Loading...
HomeMy WebLinkAbout06. CC 680 Rio Hondo Golf Course Ltg AGENDA MEMO DATE: December 13, 2011 TO: Mayor and Members of the City Council FROM: Office of the City Manager By: John Oskoui, P.E., Director of Public Works SUBJECT:CASH CONTRACT NO. 680 – RIO HONDO GOLF COURSE LIGHTING PROJECT – APPROVE PLANS AND SPECIFICATIONS AND AUTHORIZE SOLICITATION FOR BIDS RECOMMENDATION That the City Council approve plans and specifications and authorize solicitation for bids for Cash Contract No. 680 – Rio Hondo Golf Course Lighting Project BACKGROUND On August 28, 2004, the new Rio Hondo Clubhouse was dedicated in a public ceremony. The Rio Hondo Clubhouse and Parking Lot Replacement project consisted of the construction of a new, 23,000 square foot, two-level clubhouse with a compact building footprint, landscaping and parking lot improvements. The clubhouse lower level included a 90-stall cart storage area, 900 square foot golf shop, and snack bar. The clubhouse upper level provided a 300 person banquet hall (divisible into three rooms), and 80-person restaurant/lounge and dining area, a spacious terrace outside the banquet area for outdoor events, an outdoor viewing porch next to the bar, administration offices, formal lobby, brides room, executive dining room, and full service commercial kitchen. The parking lots were completely reconstructed to provide 276 parking stalls with shade trees, a vehicular drop-off area at the front entry featuring a prominent fountain, and parking lot lighting. DISCUSSION Scheduled events at the Rio Hondo Golf Course and Clubhouse continue to thrive due to the variety of services and accommodations offered. The clubhouse upper level has impressive views of the golf course from banquet halls and bar/dining areas. However, since many events at the facility are scheduled at night, these views are not enjoyed. It was recommended that the impressive views of the golf course be enhanced with outdoor lighting that accentuates some of the fairway trees for the night-time patrons and guests. The Engineering Division staff has consulted with an outdoor lighting consultant and a lighting design was prepared to illuminate certain tree groupings along both sides of the fairway directly west of Rio Hondo Golf Clubhouse. Staff has also completed the preparation of plans, specifications and construction cost estimate and the project is now ready for solicitation of construction bids. CITY OF DOWNEY, CALIFORNIA Mayor and Members of the City Council Cash Contract No. 680 – Rio Hondo Golf Course Lighting Project December 13, 2011 Page 2 This project consists of installation of a new electrical enclosure with a transformer, disconnect switch and time-clock; new electrical conduits and wiring; fifteen (15) new 150 watt spot light and flood light fixtures; and all necessary related work. FINANCIAL IMPACT Based on the construction cost estimate, the total cost for the Rio Hondo Golf Course Tree Lighting Project will be $55,000.00, which includes a ten percent (10%) construction cost contingency. Project funding will be appropriated from the Golf Course fund under Account No. 52-4-4420. A detailed funding summary for the project will be presented at the time of the contract award. Attachment: Project Location Map S:\AgendaMemosCC2011\12-13-11\CC680 RHGC Tree Ltg (Auth to Bid) Ý×ÌÇÑÚÜÑÉÒÛÇ ÜÛÐßÎÌÓÛÒÌÑÚÐËÞÔ×ÝÉÑÎÕÍÛÒÙ×ÒÛÛÎ×ÒÙÜ×Ê×Í×ÑÒ ÔÑÝßÌ×ÑÒÓßÐ ÝßÍØÝÑÒÌÎßÝÌÒÑòêèðÎ×ÑØÑÒÜÑÙÑÔÚÝÑËÎÍÛ Ô×ÙØÌ×ÒÙÐÎÑÖÛÝÌ