUND:
The City's Pavement Management Information System (PMIS) is the primary tool used
to prioritize street pavement rehabilitation projects throughout the City. Based on a
review of the PMIS, Brookshire Avenue is a Secondary Arterial street requiring
rehabilitation of its existing pavement, which has deteriorated to a state of disrepair that
cannot be handled through routine street maintenance (i.e. pothole patching, crack
sealing, and slurry sealing). Specifically, Brookshire Avenue has extensive longitudinal
and transverse cracking and numerous patches due to pavement repair and utility work.
Therefore, it is recommended that the existing pavement on Brookshire Avenue
between Imperial Highway and Davis Street undergo comprehensive rehabilitation to
bring it to an acceptable standard.
DISCUSSION:
The Engineering Division staff has completed preparation of the plans, specifications
and construction cost estimate for Cash Contract No. S.S. 628 — Brookshire Avenue
Pavement Rehabilitation Project, which is now ready for solicitation of construction bids.
This project consists of the rehabilitation of the existing pavement for the entire length of
the project with the exception of the segment between Boyne Street and Davis Street,
which will involve full pavement reconstruction. In addition, the project will include the
miscellaneous repair of concrete surfaces (i.e., curb and gutter, sidewalk, driveway
approaches, curb ramps), adjusting of manholes, valve covers and survey monuments
to grade and incidental replacement of traffic signal loop detectors, striping and
pavement markings. The work will also include potable water improvements such as
upgrades to fire hydrants as well as lateral and main service lines, meters, and
connections. The attached list of work items may be referenced for a detailed scope of
work. The project covers approximately 1.25 miles of roadway. The project limits are
shown on the attached project Location Map.
CITY OF DOWNEY, CALIFORNIA
Mayor and Members of the City Council
Cash Contract No. S.S. 628 — Brookshire Avenue Pavement Rehabilitation Project
July 24, 2012
Page 2
FINANCIAL IMPACT:
The projected total cost for Cash Contract No. S.S. 628 — Brookshire Avenue Pavement
Rehabilitation Project will be $2,320,000. This includes the cost of design, construction,
project administration, inspection, materials testing and contingencies. The design
phase of the project was funded through the FY 2011 -2012 Capital Improvement
Program. Current programming of this Project is $2,019,298 (Account No. 26- 16681)
consisting of $628,307 in Proposition C funds, $361,522 in Measure R funds, $47,900 in
CalRecycle grant funds and $981,569 in Gas Tax funds, and $220,000 (Account No.
51- 18674) from the Water Fund for a grand total of $2,239,298 in the FY 2012 -13
Capital Improvement Program. A detailed cost estimate will be presented at the time of
the award of the construction contract.
Attachments:
• Project Location Map
• Project Work Items List
S: IAgendaMemos1CC2012107- 241BrookshirePavemntRehab (Auth to Bid)
LA COUNTY
ICE COMPLEX
DOWNEY IfiLDls
w
PARK
HAPERIAL
N.T.S
CITY OF DOWNEY
DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION
PROJECT LOCATION MAP
PROJECT: CASH CONTRACT NO. S.S. 628
BROOKSHIRE AVENUE PAVEMENT REHABILITATION
UMITS: IMPERIAL HIGHWAY TO DAVIS STREET
item No
D escripti on
uanti
Unit
1
Construction Surveying
1
LS
2
Traffic Control
1
LS
3
Concrete (PCC) Removal
480
CY
4
Asphalt Pavement (AC) Removal
75
CY
5
Unclassified Excavation
55
CY
6
Cold Mill Existing AC Pavement 2" Uniform Depth
132,500
SF
7
Cold Mill Existing AC Pavement 4" to 2" Variable Depth
62,250
SF
8
Construct Asphalt Concrete Pavement
8,750
TON
9
Construct Ashpalt Rubberized Hot Mix (ARHM) Cap
4,850
TON
10
Pulverize and Cement Treat Existing Pavement
197,500
SF
11
Remove Excess Pulverized Material
4,300
CY
12
Construct Variable Height PCC Curb and Gutter (Type D -8)
1,750
LF
13
Construct Variable Height PCC Curb and Gutter (Type D -8
in Exist. Cross Gutter)
510
IF
14
Construct 4" Thick PCC Sidewalk
4,450
SF
15
Construct 4" PCC Curb Ramp with Det. Warning Surface
10,000
SF
16
Install 3'x4' Raised Truncated Dome Pattern Grey
Detectable Warning Surface
4
EA
17
Construct 6" Thick PCC Commercial Driveway
470
SF
18
Construct Partial PCC Driveway
50
SF
19
Construct 6" Thick PCC Alley Intersection with Integral
Curbs
550
SF
20
Construct 8" Thick PCC Cross Gutter
5,620
SF
21
Construct PCC Valley Gutter
6
LF
22
Construct PCC Local Depression
115
SF
23
Modify Existing Catch Basin Opening
1
EA
24
Remove and Install New #5 Pull Box
3
EA
25
Adjust Survey Monument Frame and Cover to Grade
4
EA
26
Adjust Manhole Frame and Cover to Grade
1 51
i EA
27
Adjust Valve Frame and Cover to Grade
20
EA
28
Traffic Signing
1
LS
29
Pavement Markings
2,910
SF
30
Traffic Striping
16,520
LF
31
Furnish and Install Traffic Signal Loop Detector
20
EA
32
Remove Existing and Install New 1" Potable Water Meter
Only
7
EA
CITY OF DOWNEY
Cash Contract No. S.S. 628
Brookshire Avenue Pavement Rehabilitation Project
List of Bid Items
H:1Pubworks\CAPIMPISS628 Brookshire Pvmt Rehab (Imp Hwy - Davis)ICouncillList of Bid Items for Council
Item No
Description
Quantity
Unit
33
Remove Existing and Install New 1" Potable Water Meter
and Box Only
15
EA
34
Remove /Abandon Existing and Install New 1" Potable
Water Service and Meter (Reuse Existing Box)
13
EA
35
Remove /Abandon Existing and Install New 1" Potable
Water Service, Meter, and Box
37
EA
36
Remove Existing and Install New 1 -1/2" Potable Water
Meter Only
1
EA
_
37
Remove Existing and Install New 1 -1/2" Potable Water
Meter and Box
10
EA
38
Remove /Abandon Existing and Install New 2" Potable
Water Service, 1 -1/2" Meter and Box
3
EA
39
Remove Existing and Install New 2" Potable Water Meter
Only
1
EA
40
Remove /Abandon Existing Service, Meter and Box from
Main
1
EA
41
Remove Existing Fire Hydrant Assembly
7
EA
42
Furnish and Install Fire Hydrant Assembly (James Jones
3700 -R)
5
EA
43
Furnish and Install Fire Hydrant Assembly (James Jones
3775 -R)
1
EA
44
Hot Tap Ex. 8" CI Water Main and Install Fire Hydrant
Assembly (James Jones 3700 -R)
1
EA
45
Remove Existing Fire Hydrant Riser and Furnish and Install
Fire Hydrant (James Jones 3700 -R)
3
EA
46
Remove Existing Fire Hydrant Riser and Furnish and Install
Fire Hydrant (James Jones 3775 -R)
3
EA
47
Water Improvements Near Station 30 +60. Cut and Remove
Existing 8" Main. Furnish and Install 8" 90- degree Elbow
and Plug Existing 8" Main.
1
IS
48
Water Improvements Near 32 +50. Cut and Remove
Existing 8" Main and Plug. Hot Tap Existing 8" Main and
Connect to Existing 8" Main with New 8" CL 52 DIP Main
and Fittings Shown on Plans.
1
LS
49
Water Improvements Near 36 +59. Cut and Remove
Existing 4" Main and Plug. Hot Tap Existing 8" Main and
Connect to Existing 8" Main with New 8" CL 52 DIP Main,
8 "X4" Reducer, 4" CL 52 DIP Main, and Other Fittings
Shown on Plans.
1
LS
H:IPubworks \CAPIMPISS628 Brookshire Pvmt Rehab (Imp Hwy - Davis)1CouncillList of Bid Items for Council