Loading...
HomeMy WebLinkAbout04. Cash Contract 661 Quill sewer main AGENDA MEMO DATE: April 22, 2008 TO: Mayor and Members of the City Council FROM: Office of the City Manager By: Brian Ragland, Director of Public Works SUBJECTCASH CONTRACT NO. 661 : QUILL DRIVE 8-INCH SEWER MAIN EXTENSION RECOMMENDATION: That the City Council approve plans and specifications and grant authority to advertise for bids for Cash Contract No. 661 – Quill Drive 8-inch Sewer Main Extension. DISCUSSION: The City presently owns and maintains a sewer lift station at the northwest corner of Old River School Road and Quill Drive which lifts sanitary sewage from the City’s sewer main to the adjacent trunk sewer in Old River School Road that is owned and maintained by the County Sanitation Districts of Los Angeles County (CSDLAC). The lift station was constructed in the 1950’s and has become increasingly difficult to maintain due to its age and availability of replacement parts. In addition, the lift station only receives sewage flows from the Velvet Green Apartments located at the southwest corner of the intersection. Lift station electrical power usage and maintenance requirements are very costly to the City. Therefore, in lieu of replacing the lift station at an estimated cost of $200,000, the City has coordinated with adjacent property owners, the Park Meadow Condominiums Homeowners Association and the Velvet Green Apartments, on an alternative solution. The proposed project involves re-routing the sanitary sewage from the Velvet Green Apartments to an onsite main currently owned and maintained by Park Meadow Condominiums at 7300-7340 Quill Dr. just west of Old River School Road. This will require the construction of 176 lineal feet (LF) of new 8-inch vitrified clay pipe (VCP) sewer main between existing manholes located at the southwest corner of Old River School Rd. and Quill Dr. and the driveway entrance to the Park Meadows Condominiums. In order to secure the use of the Park Meadow Condominiums Homeowners Association’s (HOA) sewer main, the City has met with the HOA and they have indicated that if the City will take over ownership and maintenance of their sewer main, they will allow for the connection to be made. The private sewer main has been video inspected and no obstructions or damage was observed. CITY OF DOWNEY, CALIFORNIA Mayor and Members of the City Council Cash Contract No. 661 Quill Drive 8-inch Sewer Main Extension April 22, 2008 Page 2 Plans and Specifications for the construction of the sewer improvements have been prepared and will be made available to all parties interested in bidding the project following authorization to advertise for bids by the City Council. Construction will commence upon award of the contract by City Council and subsequent routing of the contract for signatures. The contract is expected to be awarded in May with construction beginning in early June. The estimated time of construction is 20 working days. FINANCIAL IMPACT: The total estimated cost of this project including engineering, construction, inspection, administration, and contingencies is $65,000, which is included in the Fiscal Year 2007/2008 Capital Improvement Program Budget. A detailed project cost estimate and funding analysis will be included in the recommendation to the City Council for the award of the construction contract. S:\AgendaMemos2008\agenda042208\CCno661Quill